A method for unloading pressure and preventing impact in deep slotting of rock burst coal seam drilling

By adopting the drilling deep-cut joint pressure relief method in the impact ground pressure coal seam, using umbrella-shaped pressure relief joints and high-pressure water flow jet technology, the problem of difficulty in deep coal body pressure relief in the existing technology is solved, and the tunnel support stability is achieved Accurate pressure relief in the hazardous area of ​​shock ground pressure achieves dual effect.

CN115263305BInactive Publication Date: 2024-11-05XUZHOU MINING BUSINESS GROUP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210895578.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-27
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology cannot effectively realize the pressure relief of deep coal body, resulting in high pressure relief density and insufficient strength of the coal body in the tunnel, affecting the stability of the tunnel support structure and the safe and efficient mining of coal resources.

Method used

The pressure relief and anti-impact method is adopted for deep cutting joints in the impact ground pressure coal seam drilling. By determining the construction parameters and cutting joints in the area to be removed, the pressure relief is relieved in the drilling hole by using umbrella-shaped pressure relief joints and high-pressure water flow jets. The grade and coal strength of the impact hazard zone determine the pressure relief timing and parameters, and form umbrella-shaped cracks to achieve pressure relief of deep high-stress coal.

Benefits of technology

It realizes low-density and low-strength pressure relief of shallow coal body and sufficient pressure relief of high-density and high-strength deep coal body, ensuring the stability of the tunnel anchor support structure, and accurately decompress and impact hazardous areas to achieve anti-impact protection tunnel dual goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115263305B_ABST
    Figure CN115263305B_ABST
Patent Text Reader

Abstract

The present application relates to a deep slit pressure relief and anti-impact method for rock burst coal seam drilling, comprising the following steps: determining the range of the area to be relieved; determining the construction parameters of the pressure relief drilling based on the range of the area to be relieved, and determining the slit construction plan based on the strength of the coal body in the rock burst danger area; wherein, in the slit construction plan, an umbrella-shaped pressure relief slit is implemented in the pressure relief drilling hole for pressure relief. The present invention can achieve large-scale pressure relief of deep high-stress coal bodies while increasing the borehole spacing by setting umbrella-shaped cracks in the pressure relief drilling hole, thereby achieving the purpose of low-density and low-strength pressure relief of shallow coal bodies and high-density and high-strength full pressure relief of deep coal bodies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of pressure relief and anti-impact technology for rock burst coal seams, and in particular, relates to a method for pressure relief and anti-impact method for deep slit drilling in rock burst coal seams. Background Art

[0002] Rock burst is a typical mining dynamic phenomenon that is extremely harmful. This dynamic phenomenon instantly releases a large amount of elastic deformation energy accumulated in the coal and rock mass in a sharp and violent form, causing damage to the coal and rock mass and generating strong vibrations. The power will throw the broken coal and rock into the mining space of the shaft and tunnel, making a strong noise, causing equipment damage, shaft and tunnel damage, and casualties. As of 2021, 144 rock burst mines have been identified and confirmed in my country's production mines, involving at least 195 main mining coal seams. The coal production of rock burst mines accounts for about 12% of my country's total coal production. Rock burst has become the main constraint on the safe and efficient mining of our deep coal resources.

[0003] At present, the main pressure relief prevention and control methods for coal seams with rock burst danger are large-diameter coal body drilling pressure relief, coal seam water injection, and coal body pressure relief blasting. Coal seam water injection pressure relief has poor timeliness, and coal body pressure relief blasting has safety hazards. Large-diameter coal body drilling pressure relief has become the main pressure relief technology for rock burst coal seams due to its simplicity of construction. The smaller the drilling hole spacing and the larger the drilling hole diameter of the large-diameter coal body drilling pressure relief, the better the effect. However, since the aperture of large-diameter coal body drilling pressure relief remains unchanged from shallow to deep, high-density and large-diameter drilling often damages the shallow coal body of the roadway wall, causing the anchor support system of the roadway wall to fail, aggravating the deformation of the roadway surrounding rock and affecting the normal use of the roadway. It can be known from the mine pressure theory that the shallow coal body in the tunnel wall is in a plastic state and does not have the conditions for accumulating elastic strain energy, while the deep coal body is in a high stress area and accumulates elastic energy. How to reduce the pressure relief density and strength of the shallow coal body in the tunnel wall and increase the pressure relief range and strength of the deep coal body is a difficult problem that needs to be solved urgently. Summary of the invention

[0004] In view of the above analysis, the present invention aims to provide a method for decompression and anti-impact by deep slit drilling in coal seams with rock burst, so as to solve the problem that existing decompression and prevention methods cannot effectively achieve decompression of deep coal bodies.

