A method for preventing shield machine from losing stability under adverse geological conditions
Through the cooperation of three-time interval grouting and airbag vertical poles, the problem of instability of the shield machine under adverse geological conditions was solved, and the stable excavation of the shield machine in the soft soil layer was achieved.
Patent Information
- Application Number
- CN202210911661.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-30
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-07-30
AI Technical Summary
Under unhealthy geological conditions, the problem of instability of the shield machine excavation is mainly due to the poor permeability of the grouting system to the grouting slurry between the inner wall of the tunnel and the pipe sheet, which leads to poor lining effect between the pipe sheet and the inner wall of the tunnel, which in turn affects the Stable excavation of the shield machine.
Three-time interval grouting construction is adopted, through the first, second and third grouting, grouting into the gap between the inner wall of the tunnel and the pipe sheet, ensuring that the slurry is fully penetrated and filled, and the strength of the inner wall of the tunnel is enhanced. And through the cooperation of the airbag and the upright rod, the connection between the pipe piece and the inner wall of the tunnel is further stabilized.
Through the coordination of three-time interval grouting and airbag vertical poles, the strength of the tunnel inner wall and the stability of the pipe sheet are significantly enhanced, allowing the shield machine to stably dig in the soft soil layer, avoiding the instability of the shield machine.
Smart Images

Figure CN115217481B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tunnel excavation construction, and in particular to a method for preventing shield machine tunneling instability under adverse geological conditions. Background Art
[0002] The shield machine, whose full name is tunnel boring machine, is a special engineering machinery for tunnel excavation. Modern shield tunnel boring machines integrate optical, mechanical, electrical, hydraulic, sensor and information technology. They have the functions of excavating and cutting soil, transporting soil and slag, assembling tunnel lining, measuring and guiding, and correcting deviations. They involve multiple disciplines and technologies such as geology, civil engineering, machinery, mechanics, hydraulics, electricity, control, and measurement. Shield tunnel boring machines have been widely used in tunnel projects such as subways, railways, highways, municipal engineering, and hydropower.
[0003] The shield machine is a fully enclosed tunnel boring equipment, mainly composed of the tunneling system, synchronous grouting system, slag discharge system, slag improvement system, assembly system, sealing system, guide system, etc. It uses the lining segments to provide reaction force and continuously excavate. The tunneling system of the shield machine includes a cylindrical sleeve, a circular cutter head rotatably set at one end of the sleeve, and multiple hydraulic jacks set at the other end of the sleeve.
[0004] When using a shield machine for construction, the various parts of the shield machine are first placed in the working pit for assembly, and then the reaction frame is installed in the working pit, and the initial excavation is carried out based on the reaction frame. The cutterhead rotates to excavate the tunnel, and the slag generated during the excavation process is transported to the rear of the shield machine through the slag discharge system. When the cutterhead excavates in the direction away from the reaction frame, the hydraulic jack presses against the reaction frame and pushes the sleeve to move in the direction away from the reaction frame. When there is a gap between the end of the sleeve and the reaction frame, the assembly system transports multiple segments between the sleeve and the reaction frame, and at the same time, the assembly system assembles multiple segments around the hydraulic jack and the reaction frame. At this time, the hydraulic jack abuts on the end of the segment away from the reaction frame. As the cutterhead cuts in the rotation direction, the hydraulic jack abuts on the segment and pushes the sleeve to move in the direction away from the segment. At the same time, the grouting system injects grout between the segment and the inner wall of the tunnel to complete the lining of the segment. When the slurry solidifies, the position of the segment in the tunnel becomes more stable, thus providing stable support for the excavation of the cutterhead and sleeve.
[0005] With respect to the above-mentioned related technologies, the inventor believes that the following defects exist: when the tunnel is excavated with soft geology, the grouting system injects grout between the inner wall of the tunnel and the pipe segment, and the slurry gradually penetrates into the soft soil layer. Due to the influence of gravity, the slurry has poor permeability at the top of the tunnel, resulting in poor lining effect between the pipe segment at the top of the tunnel and the inner wall of the tunnel. When the lining effect of the pipe segment is poor, the hydraulic jack cannot stably abut against the pipe segment and push the cutterhead and sleeve to excavate, resulting in instability of the shield machine excavation. Summary of the invention
[0006] In order to improve the problem of instability of shield machine excavation caused by poor lining effect of the segments, the present application provides a method for preventing instability of shield machine excavation under adverse geological conditions.
[0007] The present application provides a method for preventing shield machine tunneling instability under adverse geological conditions, which adopts the following technical solution:
[0008] The method for preventing the instability of shield machine excavation under adverse geological conditions includes the following steps:
[0009] S1. Excavation of working wells: geological survey and excavation of working wells to the designed depth;
[0010] S2. The shield machine is hoisted and the tunneling system, synchronous grouting system, slag discharge system, slag improvement system, assembly system, sealing system and guide system are sequentially placed in the working pit for assembly. Then the reaction frame is installed in the working pit and the initial excavation and advancement are carried out based on the reaction frame.
[0011] S3. The shield machine excavates, the excavation system is started, the cutterhead rotates, the hydraulic jack presses against the reaction frame and pushes the sleeve away from the reaction frame to form a tunnel, and the slag discharge system is started to transport the slag to the rear of the shield machine;
[0012] S4. Segment assembly: start the assembly system to assemble multiple segments around the inner wall of the tunnel between the hydraulic jack and the reaction frame;
[0013] S5. First grouting: start the grouting system and perform the first grouting into the gap between the tunnel inner wall and the segment;
[0014] S6. Second grouting: before the slurry of the first grouting solidifies, the grouting system is started to perform the second grouting into the gap between the inner wall of the tunnel and the segment;
[0015] S7. The third grouting, before the slurry of the first grouting and the second grouting is solidified, the grouting system is started to perform the third grouting into the gap between the inner wall of the tunnel and the segment;
[0016] S8. After the shield machine is dismantled and the tunnel is completed and penetrated, the shield machine is taken out from the working shaft.
