Control device and abnormality detection method
By storing the measured value and invalid time of the reference time in the control device, calculating the comparison result of the change rate of the operation quantity and the reference rate of change, and outputting abnormal status information, the problem of long detection time of the interrupt line in the prior art is solved, and the problem of the interrupt line detection time of the prior art is realized Earlier abnormality detection and more efficient control.
Patent Information
- Application Number
- CN202080094099.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-03
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-04-03
AI Technical Summary
The existing disconnection detection method does not require a current measurement unit, and it is impossible to detect abnormalities early.
By storing the measured value and invalid time obtained when inputting the operation amount at the reference time in the control device, the comparison result of the change rate of the operation amount and the reference rate is calculated, and abnormal state information is output, thereby shortening the time when the line is detected.
It is possible to shorten the time when the line is detected without the current measurement unit, and output abnormal detection results earlier, thereby improving the response speed of the control device.
Smart Images

Figure CN115004856B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a control device and an abnormality detection method. Background Art
[0002] Various control devices are used to control a control target based on an operation amount. For example, in order to control a heater to a target temperature, a temperature control device is used to control the power supply to the heater.
[0003] Conventional technologies related to heater disconnection detection in such a temperature control device are disclosed in Patent Documents 1 and 2.
[0004] Prior Art Literature
[0005] Patent Literature
[0006] Patent Document 1: Japanese Patent Application Publication No. 2013-054853
[0007] Patent Document 2: Japanese Patent Application Publication No. 2002-343537 Summary of the invention
[0008] Problems to be solved by the invention
[0009] As a method for detecting a disconnection, there is a method of providing a current measuring unit and determining a disconnection based on the measured current value. Patent Document 1 also belongs to this method.
[0010] In contrast, there is also a disconnection detection method that does not require a current measuring unit, and Patent Document 2 belongs to this method. In the technology of Patent Document 2, the maximum slope of the normal measurement value PV is used as a threshold value, and when the maximum slope R of the measured PV is less than the threshold value (the maximum slope of the normal measurement value PV), it is determined that the heater is disconnected.
[0011] The technology of Patent Document 2 is advantageous in that a current measuring unit is not required, but there is a problem that it takes time to detect a disconnection. That is, in order to obtain the "maximum slope R of the measured PV", it is necessary to wait until the time point when the "maximum slope" can be determined (because in order to determine whether it is the "maximum slope", it is necessary to wait until the slope of the PV decreases to a certain extent at least), and disconnection detection cannot be performed before this.
[0012] In view of the above problems, an object of the present invention is to provide an abnormality detection method which does not require an abnormality detection method of a current measuring unit and can shorten the time until disconnection is detected compared with the related art, and a control device using the abnormality detection method.
[0013] Technical solutions to solve problems
[0014] (Composition 1)
[0015] A control device that calculates an operating amount for controlling a control object based on a measured value and a target value, characterized in that the control device comprises: a storage unit that stores an invalid time of control determined based on a measured value obtained when a given operating amount is input at a reference time, and a reference value determined based on a measured value obtained when a given operating amount is input at a reference time; and a notification output unit that outputs abnormal status information based on a comparison result of a value based on the measured value and the reference value after the invalid time has passed since the time point when the abnormal detection output starts when the operating amount exceeds a threshold, i.e., the abnormal detection start time point.
[0016] (Composition 2)
[0017] The control device according to configuration 1 is characterized in that the reference value is a reference change rate of the rate of change of the measured value determined based on the measured value obtained when a given operating amount is input at the reference time, and after the invalid time has passed from the start time point of the abnormality detection, the abnormal status information is output based on the comparison result of the change rate of the measured value with the reference change rate.
[0018] (Composition 3)
[0019] The control device according to configuration 1 or 2 is characterized in that the abnormal state information is output in stages by determining a plurality of the reference values.
[0020] (Composition 4)
[0021] The control device according to any one of structures 1 to 3 is characterized in that after the invalid time has passed from the abnormality detection start time point, when the value based on the measured value is less than the disconnection reference value, a disconnection alarm is output as the abnormal state information.
[0022] (Composition 5)
[0023] The control device according to any one of structures 1 to 4 is characterized in that, during the period from the start time point of the abnormality detection to the time when the invalid time is longer than the invalid time, when the value based on the measured value does not reach the reference value once, the abnormal status information indicating the abnormality is output.
