Comprehensive site selection method and system for bridge piers in mountainous areas
Through multi-level evaluation and bank slope stability analysis, the prohibited setting distance of bridge pier positions in mountainous areas was determined, which solved the problem of poor optimization efficiency of pier positions in the existing technology, and achieved the improvement of safety and stability of bridge piers. .
Patent Information
- Application Number
- CN202210579092.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-05-25
AI Technical Summary
The existing technology lacks systematic and quantitative evaluation standards in the location selection of bridge piers in mountainous areas, resulting in poor optimization efficiency of pier locations, affecting construction organization and medium- and long-term safety control.
By obtaining the bank collapse width and unloading crack influence bandwidth, combining the bank slope stability evaluation, the prohibited setting distance of the pier position is determined, and the optimal position and acceptable position recommendation are carried out, and multi-level evaluation and reinforcement analysis are adopted. Ensure the safety and stability of the pier position.
The comprehensive evaluation and recommendation of the pier location is realized, the comprehensive reliability of the evaluation results is improved, the medium- and long-term stability and safety of the bridge pier are ensured, and safety hazards in construction are avoided.
Smart Images

Figure CN115130169B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of mountain bridge construction, and more specifically, relates to a comprehensive site selection method and system for mountain bridge piers. Background Art
[0002] As a spanning project, mountain bridges often require survey units to conduct comprehensive site selection first, recommend the best bridge site based on geological conditions, and other professionals will make a comprehensive comparison based on linearity, controlled elevation and economy to finally determine the bridge site. After the survey and design unit completes the preliminary design and determines the bridge site and bridge type plan, a two-stage survey and design of the construction drawing is required for the selected bridge site. This stage requires the determination of the location of the main structure such as piers and excavation plans, etc. There are not many quantitative indicators for the comprehensive evaluation of pier positions in existing technologies and relevant specifications. Generally, the bridge structure profession completes the layout, and the survey profession responds passively and lacks initiative. Under tight construction schedules, design and survey are usually carried out in parallel. Due to the reverse order, the pier setting is not geologically optimal. At the same time, due to multiple influencing factors such as backward survey, lack of hierarchical and systematic quantitative evaluation standards, lack of systematic consideration, and illogical comprehensive selection of mountain bridge pier locations, the optimization efficiency of pier locations is poor, which is easy to cause various problems for later construction organization and medium- and long-term safety control. Therefore, developing a comprehensive site selection method and system for bridge piers in mountainous areas to effectively overcome the defects in the above-mentioned related technologies has become a technical problem that needs to be urgently solved in the industry. Summary of the invention
[0003] In view of the above defects or improvement needs of the prior art, an embodiment of the present invention provides a method and system for comprehensive site selection of bridge piers in mountainous areas.
[0004] In the first aspect, an embodiment of the present invention provides a comprehensive site selection method for bridge piers in mountainous areas, including: according to the results of the reservoir bank survey, obtaining the basic data required for predicting the collapsed bank width by the two-stage method, combining the two-stage method to obtain the collapsed bank width through a mapping method, and determining the first-level prohibited setting distance D1 of the pier position; according to the results of the unloading crack survey, obtaining the width of the unloading crack influence zone through on-site measurement or table lookup, and determining the second-level prohibited setting distance D2 of the pier position; according to D1 and D2, determining the preliminary prohibited setting distance D of the bridge pier position; according to the slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, reviewing the preliminary prohibited setting distance D of the bridge pier position, and obtaining the effective conditions for setting piers; based on the comparison of the distance D4 of the proposed pier position with D, the proposed pier position is graded, and the optimal position and acceptable position are recommended.
[0005] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, according to the reservoir bank survey results, obtains the basic data required for predicting the collapsed bank width by the two-stage method, specifically the basic data such as the slope topographic profile, the bulk density and strength parameters of the above-water and underwater rock and soil bodies, and the water level required for predicting the collapsed bank width by the two-stage method, and obtains the collapsed bank width by the mapping method in combination with the two-stage method, and determines the first-level prohibited setting distance D1 of the pier position, including:
[0006]
[0007] Among them, α is the underwater stable slope angle, c1 is the cohesion of the underwater slope rock and soil, is the internal friction angle of the underwater slope rock and soil, γ1 is the bulk density of the underwater slope rock and soil, and H1 is the height of the underwater slope. γ1 can be measured by on-site sand filling test, or by sampling and measuring the bulk density indoors. c1 and Generally, it can be obtained through saturated direct shear test of rock and soil; H1 can be determined comprehensively through the highest flood level of surface water, design flood level and capillary influence height H3;
[0008]
[0009] Among them, β is the stable slope angle above water, c2 is the cohesion of the rock and soil mass of the slope above water, is the internal friction angle of the rock and soil mass of the water slope, γ2 is the bulk density of the rock and soil mass of the water slope, and H2 is the height of the water slope; γ2 can be determined by on-site sand filling test, or by sampling and measuring the bulk density indoors; c2 and Generally, it can be obtained through direct shear test of rock and soil;
[0010] After obtaining α and β, D1 is obtained by mapping based on the initial terrain profile obtained from engineering survey.
