By dragging the cables horizontally and longitudinally in the sea and storing them on the seabed, simulating the mixing of cables and mud, the problem that existing testing methods cannot effectively evaluate the performance of cables for sand prevention is improved, and the accuracy of the test is improved. Trustworthiness, saving testing time and cost.
Patent Information
- Application Number
- CN202210760796.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-30
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-06-30
AI Technical Summary
The existing cable sand protection performance testing methods cannot effectively simulate the sea environment, resulting in low credibility in the test results and the inability to comprehensively evaluate the sand protection performance of cables when stored on the seabed.
Put the cable into the sea for horizontal and vertical dragging, and store it on the seabed for a period of time, simulate the full mixing of cables and mud, adjust the cable posture through an underwater robot to achieve horizontal and vertical dragging, increasing the accuracy of the test and reliability.
The test conditions are closer to the actual use environment, and the results are more accurate and credible. They can evaluate the sand protection performance of the cable at different times in detail, saving testing time and cost.
Smart Images

Figure CN114993872B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cable anti-sand performance testing, and more specifically, to a cable anti-sand performance offshore testing method. Background Art
[0002] Mooring cables are key equipment for deep-water floating structures to resist environmental influences and maintain their own stable and safe positioning. They have significant advantages such as light weight, fatigue resistance, and corrosion resistance. However, if the chemical fiber inner core, the main load-bearing component, is mixed with sand particles during use, it is easy to cause fiber breakage under the long-term grinding of sand particles, resulting in reduced strength and fatigue life of the entire cable, which seriously threatens the safety of deep-water floating structures. On the other hand, there are sand particles in the marine environment where permanent mooring cables have been in service for a long time. During the installation process, the cables will also rub against the seabed and even need to be directly stored on the seabed for a long time. Therefore, polyester cables used for permanent mooring of ships and marine engineering will be equipped with a filter layer to prevent large-diameter sand particles from entering the inner core. The general structure of the cable includes an inner core, a sand-proof filter layer, and an outer sheath from the inside to the outside. Since the filtering effect of the cable's sand-proof filter layer is directly related to the service life of the cable, the sand-proof performance, as an important performance indicator, requires strict testing.
[0003] The existing method for testing the anti-sand performance of cables is to mix seawater and a certain amount of sediment in a closed test container, put in a test rope sample, increase the container pressure and drive the container to move, simulate the interaction between the cable and sediment in the use environment, and test the effectiveness of the anti-sand filter layer in blocking the penetration of sediment particles.
[0004] However, in the above test method, the amount of seawater and mud placed in the container is limited, which cannot simulate the environment in the sea well, and cannot test the impact of seawater pressure and biological corrosion in the sea on the anti-sand performance of the cable. It is quite different from the actual use environment of the cable, and the test results are not very reliable. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the existing cable anti-sand performance test method, that is, the test conditions are greatly different from the actual use environment of the cable, and the test results are of low credibility, and to provide a cable anti-sand performance offshore testing method. When the present invention tests the anti-sand performance of the cable, the cable is placed in the sea and dragged in different directions, and after the dragging is completed, the cable is stored on the seabed for a period of time to simulate the anti-sand performance of the cable after being stored on the seabed for a period of time and fully mixed with mud and sand, so that the test conditions are closer to the actual use of the cable, the test results are more accurate, and the credibility is higher.
[0006] The purpose of the present invention can be achieved by adopting the following technical solutions:
[0007] A method for testing the sand-proof performance of a cable at sea comprises the following steps:
[0008] S1: Install a counterweight on the cable and use a traction rope to securely connect the cable to the lifting end of the vessel's lifting system;
[0009] In order to ensure that the cable can sink into the sea and avoid floating on the sea surface under the influence of waves, etc., and to prevent the cable from floating away when it is stored on the seabed for a long time, a counterweight is set on the cable. The counterweight can use a gear chain ring as a counterweight, or a counterweight of other shapes, but it should be noted that the surface of the counterweight should be smooth, and the sharp parts should be wrapped with tape to avoid the counterweight wearing the cable during the test, thereby affecting the accuracy of the experimental results.
[0010] Construction vessels need to have a lifting system that is capable of lowering items from the vessel to the seabed or lifting items from the seabed to the vessel, such as a winch, a ship crane, etc. The winch, a ship crane, etc. are usually equipped with a wire rope for lifting or lowering operations. The towing rope is connected to the lifting end of the lifting system, that is, the end of the wire rope, and the wire rope is released by the winch or crane to lower the cable to the seabed for towing operations.
[0011] S2: putting the cable into the sea, so that the cable falls to the seabed under the action of the counterweight;
[0012] The counterweight allows the cable to rest on the seabed, allowing the cable to rub against the sand on the seabed.
[0013] S3: Start the ship to drag the cable for the first time. After the first drag is completed, adjust the connection between the cable and the towing rope, and then drag it for the second time.