[0024] (Composition 6)
[0025] A control device that calculates an operating amount for controlling a control object based on a measured value and a target value, characterized in that the control device comprises: a storage unit that stores an invalid time of control determined based on a measured value obtained when a given operating amount is input at a reference time; and a notification output unit that outputs a disconnection alarm when a value based on the measured value is below a disconnection reference value after the invalid time has passed since the time point when the abnormality detection output starts when the operating amount exceeds a threshold.
[0026] (Composition 7)
[0027] The control device according to Configuration 6 is characterized in that the value based on the measured value is a rate of change of the measured value.
[0028] (Composition 8)
[0029] An abnormality detection method is an abnormality detection method in a control device that calculates an operating amount used to control a control object based on a measured value and a target value, characterized in that the abnormality detection method includes: a step of predetermining an invalid time of control obtained based on a measured value obtained when a given operating amount is input at a reference time, and a reference value based on the measured value obtained when a given operating amount is input at a reference time; and a step of outputting abnormal status information based on a comparison result of a value based on the measured value and the reference value after the invalid time has passed since the time point when the abnormality detection output starts when the operating amount exceeds a threshold value.
[0030] (Composition 9)
[0031] According to the abnormality detection method described in configuration 8, it is characterized in that the reference value is a reference change rate of the rate of change of the measured value determined based on the measured value obtained when a given operating amount is input at the reference time, and after the invalid time has passed since the time point when the abnormality detection output starts, the abnormal status information is output based on the comparison result of the change rate of the measured value with the reference change rate.
[0032] (Composition 10)
[0033] An abnormality detection method is an abnormality detection method in a control device that calculates an operating amount used to control a control object based on a measured value and a target value, characterized in that the abnormality detection method includes: a step of predetermining an invalid time of control obtained based on a measured value obtained when a given operating amount is input at a reference time; and a step of outputting a disconnection alarm after the invalid time has passed from the time point when the abnormality detection output starts when the operating amount exceeds a threshold value, if the value based on the measured value is below a disconnection reference value.
[0034] (Composition 11)
[0035] The abnormality detection method according to configuration 10 is characterized in that the value based on the measured value is a rate of change of the measured value.
[0036] Effects of the Invention
[0037] According to the present invention, in the abnormality detection method that does not require a current measuring unit, the time until a wire break is detected can be shortened compared to the related art. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 This is a block diagram schematically showing the configuration of a temperature control device according to an embodiment of the present invention.
[0039] Figure 2 This is a flowchart showing an overview of abnormality detection processing in the embodiment.
[0040] Figure 3 It is a diagram showing experimental results related to the abnormality detection process of the temperature control device according to the embodiment.
[0041] Figure 4 It is a diagram showing experimental results related to the abnormality detection process of the temperature control device according to the embodiment.
[0042] Figure 5 This is a flowchart showing an overview of disconnection detection processing.
[0043] Figure 6 It is a diagram showing simulation results related to abnormality detection processing.
[0044] Figure 7 It is a diagram showing simulation results related to abnormality detection processing.
[0045] Figure 8 It is a diagram showing simulation results related to abnormality detection processing. DETAILED DESCRIPTION
[0046] The following embodiments of the present invention will be described in detail with reference to the accompanying drawings. Note that the following embodiments are only one way of implementing the present invention, and do not limit the scope of the present invention.
[0047] Figure 1 This is a block diagram schematically showing the configuration of a temperature control device (an example of a control device) according to an embodiment of the present invention.
[0048] The temperature control device 1 of the present embodiment is a device for controlling the temperature of a control object 2 , and here, the temperature of a temperature control object 22 heated by a heater 21 is controlled as an example for description.
[0049] The temperature control device 1 controls the temperature of the control object 2 by PID control based on the deviation between the target value SV and the measured value PV (measured value of the temperature measuring unit 23) of the control object. The temperature control of the control object 2 is performed by turning on / off a switching element (not particularly shown) provided on a power supply line for the heater 21 based on the operation amount MV calculated by the PID control.
[0050] The temperature control device 1 of the present embodiment detects disconnection of the heater 21 or the like, and outputs information based thereon (abnormal state information).
[0051] As a schematic structure, the temperature control device 1 includes a calculation unit 11 , a storage unit 12 , an input unit 13 , and an output unit 14 .
[0052] The computing unit 11 includes:
[0053] A PID calculation unit 111 that performs a calculation process of a manipulated variable MV based on a PID calculation of a deviation between a target value SV and a measured value PV of a controlled object;
[0054] a PID constant adjustment unit 112 for calculating PID constants used for PID operation; and
[0055] The notification output unit 113 outputs the abnormality detection output according to the rate of change PV of the measured value after the invalid time has passed since the abnormality detection start time point when the operation amount MV exceeds the threshold value, as described below. d The result of the comparison with the reference change rate is used to output abnormal status information.