[0011] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, according to the unloading crack investigation results, the width of the unloading crack influence zone is obtained by on-site measurement or table lookup, and the second level prohibited setting distance D2 of the pier position is determined, including:
[0012] D2 is the second-level prohibited distance of the bridge pier position determined by the width of the unloading crack influence zone. D2 is determined through on-site investigation or table query.
[0013] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the method of determining the preliminary prohibited setting distance D of the bridge pier location according to the first level prohibited setting distance D1 of the pier location and the second level prohibited setting distance D2 of the pier location, comprises:
[0014] D=D1+D2
[0015] Among them, D is the preliminary prohibited distance for the bridge pier location, D1 is the prohibited distance for the first-level bridge pier location determined by the stability of the reservoir bank, and D2 is the prohibited distance for the second-level bridge pier location determined by the width of the unloading crack influence zone.
[0016] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the slope stability coefficient K, the safety standard Fs, the reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, the preliminary prohibited distance D of the bridge pier position is reviewed, and the effective conditions for setting piers are obtained, including:
[0017] Whether engineering reinforcement measures are needed can be determined by the following formula:
[0018]
[0019] Among them, K is the slope stability coefficient under different working conditions obtained by slope stability calculation, F s It is the safety factor standard corresponding to different working conditions recommended by the specification; K is determined by software modeling calculation, F s Determined by looking up the standard table.
[0020] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the slope stability coefficient K, the safety standard Fs, the reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, the preliminary prohibited distance D of the bridge pier position is reviewed, and the effective conditions for setting piers are obtained, including:
[0021] Whether the engineering reinforcement measures are feasible can be determined by the following formula:
[0022] f=max(f 自然工况 ,f 降雨工况 ,f 地震工况 )
[0023] Among them, f is the reinforcement force required to meet the engineering stability requirements, f 自然工况 The reinforcement force required to meet the safety standards of natural working conditions, f 降雨工况 The compensation reinforcement required to meet the safety standard of rainfall conditions, f 地震工况The compensatory reinforcement force required to meet the safety standards of earthquake conditions; the cross-sectional size of the anti-slide pile is considered to be 2m*4m, and the pile spacing is 8m. The anti-slide force that a single anti-slide pile can provide is generally 5000-8000kN, and the sliding force per linear meter is 625kN-1000kN / m; when f≥2000kN / m, more than two rows of anti-slide piles are required for reinforcement, and it can be judged that reinforcement is not possible, otherwise reinforcement is possible;
[0024] The prohibited distance of piers can be checked by the following formula:
[0025]
[0026] Among them, D3 is the distance from the rear edge of the most unfavorable sliding surface to the slope foot determined by the slope stability.
[0027] Based on the content of the above method embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the proposed pier locations are graded based on the comparison between the distance D4 and D of the proposed pier locations, and the optimal location and acceptable location are recommended, including:
[0028] Proposed distance between pier position and slope foot
[0029] Among them, the optimal pier position is determined based on the stability of the reservoir bank, the influence range of the unloading crack zone and the stability of the slope, and the acceptable pier position is obtained by comprehensively considering other control factors such as the bridge deck elevation.
[0030] In the second aspect, an embodiment of the present invention provides a comprehensive site selection system for bridge piers in mountainous areas, including: a first main module, based on the results of the reservoir bank survey, obtaining the basic data required for predicting the collapsed bank width by the two-stage method, combining the two-stage method to obtain the collapsed bank width through a mapping method, and determining the first-level prohibited setting distance D1 of the pier position; a second main module, based on the results of the unloading crack survey, obtaining the width of the unloading crack influence zone through on-site measurement or table lookup, and determining the second-level prohibited setting distance D2 of the pier position; a third main module, based on the first-level prohibited setting distance D1 of the pier position and the second-level prohibited setting distance D2 of the pier position, determining the preliminary prohibited setting distance D of the bridge pier position; a fourth main module, based on the slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, reviewing the preliminary prohibited setting distance D of the bridge pier position, and obtaining the effective conditions for setting piers; a fifth main module, based on the comparison of the distance D4 of the proposed pier position with D, classifying the proposed pier position, and recommending the optimal position and acceptable position.
