Large cryogenic storage tank steel dome segment assembly device and construction technology
By using a combination device of central support, edge support and intermediate support in the piece assembly of large low-temperature storage tank steel domes, the problems of high construction costs and safety hazards are solved, curvature maintenance and arch height adjustment are achieved, and storage is improved The strength and construction efficiency of the tank.
Patent Information
- Application Number
- CN202211143477.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-09-20
AI Technical Summary
During the fragment assembly process of large low-temperature storage tank steel domes, the construction process is restricted by the large-scale construction scaffolding equipment rental market, resulting in high equipment rental costs and labor costs. Due to huge safety hazards in high-altitude operations, the steel domes are in the welding process. It is difficult to control the curvature and affect the strength of the storage tank.
A piece assembly device including a central bracket, an edge pillar and an intermediate pillar is adopted. The combination of these brackets is fixed to ensure the maintenance of curvature and adjustment of arch height, reducing the working time at high altitudes, and reducing equipment dependence and cost.
It effectively avoids the use of large-scale scaffolding equipment, improves construction safety and efficiency, ensures the consistency of curvature of the steel dome sheet, thereby improving the overall strength of the storage tank and reducing construction costs.
Smart Images

Figure CN115341648B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel domes, in particular to a piecewise assembly device and a construction process for a steel dome of a large cryogenic storage tank. Background Art
[0002] With the development of society and the advancement of technology, large-scale equipment and instruments have emerged. The production, assembly and maintenance of these large-scale equipment need to be operated in large-span and ultra-high spaces, which undoubtedly brings huge challenges to the assembly and construction of equipment.
[0003] At present, large cryogenic storage tanks usually use full containment tanks with relatively high safety. The outer tank is a reinforced concrete structure, and the steel inner tank includes 9Ni cylinder inner tank, dome (steel dome, aluminum ceiling), liner, embedded parts, thermal corner protection structure and other components. Among them, the span of the steel dome of a large cryogenic storage tank is generally more than 100 meters. Most of the existing technologies use the method of prefabrication in pieces, dividing the steel dome structure of the tank top into multiple pieces along the circumferential direction for prefabrication in pieces. Since the entire tank top is a spherical structure, high-altitude operations are often required when constructing and installing the steel dome.
[0004] The inventors found that when faced with the installation of large-span and ultra-high steel domes, the following problems are often encountered: 1. The construction process is restricted by the large-scale construction scaffolding equipment rental market; 2. The use of large-scale construction scaffolding equipment will result in large equipment rental costs and labor costs; 3. Since personnel need to work at high altitudes for a long time during the entire construction process, there are huge safety hazards; 4. It is difficult to ensure that the prefabricated curvature of the steel dome remains unchanged during the welding process, and the deformation problem during the construction process is serious and difficult to control, so that the tank top composed of multiple steel domes does not meet the previously designed spherical curvature requirements, affecting the strength of the entire storage tank. Summary of the invention
[0005] The purpose of the present invention is to provide a large-scale low-temperature storage tank steel dome segment assembly device and construction process, which can maintain the curvature of the prefabricated steel dome during the steel dome segment assembly construction process, adjust the arch height as needed, and avoid the use of large scaffolding equipment, reduce the time of manual high-altitude operations, improve construction safety and effectiveness, and reduce costs.
[0006] In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
[0007] A first aspect of the present invention provides a large-scale low-temperature storage tank steel dome segment assembly device.
[0008] A large-scale low-temperature storage tank steel dome segment assembly device comprises a central support and edge pillars arranged inside the storage tank, and an intermediate pillar connected to each steel dome segment, wherein the height of the central support is higher than that of the intermediate pillar, and the height of the intermediate pillar is higher than that of the edge pillar; the installation center point of the central support coincides with the central reference point of the storage tank, the front section of each steel dome segment is connected to the central support, the middle section is connected to the middle pillar, and the rear section is connected to the edge pillar.
