Temporary articulated structure and construction method of steel cap beam and prefabricated columns in asymmetrically distributed viaduct construction

By using a temporary hinged structure of steel cap beams and prefabricated columns during the construction of viaduct piers, and using the flexibility of the hinge device to release unbalanced bending moments, the problem of cap beam position deviation caused by asymmetric loads is solved, and construction safety and construction are improved. efficiency.

CN114960404BActive Publication Date: 2024-10-22CCFEB CIVIL ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210659063.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-11
Publication Date
2024-10-22
Estimated Expiration
2042-06-11

AI Technical Summary

Technical Problem

During the construction of asymmetrically distributed viaduct piers, due to the asymmetry of load distribution, unbalanced bending moments are easily generated, causing the installation position of the steel cap beam to shift, affecting its safety.

Method used

A temporary hinged structure of steel cover beams and prefabricated columns is used, including steel box columns, temporary hinged components and reserved connection components. Through the design of temporary hinged connecting plates, connecting rods and stiffening ribs, the flexible release of the hinged device is used during the construction process. Unbalanced bending moments are generated and the final locking position is fixed by welding.

Benefits of technology

It effectively reduces the position deviation of the cover beam and improves the safety during the construction process. The material structure is simple, the construction is convenient and the cost is low.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114960404B_ABST
    Figure CN114960404B_ABST
Patent Text Reader

Abstract

The present invention provides a temporary hinged structure of a steel cap beam and a prefabricated column in the construction of an asymmetrically distributed viaduct and a construction method thereof, which is characterized by comprising: a steel casing column, a temporary hinged assembly, and a reserved connection assembly; the reserved connection assembly comprises a reserved steel plate and a reserved box-shaped steel wall panel; the steel casing column comprises a box-shaped steel wall panel and a wall panel vertical stiffening rib, and the wall panel vertical stiffening rib is vertically fixed on the inner wall of the box-shaped steel wall panel; the temporary hinged assembly is arranged in the steel casing column, and the temporary hinged assembly comprises a temporary hinged connecting plate, a left temporary hinged connecting rod, and a right temporary hinged connecting rod. The present invention solves the problem that when the asymmetrically distributed portal viaduct piers are carrying out the superstructure construction, due to the asymmetry of the load distribution, an unbalanced bending moment is easily generated, which will cause a certain offset to the installation position of the cap beam, and then have an adverse effect on the safety of the cap beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a temporary hinged structure of a steel cap beam and a prefabricated column in the construction of an asymmetrically distributed viaduct and a construction method. Background Art

[0002] In the current prefabrication and installation of steel cap beams for bridges, a combination of columns and steel cap beams is often used. A steel-concrete hybrid connection section is usually set under the cap beam, and the force-transmitting main reinforcement of the internal concrete is anchored in the concrete of the pier. Finally, the connection with the concrete pier is achieved through the force transmission between the anchoring force of the steel bars and the concrete structure. However, in many bridges, the portal viaduct piers are not symmetrically distributed. During the construction of the superstructure, the asymmetry of the load distribution is prone to unbalanced bending moments, which will cause a certain offset to the installation position of the cap beam. This will have an adverse effect on the safety of the cap beam. Summary of the invention

[0003] In response to the above problems, the present invention provides a temporary hinged structure and construction method of a steel cap beam and prefabricated columns, which solves the problem that when the superstructure of an asymmetrically distributed portal viaduct pier is constructed, unbalanced bending moments are easily generated due to the asymmetry of load distribution, thereby causing a certain offset in the installation position of the cap beam, and thus having an adverse effect on the safety of the cap beam.

[0004] The above technology of the present invention is achieved through the following technical solutions:

[0005] A temporary hinged structure of a steel cap beam and a prefabricated column in the construction of an asymmetrically distributed viaduct, characterized by comprising: a steel casing column, a temporary hinged assembly, and a reserved connection assembly;

[0006] The reserved connection assembly includes a reserved steel plate and a reserved box-shaped steel wall plate, the reserved box-shaped steel wall plate is fixedly sleeved on the top of the prefabricated column steel-concrete mixed section, and extends upward to protrude from the top surface of the prefabricated column steel-concrete mixed section, and the reserved steel plate is fixedly arranged on the top surface of the prefabricated column steel-concrete mixed section and is fixedly connected to the inner wall of the reserved box-shaped steel wall plate;

[0007] The steel box column comprises a box-shaped steel wall panel and a vertical stiffening rib of the wall panel. The vertical stiffening rib of the wall panel is vertically fixedly arranged on the inner wall of the box-shaped steel wall panel. The upper end of the vertical stiffening rib of the wall panel is fixedly connected to the bottom plate of the steel cap beam, and the lower end is abutted against the reserved steel plate. The upper end of the box-shaped steel wall panel is fixedly connected to the bottom plate of the steel cap beam, and the lower end is in contact with the reserved steel plate with a welding gap.