[0031] In a third aspect, an embodiment of the present invention provides an electronic device, including:
[0032] At least one information processor, at least one memory and communication interface and a power supply; wherein,
[0033] The information processor, memory and communication interface communicate with each other and are powered by the power supply; the memory stores program instructions that can be executed by the information processor, and the information processor calls the program instructions to execute the comprehensive site selection method for mountain bridge piers provided in any way in the first aspect.
[0034] In a fourth aspect, an embodiment of the present invention provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, wherein the computer instructions enable the computer to execute the comprehensive site selection method for bridge piers in mountainous areas provided in any manner in the first aspect.
[0035] The embodiment of the present invention provides a comprehensive site selection method and system for bridge piers in mountainous areas. The prohibited setting distance D1 of the first-level pier positions is determined by predicting the collapsed bank width, and the prohibited setting distance D2 of the second-level pier positions is determined according to the width of the unloading crack influence zone. The preliminary prohibited setting distance D of the bridge pier positions is determined through D1 and D2. The preliminary prohibited setting distance D of the piers is reviewed according to the slope stability evaluation results K, Fs, f, D3 and other indicators, and the effective conditions for setting piers are obtained. Finally, the proposed pier positions are graded according to the proposed pier position distance D4 and the prohibited setting distance D, and the mountain bridge pier positions are comprehensively evaluated and pier locations are recommended. The evaluation results are comprehensive and reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 A flow chart of a comprehensive site selection method for bridge piers in mountainous areas according to an embodiment of the present invention;
[0037] Figure 2 A schematic diagram of a bank collapse width prediction method according to an embodiment of the present invention;
[0038] Figure 3 This is a schematic diagram of the relationship between D1, D2, D3, and D4 in an embodiment of the present invention;
[0039] Figure 4 It is a schematic structural diagram of a comprehensive site selection device for bridge piers in mountainous areas according to an embodiment of the present invention;
[0040] Figure 5 The figure is a schematic diagram of the physical structure of an electronic device according to an embodiment of the present invention.
[0041] Figure 6 It is a schematic diagram of the overall process of the comprehensive site selection method for bridge piers in mountainous areas according to an embodiment of the present invention. DETAILED DESCRIPTION
[0042] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0043] For the core control elements of each part, different preferred indicators are defined for quantification. Then, according to different elements, a single-factor prohibited setting distance is formed, and the preliminary prohibited setting distance under the comprehensive elements is summarized. Then, the preliminary prohibited setting distance is reviewed by using the results of the bank slope stability evaluation and the effective conditions for the pier to be set are screened. Finally, under the conditions where the pier can be set, the positions of the proposed piers and abutments are classified. When D4 < D, the pier cannot be set; when D4 = D, it is the optimal pier setting position; when D4 > D, it is an acceptable pier setting position. The indicators are intuitive and the logical relationship is clear, which can be used as a method for selecting the locations of piers and abutments of mountainous highway bridges to guide engineering practice. Based on this idea, the embodiments of the present invention provide a comprehensive method for selecting the locations of piers and abutments of mountainous bridges. Refer to Figure 1 The method includes: according to the results of the reservoir bank investigation, obtaining the basic data required for predicting the width of the collapsed bank by the two-segment method, and combining the two-segment method to obtain the width of the collapsed bank by the graphical method, and determining the first-level prohibited setting distance D1 for the pier and abutment positions; according to the results of the investigation of unloading fissures, obtaining the width of the unloading fissure influence zone through on-site measurement or by referring to a table, and determining the second-level prohibited setting distance D2 for the pier and abutment positions; according to D1 and D2, determining the preliminary prohibited setting distance D for the bridge pier and abutment positions; according to the slope stability coefficient K, safety standard Fs, reinforcement force f required to reach the safety standard, and the distance D3 from the trailing edge of the most unfavorable slip surface to the toe of the slope obtained from the bank slope stability evaluation, reviewing the preliminary prohibited setting distance D for the bridge pier and abutment positions, and obtaining the effective conditions for the pier to be set; based on the comparison between the distance D4 of the proposed pier and abutment positions and D, classifying the proposed pier and abutment positions, and recommending the optimal position and acceptable positions.