[0009] Preferably, the central support includes four central columns, a plurality of cross arms are arranged between two adjacent central columns, cross-type diagonal braces are arranged between adjacent cross arms, a top platform is arranged on the top of the central support, and diagonal braces are arranged on both sides of each central column of the central support.
[0010] Preferably, a ladder is also provided on the central support, and the top of the ladder is connected to the top platform; a center ring is also provided on the top platform.
[0011] Preferably, the edge support includes a support, a connecting support and an edge column, the support is fixedly connected to the bottom of the tank, the support is provided with an edge column, the top of the edge column is provided with a connecting piece, the edge column is provided with a connecting support, and the edge column is fixedly connected to the outer tank wall of the tank through the connecting support.
[0012] Preferably, a vertical lining embedded part is provided in the outer tank wall of the storage tank, and the connecting support is fixed to the vertical lining embedded part by welding.
[0013] Preferably, the connecting member includes a No. 1 pad and two positioning plates arranged on the top of the No. 1 pad. A support plate is also arranged on the No. 1 pad, and the support plate is fixedly connected to the tail section of the steel dome sheet.
[0014] Preferably, the middle pillar includes a base and a jack arranged in the base, the base is fixedly connected to the bottom of the storage tank, the free end of the jack is connected to the middle column, and the middle column and the middle section of the steel dome sheet are detachably connected.
[0015] Preferably, a No. 2 gasket is provided on the top of the middle column, and a No. 2 lifting ear is symmetrically provided on the No. 2 gasket. A No. 1 lifting ear is provided at the lower part of the steel dome sheet, and the No. 1 lifting ear and the No. 2 lifting ear are detachably connected by bolts.
[0016] Preferably, the base includes a bottom plate and two oppositely arranged vertical plates on the bottom plate, the jack is arranged between the two vertical plates, a top plate is also arranged between the two vertical plates, an intermediate column is arranged on the upper part of the top plate, and the free end of the jack passes through a reserved hole on the top plate and is connected to the intermediate column.
[0017] A second aspect of the present invention provides a construction process based on the above-mentioned large-scale low-temperature storage tank steel dome segment assembly device.
[0018] A construction process based on the above-mentioned large-scale low-temperature storage tank steel dome segment assembly device comprises the following steps:
[0019] (a) Prefabricated edge supports, intermediate supports and center supports;
[0020] (ii) Positioning and laying out the edge pillars, intermediate pillars and center supports:
[0021] (1) Positioning and laying out edge pillars: Determine the number and installation angle of edge pillars. The installation angle of edge pillars should be consistent with the angle of dome radial beams. The installation positions of edge pillars should be evenly distributed along the circumference of the rear end of the steel dome sheet.
[0022] (2) The middle support is installed at the center of the steel dome sheet and at a set distance away from the center of the circle;
[0023] (3) Center bracket positioning and laying out: The installation center point of the center bracket is consistent with the center reference point of the tank;
[0024] (III) Install edge pillars, intermediate pillars and center supports:
[0025] (1) Installation of edge supports:
[0026] ① According to the position of the edge support positioning and setting out, fix the center line of the edge support on the positioning line, and use a level ruler to correct the verticality of the edge support;
[0027] ② Use connecting supports to weld and fix the edge columns to the vertical lining embedded parts of the outer tank wall of the storage tank;
[0028] ③ The vertical lining embedded parts of adjacent edge columns are distributed alternately in single and double pieces to complete the fixation of edge columns;
[0029] ④After the edge columns are fixed, level the height of the edge columns. When the requirements are met, weld the No. 1 pad to the edge columns;
[0030] (2) Installation of the center bracket:
[0031] ① Hang the center bracket into the tank, ensure that the center of the center bracket is consistent with the reference center of the tank, and calibrate the four center columns to be vertical;
[0032] ②After the center bracket is corrected, fully weld and fix the lower end of the center column to the embedded parts at the bottom of the tank;
[0033] ③After welding is completed, install and weld the diagonal brace;
[0034] (3) Installation of the middle support: Before the steel dome sheet is hoisted into the tank, the No. 2 lifting ear of the middle support and the No. 1 lifting ear of the steel dome sheet are connected together with bolts, and the middle support and the steel dome sheet are hoisted into place together;
[0035] (IV) Installation of steel dome sheets:
[0036] (1) Install the center ring
[0037] ① The center ring is hoisted into place and placed on the center bracket. The center of the center ring is consistent with the reference center of the tank, and the bolt holes of the center ring are consistent with the bolt holes of the radial beam;
[0038] ② Correct the plane on the center ring to be level;
[0039] ③After the upper surface of the center ring is leveled, fix the center ring to the center column of the center bracket;
[0040] (2) Install the steel dome pieces crosswise and symmetrically until all the steel dome pieces are installed;
[0041] (3) After the steel dome pieces are cross-symmetrically installed, the symmetrical steel dome pieces are welded together.
