Device and method for simulating in-situ stability of high-temperature pipelines under temperature and mechanical loads

By designing a temperature and mechanical load simulation device for simulating the in-position stability of high-temperature pipelines, complex problems in the in-position stability of high-temperature pipelines are solved, and accurate simulation of pipeline-foundation interactions and exploration of foundation strength changes is achieved. , provide scientific support for actual engineering.

CN115184583BActive Publication Date: 2024-11-15ZHEJIANG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210767422.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-11-15
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

The prior art is difficult to effectively study the in-position stability of high-temperature pipelines, especially in complex foundation environments under temperature and mechanical loads, resulting in problems such as in-position instability of pipelines and reduced foundation bearing performance.

Method used

A simulation device including pipeline model, experimental formation model, temperature control system, loading system and monitoring system was designed, which can simulate soil hole pressure and temperature changes caused by pipeline temperature in the real formation, and achieve constant temperature and heating through the temperature control system. - Cooling cycle, the afterburner system simulates load changes, and the monitoring system measures temperature and hole pressure in real time.

Benefits of technology

The device can more reliably and accurately reflect the in-situ stability problem of high-temperature pipeline-foundation interaction, explore changes in foundation strength, provide scientific support for pipeline design and construction, and effectively guide actual engineering design and disaster prevention and control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115184583B_ABST
    Figure CN115184583B_ABST
Patent Text Reader

Abstract

The invention discloses a device and method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads, which mainly include an experimental formation model and a supporting structure, a pipeline model, a temperature control system, a loading system and a monitoring system; wherein the pipeline model includes a pipeline, a sealing cover, a reinforcing rod and a heating pipe; the experimental formation model and the supporting structure include a foundation model, the pipeline is buried in the foundation model, the temperature control system controls the heating of the heating pipe, the loading system applies a load to the pipeline through the reinforcing rod, and the monitoring system monitors the load, temperature and pore pressure. The device and method can effectively reproduce the influence of the temperature of the oil and gas pipeline in the formation during the start-up, long-term operation and shutdown stages on the thermal water-hydraulic coupling response of the high-temperature pipeline, reveal the pore pressure and displacement evolution law of the foundation around the pipe under the action of the temperature field, the process of exerting the constraint force of the soil around the pipe and the bearing characteristics of the pipeline under complex environment, which is of great significance to the development of marine energy and the implementation of the national energy strategy, and provides important scientific support for pipeline design and construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical engineering and energy engineering, and relates to a device and method for simulating the in-situ stability of a pipeline, in particular to a device and a working method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads. Background Art

[0002] The development of offshore oil and gas resources is one of the key directions for breaking through energy bottlenecks in the world today. In the past 10 years, 60% of the newly discovered oil and gas fields in the world are offshore oil and gas fields. At the same time, pipeline transportation is the most economical and effective way to transport oil and gas resources over long distances. When transporting crude oil through pipelines, it is often heated to reduce its viscosity and improve transportation efficiency and economy. With the deepening of mining depth and the extension of transportation distance, the working temperature of the pipeline continues to increase, and its design temperature generally reaches 100℃, and the highest is nearly 200℃. Even if the outside of the pipeline is covered with an insulation layer, its surface temperature can still reach 50-60℃. Therefore, ensuring the normal service of oil and gas pipelines in high temperature and high pressure complex environments has become an important issue in the field of geotechnical and energy engineering.

[0003] With the development of oil and gas energy exploitation, more and more high-temperature oil and gas pipelines need to pass through soft seabed soil layers or be built on soft soil foundations. The presence of oil pipelines in the foundation and their temperature effects may lead to the degradation of foundation characteristics, seriously affecting the long-term service stability of the pipeline. It mainly manifests in two aspects. On the one hand, during the operation of the high-temperature pipeline, there is a temperature difference with the surrounding foundation, which transfers heat to the surrounding foundation, causing the temperature of the foundation around the pipeline to change, which will cause the pore water to expand and produce excess pore pressure, changing the stress state of the soil; on the other hand, the increase in the temperature of the soil in the foundation will affect the infiltration channels between soil particles and the dynamic viscosity of water, change the permeability characteristics of the soil, and further affect the safe service performance of the pipeline. The above phenomenon involves complex thermal water-hydraulic coupling, which will cause soil deformation and strength changes, and may change the soil's constraint on the pipeline, resulting in reduced foundation bearing capacity, making the pipeline more susceptible to catastrophic problems such as buckling and floating.