[0044] Based on the content of the above method embodiment, as an optional embodiment, in the comprehensive method for selecting the locations of piers and abutments of mountainous bridges provided in the embodiments of the present invention, the obtaining the basic data required for predicting the width of the collapsed bank by the two-segment method according to the results of the reservoir bank investigation is specifically the basic data such as the slope terrain profile, the unit weights and strength parameters of the rock and soil masses above and below the water surface, and the water level required for predicting the width of the collapsed bank by the two-segment method. Combining the two-segment method to obtain the width of the collapsed bank by the graphical method and determining the first-level prohibited setting distance D1 for the pier and abutment positions includes:
[0045]
[0046] where α is the underwater stable bank slope angle, and c1 is the cohesion of the rock and soil mass of the underwater slope, is the internal friction angle of the underwater slope rock and soil, γ1 is the bulk density of the underwater slope rock and soil, and H1 is the height of the underwater slope. γ1 can be measured by on-site sand filling test, or by sampling and measuring the bulk density indoors. c1 and Generally, it can be obtained through saturated direct shear test of rock and soil; H1 can be determined comprehensively through the highest flood level of surface water, design flood level and capillary influence height H3. The design flood level is considered based on whether there is a reservoir. If there is a reservoir, it is considered, otherwise it is not considered.
[0047]
[0048] Among them, β is the stable slope angle above water, c2 is the cohesion of the rock and soil mass of the slope above water, is the internal friction angle of the rock and soil mass of the water slope, γ2 is the bulk density of the rock and soil mass of the water slope, and H2 is the height of the water slope; γ2 can be determined by on-site sand filling test, or by sampling and measuring the bulk density indoors; c2 and It can generally be obtained through direct shear test of rock and soil.
[0049] After obtaining α and β, D1 is obtained by mapping based on the initial terrain profile obtained from engineering survey.
[0050] Specifically, firstly, according to the reservoir bank survey, the basic data required for the two-stage method to predict the width of the collapsed bank are obtained, specifically, the basic data such as the slope topographic profile, the bulk density and strength parameters of the above-and-underwater rock and soil bodies, and the water level required for the two-stage method to predict the width of the collapsed bank; as a key influencing factor that may induce large-scale collapse and landslides and block the waterway of the reservoir, it is very necessary to predict it in order to improve the safety of bridges in mountainous areas. Common prediction methods mainly include the Kachukin method, the Zolotarev method, and the two-stage method. After comparative analysis, the Kachukin method is suitable for loess soil layers and reservoirs in plain areas. In actual application, the Zolotarev method needs to determine too many slope foot parameters, which has certain difficulties in application. Therefore, the present invention selects the two-stage prediction method suitable for canyon-type reservoirs in mountainous areas, and determines the first-level prohibited setting distance D1 of the pier position through the mapping method. The mapping method is as follows: Figure 2 As shown, after obtaining α and β, based on the initial terrain profile obtained by engineering measurement, a is used as the starting point and α is used as the angle to draw a straight line, which intersects with the height of H1 to obtain point b; b is used as the starting point and β is used to draw a straight line, which intersects with the slope surface to obtain point c, and H2 is determined simultaneously; the horizontal distance from point a to point c is the collapsed bank width. H1 is the height of the underwater slope, H2 is the height of the above-water slope, H3 is the capillary influence height, a is the starting point of the underwater slope, b is the end point of the underwater slope collapse, and c is the end point of the above-water slope collapse. D1 can be obtained by the above-mentioned drawing method.
[0051] Based on the content of the above method embodiment, as an optional embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, according to the unloading crack investigation results, the width of the unloading crack influence zone is obtained by on-site measurement or table lookup, and the second-level prohibited setting distance D2 of the pier position is determined, including: D2 is the second-level prohibited setting distance of the bridge pier position determined by the width of the unloading crack influence zone, and D2 is determined by on-site investigation or table lookup.
[0052] Specifically, the so-called unloading cracks are cracks formed due to the release and adjustment of rock stress due to natural geological effects and artificial excavation. They are often further opened or displaced by gravity, weathering and the physical geological effects of the slope. Therefore, they are also one of the factors affecting the determination of the location of bridge piers. The present invention determines the second-level prohibited setting distance D2 of the pier position based on the unloading crack investigation, by obtaining the width of the unloading crack influence zone through on-site measurement or table lookup; wherein, the table can be specifically determined through Table 1: Statistical table of empirical values of strong unloading crack width, and the data in the table are the statistical results of many years of engineering summary, which has good practical reference.
