A UAV control method and system for a mobile command vehicle
Through the coordinated control of mobile command vehicles and multiple drones, three-dimensional models are generated using infrared, ultraviolet thermal imagers and airborne radars, and the order of acquisition equipment and transmission strategies are optimized, which solves the communication between drones during high-voltage power line inspection. The problem of obstacles improves patrol efficiency and fault positioning capabilities, and ensures the safety of the power system.
Patent Information
- Application Number
- CN202210665025.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-14
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-06-14
AI Technical Summary
During the inspection of high-voltage power line, existing drones have shortened communication distances, reduced operating ranges, and inefficient efficiency. They cannot effectively monitor long-distance high-voltage power lines.
Using mobile command vehicles as the ground control center, it communicates with two types of drones (first patrol drone and second patrol drone), and collects data through infrared thermal imaging cameras, ultraviolet thermal imaging cameras and airborne radars. , generate three-dimensional models, optimize the usage order of the acquisition equipment, and automatically adjust the acquisition and transmission strategies based on the drone's battery life and communication status to ensure the real-time and accuracy of data transmission.
It improves the battery life and operating efficiency of drones during high-voltage power line inspection, enhances the rapid positioning and emergency handling of power line failures, reduces data transmission time, and improves the safety and reliability of the power system.
Smart Images

Figure CN114915031B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power monitoring, and in particular to a method and system for controlling an unmanned aerial vehicle of a mobile command vehicle. Background Art
[0002] In the daily maintenance of high-voltage power lines, it is necessary to conduct temperature and daily monitoring of power lines. Since high-voltage lines are generally long and have large spans, and most of them are distributed in complex areas such as mountains and hills with complex terrain, 500kV and above transmission lines have become the main power transmission of local networks, and the mileage of transmission lines is growing rapidly at a stable rate every year. These high-voltage power lines cover a very wide area, and a considerable part of them are located in economically underdeveloped areas with complex terrain and harsh environment. They are always facing the risk of external damage. At the same time, lightning strikes, wind and sand, and ice and snow weather also seriously threaten the safety of power transmission and seriously affect the safe operation of the power system. Based on this, it is very necessary to organize regular inspections of the power grid.
[0003] Power inspection refers to the timely and accurate inspection of the operating status of power lines and auxiliary equipment, as well as the surrounding environment of power line corridors. Through investigation, fault points and potential hidden dangers that endanger power safety are discovered and effectively eliminated to ensure the safe and reliable operation of transmission lines. At present, the inspection of overhead lines is mainly manual. Inspectors use auxiliary equipment to conduct close inspections of power facilities. Manual inspections require inspectors to climb towers, which poses a great threat to personal safety.
[0004] The monitoring scheme of the prior art is to inspect the power transmission system through drones. The infrared temperature data of the line is measured by the infrared probe set on the drone. The drone platform also serves as a platform for ground communication with the drone, thereby ensuring the normal and stable operation of the line. However, since most high-voltage lines are set in mountainous and hilly areas, the terrain is undulating. There are not only many peaks, but also no roads between the peaks. When the drone is patrolling the line, the flight altitude of the drone fluctuates according to the height of the line, which can achieve rapid patrol. Since the drone and the ground communication adopt radio protocol transmission, under normal line-of-sight conditions of radio transmission, due to the wavelength characteristics of radio, the radio diffraction ability is poor. If there are obstacles in the middle, there will be different degrees of attenuation according to the nature of the obstacles. If it is a tall building or a mountain, and the unmanned aircraft platform vehicle cannot enter the valley at the same time, the communication distance may be reduced to only a very short distance. The drone patrol is a large-scale operation. If it is restricted by radio transmission, its operating range will be greatly reduced, resulting in poor adaptability and low efficiency, and the original advantages of drone patrol will be lost. Summary of the invention
[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention discloses a method for controlling a UAV of a mobile command vehicle, wherein the mobile command vehicle acts as a ground control center to communicate with the patrol UAV, comprising the following steps:
[0006] Step 1, the mobile command vehicle releases the drone to patrol the line according to the line to be patrolled, the drone includes a first patrol drone and a second patrol drone, the drone collects data by mounting different types of data acquisition equipment, the different types of data acquisition equipment in the second patrol drone include infrared thermal imagers, ultraviolet thermal imagers and airborne radars, due to the high energy consumption of airborne radars, the turning on state will cause the working life of the drone to be reduced, wherein the airborne radar is in a normally closed state, and the infrared thermal imager finds the heating fault point on the patrol line through abnormal temperature changes;
[0007] Step 2: After determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar based on the current cruise data of the second patrol drone.