[0017] By adopting the above technical solution, the working pit is excavated to the designed depth, and the components of the shield machine are hoisted into the working pit for assembly, and then the reaction frame is installed in the working pit, the cutterhead is driven to rotate, and the initial excavation is carried out based on the reaction frame. During the excavation process, the slag discharge system is started, and the slag discharge system transfers the slag to the rear of the shield machine.
[0018] As the shield machine advances, when a certain gap exists between the end of the sleeve and the reaction frame, the assembly system is started, which transports multiple segments between the sleeve and the reaction frame and assembles the multiple segments around the inner wall of the tunnel between the hydraulic jack and the reaction frame. The hydraulic jack is started, and the hydraulic jack abuts against the segment and pushes the casing away from the segment, thereby realizing the advancement of the shield machine.
[0019] During the tunneling process of the shield machine, the grouting system is started, and the grouting system performs the first grouting into the gap between the tunnel inner wall and the segment, so that the slurry is pre-filled in the gap between the segment and the tunnel inner wall. After the first grouting is completed, a second grouting is performed into the gap between the tunnel inner wall and the segment before the slurry of the first grouting solidifies, so that the slurry of the second grouting fills the gap between the segment and the tunnel inner wall again. After the second grouting is completed, a third grouting is performed into the gap between the tunnel inner wall and the segment before the slurry of the first and second grouting solidifies, so that the slurry of the third grouting fills the gap between the segment and the tunnel inner wall again.
[0020] Through three interval grouting constructions, the slurry is allowed to penetrate as much as possible into the soft inner wall of the tunnel, thus enhancing the strength of the inner wall of the tunnel. At the same time, the slurry is allowed to fill as much as possible between the inner wall of the tunnel and the pipe segment, so that the pipe segment is stably lined on the inner wall of the tunnel. The cutterhead and sleeve can be stably excavated in the soil layer under the interaction of the hydraulic jack and the pipe segment, thereby allowing the shield machine to stably excavate in the soft soil layer. When the tunnel excavation is completed, the shield machine can be dismantled and taken out of the tunnel.
[0021] Optionally, the pipe segment is arranged in an arc shape, and an embedding groove is opened on the outer wall of the pipe segment. An air bag is embedded in the embedding groove of the pipe segment, and a second grouting pipe for the second grouting construction is arranged on the air bag. One end of the second grouting pipe is connected to the air bag, and the other end passes through the pipe segment and points to the inner side of the pipe segment.
[0022] By adopting the above technical solution, during the second grouting, slurry can be injected into the airbag through the second grouting pipe. As the slurry is injected, the airbag expands. The expanded airbag can squeeze the slurry outside the airbag into the soft soil layer, which helps the slurry to penetrate the inner wall of the tunnel, thereby enhancing the strength of the inner wall of the tunnel. When the slurry outside and inside the airbag solidifies, the airbag is buried in the solidified concrete. The airbag enhances the stability of the connection between the pipe segment and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer.
[0023] Optionally, a plurality of vertical poles are fixedly connected to the airbag, wherein the vertical poles are located on a side of the airbag away from an inner wall of the embedding groove, and one end of the vertical poles is located outside the airbag and the other end is located inside the airbag.
[0024] By adopting the above technical solution, during the second grouting, as the slurry is injected into the airbag, the expanded airbag drives the vertical rod to be inserted into the soft soil layer, so that one end of the vertical rod is inserted into the inner wall of the tunnel and the other end is inserted into the slurry in the airbag. When the slurry inside and outside the airbag solidifies, the airbag and the vertical rod are buried in the solidified concrete. The airbag and the vertical rod enhance the stability of the connection between the pipe segment and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer.
[0025] Optionally, a plug-in groove is provided on one side of the pipe segment close to the hydraulic jack, and a plug-in strip adapted to be plugged into the plug-in groove is fixedly connected to the other side;
[0026] When the hydraulic jack abuts against the side of the pipe segment away from the reaction frame, the plug-in strip is plugged into the plug-in groove.
[0027] By adopting the above technical solution, when assembling the segments, the assembly system first drives the free ends of the hydraulic jacks one by one to move toward the cutterhead, and at this time there is a gap between the free ends of the hydraulic jacks and the fixed segments. Then the new segment is clamped and placed at the free end of the hydraulic jack by the assembly system, and the hydraulic jack is started, and the hydraulic jack pushes the new segment toward the fixed segment, so that the adjacent segments are connected by the splicing strips and the splicing grooves, which ensures the stability of the splicing between the adjacent segments, and then the shield machine can stably excavate in the soft soil layer under the reaction of the segments.
[0028] Optionally, a mounting hole connected to the outer side of the pipe segment is provided on the side wall on one side of the plug-in slot, and a sliding hole connected to the inner side of the pipe segment is provided on the side wall on the other side, the sliding hole is aligned with the mounting hole, a third grouting pipe is slidably connected to the pipe segment in the mounting hole, the length of the third grouting pipe is greater than the depth of the mounting hole, and a first elastic member connected to the third grouting pipe is provided on the pipe segment;
[0029] A grouting hole is formed through the plug strip, and the diameter of the grouting hole is smaller than the outer diameter of the third grouting pipe;
[0030] When the plug-in strip is not inserted into the plug-in slot, the first elastic member is in an initial state, at which time one end of the third grouting pipe close to the sliding hole is located in the plug-in slot, and the other end is located in the mounting hole;
[0031] When the plug-in strip is inserted into the plug-in groove, the mounting hole is aligned with the grouting hole, one end of the third grouting pipe close to the sliding hole abuts against the plug-in strip, and the other end protrudes from the outer wall of the pipe segment, and the first elastic member is deformed.