[0056] Furthermore, in Figure 1 In the embodiment, the structure is recorded separately for each function, but it does not necessarily mean that these structures are divided in hardware. For example, the operation unit 11 can also be composed of well-known devices such as PLC, MCU, and microcomputer, and each structure is installed in software. As described below, in this embodiment, the installation of each structure in software is taken as an example. Of course, each structure can also be composed in hardware, for example, it can be a structure composed of FPGA, etc., or it can be a structure composed of dedicated hardware such as ASIC, etc.
[0057] The storage unit 12 stores threshold values described below, reference values, PID constants obtained in the self-tuning process of the PID constant adjustment unit 112 , invalid time information, slope values at reference time, and the like.
[0058] The temperature control device 1 has a self-tuning function for automatically calculating PID constants suitable for the control object and control conditions. Since the self-tuning process itself is a technology that has been used for a long time, a detailed description is omitted here. The appropriate PID constants are calculated based on the measured value PV obtained for the input with the operation amount set to 100%.
[0059] Based on this self-adjustment process, the invalid time (the time from when the input changes to when the output changes) and the change rate of the measured value PV are acquired and stored in the storage unit 12 as invalid time information and the slope value at the reference time.
[0060] In the present embodiment, in the self-adjusting process, when the input is made to set the operation amount to 100%, based on the data when the measured value PV is in the range of 5% to 95% relative to the target value SV, the average slope of the measured value PV in the range is set as the "reference slope value". The "reference slope value" is not limited to this, and any information indicating the rate of change of the output obtained when a given operation amount is input may be used. For example, the maximum slope of the measured value PV may be set as the "reference slope value".
[0061] The “slope value at the reference time” is a measured value / time. The unit of the slope value at the reference time in the present embodiment is °C / min.
[0062] The input unit 13 is a mechanism for receiving inputs such as various settings and operation instructions from the user, and is composed of, for example, an operation unit for the user to directly perform input operations, a receiving unit for receiving inputs of data from an external device, and the like.
[0063] The output unit 14 is a mechanism for outputting information to the user, and is composed of, for example, various display devices, speakers, various warning lamps, a transmission unit for outputting data to an external device, and the like.
[0064] As described above, the temperature control device 1 of the present embodiment has a function of detecting disconnection of the heater 21, etc., and outputting information based thereon (abnormal state information). First, the invalid time of the control and the reference value determined based on the measured value obtained when a given operating amount is input when the device is not abnormal (or when the device is in a preferred state) are obtained in advance. In the present embodiment, as the reference value, the "slope value at the reference time" based on the rate of change of the measured value is obtained in advance. And, when the device is in the working state, while monitoring the value based on the measured value (change in the measured value PV), the abnormal state information is output based on the comparison result between the value and the reference value. In the present embodiment, based on the rate of change PV of the measured value PV dThe abnormal state information is output based on the comparison result with the reference change rate determined based on the slope value at the reference time. That is, the device is judged to be abnormal based on how much the change rate of the measured value PV (PV slope) has changed compared to the state when the device is not abnormal.
[0065] Below, refer to Figure 2 An example of the processing operation of the temperature control device 1 related to this feature is explained in the flowchart.
[0066] Furthermore, Figure 2 The processing is executed by the operation unit 11 while reading and writing data in the storage unit 12 as needed. That is, here, it is taken as an example that the PID operation unit 111, the PID constant adjustment unit 112, and the notification output unit 113 are implemented in the form of software.
[0067] In the initialization process of the temperature control device 1 by turning on the power of the temperature control device 1 or the like, 2 is substituted into TDA which is a flag indicating abnormal state information (step 201).
[0068] In this embodiment, as detection of abnormal state, a case where judgment is made in three stages, namely "no abnormality", "inspection notification", and "disconnection detection", is taken as an example. "No abnormality" is a state where it is judged that there is no problem with the device, and the value of TDA is equivalent to 1. "Inspection notification" is a notification that prompts maintenance because performance degradation is confirmed although it has not reached a failure. The value of TDA is equivalent to 2. "Disconnection detection" is a state where a disconnection is detected, and the value of TDA is 3. When a disconnection is detected, an alarm is issued, and control stop processing is performed.
[0069] After the initialization process of the device, the temperature control process for the temperature-controlled object 2 is started, and the manipulated variable MV is input (the value of the manipulated variable MV increases).