[0008] Step 3, when it is determined that the insulation state is in the second preset state, the airborne radar is directly turned on to perform real-time modeling and analysis on the relative position of the conductors of the transmission line and the channel corridor, and the current position point and possible landing position point of the drone are marked on the generated model, wherein the airborne radar collects point cloud data of the power channel corridor of the transmission line and the surrounding ground environment, monitors the safe distance between the power line channel corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power channel corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone;
[0009] Step 4: After receiving the three-dimensional model data and the drone landing data generated in step 3, the mobile command vehicle obtains the sag state of the power line near the fault point through data analysis and software simulation.
[0010] Furthermore, the inspection priority of the inspection route is set, and for the infrared thermal imager, priority is given to collecting thermal images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line.
[0011] Furthermore, before the second patrol drone is launched, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
[0012] Furthermore, the analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and rusted hardware by using a high-definition camera.
[0013] Furthermore, ultraviolet video information of equipment in the transmission line is collected by an ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
[0014] The present invention further discloses a UAV control system of a mobile command vehicle, wherein the mobile command vehicle serves as a ground control center to communicate with the patrol UAV, and comprises the following modules:
[0015] A drone launching module, wherein the mobile command vehicle launches the drone to patrol the line according to the line to be patrolled, wherein the drone includes a first patrol drone and a second patrol drone, wherein the drone collects data by mounting different types of data acquisition equipment, wherein the different types of data acquisition equipment in the second patrol drone include an infrared thermal imager, an ultraviolet thermal imager and an airborne radar, and since the airborne radar has high energy consumption, the working life of the drone will be reduced when it is turned on, wherein the airborne radar is in a normally closed state, and the infrared thermal imager detects heating fault points on the patrol line through abnormal temperature changes;
[0016] The fault point analysis module, after determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar according to the current cruise data of the second patrol drone;
[0017] The emergency response module directly turns on the airborne radar when it is determined that the insulation state is in the second preset state, performs real-time modeling and analysis on the relative positions of the conductors and the corridors of the power transmission line, and marks the current position of the drone and the possible landing position on the generated model. The airborne radar collects point cloud data of the power corridor of the power transmission line and the surrounding terrain environment, monitors the safe distance between the power corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone;
[0018] Data analysis module: After the mobile command vehicle receives the generated 3D model data and drone landing data, it obtains the sag status of the power lines near the fault point through data analysis and software simulation.
[0019] Furthermore, the inspection priority of the inspection route is set, and for the infrared thermal imager, priority is given to collecting thermal images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line.
[0020] Furthermore, before the second patrol drone is launched, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
[0021] Furthermore, the analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and rusted hardware by using a high-definition camera.
[0022] Furthermore, ultraviolet video information of equipment in the transmission line is collected by an ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
[0023] Compared with the prior art, the present invention has the following beneficial effects: the types of drones in the patrol vehicles in the prior art are all the same, and when performing long-distance patrol tasks, the power cannot be intelligently allocated to balance the endurance of the work tasks, and particularly important fault points cannot be discovered in time due to insufficient power. First, the present invention performs power line patrols by setting two types of drones with multiple different acquisition devices, setting a priority patrol order, and deciding whether to sacrifice the return possibility of the drone according to the endurance of the drone and the urgency of the discovery event. The present invention optimizes the acquisition order of multiple acquisition devices, quickly locates the problem point and increases the endurance. Secondly, due to signal shielding and other problems in the drone working scene, the communication signal is intermittent, and the drone automatically determines whether wireless transmission is required according to the communication status. Finally, the drone of the present invention has a real-time calculation function. In the case of insufficient power or the need to turn on a power-consuming acquisition device, the settlement result is directly sent to the mobile command vehicle through real-time calculation, which reduces the data transmission time, increases the emergency fault processing time and the possibility of drone recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention can be further understood from the following description in conjunction with the accompanying drawings. The components in the figures are not necessarily drawn to scale, but the emphasis is placed on illustrating the principles of the embodiments. In the figures, the same reference numerals designate corresponding parts in different views.
[0025] Figure 1 It is a flow chart of a method for controlling a drone of a mobile command vehicle in one embodiment of the present invention.