[0032] By adopting the above technical solution, when the hydraulic jack needs to push the new pipe segment to be spliced with the fixed pipe segment, the third grouting pipe is first slid in the installation hole toward the outside of the pipe segment. When the plug-in strip is inserted into the plug-in groove, the grouting hole, the sliding hole and the installation hole are all aligned, and the first elastic member is deformed. Since the outer diameter of the third grouting pipe is larger than the aperture size of the grouting hole, one end of the third grouting pipe close to the sliding hole abuts against the grouting hole of the plug-in strip, and the other end protrudes from the outer wall of the pipe segment and is plugged into the inner wall of the tunnel. When performing the third grouting, the slurry can be pumped into the third grouting pipe from the sliding hole and the grouting hole in turn, and the slurry flows to the outside of the pipe segment along the third grouting pipe, so that the slurry of the third grouting fills the gap between the pipe segment and the inner wall of the tunnel again. The third grouting pipe is wrapped in slurry. When the slurry of the third grouting is solidified, the third grouting pipe is buried in the solidified concrete. The third grouting pipe enhances the stability of the connection between the pipe segment and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer.
[0033] Optionally, a fourth grouting pipe is slidably arranged in the sliding hole and aligned with the third grouting pipe, the aperture size of the grouting hole is not less than the outer diameter size of the fourth grouting pipe, and a second elastic member connected to the fourth grouting pipe is arranged on the pipe segment;
[0034] When the plug-in strip is not inserted into the plug-in slot, the second elastic member is in an initial state, and at this time, one end of the fourth grouting pipe close to the mounting hole is located in the plug-in slot.
[0035] By adopting the above technical solution, when the hydraulic jack needs to push the new pipe segment to be spliced with the fixed pipe segment, the fourth grouting pipe is first slid in the sliding hole toward the inner side of the pipe segment, and the second elastic member is deformed. When the plug-in strip is inserted into the plug-in slot, the grouting hole, the sliding hole and the mounting hole are all aligned. At this time, the second elastic member drives the fourth grouting pipe to slide and plug into the grouting hole. When the third grouting is performed, slurry can be injected into the fourth grouting pipe, and the slurry overflows into the grouting hole through the fourth grouting pipe, and then overflows from the grouting hole to the third grouting pipe, and flows to the outside of the pipe segment along with the third grouting pipe, and the third grouting pipe is wrapped in the slurry. When the slurry of the third grouting is solidified, the third grouting pipe is buried in the solidified concrete. The third grouting pipe enhances the stability of the connection between the pipe segment and the inner wall of the tunnel to a certain extent, so that the shield machine can be stably excavated in the soft soil layer.
[0036] Optionally, the third grouting pipe and the fourth grouting pipe are both provided with an oblique section on one side close to the notch of the plug-in slot, and the oblique section is located at one end where the third grouting pipe and the fourth grouting pipe are close to each other.
[0037] By adopting the above technical solution, when the hydraulic jack pushes the new pipe segment to move in the direction close to the fixed pipe segment, the plug-in strip is inserted from the notch of the plug-in slot. As the plug-in strip is inserted, the plug-in strip pushes the third grouting pipe and the fourth grouting pipe to slide away from each other through the oblique section. When the plug-in strip is inserted into the plug-in slot and the grouting hole is aligned with the fourth grouting pipe, the plug-in strip is stopped from being pushed further, and the fourth grouting pipe slides down and plugs into the grouting hole under the drive of the second elastic member. The interaction between the fourth grouting pipe and the grouting hole allows the plug-in strip to be stably locked and plugged into the plug-in slot, ensuring the stability of the joint between two adjacent pipe segments.
[0038] Optionally, a second anti-overflow member is provided in the second grouting pipe, and a third anti-overflow member is provided in the third grouting pipe and / or the fourth grouting pipe.
[0039] By adopting the above technical solution, the second anti-overflow member is provided so that the slurry can be pumped from the end of the second grouting pipe away from the airbag and flow into the airbag, but the slurry in the airbag cannot flow out of the airbag through the second grouting pipe, so that the slurry in the airbag is stably stored, and then the column on the airbag can be stably inserted into the inner wall of the tunnel. The third anti-overflow member is provided so that the slurry can flow through the fourth grouting pipe and the third grouting pipe in sequence and flow to the outside of the pipe segment, but the slurry between the pipe segment and the inner wall of the tunnel cannot drip to the inside of the pipe segment through the third grouting pipe and the fourth grouting pipe.
[0040] Optionally, a flexible sealing layer is provided on the peripheral wall of the tube segment.
[0041] By adopting the above technical solution, the flexible sealing layer prevents the slurry from penetrating the joints of two adjacent segments when they are spliced, so that the slurry can stably fill the gap between the segment and the inner wall of the tunnel. At the same time, the flexible sealing layer can protect the surrounding wall of the segment, avoiding the segment from being damaged during splicing as much as possible, ensuring the integrity of the segment structure, and thus allowing the shield machine to stably excavate in the soft soil layer.
[0042] Optionally, the grouting system comprises a plurality of grouting heads arranged around the inner wall of the sleeve, a slurry storage box connected to the plurality of grouting heads, and a pumping assembly for pumping the slurry in the slurry storage box into the grouting heads, and the slurry storage box and the pumping assembly are both arranged on the sleeve;
[0043] The length direction of the multiple grouting heads is consistent with the length direction of the sleeve, and the ends of the multiple grouting heads away from the cutter disc extend to the outer end of the sleeve. The outer wall of the pipe segment is provided with a guide groove for the relative sliding installation of the grouting heads.
[0044] By adopting the above technical solution, when the first grouting is performed, the pump pressure assembly is started, and the pump pressure assembly pumps the slurry in the slurry storage box to the grouting head. Since the grouting head is relatively slidably installed in the guide groove, the grouting head can guide the slurry to the outer wall of the pipe segment, so that the outer wall of the pipe segment is soaked in the slurry. Since the outer wall area of the pipe segment is large, when the slurry solidifies, the pipe segment is stably bonded to the inner wall of the tunnel. At the same time, the fixed setting of the guide groove and the grouting head provides guidance and reference for the installation of the pipe segment, so that when the pipe segment is assembled, the grouting holes on the plug-in strip can be quickly aligned with the sliding holes and installation holes in the plug-in groove, thereby facilitating the construction of the third grouting.