[0004] At present, in the study of the interaction between pipeline facilities and foundations, domestic and foreign scholars usually focus on the physical and mechanical interaction between pipelines and foundations. There is still a lack of research on the changes in soil pore pressure caused by pipeline temperature and the redistribution of the mechanical state of the pipe-soil interface induced by it. Therefore, it is urgent to invent a device and method for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads, including a heating system that can achieve constant temperature and heating-cooling cycles, a pipeline pulling system with controllable loading rate, and a monitoring system for measuring foundation temperature and pore pressure changes, etc., to study the in-situ stability problem of high-temperature pipeline-foundation interaction, obtain the evolution law of foundation temperature and pore pressure around the pipe, explore the strength changes of the foundation, and provide important scientific support for pipeline design and construction. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention aims to provide a device and method for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads, which can simulate the changes in soil pore pressure and temperature caused by pipeline temperature in real strata, so that the test results can more reliably and accurately reflect the prototype situation.

[0006] The technical solution of the present invention is as follows:

[0007] A device for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads comprises a pipeline model, an experimental formation model and a supporting structure, a temperature control system, a loading system and a monitoring system; the pipeline model comprises a pipeline, a sealing cover, a force rod and a heating pipe, sealing covers are installed on both sides of the pipeline, the heating pipe is fixed on one sealing cover and placed in the pipeline, the force rod is fixed on the pipeline, and the force rod is a hollow structure; the experimental formation model and the supporting structure comprise a foundation model, the pipeline is buried in the foundation model, the temperature control system is used to control the heating of the heating pipe, the loading system is used to apply a load to the pipeline through the force rod, and the monitoring system comprises an axial force meter, a temperature sensor and a pore pressure sensor, the axial force meter is used to monitor the load applied by the loading system, and the temperature sensor and the pore pressure sensor are used to monitor the temperature and pore pressure on the pipeline surface and in the foundation model.

[0008] In the above technical solution, further, the monitoring system includes a plurality of pore pressure sensors and a plurality of temperature sensors; wherein a total of four pore pressure sensors are arranged in four directions of the central cross section of the pipeline, a temperature sensor is fixed on the surface of the pipeline, and temperature sensors and pore pressure sensors are arranged simultaneously at a total of four positions in the foundation located on the side and bottom of the pipeline in the foundation model.

[0009] Furthermore, due to the rapid temperature decay and large temperature gradient near the pipeline, the temperature influence is mainly concentrated in the range of about 1D. The four positions are 0.5D and 1.0D from the pipe wall on the side of the pipeline and 0.5D and 1.0D from the pipe wall on the bottom of the pipeline, and D is the pipe diameter.

[0010] Furthermore, the experimental stratum model and supporting structure also include a model box, a bracket, an upper beam and a coarse sand cushion layer; the model box is provided with a glass window, two brackets are provided at the front and back of the model box, and an upper beam is provided on the bracket; the model box is used to contain the foundation model and a coarse sand cushion layer is provided under the foundation model for drainage.

[0011] Furthermore, the loading system is composed of a motor, a pulley, a force beam and a buckle; the force rod passes through the force beam and the upper beam from bottom to top in sequence, and the force beam and the force rod are fixed by a buckle, the pulley is fixedly installed under the upper beam, the axial force meter is fixed on the force beam, and the traction rope is wrapped around the motor roller and tied to the axial force meter through the pulley.

[0012] Furthermore, the temperature control system is composed of a temperature controller and a temperature control probe. The temperature control probe is placed inside the pipeline. The data line is led out through the force rod and connected to the temperature controller. The temperature controller is electrically connected to the heating tube.