[0070] In step 202 , it is determined whether the value of the operation amount MV exceeds the “abnormality detection start output.” The “abnormality detection start output” is a threshold value for determining the start of the abnormality detection process described in this embodiment, and is set to 80% in this embodiment and stored in the storage unit 12 .
[0071] When the value of the manipulated variable MV exceeds the "abnormal detection start output", that is, when the abnormal detection start time is reached, the change rate of the measured value PV, i.e., PV d , compare it with the disconnection reference value (step 202: yes → step 203),
[0072] PV d It is the rate of change of the temperature of the temperature-controlled object 22 measured by the temperature measuring unit 23 (the differential value of PV).
[0073] The "broken wire reference value" is a threshold value for judging a broken wire, and is set, for example, by multiplying the "slope value at the reference time" by a coefficient, subtracting a given deviation, etc. (Of course, it can also be a value set in the form of a constant (absolute value)). In the present embodiment, the coefficient is 0, so the "broken wire reference value" is 0°C / min. Furthermore, the broken wire reference value itself can be set in the storage unit 12, or the values required for calculating the coefficient, deviation, etc. can be set in the storage unit 12, and the broken wire reference value can be calculated based on the "slope value at the reference time". In addition, the user can set the broken wire reference value itself, or the user can set the coefficient, deviation, etc. used to calculate the broken wire reference value.
[0074] The result of step 203 is PV d If the disconnection reference value is not exceeded (that is, the slope of PV is not positive), the process proceeds to the loop processing of step 203 and step 211 .
[0075] In step 211, it is determined whether the invalid time L×1.2 has passed since the time when the manipulated variable MV is input. Since the output (PV) cannot be obtained until the invalid time has passed since the manipulated variable MV is input, the time is waited. In addition, the value is set to 1.2 times to take a margin, and the method of taking the margin can be arbitrarily set according to the control object, design concept, etc. (it is also possible not to take a margin).
[0076] After 1.2 L has passed since the start of the input of the manipulated amount MV, PV d If the disconnection reference value is not exceeded, 3 is substituted into TDA and a disconnection alarm is output (step 211: Yes → step 212). Since the slope of PV is not positive (no output) even if the invalid time has passed after the input of the operation amount, it is judged as disconnection.
[0077] In this embodiment, the "disconnection alarm output" is the output of a corresponding warning lamp (LED as the output unit 14) lighting up in red and a warning sound. Although not particularly shown, when the disconnection alarm is output, a control stop process is also performed.
[0078] Through the above processing, a process of "outputting a disconnection alarm as abnormal state information when the change rate of the measured value becomes equal to or less than the disconnection reference value after the invalid time has passed from the abnormality detection start time point" is performed.
[0079] On the other hand, the result of determination in step 203 is PV d When the disconnection reference value is exceeded, the process proceeds to the loop processing of steps 206 and 207. In the loop processing of steps 206 and 207, the processes of steps 204 and 205 are also performed.
[0080] In step 206, PV dWhether it exceeds "baseline change rate 1".
[0081] "Baseline change rate 1" is a threshold value (one of them) for judging the state of the device, and is set by multiplying the "baseline slope value" by a coefficient, subtracting a given deviation, or the like. In the present embodiment, the coefficient is 0.3 (30%). In addition, the baseline change rate 1 itself may be set in the storage unit 12, or values required for calculation of the coefficient, deviation, etc. may be set in the storage unit 12, and the baseline change rate 1 may be calculated based on the "baseline slope value". In addition, the baseline change rate 1 itself may be set by the user, or the coefficient, deviation, etc. used to calculate the baseline change rate 1 may be set by the user.
[0082] In PV d When the "reference rate of change 1" is not reached, it is determined whether the value of the operation amount MV is less than the "abnormal detection end output" (step 206: No → step 207). The "abnormal detection end output" is a threshold value that determines the end of the abnormal detection process. For example, it is set by multiplying the "abnormal detection start output" by a coefficient, subtracting a given deviation from the "abnormal detection start output", etc. (of course, the "abnormal detection start output" itself can also be set directly). In the present embodiment, the deviation is 5%, so the "abnormal detection end output" is 80-5=75%. Furthermore, the abnormal detection end output itself can be set in the storage unit 12, and the values required for the calculation of the coefficient, deviation, etc. can be set in the storage unit 12, and the abnormal detection end output is calculated according to the "abnormal detection start output". In addition, the user can also set the abnormal detection end output itself, and the user can also set the coefficient, deviation, etc. used to calculate the abnormal detection end output.
[0083] In PV d When the "reference change rate 1" has not been reached and the value of the manipulated variable MV has not become less than the "abnormality detection end output", the loop processing of steps 206 and 207 is continued, and the processing of steps 204 and 205 is performed.