[0026] Figure 2 It is a structural block diagram of a mobile command vehicle in one embodiment of the present invention. DETAILED DESCRIPTION
[0027] Embodiment 1
[0028] like Figure 1 As shown, this embodiment provides a method for controlling a UAV by a mobile command vehicle, wherein the mobile command vehicle acts as a ground control center to communicate with the patrol UAV, including the following steps:
[0029] Step 1, the mobile command vehicle releases the drone to patrol the line according to the line to be patrolled, the drone includes a first patrol drone and a second patrol drone, the drone collects data by mounting different types of data acquisition equipment, the different types of data acquisition equipment in the second patrol drone include infrared thermal imagers, ultraviolet thermal imagers and airborne radars, due to the high energy consumption of airborne radars, the turning on state will cause the working life of the drone to be reduced, wherein the airborne radar is in a normally closed state, and the infrared thermal imager finds the heating fault point on the patrol line through abnormal temperature changes;
[0030] Step 2: After determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar based on the current cruise data of the second patrol drone.
[0031] Step 3, when it is determined that the insulation state is in the second preset state, the airborne radar is directly turned on to perform real-time modeling and analysis on the relative position of the conductors of the transmission line and the channel corridor, and the current position point and possible landing position point of the drone are marked on the generated model, wherein the airborne radar collects point cloud data of the power channel corridor of the transmission line and the surrounding ground environment, monitors the safe distance between the power line channel corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power channel corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone;
[0032] Step 4: After receiving the three-dimensional model data and the drone landing data generated in step 4, the mobile command vehicle obtains the sag state of the power line near the fault point through data analysis and software simulation.
[0033] Furthermore, the inspection priority of the inspection route is set, and for the infrared thermal imager, priority is given to collecting thermal images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line.
[0034] Furthermore, before the second patrol drone is launched, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
[0035] Furthermore, the analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and rusted hardware by using a high-definition camera.
[0036] Furthermore, ultraviolet video information of equipment in the transmission line is collected by an ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
[0037] The present invention further discloses a UAV control system of a mobile command vehicle, wherein the mobile command vehicle serves as a ground control center to communicate with the patrol UAV, and comprises the following modules:
[0038] A drone launching module, wherein the mobile command vehicle launches the drone to patrol the line according to the line to be patrolled, wherein the drone includes a first patrol drone and a second patrol drone, wherein the drone collects data by mounting different types of data acquisition equipment, wherein the different types of data acquisition equipment in the second patrol drone include an infrared thermal imager, an ultraviolet thermal imager and an airborne radar, and since the airborne radar has high energy consumption, the working life of the drone will be reduced when it is turned on, wherein the airborne radar is in a normally closed state, and the infrared thermal imager detects heating fault points on the patrol line through abnormal temperature changes;
[0039] The fault point analysis module, after determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar according to the current cruise data of the second patrol drone;
[0040] The emergency response module directly turns on the airborne radar when it is determined that the insulation state is in the second preset state, performs real-time modeling and analysis on the relative positions of the conductors and the corridors of the power transmission line, and marks the current position of the drone and the possible landing position on the generated model. The airborne radar collects point cloud data of the power corridor of the power transmission line and the surrounding terrain environment, monitors the safe distance between the power corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone;
[0041] Data analysis module: After the mobile command vehicle receives the generated 3D model data and drone landing data, it obtains the sag status of the power lines near the fault point through data analysis and software simulation.
[0042] Furthermore, the inspection priority of the inspection route is set, and for the infrared thermal imager, priority is given to collecting thermal images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line.
[0043] Furthermore, before the second patrol drone is launched, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
[0044] Furthermore, the analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and rusted hardware by using a high-definition camera.
[0045] Furthermore, ultraviolet video information of equipment in the transmission line is collected by an ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
[0046] In this embodiment, if Figure 2 As shown, the unmanned command vehicle is equipped with a roof platform on the top of the vehicle, which is used to install a folding and lifting lighting camera system, an external speaker, an antenna and other equipment. A stainless steel guardrail is set around the roof platform, and a ladder is installed on the rear tailgate. The roof of the vehicle behind the cockpit needs to be modified with a skylight for installing an automatic lifting platform, which has a take-off and landing wheelbase greater than or equal to 400mm for a drone. The car is equipped with a one-button skylight, and the drone placed on the lifting platform can automatically rise to the roof of the vehicle in the car, and the drone can take off with one button through route planning.
[0047] According to the requirements of vehicle modification, comprehensive consideration should be given to many factors such as chassis suspension, vehicle weight distribution, equipment shock absorption, etc. to prevent overloading, unbalanced loading, etc. If the vehicle chassis needs to be reinforced, it should be reinforced in accordance with the modification requirements stipulated by the state.