[0005] The object of the present invention is achieved in that:

[0006] A method for unloading pressure and preventing impact by deep slit cutting in a rock burst coal seam drilling hole, comprising the following steps:

[0007] Determine the scope of the area to be depressurized;

[0008] The construction parameters of the pressure relief drilling hole are determined based on the pressure relief range, and the slotting construction plan is determined based on the strength of the coal body in the impact danger area; wherein, in the slotting construction plan, an umbrella-shaped pressure relief slot is implemented in the pressure relief drilling hole for pressure relief.

[0009] Furthermore, before determining the scope of pressure relief implementation, it also includes: determining the pressure relief timing based on the level evaluation result of the impact danger zone in the target area.

[0010] Furthermore, the timing of the pressure relief project is determined according to the following conditions:

[0011] For strong impact danger zones, the timing of pressure relief is: when the strong impact danger zone is not less than 300m away from the working face and the pressure relief project is implemented 60-70 days ahead of the working face;

[0012] For medium impact danger areas, the timing of pressure relief is: when the medium impact danger area is 200-300m away from the working face and the pressure relief project is implemented 50-60 days ahead of the working face;

[0013] For weak impact danger zones, the timing for pressure relief is: when the weak impact danger zone is 100-200m away from the working face and the pressure relief project is implemented 30-40 days ahead of the working face.

[0014] Furthermore, the step of determining the range of the area to be depressurized is:

[0015] Stress monitoring and drill cuttings monitoring are carried out in the tunnel of the coal seam working face with impact danger. The distribution law of coal body support pressure is obtained based on the monitored data and the support pressure curve is drawn. The peak position of the support pressure and the distance l between the peak value and the roadway side are determined. The range of pressure relief L to be implemented is:

[0016]

[0017] Where l is the distance from the peak of the support pressure to the side of the tunnel, m.

[0018] Furthermore, the construction parameters of the pressure relief boreholes include the depth, diameter and spacing of the pressure relief boreholes; according to the level evaluation results of the impact danger zone, the spacing D, depth H and diameter R of the pressure relief boreholes are determined, specifically:

[0019] Areas with strong impact danger: r≤D<1.5r, R≤42mm, H=max(l+10,20)m;

[0020] Medium impact hazard area: 1.5r≤D<2.0r, R≤65mm, H=max(l+5,15)m;

[0021] Weak impact danger area: 2.0r≤D<4.0r, R≤65mm, H=max(l,15)m;

[0022] Among them, r is the average length of the crack, D is the spacing of the pressure relief boreholes, H is the depth of the pressure relief boreholes, and R is the aperture of the pressure relief boreholes.

[0023] Furthermore, before implementing the umbrella-shaped pressure relief seam in the pressure relief borehole, the method further includes: obtaining the coal strength R of the impact danger zone; c , and based on the coal strength R in the impact danger zone c , determine the nozzle diameter for slitting according to the following conditions

[0024] When R c ≤10MPa, then Φ≥3.0mm;

[0025] When 10<R c <15MPa, then 2.0≤Φ<3.0mm;

[0026] When R c ≥15MPa, then Φ≤2.0mm.

[0027] Furthermore, during the cutting construction, a plurality of groups of umbrella-shaped pressure relief seams are constructed in sequence from the inside to the outside in the pressure relief borehole using cutting equipment, each group of umbrella-shaped pressure relief seams includes 8-12 symmetrical cracks, and the crack length is controlled by controlling the cutting time during the implementation process.

[0028] Furthermore, when the coal seam in the area to be depressurized is stable and has no occurrence change, the lengths of multiple fractures are the same;

[0029] When the area to be depressurized is close to the fault structure, the length of the crack close to the fault structure is greater than the length of the crack far from the fault structure.