[0042] The present invention has the following beneficial effects:
[0043] 1. The large-scale cryogenic storage tank steel dome segmented assembly device of the present invention is particularly suitable for segmented assembly of large-span steel domes. Compared with the prior art which only uses large-scale lifting devices and scaffolding devices for labor-intensive and device-intensive assembly during the large-span steel dome assembly construction, the present invention saves the use of a large number of scaffolding devices, saves a large amount of manual high-altitude work workload, and reduces the insecurity caused by high-altitude work.
[0044] 2. The present invention combines a central support, an edge support and an intermediate support. The central support is used as a reference to fix the front section of the steel dome sheet on the central ring of the central support. The edge support is used to effectively fix the rear section of the steel dome sheet. The intermediate support is used to adjust the arch height and curvature of the steel dome sheet. This can effectively avoid the problems in the prior art that the steel dome sheet is easily deformed and the curvature is difficult to control during construction.
[0045] 3. The present invention combines a central support, an edge support and an intermediate support to assemble the steel dome pieces in pieces, thereby ensuring that the steel dome pieces maintain the prefabricated curvature and arch height, thereby improving the subsequent strength of the entire storage tank and ensuring the effectiveness of the steel dome piece assembly construction.
[0046] 4. The present invention reduces the reliance on large lifting devices and scaffolding, makes the construction process more compact, and reduces construction costs.
[0047] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0049] Figure 1 This is a schematic diagram of the overall structure of Embodiment 1 of the present invention;
[0050] Figure 2 This is a schematic diagram of the structure of the central support according to the first embodiment of the present invention;
[0051] Figure 3 This is a schematic diagram of the edge support structure of an embodiment of the present invention;
[0052] Figure 4 This is a schematic diagram of the structure of an edge support connecting piece according to an embodiment of the present invention;
[0053] Figure 5 This is a schematic diagram of the structure of the middle pillar in Embodiment 1 of the present invention;
[0054] Figure 6 For the present invention Figure 5 Schematic diagram of the structure in the middle A direction;
[0055] Figure 7 This is a schematic diagram of the structure of the intermediate support base of the present invention;
[0056] Figure 8 This is a schematic diagram of the central ring structure of the present invention;
[0057] In the accompanying drawings, the list of parts represented by each reference numeral is as follows: 1 center bracket, 2 edge pillar, 3 steel dome sheet, 4 intermediate pillar, 5 center column, 6 cross arm, 7 diagonal brace, 8 top platform, 9 diagonal brace, 10 ladder, 11 center ring, 12 support, 13 connecting support, 14 edge column, 15 connecting part, 16 vertical lining embedded part, 17 No. 1 pad, 18 positioning plate, 19 support plate, 20 base, 21 jack, 22 intermediate column, 23 No. 2 pad, 24 No. 1 lifting ear, 25 No. 2 lifting ear, 26 bolt, 27 bottom plate, 28 vertical plate, 29 top plate. DETAILED DESCRIPTION
[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0059] In the description of the present invention, it should be understood that the terms "upper", "middle", "outer", "inner", "lower", "all around" and the like indicating directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.