[0014] When the cable sinks to the seabed and reaches the seabed, the cable is dragged to make it rub against the mud on the seabed. When the ship is traveling in a straight line, ensure that the cable is dragged in at least two directions. One is to drag the cable in a direction perpendicular to the length of the cable, that is, horizontal dragging. At this time, the towing rope is required to fix at least both ends of the cable; the other dragging direction is parallel to the length of the cable, that is, longitudinal dragging. At this time, only one end of the cable is required to be fixed. The ship can turn in various directions appropriately during the movement. When adjusting the direction of the cable, you can use an underwater robot to adjust it directly in the sea, or you can pull up the towing rope to drag the cable back to the ship for manual adjustment.
[0015] S4: After the towing is completed, the cable is disconnected from the vessel so that the cable is placed on the seabed and the position of the cable is recorded;
[0016] The cable is stored on the seabed for a period of time to test whether the mud will break through the sand-proof filter layer of the cable and enter the inner core of the cable in a natural environment where the seabed current carries mud and sand that constantly washes the cable, the cable sinks into the mud and sand, and marine organisms attach to it. This way, the sand-proof performance of the cable can be evaluated from multiple aspects.
[0017] S5: After the cable is stored on the seabed for a certain period of time, the ship sails to the recorded cable position and recovers the cable.
[0018] In order to facilitate the recovery of the cable, a positioning device or a component that facilitates the salvage of the cable can be installed on the cable, such as a buoy or a floating ball on the cable to facilitate finding the cable, or a hook on the cable to facilitate salvaging the cable.
[0019] Furthermore, in step S1, three sections of cables of the same length are cut, and the cuts at both ends of the cables are blocked, one section of the cables is used as a control group, and the other two sections of the cables are used as a first experimental group. After counterweights are installed on the two sections of the cables in the first experimental group, they are fixedly connected to the lifting end of the lifting system of the ship through a traction rope;
[0020] In step S4, after the towing is completed, the cables of the first experimental group are stored on the seabed for a certain period of time;
[0021] In step S5, after the cables of the first experimental group are stored on the seabed for a certain period of time, one section of the cables is first recovered, and after being stored for a period of time, the other section of the cables is recovered.
[0022] In this scheme, at least two cables can be tested in one experiment. The ship can also fix multiple towing ropes at one time to conduct multiple groups of experiments. At the same time, one experiment can obtain the anti-sand performance of the cable after being stored on the seabed for different periods of time, more accurately and comprehensively evaluate the anti-sand performance, and save test time and testing costs. Blocking both ends of the cable can prevent the cable from gradually spreading from the cut surface after cutting and mud and sand from entering the cable from both ends. The cable in the control group is the third cable. The cable in the control group does not enter the sea for testing, but is kept in the laboratory for comparison with the first and second cables that are recovered. The control group is used to compare the dust particles brought in during the production process in a factory environment.
[0023] Further, in step S1, two sections of cables in the first experimental group are fixed by a first traction rope, the two cables include a first cable and a second cable, the first traction rope includes six rope segments, the six rope segments include a first rope segment, a second rope segment, a third rope segment, a fourth rope segment, a fifth rope segment and a sixth rope segment, one end of the first rope segment is used to connect to the ship, the other end of the first rope segment is connected to one end of the second rope segment, the other end of the second rope segment is connected to one end of the first cable, one end of the third rope segment is connected to one end of the first cable, and the other end of the third rope segment is connected to one end of the second cable. ends are connected, one end of the fourth rope segment is connected to one end of the second cable, one end of the fifth rope segment is connected to the other end of the first rope segment, the other end of the fifth rope segment is connected to the other end of the first cable, one end of the sixth rope segment is connected to the other end of the first cable, the other end of the sixth rope segment is connected to the other end of the second cable, the second rope segment and the fifth rope segment are connected to the same end of the first rope segment, the second rope segment and the third rope segment are connected to the same end of the first cable, the third rope segment and the fourth rope segment are connected to the same end of the second cable, and the fifth rope segment and the sixth rope segment are connected to the same end of the first cable.
[0024] In this scheme, the two cables of the first experimental group are connected to the ship using a traction rope. If it is necessary to test more cables with different seabed storage times, several first experimental groups can be set up, or the same first traction rope can be connected to more than three cables, and each cable segment is parallel to each other. The above is the connection method of the cable of the first experimental group and the first traction rope. After the connection, the first rope segment is connected to the ship, and the ship travels in a straight line. The first rope segment is parallel to the travel direction of the ship. At this time, the two cables are parallel to each other and perpendicular to the travel direction of the ship in the initial state. Since the cable itself has a certain rigidity, it can also maintain a straight state when moving, realizing the lateral drag of the cable. A straight stick can also be placed at the cable or between the second rope segment and the fifth rope segment, or the third rope segment and the sixth rope segment to force the cable to maintain a straight state. In this scheme, the first drag of the cable is a lateral drag, and the second drag is a longitudinal drag. After the lateral drag is completed, only the second rope segment and the sixth rope segment need to be cut to carry out the longitudinal drag of the cable, and then the third rope segment is cut to separate the two cables so as to recover the two cables one after another. Alternatively, the third rope segment and the fifth rope segment may be cut to perform longitudinal dragging of the cable, and then the sixth rope segment may be cut to separate the first cable from the second cable.