[0053] Table 1
[0054]
[0055] Based on the content of the above method embodiment, as an optional embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the method of determining the preliminary prohibited setting distance D of the bridge pier location according to the first level prohibited setting distance D1 of the pier location and the second level prohibited setting distance D2 of the pier location, includes:
[0056] D=D1+D2 (3)
[0057] Where D is the initial prohibited distance for the bridge pier location, D1 is the first-level prohibited distance for the bridge pier location determined by the stability of the reservoir bank, and D2 is the second-level prohibited distance for the bridge pier location determined by the width of the unloading crack influence zone. As shown in Formula 3, the initial prohibited distance D for the bridge pier location is determined by taking the sum of D1 and D2, as shown in Formula 3. Figure 3 As shown in the figure, in actual projects, in order to ensure the medium- and long-term stability of bridge piers, it is generally forbidden to set the pier structure within the reservoir bank stability influence range D1, and it is not allowed to be set within the strong unloading crack zone influence range D2, so the preliminary forbidden distance D=D1+D2 is obtained by the cumulative superposition summation method.
[0058] Based on the content of the above method embodiment, as an optional embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the slope stability coefficient K, the safety standard Fs, the reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, the preliminary prohibited distance D of the bridge pier position is reviewed, and the effective conditions for setting piers are obtained, including:
[0059] Whether engineering reinforcement measures are needed can be determined by the following formula:
[0060]
[0061] Among them, K is the slope stability coefficient under different working conditions obtained by slope stability calculation, F s It is the safety factor standard corresponding to different working conditions recommended by the specification; K is generally determined by software modeling calculation, F s Determined by looking up the standard table.
[0062] Whether the engineering reinforcement measures are feasible can be determined by the following formula:
[0063] f=max(f 自然工况 ,f 降雨工况 ,f 地震工况 ) (5)
[0064] Among them, f is the reinforcement force required to meet the engineering stability requirements, f 自然工况 The reinforcement force required to meet the safety standards of natural working conditions, f 降雨工况 The compensation reinforcement required to meet the safety standard of rainfall conditions, f 地震工况 To meet the compensatory reinforcement force required to meet the safety standards of earthquake conditions; the cross-sectional size of the anti-slide pile is considered to be 2m*4m, and the pile spacing is 8m. The anti-slide force that a single anti-slide pile can provide is generally 5000-8000kN, and the sliding force per linear meter is 625kN-1000kN / m; when f≥2000kN / m, more than two rows of anti-slide piles are required for reinforcement and it can be judged that reinforcement is not possible, otherwise reinforcement is possible.
[0065] The prohibited distance of piers can be checked by the following formula:
[0066]
[0067] Among them, D3 is the distance from the rear edge of the most unfavorable sliding surface to the slope foot determined by the slope stability.
[0068] Specifically, Figure 2As shown in the figure, D3 can generally be obtained by measuring the horizontal distance from the intersection point d of the most unfavorable sliding surface and the slope surface in the stability calculation result diagram to the slope foot point a; the most unfavorable sliding surface can be numerically modeled by the slope limit equilibrium method and calculated using the automatic search method; at the same time, D3 only works under unstable or unreinforceable conditions.
[0069] Based on the content of the above method embodiment, as an optional embodiment, the comprehensive site selection method for bridge piers in mountainous areas provided in the embodiment of the present invention, the proposed pier locations are graded based on the comparison between the distance D4 and D of the proposed pier locations, and the optimal location and acceptable location are recommended, including:
[0070] Proposed distance between pier position and slope foot
[0071] The optimal pier location is determined based on the stability of the reservoir bank, the influence range of the unloading crack zone, and the stability of the bank slope. The acceptable pier location is obtained by comprehensively considering other control factors such as the bridge deck elevation. Specifically, the spatial relationship between D1, D2, D, D3, and D4 is as follows: Figure 3 As shown in Notice 7, when the proposed pier position D4 is less than D, the bridge pier is affected by the stability of the reservoir bank and the unloading cracks, and it is difficult to maintain a stable design and use state. There are medium- and long-term engineering safety risks, and once a safety hazard is formed, it is difficult to effectively control the engineering losses caused by it; therefore, it is necessary to optimize the site selection during the survey and design stage to effectively avoid and control the medium- and long-term safety threats caused by the stability of the reservoir bank and the unloading effect; therefore, when the proposed pier position D4 is less than D, it is prohibited to set bridge piers. When the proposed pier position D4 is equal to D, the slope engineering is in a stable state. At this time, the span is the smallest, the engineering safety is controllable, and it is relatively economical; therefore, when the proposed pier position D4 is equal to D, it is the conditionally optimal pier position. When the proposed pier position D4 is greater than D, the safety threats caused by the stability of the reservoir bank and the unloading cracks are preliminarily avoided. At this time, the second-level safety threats caused by the stability of the slope need to be considered; as Figure 6 As shown in the figure, when the proposed pier position D4>D, there are two situations; when D4>D3>D, the slope stability will not directly affect the safety of the pier, and the pier can be set, but it is not the minimum span; when D3>D4>D, the slope stability may affect the safety of the pier. At this time, it is necessary to further judge the comparison value of the slope stability coefficient K and the safety factor standard Fs. When the slope stability coefficient K≥safety factor standard Fs, the pier can be set, and no engineering measures are required; when the slope stability coefficient K<safety factor standard Fs, the required reinforcement force f can be provided by engineering measures, and the pier can be set; when the slope stability coefficient K<safety factor standard Fs, the required reinforcement force f cannot be provided by engineering measures, and the pier cannot be set, and it needs to be set outside D3. In summary, when the proposed pier position D4>D is proposed, it is an acceptable pier position.
