Composite floor slab and construction method thereof
By designing holes on the stiffener ribs and using light steel keels or triangular corrugated steel bar materials and on-site casting with angle steel formwork, the problem of difficulty in inserting pipelines in existing stiffened overlapping floor slabs is solved, achieving more efficient construction and stronger resistance to deformation.
Patent Information
- Application Number
- CN202211026692.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-25
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-08-25
AI Technical Summary
The existing stiffened overlapping floor slabs are difficult to insert ventilation ducts and threading pipes after prefabricated connections, and are easily damaged during transportation.
A composite floor slab is designed with first and second openings running left and right through the stiffening ribs, allowing the pipeline to pass through these openings, and light steel keels or triangular corrugated steel bars are used as stiffening rib materials, combined with angle steel formwork Concrete ribs are poured on site to form gaps to facilitate pipeline layout.
The stiffening rib structure and construction methods have been optimized, which facilitates pipeline layout, reduces the difficulty and damage risk at the construction site, and improves the deformation resistance of the floor slabs.
Smart Images

Figure CN115341700B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of construction, in particular to a building floor slab. Background Art
[0002] The reinforced rib composite slab is one of the common slabs on the market, including a concrete base plate at the bottom, a concrete rib plate at the top, and reinforced ribs connecting the concrete base plate and the concrete rib plate. The concrete base plate, concrete rib plate, and reinforced ribs of the existing reinforced rib composite slab are mostly prefabricated and connected in the prefabrication yard before being transported to the construction site for construction. This method can effectively improve the efficiency of on-site construction and reduce the pollution caused by on-site construction. However, because the three parts have been pre-connected, it is not convenient to insert ventilation ducts, wire threading pipes and other equipment between the concrete base plate and the concrete rib plate. Moreover, it is easy to be bumped and damaged during transportation. Summary of the invention
[0003] The object of the present invention is to provide a composite floor slab and a construction method thereof to solve the above problems.
[0004] The technical problem solved by the present invention can be achieved by adopting the following technical solutions:
[0005] A composite floor slab, comprising a concrete bottom plate, a concrete rib plate, and a stiffening rib; wherein the stiffening rib comprises a left rib located on the left side and a right rib located on the right side, the left rib is provided with a first opening extending from left to right, and the right rib is provided with a second opening extending from left to right;
[0006] The portion of the left rib located between two adjacent first openings is used as a first connecting column, and the portion of the right rib located between two adjacent second openings is used as a second connecting column;
[0007] The tops of the left rib and the right rib are inserted into the concrete rib plate, and the bottoms of the left rib and the right rib are inserted into the concrete bottom plate;
[0008] The distance between the left rib and the right rib gradually increases from the concrete rib plate to the concrete bottom plate;
[0009] A gap is arranged between the concrete bottom plate and the concrete rib plate, so that the first opening and the second opening are partially or completely exposed to the outside.
[0010] As a preferred solution, the left rib and the right rib are both "U"-shaped light steel keels, and the light steel keel includes a plate-shaped first steel plate, the top end of the first steel plate is connected to the second steel plate, and the bottom end of the first steel plate is connected to the third steel plate;
[0011] At least the second steel plate is buried in the concrete rib plate, and at least two third steel plates are buried in the concrete bottom plate;
[0012] The two light steel keels are arranged in a mirror image, and the first steel plate is provided with holes penetrating left and right. The hole on the light steel keel on the left is used as the first opening, and the hole on the light steel keel on the right is used as the second opening.
[0013] As another preferred embodiment, the left rib and the right rib are both first steel bars in a triangular wave shape, the two first steel bars are arranged in a mirror image, the wave crests of the two first steel bars are offset and then welded together, the space between the wave crest and the wave trough of the first steel bar on the left side is used as the first opening, and the space between the wave crest and the wave trough of the first steel bar on the right side is used as the second opening;
[0014] The wave crests of at least two first steel bars are buried in the concrete ribs, and the wave troughs of at least two first steel bars are buried in the concrete bottom plate.
[0015] Preferably, the composite floor slab further comprises an "L"-shaped angle steel formwork, wherein the angle steel formwork is composed of a vertical plate located in the vertical direction and a horizontal plate located in the horizontal direction;
[0016] There are two angle steel templates, namely a left angle steel template and a right angle steel template;
[0017] A first notch for inserting a first connecting column is formed on the transverse plate of the left angle steel template, and a second notch for inserting a second connecting column is formed on the transverse plate of the right angle steel template.