[0045] In summary, the present application includes at least one of the following beneficial technical effects:
[0046] 1. Through three interval grouting constructions, the slurry can penetrate into the soft inner wall of the tunnel as much as possible, thus enhancing the strength of the inner wall of the tunnel. At the same time, the slurry can be filled between the inner wall of the tunnel and the pipe segment as much as possible, so that the pipe segment is stably lined on the inner wall of the tunnel. The cutterhead and sleeve can be stably excavated in the soil layer under the interaction between the hydraulic jack and the pipe segment, thereby enabling the shield machine to stably excavate in the soft soil layer;
[0047] 2. During the second grouting, as the slurry is injected, the airbag expands, and the expanded airbag drives the pole to be inserted into the soft soil layer, so that one end of the pole is inserted into the inner wall of the tunnel and the other end is inserted into the slurry in the airbag. When the slurry inside and outside the airbag solidifies, the airbag and the pole are buried in the solidified concrete. The airbag and the pole enhance the stability of the connection between the segment and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer;
[0048] 3. When assembling the segments, one end of the third grouting pipe close to the sliding hole abuts against the grouting hole of the splice strip, and the other end protrudes from the outer wall of the segment and is plugged into the inner wall of the tunnel. When performing the third grouting, the slurry can be pumped into the third grouting pipe from the sliding hole and the grouting hole in turn. The slurry flows to the outside of the segment along the third grouting pipe, so that the slurry of the third grouting fills the gap between the segment and the inner wall of the tunnel again. The third grouting pipe is wrapped in the slurry. When the slurry of the third grouting solidifies, the third grouting pipe is buried in the solidified concrete. The third grouting pipe enhances the stability of the connection between the segment and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a flow chart of a method for preventing instability of shield machine excavation under adverse geological conditions in an embodiment of the present application.
[0050] Figure 2 It is a schematic diagram of the partial cross-sectional structure of the cutter disc, hydraulic jack, pipe segment, airbag and sleeve in the embodiment of the present application.
[0051] Figure 3 yes Figure 2 Enlarged schematic diagram of part A.
[0052] Figure 4 It is a schematic diagram of the structure of the pipe segment, the airbag, the vertical pole, the plug-in strip, the third grouting pipe and the fourth grouting pipe in the embodiment of the present application.
[0053] Figure 5 It is a schematic diagram of the cross-sectional structure of the pipe segment in the embodiment of the present application, which is mainly used to display the second grouting pipe and the second anti-overflow member.
[0054] Figure 6 yes Figure 5 Schematic diagram of the enlarged portion B.
[0055] 1. Cutter head; 2. Hydraulic jack; 3. Segment; 4. Embedded groove; 5. Air bag; 6. Second grouting pipe; 7. Vertical pole; 8. Plug groove; 9. Plug strip; 10. Mounting hole; 11. Sliding hole; 12. Third grouting pipe; 13. First elastic member; 14. Grouting hole; 15. Fourth grouting pipe; 16. Second elastic member; 17. Oblique section; 18. Second anti-overflow member; 19. Third anti-overflow member; 20. Sealing layer; 21. Grouting head; 22. Slurry storage box; 23. Pumping assembly; 24. Guide groove; 25. Sleeve; 26. First limit plate; 27. Mounting groove; 28. Limit groove; 29. Second limit plate. DETAILED DESCRIPTION
[0056] The following is combined with Figure 1-6 This application is described in further detail.
[0057] The present application discloses a method for preventing the instability of a shield machine under adverse geological conditions. Figure 1 and Figure 2 A method for preventing shield machine tunneling instability under adverse geological conditions comprises the following steps:
[0058] S1. Excavation of working wells: geological survey and excavation of working wells to the designed depth;
[0059] S2. The shield machine is hoisted, and the excavation system, synchronous grouting system, slag discharge system, slag improvement system, assembly system, sealing system, and guide system are sequentially placed in the working pit for assembly, and then the reaction frame is installed in the working pit, and the shield machine is driven to start excavation in the direction away from the reaction frame based on the reaction frame;
[0060] S3. The shield machine is excavated, the excavation system is started, the cutter head 1 rotates, multiple hydraulic jacks 2 are pressed against the reaction frame and push the sleeve 25 away from the reaction frame to form a tunnel, and the slag discharge system is started to transport the slag to the rear of the shield machine;
[0061] S4. Segment 3 is assembled. While the cutter head 1 is rotating, the assembly system is started. The free ends of the multiple hydraulic jacks 2 are contracted one by one, so that the assembly system can surround and place the multiple segments 3 one by one on the inner wall of the tunnel near the reaction frame of the hydraulic jack 2. After the positioning and placement of the segment 3 is completed, the hydraulic jack 2 is started. The hydraulic jack 2 drives the new segment 3 to be assembled quickly and stably with the fixed segment 3. At this time, the new segment 3 is partially located in the sleeve 25;
[0062] S5. After the first grouting is completed, the cutterhead 1 continues to rotate and cut, and the hydraulic jack 2 continues to lift, so that the sleeve 25 continues to advance. When the new segment 3 is gradually exposed from the end of the sleeve 25 away from the cutterhead 1, the grouting system is started, and the grouting system performs the first grouting into the gap between the inner wall of the tunnel and the new segment 3;
[0063] S6. Second grouting: Since the soil layer of the inner wall of the tunnel is soft, the slurry of the first grouting will partially infiltrate the inner wall of the tunnel, resulting in a decrease in the amount of slurry filled between the inner wall of the tunnel and the outer wall of the segment 3. Therefore, before the slurry of the first grouting solidifies, the grouting system is started again, and the grouting system performs a second grouting in the gap between the inner wall of the tunnel and the outer wall of the segment 3, so that the gap between the inner wall of the tunnel and the outer wall of the segment 3 is fully filled with slurry as much as possible;
[0064] S7. A third grouting, before the slurry of the first grouting and the second grouting solidifies, the grouting system is started to perform a third grouting into the gap between the inner wall of the tunnel and the segment 3, so that the slurry fully fills the gap between the inner wall of the tunnel and the outer wall of the segment 3;
[0065] S8. After the shield machine is dismantled and the tunnel is completed and penetrated, the shield machine is taken out from the working shaft.
