A method for designing simultaneous power usage coefficient of battery capacity machine based on simulation
Through the simulation design method, a power consumption model of the battery capacity test process is established to simulate different scenarios, which solves the problem in the existing technology that the power consumption design of the battery capacity machine relies on manual experience, and achieves accurate description of power consumption and system robustness. Improvement to ensure the safety and stability of battery cell production.
Patent Information
- Application Number
- CN202210696609.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-20
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-06-20
AI Technical Summary
The existing technology in the battery cell workshop mainly relies on manual experience to design the simultaneous use coefficient of battery capacity and machine power, resulting in an unscientific design that may result in improper selection of transformer capacity, affect the stable operation of the production line and even lead to safety accidents, and it is difficult to accurately describe the equipment usage. Electrical power and energy consumption changes.
Adopt a simulation-based design method for the simultaneous use coefficient of battery cell capacity machine, and use the discrete event simulation planning method to establish a simulation model to simulate the power consumption in different scenarios, calculate and draw the power waveform diagram, and select a reasonable simultaneous use coefficient design value.
It achieves an accurate digital expression of the electric power used during the cell capacity test process, fully considers random abnormal events such as material feeding strategies and equipment failures, improves the robustness of the design system, and ensures the safety and stability of the cell production process.
Smart Images

Figure CN115098963B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of simulation planning, and in particular to a method for designing a simultaneous electricity usage coefficient of a battery capacity machine based on simulation. Background Art
[0002] The design of the simultaneous use coefficient of the cell capacity and electricity consumption is a crucial data in the planning and design of the cell workshop, which directly affects the workshop load forecast calculation and is related to the selection of transformer capacity. Different choices of simultaneous use coefficients may result in a difference of one level or even more in transformer capacity. Too large a value will cause too much waste, while too small a value will affect the stable operation of the production line and lead to safety accidents in serious cases. Scientific simultaneous use coefficient design methods are particularly important, and currently they still mainly rely on the design method of manual experience.
[0003] The discrete event simulation planning method comprehensively considers the coupling of complex dynamic systems and the influence of random factors. It can more intuitively and accurately describe the changes in power consumption and energy consumption of equipment in the battery capacity test process. By simulating various uncertain and abnormal factors in the future operation process, it quantitatively evaluates the simultaneous use coefficient of the optimized design and improves the robustness of the design system, thereby ensuring the safe and stable production process of the battery cells and scientifically assisting factory planning and construction. This method is also of reference significance for the design of simultaneous use coefficients of similar workshops / equipment. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for designing the simultaneous use coefficient of electricity consumption of a battery capacity machine based on simulation, which can be applied to the power distribution planning and design of the capacity machine in the planning stage of a battery workshop.
[0005] The technical solution of the present invention is as follows:
[0006] A method for designing a simultaneous power usage coefficient of a battery capacity machine based on simulation includes the following steps:
[0007] S1. Prepare basic data, calculate the power consumption of each stage of the capacity machine according to the duration, voltage, and current capacity test process data of each stage in the capacity process cycle of each type of battery cell, consider the process conditions of different stages of the capacity test, and provide basic data for simulation design;
[0008] S2. Establish a simulation model. Based on the discrete event simulation engine, establish a simulation model for the cell capacity test process according to information such as workshop layout, resource allocation, and production logistics strategy, and realize the change of real-time power consumption of equipment during the capacity test process;
[0009] S3. Verify the simulation model. Run the simulation model under different scenarios such as battery cell model, available equipment data, test batch, and failure mode. Simulate and calculate the process capacity and energy consumption. Compare the results with the theoretical calculation results under different scenarios. When the deviation of process capacity and energy consumption is less than 5%, the simulation model is considered reliable.
[0010] S4. Output the total real-time power consumption of the capacity machine, run the capacity test process simulation model under different feeding strategies, calculate the total real-time power consumption of the output capacity machine in real time, and draw the total power consumption waveform under different feeding strategies;
[0011] S5. Select the design value of the simultaneous use coefficient. According to the power consumption data output in step S4, calculate and draw a graph showing the variation range of the simultaneous use coefficient under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient as required.