[0084] The processing of step 204 is the same as the processing of step 211 described above. If 1.2 L has not passed since the start of input of the operation amount MV, step 205 is skipped, and after 1.2 L has passed, the value based on TDA is output in step 205. Since 2 is input to TDA in step 201, the value of TDA here is 2.
[0085] As described above, the TDA value of 2 indicates "inspection notification", and in the present embodiment, the output based on the TDA value in step 205 is the lighting of the LED of the output unit 14 in yellow.
[0086] The above process is performed after the invalid time has passed since the input operation amount. d If the reference change rate 1 is not reached, it is determined that a failure has not occurred but performance degradation (eg, degradation of the heater 21) has been confirmed, and a notification (yellow lighting of the LED) to prompt maintenance is performed.
[0087] On the other hand, in PV d If the reference change rate exceeds "reference change rate 1", the loop processing of steps 206 and 207 is exited and the process proceeds to step 208 (step 206: Yes→step 208).
[0088] In step 208, 1 is substituted into TDA. As described above, this indicates "no abnormality." In the next step 209, an output based on the value of TDA is performed.
[0089] In the present embodiment, the “output based on the value (1) of the TDA” is lighting of the LED serving as the output unit 14 in green.
[0090] In this embodiment, the PV value of 0.3 times the slope value at the reference time is obtained. d This is an example of a normal range.
[0091] Step 210 following step 209 is the same determination process as step 207 described above. When the value of the manipulated variable MV is not less than the "abnormality detection end output", the process of step 209 is continued (lit green).
[0092] As can be seen from the above description, in this embodiment, even if the "reference change rate 1" is reached once from the abnormality detection start time point, "no abnormality" is output, otherwise "inspection notification (or disconnection alarm)" is output. That is, "when the change rate of the measured value does not reach the reference change rate once from the abnormality detection start time point to the invalid time of more than the prescribed time, the abnormal state information indicating the abnormality is output" is processed.
[0093] In the process of step 207 or step 210, when the value of the manipulated variable MV becomes less than the "abnormal detection end output", the process returns to step 201. That is, when the value of the manipulated variable MV becomes less than the "abnormal detection end output", the abnormal detection process is temporarily terminated. When the value of the manipulated variable MV reaches the abnormal detection start output again (step 202), the abnormal detection process described above is started again. In addition, even after the abnormal detection process is completed, the output based on the TDA information from the output unit 14 (in this example, the lighting of the LED) can be continued.
[0094] Figure 3It is a diagram showing the experimental results (at the time of startup) regarding the abnormality detection process of the temperature control device 1 according to the present embodiment. Figure 3 The upper graph shows the changes of the manipulated value MV and the measured value PV over time, and the lower graph shows the slope of the measured value PV, i.e., PV d , the slope value at the baseline and the baseline change rate 1.
[0095] The conditions of this experiment are as follows (the setting of each threshold value is as described above).
[0096] Slope value at the reference time = 36.9 (℃ / min)
[0097] Invalid time L = 22 (sec)
[0098] Proportional degree = 12.6 (℃)
[0099] Integration time = 81 (sec)
[0100] Derivative time = 20 (sec)
[0101] Input MV, when MV becomes abnormality detection start output (80%), abnormality detection starts. And, after 1.2L (1.2×22=26.4) seconds, PV d Since the value is approximately close to the "slope value at the time of reference", and exceeds the reference change rate (36.9×0.3=11.07), an output of "no abnormality" is performed.
[0102] from Figure 3 It can be seen that the PV starts to rise slowly after the invalid time relative to the rise of the MV, and the change of the PV value just after the rise is small. In the past, considering the slow change of the PV value, after the manipulated variable MV becomes 100%, the presence of a disconnection is determined by whether the PV has changed at the time point when 2 times the integral time has passed. Therefore, in this example, the disconnection alarm takes about 200 (sec).
[0103] Furthermore, in the case of the technology of Patent Document 2, in order to obtain the "maximum slope R of the measured PV", it is necessary to wait until the time point at which the "maximum slope" can be determined (because in order to determine whether it is the "maximum slope", it is necessary to wait until the slope of the PV decreases to a certain extent at least). Figure 3 In the example above, you still need to wait for more than 200 (sec).
[0104] In contrast, in this embodiment, the abnormality detection result can be output in about 75 (sec). Figure 3 It can be seen that PV d Compared with the PV value itself, it is possible to obtain a meaningful change value at an earlier stage, so it is possible to detect it earlier. Figure 3 The lower side of the curve graph also shows that before 50 (sec) PV d When the "reference change rate 1" is exceeded, abnormality detection can actually be performed at a stage earlier than 75 (sec).