[0008] The temporary hinge assembly is arranged in the steel casing column, and the temporary hinge assembly includes a temporary hinge connecting plate, a left temporary hinge connecting rod and a right temporary hinge connecting rod; the temporary hinge connecting plate is fixedly arranged on the reserved steel plate, the bottom ends of the left temporary hinge connecting rod and the right temporary hinge connecting rod are fixedly connected to the temporary hinge connecting plate, and the top ends of the left temporary hinge connecting rod and the right temporary hinge connecting rod are respectively fixedly connected to the corresponding vertical stiffening ribs of the same side wall panel.

[0009] Preferably, the temporary hinged structure of the present invention further comprises corner stiffening ribs; the corner stiffening ribs are fixedly connected to the outer side of the connection between the box-shaped steel wall panel and the steel cap beam bottom plate.

[0010] Preferably, a circular manhole connected to the steel casing column is provided on the bottom plate of the steel cap beam.

[0011] Preferably, an open-hole stiffening plate is provided on the bottom edge of the circular manhole.

[0012] Preferably, the temporary hinge connection plate is made of a thin-walled steel plate, and the temporary hinge connection rod is made of an angle steel.

[0013] Preferably, the welding gap between the lower end of the box-shaped steel wall panel and the reserved steel plate is 2 to 3 mm.

[0014] Preferably, the diameter of the circular manhole is 0.5-0.8 m.

[0015] Preferably, the reserved connection assembly is prefabricated on the prefabricated steel-concrete mixed section of the column.

[0016] Preferably, the inner sides of the reserved steel plates and the reserved box-type steel wall panels are provided with steel-concrete mixed section connecting ribs, and the reserved connection components are prefabricated on the steel-concrete mixed section of the prefabricated column through the steel-concrete mixed section connecting ribs.

[0017] A temporary hinge method for steel cap beams and prefabricated columns in the construction of an asymmetrically distributed viaduct is characterized by comprising the following steps:

[0018] S1. Installation of steel casing columns

[0019] Install the steel casing column at the designed position of the steel cap beam, so that the upper end of the steel casing column is fixedly connected to the bottom plate of the steel cap beam;

[0020] S2. Lifting and lowering of steel cap beam

[0021] Lift the steel cap beam connected to the steel box column and then slowly lower it to support it on the reserved connection assembly, control the lower end of the vertical stiffening rib of the wall panel to abut against the reserved steel plate, at this time, the lower end of the box steel wall panel is connected with the reserved box steel wall panel and a welding interval is left;

[0022] S3. Temporary hinge connection between steel cap beam and prefabricated columns

[0023] The temporary hinged connection plate is welded and fixed on the reserved steel plate; the temporary hinged connection plate is welded and fixed on the reserved steel plate; the bottom ends of the left temporary hinged connection rod and the right temporary hinged connection rod are welded and fixed on the temporary hinged connection plate, and the top ends are respectively welded and fixed on the corresponding vertical stiffening ribs of the same side wall plate to form a temporary hinge connection;

[0024] S4. Construction of steel cap beam superstructure

[0025] The steel cap beam superstructure is constructed, and the unbalanced bending moment generated during the superstructure construction is released by utilizing the flexibility of the temporary hinged connecting rod and the welding gap between the steel casing column and the reserved connection assembly;

[0026] S5, temporary hinged consolidation

[0027] The steel casing columns are welded and fixed to the reserved connection components to achieve temporary hinged consolidation, and the welding method is full penetration.

[0028] Compared with the prior art, the present invention has the following beneficial effects: by using the temporary hinged structure of the steel cap beam and the prefabricated column of the present invention, when the steel cap beam and the column are connected and fixed, the position deviation of the cap beam caused by the unbalanced bending moment generated during the construction of the bridge superstructure can be reduced. At the same time, the unbalanced bending moment generated during the construction process can be released by utilizing the flexibility of the material of the device and the rotation of the hinge device. The device is relatively simple in structure, relatively convenient in construction, and relatively low in cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a transverse bridge elevation view of the temporary hinged structure of the present invention.