[0030] When the area to be relieved is close to the fold structure, the length of the crack on the side close to the axis of the fold structure is greater than the length of the crack on the side away from the axis of the fold structure.

[0031] Furthermore, when the coal seam in the area to be depressurized is stable and has no occurrence change, the cutting time of all fractures is T and the cutting pressure is P;

[0032] If the fault drop is greater than the coal seam thickness, the cutting time is extended to T on the side close to the fault. 1 And increase the cutting pressure to P 1 , T 1 =1.3T-1.5T, P 1 =1.2P-1.5P;

[0033] If the fault drop is less than the coal seam thickness, the cutting time is extended to T on the side close to the fault. 3 And increase the cutting pressure to P 3 , T3 =1.8-2T, P 3 =1.8P-2P;

[0034] If the area to be depressurized is close to one side of the anticline axis, the cutting time is extended to T 5 And increase the pressure to P 5 , T 5 =1.5T, P 5 =1.2P-1.5P;

[0035] If the area to be relieved is close to one side of the syncline axis, extend the cutting time to T 7 And increase the pressure to P 7 , T 7 =2T,P 7 =1.2P-1.5P.

[0036] Furthermore, the spacing Δl between two adjacent groups of umbrella-shaped pressure relief seams in the pressure relief borehole is determined by the following formula:

[0037] Areas with strong impact risk assessment: Δl≤1.0m;

[0038] Impact hazard assessment for areas with medium impact hazard: 1.0<Δl≤2.0m;

[0039] The impact hazard is assessed as a weak impact hazard area: 2.0<Δl≤3.0m.

[0040] Furthermore, after the umbrella-shaped pressure relief joint is completed, high-pressure water jet is used to continue water injection for 30 minutes inside the pressure relief borehole.

[0041] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:

[0042] a) The deep slit pressure relief and anti-impact method for rock burst coal seam drilling provided by the present invention determines the timing of pressure relief according to the impact risk assessment results; determines the starting position and range of umbrella-shaped pressure relief according to the peak position of the support pressure; determines the parameters of the high-pressure water jet nozzle and the arrangement of the umbrella-shaped slits according to the uniaxial compressive strength of the coal body; and determines the spacing of pressure relief drilling holes based on the length of the cut cracks in the hole. In a small-diameter coal seam pressure relief drilling hole, a high-pressure water jet is used to cut slits in the deep coal body at a certain circumferential angle and form umbrella-shaped cracks. This can achieve large-scale pressure relief of deep high-stress coal bodies while increasing the spacing between drilling holes, achieving the purpose of low-density and low-strength pressure relief of shallow coal bodies and high-density and high-strength full pressure relief of deep coal bodies.

[0043] b) The deep slit pressure relief and anti-impact method for rock burst coal seam drilling provided by the present invention can not only ensure the stability of the tunnel anchor support structure, but also realize the precise pressure relief in the high stress impact danger zone, thereby achieving the dual goals of anti-impact and tunnel protection and achieving twice the result with half the effort. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0045] Figure 1 A flow chart of the rock burst coal seam drilling deep slit pressure relief and rock burst prevention method provided by the present invention;

[0046] Figure 2 A schematic diagram of the plan layout of the deep slit pressure relief and anti-impact method for rock burst coal seam drilling provided by the present invention;

[0047] Figure 3 for Figure 2 AA section diagram of the vertical drilling hole;

[0048] Figure 4 for Figure 2 Schematic diagram of the BB section of the parallel drilling;

[0049] Figure 5 Schematic diagram of umbrella-shaped cracks when the area to be depressurized is close to the fault structure.

[0050] Reference numerals:

[0051] 1- goaf; 2- working face; 3- lane side; 4- pressure relief borehole; 5- umbrella-shaped pressure relief joint; 6- coal seam; 7- roof; 8- floor; 9- fault structure. DETAILED DESCRIPTION

[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0053] To facilitate understanding of the embodiments of the present application, further explanation will be given below with reference to specific embodiments in conjunction with the accompanying drawings. The embodiments do not constitute a limitation on the embodiments of the present application.