[0072] The comprehensive site selection method for bridge piers in mountainous areas provided by the embodiment of the present invention determines the first-level prohibited setting distance D1 of the pier location according to the collapsed bank width, determines the second-level prohibited setting distance D2 of the pier location according to the width of the unloading crack influence zone, determines the preliminary prohibited setting distance D of the bridge pier location according to D1 and D2, verifies the preliminary prohibited setting distance D of the pier location according to the slope stability evaluation indexes K, Fs, f, and D3, and obtains the effective conditions for setting piers, and finally, based on the comparison between the distance D4 of the proposed pier location and D, classifies the proposed pier location, and recommends the optimal location and acceptable location, comprehensively evaluates the location of bridge piers in mountainous areas and recommends pier locations, and has the characteristics of comprehensive and reliable evaluation results.
[0073] The overall detailed process of the comprehensive site selection method for bridge piers in mountainous areas provided by the embodiment of the present invention is as follows: Figure 6 As shown. The process of the method includes: the first step is to determine the first-level prohibited setting distance D1 of the pier through the stability of the reservoir bank. First, according to the reservoir bank survey, the basic data required for predicting the collapsed bank width by the two-stage method is obtained, and the collapsed bank width is obtained by the two-stage method through the drawing method, so as to determine the first-level prohibited setting distance D1 of the pier position; the second step is to determine the second-level prohibited setting distance D2 of the pier through the unloading effect. First, according to the unloading crack survey, the width of the unloading crack influence zone is obtained by on-site measurement or table lookup, so as to determine the second-level prohibited setting distance D2 of the pier position; the third step is to determine the preliminary prohibited setting distance D of the bridge pier, mainly based on the D1 and D2 determined in the early stage, and the preliminary prohibited setting distance D of the bridge pier position is determined by taking the sum of them; the fourth step is to use the arrangement stability evaluation result to meet D to obtain the conditions for setting piers. First, the slope stability coefficient obtained by the slope stability evaluation K, safety standard Fs, reinforcement force f required to meet the safety standard, the distance from the rear edge of the most unfavorable sliding surface to the slope foot D3, the preliminary prohibited distance D of the bridge pier position is reviewed, and through parameter comparison, when K≥Fs, no reinforcement is required, the prohibited distance is D, and piers can be installed; when K<Fs and f<2000kN / m, reinforcement can be carried out, the prohibited distance is D, and piers can be installed; when K<Fs and f≥2000kN / m, reinforcement cannot be carried out, piers are prohibited from being installed within the range of D3, and the site is reselected, thereby obtaining the effective conditions for installing piers; the fourth step is to classify the proposed pier locations, and recommend the optimal location and acceptable location. By comparing the proposed pier location distance D4 with D, the proposed pier locations are classified. When D4<D, piers are prohibited. When D4=D, it is the optimal pier location. When D4>D, the pier location is acceptable, thereby recommending the optimal location and acceptable location.