[0030] Figure 2 It is a top view of the temporary hinged structure of the present invention.

[0031] Figure 3 for Figure 1 Cross-section view at AA in the middle.

[0032] Figure 4 for Figure 1 Cross-section view at the middle BB.

[0033] Figure 5 for Figure 1 Enlarged schematic diagram of point C in the middle.

[0034] Figure 6 It is a flow chart of the construction method of the present invention.

[0035] The meanings of the symbols in the above figure are: steel box column 1, box steel wall panel 101, wall panel vertical stiffening rib 102, temporary hinge connection plate 201, temporary hinge assembly 2, left temporary hinge connection rod 202, right temporary hinge connection rod 203, reserved connection assembly 3, reserved steel plate 301, reserved box steel wall panel 302, steel-concrete mixed section connecting rib plate 303, prefabricated column 4, prefabricated column steel-concrete mixed section 401, steel cap beam 5, steel cap beam bottom plate 501, circular manhole 502, perforated stiffening plate 503, corner stiffening rib 6, DETAILED DESCRIPTION

[0036] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc., are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0038] Example 1

[0039] The temporary hinged structure of the steel cap beam 5 and the prefabricated column 4 in the construction of the asymmetrically distributed viaduct is shown in Figures 1 to Figure 5 , which includes: a steel casing column 1, a temporary hinged component 2, and a reserved connection component 3;

[0040] The reserved connection assembly 3 includes a reserved steel plate 301 and a reserved box-shaped steel wall plate 302; the reserved box-shaped steel wall plate 302 is fixedly sleeved on the top of the prefabricated column steel-concrete mixed section 401, and extends upward to protrude from the top surface of the prefabricated column steel-concrete mixed section 401; the reserved steel plate 301 is fixedly arranged on the top surface of the prefabricated column steel-concrete mixed section 401 and is fixedly connected to the inner wall of the reserved box-shaped steel wall plate 302;

[0041] The steel casing column 1 includes a box-shaped steel wall panel 101 and a wall panel vertical stiffening rib 102; the wall panel vertical stiffening rib 102 is vertically fixedly arranged on the inner wall of the box-shaped steel wall panel 101, and is evenly distributed on the inner wall of the box-shaped steel wall panel 101 along the circumferential direction; the upper end of the wall panel vertical stiffening rib 102 is fixedly connected to the steel cap beam bottom plate 501, and the lower end is abutted against the reserved steel plate 301; the upper end of the box-shaped steel wall panel 101 is fixedly connected to the steel cap beam bottom plate 501, and the lower end is connected to the reserved box-shaped steel wall panel 302 and a welding interval is left; the reserved box-shaped steel wall panel 302 has the same cross-sectional shape and size as the box-shaped steel wall panel 101, and the top and bottom surfaces of both are open;

[0042] The temporary hinge assembly 2 is arranged in the steel casing column 1; the temporary hinge assembly 2 includes a temporary hinge connecting plate 201, a left temporary hinge connecting rod 202 and a right temporary hinge connecting rod 203; the temporary hinge connecting plate 201 is fixedly arranged on the reserved steel plate 301, the bottom ends of the left temporary hinge connecting rod 202 and the right temporary hinge connecting rod 203 are fixedly connected to the temporary hinge connecting plate 201, and the top ends of the left temporary hinge connecting rod 202 and the right temporary hinge connecting rod 203 are respectively fixedly connected to the corresponding vertical stiffening ribs 102 of the same side wall plate; and the left temporary hinge connecting rod 202 and the right temporary hinge connecting rod 203 should be symmetrically arranged on both sides of the interior of the steel casing column 1;

[0043] In order to improve the connection strength between the top of the steel casing column 1 and the steel cap beam 5, further, in a preferred embodiment, please refer to Figure 1 , Figure 4 The temporary hinged structure of the present invention also includes corner stiffening ribs 6; the corner stiffening ribs 6 are fixedly connected to the outer side of the connection between the box-shaped steel wall panel 101 and the steel cap beam bottom plate 501; preferably, the corner stiffening ribs 6 are symmetrically arranged on both sides of the steel casing column 1, and usually 4 to 6 corner stiffening ribs 6 are arranged on each side of the steel casing column 1.