[0013] A method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads is implemented using the above-mentioned device and specifically includes the following steps:

[0014] Step (1): Pipeline model assembly

[0015] Fix the heating tube, the force rod and the sealing cover to the pipeline, fix the four borehole pressure sensors to the four reserved holes on the upper, lower, left and right sides of the central section of the pipeline, place the temperature control probe inside the pipeline, and fix the temperature sensor to the pipeline surface with a cable tie. Ensure the pipeline is sealed after installation, and all lines are led out through the force rod; the data line of the temperature control probe and the power line of the heating tube are connected to the temperature controller; the data line of each sensor is connected to the data collector through the aviation plug;

[0016] Step (2): Build the support structure and arrange the pipeline model

[0017] Place the pipeline model in the model box and build a supporting structure. After the supporting structure is built, temporarily fix the force rod of the pipeline model to the supporting structure with buckles;

[0018] Step (3): Install the loading system

[0019] After installing the loading system, release the buckle used for temporary fixation;

[0020] Step (4): Preparation of foundation model and arrangement of other sensors

[0021] Prepare foundation models according to the different foundations to be simulated in the experiment and fill them into the model box; arrange the remaining pore pressure sensors and temperature sensors at the required positions; lead the data line out of the model box and connect it to the data collector through the aviation plug;

[0022] Step (5): Heating experiment

[0023] Adjust the upper limit of the heating of the temperature controller and the target temperature to be maintained; turn on the data acquisition device for data acquisition; connect the power of the heating tube to start heating; the pore pressure sensor on the surface of the pipeline, the temperature sensor on the surface of the pipeline, and the pore pressure sensor and temperature sensor in the foundation model simultaneously acquire data; after the heating experiment, maintain the temperature for a predetermined time and observe the dissipation process of the pore pressure during the high temperature maintenance process; then adjust the hysteresis of the temperature controller and conduct a cyclic heating experiment; after a sufficient number of predetermined cycles, stop heating until the temperature drops to the same as the ambient temperature, and observe the changes in pore pressure and temperature at different positions; step (6): pull-up experiment

[0024] Wait for the temperature of the pipeline and foundation model to completely dissipate; adjust the pulling rate of the loading system; turn on the data acquisition device and start monitoring the pore pressure on the pipeline surface and the pore pressure at different positions in the foundation model as well as the pulling axial force; control the loading system to start pulling at a uniform speed while monitoring the readings of the pore pressure sensors and axial force gauges at different positions; when the pipeline is completely pulled out, turn off the loading system and stop data acquisition.

[0025] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0026] (1) The present invention provides a device and working method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads. Traditional pipeline tests only consider mechanical load pull-up. The temperature of oil and gas pipelines varies greatly during operation, reaching 30°C to 50°C. The present invention uses a set of devices to simultaneously perform temperature and mechanical load coupling loading, which is more in line with actual working conditions; the device has a simple structure and is easy to install and conduct tests.

[0027] (2) The device can test the temperature and pore pressure of the pipe foundation while testing the pipe surface temperature and soil pressure.

[0028] (3) The device is not limited to foundation models of a single type and working condition. Different foundation models can be prepared according to the actual stratum soil type and stress state in different regions, and can effectively and reliably simulate the actual stratum conditions.

[0029] (4) The device is also suitable for simulating the interaction between pipelines and foundations under hypergravity. Based on the "scale" effect, the hypergravity test can reproduce the self-weight stress field of the prototype foundation soil, and can more accurately reproduce the coupling effect of the temperature field-seepage field-stress field. It can better guide the actual engineering design and propose methods for preventing and controlling disasters of engineering facilities. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a longitudinal cross-sectional view of a pipeline model of the device of the present invention;

[0031] Figure 2 It is a transverse cross-sectional view of a pipeline model of the device of the present invention;

[0032] Figure 3 It is the side section view of the pipeline model in the model box;

[0033] Figure 4 for Figure 3 The forward section view of the pipeline model along the A-A section in the model box;

[0034] Figure 5 for Figure 3 The forward section view of the middle pipe model along the B-B section in the model box;

[0035] Figure 6 for Figure 3 Positive cross-sectional view of the pipeline model in the model box along the C-C section.