[0025] Furthermore, in step S3, after the first dragging is completed, the second rope segment and the sixth rope segment are disconnected using an underwater robot, thereby adjusting the connection mode between the first cable and the second cable and the first traction rope, and then a second dragging is performed.
[0026] After the cable and traction rope are recovered from the seabed, the second and sixth rope segments are cut off before being lowered. The test time is greatly extended and the test cost is increased during the recovery and lowering process. It is convenient and quick to cut the second and sixth rope segments directly on the seabed using an underwater machine. Underwater robots are common auxiliary equipment for underwater operations. Underwater robots are equipped with mechanical arms. As long as the underwater robot is fixedly connected or carries hydraulic shears or cutters, the rope segments can be disconnected by using the mechanical arms to operate the hydraulic shears or cutters. After the second and sixth rope segments are cut off, as the ship moves in a straight line, the first rope segment, the fifth rope segment, the first cable, the third rope segment, the second cable and the fourth rope segment are connected in sequence and gradually become a straight line parallel to the moving direction of the ship, realizing the longitudinal dragging of the cable.
[0027] Furthermore, in step S4, after the dragging is completed, the first rope segment and the third rope segment are disconnected using an underwater robot, so that the cable of the first experimental group remains on the seabed, and the first cable and the second cable are separated.
[0028] After the underwater robot cuts the first rope segment, the cable is separated from the ship. After the third rope segment is cut, the first cable and the second cable are separated from each other, so that it is convenient to salvage the cable segment with a shorter storage time first.
[0029] Furthermore, a first rope ring is provided at the connection between the second rope segment and the fifth rope segment and the first rope segment, the other end of the first rope segment is connected to the first rope ring, one end of the second rope segment and one end of the fifth rope segment are both connected to the first rope ring, and the other end of the fourth rope segment is provided with a second rope ring.
[0030] The first rope segment, the second rope segment and the fifth rope segment are connected together at three ends through the first rope ring. When the first cable and the second cable are recovered in step S5, the first rope ring is used to facilitate the salvage of the first cable, and the second rope ring is used to facilitate the salvage of the second cable.
[0031] Furthermore, in step S5, when the first cable and the second cable are recovered, the lifting end of the lifting system and the underwater robot are lowered, and a hook is provided on the lifting end. After the underwater robot searches for the cable, the underwater robot hangs the first rope ring and the second rope ring on the hook, and pulls up the wire rope for recovery.
[0032] The wire rope is a common tool for ship operations. The wire rope can be easily lowered to the seabed through common operating equipment such as cranes or winches on ships. A hook is fixed to the head of the wire rope, and the first rope ring and the second rope ring can be hung on the hook through the mechanical arm of the underwater robot, so as to recover the first cable and the second cable.
[0033] Furthermore, two knots symmetrical about the cables are provided at both ends of the first cable and the second cable near the blocking part, and the second rope segment, the third rope segment, the fourth rope segment, the fifth rope segment and the sixth rope segment are all fixedly connected to the knots to achieve connection with the cables, and the counterweight block is fixedly connected to the knots.
[0034] Use nylon rope or other seawater corrosion-resistant rope to tie knots at both ends of the cable. There are two knots at each end of the cable. The knots can be used to connect the rope segment and the counterweight. In this way, the counterweight can be fixedly connected to the rope segment without damaging or bending the cable.
[0035] Furthermore, in step S1, the fourth section of the cable is cut as the second experimental group, and the cable of the second experimental group is fixedly connected to the lifting end of the lifting system of the ship through the traction rope after the counterweight is installed;
[0036] In step S4, after the towing is completed, the cables of the second experimental group are first recovered, and the cables of the first experimental group are stored on the seabed;
[0037] The cable in the second experimental group is the fourth cable, which is fixedly connected to the ship through the second traction rope, and the second traction rope includes a first connecting rope, a second connecting rope and a third connecting rope, one end of the first connecting rope is connected to, the other end of the first connecting rope is connected to one end of the second connecting rope and one end of the third connecting rope, and the other end of the second connecting rope and the other end of the third connecting rope are respectively connected to two ends of the fourth cable.
[0038] This connection method is similar to the connection method of the cable and the first traction rope in the first experimental group, except that in the second experimental group, the second traction rope only needs to be connected to one cable. By connecting in this way, the lateral dragging of the fourth cable can be achieved, and at the same time, the longitudinal dragging of the fourth cable can be achieved by cutting the third connecting rope.
[0039] Furthermore, in step S3, after the first dragging is completed, the third connecting rope is disconnected using an underwater robot, and then the second dragging is performed.
[0040] After the first drag is completed, the second rope segment, the sixth rope segment, and the third connecting rope need to be cut before the second drag is performed.