[0048] The layout of the vehicle is divided into equipment storage area, driving area, data processing and operation area, and automatic lifting platform area for drones. The layout should be reasonable to facilitate personnel operation and equipment access. The equipment storage area can place ≥4 models with a wheelbase of 600mm, 1 model with a wheelbase of ≥850mm, and 1 model with a wheelbase of ≥1400mm, a total of 6 drones, and the placement space supports indefinite adjustment, and the space supports expandable functions. The driving area can use the factory settings without modification. The data processing and operation area is set up with a semi-partitioned cabinet wall in the back row of the driving area for the installation of devices greater than or equal to 4 10.1-inch and 1 19-inch display screens. An operating platform is set up in the middle of the cabinet, and no less than 3 movable seats are installed to facilitate the staff to operate the cabinet equipment. At the same time, 1 processor and 1 printer can be placed in this area to facilitate communication with the command center and data processing. The automatic lifting platform for drones is set above the operator. By opening the sunroof with one button, the drone placed on the lifting platform will be automatically lifted to the outside of the roof through the sunroof. The lifting platform can accommodate a drone with a wheelbase greater than or equal to 400mm.
[0049] In this embodiment, energy is supplied through a power supply system, wherein the power supply system is composed of a generator, UPS, additional batteries, a distribution box, a grounding system, a power supply lightning protection device, etc., to provide multiple power supplies for vehicle-mounted communications, electronics, lighting and other equipment, backing up each other, and maintaining uninterrupted power supply for vehicle-mounted equipment. Power supply is provided in two ways: generator power supply and mains power supply, so a mains power supply interface must be reserved.
[0050] When the conditions for external mains power are met, mains power supply should be used first. When there is no mains power, generator power supply should be used. The power distribution system can realize automatic conversion between power generation and mains power. When there is no mains power or generator power supply, UPS will supply power to the main equipment for no less than 20 minutes. The backup time requirements of the main equipment are met. The mobile lighting and the external horn are respectively powered by automatic switching of DC dual power supplies. When there is mains power input, the mains power is converted to DC power supply through the switching power supply. When there is no mains power input, the power is supplied by the original vehicle battery and the additional battery.
[0051] The design of the power supply system complies with the requirements of GB 50054-95 "Low Voltage Power Distribution Design Specification". The wiring in the vehicle is neat, reasonable, safe, reliable, and has an appropriate margin. The power lines are separated from AC and DC, strong current and weak current, and the power lines and various signal line ducts are separated to avoid electromagnetic interference and meet the design conditions of electromagnetic compatibility. The wiring heads and cable parts should be marked and correspond to the instructions. The markings are clear and easy to repair. The distribution box can realize automatic switching of power supply and reasonably distribute the power supply to each power system. The distribution box is equipped with an input power status display, which is convenient for operators to grasp the power supply status and system safety status in real time.
[0052] A surge protector is installed at each of the generator and mains power access points to prevent lightning and overvoltage from invading the AC power supply channel from damaging the communication vehicle equipment; and a 40A fuse or circuit breaker is connected in series before the surge protector to prevent power supply failure caused by a short circuit in the surge protector. The equipment grounding wire is a copper strip laid in the cabinet to achieve a reliable electrical connection with the grounding terminal. The wiring outside the vehicle is based on the basic principles of concealment, beauty, rainproof and sealing.
[0053] On this basis, a mobile communication command system is set up. The mobile communication command system is mainly composed of a mobile front-end system, a drone command system, a wireless transmission network and a video management platform. The system uses 4G / 5G multi-card aggregation equipment, WiFi wireless communication modules, GPS / Beidou dual-mode positioning, storage, alarm, battery and other modules to provide relevant networks at the disposal site, connect the mobile front-end system (drone or single soldier) to the video management platform of the on-site mobile command vehicle, and realize the aggregation, display, scheduling, transmission, storage and other applications of images, voice and data. Then, the vehicle-mounted audio and video transmission system is used to achieve linkage and coordinated command with the back-end command center. Combined with network security requirements, it is necessary to strengthen the prevention measures at all levels of the TCP / IP protocol and implement encryption technology at each level to ensure the security of the network.
