Steel-concrete composite bridge deck using T-type shear connector and construction method
By using T-shaped shear joints and tension frame units in steel-concrete combined bridge deck panels, the problems of complex structure and difficult construction of existing bridge deck panels are solved, and high shear resistance and construction convenience are achieved. Application of bridge decks for large span bridges.
Patent Information
- Application Number
- CN202210723284.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-24
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-06-24
AI Technical Summary
The existing steel-concrete composite bridge deck panels have complex structure, high construction difficulty and low durability. They are inconvenient to use in larger span bridge decks, and are not economically good, making it difficult to meet the continuous durability, lightweight and convenient construction of bridges. need.
A steel-concrete composite bridge deck with T-shaped shear joints is formed by setting T-shaped double-sided open-hole steel plate units and steel mesh on the bottom steel plate, and forming multiple concrete shear bolts and nails in the upper concrete layer, combined with tensioning The frame unit simplifies the construction process and improves shear resistance.
It significantly enhances the shear resistance of the bridge deck, improves structural integrity and construction efficiency, reduces the amount of steel used and self-weight, meets the durability and economic requirements of the bridge, and is suitable for the application of bridge decks with larger spans.
Smart Images

Figure CN115162158B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge structures, and in particular relates to a steel-concrete composite bridge deck using a T-shaped shear-resistant connector and a construction method. Background Art
[0002] The bridge deck, as an important part of the bridge structure, directly bears the wheel pressure and impact of the upper vehicles. Its working condition will directly affect the performance of the bridge. The correct selection of the bridge deck structure is of great significance in bridge design.
[0003] Steel-concrete composite bridge deck is a new type of bridge deck that is composed of a steel base plate and an upper layer of concrete, which are combined into a whole and bear the load together through various forms of shear connectors such as studs or perforated steel plate connectors (PBL). Under load, it can give full play to the combined advantages of the strong tensile properties of steel and the strong compressive properties of concrete.
[0004] At present, in the construction of steel-concrete composite bridge decks, elastic connectors such as densely distributed shear studs or rigid connectors such as perforated steel plates (PBL) are usually used in combination with studs. Even longitudinal steel bars are inserted into the holes of the perforated steel plate connectors (PBL) to connect with densely distributed studs in other areas, so as to improve the overall shear bearing capacity of the steel-concrete composite bridge deck.
[0005] In this combined shear connector, the perforated steel plate itself has large anti-slip stiffness, high shear strength, and can enhance the connection of the bottom steel plate of the bridge deck and the lateral stiffness of the bridge deck. It is a new type of steel-concrete composite bridge deck, an innovation and development of traditional steel-concrete composite slabs, and is more suitable for use as a bridge deck that bears large loads, complex loads, and fatigue loads.
[0006] However, if the bridge deck is densely covered with shear studs, the construction area and workload will increase significantly, and the quality of stud welding is affected by many factors such as the welding skills of technicians and welding equipment. Shear connectors that combine perforated plate connectors (PBL) and studs still require a large number of studs to meet the shear design requirements.
[0007] The new shear-resistant composite connector using a perforated steel plate connector (PBL) + bolts + longitudinal reinforcement first requires the longitudinal reinforcement to pass through the hole in the perforated steel plate. The shear section of the reinforcement in the perforated section is very small, and the shear performance of the reinforcement + concrete pin combination formed by the pin and the concrete section in the hole is slightly improved compared to the shear performance of the pin in the steel plate perforated full concrete section.
[0008] Secondly, the rigid perforated steel plate connector (PBL) has high rigidity and small contact area with the bridge deck concrete, and cracks are very likely to appear at the interface between steel and concrete after bearing load. Finally, the new combined shear connector of perforated steel plate connector (PBL) + studs + longitudinal steel bars still needs to be sheared together with the studs to meet the shear design requirements. The bridge deck structure is cumbersome, the construction area is large, and the amount of steel and the self-weight of the bridge deck are increased. The economic efficiency is low, which limits its application in bridge decks with larger spans, and does not conform to the development direction of the bridge deck system for continuous durability, lightweight, and convenient construction.