[0054] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the term "connected" should be understood in a broad sense, for example, it can be a fixed connection, or a detachable connection, or an integral connection, which can be a mechanical connection, or an electrical connection, which can be a direct connection, or can be indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0055] The terms "top", "bottom", "above", "lower", and "on" used throughout the description are relative to the relative positions of components of a device, such as the relative positions of the top and bottom substrates within a device. It is understood that devices are multifunctional regardless of their orientation in space.

[0056] Example 1

[0057] A specific embodiment of the present invention, as Figures 1 to 4 As shown, a method for deep slit pressure relief and anti-impact in rock burst coal seam drilling is disclosed, wherein an umbrella-shaped pressure relief slit 5 is implemented in a pressure relief drilling hole 4 to relieve pressure, and the method comprises the following steps:

[0058] Step S1: Determine the pressure relief timing based on the level evaluation result of the impact danger zone in the target area.

[0059] Conduct impact hazard assessment in the mining area and divide it into strong impact hazard area, medium impact hazard area and weak impact hazard area according to the impact hazard level. According to the impact hazard assessment results of the mining area, determine the timing of implementing the pressure relief project. When determining the timing of implementing the pressure relief project, determine the timing of the pressure relief project according to the following conditions:

[0060] For the strong impact danger zone, the time for pressure relief is: when the distance between the strong impact danger zone and the working face 2 is not less than 300m, and the pressure relief project is implemented 60-70 days ahead of the working face;

[0061] For the medium impact danger zone, the timing of decompression is: when the medium impact danger zone is 200-300m away from the working face 2, and the decompression project is implemented 50-60 days ahead of the working face;

[0062] For weak impact danger zones, the timing for pressure relief is: when the weak impact danger zone is 100-200m away from working face 2 and the pressure relief project is implemented 30-40 days ahead of the working face.

[0063] Among them, Figure 2 The right side is the goaf 1, and the implementation sequence of the pressure relief project is: construction is carried out sequentially from the working face 2 to the stop mining line.

[0064] Step S2: Determine the pressure relief range that needs to be relieved.

[0065] Specifically, stress monitoring and drill cuttings monitoring are carried out in the tunnel of the coal seam working face with impact danger. The distribution law of coal body support pressure is obtained according to the monitored data and the support pressure curve is drawn. The peak position of the support pressure and the distance l between the peak value and the roadway wall 3 are determined. The range L of the pressure relief area to be relieved where pressure relief is required is:

[0066]

[0067] Where l is the distance from the peak of the support pressure to the sidewall (3), m.

[0068] That is to say, ① when the peak value of the supporting pressure is greater than or equal to 10m from the side of the tunnel 3, the orifice of the pressure relief borehole 4 in the side of the tunnel 3 is taken as the origin, and the process is implemented from the (l-5)m position forward, for a total of 10m; ② when the peak value of the supporting pressure is greater than 5m and less than 10m from the side of the tunnel 3, the orifice of the pressure relief borehole 4 in the side of the tunnel 3 is taken as the origin, and the process is implemented from the position of the stress peak point in the borehole forward, for a total of 5m; ③ when the peak value of the supporting pressure is less than 5m from the side of the tunnel 3, only the pressure relief borehole 4 is used for pressure relief, and no umbrella-shaped cutting is implemented in the hole.

[0069] Step S3: Determine the construction parameters of the pressure relief borehole 4 based on the pressure relief range, and determine the slotting construction plan based on the strength of the coal body in the impact danger zone; and perform pressure relief by implementing an umbrella-shaped pressure relief seam 5 in the pressure relief borehole 4.

[0070] Step S3-1: Determine the construction parameters of the pressure relief drilling hole 4, which include the depth, diameter, inclination, spacing, and final hole position of the pressure relief drilling hole 4. During the drilling construction of the coal seam 6, at the starting position of the designed construction, the coal seam 6 pressure relief drilling hole 4 is firstly implemented to the final hole position, and the drilling rig implementing the coal seam 6 pressure relief drilling hole 4 moves forward to continue to implement the next coal seam 6 pressure relief drilling hole 4 until the construction of all the preset position pressure relief drilling holes 4 is completed.