[0036] Description of reference numerals:

[0037] 1 pipeline; 2 sealing cover; 3 force rod; 4 heating tube; 5 temperature control probe; 6 temperature controller; 7 temperature sensor; 8 pore pressure sensor; 9 aviation plug; 10 data acquisition device; 11 model box; 12 glass window; 13 bracket; 14 upper beam; 15 force beam; 16 axial force gauge; 17 buckle; 18 foundation model; 19 coarse sand cushion layer; 20 pulley; 21 electric motor. DETAILED DESCRIPTION

[0038] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0039] The device for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical loads of the present invention mainly comprises an experimental formation model and a supporting structure, a pipeline model, a temperature control system, a loading system and a monitoring system; the experimental formation model and the supporting structure comprise a model box, a glass window, a bracket, an upper beam, a foundation model and a coarse sand cushion layer; the pipeline model comprises a pipeline, a sealing cover, a force rod and a heating pipe; the temperature control system comprises a temperature controller and a temperature control probe; the loading system comprises a motor, a pulley, a force beam and a buckle; the monitoring system comprises a pore pressure sensor, a temperature sensor, an axial force meter and a data collector;

[0040] Furthermore, the model box is a plane strain rigid box with insulation and heat preservation functions, and is equipped with glass windows on the front and back sides, so that the internal foundation model and the position of the pipeline can be observed; the two brackets are fixed to the center of the front and back of the model box with screws; the upper beam is fixed above the bracket with bolts; the foundation model is prepared according to the real stratum to be simulated; a coarse sand cushion layer is arranged below, a drainage pipe is built in, and a geotextile is wrapped outside for drainage;

[0041] Furthermore, the pipeline model is a cylindrical aluminum pipeline, which is opened on the left and right and tapped inside, and can be sealed with a sealing cover; the surface is oxidized and frosted to control the fit of the pipeline model with the foundation model; holes are opened symmetrically on the left and right of the pipeline surface and tapped inside, so that a force rod with a thread at one end can be fixed on the pipeline, and a raw tape is wrapped outside for waterproofing; the force rod is hollow for wiring; four fixing holes are opened at predetermined positions on the middle section of the pipeline, and a threaded borehole pressure sensor probe is screwed into the fixing hole, and a raw tape is wrapped outside for waterproofing; the data line of the borehole pressure sensor is led out through the force rod; one end of the heating pipe is fixed to the sealing cover on the left, and after being screwed into the inside of the pipeline, the power line is led out from the hollow part of the force rod;

[0042] Furthermore, a temperature probe is placed inside the pipeline, and a data line is led out through a force rod; a power line of the heating tube is connected to a temperature controller, and a data line of the temperature control probe is connected to the temperature controller; the temperature controller has the functions of setting the heating temperature, maintaining the temperature and the temperature hysteresis;

[0043] Further, the bracket is fixed to the model box with screws; the upper beam is fixed to the bracket with two bolts; the axial force meter is fixed to the force beam; the force beam is passed through the force rod and fixed with four buckles; the force rod of the pipeline model is passed through the reserved hole of the upper beam and then temporarily fixed with buckles; a pulley is installed on the lower side of the upper pull; the motor is fixed to the model box; after the traction rope is wrapped around the motor, it is tied to the pull ring of the axial force meter through the pulley, and the temporary buckle is released;

[0044] Furthermore, the data lines of the four pore pressure sensors inside the pipeline are led out through the force rod; a temperature sensor is arranged on the pipeline surface and fixed with a cable tie; pore pressure sensors and temperature sensors are arranged at predetermined positions in the foundation model to monitor the temperature and pore pressure response at different positions of the formation; the data lines of the above sensors are connected to the data acquisition device through an aviation plug.

[0045] The method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical load is implemented using the above-mentioned device and includes the following steps:

[0046] Step (1): High temperature pipe model assembly

[0047] Fix the heating tube to the sealing cover on one side; fix two force rods on the pipeline, and seal the fixing threads with raw tape; fix four borehole pressure sensors on the reserved holes of the pipeline, and lead out the data lines through the hollow force rods; place the temperature control probe inside the pipeline, and lead out the data lines through the force rods; fix the sealing cover with the heating tube to one side of the pipeline, and lead out the power line of the heating tube through the force rods; screw on the sealing cover on the other side; connect the data line of the temperature control probe to the temperature controller, and the power line of the heating tube to the temperature controller; fix the temperature sensor to the sensor surface with a cable tie; connect the data line of the above sensors to the data acquisition device through the aviation plug;

[0048] Step (2): Build the support structure and arrange the pipeline model

[0049] Place the pipeline model in the model box and build the supporting structure. Fix the bracket to the model box with screws; fix the upper beam to the bracket with two bolts; fix the axial force gauge to the force beam; pass the force beam through the force rod and fix it with four buckles; pass the force rod of the pipeline model through the reserved hole of the upper beam and then temporarily fix it with buckles;