[0041] Furthermore, the fourth cable is provided with two knots symmetrical about the cable near the blocking parts at both ends of the cable, the second connecting rope and the third connecting rope are fixedly connected to the knots to achieve connection with the fourth cable, and the counterweight is fixedly connected to the knots.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] (1) The cable is placed in the sea and dragged horizontally and vertically. After the dragging is completed, the cable is stored on the seabed for a period of time to simulate the anti-sand performance of the cable after being stored on the seabed for a period of time and fully mixed with mud and sand. In this way, the test conditions are closer to the actual use of the cable, and the test results are more accurate and more reliable.
[0044] (2) Multiple sections of cable can be tested in one experiment, so as to compare the anti-sand performance of the cable after being stored in the sea for different time periods, making the test results more detailed, reliable and more referenceable.
[0045] (3) The connection method of the first traction rope with the first cable and the second cable, as well as the connection method of the second traction rope with the fourth cable, enables the cables to be easily adjusted in the sea by an underwater robot to achieve lateral and longitudinal dragging, which is easy to operate and greatly saves test time and test costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 This is a schematic diagram of the first dragging of the first experimental group of Example 1 of the present invention;
[0047] Figure 2 This is a schematic diagram of the second dragging of the first experimental group of Example 1 of the present invention;
[0048] Figure 3 A schematic diagram of the cable of the present invention when stored on the seabed;
[0049] Figure 4 This is a schematic diagram of the first dragging of the control group in Example 2 of the present invention;
[0050] Figure 5 This is a schematic diagram of the second dragging of the control group in Example 2 of the present invention.
[0051] The illustrations are as follows:
[0052] 1-first traction rope, 11-first rope segment, 12-second rope segment, 13-third rope segment, 14-fourth rope segment, 15-fifth rope segment, 16-sixth rope segment, 2-cable, 21-first cable, 22-second cable, 23-fourth cable, 3-counterweight, 41-first rope ring, 42-second rope ring, 5-knot, 6-second traction rope, 61-first connecting rope, 62-second connecting rope, 63-third connecting rope, DETAILED DESCRIPTION
[0053] The present invention is further described below in conjunction with specific implementation methods. The accompanying drawings are only used for exemplary descriptions and are only schematic diagrams, not actual drawings, and cannot be understood as limiting this patent; in order to better illustrate the embodiments of the present invention, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted.
[0054] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0055] Example 1
[0056] like Figures 1 to 3 As shown, a method for testing the sand-proof performance of a cable at sea comprises the following steps:
[0057] S1: Install a counterweight 3 on the cable 2, and use a traction rope to fix the cable 2 to the lifting end of the ship's lifting system;
[0058] In order to ensure that the cable 2 can sink into the sea and avoid floating on the sea surface under the influence of waves, etc., and to prevent the cable 2 from floating away when the cable 2 is subsequently stored on the seabed for a long time, a counterweight 3 is set on the cable 2. The counterweight 3 can use a gear chain ring as the counterweight 3, or a counterweight 3 of other shapes, but it should be noted that the appearance of the counterweight 3 should be smooth, and the sharp parts should be wrapped with tape to prevent the counterweight 3 from wearing the cable 2 during the test, thereby affecting the accuracy of the experimental results.
[0059] Construction vessels need to have a lifting system that is capable of lowering items from the vessel to the seabed or lifting items from the seabed to the vessel, such as a winch, a ship crane, etc. The winch, a ship crane, etc. are usually equipped with a wire rope for lifting or lowering operations. The towing rope is connected to the lifting end of the lifting system, that is, the end of the wire rope, and the wire rope is released by the winch or crane to lower the cable to the seabed for towing operations.
[0060] S2: putting the cable 2 into the sea, so that the cable 2 falls to the seabed under the action of the counterweight 3;
[0061] The counterweight 3 causes the cable 2 to fall on the seabed, so that the cable 2 can rub against the mud and sand on the seabed.
[0062] S3: Start the ship to drag the cable 2 for the first time. After the first drag is completed, adjust the connection between the cable 2 and the traction rope, and then drag it for the second time.
[0063] When the cable 2 sinks to the seabed and reaches the seabed, the cable 2 is dragged to make the cable 2 rub against the mud and sand on the seabed. When the ship is traveling in a straight line, ensure that the cable 2 is dragged in at least two directions. One is to drag the cable 2 in a direction perpendicular to the length of the cable 2, that is, horizontal dragging. At this time, the towing rope is required to fix at least both ends of the cable 2; the other towing direction is parallel to the length of the cable 2, that is, longitudinal dragging. At this time, only the cable 2 needs to fix at least one end of the cable 2. The ship can turn in various directions appropriately during the movement. When adjusting the direction of the cable 2, you can use an underwater robot to adjust it directly in the sea, or you can pull up the towing rope to drag the cable 2 back to the ship for manual adjustment.
[0064] S4: After the towing is completed, the cable 2 is disconnected from the vessel, so that the cable 2 is placed on the seabed, and the position of the cable 2 is recorded;
[0065] The cable 2 is stored on the seabed for a period of time to detect whether the sediment will break through the sand-proof filter layer of the cable 2 and enter the inner core of the cable 2 in a natural environment where the cable 2 is continuously washed by sediment carried by the seabed current, the cable 2 sinks into the sediment, and marine organisms attach. In this way, the sand-proof performance of the cable 2 can be evaluated in many aspects.