[0066] Through three interval grouting constructions, the slurry can penetrate into the soft inner wall of the tunnel as much as possible, thereby enhancing the strength of the inner wall of the tunnel. At the same time, the slurry is filled between the inner wall of the tunnel and the pipe segment 3 as much as possible, so that the pipe segment 3 is stably lined on the inner wall of the tunnel. The cutter head 1 and the sleeve 25 can stably excavate in the soil layer under the interaction of the hydraulic jack 2 and the pipe segment 3, thereby allowing the shield machine to stably excavate in the soft soil layer.
[0067] Reference Figure 2 and Figure 3 The sleeve 25 is cylindrical, and both ends of the sleeve 25 are open, and the cutter head 1 is rotatably connected to the front end of the sleeve 25. In order to realize convenient grouting construction, the grouting system includes a plurality of grouting heads 21 arranged around the inner wall of the sleeve 25, a slurry storage box 22 connected to the plurality of grouting heads 21, and a pumping assembly 23 for pumping the slurry in the slurry storage box 22 into the grouting head 21. The number of grouting heads 21 is consistent with the number of pipe segments 3 on the same cross section of the tunnel, and the plurality of grouting heads 21 correspond one to one to the plurality of pipe segments 3. The grouting heads 21 are fixedly mounted on the inner wall of the sleeve 25 away from the cutter head 1 through a support plate, and the length direction of the grouting heads 21 is consistent with the length direction of the sleeve 25, and the ends of the grouting heads 21 away from the cutter head 1 extend to the outer end of the sleeve 25.
[0068] Reference Figure 2 and Figure 3 The slurry storage box 22 and the pump assembly 23 are both arranged on the sleeve 25. The pump assembly 23 includes a feed pipe and a pump body. The slurry storage box 22 is fixed in the sleeve 25 by screws, and the pump body is fixed on the slurry storage box 22. One end of the feed pipe is connected to the slurry storage box 22 through the pump body, and the other end is connected to the grouting head 21. The pipe segment 3 is arranged in an arc shape, and multiple pipe segments 3 are abutted end to end and enclosed to form a circular ring. A guide groove 24 for the grouting head 21 to slide relative to the outer wall of the pipe segment 3 is provided. The length direction of the guide groove 24 is consistent with the width direction of the pipe segment 3, and both ends of the guide groove 24 are opened.
[0069] When assembling the segments 3 and grouting for the first time, the free ends of the plurality of hydraulic jacks 2 are retracted one by one, and the plurality of segments 3 are placed one by one on the side of the hydraulic jacks 2 away from the cutterhead 1. At this time, the guide groove 24 on the segment 3 is buckled on the grouting head 21. The hydraulic jack 2 is started again, and the hydraulic jack 2 pushes the new segment 3 and abuts against the side of the fixed segment 3. At this time, under the abutment of the hydraulic jack 2, the plurality of segments 3 are spliced around in the tunnel. As the cutterhead 1 continues to rotate and cut, and the hydraulic jack 2 continues to lift, the sleeve 25 continues to advance, and the sleeve 25 drives the grouting head 21 to slide in the guide groove 24. When the new segment 3 gradually emerges from the end of the sleeve 25 away from the cutterhead 1, the grouting system is started, and the grouting system performs the first grouting in the gap between the inner wall of the tunnel and the new segment 3. The slurry flows to the outer wall of the segment 3 through the guide groove 24, so that the outer wall of the segment 3 is soaked in the slurry. Since the outer wall area of the segment 3 is large, when the slurry solidifies, the segment 3 is stably bonded to the inner wall of the tunnel.
[0070] To ensure the stability of the installation of segment 3, refer to Figure 4 and Figure 5 A flexible sealing layer 20 is provided on the peripheral wall of the pipe segment 3. The sealing layer 20 can be a damping layer or a rubber layer. In the embodiment of the present application, the sealing layer 20 is provided as a rubber layer. The provision of the rubber layer prevents the slurry from penetrating the joints of two adjacent pipe segments 3 when they are spliced, so that the slurry can stably fill the gap between the pipe segment 3 and the inner wall of the tunnel. At the same time, the flexible sealing layer 20 can protect the peripheral wall of the pipe segment 3, and avoid the pipe segment 3 from being damaged during splicing as much as possible, thereby ensuring the integrity of the pipe segment 3 structure, and then the pipe segment 3 can be stably installed on the inner wall of the tunnel under the action of the mud.
[0071] Since the soil layer on the inner wall of the tunnel is soft, in order to further improve the stability of the installation of the pipe segment 3, refer to Figure 4 and Figure 5 , an embedding groove 4 is provided on the outer wall of the tube segment 3, and an airbag 5 is embedded in the embedding groove 4 of the tube segment 3, and the airbag 5 is made of rubber material. A plurality of vertical rods 7 are fixedly connected to the airbag 5, and the vertical rods 7 are made of steel material. The vertical rods 7 are located on the side of the airbag 5 away from the inner wall of the embedding groove 4, and one end of the vertical rod 7 is located outside the airbag 5, and the other end is located inside the airbag 5. In order to ensure the sealing of the airbag 5 at the vertical rod 7, a rubber ring is sealed on the vertical rod 7, and the rubber ring is integrally formed with the airbag 5, so that the vertical rod 7 is sealed to penetrate the airbag 5.
[0072] Reference Figure 4 and Figure 5The airbag 5 is provided with a second grouting pipe 6 for the second grouting construction. One end of the second grouting pipe 6 is connected to the airbag 5, and the other end is penetrated by the pipe segment 3 and points to the inner side of the pipe segment 3. In order to facilitate the slurry to be smoothly injected into the airbag 5 from the second grouting pipe 6, and the slurry in the airbag 5 is not easy to flow out from the second grouting pipe 6, a second anti-overflow member 18 is provided in the second grouting pipe 6. The second anti-overflow member 18 can be a one-way valve or a one-way valve. In the embodiment of the present application, the second anti-overflow member 18 is set as a one-way valve. The one-way valve is made of rubber material, and the peripheral wall of the one-way valve is sealed and bonded to the inner wall of the second grouting pipe 6 by waterproof glue.