[0071] According to the evaluation result of the impact danger zone level, the spacing D, depth H and aperture R of the pressure relief borehole 4 are determined as follows:

[0072] ① Areas with strong impact danger: r≤D<1.5r, R≤42mm, H=max(l+10,20)m;

[0073] ② Medium impact risk area: 1.5r≤D<2.0r, R≤65mm, H=max(l+5,15)m;

[0074] ③Weak impact danger area: 2.0r≤D<4.0r, R≤65mm, H=max(l,15)m.

[0075] Wherein, r is the average length of the cracks cut in the pressure relief borehole 4 , D is the spacing of the pressure relief boreholes 4 , H is the depth of the pressure relief boreholes 4 , and R is the aperture of the pressure relief boreholes 4 .

[0076] The depth parameter of the pressure relief borehole 4 satisfies the requirements of the position and range of the umbrella-shaped pressure relief seam 5 at the same time.

[0077] The scheme for determining the inclination of the coal seam 6 pressure relief borehole 4 is as follows: the coal seam 6 pressure relief borehole 4 is perpendicular to the direction of the tunnel, the opening is located in the middle of the coal seam 6, and is not less than 1.5m away from the top plate 7 and the bottom plate 8 of the coal seam 6, and the inclination of the pressure relief borehole 4 is parallel to the inclination of the coal seam 6.

[0078] The existing coal seam pressure relief uses large-diameter drilling to relieve pressure. The diameter of the pressure relief drilling hole is greater than 100mm. The diameter of the pressure relief drilling hole is constant from the coal wall to the coal body. However, the drilling rig for constructing large-diameter drilling holes has high power and is usually a hydraulic drilling rig. The hydraulic drilling rig is large in size, but it is inconvenient to move and operate the large-volume drilling rig due to the limited space in the underground working face tunnel. This embodiment uses a small-diameter pressure relief drilling hole (the diameter of the pressure relief drilling hole is not greater than 65mm). The drilling rig used is small in size and flexible in mobile construction and operation. It can expand the hole in the area with high stress inside the coal body, which solves the problem that the large drilling rig cannot enter, and can also reduce the impact on the anchor net support structure in the shallow coal wall, avoiding the failure of the anchor net support in the coal wall and causing the coal wall to be damaged and unstable.

[0079] S3-2: Obtain the strength of the coal body in the impact danger zone, and determine the cutting parameters and construction process based on the obtained strength of the coal body in the impact danger zone.

[0080] Specifically, the uniaxial compressive strength R of coal can be measured according to the national standard GB / T 23561.7-2009. c ; A high-pressure water jet is used to achieve the pressure relief of the umbrella-shaped pressure relief seam 5 in the coal body in the borehole 4. The high-pressure water jet is ejected by a double-nozzle drill bit, and the double nozzles are distributed on both sides of the drill bit, forming a 180° line with the center point of the drill bit.

[0081] The nozzle diameter is determined by the following formula:

[0082] ①When the uniaxial compressive strength of the coal in the cutting area is R c ≤10MPa, the nozzle diameter Φ≥3.0mm, preferably a nozzle with a diameter of Φ3.0mm;

[0083] ②When the uniaxial compressive strength of the coal in the cutting area is 10<R c <15MPa, the nozzle diameter is 2.0≤Φ<3.0mm, and a nozzle with a diameter of Φ2.5mm is preferred;

[0084] ③When the uniaxial compressive strength of the coal in the cutting area R c≥15MPa, the nozzle diameter Φ≤2.0mm, and a nozzle with a diameter of Φ2.0mm is preferred.

[0085] In step S3-2, when the slits are arranged, a plurality of groups of umbrella-shaped pressure relief slits 5 are sequentially constructed from the inside to the outside in the pressure relief borehole 4 using a cutting device. The umbrella-shaped pressure relief slits refer to multiple slits at different angles at the same position in the pressure relief borehole, and the multiple slits are radial umbrella-shaped structures in the pressure relief borehole, such as Figures 4 to 5 shown.