[0044] In order to allow the workers to enter the interior of the steel casing column 1 for construction and facilitate the transportation of construction materials into the steel casing column 1, further, in a preferred embodiment, please refer to Figures 1 to 3 A circular manhole 502 connected to the steel casing column 1 is provided on the bottom plate 501 of the steel cap beam.

[0045] In order to ensure that the circular manhole 502 is provided on the steel cap beam bottom plate 501 without affecting the strength of the steel cap beam bottom plate 501, further, in a preferred embodiment, please refer to Figures 1 to 3 An open-hole stiffening plate 503 is provided at the bottom edge of the circular manhole 502 .

[0046] In order to facilitate the use of local materials during construction, further, in a preferred embodiment, the temporary hinge connecting plate 201 is made of thin-walled steel plate, and the temporary hinge connecting rod 202 is made of angle steel.

[0047] Furthermore, in a preferred embodiment, the welding gap between the lower end of the box-shaped steel wall panel 101 and the reserved steel plate 301 is 2 to 3 mm.

[0048] Furthermore, in a preferred embodiment, the diameter of the circular manhole 502 is 0.5-0.8 m.

[0049] In order to ensure the connection strength between the reserved connection component 3 and the prefabricated column steel-concrete mixed section 401 and improve the construction efficiency at the construction site, further, in a preferred embodiment, the reserved connection component 3 is prefabricated on the prefabricated column steel-concrete mixed section 401.

[0050] Furthermore, in a preferred embodiment, the inner sides of the reserved steel plate 301 and the reserved box-type steel wall plate 302 are provided with steel-concrete mixed section connecting ribs 303, and the reserved connection assembly 3 is prefabricated on the prefabricated column steel-concrete mixed section 401 through the steel-concrete mixed section connecting ribs 303.

[0051] Example 2

[0052] Temporary hinge method between steel cap beam and precast column in asymmetrical distribution viaduct construction, please refer to Figure 6 , which comprises the following steps:

[0053] S1. Installation of steel casing columns

[0054] Install the steel casing column 1 at the designed position of the steel cap beam, so that the upper end of the steel casing column 1 is fixedly connected to the bottom plate 501 of the steel cap beam;

[0055] S2. Lifting and lowering of steel cap beam

[0056] Lift the steel cap beam connected to the steel casing column 1 and then slowly lower it to support it on the reserved connection assembly 3, and control the lower end of the vertical stiffening rib 102 of the wall panel to abut against the reserved steel plate 301. At this time, the lower end of the box-shaped steel wall panel 101 is connected to the reserved box-shaped steel wall panel 302 and a welding interval is left;

[0057] S3. Temporary hinge connection between steel cap beam and prefabricated columns

[0058] The temporary hinge connecting plate 201 is welded and fixed on the reserved steel plate 301; the temporary hinge connecting plate 201 is welded and fixed on the reserved steel plate 301; the bottom ends of the left temporary hinge connecting rod 202 and the right temporary hinge connecting rod 203 are welded and fixed on the temporary hinge connecting plate 201, and the top ends are respectively welded and fixed on the corresponding vertical stiffening ribs 102 of the same side wall plate to form a temporary hinge connection;

[0059] S4. Construction of steel cap beam superstructure

[0060] The upper structure of the steel cap beam is constructed, and the flexibility of the left temporary hinge connecting rod 202 and the right temporary hinge connecting rod 203, as well as the welding gap left between the steel casing column 1 and the reserved connection component 3, are used to release the unbalanced bending moment generated during the construction of the upper structure;

[0061] S5, temporary hinged consolidation

[0062] The steel casing column 1 is welded and fixed to the reserved connection component 3 to realize temporary hinged consolidation, and the welding method is full penetration.