[0060] Embodiment 1:
[0061] See also Figure 1-8 As shown, the present invention is a piecewise assembly device for a steel dome of a large cryogenic storage tank, comprising a central support 1 and edge struts 2 arranged inside the storage tank, and an intermediate strut 4 connected to each steel dome piece 3, wherein the height of the central support 1 is higher than that of the intermediate strut 4, and the height of the intermediate strut 4 is higher than that of the edge strut 2; the installation center point of the central support 1 coincides with the center reference point of the storage tank, the front section of each steel dome piece 3 is connected to the central support 1, the middle section is connected to the intermediate strut 4, and the rear section is connected to the edge strut 2.
[0062] like Figure 1 The figure shows the overall structure of the present invention. Since the tank top of the storage tank is a sphere, each steel dome sheet 3 is assembled in pieces according to the arc surface of the sphere. The front section of the steel dome sheet 3 corresponds to the vertex position of the arc surface of the spherical surface, the middle section of the steel dome sheet 3 corresponds to the middle position of the arc surface of the spherical surface, and the rear section of the steel dome sheet 3 corresponds to the position of the arc surface of the spherical surface close to the end point. The front section of the steel dome sheet 3 has the largest distance from the horizontal plane, the rear section of the steel dome sheet 3 has the smallest distance from the horizontal plane, and the distance between the middle section and the horizontal plane is between the two.
[0063] Furthermore, the central support 1 includes four central columns 5, a plurality of cross arms 6 are arranged between two adjacent central columns 5, cross-type diagonal braces 7 are arranged between adjacent cross arms 6, a top platform 8 is arranged on the top of the central support 1, and diagonal braces 9 are arranged on both sides of each central column 5 of the central support 1.
[0064] In this embodiment, a plurality of cross arms 6 are evenly arranged along the height direction of the central column 5, and the number of the cross arms 6 is 4-8.
[0065] Furthermore, a ladder 10 is provided on the central support 1 , and the top of the ladder 10 is connected to the top platform 8 ; a center ring 11 is also provided on the top platform 8 .
[0066] The setting of the ladder 10 facilitates the staff to climb and perform operations on the top platform 8 of the center support 1. The setting of the center ring 11 is to provide each steel dome sheet 3 with a fixed reference position.
[0067] Furthermore, the edge support 2 includes a support 12, a connecting support 13 and an edge column 14. The support 12 is fixedly connected to the bottom of the tank, the edge column 14 is arranged on the support 12, the top of the edge column 14 is provided with a connecting piece 15, the edge column 14 is provided with a connecting support 13, and the edge column 14 is fixedly connected to the outer tank wall of the tank through the connecting support 13.
[0068] Furthermore, a vertical lining embedded part 16 is provided in the outer tank wall of the storage tank, and the connecting support 13 is fixed to the vertical lining embedded part 16 by welding.
[0069] Considering the stability of the pillar, in this embodiment, a connecting support 13 is added at the annular lining embedded part at an elevation of 0.625 meters on the outer tank wall of the storage tank, and the number of supports is 48. That is, the number of adjacent vertical lining embedded parts 16 is alternately distributed in single and double pieces.
[0070] Furthermore, the connecting member 15 includes a No. 1 pad 17 and two positioning plates 18 arranged on the top of the No. 1 pad 17. A support plate 19 is also arranged on the No. 1 pad 17, and the support plate 19 is fixedly connected to the tail section of the steel dome sheet 3.
[0071] The function of the positioning plate 18 is to achieve positioning, thereby facilitating installation.