[0054] A video communication management platform is deployed on the UAV command vehicle to access mobile front-end devices and realize the aggregation, display, scheduling, transmission, storage and other applications of images, voices and data sent back by the front end. The system supports matrix switching, audio and video encoding and decoding, centralized storage management, and real-time network preview of digital and analog videos, and has functions such as command video terminal and MCU. Through the network, network video encoding devices such as front-end soldiers and drones can be connected to the platform to realize real-time monitoring, two-way intercom, PTZ control, video storage and other functions; the system also has the access capability of video command terminals and can support ≥6-party video conferences; the aggregated network video and analog video can be transmitted to the display device for centralized display through the system.
[0055] A single-soldier system interface is reserved. When an emergency occurs and the vehicle cannot reach the designated location, the accident site inspectors or rescue personnel can carry a single-soldier image transmission terminal and use the 4G / 5G single-soldier encoder and related equipment to realize functions such as video command, two-way intercom, and position positioning.
[0056] The receiving and transmitting devices are planar array tracking antennas and homemade gimbals with flat tracking antennas. They can be raised and lowered randomly by 1 meter. The tracking gimbal automatically follows the flight direction of the aircraft to ensure uninterrupted control and communication transmission of the drone, and can realize automatic tracking of the drone antenna.
[0057] In addition, the camera is integrated on the high pole and the display device is configured in the vehicle. Before the drone takes off and lands, the facilities around the vehicle can be checked to prevent obstacles from affecting it. The drone’s take-off and landing posture can also be monitored in real time.
[0058] In this embodiment, the power supply system of the vehicle body is specifically as follows: the whole vehicle is equipped with a generator to generate electricity, which is charged by an inverter to two batteries. The two 12V batteries are connected in parallel to output a total 12VDC power, which is then used to power various 12V electrical devices through a voltage-stabilized power supply. In view of the strict power requirements of the server, a dedicated UPS is provided for the server, and the battery power output is then passed through the UPS to power the 220V devices in the whole vehicle.
[0059] The generator is a dual power generator, 3kW*2 / unit, efficiency, η=86%, actual total output power P=5.16kW, output 12VDC, providing power for the entire vehicle.
[0060] The UPS adopts a standard rack UPS system with network port output, which can be integrated into the power management system for unified control. It has real-time display of voltage and current, automatic power switching alarm, and 220VAC output or input prompt. At the same time, a 220VAC input waterproof aviation socket is left on the outside of the vehicle to realize external 220VAC input air energy to supply power to all equipment in the vehicle.
[0061] The power management system: the power supply of the whole vehicle is centrally managed, processed by an industrial computer, displayed on a touch screen, and equipped with standardized devices such as standard industrial contactors in the background to achieve integrated electrical operation of the whole vehicle. Each control is equipped with an independent circuit breaker to ensure that power-off protection does not interfere with each other, thereby improving system stability.
[0062] Provides a socket in the car, outputs 220VAC, for 220V devices in the car to draw power. It is located on the left and right sides below the control panel in the car.
[0063] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0064] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0065] Although the present invention has been described above with reference to various embodiments, it should be understood that many changes and modifications can be made without departing from the scope of the present invention. Therefore, it is intended that the above detailed description is considered to be illustrative rather than restrictive, and it should be understood that the following claims (including all equivalents) are intended to limit the spirit and scope of the present invention. The above embodiments should be understood to be only used to illustrate the present invention and not to limit the scope of protection of the present invention. After reading the content of the record of the present invention, the technician can make various changes or modifications to the present invention, and these equivalent changes and modifications also fall into the scope defined by the claims of the present invention.
Claims
1. A method for controlling a drone using a mobile command vehicle, wherein the mobile command vehicle acts as a ground control center to communicate with a patrol drone, characterized in that: The steps include: Step 1, the mobile command vehicle releases the drone to patrol the line according to the line to be patrolled, the drone includes a first patrol drone and a second patrol drone, the drone collects data by mounting different types of data acquisition equipment, the different types of data acquisition equipment in the second patrol drone include infrared thermal imagers, ultraviolet thermal imagers and airborne radars, due to the high energy consumption of airborne radars, the turning on state will cause the working life of the drone to be reduced, wherein the airborne radar is in a normally closed state, and the infrared thermal imager finds the heating fault point on the patrol line through abnormal temperature changes; Step 2: After determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar based on the current cruise data of the second patrol drone. Step 3, when it is determined that the insulation state is in the second preset state, the airborne radar is directly turned on to perform real-time modeling and analysis on the relative position of the conductors of the transmission line and the channel corridor, and the current position point and possible landing position point of the drone are marked on the generated model, wherein the airborne radar collects point cloud data of the power channel corridor of the transmission line and the surrounding ground environment, monitors the safe distance between the power line channel corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power channel corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone; Step 4: After receiving the three-dimensional model data and the drone landing data generated in step 3, the mobile command vehicle obtains the sag state of the power line near the fault point through data analysis and software simulation.