[0073] During the second grouting, slurry can be injected into the airbag 5 through the second grouting pipe 6. As the slurry is injected into the airbag 5, the expanded airbag 5 can squeeze the slurry outside the airbag 5 into the soft soil layer, which helps the slurry to penetrate the inner wall of the tunnel, thereby enhancing the strength of the inner wall of the tunnel. As the slurry is injected into the airbag 5, the expanded airbag 5 drives the vertical rod 7 to be inserted into the soft soil layer, so that one end of the vertical rod 7 is inserted into the inner wall of the tunnel and the other end is inserted into the slurry in the airbag 5. When the slurry inside and outside the airbag 5 solidifies, the airbag 5 and the vertical rod 7 are buried in the solidified concrete. The airbag 5 and the vertical rod 7 enhance the stability of the connection between the pipe segment 3 and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer.
[0074] In order to improve the stability of the splicing between two adjacent segments 3, refer to Figure 4 and Figure 5 , a plug-in slot 8 is provided on one side of the pipe segment 3 close to the hydraulic jack 2, and a plug-in strip 9 is fixedly connected to the plug-in slot 8 on the other side, and the plug-in strip 9 is integrally formed with the pipe segment 3. A mounting hole 10 connected to the outer side of the pipe segment 3 is provided on the side wall on one side of the plug-in slot 8, and a sliding hole 11 connected to the inner side of the pipe segment 3 is provided on the side wall on the other side, and the sliding hole 11 is aligned with the mounting hole 10. Grouting holes 14 corresponding to the sliding holes 11 and the mounting holes 10 are provided through the plug-in strip 9, the aperture size of the mounting hole 10 is larger than the aperture size of the grouting hole 14, and the aperture size of the sliding hole 11 is not larger than the aperture size of the grouting hole 14. In the embodiment of the present application, the aperture size of the sliding hole 11 is the same as the aperture size of the grouting hole 14.
[0075] Reference Figure 5 and Figure 6The third grouting pipe 12 is slidably connected in the installation hole 10 on the pipe segment 3. The length dimension of the third grouting pipe 12 is greater than the depth dimension of the installation hole 10. The outer diameter dimension of the third grouting pipe 12 is greater than the aperture dimension of the grouting hole 14. An annular installation groove 27 is provided on the inner wall of the installation hole 10. A first elastic member 13 connected to the third grouting pipe 12 is provided in the installation groove 27 on the pipe segment 3. The first elastic member 13 can be an air ring or a first spring. In the embodiment of the present application, the first elastic member 13 is set as a first spring.
[0076] Reference Figure 5 and Figure 6 The third grouting pipe 12 is fixedly sleeved with a first limiting plate 26, which is slidably arranged in the mounting groove 27. The first spring is sleeved on the third grouting pipe 12, and the first spring is located on the side of the first limiting plate 26 close to the outer wall of the pipe segment 3. One end of the first spring is fixedly connected to the inner wall of the mounting groove 27, and the other end is fixedly connected to the first limiting plate 26. When the first spring is in the initial state, one end of the third grouting pipe 12 close to the sliding hole 11 is located in the plug-in groove 8, and the other end is located in the mounting hole 10.
[0077] Reference Figure 5 and Figure 6 A fourth grouting pipe 15 is slidingly arranged in the sliding hole 11 and aligned with the third grouting pipe 12. An annular limiting groove 28 is opened on the inner wall of the sliding hole 11. A second elastic member 16 connected to the fourth grouting pipe 15 is arranged in the limiting groove 28 on the pipe segment 3. The second elastic member 16 can be an air ring or a second spring. In the embodiment of the present application, the second elastic member 16 is set as a second spring.
[0078] Reference Figure 5 and Figure 6 The fourth grouting pipe 15 is fixedly sleeved with a second limiting plate 29, which is slidably arranged in the limiting groove 28. The second spring is sleeved on the fourth grouting pipe 15, and the second spring is located on the side of the second limiting plate 29 close to the inner wall of the pipe segment 3. One end of the second spring is fixedly connected to the inner wall of the limiting groove 28, and the other end is fixedly connected to the second limiting plate 29. When the second spring is in the initial state, the end of the fourth grouting pipe 15 close to the mounting hole 10 is located in the plug-in groove 8.
[0079] In order to facilitate the rapid insertion of the plug-in strip 9 into the plug-in slot 8, refer to Figure 5 and Figure 6 The third grouting pipe 12 and the fourth grouting pipe 15 are both provided with an oblique section 17 on one side close to the notch of the plug-in groove 8, and the oblique section 17 is located at one end where the third grouting pipe 12 and the fourth grouting pipe 15 are close to each other.
[0080] When assembling the pipe segment 3, first place the new pipe segment 3 between the hydraulic jack 2 and the fixed and bonded pipe segment 3, and make the guide groove 24 on the pipe segment 3 buckle on the grouting head 21, at this time, the line connecting the grouting hole 14 and the sliding hole 11 / installation hole 10 is parallel to the axis of the sleeve 25. Then start the hydraulic jack 2, the hydraulic jack 2 abuts against the side of the new pipe segment 3 away from the reaction frame, and the hydraulic jack 2 pushes the new pipe segment 3 toward the reaction frame, so that the plug-in strip 9 on the new pipe segment 3 is plugged into the plug-in groove 8.