[0066] S5: After the cable 2 is stored on the seabed for a certain period of time, the ship travels to the recorded position of the cable 2 and recovers the cable 2.
[0067] In step S1, three sections of the cable 2 of the same length are cut, and the cuts at both ends of the cable 2 are blocked, one section of the cable 2 is used as a control group, and the other two sections of the cable 2 are used as a first experimental group. The two sections of the cable 2 of the first experimental group are both installed with counterweights 3 and fixedly connected to the ship through a traction rope;
[0068] In step S4, after the towing is completed, the cable 2 of the first experimental group is stored on the seabed for a certain period of time;
[0069] In step S5, after the cables 2 of the first experimental group are stored on the seabed for 24 hours, one section of the cables 2 is first recovered, and after 6 months, the other section of the cables 2 is recovered.
[0070] One experiment can complete the test of at least two cables 2. The ship can also fix multiple towing ropes at one time to conduct multiple groups of experiments. At the same time, one experiment can obtain the anti-sand performance of the cable 2 after being stored on the seabed for different periods of time, more accurately and comprehensively evaluate the anti-sand performance, and save test time and test costs. Blocking both ends of the cable 2 can prevent the cable 2 from gradually spreading from the cut surface after cutting and mud and sand from entering the cable from both ends. The cable 2 of the control group is the third cable. The control group cable does not enter the sea for testing, but is retained in the laboratory for comparison with the recovered first cable 21 and second cable 22. The control group is used to compare the dust particles brought in during the production process in a factory environment.
[0071] In step S1, two cables 2 in the first experimental group are fixed by the first traction rope 1, the two cables 2 include a first cable 21 and a second cable 22, the first traction rope 1 includes six rope segments, the six rope segments include a first rope segment 11, a second rope segment 12, a third rope segment 13, a fourth rope segment 14, a fifth rope segment 15 and a sixth rope segment 16, one end of the first rope segment 11 is used to connect to the ship, the other end of the first rope segment 11 is connected to one end of the second rope segment 12, the other end of the second rope segment 12 is connected to one end of the first cable 21, one end of the third rope segment 13 is connected to one end of the first cable 21, and the other end of the third rope segment 13 is connected to one end of the second cable 22. One end of the fourth rope segment 14 is connected to one end of the second cable 22, one end of the fifth rope segment 15 is connected to the other end of the first rope segment 11, the other end of the fifth rope segment 15 is connected to the other end of the first cable 21, one end of the sixth rope segment 16 is connected to the other end of the first cable 21, the other end of the sixth rope segment 16 is connected to the other end of the second cable 22, the second rope segment 12 and the fifth rope segment 15 are connected to the same end of the first rope segment 11, the second rope segment 12 and the third rope segment 13 are connected to the same end of the first cable 21, the third rope segment 13 and the fourth rope segment 14 are connected to the same end of the second cable 22, and the fifth rope segment 15 and the sixth rope segment 16 are connected to the same end of the first cable 21.
[0072] In this scheme, the two cables 2 of the first experimental group are connected to the ship using a traction rope. If it is necessary to test more cables 2 with different seabed storage times, several more first experimental groups can be set up. The above is the connection method of the cables 2 of the first experimental group and the first traction rope 1. After such connection, the first rope segment 11 is connected to the ship, and the ship travels in a straight line with the first rope segment 11 parallel to the travel direction of the ship. At this time, the two cables 2 are parallel to each other and perpendicular to the travel direction of the ship in the initial state. Since the cable 2 itself has a certain rigidity, it can maintain a straight state when moving, so as to achieve lateral dragging of the cable 2. A straight stick can also be placed at the cable 2 or between the second rope segment 12 and the fifth rope segment 15, or the third rope segment 13 and the sixth rope segment 16 to force the cable 2 to maintain a straight state. In this solution, the first dragging of the cable 2 is a lateral dragging, and the second dragging is a longitudinal dragging. After the lateral dragging is completed, only the second rope segment 12 and the sixth rope segment 16 need to be cut to carry out the longitudinal dragging of the cable 2, and then the third rope segment 13 can be cut to separate the two cables 2 and thus recover the two cables 2 one after another.
[0073] In step S3, after the first dragging is completed, the second rope segment 12 and the sixth rope segment 16 are disconnected by using an underwater robot, so as to adjust the connection mode between the first cable 21 and the second cable 22 and the first traction rope 1, and then the second dragging is performed.
[0074] After the cable 2 and the traction rope are recovered from the seabed, the second rope segment 12 and the sixth rope segment 16 are cut and then lowered. The test time is greatly extended during the recovery and lowering process, and the test cost is increased. It is convenient and quick to cut the second rope segment 12 and the sixth rope segment 16 directly on the seabed using an underwater machine. The underwater robot is a common auxiliary equipment for underwater operations. The underwater robot is provided with a mechanical arm. As long as the underwater robot is fixedly connected or carries a hydraulic shear or a cutter, the rope segment can be disconnected by using the mechanical arm to operate the hydraulic shear or the cutter. After the second rope segment 12 and the sixth rope segment 16 are cut, as the ship travels in a straight line, the first rope segment 11, the fifth rope segment 15, the first cable 21, the third rope segment 13, the second cable 22 and the fourth rope segment 14 are connected in sequence and gradually become a straight line parallel to the moving direction of the ship, so as to realize the longitudinal dragging of the cable 2.