[0074] The implementation basis of each embodiment of the present invention is to implement programmed processing through a device with a processor function. Therefore, in engineering practice, the technical solutions and functions of each embodiment of the present invention can be encapsulated into various modules. Based on this reality, on the basis of the above embodiments, the embodiment of the present invention provides a device for comprehensive analysis of the site selection of bridge piers in mountainous areas, which is used to execute the comprehensive site selection method of bridge piers in mountainous areas in the above method embodiment. Figure 4 The device includes: a first main module, according to the reservoir bank survey, obtains the basic data required for predicting the collapsed bank width by the two-stage method, combines the two-stage method to obtain the collapsed bank width through the mapping method, and determines the first-level prohibited setting distance D1 of the pier position; a second main module, according to the unloading crack survey, obtains the width of the unloading crack influence zone through on-site measurement or table lookup, and determines the second-level prohibited setting distance D2 of the pier position; a third main module, according to the first-level prohibited setting distance D1 of the pier position and the second-level prohibited setting distance D2 of the pier position, determines the preliminary prohibited setting distance D of the bridge pier position; a fourth main module, according to the slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, reviews the preliminary prohibited setting distance D of the bridge pier position, and obtains the effective conditions for setting piers; a fifth main module, according to the comparison between the distance D4 of the proposed pier position and D, classifies the proposed pier position, and recommends the optimal position and acceptable position.
[0075] The device for comprehensive analysis of the site selection of bridge piers in mountainous areas provided by the embodiment of the present invention adopts Figure 4 Several modules in it determine the first-level prohibited setting distance D1 of the pier location according to the collapsed bank width, determine the second-level prohibited setting distance D2 of the pier location according to the width of the unloading crack influence zone, determine the preliminary prohibited setting distance D of the bridge pier location through D1 and D2, and verify the preliminary prohibited setting distance D of the pier location according to the slope stability evaluation indicators K, Fs, f, and D3 to obtain the effective conditions for setting piers, and finally, based on the comparison between the distance D4 of the proposed pier location and D, classify the proposed pier location, and recommend the optimal location and acceptable location, conduct a comprehensive evaluation of the bridge pier location in mountainous area and recommend the pier location, which has the characteristics of comprehensive and reliable evaluation results.
[0076] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A comprehensive site selection method for bridge piers in mountainous areas, characterized in that: According to the results of the reservoir bank survey, the basic data required for predicting the collapsed bank width by the two-stage method are obtained, and the collapsed bank width is obtained by the mapping method combined with the two-stage method to determine the first-level prohibited setting distance D1 of the pier position; according to the results of the unloading crack investigation, the width of the unloading crack influence zone is obtained by on-site measurement or table lookup, and the second-level prohibited setting distance D2 of the pier position is determined; according to D1 and D2, the preliminary prohibited setting distance D of the bridge pier position is determined; according to the slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, the preliminary prohibited setting distance D of the bridge pier position is reviewed, and the effective conditions for setting piers are obtained; based on the comparison between the distance D4 of the proposed pier position and D, the proposed pier position is graded, and the optimal position and acceptable position are recommended.
2. A comprehensive site selection method for bridge piers in mountainous areas according to claim 1, characterized in that: According to the bank survey results, the basic data required for predicting the bank collapse width by the two-stage method are obtained, specifically the slope topographic profile, the bulk density and strength parameters of the above-water and underwater rock and soil bodies, and the basic water level data required for predicting the bank collapse width by the two-stage method. The bank collapse width is obtained by the mapping method in combination with the two-stage method, and the first-level prohibited setting distance D1 of the pier position is determined, including: Among them, α is the underwater stable slope angle, c1 is the cohesion of the underwater slope rock and soil, is the internal friction angle of the underwater slope rock and soil, γ1 is the bulk density of the underwater slope rock and soil, and H1 is the height of the underwater slope. γ1 can be determined by on-site sand filling test, or by sampling and measuring the bulk density indoors. c1 and Generally, it can be obtained through saturated direct shear test of rock and soil; H1 can be determined comprehensively through the highest flood level of surface water, design flood level and capillary influence height H3; Among them, β is the stable slope angle above water, c2 is the cohesion of the rock and soil mass of the slope above water, is the internal friction angle of the rock and soil mass of the water slope, γ2 is the bulk density of the rock and soil mass of the water slope, and H2 is the height of the water slope; γ2 can be determined by on-site sand filling test, or by sampling and measuring the bulk density indoors; c2 and Generally, it can be obtained through direct shear test of rock and soil; After obtaining α and β, D1 is obtained by mapping based on the initial terrain profile obtained from engineering survey.
3. A comprehensive site selection method for bridge piers in mountainous areas according to claim 2, characterized in that: According to the unloading crack investigation results, the width of the unloading crack influence zone is obtained by on-site measurement or table lookup, and the second-level prohibited setting distance D2 of the pier position is determined, including: D2 is the second-level prohibited distance of the bridge pier position determined by the width of the unloading crack influence zone. D2 is determined through on-site investigation or table query.