[0086] The drilling rig with a double-nozzle high-pressure water jet drill uses a high-pressure water jet to complete the umbrella-shaped pressure relief seam 5 in the pressure relief borehole 4 that has been completed. Specifically, a linearly distributed double-nozzle high-pressure water jet drill is used to cut two cracks at a time. After the cutting is completed, the drill rod is rotated at an angle of 30-45°, and the cutting is continued. After repeated rotation and cutting for multiple times, 8-12 cracks are formed at the same position in the pressure relief borehole 4. The length of the cracks can be controlled by controlling the cutting time. For example, 8 cracks at the same position in the pressure relief borehole are a group of umbrella-shaped pressure relief seams 5. After the cutting is completed, the hole is washed by high-pressure water flow. The multiple groups of umbrella-shaped pressure relief seams 5 in the hole adopt a backward implementation scheme, that is, the coal seam 6 pressure relief borehole 4 is first implemented to the bottom position of the hole. After completing one group of cutting seams, the drill rod is withdrawn from the pressure relief borehole 4. According to the determined group spacing, the construction of the umbrella-shaped pressure relief seams 5 in the next group of pressure relief boreholes 4 is implemented until the construction of the designed number of umbrella-shaped pressure relief seams 5 is completed.

[0087] During the cracking process, the length of the crack is controlled by controlling the cutting time. Specifically, the parameters of the double nozzles (nozzle diameter) can be controlled to achieve different water pressures, flow rates, and flow rates of high-pressure water sprayed on both sides, so as to achieve different crack lengths on both sides. Alternatively, in areas where asymmetric slitting is required, two rounds of slitting are performed. First, symmetrical cracks are cut, and then a large nozzle is replaced or one of the nozzles is blocked for the second round of slitting. At this time, only one side is cut to achieve the purpose of having one long crack and one short crack.

[0088] Considering that the coal seam occurrence state and stratum structure in the area to be decompressed will affect the decompression effect, in this embodiment, a cutting plan is formulated in a targeted manner according to different geological structure conditions during the construction of each group of cutting. Taking the number of cracks in each group as 8 as an example, the length parameters of the 8 cracks at the same position of the decompression borehole 4 are determined according to the following principles:

[0089] ① When the coal seam in the area to be unloaded is stable and has no occurrence change, the eight cracks are symmetrical and have the same length. During construction, the cutting time and pressure of the eight cracks are the same. The cutting time of all cracks is T and the cutting pressure is P;

[0090] ② When the area to be depressurized is close to the fault structure 9, Figure 5As shown, the length of the crack near the fault structure 9 is greater than the length of the crack far from the fault structure. Further, according to the relationship between the fault drop and the coal seam thickness, it is divided into the following two cases:

[0091] (2.1) If the fault drop is greater than the coal seam thickness, the cutting time is extended to T on the side close to the fault. 1 And increase the cutting pressure to P 1 , the cutting time is 1.3-1.5 times that of the non-fault side, and the cutting pressure is increased by 1.2-1.5 times, that is, T 1 =1.3T-1.5T, P 1 =1.2P-1.5P; and the cutting time of the crack on the side away from the fault is T 2 =T, cutting pressure P 2 =P; make the length of the crack on the side close to the fault larger than the cracks in other directions, forming an asymmetric crack distribution, and stop cutting when the crack cuts to the fault plane;

[0092] (2.2) If the fault drop is less than the coal seam thickness, the cutting time is extended to T on the side close to the fault. 3 And increase the cutting pressure to P 3 , cutting time T 3 It is 1.8-2 times of the non-fault side, and the cutting pressure is increased by 1.2-1.5 times, that is, T 3 =1.8-2T, P 3 =1.8P-2P; and the cutting time of the crack on the side away from the fault is T 4 =T, cutting pressure P 4 =P. The above scheme makes the length of the cracks on the side close to the fault greater than the cracks in other directions, forming an asymmetric crack distribution. After the cracks are cut to the fault plane, they continue to cut and pass through the fault plane at 90 degrees perpendicular to the fault plane, realizing penetrating pressure relief on the fault plane. Since the horizontal stress of the coal body on the side close to the fault is high, the above crack construction scheme is used to cut the cracks and increase the length of the cut cracks, which can reduce the horizontal stress of the fault plane; after cutting to the fault plane, a part of the high-pressure water enters the fault plane, reducing the friction of the fault plane, reducing the energy released by the fault slip, and improving the pressure relief effect; the cracks pass through the fault plane, which can effectively destroy the integrity of the fault plane and reduce the energy accumulated in the fault.