[0075] In this solution, the underwater robot used is a work-level underwater robot, such as the Triton XLX work-level ROV. Work-level underwater robots are mainly used in the oil and gas development industry, including drilling support, construction support, inspection, repair and maintenance and other sub-industries. They are usually equipped with two manipulators that can directly grasp, push, pull and other tools, and can also use other tools.
[0076] In step S4, after the dragging is completed, the first rope segment 11 and the third rope segment 13 are disconnected using an underwater robot, so that the cable 2 of the first experimental group remains on the seabed, and the first cable 21 and the second cable 22 are separated.
[0077] After the underwater robot cuts the first rope segment 11, the cable 2 is separated from the ship. After the third rope segment 13 is cut, the first cable 21 and the second cable 22 are separated from each other, so that it is convenient to salvage the cable 2 with a shorter storage time first.
[0078] A first rope ring 41 is provided at the connection between the second rope segment 12 and the fifth rope segment 15 and the first rope segment 11, the other end of the first rope segment 11 is connected to the first rope ring 41, one end of the second rope segment 12 and one end of the fifth rope segment 15 are both connected to the first rope ring 41, and a second rope ring 42 is provided at the other end of the fourth rope segment 14.
[0079] The first rope segment 11, the second rope segment 12 and the fifth rope segment 15 are connected together at three ends through the first rope ring 41. When the first cable 21 and the second cable 22 are recovered in step S5, the first rope ring 41 facilitates the recovery of the first cable 21, and the second rope ring 42 facilitates the recovery of the second cable 22.
[0080] In step S5, after the first cable 21 is stored on the seabed for 24 hours, the first cable 21 is recovered; after the second cable is stored on the seabed for 6 months, the second cable 22 is recovered. When the first cable 21 and the second cable 22 are recovered, the lifting end of the lifting system and the underwater robot are lowered, and the lifting end is provided with a hook. After the underwater robot searches for the cable 2, the underwater robot hangs the first rope ring 41 and the second rope ring 42 on the hook, and pulls up the wire rope for recovery.
[0081] The steel wire rope is a common tool for ship operations. The steel wire rope can be easily lowered to the seabed through common operating equipment such as cranes or winches on ships. A hook is fixedly connected to the head of the steel wire rope, and the first rope ring 41 and the second rope ring 42 can be hung on the hook through the mechanical arm of the underwater robot, so that the first cable 21 and the second cable 22 can be recovered.
[0082] Two knots 5 symmetrical about the cables 2 are set near the blocking points at both ends of the first cable 21 and the second cable 22. The second rope segment 12, the third rope segment 13, the fourth rope segment 14, the fifth rope segment 15 and the sixth rope segment 16 are all fixedly connected to the knots 5 to achieve connection with the cables 2, and the counterweight block 3 is fixedly connected to the knots 5.
[0083] Nylon rope or other seawater corrosion-resistant rope is used to tie knots 5 at both ends of the cable 2. There are two knots 5 at each end of the cable 2. The knots 5 can be used to connect the rope segment and the counterweight 3. In this way, the counterweight 3 can be fixedly connected to the rope segment without damaging the cable 2 or bending the cable 2.
[0084] The first cable 21 and the second cable 22 that completed the offshore simulation test and the control cable that did not undergo the test were dissected and sampled in the laboratory, and the sand particles on the fibers at different positions of the inner core were checked using an electron microscope scanning method. The test results showed that no particles with a diameter of more than 5um entered the interior of the cable 2. Even if the cable 2 was stored wet on the seabed for 6 months, the anti-sand filter layer could still prevent the entry of sand particles with a diameter of more than 5um, indicating that the anti-sand performance of the anti-sand filter layer used in this cable meets the requirements.
[0085] Example 2
[0086] This embodiment is similar to the embodiment 1, except that, in this embodiment, in the step S1, the fourth section of the cable (2) is cut as the second experimental group, and the cable (2) of the second experimental group is fixedly connected to the lifting end of the lifting system of the ship through the traction rope after the counterweight (3) is installed;
[0087] In step S4, after the towing is completed, the cables of the second experimental group are first recovered, and the cables of the first experimental group are stored on the seabed;
[0088] like Figure 4 and Figure 5 As shown, the cable 2 in the second experimental group is the fourth cable 23, and the fourth cable 23 is fixedly connected to the ship through the second traction rope 6. The second traction rope 6 includes a first connecting rope 61, a second connecting rope 62 and a third connecting rope 63. One end of the first connecting rope 61 is connected to, and the other end of the first connecting rope 61 is connected to one end of the second connecting rope 62 and one end of the third connecting rope 63. The other end of the second connecting rope 62 and the other end of the third connecting rope 63 are respectively connected to two ends of the fourth cable 23.