4. A comprehensive site selection method for bridge piers in mountainous areas according to claim 3, characterized in that: The method of determining the preliminary prohibited setting distance D of the bridge pier position according to the first level prohibited setting distance D1 of the pier position and the second level prohibited setting distance D2 of the pier position includes: D=D1+D2 Among them, D is the preliminary prohibited distance for the bridge pier location, D1 is the prohibited distance for the first-level bridge pier location determined by the stability of the reservoir bank, and D2 is the prohibited distance for the second-level bridge pier location determined by the width of the unloading crack influence zone.
5. A comprehensive site selection method for bridge piers in mountainous areas according to claim 4, characterized in that: The slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation are used to review the initial prohibited distance D for the bridge pier location, and obtain the effective conditions for setting piers, including: Whether engineering reinforcement measures are needed can be determined by the following formula: Among them, K is the slope stability coefficient under different working conditions obtained by slope stability calculation, F s It is the safety factor standard corresponding to different working conditions recommended by the specification; K is determined by software modeling calculation, F s Determined by looking up the standard table.
6. A comprehensive site selection method for bridge piers in mountainous areas according to claim 5, characterized in that: The slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation are used to review the initial prohibited distance D for the bridge pier location, and obtain the effective conditions for setting piers, including: Whether the engineering reinforcement measures are feasible can be determined by the following formula: f=max(f 自然工况 ,f 降雨工况 ,f 地震工况 ) Among them, f is the reinforcement force required to meet the engineering stability requirements, f 自然工况 The reinforcement force required to meet the safety standards of natural working conditions, f 降雨工况 The compensation reinforcement required to meet the safety standard of rainfall conditions, f 地震工况 The compensatory reinforcement force required to meet the safety standards of earthquake conditions; the cross-sectional size of the anti-slide pile is considered to be 2m*4m, and the pile spacing is 8m. The anti-slide force that a single anti-slide pile can provide is generally 5000-8000kN, and the sliding force per linear meter is 625kN-1000kN / m; when f≥2000kN / m, more than two rows of anti-slide piles are required for reinforcement, and it can be judged that reinforcement is not possible, otherwise reinforcement is possible; The prohibited distance of piers can be checked by the following formula: Among them, D3 is the distance from the rear edge of the most unfavorable sliding surface to the slope foot determined by the slope stability.
7. A comprehensive site selection method for bridge piers in mountainous areas according to claim 6, characterized in that: The proposed pier locations are graded based on the comparison between the distance D4 and D of the proposed pier locations, and the optimal location and acceptable location are recommended, including: Proposed distance between pier position and slope foot Among them, the optimal pier position is determined based on the stability of the reservoir bank, the influence range of the unloading crack zone and the stability of the slope, and the acceptable pier position is obtained by comprehensively considering the bridge deck elevation, slope stability and reinforcement force f.
8. A comprehensive site selection system for bridge piers in mountainous areas, characterized in that: include: The first main module, based on the bank survey results, obtains the basic data required for predicting the bank collapse width using the two-stage method, obtains the bank collapse width using the two-stage method through the mapping method, and determines the first-level prohibited setting distance D1 of the pier position; The second main module, based on the results of the unloading crack investigation, obtains the width of the unloading crack influence zone through on-site measurement or table lookup, and determines the second-level prohibited setting distance D2 of the pier location; the third main module, determines the preliminary prohibited setting distance D of the bridge pier location based on the first-level prohibited setting distance D1 of the pier location and the second-level prohibited setting distance D2 of the pier location; the fourth main module, based on the slope stability coefficient K, safety standard Fs, reinforcement force f required to meet the safety standard, and the distance D3 from the rear edge of the most unfavorable sliding surface to the slope foot obtained by the slope stability evaluation, reviews the preliminary prohibited setting distance D of the bridge pier location and obtains the effective conditions for setting piers; the fifth main module, based on the comparison of the distance D4 of the proposed pier location with D, classifies the proposed pier location, and recommends the optimal location and acceptable location.
9. An electronic device, characterized in that: include: At least one information processor, at least one memory and communication interface and a power supply; wherein, The information processor, memory and communication interface communicate with each other and are powered by the power supply; The memory stores program instructions that can be executed by the information processor, and the information processor calls the program instructions to execute the method according to any one of claims 1 to 7.
10. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium stores computer instructions that cause the computer to execute the method of any one of claims 1 to 7.