[0081] During the process of inserting the plug strip 9 into the plug slot 8, the plug strip 9 pushes the third grouting pipe 12 and the fourth grouting pipe 15 to slide in the direction away from each other through the oblique section 17. After the plug strip 9 is inserted into the plug slot 8 and the grouting hole 14 is aligned with the fourth grouting pipe 15, the plug strip 9 is stopped from being pushed further, and the fourth grouting pipe 15 slides down and plugs into the grouting hole 14 under the drive of the second elastic member 16. The interaction between the fourth grouting pipe 15 and the grouting hole 14 enables the plug strip 9 to be stably locked and plugged into the plug slot 8, thereby ensuring the stability of the joints of the two adjacent pipe segments 3. At the same time, since the outer diameter of the third grouting pipe 12 is larger than the aperture size of the grouting hole 14, one end of the third grouting pipe 12 close to the sliding hole 11 abuts against the grouting hole 14 of the plug strip 9, and the other end protrudes from the outer wall of the pipe segment 3 and is plugged into the inner wall of the tunnel.
[0082] During the third grouting, slurry can be injected into the fourth grouting pipe 15, and the slurry overflows into the grouting hole 14 through the fourth grouting pipe 15, and then overflows from the grouting hole 14 into the third grouting pipe 12, and flows to the outside of the pipe segment 3 along the third grouting pipe 12, and the third grouting pipe 12 is wrapped in the slurry. After the slurry of the third grouting solidifies, the third grouting pipe 12 is buried in the solidified concrete, and the third grouting pipe 12 enhances the stability of the connection between the pipe segment 3 and the inner wall of the tunnel to a certain extent, so that the shield machine can stably excavate in the soft soil layer.
[0083] In order to prevent the slurry between the segment 3 and the inner wall of the tunnel from dripping into the inner side of the segment 3 through the third grouting pipe 12 and the fourth grouting pipe 15, Figure 5 and Figure 6, a third anti-overflow member 19 is provided in the third grouting pipe 12 and / or the fourth grouting pipe 15. In the embodiment of the present application, the third anti-overflow member 19 is provided in the third grouting pipe 12, and the third anti-overflow member 19 is located at one end of the third grouting pipe 12 away from the fourth grouting pipe 15. The third anti-overflow member 19 can be a one-way valve or a one-way valve. In the embodiment of the present application, the third anti-overflow member 19 is provided with a one-way valve. The one-way valve is sealed and bonded to the inner wall of the third grouting pipe 12 by waterproof glue, so that the slurry can flow through the fourth grouting pipe 15 and the third grouting pipe 12 in sequence and flow to the outside of the pipe segment 3, but the slurry between the pipe segment 3 and the inner wall of the tunnel cannot drip to the inside of the pipe segment 3 through the third grouting pipe 12 and the fourth grouting pipe 15.
[0084] The implementation principle of the method for preventing the instability of shield machine excavation under adverse geological conditions in the embodiment of the present application is as follows: dig the working well to the designed depth, and hoist the various components of the shield machine into the working well for assembly, and then install the reaction frame in the working well, drive the cutter head 1 to rotate, and start excavation based on the reaction frame. During the excavation process, start the slag discharge system, and the slag discharge system transfers the slag to the rear of the shield machine.
[0085] The assembly system is started while the cutter head 1 rotates, and the free ends of the multiple hydraulic jacks 2 are contracted one by one, so that the assembly system can surround and place the multiple segments 3 one by one on the inner wall of the tunnel near the reaction frame of the hydraulic jack 2. After the positioning and placement of the segments 3 is completed, the hydraulic jack 2 is started, and the hydraulic jack 2 drives the new segment 3 to be assembled with the fixed segment 3 quickly and stably. At this time, the new segment 3 is partially located in the sleeve 25, and the plug-in strip 9 on the side of the new segment 3 outside the sleeve 25 is inserted into the plug-in groove 8 of the fixed segment 3, and one end of the third grouting pipe 12 protrudes from the outer wall of the segment 3 and is plugged into the soil layer of the inner wall of the tunnel, and one end of the second grouting pipe 6 is inserted into the grouting hole 14 of the plug-in strip 9.
[0086] As the cutter head 1 continues to rotate and cut, and the hydraulic jack 2 continues to lift, the sleeve 25 continues to advance. When the new segment 3 is gradually exposed from the end of the sleeve 25 away from the cutter head 1, the grouting system is started. The grouting system performs the first grouting into the gap between the inner wall of the tunnel and the new segment 3. The slurry flows through the guide groove 24 to the outer wall of the segment 3, so that the outer wall of the segment 3 is immersed in the slurry.
[0087] Then, after a short interval, the second grouting is performed before the slurry of the first grouting solidifies. During the second grouting, the slurry can be injected into the airbag 5 through the second grouting pipe 6. As the slurry is injected into the airbag 5, the expanded airbag 5 can squeeze the slurry outside the airbag 5 into the soft soil layer, which helps the slurry to penetrate the inner wall of the tunnel, thereby enhancing the strength of the inner wall of the tunnel. As the slurry is injected into the airbag 5, the expanded airbag 5 drives the vertical rod 7 to be inserted into the soft soil layer, so that one end of the vertical rod 7 is inserted into the inner wall of the tunnel and the other end is inserted into the slurry in the airbag 5.
[0088] After a short interval, the third grouting is carried out before the slurry of the first and second grouting solidifies. During the third grouting, slurry can be injected into the fourth grouting pipe 15, and the slurry overflows into the grouting hole 14 through the fourth grouting pipe 15, and then overflows from the grouting hole 14 to the third grouting pipe 12, and flows to the outside of the pipe segment 3 along the third grouting pipe 12, and the third grouting pipe 12 is wrapped in the slurry.
[0089] After the slurry from the three grouting operations solidifies, the airbag 5, the vertical pole 7 and the third grouting pipe 12 are buried in the solidified concrete. The airbag 5, the vertical pole 7 and the third grouting pipe 12 enhance the stability of the connection between the pipe segment 3 and the inner wall of the tunnel to a certain extent, so that the cutter head 1 and the sleeve 25 can be stably excavated in the soil layer under the interaction between the hydraulic jack 2 and the pipe segment 3, thereby enabling the shield machine to stably excavate in the soft soil layer.