[0018] A construction method of a composite floor slab, characterized in that:
[0019] Step 1. Making a concrete base plate with stiffening ribs: insert the bottom of the stiffening ribs into a mold for making a concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain a concrete base plate with stiffening ribs;
[0020] Step 2. Laying out pipelines: transport the concrete base plate with stiffening ribs to the construction site, hoist it to the designated location, and then place the pipelines between two adjacent troughs of the first steel bar;
[0021] Step 3. Make concrete ribs: insert the first connecting column from the left side of the stiffening rib to the right, insert the second connecting column from the right side of the stiffening rib to the left, insert the cross plates of the two angle steel templates together, at this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, pour concrete into the pouring groove, and after the concrete solidifies, obtain a concrete rib;
[0022] Another construction method of a composite floor slab is characterized in that:
[0023] Step 1. Making a concrete base plate with stiffening ribs: insert the bottom of the stiffening ribs into a mold for making a concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain a concrete base plate with stiffening ribs;
[0024] Step 2. Make concrete ribs: At the prefabrication site or construction site, insert the first connecting column from the left side of the stiffening rib to the right, insert the second connecting column from the right side of the stiffening rib to the left, and insert the cross plates of the two angle steel templates together. At this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, pour concrete into the pouring groove, and after the concrete solidifies, obtain a concrete rib, thereby forming a composite plate with stiffening ribs;
[0025] Step 3. Laying pipelines: After hoisting the composite plate with stiffening ribs to the designated location, let the pipelines pass through the gaps enclosed by the first steel bars, the concrete bottom plate and the concrete ribs.
[0026] Beneficial effects:
[0027] 1. The present invention optimizes the structure of the stiffening rib, adds a first opening and a second opening, and utilizes the first opening and the second opening to facilitate the layout of the pipeline;
[0028] 2. The present invention optimizes the construction method, and changes the concrete ribs cast in the prefabrication yard to the concrete ribs cast on site, which can temporarily delay the closure of the top of the stiffening ribs, so that the pipeline can be placed into the first opening and the second opening through the gap at the top of the stiffening ribs, thereby further facilitating the layout of the pipeline;
[0029] 3. The present invention is provided with an angle steel formwork, by which the concrete ribs can be cast on site;
[0030] 4. The present invention uses light steel keels as the material for the stiffening ribs, which have strong deformation resistance and allow reinforcement to be provided on one side horizontally or one side vertically. The difficulty of distance control on the construction site is greatly reduced compared to the existing composite slabs. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a structural schematic diagram of the present invention;
[0032] Figure 2 It is another structural schematic diagram of the present invention;
[0033] Figure 3 The present invention Figure 1 A schematic diagram of a portion of the structure in the middle;
[0034] Figure 4 It is a structural diagram of light steel keel;
[0035] Figure 5It is a structural diagram of a stiffening rib;
[0036] Figure 6 It is another structural diagram of stiffening ribs;
[0037] Figure 7 It is a structural diagram of an angle steel formwork;
[0038] Figure 8 This is a reference diagram of the usage status of the angle steel formwork. DETAILED DESCRIPTION
[0039] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.
[0040] Reference Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 ,
[0041] A construction method for composite floor
[0042] Step 1. Making a concrete base plate with stiffening ribs: insert the bottom of the stiffening ribs into a mold for making a concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain a concrete base plate with stiffening ribs;
[0043] Step 2. Laying out pipelines: transport the concrete base plate with stiffening ribs to the construction site, hoist it to the designated location, and then place the pipelines between two adjacent troughs of the first steel bar;
[0044] Step 3. Make concrete rib 3: Insert the first connecting column from the left side of the stiffening rib to the right, insert the second connecting column from the right side of the stiffening rib to the left, and insert the cross plates of the two angle steel templates together. At this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, pour concrete into the pouring groove, and after the concrete solidifies, obtain the concrete rib 3;
[0045] Another construction method for composite floor
[0046] Step 1. Make a concrete base plate with stiffening ribs: insert the bottom of the stiffening rib into the mold for making the concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain the concrete base plate with stiffening ribs; Step 2. Make a concrete rib plate 3: At the prefabrication site or construction site, insert the left angle steel template from the left side of the stiffening rib to the right with the first connecting column, and insert the right angle steel template from the right side of the stiffening rib to the left with the second connecting column, and insert the cross plates 8 of the two angle steel templates together. At this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, and pour concrete into the pouring groove. After the concrete solidifies, a concrete rib plate 3 is obtained, thereby forming a composite plate with stiffening ribs; Step 3. Lay pipelines: After hoisting the composite plate with stiffening ribs to the specified position, let the pipelines pass through the gap surrounded by the first steel bar and the concrete base plate and the concrete rib plate 3.