[0050] Step (3): Load system installation

[0051] Install a pulley on the lower side of the puller; fix the motor on the model box; wrap the traction rope around the motor, tie it to the dynamometer pull ring through the pulley, and release the temporary buckle;

[0052] Step (4): Preparation of foundation model and arrangement of other sensors

[0053] According to the experimental requirements, different methods are used to prepare the required foundation model; and the remaining pore pressure sensors and temperature sensors are arranged at the required positions; the data line is led out of the model box and connected to the data acquisition device through the aviation plug;

[0054] Step (5): Heating experiment

[0055] Adjust the heating amplitude and rated temperature of the temperature controller; turn on the data acquisition device for data acquisition; connect the power of the heating pipe to start heating; the pore pressure sensor on the pipeline surface, the temperature sensor on the pipeline surface, and the pore pressure sensor and temperature sensor in the foundation model simultaneously collect data; after the start of the heating experiment, maintain the temperature at a predetermined time, and observe the dissipation process of the pore pressure in the process of maintaining the high temperature; then adjust the hysteresis of the temperature controller and conduct a cyclic heating experiment; after setting a sufficient number of cycles, stop heating until the temperature is completely dissipated, and observe the changes in pore pressure and temperature at different positions;

[0056] Step (6): Pull-up experiment

[0057] Wait for the temperature of the pipeline and foundation model to completely dissipate; adjust the pulling rate of the motor; turn on the data acquisition device to monitor the pore pressure on the pipeline surface and the pore pressure at different positions in the foundation model and the pulling axial force; turn on the motor to pull up at a uniform speed, while monitoring the readings of the pore pressure sensors and axial force gauges at different positions; when the pipeline is completely pulled out, turn off the motor and stop data acquisition.

[0058] like Figure 1 and Figure 2As shown, the in-situ stability simulation device of a high-temperature pipeline under temperature and mechanical load proposed in this embodiment mainly includes a pipeline 1, a sealing cover 2, a force rod 3, a heating tube 4, a temperature control probe 5, a temperature controller 6, a temperature sensor 7 and a pore pressure sensor 8; wherein the pipeline 1 is a hollow cylindrical pipeline made of aluminum with a length of 260 mm, an outer diameter of 50 mm and an inner diameter of 30 mm, two holes (φ12) are opened on the left and right surfaces of the pipeline 1 for connecting the force rod 3 (φ8), and four holes (φ14) are opened along four directions on the central cross section of the pipeline 1 for embedding the pore pressure sensor 8; a φ10 hole is set on the left sealing cover 2 for fixing the heating tube 4; after the temperature control probe 5 is placed in the pipeline 1, the data line is led out through the force rod 3 and connected to the temperature controller 6; after the left sealing cover 2 is fixed to the pipeline 1, the force rod 3 is connected to the temperature controller 6; The power line of the heat pipe 4 is led out through the force rod 3 and then connected to the temperature controller 6; the temperature controller 6 has a PID self-tuning function, which can realize temperature measurement in the range of 0 to 120°C, with a maximum temperature rise and fall amplitude of 30°C and a control accuracy of 0.1°C; the pore pressure sensor 8 is screwed into the four reserved φ14 holes, and the data line is led out through the force rod 3; the temperature sensor 7 is fixed on the surface of the pipeline 1 with a cable tie; the pore pressure sensor 8 uses an absolute pressure chip with a range of 0 to 200 kPa (absolute pressure), 24V power supply, and an output of 0 to 5V; the temperature sensor 7 uses a Ni-Cu thermocouple with a temperature test range of 0 to 150°C and an accuracy of 0.2°C, and is equipped with a signal amplifier; all data lines are connected to the data acquisition device 10 through the aviation plug 9.