[0093] ③ When the area to be unloaded is close to the fold structure, the length of the crack on the side close to the axis of the fold structure is greater than the length of the crack on the side away from the axis of the fold structure. Further, according to the difference between syncline structure and anticline structure, it is divided into the following two situations:

[0094] (3.1) If the area to be depressurized is close to one side of the anticline axis, extend the cutting time to T 5 And increase the pressure to P 5 , cutting time T 5The cutting pressure is increased by 1.2-1.5 times, that is, T 5 =1.5T, P 5 =1.2P-1.5P; and the cutting time of the crack away from the anticline axis is T 6 =T, cutting pressure P 6 = P. Make the length of the cracks on the side close to the anticline axis longer than the cracks in other directions, forming an asymmetric crack distribution;

[0095] (3.2) If the area to be relieved is close to one side of the syncline axis, extend the cutting time to T 7 And increase the pressure to P 7 , cutting time T 7 The cutting pressure is increased by 1.2-1.5 times, that is, T 7 =2T,P 7 =1.2P-1.5P; and the cutting time of the crack away from the syncline axis is T 8 =T, cutting pressure P 8 =P. The length of the cracks near the syncline axis is made longer than the cracks in other directions, forming an asymmetric crack distribution. Since the horizontal stress is concentrated in the fold axis, especially the syncline axis, and the coal seam is more compact due to horizontal compression, the above crack construction scheme is used for cutting. By cutting the cracks to form crack space, the coal seam has space to release horizontal stress and deformation, achieving the purpose of releasing pressure and energy.

[0096] In this embodiment, the distance Δl between two adjacent groups of umbrella-shaped pressure relief seams 5 in the pressure relief borehole 4 is determined by the following formula:

[0097] ① Areas where the impact hazard is assessed as strong impact hazard: Δl≤1.0m;

[0098] ② Areas with medium impact risk assessment: 1.0<Δl≤2.0m;

[0099] ③ Areas where the impact hazard is assessed as weak impact hazard: 2.0<Δl≤3.0m.

[0100] Furthermore, after the umbrella-shaped pressure relief seam 5 is completed, water is continuously injected into the pressure relief borehole 4 by high-pressure water jet for 30 minutes to further remove the coal powder inside the pressure relief borehole and to moisten and soften the coal body.

[0101] Compared with the prior art, the deep slit pressure relief and anti-bumping method for rock burst coal seam drilling provided in this embodiment is a pressure relief and anti-bumping technical method that uses high-pressure water jets to cut deep in the rock burst dangerous coal body in the borehole and form umbrella-shaped cracks. Specifically, the coal seam drilling pressure relief and high-pressure water jet slit cutting are combined to create a deep pressure relief zone in the deep part of the borehole, and achieve differentiated pressure relief in different areas of the coal seam, which meets the stability of the tunnel support and the elimination of rock burst danger. The deep slit pressure relief and anti-bumping method for rock burst coal seam drilling in this embodiment can use a small diameter drilling rig to implement coal seam drilling to the rock burst danger zone, use high-pressure water jet directional slit cutting to evenly cut the circumferential surface of the borehole, and then form an umbrella-shaped pressure relief seam to achieve the purpose of expanding the pressure relief range, and achieve differentiated pressure relief inside the pressure relief borehole. The shallow pressure relief range is small, which is conducive to protecting the stability of the tunnel support, and the deep pressure relief range is large, which is conducive to eliminating the impact danger.

[0102] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only the specific implementation method of the present application and is not intended to limit the scope of protection of the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application.

Claims

1. A method for unloading pressure and preventing impact in deep-seated slits in rock burst coal seams, characterized in that: The steps include: Determine the scope of the area to be depressurized; Determine the construction parameters of the pressure relief drilling hole based on the range of the pressure relief area, and determine the slotting construction plan based on the strength of the coal body in the impact danger area; wherein, in the slotting construction plan, implement an umbrella-shaped pressure relief slot in the pressure relief drilling hole to relieve pressure; During the cutting construction, multiple groups of umbrella-shaped pressure relief seams are constructed in sequence from the inside to the outside in the pressure relief borehole using cutting equipment. Each group of umbrella-shaped pressure relief seams includes 8-12 symmetrical cracks. During the implementation process, the length of the cracks is controlled by controlling the cutting time. When the coal seam in the area to be unloaded is stable and has no occurrence change, the lengths of multiple fractures are the same; When the area to be depressurized is close to the fault structure, the length of the crack close to the fault structure is greater than the length of the crack far from the fault structure. When the area to be relieved is close to the fold structure, the length of the crack on the side close to the axis of the fold structure is greater than the length of the crack on the side away from the axis of the fold structure.

2. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1 is characterized in that: Before determining the scope of pressure relief implementation, it also includes: determining the timing of pressure relief based on the level evaluation results of the impact danger zone in the target area.

3. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 2 is characterized in that: Determine the timing of pressure relief engineering according to the following conditions: For strong impact danger zones, the timing of pressure relief is: when the strong impact danger zone is not less than 300m away from the working face and the pressure relief project is implemented 60-70 days ahead of the working face; For medium impact danger areas, the timing of pressure relief is: when the medium impact danger area is 200-300m away from the working face and the pressure relief project is implemented 50-60 days ahead of the working face; For weak impact danger zones, the timing for pressure relief is: when the weak impact danger zone is 100-200m away from the working face and the pressure relief project is implemented 30-40 days ahead of the working face.

4. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1, characterized in that: The steps of determining the range of the area to be depressurized are: Stress monitoring and drill cuttings monitoring are carried out in the tunnel of the coal seam working face with impact danger. The distribution law of coal body support pressure is obtained based on the monitored data and the support pressure curve is drawn. The peak position of the support pressure and the distance l between the peak value and the roadway side are determined. The range of pressure relief L to be implemented is: Where l is the distance from the peak of the support pressure to the side of the tunnel, m.

5. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1, characterized in that: The construction parameters of the pressure relief drilling holes include the depth, diameter and spacing of the pressure relief drilling holes. The spacing D, depth H and diameter R of the pressure relief drilling holes are determined according to the level evaluation results of the impact danger zone, specifically: Areas with strong impact hazards: r≤D<1.5r, R≤42mm, H=max(l+10,20)m; Medium impact hazard area: 1.5r≤D<2.0r, R≤65mm, H=max(l+5,15)m; Weak impact danger area: 2.0r≤D<4.0r, R≤65mm, H=max(l,15)m; Among them, r is the average length of the crack, D is the spacing of the pressure relief boreholes, H is the depth of the pressure relief boreholes, and R is the aperture of the pressure relief boreholes.

6. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1, characterized in that: Before implementing the umbrella-shaped pressure relief joint in the pressure relief borehole, it also includes: obtaining the coal strength R in the impact danger area c , and based on the coal strength R in the impact danger zone c , determine the nozzle diameter for slitting according to the following conditions When R c ≤10MPa, then Φ≥3.0mm; When 10 <R c <15MPa, then 2.0≤Φ<3.0mm; When R c ≥15MPa, then Φ≤2.0mm.

7. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1, characterized in that: When the coal seam in the area to be unloaded is stable and has no occurrence change, the cutting time of all fractures is T and the cutting pressure is P; If the fault drop is greater than the coal seam thickness, the cutting time is extended to T1 and the cutting pressure is increased to P1 on the side close to the fault, T1 = 1.3T-1.5T, P1 = 1.2P-1.5P; If the fault drop is less than the coal seam thickness, the cutting time is extended to T3 and the cutting pressure is increased to P3 on the side close to the fault, T3 = 1.8-2T, P3 = 1.8P-2P; If the area to be depressurized is close to one side of the anticline axis, the cutting time is extended to T5 and the pressure is increased to P5, T5 = 1.5T, P5 = 1.2P-1.5P; If the area to be depressurized is close to one side of the syncline axis, the cutting time is extended to T7 and the pressure is increased to P7, T7=2T, P7=1.2P-1.5P.

8. The method for unloading pressure and preventing impact in deep slit drilling of impact rock pressure coal seam according to claim 1, characterized in that: The distance Δl between two adjacent groups of umbrella-shaped pressure relief joints in the pressure relief borehole is determined by the following formula: Areas with strong impact risk assessment: Δl≤1.0m; Impact hazard assessment for areas with medium impact hazard: 1.0<Δl≤2.0m; The impact hazard is assessed as a weak impact hazard area: 2.0<Δl≤3.0m.