[0047] The above two construction methods may further include step 4. Filling the bottom seam: filling the gap between two adjacent concrete bottom plates 2 with a caulking material. The caulking material is preferably UHPC high-strength concrete. The gap between the concrete bottom plates 2 is preferably 2 centimeters. The present invention selects the caulking material and the gap size, and the floor slab obtained after the selection is not easy to crack. Preferably, during construction, the side end faces of the concrete bottom plates 2 are butted against each other, and tape is affixed to the bottom joints of the two connected concrete bottom plates 2. Chamfering is used to pour concrete mortar into the joints, and the bottom tape is torn off after the poured concrete mortar solidifies.
[0048] In the above two construction methods, the concrete base plate 2 can be rice husk concrete or wood fiber concrete, both of which can effectively prevent the base plate from cracking and can also play a role in heat insulation and sound insulation. Preferably, it is rice husk concrete. Rice husk concrete allows the base plate to be less than 6 cm, which can effectively reduce the structural load.
[0049] The above two construction methods may also include step 5. Placing functional materials: placing functional materials between the concrete base plate 2 and the concrete rib plate 3, such as thermal insulation materials, to achieve thermal insulation, or weight-reducing materials to reduce the weight of the floor slab.
[0050] In the above two construction methods, detection equipment can be preset in the concrete base plate 2, such as fire alarm equipment, fire sprinkler equipment, smoke detection equipment, anti-theft alarm equipment, etc.
[0051] The above two construction methods may also include step six. Placing the concrete top plate 1: connecting the concrete top plate 1 to the concrete ribs 3. Yes, the lower end surface of the concrete top plate 1 is provided with a groove with an opening facing downward, and the concrete ribs 3 are inserted into the groove. It is also possible to provide a step-like structure near the edge of the concrete top plate 1, and the concrete top plate 1 sits on the concrete ribs 3 using the step-like structure. Under this structure, it is convenient to remove the concrete top plate 1 later and repair the pipelines thereunder. There is a gap between the concrete top plates 1, and the gap is preferably 2 cm. The caulking material of the gap is preferably UHPC high-strength concrete.
[0052] In the above two construction methods, the structure of the stiffening rib can be: including left rib 4 and right rib. The left rib 4 and the right rib are both "U"-shaped light steel keels, and the light steel keel includes a plate-shaped first steel plate 15, the top of the first steel plate 15 is connected to the second steel plate 13, and the bottom of the first steel plate 15 is connected to the third steel plate 14; at least the second steel plate is buried in the concrete rib plate 3, and at least two third steel plates are buried in the concrete bottom plate 2; the two light steel keels are arranged in a mirror image, and the first steel plate is provided with holes that penetrate left and right, and the hole on the light steel keel on the left side is used as the first opening, and the hole on the light steel keel on the right side is used as the second opening 16.
[0053] In the above two construction methods, the structure of the stiffening rib can also be: including a left rib 4 and a right rib 5. The left rib 4 and the right rib 5 are both first steel bars in a triangular wave shape, and the two first steel bars are arranged in a mirror image, and the wave crests of the two first steel bars are welded together after being offset, and the space between the wave crest and the wave trough of the first steel bar on the left side is used as the first opening, and the space between the wave crest and the wave trough of the first steel bar on the right side is used as the second opening; at least two wave crests of the first steel bars are buried in the concrete rib plate 3, and at least two wave troughs of the first steel bars are buried in the concrete bottom plate 2.