[0089] In this embodiment, a second experimental group is added, and the fourth cable 23 of the second experimental group also needs to enter the seabed for the towing experiment, but the fourth cable 23 does not need to remain on the seabed. This connection method is similar to the connection method between the cable 2 and the first towing rope 1 of the first experimental group, except that in the second experimental group, the second towing rope 6 only needs to be connected to one cable 2. By connecting in this way, the lateral towing of the fourth cable 23 can be achieved, and at the same time, the longitudinal towing of the fourth cable 23 can be achieved by cutting the third connecting rope 63.
[0090] In step S3, after the first dragging is completed, the third connecting rope 63 is disconnected by using an underwater robot, and then the second dragging is performed.
[0091] After the first dragging is completed, the second rope segment 12, the sixth rope segment 16, and the third connecting rope 63 need to be cut, and then the second dragging is performed.
[0092] The fourth cable 23 is provided with two knots 5 symmetrical about the cable 2 near the blocking parts at both ends of the cable 2. The second connecting rope 62 and the third connecting rope 63 are both fixedly connected to the knots 5 to achieve connection with the fourth cable 23. The counterweight 3 is fixedly connected to the knots 5.
[0093] In this embodiment, the second experimental group only performs towing, and the first experimental group needs to be stored on the seabed for a certain period of time after towing. When cutting the first cable 21, the second cable 22, and the fourth cable 23, an extra section of the cable can be cut and stored as the cable 2 that has not been tested for comparison.
[0094] Example 3
[0095] This embodiment is similar to Embodiment 2, except that, in this embodiment, after the first dragging is completed, an underwater robot is used to cut the third rope segment 13, the fifth rope segment 15 and the second connecting rope 62, and then a second dragging is performed. After the second dragging is completed, an underwater robot is used to cut the sixth rope segment 16 to separate the first cable 21 and the second cable 22.
[0096] Example 4
[0097] In addition to the features described in any one of Embodiments 1 to 3, this embodiment also includes the following features:
[0098] When cutting cables 2 of the same length and plugging both ends of the cables 2, cut three sections of cables 2 of about 3 meters each, cut both ends flat, and use plugs to seal. The plugs are coated with polyester cable with a thickness of not less than 7mm and a coating length of not less than 300mm. Be careful not to damage the coating. After the polyurethane coating is completely solidified, use a nylon rope with a diameter of 12mm and a breaking strength of 3 tons to wrap 5 turns at a position 400mm away from the end, and then double it at the symmetrical positions on both sides to make two knots 5 not shorter than 20cm. To ensure that the test results are not affected, the sample rope should be wrapped with clean and dry canvas during transportation.
[0099] Example 5
[0100] In addition to the features described in any one of Embodiments 1 to 4, this embodiment also includes the following features:
[0101] The second rope segment 12, the third rope segment 13, the fourth rope segment 14, the fifth rope segment 15 and the sixth rope segment 16 are nylon ropes with a diameter of 20 mm, a breaking strength of 5 tons and a length of 3 meters, and the first rope segment 11 is a nylon rope with a diameter of 20 mm, a breaking strength of 5 tons and a length of 5 meters. The counterweight block is a geared chain ring with a weight of not less than 10 kg.
[0102] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A method for testing the sand-proof performance of a cable at sea, characterized in that: The steps include: S1: Install a counterweight (3) on the cable (2), and use a traction rope to fix the cable (2) to the lifting end of the lifting system of the ship; S2: placing the cable (2) into the sea, so that the cable (2) falls to the seabed under the action of the counterweight (3); S3: starting the vessel to drag the cable (2) for the first time, adjusting the connection between the cable (2) and the towing rope after the first dragging is completed, and then dragging for the second time; S4: After the towing is completed, the cable (2) is disconnected from the vessel, so that the cable (2) is placed on the seabed, and the position of the cable (2) is recorded; S5: After the cable (2) is stored on the seabed for a certain period of time, the vessel travels to the recorded position of the cable (2) and recovers the cable (2); In the step S1, three sections of cables (2) of the same length are cut, and the cuts at both ends of the cables (2) are sealed, one section of the cables (2) is used as a control group, and the other two sections of the cables (2) are used as a first experimental group. After the two sections of the cables (2) of the first experimental group are installed with counterweights (3), they are fixedly connected to the lifting system of the ship through a traction rope; in the step S4, after the towing is completed, the cables (2) of the first experimental group are stored on the seabed for a certain period of time; in the step S5, after the cables (2) of the first experimental group are stored on the seabed for a certain period of time, one section of the cables (2) is first recovered, and the other section of the cables (2) is recovered after being stored for a period of time; the first cable (21) and the second cable (22) that have completed the marine simulation test and the control group cable that has not been tested are respectively dissected and sampled in the laboratory, and the sediment particles on the fibers at different positions of the inner core are checked using an electron microscope scanning method.