[0072] Furthermore, the middle support 4 includes a base 20 and a jack 21 disposed in the base 20, the base 20 is fixedly connected to the bottom of the storage tank, the free end of the jack 21 is connected to an intermediate column 22, and the intermediate column 22 is detachably connected to the middle section of the steel dome sheet 3. The function of the jack 21 is to facilitate the adjustment of the arch height of the steel dome sheet 3.
[0073] In this embodiment, the middle support 4 is arranged at a position slightly away from the center of the middle part of the steel dome sheet 3. The purpose of such arrangement is also to facilitate the adjustment of the arch height of each steel dome sheet 3.
[0074] Furthermore, a No. 2 gasket 23 is provided on the top of the middle column 22, and a No. 2 ear 25 is symmetrically provided on the No. 2 gasket 23. A No. 1 ear 24 is provided at the lower part of the steel dome sheet 3, and the No. 1 ear 24 and the No. 2 ear 25 are detachably connected by bolts 26.
[0075] Furthermore, the base 20 includes a bottom plate 27 and two oppositely arranged vertical plates 28 on the bottom plate 27, the jack 21 is arranged between the two vertical plates 28, a top plate 29 is also arranged between the two vertical plates 28, an intermediate column 22 is arranged on the upper part of the top plate 29, and the free end of the jack 21 passes through the reserved hole on the top plate 29 and is connected to the intermediate column 22.
[0076] When fixing the middle column 22 and the steel dome sheet 3, in this embodiment, it is only necessary to fix the first hanging ear 24 and the second hanging ear 25 with the bolt 26, which is convenient to operate and has a good fixing effect.
[0077] Embodiment 2:
[0078] This embodiment discloses a construction process for the large-scale cryogenic storage tank steel dome segment assembly device as described in the above-mentioned embodiment 1.
[0079] A construction process for a large-scale cryogenic storage tank steel dome segment assembly device specifically comprises the following steps:
[0080] 1. Prefabrication of dome tooling
[0081] (1) The dome device consists of a central support, intermediate supports, and edge supports.
[0082] (2) According to the construction requirements on site, each tank requires 1 set of central support, 60 sets of intermediate supports, and 96 sets of edge supports. The height of the above three is determined by the installation height of the tank ceiling, and the number and specifications of the intermediate supports and edge supports are determined by the weight and number of segments of the installed steel dome.
[0083] (3) The central support consists of four columns, diagonal braces, diagonal braces, a top platform and other components.
[0084] (4) The middle pillar is composed of the No. 1 lifting eye, the No. 2 lifting eye, the middle pillar and the base.
[0085] (5) The edge support consists of edge columns, connecting supports and bearings.
[0086] (6) The center support, middle support, and edge support together form a temporary tooling device to support the steel dome piece. The installation arch height of the steel dome is ensured by adjusting the middle support.
[0087] 2. Installation of dome tooling
[0088] 2.1 Positioning and laying out of dome tooling
[0089] (1) Positioning and laying out edge pillars: The number of edge pillars is 96 (96 are set for a 160,000 cubic meter storage tank. If the storage tank volume increases, the number and specifications should be adjusted according to the actual force). The installation angle of the edge pillars is consistent with the angle of the dome radial beam. The edge pillars start at the 0° position of the cross centerline and are evenly distributed along the circumference.
[0090] (2) Positioning of the middle pillar: It is located in the middle of the dome piece, slightly away from the center of the circle, in order to adjust the arch height of each dome piece.
[0091] (3) Center support positioning and layout: The installation center point of the center support is consistent with the center reference point of the tank.
[0092] 2.2 Installation of dome tooling
[0093] (1) Installation of edge supports:
[0094] ① According to the position of the edge support positioning and laying out, fix the center line of the base of the edge support on the positioning line, and use a level ruler to correct the verticality of the edge support.
[0095] ② Use connecting supports to weld and fix the edge supports to the vertical lining embedded parts of the outer tank wall.