2. The method for controlling a drone of a mobile command vehicle according to claim 1, characterized in that: The inspection priority of the inspection route is set. For the infrared thermal imager, thermal imaging images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line are collected first.
3. The method for controlling a drone of a mobile command vehicle according to claim 2, characterized in that: Before launching the second patrol drone, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
4. The method for controlling a drone of a mobile command vehicle as claimed in claim 3, characterized in that: The analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and corroded hardware through a high-definition camera.
5. The method for controlling a drone of a mobile command vehicle according to claim 4, characterized in that: Ultraviolet video information of equipment in the transmission line is collected through the ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
6. A UAV control system for a mobile command vehicle, wherein the mobile command vehicle acts as a ground control center to communicate with patrol UAVs, characterized in that: Includes the following modules: A drone launching module, wherein the mobile command vehicle launches the drone to patrol the line according to the line to be patrolled, wherein the drone includes a first patrol drone and a second patrol drone, wherein the drone collects data by mounting different types of data acquisition equipment, wherein the different types of data acquisition equipment in the second patrol drone include an infrared thermal imager, an ultraviolet thermal imager and an airborne radar, and since the airborne radar has high energy consumption, the working life of the drone will be reduced when it is turned on, wherein the airborne radar is in a normally closed state, and the infrared thermal imager detects heating fault points on the patrol line through abnormal temperature changes; The fault point analysis module, after determining the heating fault point, the second patrol drone detects the insulation state of the device near the fault point through an ultraviolet thermal imager. When it is determined that the insulation state is in a first preset state, the second patrol drone sends an inquiry message to the mobile command vehicle, and the mobile command vehicle determines whether it is necessary to turn on the airborne radar according to the current cruise data of the second patrol drone; The emergency response module directly turns on the airborne radar when it is determined that the insulation state is in the second preset state, performs real-time modeling and analysis on the relative positions of the conductors and the corridors of the power transmission line, and marks the current position of the drone and the possible landing position on the generated model. The airborne radar collects point cloud data of the power corridor of the power transmission line and the surrounding terrain environment, monitors the safe distance between the power corridor and the ground tree barriers, vegetation and buildings to generate a three-dimensional model of the line and the power corridor, and calculates the appropriate landing position of the second inspection drone on the generated three-dimensional model according to the remaining power of the second inspection drone; Data analysis module: After the mobile command vehicle receives the generated 3D model data and drone landing data, it obtains the sag status of the power lines near the fault point through data analysis and software simulation.
7. The UAV control system of a mobile command vehicle as claimed in claim 6, characterized in that: The inspection priority of the inspection route is set. For the infrared thermal imager, thermal imaging images of the heating conditions of insulators, power cables, grading rings and metal power equipment in the transmission line are collected first.
8. The UAV control system of a mobile command vehicle as claimed in claim 7, characterized in that: Before launching the second patrol drone, the first patrol drone is launched. The data acquisition device of the first patrol drone is a high-definition camera. The high-definition camera is used to collect optical images of power towers, power cables and power channel corridors of the transmission lines to determine the network transmission status. If the network transmission status satisfies the transmission rate greater than the first preset value, the optical image data is directly transmitted and the collected optical image data is sent to the mobile command vehicle. When it is determined that the transmission rate of the network transmission status is less than the first preset value, the optical image is analyzed after the first patrol drone returns.
9. The UAV control system of a mobile command vehicle as claimed in claim 8, characterized in that: The analysis of the optical images further includes inspecting and visually identifying equipment defects and safety hazards such as broken wire strands, missing pins, and corroded hardware through a high-definition camera.
10. The UAV control system of a mobile command vehicle as claimed in claim 9, characterized in that: Ultraviolet video information of equipment in the transmission line is collected through the ultraviolet imager to monitor abnormal discharge of power lines and metal equipment in the transmission line.
Citation Information
Patent Citations
Power transmission and transformation system polling method based on unmanned aerial vehicle
CN106504362A
Method for polling power transmission line by using vertical take-off and landing fixed-wing unmanned aerial vehicle
CN113189615A
Unmanned aerial vehicle power transmission and transforming monitoring system based on laser quantum cryptography communications
WO2013135044A1