[0054] In the above two construction methods, the angle steel template can be removed or not. The structure of the angle steel template is as follows: the angle steel template is composed of a vertical plate 7 located in the vertical direction and a horizontal plate 8 located in the horizontal direction, forming an "L" shape; there are two angle steel templates, namely a left angle steel template 10 and a right angle steel template 11; the horizontal plate 8 of the left angle steel template has a first notch for inserting the first connecting column, and the horizontal plate 8 of the right angle steel template 11 has a second notch 12 for inserting the second connecting column.
[0055] In the above two construction methods, the transverse plates 8 of the two angle steel formworks are butted against each other, and the end faces of the transverse plates 8 away from the vertical plates 7 can be butted against each other. It is also possible that the lower end face of the transverse plate 8 of one angle steel formwork is butted against the upper end face of the transverse plate 8 of the other angle steel formwork. At this time, the lower end faces of the angle steel formworks partially overlap. In addition to supporting the concrete that forms the concrete rib 3, the angle steel formworks also play a role in limiting the position of the reinforcing ribs. Therefore, the present invention allows a gap between the tops of the left rib 4 and the right rib 5 to facilitate the placement of pipelines from the tops of the reinforcing ribs into the first opening and the second opening. At this time, preferably, a gap connecting to the outside world is provided above the first opening and the second opening. At this time, when the reinforcing rib is a light steel keel, the gap passes through the second steel plate. When the reinforcing rib is the first steel bar, a gap is naturally formed as long as the two wave peaks are not connected. Of course, because there are the first opening and the second opening, it is also possible to use a method where a pipeline passes through the opening from one side. At this time, straight steel bars can be set on the top of the two first steel bars, that is, each crest of the first steel bar is connected to a third steel bar in a straight line. During construction, the third steel bar is preferably welded to the first steel bar in this step of making the concrete rib 3. As for whether to weld the third steel bar first or place the angle steel formwork first, this is not required, because the angle steel formwork optimized by the present invention is not affected by whether there is a third steel bar at the crest of the first steel bar.
[0056] In the above two construction methods, the present invention limits the distance between the left rib 4 and the right rib 5 to gradually increase from the concrete rib plate 3 to the concrete bottom plate 2, so that the depth of the reinforcing rib inserted into the angle steel formwork is allowed to be controlled by the depth of the notch 9, and the bottom of the transverse plate 8 of the angle steel formwork can also be connected with a support leg, and the depth of the first steel bar inserted into the angle steel formwork can be adjusted by adjusting the height of the support leg. In the case where the end faces of the transverse plates 8 of the two angle steel formworks away from the vertical plates 7 are abutted together, it is preferred that the bottoms of the transverse plates 8 of the two angle steel formworks are respectively connected with support legs. When the lower end face of the transverse plate 8 of one angle steel formwork abuts against the upper end face of the transverse plate 8 of the other angle steel formwork, the lower end face of the transverse plate 8 of the upper angle steel formwork may not be provided with a support leg, and a support leg is only provided on the lower end face of the transverse plate 8 of the lower angle steel formwork. It is further preferred that the width of the transverse plate 8 of one angle steel template is not less than the width of the concrete rib 3, and the angle steel template is used as the lower template. The width of the transverse plate 8 of the other angle steel template is not greater than half of the width of the concrete rib 3, and the angle steel template is used as the upper template. At least four corners of the transverse plate 8 of the lower template are each provided with a support leg extending downward. The transverse plate 8 of the upper template sits on the transverse plate 8 of the lower template. The upper template can be provided with a strip-shaped guide protrusion extending downward at the position opposite to the notch, and the strip-shaped guide protrusion is inserted into the notch of the lower template. Thereby guiding the upper template to move on the lower template, so that the notch alignment of the two angle steel templates is more accurate.
[0057] The structure of the composite floor slab obtained by the above two construction methods is:
[0058] A composite floor slab includes a concrete base plate 2, a concrete rib plate 3, and stiffening ribs; the stiffening ribs include a left rib 4 located on the left side and a right rib 5 located on the right side, the left rib 4 is provided with a first opening extending from left to right, and the right rib 5 is provided with a second opening extending from left to right; the portion of the left rib 4 between two adjacent first openings is used as a first connecting column, and the portion of the right rib 5 between two adjacent second openings is used as a second connecting column; the tops of the left rib 4 and the right rib 5 are inserted into the concrete rib plate 3, and the bottoms of the left rib 4 and the right rib 5 are inserted into the concrete base plate 2; the distance between the left rib 4 and the right rib 5 gradually increases from the concrete rib plate 3 to the concrete base plate 2; a gap is provided between the concrete base plate 2 and the concrete rib plate 3, so that the first opening and the second opening are partially or completely exposed. The shape of the exposed portion of the first opening and the second opening is preferably a triangle, an isosceles trapezoid, etc.