[0096] ③ Considering the stability of the pillar, add a connecting support at the annular lining embedded part at the elevation of 0.625 meters on the outer wall of the tank, and the number of supports is 48 (single and double pieces are distributed alternately).
[0097] ④ After the edge pillars are fixed, use a spirit level to level the height of the edge pillars according to the reference elevation. After ensuring that the requirements of the drawing are met, weld the top pads of the edge pillars to the edge pillars.
[0098] (2) Installation of the center bracket:
[0099] ① Lift the center bracket into place in the tank, ensure that the center of the center bracket is consistent with the reference center of the tank, and calibrate the four center columns to be vertical.
[0100] ② After the center bracket is corrected, fully weld and fix the lower end of the center column to the embedded parts at the bottom of the tank.
[0101] ③After the welding of the center bracket is completed, the diagonal brace is installed and welded.
[0102] ④The height of the center support is adjusted according to the reference elevation of the tank foundation and meets the dome installation elevation.
[0103] (3) Installation of the middle support: Before the steel dome piece is hoisted into the tank, the No. 2 lifting ear of the middle support is connected with the No. 1 lifting ear welded in advance under the steel dome piece by bolts, and the middle support and the steel dome piece are hoisted into place together.
[0104] 3. Installation of steel dome
[0105] (1) Install the center ring
[0106] ① The center ring is hoisted into place and placed on the center pillar so that the center of the center ring is consistent with the reference center of the tank. The center ring is installed according to the orientation of the drawing to ensure that the bolt holes of the center ring are consistent with the bolt holes of the radial beam.
[0107] ② Use a spirit level to level the plane on the center ring.
[0108] ③After the upper surface of the center ring is corrected to be level, fully weld the center ring and the center column of the center support to fix them.
[0109] (2) Installation sequence of steel dome sheets
[0110] The steel dome pieces are installed crosswise and symmetrically until they are completed.
[0111] (3) Connection between steel dome pieces
[0112] After the dome pieces are installed cross-symmetrically, the next step is to weld them together, using a vertical lift to assist in the process.
[0113] 3. Dismantling of dome tooling
[0114] After all the steel dome pieces are welded together, the center support and the middle support can be removed. After the steel dome is gas-lifted and installed in place, the edge support can be removed.
[0115] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0116] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A construction process for a large-scale low-temperature storage tank steel dome segment assembly device, characterized in that: It includes a central support and edge pillars arranged inside the storage tank, and an intermediate pillar connected to each steel dome sheet, wherein the height of the central support is higher than that of the intermediate pillars, and the height of the intermediate pillars is higher than that of the edge pillars; the installation center point of the central support coincides with the central reference point of the storage tank, and the front section of each steel dome sheet is connected to the central support, the middle section is connected to the intermediate pillar, and the rear section is connected to the edge pillars; The central support comprises four central columns, a plurality of cross arms are arranged between two adjacent central columns, the cross arms are evenly arranged along the height direction of the central columns, cross-type diagonal braces are arranged between adjacent cross arms, a top platform is arranged on the top of the central support, and diagonal braces are arranged on both sides of each central column of the central support; The edge support comprises a support, a connecting support and an edge column, the support is fixedly connected to the bottom of the storage tank, the support is provided with an edge column, the top of the edge column is provided with a connecting piece, the edge column is provided with a connecting support, and the edge column is fixedly connected to the outer tank wall of the storage tank through the connecting support; A vertical lining embedded part is arranged in the outer tank wall of the storage tank, and the connecting support is fixed to the vertical lining embedded part by welding; The connecting piece includes a No. 1 pad and two positioning plates arranged on the top of the No. 1 pad. The No. 1 pad is also provided with a support plate, and the support plate is fixedly connected to the tail section of the steel dome sheet. The number of adjacent vertical lining embedded parts is alternately distributed in