[0063] It should be emphasized that the above are only preferred embodiments of the present invention and do not impose any form of limitation on the present invention. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. Temporary articulated structure of steel cap beam and prefabricated columns in asymmetrically distributed viaduct construction. Features include: Steel casing column (1), temporary hinge assembly (2), reserved connection assembly (3), corner stiffening rib (6); The reserved connection assembly (3) comprises a reserved steel plate (301) and a reserved box-shaped steel wall plate (302); the reserved box-shaped steel wall plate (302) is fixedly sleeved on the top of the prefabricated column steel-concrete mixed section (401) and extends upward to protrude from the top surface of the prefabricated column steel-concrete mixed section (401); the reserved steel plate (301) is fixedly arranged on the top surface of the prefabricated column steel-concrete mixed section (401) and is fixedly connected to the inner wall of the reserved box-shaped steel wall plate (302); The steel jacket box column (1) comprises a box-shaped steel wall panel (101) and a wall panel vertical stiffening rib (102), the wall panel vertical stiffening rib (102) being vertically fixedly arranged on the inner wall of the box-shaped steel wall panel (101), the wall panel vertical stiffening rib (102) having an upper end fixedly connected to a steel cap beam bottom plate (501), and a lower end abutting against a reserved steel plate (301), the box-shaped steel wall panel (101) having an upper end fixedly connected to a steel cap beam bottom plate (501), and a lower end abutting against a reserved box-shaped steel wall panel (302) with a welding gap left; The temporary hinge assembly (2) is arranged in the steel casing column (1), and the temporary hinge assembly (2) comprises a temporary hinge connection plate (201), a left temporary hinge connection rod (202) and a right temporary hinge connection rod (203). The temporary hinge connection plate (201) is fixedly arranged on the reserved steel plate (301), the bottom ends of the left temporary hinge connection rod (202) and the right temporary hinge connection rod (203) are fixedly connected to the temporary hinge connection plate (201), and the top ends of the left temporary hinge connection rod (202) and the right temporary hinge connection rod (203) are respectively fixedly connected to the corresponding vertical stiffening ribs (102) of the same side wall plate; The corner stiffening rib (6) is fixedly connected to the outer side of the connection between the box-shaped steel wall plate (101) and the steel cap beam bottom plate (501); the steel cap beam bottom plate (501) is provided with a circular manhole (502) connected to the steel casing column (1).

2. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 1, It is characterized in that An open-hole stiffening plate (503) is provided at the bottom edge of the circular manhole (502).

3. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 1, It is characterized in that The temporary hinge connection plate (201) is made of a thin-walled steel plate, and the left temporary hinge connection rod (202) and the right temporary hinge connection rod (203) are made of angle steel.

4. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 1, It is characterized in that The welding gap between the lower end of the box-shaped steel wall plate (101) and the reserved steel plate (301) is 2 to 3 mm.

5. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 1, It is characterized in that The diameter of the circular manhole (502) is 0.5-0.8 m.

6. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 1, It is characterized in that The reserved connection assembly (3) is prefabricated on the prefabricated column steel-concrete mixed section (401).

7. The temporary hinged structure of the steel cap beam and the prefabricated columns in the construction of the asymmetrically distributed viaduct as claimed in claim 6, It is characterized in that A steel-concrete mixed section connecting rib plate (303) is provided inside the reserved steel plate (301) and the reserved box-shaped steel wall plate (302), and the reserved connection component (3) is prefabricated on the prefabricated column steel-concrete mixed section (401) via the steel-concrete mixed section connecting rib plate (303).

8. Temporary articulation method of steel cap beam and prefabricated columns in asymmetrically distributed viaduct construction. Features The steps include: S1. Installation of steel casing columns Install the steel casing column (1) at the designed position of the steel cap beam, so that the upper end of the steel casing column (1) is fixedly connected to the bottom plate (501) of the steel cap beam; S2. Lifting and lowering of steel cap beam After lifting the steel cap beam connected to the steel casing column (1), it is slowly lowered so that it is supported on the reserved connection assembly (3), and the lower end of the vertical stiffening rib (102) of the control wall panel is abutted against the reserved steel plate (301). At this time, the lower end of the box-shaped steel wall panel (101) is connected to the reserved box-shaped steel wall panel (302) and a welding interval is left; S3. Temporary hinge connection between steel cap beam and prefabricated columns The temporary hinge connection plate (201) is welded and fixed to the reserved steel plate (301); the bottom ends of the left temporary hinge connection rod (202) and the right temporary hinge connection rod (203) are welded and fixed to the temporary hinge connection plate (201), and the top ends are respectively welded and fixed to the corresponding vertical stiffening ribs (102) of the same side wall plate, so as to form a temporary hinge connection; S4. Construction of steel cap beam superstructure The upper structure of the steel cap beam is constructed, and the unbalanced bending moment generated during the construction of the upper structure is released by utilizing the flexibility of the left temporary hinge connecting rod (202) and the right temporary hinge connecting rod (203) and the welding gap left between the steel casing column (1) and the reserved connection assembly (3); S5, temporary hinged consolidation The steel casing column (1) is welded and fixed to the reserved connection assembly (3) to achieve temporary hinged consolidation, and the welding method is full penetration.