[0009] Therefore, it is necessary to design a steel-concrete composite bridge deck structure and its construction method with reasonable structural force, light weight, excellent durability, convenient construction, and strong economy and practicality, so as to effectively solve the current problems of complex structure and construction of steel-concrete composite bridge decks, large working surface, multiple diseases, and low durability.
[0010] The Chinese invention patent with the publication number CN106149562A and the publication date of November 23, 2016, discloses a steel-concrete composite bridge deck structure with uniform and ultra-thin perforated T-shaped stiffening ribs, including at least two composite bridge deck units spliced on the main beam, the composite bridge deck unit including a bottom steel plate and a cast-in-place concrete plate cast thereon, and a shear key connecting the bottom steel plate and the cast-in-place concrete plate as a whole, the shear key including a steel bar shear key embedded in the cast-in-place concrete plate, and longitudinally extending perforated T-shaped stiffening ribs arranged transversely at intervals on the bottom steel plate; each perforated T-shaped stiffening rib has a T-shaped cross-section, and longitudinally spaced through holes are opened on its vertical plate surface, and the lower end of the vertical plate surface is welded to the bottom steel plate surface.
[0011] However, the concrete shear bolts formed on the perforated T-shaped stiffening ribs of the steel-concrete composite bridge deck in this invention patent are relatively small in size and relatively small in number, so the effect of improving the shear resistance performance of the bridge deck is very limited. Summary of the invention
[0012] The present invention provides a steel-concrete composite bridge deck using a T-shaped shear-resistant connector, which can provide a T-shaped double-sided perforated steel plate unit, a steel mesh, and an upper concrete layer on a bottom steel plate, so that the steel-concrete composite bridge deck has greater shear resistance performance.
[0013] In addition, the present invention also provides a construction method for the steel-concrete composite bridge deck, which can relatively simply and efficiently complete the entire construction process of the composite bridge deck by first fixing the bottom steel plate, then welding the T-shaped double-sided perforated steel plate unit, then welding the steel mesh, and finally pouring to form an upper concrete layer.
[0014] The technical solution adopted by the present invention to solve the above-mentioned problem is: a steel-concrete composite bridge deck with a T-shaped shear-resistant connector is used, and the structure includes a bottom steel plate and an upper concrete layer, and also includes a T-shaped double-sided perforated steel plate unit arranged on the upper surface of the bottom steel plate, and a steel mesh arranged on the T-shaped double-sided perforated steel plate unit and located in the upper concrete layer.
[0015] A further preferred technical solution is that the T-shaped double-sided perforated steel plate unit includes a vertical steel plate arranged on the upper surface of the bottom steel plate, a transverse steel plate arranged on the upper end surface of the vertical steel plate, a bottom opening arranged on the vertical steel plate and used to form a transverse concrete shear bolt, and an upper opening arranged on the transverse steel plate and used to form a vertical concrete shear bolt.
[0016] A further preferred technical solution is that the bottom openings and the upper openings are both elliptical in shape, and two rows of the upper openings are respectively arranged at two sides of the vertical steel plate.
[0017] A further preferred technical solution is that the length direction of the vertical steel plate, the length direction of the transverse steel plate, the long axis direction of the bottom opening, and the long axis direction of the upper opening are all the same, which are the transverse direction of the bridge deck.
[0018] A further preferred technical solution is that: the minor axis length of the bottom opening is greater than 1 / 2 of the vertical width of the vertical steel plate; the minor axis length of the upper opening is greater than 1 / 4 of the horizontal width of the horizontal steel plate; the minor axis lengths of the bottom opening and the upper opening are both greater than the maximum particle size of the aggregate in the upper concrete layer.
[0019] A further preferred technical solution is that a tensioning frame unit for installing the steel mesh is also provided on the transverse steel plate.
[0020] A further preferred technical solution is that the tensioning frame unit includes a lifting column arranged on the upper surface of the transverse steel plate, a lifting half-tube arranged on the lifting column and used to engage the lower steel bars of the steel mesh, a limiting plate arranged on the lower surface of the transverse steel plate, a vertical pulling plate arranged on the limiting plate, and a pulling half-tube arranged on the vertical pulling plate and used to hook the lower steel bars of the steel mesh downward.