[0059] like Figure 3 As shown, the pipeline model used in this embodiment is placed in a model box, and a cross-sectional view is shown when observed from the left side; the model box 11 shown in the figure has glass windows 12 set at the front and back to observe the position of the pipeline 1 in the model box 11 and the deformation of the foundation model 18, and the size is 600mm×260mm×500mm (length×width×height), and the glass window 12 is made of acrylic glass; two brackets 13 are fixed to the model box 11 with screws; the upper beam 14 is fixed to the bracket 13 with two bolts; the axial force meter 16 is fixed to the force beam 15; the force beam 15 passes through the force rod 3 and is fixed with four buckles 17; the force rod 3 of the pipeline model passes through the upper beam 1 4, and then temporarily fix it with a buckle; install a pulley 20 on the lower side of the upper beam 14; fix the motor 21 on the model box 11; after winding the traction rope around the motor 21, tie it to the pull ring of the axial force meter 16 through the pulley 14, and release the temporary buckle; the maximum range of the axial force meter 16 is 2500N, and the accuracy is 0.1%; the motor 21 is composed of a reduction motor and a roller, and the roller converts the torque output by the motor into the pipeline pull-up load through the traction rope. The reducer amplifies the output force and reduces the traction speed. The reduction ratio is 1:250, the maximum load is 2500N, and the minimum traction speed is 0.1mm / s. The fixed speed of this embodiment is 0.2mm / s.

[0060] The foundation model 18 used in this embodiment is a saturated soft clay foundation, which is prepared by Malaysian kaolin. According to the size of the model box, 46 kg of dry soil and 74 kg of water are added to the vacuum mixing tank in batches. After sufficient mixing, the mud is poured into the model box, and an overburden load of 320 kg is applied in stages with a loading plate, which is equivalent to a preliminary consolidation pressure of 20 kPa. A coarse sand cushion layer 19 is arranged under the foundation model 18, which is wrapped with a geotextile and has a built-in drainage pipe for drainage.

[0061] In this embodiment, four observation points are set inside the foundation model 18; temperature sensors 7 and pore pressure sensors 8 are arranged at 0.5D and 1.0D (D is the outer diameter of the pipeline) on the left side of the pipeline 1 and 0.5D and 1.0D (D is the outer diameter of the pipeline) on the lower side of the pipeline 1 to observe the temperature and pore pressure responses at different positions inside the foundation; the data of the above sensors are connected to the data acquisition device 10 via the aviation plug 9.

[0062] The method for simulating the in-situ stability of a high-temperature pipeline under temperature and mechanical load is implemented using the above device and includes the following steps:

[0063] Step 1: Pipeline Model Assembly

[0064] Fix the heating tube 4 to the sealing cover 2 on one side; fix two booster rods 3 to the pipe 1 by screws, and seal the threads with raw tape; fix four borehole pressure sensors 8 to the reserved holes of the pipe 1, and lead the data line from the back through the hollow booster rod 3; place the temperature control probe 5 inside the pipe 1, and lead the data line through the booster rod 3; screw the sealing cover with the heating tube to one side of the pipe 1, and lead the power line of the heating tube 4 through the booster rod; screw on the sealing cover 2 on the other side; connect the data line of the temperature control probe 5 to the temperature controller 6, and the power line of the heating tube 4 to the temperature controller 6; fix a temperature sensor 7 to the sensor surface with a cable tie; connect the data line of the above sensor to the data collector 10 through the aviation plug 9;

[0065] Step 2: Sensor placement in foundation model

[0066] A sensor fixing bracket is set in the model box 11; the prepared pore pressure sensor 8 and temperature sensor 7 are fixed on the bracket; the data is led out of the model box 11 and connected to the data acquisition device 10 through the aviation plug 9;

[0067] Step 3: Support structure construction and loading system installation

[0068] Fix the bracket 13 to the model box 12 with screws; fix the upper beam 14 to the bracket 13 with two bolts; fix the axial force gauge 16 to the force beam 15; pass the force beam 15 through the force rod 3 and fix it with four buckles 17; pass the force rod 3 of the pipeline model through the reserved hole of the upper beam 14, and then temporarily fix it with buckles; install the pulley 20 on the lower side of the upper beam; fix the motor 21 to the model box 12; wrap the traction rope around the motor 21, and then tie it to the pull ring of the axial force gauge 16 through the pulley 20, and release the temporary buckle;

[0069] Step 4: Foundation model preparation

[0070] Malaysian kaolin was used to prepare saturated soft clay foundation. According to the size of the model box, 46 kg of dry soil and 74 kg of water were added to the vacuum mixing tank in batches. After sufficient mixing, the slurry was poured into the model box. A loading plate was used to apply an overburden load of 320 kg in stages, which was equivalent to a preliminary consolidation pressure of 20 kPa. A coarse sand cushion layer 19 was set under the foundation model 18, wrapped with a geotextile and equipped with a built-in drainage pipe for drainage.