[0059] The composite floor slab may also be a concrete top plate 1, which is connected to the concrete ribs 3. The lower end surface of the concrete top plate 1 is provided with a groove with an opening facing downward, and the concrete ribs 3 are inserted into the groove. The concrete top plate 1 may also be provided with a step-like structure near the edge, and the concrete top plate 1 sits on the concrete ribs 3 using the step-like structure. Under this structure, it is convenient to remove the concrete top plate 1 later and repair the pipelines thereunder.
[0060] The composite floor slab may further include a functional layer, wherein a functional material is filled between the concrete top slab 1 and the concrete bottom slab 2, and the layer where the functional material is located is used as the functional layer. A pipeline is buried in the functional layer, and the pipeline passes through at least one first opening or one second opening.
[0061] There is a first angle between the second steel plate and the first steel plate, and the first angle is not 180 degrees; there is a second angle between the third steel plate and the first steel plate, and the second angle is not 180 degrees. Preferably, the first angle and the second angle are both 90 degrees. It is possible that the second steel plate and the third steel plate are both located on the inner side of the stiffening rib. It is also possible that the second steel plate and the third steel plate are both located on the outer side of the stiffening rib. Regardless of whether it is on the inner side or the outer side, it is preferred that the upper end surface of the second steel plate is flush with the upper end surface of the concrete rib, and the lower end surface of the second steel plate is flush with the lower end surface of the concrete rib. The upper end surface of the third steel plate is flush with the upper end surface of the concrete bottom plate 2, and the lower end surface of the third steel plate is flush with the lower end surface of the concrete bottom plate 2.
[0062] A suspension hole is preferably opened at the junction of the third steel plate and the first steel plate, and a suspension hole is also preferably opened on the second steel bar 6. Suspension bolts are inserted into the suspension holes, and the tops of the suspension bolts are exposed outside the concrete bottom plate 2. Thus, the present invention is hoisted to a designated position by using the suspension bolts.
[0063] There is a third angle between the first steel bar, the first steel plate and the concrete bottom plate 2, and the third angle is preferably 60 degrees.
[0064] The concrete bottom plate 2 can be a bottom plate formed by prefabricated concrete, in particular, a UHPC bottom plate made of UHPC ultra-high performance concrete. In the case of a UHPC bottom plate, the bottom plate has high strength, and no steel bars are required in the bottom plate, and only steel mesh is arranged. The thickness of the concrete top plate 1 and the concrete bottom plate 2 is preferably 15-50 mm. Chamfers are provided on both sides of the concrete bottom plate 2. The chamfers are located at the intersection of the upper end face and the side end face of the concrete bottom plate 2. The side end faces here are two side end faces parallel to the extension direction of the concrete stiffening ribs.
[0065] A wire mesh plate may be embedded in the concrete base plate 2. The wire mesh plate is preferably located below the stiffening ribs. The stiffening ribs may be connected to the wire mesh plate by tying steel bars.
[0066] Transverse reinforcement and longitudinal reinforcement may be embedded in the concrete base plate 2, and the longitudinal reinforcement is preferably located below the stiffening ribs, and the stiffening ribs are welded to the longitudinal reinforcement. For the first reinforcement, under this structure, the longitudinal reinforcement can replace the second reinforcement 6, thereby eliminating the need for a separate second reinforcement.