[0021] A further preferred technical solution is that the tensioning frame unit also includes a transverse bottom plate arranged on the lower end surface of the lifting column, two first clamping columns respectively arranged at both sides of the lower surface of the transverse bottom plate and used to engage with the upper opening, and a second clamping column arranged on the upper surface of the limiting plate and used to engage with the upper opening.
[0022] A further preferred technical solution is that the first clamping column and the second clamping column are both used for sliding clamping on the upper opening, and the tube body opening of the pulling half tube is tilted downward.
[0023] The construction method of a steel-concrete composite bridge deck using a T-shaped shear connector comprises the following steps in sequence:
[0024] S1. Fixing the bottom steel plate on the bridge steel main beam;
[0025] S2, welding the bottom edge of the T-shaped double-sided perforated steel plate unit to the upper surface of the bottom steel plate;
[0026] S3, welding the steel mesh on the upper surface of the T-shaped double-sided perforated steel plate unit;
[0027] S4, pouring concrete on the bottom steel plate, and tamping it densely at the openings of the T-shaped double-sided perforated steel plate unit to form the upper concrete layer, and then covering and curing the upper concrete layer until the designed strength is reached, thereby finally forming a complete bridge deck.
[0028] The present invention has the following advantages.
[0029] First, the upper concrete layer forms a large number of concrete shear studs with large cross-sections on the T-shaped double-sided perforated steel plate unit, which significantly enhances the shear resistance of the bridge deck.
[0030] Second, the T-shaped double-sided perforated steel plate unit plus the steel mesh form the internal steel "skeleton" of the upper concrete layer, further improving the structural integrity of the bridge deck.
[0031] Third, there is a tensioning frame unit between the T-shaped double-sided perforated steel plate unit and the steel mesh to ensure that the steel mesh has sufficient welding area and that it is firmly welded to the T-shaped double-sided perforated steel plate unit.
[0032] Fourth, the tensioning frame unit can further adjust the relative height of the steel mesh compared to the bottom steel plate.
[0033] Fifth, due to the provision of the tensioning frame unit, the T-shaped double-sided perforated steel plate unit and the steel mesh can be firmly connected without welding, ensuring that the steel mesh is not easily displaced when the upper concrete layer is poured.
[0034] Sixth, the tensioning frame unit relies on the arc-shaped edge of the upper opening to have a self-clamping and fastening effect on the transverse steel plate, which indirectly ensures the firm installation of the steel mesh.
[0035] Seventh, the lower steel bars of the steel mesh can still be welded after lifting and pulling the half pipe, and there is no limit on the length, so the welding area is sufficient.
[0036] Eighth, the construction method of the entire composite bridge deck is relatively simple and convenient. From bottom to top, first the steel structure and then the concrete structure, the construction operation is reasonable and orderly. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a schematic diagram of the cross-sectional structure of the present invention along the longitudinal bridge direction.
[0038] Figure 2 It is a schematic structural diagram of a T-shaped double-sided perforated steel plate unit in the present invention.
[0039] Figure 3 It is a schematic diagram of the position structure of the tensioning frame unit in the present invention.
[0040] Figure 4 It is a schematic diagram of the position structure of the lifting column in the present invention.
[0041] Figure 5 It is a schematic diagram of the position structure of the vertical pulling plate in the present invention.
[0042] Figure 6 It is a schematic diagram of the clamping operation mode of the first clamping column and the second clamping column in the present invention.
[0043] In the accompanying drawings, the meanings of the various numbers are as follows: longitudinal bridge direction a, low clamping strength position b of the clamping column, high clamping strength position c of the clamping column, bottom steel plate 11, upper concrete layer 12, T-shaped double-sided perforated steel plate unit 1, steel mesh 2, vertical steel plate 101, transverse steel plate 102, bottom opening 103, upper opening 104, tensioning frame unit 3, lifting column 301, lifting half pipe 302, limit plate 303, vertical pulling plate 304, pulling half pipe 305, transverse bottom plate 306, first clamping column 307, second clamping column 308. DETAILED DESCRIPTION
[0044] The following descriptions are merely preferred embodiments of the present invention and are not intended to limit the scope of the present invention.