[0105] Furthermore, conventionally, only the presence or absence of disconnection (only binary value) was determined, but in the present embodiment, a step-by-step determination can be made.
[0106] Figure 4 is with Figure 3 The graph shows the results of an experiment under basically the same conditions, which simulates a case where a wire breakage occurs when the control is in a stable state. Figure 4 The upper graph shows the changes of the manipulated value MV and the measured value PV over time, and the lower graph shows the slope of the measured value PV, i.e., PV d , the slope value at the baseline and the disconnection baseline value.
[0107] When MV and PV are in a stable state, PV starts to drop due to a wire break. In contrast, feedback is applied and MV starts to rise, but PV continues to drop due to a wire break. As a result, MV continues to rise, and abnormality detection starts when MV reaches the abnormality detection start output (80%). After that, even after 1.2L (1.2×22=26.4) seconds, PV d Since it is also a negative value, a disconnection alarm is output at this time point (a time point around 2350 (sec) in the figure).
[0108] In contrast, in the case of the previous disconnection alarm (LBA), after the operating amount MV becomes 100%, the presence or absence of disconnection is determined based on whether the PV has changed at a time point when twice the integration time has passed. Therefore, in this example, if the time point does not exceed 2500 (sec), no alarm is output.
[0109] Furthermore, a simulation related to the abnormality detection process of the present embodiment was performed.
[0110] Figures 6 to 8 Represents the simulation results. Figures 6 to 8 and Figure 4 Similarly, the upper graph shows the changes in the manipulated variable MV and the measured value PV over time, and the lower graph shows the slope of the measured value PV, i.e., PV d , the slope value at the baseline and the baseline change rate 1.
[0111] Figures 6 to 8 The conditions used in the simulation are as follows (for the settings other than the following, Figure 4 The experiments were carried out under the same conditions).
[0112] Slope value at the reference time = 30.8 (℃ / min)
[0113] Invalid time L = 47.6 (sec)
[0114] Proportional degree = 20.4 (℃)
[0115] Integration time = 87.8 (sec)
[0116] Derivative time = 21.9 (sec)
[0117] Figure 6 This is the simulation result when the simulation device is normal.
[0118] Input MV, when MV becomes abnormal detection start output (80%), abnormal detection starts. Then, after 1.2L (1.2×47.6≈57.1) seconds, PV d Since the reference change rate (30.8×0.3≈9.2) is exceeded, a “no abnormality” output is performed (the LED lights up green).
[0119] from Figure 6 It can be seen that according to this embodiment, it is also possible to d Abnormality detection is performed before the maximum value (ie, the maximum slope) is reached. This enables earlier detection than the technique of Patent Document 2 which requires obtaining the "maximum slope R of the measured PV".
[0120] Figure 7 This is a simulation result simulating a case where the device is abnormal (a state where heater degradation is progressing).
[0121] Input MV, when MV becomes abnormal detection start output (80%), abnormal detection starts. Then, after 1.2L (1.2×47.6≈57.1) seconds, PV d The disconnection reference value (0) is exceeded, but the reference change rate (30.8×0.3≈9.2) is not exceeded, so a maintenance notification is issued (the LED lights up yellow). In this example, a maintenance notification is issued temporarily (the LED lights up yellow), but in the following Figure 7 At a time point of more than 80 seconds, PV d Since the reference rate of change is exceeded, a notification indicating that there is no abnormality is provided at that time (the LED turns on green). Thus, the user can recognize that the device is in a state of being generally free of problems, but is deteriorating.
[0122] Figure 8 This is the simulation result of a case where a disconnection occurs when the simulation control is in a stable state.
[0123] When MV and PV are in a stable state, PV starts to drop due to a wire break. In contrast, feedback is applied and MV starts to rise, but PV continues to drop due to a wire break. As a result, MV continues to rise, and abnormality detection starts when MV reaches the abnormality detection start output (80%). After that, even after 1.2L (1.2×47.6≈57.1) seconds, PV d is also a negative value, so a disconnection alarm is output at this point in time.
[0124] As described above, according to the temperature control device 1 of the present embodiment, it is possible to shorten the time until the disconnection is detected compared with the related art by providing an abnormality detection method that does not require a current measuring unit.
[0125] Furthermore, not only can the presence or absence of disconnection be detected, but also periodic abnormal state information (in this embodiment, "no abnormality", "inspection notification", "disconnection detection") can be output, which is very useful.