[0012] Further, step S1 includes:
[0013] S11, obtaining the capacity test process data of each stage in the capacity process cycle of each type of battery cell, including the duration dt, voltage U, and current I data of each stage;
[0014] S12. Calculate the line loss voltage drop at each stage according to the capacity test process data at each stage. The empirical formula is: line loss voltage drop dU = current I*(conductor resistivity ρ*length L / cross-sectional area S+resistance correction dR);
[0015] S13. Capacity test process types mainly include the placement process Rest, constant current charging process CC, variable current constant voltage charging process CV, and constant current discharge process DC. The power consumption of the current process is calculated according to the type of each stage. When the constant current discharge process is in progress, the power feedback effect is considered and the constant power is reversed. The empirical formula is: power consumption P = (-1) * voltage U * current I * test batch N / power supply coefficient e * reverse transmission coefficient f;
[0016] During the variable current constant voltage charging process, the cut-off current is considered, and the power consumption is calculated based on the average current at the beginning and end. The empirical formula is: Power consumption P = (voltage U + line loss voltage drop dU) * (starting current Is + ending current Ie) / 2 * test batch N / power supply coefficient e;
[0017] During the constant current charging process, the empirical formula is: power consumption P = (voltage U + line loss voltage drop dU) * current I * test batch N / power supply coefficient e;
[0018] Among them, the power supply coefficient is 0.75 and the return coefficient is 0.6.
[0019] Further, step S2 includes:
[0020] S21, object modeling, based on the discrete event simulation engine, graphically modeling and position arrangement of the workshop or production line, and modeling of production facility objects, logistics facility objects, workpiece objects, and logical objects;
[0021] S22, data modeling, standardizing the expression of object attribute data, production basic data, simulation input and output data, simulation process data, etc., and defining them in the simulation object component panel;
[0022] S23, activity modeling, based on custom scripts, realizes the flow of product production logistics process, realizes the real-time power consumption change of equipment during capacity testing, and calculates the total energy consumption of equipment in real time.
[0023] Further, step S4 includes:
[0024] S41. Design different feeding strategies;
[0025] S42, running the simulation model under different feeding strategy schemes, the power consumption of each stage of the capacity test changes accordingly during the simulation process, and the total real-time power consumption of the output capacity machine is calculated in real time;
[0026] S43. Draw a waveform diagram of total power consumption under different feeding strategies.
[0027] Further, step S5 includes:
[0028] S51, according to the power consumption data output in step S4, statistics are made on the maximum, minimum and average values of the total power consumption under different feeding strategies;
[0029] S52, respectively calculating the maximum value, minimum value and average value of the simultaneous use coefficient, and the calculation formula is simultaneous use coefficient = total power consumption / total rated power;
[0030] S53. Draw a graph of the variation range of the simultaneous use coefficient under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient based on production capacity and other requirements.
[0031] Compared with the prior art, the beneficial effect of the present invention is that a simulation-based method for designing the simultaneous power usage coefficient of a battery capacity machine provided by the present invention can accurately digitally express the dynamics of the power consumption in the capacity testing process, while fully considering various feeding strategies, equipment failures and other random abnormal events in future test operations, thereby improving the robustness of the design system and ensuring a safe and stable production process of battery cells. This method is also of reference significance for the design of simultaneous usage coefficients of similar workshops / equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0033] Figure 1 is a flow chart of the method of the present invention;
[0034] Figure 2 This is a table of power consumption data for each stage in the process cycle of the four battery cell capacity processes in the embodiment of the present invention;
[0035] Figure 3 This is a simulation model diagram of a cell capacity test process according to an embodiment of the present invention;
[0036] Figure 4 A verification data table of a simulation model according to an embodiment of the present invention;
[0037] Figure 5 It is a waveform diagram of total power consumption under different production capacity requirements of an embodiment of the present invention;
[0038] Figure 6 FIG. 4 is a graph showing the relationship between the simultaneous use coefficient and the capacity demand according to an embodiment of the present invention. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0040] See also Figure 1 The present invention provides a method for designing a simultaneous power usage coefficient of a battery capacity machine based on simulation, comprising the following steps:
[0041] S1. Prepare basic data, calculate the power consumption of each stage of the capacity machine according to the duration, voltage, and current capacity test process data of each stage in the capacity process cycle of each type of battery cell, consider the process conditions of different stages of the capacity test, and provide basic data for simulation design;
[0042] Step S1 specifically includes:
[0043] S11, obtaining the capacity test process data of each stage in the capacity process cycle of each type of battery cell, including the duration dt, voltage U, and current I data of each stage;
[0044] S12. Calculate the line loss voltage drop at each stage according to the capacity test process data at each stage. The empirical formula is: line loss voltage drop dU = current I*(conductor resistivity ρ*length L / cross-sectional area S+resistance correction dR);
[0045] S13. Capacity test process types mainly include the placement process Rest, constant current charging process CC, variable current constant voltage charging process CV, and constant current discharge process DC. The power consumption of the current process is calculated according to the type of each stage. When the constant current discharge process is in progress, the power feedback effect is considered and the constant power is reversed. The empirical formula is: power consumption P = (-1) * voltage U * current I * test batch N / power supply coefficient e * reverse transmission coefficient f;
[0046] During the variable current constant voltage charging process, the cut-off current is considered, and the power consumption is calculated based on the average current at the beginning and end. The empirical formula is: Power consumption P = (voltage U + line loss voltage drop dU) * (starting current Is + ending current Ie) / 2 * test batch N / power supply coefficient e;
[0047] During the constant current charging process, the empirical formula is: power consumption P = (voltage U + line loss voltage drop dU) * current I * test batch N / power supply coefficient e;
[0048] Among them, the power coefficient is 0.75 and the return coefficient is 0.6;
[0049] S2. Establish a simulation model. Based on the discrete event simulation engine, establish a simulation model for the cell capacity test process according to information such as workshop layout, resource allocation, and production logistics strategy, and realize the change of real-time power consumption of equipment during the capacity test process;
[0050] Step S2 specifically includes:
[0051] S21, object modeling, based on the discrete event simulation engine, graphically modeling and position arrangement of the workshop or production line, and modeling of production facility objects, logistics facility objects, workpiece objects, and logical objects;
[0052] S22, data modeling, standardizing the expression of object attribute data, production basic data, simulation input and output data, simulation process data, etc., and defining them in the simulation object component panel, such as the feeding logic object defines the feeding plan, and the receiving logic object defines the output capacity data;
[0053] S23, activity modeling, based on custom scripts, realizes the flow of product production logistics process, realizes the change of real-time power consumption of equipment during capacity testing, and calculates the total energy consumption of equipment in real time;
[0054] S3. Verify the simulation model. Run the simulation model under different scenarios such as battery cell model, available equipment data, test batch, and failure mode. Simulate and calculate the process capacity and energy consumption. Compare the results with the theoretical calculation results under different scenarios. When the deviation of process capacity and energy consumption is less than 5%, the simulation model is considered reliable.
[0055] S4. Output the total real-time power consumption of the capacity machine, run the capacity test process simulation model under different feeding strategies, calculate the total real-time power consumption of the output capacity machine in real time, and draw the total power consumption waveform under different feeding strategies;
[0056] Step S4 specifically includes:
[0057] S41. Design different feeding strategies, such as uniform feeding according to daily production requirements;
[0058] S42, running the simulation model under different feeding strategy schemes, the power consumption of each stage of the capacity test changes accordingly during the simulation process, and the total real-time power consumption of the output capacity machine is calculated in real time;
[0059] S43, drawing a waveform diagram of total power consumption under different feeding strategies;
[0060] S5. Select the design value of the simultaneous use coefficient. According to the power consumption data output in step S4, calculate and draw a graph showing the range of simultaneous use coefficients under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient as needed.
[0061] Step S5 specifically includes:
[0062] S51, according to the power consumption data output in step S4, statistics are made on the maximum, minimum and average values of the total power consumption under different feeding strategies;
[0063] S52, respectively calculating the maximum value, minimum value and average value of the simultaneous use coefficient, and the calculation formula is simultaneous use coefficient = total power consumption / total rated power;
[0064] S53. Draw a graph of the variation range of the simultaneous use coefficient under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient based on production capacity and other requirements.