[0045] As attached Figure 1-6 As shown, a steel-concrete composite bridge deck using a T-shaped shear connector has a structure including a bottom steel plate 11 and an upper concrete layer 12, and also includes a T-shaped double-sided perforated steel plate unit 1 arranged on the upper surface of the bottom steel plate 11, and a steel mesh 2 arranged on the T-shaped double-sided perforated steel plate unit 1 and located in the upper concrete layer 12.
[0046] In this embodiment, the arrangement and extension direction of the plurality of T-shaped double-sided perforated steel plate units 1 is the longitudinal direction of the bridge deck, that is, the driving direction, and the T-shaped double-sided perforated steel plate unit 1 itself is a large shear-resistant connector.
[0047] The T-shaped double-sided perforated steel plate unit 1 includes a vertical steel plate 101 arranged on the upper surface of the bottom steel plate 11, a transverse steel plate 102 arranged on the upper end surface of the vertical steel plate 101, a bottom opening 103 arranged on the vertical steel plate 101 and used to form a transverse concrete shear stud, and an upper opening 104 arranged on the transverse steel plate 102 and used to form a vertical concrete shear stud.
[0048] In this embodiment, the vertical steel plate 101 plus the transverse steel plate 102 form a T-shaped structure, and concrete shear bolts can be formed at the bottom opening 103 and the upper opening 104, thereby ultimately increasing the shear resistance performance of the bridge deck.
[0049] In addition, the vertical steel plate 101 and the horizontal steel plate 102 may be formed in one piece, or may be welded and fixed in advance.
[0050] The bottom openings 103 and the upper openings 104 are both elliptical in shape, and two rows of the upper openings 104 are respectively arranged at both sides of the vertical steel plate 101. The length direction of the vertical steel plate 101, the length direction of the transverse steel plate 102, the long axis direction of the bottom openings 103, and the long axis direction of the upper openings 104 are all the same, which are all transverse to the bridge deck.
[0051] In this embodiment, the shapes of the bottom opening 103 and the upper opening 104 cannot be polygons, such as rectangles, triangles, etc., because the force will be too concentrated at the end corners of the polygon, and the T-shaped double-sided perforated steel plate unit 1 will easily crack at the end corners of the openings.
[0052] In addition, circular holes are more preferred, and the above-mentioned problem of force concentration can be appropriately alleviated. However, for the long T-shaped double-sided perforated steel plate unit 1, if the circular hole is too small, the formed concrete shear bolts are not large enough and the shear resistance is average. If the circular hole is too large, an area with too small width is easily formed at the vertical steel plate 101 and the horizontal steel plate 102, and this area is also prone to breakage.
[0053] Therefore, the most preferred shape is an ellipse with its long axis being horizontal, which can alleviate the problem of the side of the steel plate being too thin caused by the circular hole.
[0054] In addition, the above-mentioned words “double-sided openings” refer to the two rows of upper openings 104 being arranged on both sides.
[0055] The minor axis length of the bottom opening 103 is greater than 1 / 2 of the vertical width of the vertical steel plate 101; the minor axis length of the upper opening 104 is greater than 1 / 4 of the horizontal width of the horizontal steel plate 102; the minor axis lengths of the bottom opening 103 and the upper opening 104 are both greater than the maximum particle size of the aggregate in the upper concrete layer 12.
[0056] In this embodiment, the bottom opening 103 and the upper opening 104 are as large as possible, so as to increase the size specifications of the concrete shear bolts formed at the bottom opening 103 and the upper opening 104 as much as possible without significantly reducing the structural strength of the T-shaped double-sided perforated steel plate unit 1, so as to improve the shear resistance performance of the entire composite bridge deck.
[0057] In addition, the maximum particle size of the raw materials at the upper concrete layer 12 is the particle size of the largest aggregate, and the short axis lengths of the two openings are both greater than the maximum particle size, which can ensure that the concrete material can pass through the T-shaped double-sided perforated steel plate unit 1, thereby ensuring the pouring fluidity of the concrete material.