[0126] In addition, for example, as shown in the method of Patent Document 2, when disconnection detection is performed based on the maximum slope of PV, disconnection detection can basically only be performed during temperature rise (because the maximum slope of PV cannot be obtained). In contrast, according to the temperature control device 1 of this embodiment, as described above, disconnection detection can be performed even outside the temperature rise period.
[0127] Furthermore, in this embodiment, as abnormal state information, three stages of "no abnormality", "inspection notification", and "disconnection detection" are used as examples, but judgment can also be performed in more stages. By determining multiple "reference change rates", it is possible to output abnormal state information in more stages. For example, in this embodiment, the "reference change rate" is set to the value obtained by multiplying the "slope value at the reference time" by 0.3, but the "slope value at the reference time" can also be multiplied by 0.2, 0.4, 0.6, 0.8, etc. to determine multiple "reference change rates" to output abnormalities according to the degree.
[0128] On the other hand, only disconnection detection may be performed.
[0129] Figure 5 This is a flowchart showing an overview of processing for performing only disconnection detection at startup.
[0130] After the temperature control process of the temperature control object 2 is started (step 501), it is determined whether the manipulated variable MV exceeds the abnormality detection start output (step 502). Next, after the manipulated variable MV exceeds the abnormality detection start output, it waits for 1.2L to pass (step 503). The processing of steps 502 and 503 is the same as Figure 2 The same processing is performed in steps 202 and 211.
[0131] After 1.2L has passed since the operation amount MV exceeded the abnormality detection and output started, PV d If the disconnection threshold value is not exceeded, a disconnection alarm is output (step 504: No → step 505). d If the disconnection threshold is exceeded, no disconnection alarm is output. Figure 2 The same processing is performed in steps 203 and 212.
[0132] In the embodiment, the abnormality detection start output is set to 80% as an example, but the abnormality detection start output can be set to any value. Figure 5 In the disconnection alarm processing, in order to notify the disconnection alarm earlier, the abnormality detection start output can be set to a smaller value (the abnormality detection start output can also be set to "0%").
[0133] In addition, the user can also set the abnormality detection to start output.
[0134] In the embodiment, the case where the slope value at the invalid time and the reference time is obtained based on the self-adjustment process is taken as an example, but the present invention is not limited to this. As a process for determining the PID constant, there is also an automatic adjustment process, etc., based on which the slope value at the invalid time and the reference time can be obtained. In addition, the process of obtaining the slope value at the invalid time and the reference time can also be performed independently from the process for determining the PID constant. In a device where the control object, control conditions, etc. do not change, the slope value at the invalid time and the reference time can also be set in advance in the device (set at the time of shipment).
[0135] In the embodiment, PID control is described as an example of control processing, but the present invention is not limited to this and can be used in any control method that calculates an operation amount for controlling a control object based on a measured value and a target value.
[0136] In the present embodiment, the temperature control device is described as an example of the control device. However, the present invention is not limited to the temperature control device, and can be applied to a control device that controls a control object according to an operation amount.
[0137] In this embodiment, the "output of abnormal state information" is the lighting of a warning light, but the present invention is not limited thereto. For example, it may be output in various ways such as displaying information on a display device, outputting a warning sound, and sending information to an external device. In addition, the abnormal state information may be recorded in the device so that it can be used for subsequent analysis.
[0138] In the present embodiment, the reference change rate (PV change rate) is used as the "reference value determined based on the measured value obtained when a given operation amount is input at the reference time", and the measured value change rate is used as the "measured value-based value" compared with the reference change rate. However, the present invention is not limited to this. As the "reference value", any value that can evaluate the change of the measured value PV, such as the "PV value itself", can be used.
[0139] That is, as the "reference value determined based on the measured value obtained when a given operation amount is input at the reference time", for example, the PV itself measured at the reference time or a value obtained by multiplying the PV by a correction coefficient can be used. As the "PV measured at the reference time", the PV value at a certain time point (for example, when the invalid time has passed, after a predetermined invalid time has passed, etc.), the average value of the PV value in a certain range, the maximum value or minimum value of the PV value in a certain range, etc. can be appropriately determined according to the design concept of the target device, etc. The same applies to the disconnection reference value.
[0140] In the above case, Figure 2 In the processing of step 206, the PV measured at that time is compared with the reference value 1 (instead of the reference change rate 1). The reference value 1 is a value obtained by multiplying the "PV measured at the reference time" by a coefficient, or a value obtained by subtracting a given deviation amount, etc. (stored in the storage unit 12). Figure 2 Step 203, Figure 5 In the processing of step 504, the PV measured at that time is compared with the disconnection reference value. The disconnection reference value is a value obtained by multiplying the "PV measured at the reference time" by a coefficient, "0", etc. (stored in the storage unit 12). Other processing concepts and Figure 2 , 5 The processing concept described in is the same.