[0065] In order to illustrate the technical solution of the present invention, a specific embodiment is provided below for illustration.
[0066] Example
[0067] This embodiment applies this method to the capacity test process of the power battery cell production line. A single pull line contains 7 capacity machines on the left and right sides, each with 9 layers, for a total of 126 storage locations. Each storage location can accommodate the capacity test of 2 pallets of cells. The number of cells contained in a single pallet of different models of cells, that is, the test batch, is different. There is a stacker on each side, which can load and unload 2 pallets at the same time. Single pull is compatible with the production of 4 types of cells. Before switching the pull line product, all products on the line need to be cleared. The target capacity of single pull is 20K pcs / day.
[0068] Step S1, prepare basic data, obtain the duration, voltage, and current capacity of each stage in the capacity process cycle of the wire drawing production A, B, C, and D model batteries, and calculate the line loss voltage drop at each stage according to the empirical formula: line loss voltage drop dU = current I*(conductor resistivity ρ*length L / cross-sectional area S+resistance correction dR), where the actual ρ is 0.0206Ω*mm2 / m, L is 12m, S is 70mm2, and dR is 0.0023Ω;
[0069] According to the empirical formula: when the constant current discharge process is DC, the power P = (-1) * voltage U * current I * test batch N / power factor e * reverse transmission factor f;
[0070] During the variable current constant voltage charging process CV, the power consumption P = (voltage U + line loss voltage drop dU) * (starting current Is + ending current Ie) / 2 * test batch N / power supply coefficient e;
[0071] During the constant current charging process CC, the power used P = (voltage U + line loss voltage drop dU) * current I * test batch N / power factor e;
[0072] Among them, e is taken as 0.75, f is taken as 0.6, the test batches N of A, B, C, and D are 16, 16, 24, and 24 respectively, the starting current Is of the CV stage is taken as the constant current value of the previous stage, and the ending current Ie is taken as 0.05 times of the maximum current of the entire stage;
[0073] Finally, we get Figure 2 The power consumption data of each stage in the process cycle of the four battery cell capacities shown;
[0074] Step S2, establish a simulation model, based on the discrete event simulation engine, according to the capacity machine layout, stacker scheduling strategy and other information, graphically model the layout of the workshop or production line, arrange the capacity machine, stacker, buffer, entrance and exit, and set the basic logic of the production and logistics process, including stacker scheduling strategy, processing hours, and other important time parameters, set the law of battery cells entering the wire drawing, and complete the establishment of the battery cell capacity test process simulation model, such as Figure 3 As shown;
[0075] Step S3, verify the simulation model, run the simulation model under 9 different scenarios such as battery cell model, available equipment data, test batch, failure mode, etc., the deviation between the simulation calculation process capacity and energy consumption and the theoretical calculation results is less than 5%, the simulation model is reliable and trustworthy, the verification data is as follows Figure 4 As shown;
[0076] Step S4, output the total real-time power consumption of the capacity machine: design a simulation test, and evenly feed the four types of batteries according to the material quantity of 10K-35Kpcs / day production capacity, run the simulation model, and change the power consumption of each stage of the capacity test accordingly during the simulation process, and calculate the total real-time power consumption of the output capacity machine in real time, and draw the total power consumption waveform under different product and different production capacity requirements, such as Figure 5 As shown;
[0077] Step S5, select the design value of the simultaneous use coefficient, and according to the power consumption data output in step S4, count the maximum, minimum and average values of the total power consumption under different capacity requirements, and according to the formula simultaneous use coefficient = total power consumption / total rated power, calculate the maximum, minimum and average values of the simultaneous use coefficient respectively, and draw a relationship diagram between the simultaneous use coefficient and the capacity requirement, such as Figure 6 As shown, according to the 20K production capacity requirement, the simultaneous use coefficient design value is selected as 0.25.