single and double pieces. The middle pillar comprises a base and a jack arranged in the base, a No. 2 gasket is arranged on the top of the middle pillar, a No. 2 lifting ear is symmetrically arranged on the No. 2 gasket, a No. 1 lifting ear is arranged at the lower part of the steel dome sheet, and the No. 1 lifting ear and the No. 2 lifting ear are detachably connected by bolts; The middle support is set at a position slightly away from the center of the circle in the middle of the steel dome sheet; The construction process includes the following steps: (a) Prefabricated edge supports, intermediate supports and center supports; (ii) Positioning and laying out the edge pillars, intermediate pillars and center supports: (1) Positioning and laying out edge pillars: Determine the number and installation angle of edge pillars. The installation angle of edge pillars should be consistent with the angle of dome radial beams. The installation positions of edge pillars should be evenly distributed along the circumference of the rear end of the steel dome sheet. (2) The middle support is installed at the center of the steel dome sheet and at a set distance away from the center of the circle; (3) Center bracket positioning and laying out: The installation center point of the center bracket is consistent with the center reference point of the tank; (III) Install edge pillars, intermediate pillars and center supports: (1) Installation of edge supports: ① According to the position of the edge support positioning and setting out, fix the center line of the edge support on the positioning line, and use a level ruler to correct the verticality of the edge support; ② Use connecting supports to weld and fix the edge columns to the vertical lining embedded parts of the outer tank wall of the storage tank; ③ The vertical lining embedded parts of adjacent edge columns are distributed alternately in single and double pieces to complete the fixation of edge columns; ④After the edge columns are fixed, level the height of the edge columns. When the requirements are met, weld the No. 1 pad to the edge columns; (2) Installation of the center bracket: ① Hang the center bracket into the tank, ensure that the center of the center bracket is consistent with the reference center of the tank, and calibrate the four center columns to be vertical; ②After the center bracket is corrected, fully weld and fix the lower end of the center column to the embedded parts at the bottom of the tank; ③After welding is completed, install and weld the diagonal brace; (3) Installation of the middle support: Before the steel dome sheet is hoisted into the tank, the No. 2 lifting ear of the middle support and the No. 1 lifting ear of the steel dome sheet are connected together with bolts, and the middle support and the steel dome sheet are hoisted into place together; (IV) Installation of steel dome sheets: (1) Install the center ring ① The center ring is hoisted into place and placed on the center bracket. The center of the center ring is consistent with the reference center of the tank, and the bolt holes of the center ring are consistent with the bolt holes of the radial beam; ② Correct the plane on the center ring to be level; ③After the upper surface of the center ring is leveled, fix the center ring to the center column of the center bracket; (2) Install the steel dome pieces crosswise and symmetrically until all the steel dome pieces are installed; (3) After the steel dome pieces are cross-symmetrically installed, the symmetrical steel dome pieces are welded together; (V) Dismantling of dome tooling equipment: After all the steel dome pieces are welded together, the center support and the middle pillars are removed. After the steel dome is gas-lifted and installed in place, the edge pillars are removed.
2. The large-scale low-temperature storage tank steel dome segment assembly device according to claim 1 is characterized in that: The central support is also provided with a ladder, the top of which is connected to the top platform; the top platform is also provided with a central ring.
3. The large-scale low-temperature storage tank steel dome segment assembly device according to claim 1 is characterized in that: The base is fixedly connected to the bottom of the storage tank, the free end of the jack is connected to an intermediate column, and the intermediate column and the intermediate section of the steel dome sheet are detachably connected.
4. The large-scale low-temperature storage tank steel dome segment assembly device according to claim 3 is characterized in that: The base includes a bottom plate and two oppositely arranged vertical plates on the bottom plate, the jack is arranged between the two vertical plates, a top plate is also arranged between the two vertical plates, an intermediate column is arranged on the upper part of the top plate, and the free end of the jack passes through a reserved hole on the top plate and is connected to the intermediate column.