[0058] The transverse steel plate 102 is also provided with a tensioning frame unit 3 for installing the steel mesh 2 .
[0059] In this embodiment, the tensioning frame unit 3 has at least the following three functions and advantages.
[0060] First, the installation method of the steel mesh 2 can be selected to be fixed by snapping in addition to welding.
[0061] Second, the steel mesh 2 is provided with a height adjustment function, that is, the tensioning frame unit 3 of different height sizes is selected.
[0062] Third, the tension frame unit 3 itself can provide a welding area of unlimited length within a certain range to ensure that the steel mesh 2 is stably welded on the tension frame unit 3. Similarly, the tension frame unit 3 can also be fully welded on the T-shaped double-sided perforated steel plate unit 1.
[0063] The tensioning frame unit 3 includes a lifting column 301 arranged on the upper surface of the transverse steel plate 102, a lifting half pipe 302 arranged on the lifting column 301 and used to engage the lower steel bars of the steel mesh 2, a limiting plate 303 arranged on the lower surface of the transverse steel plate 102, a vertical pulling plate 304 arranged on the limiting plate 303, and a pulling half pipe 305 arranged on the vertical pulling plate 304 and used to hook the lower steel bars of the steel mesh 2 downward.
[0064] In this embodiment, the use of the tension frame unit 3 requires that the length direction of the steel bars at the bottom of the steel mesh 2 is consistent with the length direction of the T-shaped double-sided perforated steel plate unit 1.
[0065] The center angle of the cross-sectional shape of the lifting half-tube 302 is less than 180°, and the center angle of the cross-sectional shape of the pulling half-tube 305 is greater than 180°, and the latter ensures a sufficient upper limit function after engagement.
[0066] In addition, the lifting column 301, the limiting plate 303, and the vertical pulling plate 304 can be welded to the transverse steel plate 102, and the lifting half pipe 302 and the pulling half pipe 305 can also be welded to the lower steel bars.
[0067] Finally, the central lifting column 301 is “pushed upward” and the vertical pulling plates 304 on both sides are “pulled downward” to ensure that the steel mesh 2 is stably installed on the transverse steel plate 102.
[0068] The tensioning frame unit 3 also includes a transverse bottom plate 306 arranged on the lower end surface of the lifting column 301, two first clamping columns 307 respectively arranged at both sides of the lower surface of the transverse bottom plate 306 and used to engage with the upper opening 104, and a second clamping column 308 arranged on the upper surface of the limiting plate 303 and used to engage with the upper opening 104.
[0069] In this embodiment, since the upper opening 104 is elliptical, the two first clamping columns 307 are moved together from the low clamping strength position b of the clamping column to the high clamping strength position c of the clamping column, so as to further reinforce the lifting column 301.
[0070] Similarly, the second clamping column 308 can also slide on the arc-shaped edge of the upper opening 104 to select different positions, so as to ensure that the clamping strength of the vertical pulling plate 304 on the horizontal steel plate 102 is flexible and adjustable.
[0071] The first clamping column 307 and the second clamping column 308 are both used for sliding clamping on the upper opening 104, and the tube opening of the pulling half tube 305 is tilted downward.
[0072] In this embodiment, both the first clamping column 307 and the second clamping column 308 are cylinders, and vertical stripe protrusions are provided on the annular surfaces thereof to ensure sufficient friction clamping of the arcuate edge of the upper opening 104 .
[0073] The construction method of a steel-concrete composite bridge deck using a T-shaped shear connector comprises the following steps in sequence:
[0074] S1, fixing the bottom steel plate 11 on the bridge steel main beam;
[0075] S2, welding the bottom edge of the T-shaped double-sided perforated steel plate unit 1 to the upper surface of the bottom steel plate 11;
[0076] S3, welding the steel mesh 2 on the upper surface of the T-shaped double-sided perforated steel plate unit 1;
[0077] S4, pouring concrete on the bottom steel plate 11, and tamping it densely at the openings of the T-shaped double-sided perforated steel plate unit 1 to form the upper concrete layer 12, and then covering and curing the upper concrete layer 12 until the designed strength is reached, thereby finally forming a complete bridge deck.