[0071] Step 5: Heating Experiment

[0072] Adjust the upper heating limit and target temperature of the temperature controller 6; turn on the data acquisition device 10 for data acquisition; turn on the power of the heating tube 4 to start heating; the pore pressure sensor 8 on the pipeline surface, the temperature sensor 7 on the pipeline surface, and the pore pressure sensor 8 and temperature sensor 7 in the foundation model simultaneously perform data acquisition; after starting the heating experiment, maintain the temperature for a preset time, and observe the dissipation process of the pore pressure during the high temperature maintenance process; then adjust the hysteresis of the temperature controller 6 to perform a cyclic heating experiment; after a preset sufficient number of cycles, stop heating until the temperature is completely dissipated, and observe the pore pressure and temperature at different positions;

[0073] Step 6: Pull-up experiment

[0074] Wait for the temperature of the pipeline 1 and the foundation model 18 to completely dissipate; adjust the pulling-up rate of the motor 21; turn on the data acquisition device 10 and start monitoring the pore pressure on the surface of the pipeline 1 and the pore pressure at different positions in the foundation model 18 as well as the pulling-up axial force; turn on the motor 21 and start pulling up at a uniform speed, while monitoring the readings of the pore pressure sensor 8 at different positions and the readings of the axial force meter 16; when the pipeline 1 is completely pulled out, turn off the motor 21 and stop data acquisition.

[0075] Implementation results After experimental testing, the test conditions and test results are as follows: during single heating, the temperature of the pipeline surface rises significantly, and excess pore pressure is first induced on the pipeline surface, and the pore pressure gradually dissipates while maintaining the temperature, and the temperature and pore pressure responses inside the foundation have hysteresis; during cyclic heating, the pore pressure responds to the temperature cycle, and the cyclic peak of the pore pressure gradually decreases, and the temperature and pore pressure responses inside the foundation lag behind the pipeline surface; after stopping heating, the pore pressure gradually dissipates, and finally an obvious negative pore pressure appears. The pull-up experiment shows that positive pore pressure appears on the upper side and left and right sides of the pipeline, and negative pore pressure appears on the lower side; the pull-up has a resistance peak. From the test results, the model and method disclosed in the present invention can effectively reflect the influence of the temperature effect of the oil pipeline in the foundation on the pore pressure and strength changes of the soil around the pipe, and can effectively reveal the thermal-hydraulic-mechanical multi-field coupling effect mechanism of the soil around the pipe under temperature load, and has achieved significant technical advantages.

[0076] Personnel in the technical field can easily make various changes and modifications based on the text description, drawings and claims provided by the present invention without departing from the concept and scope of the present invention defined by the claims. Any modification, modification or equivalent change made to the above embodiments based on the technical concept and essence of the present invention shall fall within the scope of protection defined by the claims of the present invention.