[0141] In the processing of each numerical information described so far, performing operations such as multiplication by a correction coefficient and other appropriate optimization operations does not make a difference to the basic concept of the present invention.
[0142] Furthermore, in the comparison process of numerical values, the difference between “above” and “exceeds” and between “less than” and “below” does not cause any difference to the basic concept of the present invention.
[0143] Description of symbols
[0144] 1 Temperature control device (control device)
[0145] 11Calculation unit
[0146] 111PID calculation unit
[0147] 112PID constant adjustment unit
[0148] 113 Notification output unit
[0149] 12 Storage unit
[0150] 13 Input section
[0151] 14 Output section
[0152] 2. Control object.
Claims
1. A control device that calculates an operation amount for controlling a control object based on a measured value and a target value, characterized in that: The control device comprises: a storage unit storing an invalid time of control determined based on a measured value obtained when a given operation amount is input at a reference time, and a reference value determined based on the measured value obtained when a given operation amount is input at the reference time, the invalid time being a time from a time when an input changes to a time when an output changes as a result thereof; as well as A notification output unit outputs abnormal state information based on a comparison result between a value based on a measured value and the reference value after the invalid time has passed since the abnormality detection start time point, wherein the abnormality detection start time point is a time point when the operation amount exceeds a threshold value for abnormality detection start output.
2. The control device according to claim 1, characterized in that: The reference value is a reference change rate determined based on a change rate of a measured value obtained when a given operation amount is input at a reference time, After the invalid time has elapsed from the abnormality detection start time point, abnormal state information is output based on a comparison result of a change rate of the measured value with the reference change rate.
3. The control device according to claim 1, characterized in that: By determining a plurality of the reference values, the abnormal state information is output in stages.
4. The control device according to claim 1, characterized in that: After the invalid time has elapsed from the abnormality detection start time point, when the value based on the measurement value is equal to or less than a disconnection reference value, a disconnection alarm is output as the abnormal state information.
5. The control device according to any one of claims 1 to 4, characterized in that: If the value based on the measurement value does not reach the reference value even once during the period from the abnormality detection start time point until a time equal to or longer than the invalid time has passed, the abnormal state information indicating an abnormality is output.
6. A control device that calculates an operation amount for controlling a control object based on a measured value and a target value, characterized in that: The control device comprises: a storage unit storing an invalid time of control determined based on a measured value obtained when a given operation amount is input at a reference time, the invalid time being a time from when the input changes to when the output changes accordingly; as well as The notification output unit outputs a disconnection alarm when a value based on the measured value is equal to or less than a disconnection reference value after the invalid time has passed since the operation amount exceeds the threshold value and an abnormality detection output is started.
7. The control device according to claim 6, characterized in that: The value based on the measured value is the rate of change of the measured value.
8. An abnormality detection method in a control device for calculating an operation amount for controlling a control object based on a measured value and a target value, characterized in that: The anomaly detection method comprises: A step of predetermining an invalid time of control obtained based on a measured value obtained when a given operation amount is input at a reference time, and a reference value based on the measured value obtained when a given operation amount is input at a reference time, wherein the invalid time is a time from a time when an input changes to a time when an output changes as a result thereof; and A step of outputting abnormal state information based on a comparison result between a value based on a measured value and the reference value after the invalid time has passed since the operation amount exceeds a threshold value and an abnormality detection output is started.
9. The abnormality detection method according to claim 8, characterized in that: The reference value is a reference change rate determined based on a change rate of a measured value obtained when a given operation amount is input at a reference time, After the invalid time has elapsed from the time point when the abnormality detection output is started, the abnormal state information is output based on the comparison result of the change rate of the measured value with the reference change rate.
10. An abnormality detection method in a control device for calculating an operation amount for controlling a control object based on a measured value and a target value, characterized in that: The anomaly detection method comprises: A step of predetermining an invalid time of control obtained based on a measured value obtained when a given operation amount is input at a reference time, the invalid time being a time from when the input changes to when the output changes accordingly; and A step of outputting a disconnection alarm when a value based on the measured value is equal to or less than a disconnection reference value after the invalid time has elapsed since the operation amount exceeds the threshold value and an abnormality detection output is started.
11. The abnormality detection method according to claim 10, characterized in that: The value based on the measured value is the rate of change of the measured value.