[0078] In S2 of this embodiment, ordinary studs may be further welded on the upper surface of the bottom steel plate 11 at this time.
[0079] Finally, the steel-concrete composite bridge deck has outstanding shear resistance.
[0080] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various modifications can be made within the knowledge of ordinary technicians in the technical field without departing from the purpose of the present invention. These are all non-creative modifications and are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A steel-concrete composite bridge deck using a T-shaped shear connector, the structure comprising a bottom steel plate (11) and an upper concrete layer (12), Features: It also includes a T-shaped double-sided perforated steel plate unit (1) arranged on the upper surface of the bottom steel plate (11), and a steel mesh (2) arranged on the T-shaped double-sided perforated steel plate unit (1) and located in the upper concrete layer (12). The T-shaped double-sided perforated steel plate unit (1) comprises a vertical steel plate (101) arranged on the upper surface of the bottom steel plate (11), a transverse steel plate (102) arranged on the upper end surface of the vertical steel plate (101), a bottom opening (103) arranged on the vertical steel plate (101) and used to form a transverse concrete shear stud, and an upper opening (104) arranged on the transverse steel plate (102) and used to form a vertical concrete shear stud. The bottom opening (103) and the upper opening (104) are both elliptical in shape, and two rows of upper openings (104) are respectively arranged at two sides of the vertical steel plate (101). The length direction of the vertical steel plate (101), the length direction of the transverse steel plate (102), the long axis direction of the bottom opening (103), and the long axis direction of the upper opening (104) are all the same, and are all in the transverse direction of the bridge deck. The transverse steel plate (102) is also provided with a tensioning frame unit (3) for installing the steel mesh (2). The tensioning frame unit (3) comprises a jacking column (301) arranged on the upper surface of the transverse steel plate (102), a jacking half-tube (302) arranged on the jacking column (301) and used to engage the lower steel bars of the steel mesh (2), a limiting plate (303) arranged on the lower surface of the transverse steel plate (102), a vertical pulling plate (304) arranged on the limiting plate (303), and a pulling half-tube (305) arranged on the vertical pulling plate (304) and used to hook the lower steel bars of the steel mesh (2) downwards. The tensioning frame unit (3) further comprises a transverse bottom plate (306) arranged on the lower end surface of the jacking column (301), two first clamping columns (307) respectively arranged at two side positions on the lower surface of the transverse bottom plate (306) and used to engage with the upper opening (104), and a second clamping column (308) arranged on the upper surface of the limiting plate (303) and used to engage with the upper opening (104). The first clamping column (307) and the second clamping column (308) are both used for sliding clamping on the upper opening (104), and the tube opening of the pulling half tube (305) is tilted downward.
2. The steel-concrete composite bridge deck using a T-shaped shear connector according to claim 1, Features: The short axis length of the bottom opening (103) is greater than 1 / 2 of the vertical width of the vertical steel plate (101); the short axis length of the upper opening (104) is greater than 1 / 4 of the horizontal width of the horizontal steel plate (102); and the short axis lengths of the bottom opening (103) and the upper opening (104) are both greater than the maximum particle size of aggregate in the upper concrete layer (12).
3. The construction method of the steel-concrete composite bridge deck using the T-shaped shear connector as claimed in claim 1, Features The following steps are included in sequence: S1, fixing the bottom steel plate (11) on the bridge steel main beam; S2, welding the bottom edge of the T-shaped double-sided perforated steel plate unit (1) to the upper surface of the bottom steel plate (11); S3, welding the steel mesh (2) on the upper surface of the T-shaped double-sided perforated steel plate unit (1); S4, pouring concrete on the bottom steel plate (11), and tamping it densely at the openings of the T-shaped double-sided perforated steel plate unit (1) to form the upper concrete layer (12), and then covering and curing the upper concrete layer (12) until the designed strength is reached, thereby finally forming a complete bridge deck.