Claims

1. A device for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads, characterized in that: It includes an experimental stratum model and supporting structure, a pipeline model, a temperature control system, a loading system and a monitoring system; the experimental stratum model and the supporting structure include a model box, a glass window, a bracket, an upper beam, a foundation model and a coarse sand cushion; the pipeline model is composed of a pipeline, a sealing cover, a force rod and a heating pipe; the temperature control system is composed of a temperature controller and a temperature control probe; the loading system is composed of a motor, a pulley, a force beam and a buckle; the monitoring system is composed of a pore pressure sensor, a temperature sensor, an axial force meter and a data collector; The model box is a plane strain rigid box with insulation and heat preservation functions. Glass windows are installed on the front and back sides for observing the internal foundation model and pipeline positions. Two brackets are fixed to the model box with screws. The upper beam is fixed above the bracket with bolts. The foundation model is prepared according to the real stratum to be simulated. A coarse sand cushion layer is set below, a drainage pipe is built in, and geotextile is wrapped outside for drainage. The pipeline model is a cylindrical aluminum pipeline, which is open on the left and right and tapped inside, and can be sealed with a sealing cover; the surface is oxidized and frosted to control the fit between the pipeline model and the foundation model; holes are opened symmetrically on the left and right sides of the pipeline surface and tapped inside, so that a force rod with a thread at one end can be fixed on the pipeline, and a raw tape is wrapped outside for waterproofing; the force rod is hollow for wiring; four fixing holes are opened in four directions on the middle section of the pipeline, and a threaded borehole pressure sensor probe is screwed into the fixing holes, and a raw tape is wrapped outside for waterproofing; the data line of the borehole pressure sensor is led out through the hollow of the force rod; one end of the heating pipe is fixed to a sealing cover on one side, and after being screwed into the inside of the pipeline, the power line is led out from the hollow of the force rod; The temperature control probe is placed inside the pipeline, and the data line is led out through the hollow of the force rod; the power line of the heating tube is connected to the temperature controller, and the data line of the temperature control probe is connected to the temperature controller; the temperature controller has the functions of setting the heating temperature, maintaining the temperature and the temperature hysteresis; The force rod passes through the force beam and the upper beam from bottom to top in sequence, and the force beam and the force rod are temporarily fixed by buckles, the axial force meter is fixed to the force beam, the pulley is fixedly installed under the upper beam, and the motor is fixed to the model box; after the traction rope is wrapped around the motor, it is tied to the pull ring of the axial force meter through the pulley, and the temporary buckle is released; Arrange the temperature sensor on the pipe surface and fix it with cable ties; Pore ​​pressure sensors and temperature sensors are arranged at predetermined positions in the foundation model to monitor the temperature and pore pressure responses at different positions of the formation; the data lines of all sensors are connected to the data acquisition device via aviation plugs.

2. The device for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads according to claim 1, characterized in that: Temperature sensors and pore pressure sensors are arranged simultaneously at four locations in the foundation model on the side and bottom of the pipeline.

3. The device for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads according to claim 2, characterized in that: The four positions are 0.5D and 1.0D away from the pipe wall on the side of the pipe and 0.5D and 1.0D away from the pipe wall on the bottom of the pipe, and D is the pipe diameter.

4. A method for simulating the in-situ stability of high-temperature pipelines under temperature and mechanical loads, characterized in that: The method is implemented by using the device according to any one of claims 1 to 3, and specifically comprises the following steps: Step (1): Pipeline model assembly Fix the heating tube, the force rod and the sealing cover to the pipeline, fix the four borehole pressure sensors to the four reserved holes on the upper, lower, left and right sides of the central section of the pipeline, place the temperature control probe inside the pipeline, and fix the temperature sensor to the pipeline surface with a cable tie. Ensure the pipeline is sealed after installation, and all lines are led out through the force rod; the data line of the temperature control probe and the power line of the heating tube are connected to the temperature controller; the data line of each sensor is connected to the data collector through the aviation plug; Step (2): Build the support structure and lay out the pipeline model Place the pipeline model in the model box, and after the support structure is built, temporarily fix the force rod of the pipeline model to the support structure with buckles; Step (3): Install the loading system After installing the loading system, release the buckle used for temporary fixation; Step (4): Preparation of foundation model and arrangement of other sensors Prepare foundation models according to the different foundations to be simulated in the experiment and fill them into the model box; arrange the remaining pore pressure sensors and temperature sensors at the required positions; lead the data line out of the model box and connect it to the data collector through the aviation plug; Step (5): Heating experiment Adjust the upper limit of the temperature controller heating and the target temperature to be maintained; turn on the data acquisition device for data acquisition; connect the power of the heating pipe to start heating; the pore pressure sensor on the pipeline surface, the temperature sensor on the pipeline surface, and the pore pressure sensor and temperature sensor in the foundation model simultaneously acquire data; after the heating experiment, maintain the temperature for a predetermined time, and observe the dissipation process of the pore pressure during the high temperature maintenance process; then adjust the hysteresis of the temperature controller and conduct a cyclic heating experiment; after a sufficient number of predetermined cycles, stop heating until the temperature is completely dissipated, and observe the changes in pore pressure and temperature at different positions; Step (6): Pull-up experiment Wait for the temperature of the pipeline and foundation model to completely dissipate; adjust the pulling rate of the loading system; turn on the data acquisition device and start monitoring the pore pressure on the pipeline surface and the pore pressure at different positions in the foundation model as well as the pulling axial force; control the loading system to start pulling at a uniform speed, while monitoring the readings of the pore pressure sensors and axial force gauges at different positions; When the pipeline is completely pulled out, turn off the loading system and stop data collection.