[0078] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for designing the simultaneous use coefficient of electric power for a battery capacity machine based on simulation, characterized in that: The following steps are involved: S1. Prepare basic data, calculate the power consumption of each stage of the capacity machine according to the duration, voltage, and current capacity test process data of each stage in the capacity process cycle of each type of battery cell, consider the process conditions of different stages of the capacity test, and provide basic data for simulation design; S2. Establish a simulation model. Based on the discrete event simulation engine, establish a simulation model for the cell capacity test process according to the workshop layout, resource allocation, and production logistics strategy information, and realize the change of real-time power consumption of the equipment during the capacity test process; S3. Verify the simulation model. Run the simulation model under different scenarios of battery cell model, available equipment data, test batch, and failure mode. Simulate and calculate the process capacity and energy consumption. Compare the results with the theoretical calculation results under different scenarios. When the deviation of process capacity and energy consumption is less than 5%, the simulation model is considered reliable. S4. Output the total real-time power consumption of the capacity machine, run the capacity test process simulation model under different feeding strategies, calculate the total real-time power consumption of the output capacity machine in real time, and draw the total power consumption waveform under different feeding strategies; S5. Select the design value of the simultaneous use coefficient. According to the power consumption data output in step S4, calculate and draw a graph showing the variation range of the simultaneous use coefficient under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient as required.
2. According to the method for designing the simultaneous use coefficient of electric power of a battery capacity machine based on simulation in claim 1, it is characterized in that: Step S1 includes: S11, obtaining the capacity test process data of each stage in the capacity process cycle of each type of battery cell, including the duration dt, voltage U, and current I data of each stage; S12. Calculate the line loss voltage drop at each stage according to the capacity test process data at each stage. The empirical formula is: line loss voltage drop dU = current I*(conductor resistivity ρ*length L / cross-sectional area S+resistance correction dR); S13. Capacity test process types include rest process, constant current charging process CC, variable current constant voltage charging process CV, constant current discharge process DC. The power consumption of the current process is calculated according to the type of each stage. When the constant current discharge process is in progress, the power feedback effect is considered and the constant power is reversed. The empirical formula is: power consumption P = (-1) * voltage U * current I * test batch N / power supply coefficient e * reverse transmission coefficient f; During the variable current constant voltage charging process, the cut-off current is considered, and the power consumption is calculated based on the average current at the beginning and end. The empirical formula is: Power consumption P = (voltage U + line loss voltage drop dU) * (starting current Is + ending current Ie) / 2 * test batch N / power supply coefficient e; During the constant current charging process, the empirical formula is: power consumption P = (voltage U + line loss voltage drop dU) * current I * test batch N / power supply coefficient e; Among them, the power supply coefficient is 0.75 and the return coefficient is 0.
6.
3. The method for designing the simultaneous use coefficient of electric power for a battery capacity machine based on simulation according to claim 1, characterized in that: Step S2 includes: S21, object modeling, based on the discrete event simulation engine, graphically modeling and position arrangement of the workshop or production line, and modeling of production facility objects, logistics facility objects, workpiece objects, and logical objects; S22, data modeling, standardizing the expression of object attribute data, production basic data, simulation input and output data, and simulation process data, and defining them in the simulation object component panel; S23, activity modeling, based on custom scripts, realizes the flow of product production logistics process, realizes the real-time power consumption change of equipment during capacity testing, and calculates the total energy consumption of equipment in real time.
4. The method for designing the simultaneous use coefficient of electric power of a battery capacity machine based on simulation according to claim 1, characterized in that: Step S4 includes: S41. Design different feeding strategies; S42, running the simulation model under different feeding strategy schemes, the power consumption of each stage of the capacity test changes accordingly during the simulation process, and the total real-time power consumption of the output capacity machine is calculated in real time; S43. Draw a waveform diagram of total power consumption under different feeding strategies.
5. The method for designing the simultaneous use coefficient of electric power for a battery capacity machine based on simulation according to claim 1, characterized in that: Step S5 includes: S51, according to the power consumption data output in step S4, statistics are made on the maximum, minimum and average values of the total power consumption under different feeding strategies; S52, respectively calculating the maximum value, minimum value and average value of the simultaneous use coefficient, and the calculation formula is simultaneous use coefficient = total power consumption / total rated power; S53. Draw a graph of the variation range of the simultaneous use coefficient under different feeding strategies, and select a reasonable design value of the simultaneous use coefficient according to production capacity requirements.