2. The offshore testing method for the anti-sand performance of cables according to claim 1, characterized in that: In step S1, two sections of cables (2) in the first experimental group are fixed by a first traction rope (1), the two cables (2) include a first cable (21) and a second cable (22), the first traction rope (1) includes six rope segments, the six rope segments include a first rope segment (11), a second rope segment (12), a third rope segment (13), a fourth rope segment (14), a fifth rope segment (15) and a sixth rope segment (16), one end of the first rope segment (11) is used to connect to the ship, the other end of the first rope segment (11) is connected to one end of the second rope segment (12), the other end of the second rope segment (12) is connected to one end of the first cable (21), one end of the third rope segment (13) is connected to one end of the first cable (21), and the other end of the third rope segment (13) is connected to one end of the second cable (22), One end of the fourth rope segment (14) is connected to one end of the second cable (22), one end of the fifth rope segment (15) is connected to the other end of the first rope segment (11), the other end of the fifth rope segment (15) is connected to the other end of the first cable (21), one end of the sixth rope segment (16) is connected to the other end of the first cable (21), the other end of the sixth rope segment (16) is connected to the other end of the second cable (22), the second rope segment (12) and the fifth rope segment (15) are connected to the same end of the first rope segment (11), the second rope segment (12) and the third rope segment (13) are connected to the same end of the first cable (21), the third rope segment (13) and the fourth rope segment (14) are connected to the same end of the second cable (22), and the fifth rope segment (15) and the sixth rope segment (16) are connected to the same end of the first cable (21).
3. The offshore testing method for the anti-sand performance of cables according to claim 2, characterized in that: In step S3, after the first dragging is completed, the second rope segment (12) and the sixth rope segment (16) are disconnected using an underwater robot, thereby adjusting the connection mode between the first cable (21) and the second cable (22) and the first traction rope (1), and then a second dragging is performed.
4. The offshore testing method for the anti-sand performance of cables according to claim 3, characterized in that: In step S4, after the dragging is completed, the first rope segment (11) and the third rope segment (13) are disconnected using an underwater robot, so that the cable (2) of the first experimental group remains on the seabed, and the first cable (21) and the second cable (22) are separated.
5. The offshore testing method for the anti-sand performance of cables according to claim 4, characterized in that: A first rope ring (41) is provided at the connection between the second rope segment (12) and the fifth rope segment (15) and the first rope segment (11); the other end of the first rope segment (11) is connected to the first rope ring (41); one end of the second rope segment (12) and one end of the fifth rope segment (15) are both connected to the first rope ring (41); and the other end of the fourth rope segment (14) is provided with a second rope ring (42).
6. The offshore testing method for the anti-sand performance of cables according to claim 5, characterized in that: In step S5, when the first cable (21) and the second cable (22) are recovered, the lifting end of the lifting system and the underwater robot are lowered, and a hook is provided on the lifting end. After the underwater robot finds the cable (2), the underwater robot hangs the first rope ring (41) and the second rope ring (42) on the hook, and pulls up the wire rope for recovery.
7. The offshore testing method for the anti-sand performance of a cable according to any one of claims 2 to 6, characterized in that: Two knots (5) symmetrical with respect to the cables (2) are arranged at both ends of the first cable (21) and the second cable (22) near the blocking position; the second rope segment (12), the third rope segment (13), the fourth rope segment (14), the fifth rope segment (15) and the sixth rope segment (16) are all fixedly connected to the knots (5) to achieve connection with the cables (2); and the counterweight (3) is fixedly connected to the knots (5).
8. The offshore testing method for the anti-sand performance of cables according to any one of claims 1 to 6, characterized in that: In the step S1, the fourth section of the cable (2) is cut as the second experimental group, and the cable (2) of the second experimental group is fixedly connected to the lifting system of the ship through a traction rope after the counterweight (3) is installed; In the step S4, after the dragging is completed, the cable (2) of the second experimental group is first recovered, and the cable (2) of the first experimental group is stored on the seabed; The cable (2) in the second experimental group is the fourth cable (23), and the fourth cable (23) is fixedly connected to the ship through the second traction rope (6), and the second traction rope (6) includes a first connecting rope (61), a second connecting rope (62) and a third connecting rope (63), one end of the first connecting rope (61) is connected to the lifting end of the lifting system, the other end of the first connecting rope (61) is connected to one end of the second connecting rope (62) and one end of the third connecting rope (63), and the other end of the second connecting rope (62) and the other end of the third connecting rope (63) are respectively connected to the two ends of the fourth cable (23).
9. The offshore testing method for the anti-sand performance of cables according to claim 8, characterized in that: In the step S3, after the first dragging is completed, the third connecting rope (63) is disconnected by using an underwater robot, and then the second dragging is performed.
Citation Information
Patent Citations
Cable laying precision control method and device
CN104269782A
Submarine optical cable laying device driven by dragging
CN112558256A
Anti-fouling and anti-adhesion high-strength polyester cable for deep and far seas and preparation method thereof
CN113389073A
Underwater connecting method for dynamic flexible pipe cable and anchoring base
CN114198569A
Cable guide device for underwater cleaning robot
KR1020160055291A