[0090] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for preventing instability of shield machine excavation under adverse geological conditions, characterized by: The following steps are involved: S1. Excavation of working wells: geological survey and excavation of working wells to the designed depth; S2. The shield machine is hoisted and the tunneling system, synchronous grouting system, slag discharge system, slag improvement system, assembly system, sealing system and guide system are sequentially placed in the working pit for assembly. Then the reaction frame is installed in the working pit and the initial excavation and advancement are carried out based on the reaction frame. S3. The shield machine is excavating, the excavation system is started, the cutterhead (1) rotates, the hydraulic jack (2) is pressed against the reaction frame and pushes the sleeve (25) to move away from the reaction frame to form a tunnel, and at the same time the slag discharge system is started to transport the slag to the rear of the shield machine; S4. Assembling the pipe segments (3), starting the assembly system, and assembling the plurality of pipe segments (3) around the inner wall of the tunnel between the hydraulic jack (2) and the reaction frame; S5. The first grouting is to start the grouting system and perform the first grouting into the gap between the inner wall of the tunnel and the segment (3); S6. A second grouting, before the slurry of the first grouting solidifies, the grouting system is started to perform a second grouting into the gap between the inner wall of the tunnel and the segment (3); S7. A third grouting, before the slurry of the first grouting and the second grouting solidifies, the grouting system is started to perform a third grouting into the gap between the inner wall of the tunnel and the segment (3); S8. After the tunneling is completed, the shield machine is removed from the working shaft; The pipe segment (3) is arranged in an arc shape, and an embedding groove (4) is provided on the outer wall of the pipe segment (3). The pipe segment (3) is embedded with an air bag (5) in the embedding groove (4). A second grouting pipe (6) for the second grouting construction is arranged on the air bag (5), and one end of the second grouting pipe (6) is connected to the air bag (5), and the other end passes through the pipe segment (3) and points to the inner side of the pipe segment (3); A plurality of vertical rods (7) are fixedly connected to the airbag (5). The vertical rods (7) are located on a side of the airbag (5) away from the inner wall of the embedding groove (4), and one end of the vertical rod (7) is located outside the airbag (5) and the other end is located inside the airbag (5).
2. A method for preventing instability of shield machine excavation under adverse geological conditions according to claim 1, characterized in that: The pipe segment (3) is provided with a plug-in groove (8) on one side close to the hydraulic jack (2), and a plug-in strip (9) is fixedly connected to the other side and is plug-matched with the plug-in groove (8); When the hydraulic jack (2) abuts against the side of the pipe segment (3) away from the reaction frame, the plug-in strip (9) is plugged into the plug-in groove (8).
3. A method for preventing instability of shield machine excavation under adverse geological conditions according to claim 2, characterized in that: A mounting hole (10) communicating with the outer side of the pipe segment (3) is provided on the side wall on one side of the plug-in slot (8), and a sliding hole (11) communicating with the inner side of the pipe segment (3) is provided on the side wall on the other side, the sliding hole (11) being aligned with the mounting hole (10), a third grouting pipe (12) being slidably connected in the mounting hole (10) on the pipe segment (3), the length dimension of the third grouting pipe (12) being greater than the depth dimension of the mounting hole (10), and a first elastic member (13) connected to the third grouting pipe (12) is provided on the pipe segment (3); The plug-in strip (9) is provided with a grouting hole (14) extending therethrough, and the diameter of the grouting hole (14) is smaller than the outer diameter of the third grouting pipe (12); When the plug-in strip (9) is not inserted into the plug-in slot (8), the first elastic member (13) is in an initial state, at which time one end of the third grouting pipe (12) close to the sliding hole (11) is located in the plug-in slot (8) and the other end is located in the mounting hole (10); When the plug-in strip (9) is inserted into the plug-in groove (8), the mounting hole (10) is aligned with the grouting hole (14), one end of the third grouting pipe (12) close to the sliding hole (11) abuts against the plug-in strip (9), and the other end protrudes from the outer wall of the pipe segment (3), and at this time, the first elastic member (13) is deformed.
4. The method for preventing instability of shield machine excavation under adverse geological conditions according to claim 3 is characterized in that: A fourth grouting pipe (15) is slidably disposed in the sliding hole (11) and is aligned with the third grouting pipe (12); the aperture size of the grouting hole (14) is not less than the outer diameter size of the fourth grouting pipe (15); and a second elastic member (16) connected to the fourth grouting pipe (15) is disposed on the pipe segment (3); When the plug-in strip (9) is not inserted into the plug-in slot (8), the second elastic member (16) is in an initial state, and at this time, the end of the fourth grouting pipe (15) close to the mounting hole (10) is located in the plug-in slot (8).
5. The method for preventing instability of shield machine excavation under adverse geological conditions according to claim 4 is characterized in that: The third grouting pipe (12) and the fourth grouting pipe (15) are both provided with an oblique section (17) on one side close to the slot opening of the plug slot (8), and the oblique section (17) is located at an end where the third grouting pipe (12) and the fourth grouting pipe (15) are close to each other.
6. The method for preventing instability of shield machine excavation under adverse geological conditions according to claim 4 is characterized in that: A second anti-overflow member (18) is provided in the second grouting pipe (6), and a third anti-overflow member (19) is provided in the third grouting pipe (12) and / or the fourth grouting pipe (15).
7. The method for preventing instability of shield machine excavation under adverse geological conditions according to claim 1 is characterized in that: A flexible sealing layer (20) is provided on the peripheral wall of the tube segment (3).
8. The method for preventing instability of shield machine excavation under adverse geological conditions according to claim 1 is characterized in that: The grouting system comprises a plurality of grouting heads (21) arranged around the inner wall of the sleeve (25), a slurry storage box (22) arranged in communication with the plurality of grouting heads (21), and a pumping assembly (23) for pumping slurry in the slurry storage box (22) into the grouting heads (21); the slurry storage box (22) and the pumping assembly (23) are both arranged on the sleeve (25); The length direction of the plurality of grouting heads (21) is consistent with the length direction of the sleeve (25), and the ends of the plurality of grouting heads (21) away from the cutter disc (1) extend to the outer end of the sleeve (25), and the outer wall of the pipe segment (3) is provided with a guide groove (24) for the relative sliding installation of the grouting heads (21).