[0067] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A composite floor slab, comprising a concrete base plate, a concrete rib plate, and a stiffening rib; characterized in that: The stiffening ribs include a left rib located on the left side and a right rib located on the right side, the left rib is provided with a first opening extending leftwards and rightwards, and the right rib is provided with a second opening extending leftwards and rightwards; The portion of the left rib located between two adjacent first openings is used as a first connecting column, and the portion of the right rib located between two adjacent second openings is used as a second connecting column; The tops of the left rib and the right rib are inserted into the concrete rib plate, and the bottoms of the left rib and the right rib are inserted into the concrete bottom plate; The distance between the left rib and the right rib gradually increases from the concrete rib plate to the concrete bottom plate; A gap is provided between the concrete bottom plate and the concrete rib plate, so that the first opening and the second opening are partially or completely exposed to the outside; The composite floor slab also includes an "L"-shaped angle steel formwork, which is composed of a vertical plate located in the vertical direction and a horizontal plate located in the horizontal direction; There are two angle steel templates, namely a left angle steel template and a right angle steel template; The horizontal plate of the left angle steel template is provided with a first notch for inserting the first connecting column, and the horizontal plate of the right angle steel template is provided with a second notch for inserting the second connecting column; The width of the transverse plate of one of the angle steel templates is not less than the width of the concrete rib plate, and the angle steel template is used as the lower template. The width of the transverse plate of the other angle steel template is not greater than half the width of the concrete rib plate, and the angle steel template is used as the upper template. At least four corners of the transverse plate of the lower template are each provided with a downward extending support leg, the transverse plate of the upper template sits on the transverse plate of the lower template, and the upper template is provided with a downward extending strip guide protrusion at a position opposite to the notch of the lower template, and the strip guide protrusion is inserted into the notch of the lower template.
2. The composite floor slab according to claim 1, characterized in that: The left rib and the right rib are both "U"-shaped light steel keels, and the light steel keels include a plate-shaped first steel plate, the top end of the first steel plate is connected to the second steel plate, and the bottom end of the first steel plate is connected to the third steel plate; At least the second steel plate is buried in the concrete rib plate, and at least two third steel plates are buried in the concrete bottom plate; The two light steel keels are arranged in a mirror image, and the first steel plate is provided with holes penetrating left and right. The hole on the light steel keel on the left is used as the first opening, and the hole on the light steel keel on the right is used as the second opening.
3. The composite floor slab according to claim 1, characterized in that: The left rib and the right rib are both first steel bars in a triangular wave shape, the two first steel bars are arranged in a mirror image, the wave crests of the two first steel bars are offset and then welded together, the space between the wave crest and the wave trough of the first steel bar on the left side is used as the first opening, and the space between the wave crest and the wave trough of the first steel bar on the right side is used as the second opening; The wave crests of at least two first steel bars are buried in the concrete ribs, and the wave troughs of at least two first steel bars are buried in the concrete bottom plate.
4. The composite floor slab according to claim 1, characterized in that: Also included is a concrete top plate connected to the concrete ribs.
5. The composite floor slab according to claim 4, characterized in that: It also includes a functional layer, wherein the space between the concrete top plate and the concrete bottom plate is filled with a functional material, and the layer where the functional material is located serves as the functional layer; A pipeline is buried in the functional layer, and the pipeline passes through at least one of the first openings or one of the second openings.
6. A construction method of the composite floor slab according to claims 1-5, characterized in that: Step 1. Making a concrete base plate with stiffening ribs: insert the bottom of the stiffening ribs into a mold for making a concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain a concrete base plate with stiffening ribs; Step 2. Laying out pipelines: transport the concrete base plate with stiffening ribs to the construction site, hoist it to the designated location, and then place the pipelines between two adjacent troughs of the first steel bar; Step 3. Make concrete ribs: insert the first connecting column from the left side of the stiffening rib to the right, and insert the second connecting column from the right side of the stiffening rib to the left, and insert the cross plates of the two angle steel templates together. At this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, pour concrete into the pouring groove, and after the concrete solidifies, a concrete rib is obtained.
7. Another construction method of the composite floor slab according to claims 1-5, characterized in that: Step 1. Making a concrete base plate with stiffening ribs: insert the bottom of the stiffening ribs into a mold for making a concrete base plate, pour concrete into the mold, and after the concrete solidifies, remove the mold to obtain a concrete base plate with stiffening ribs; Step 2. Make concrete ribs: At the prefabrication site or construction site, insert the first connecting column from the left side of the stiffening rib to the right, insert the second connecting column from the right side of the stiffening rib to the left, and insert the cross plates of the two angle steel templates together. At this time, the left angle steel template and the right angle steel template form a pouring groove with an opening facing upward, pour concrete into the pouring groove, and after the concrete solidifies, obtain a concrete rib, thereby forming a composite plate with stiffening ribs; Step 3. Laying pipelines: After hoisting the composite plate with stiffening ribs to the designated location, let the pipelines pass through the gaps enclosed by the first steel bars, the concrete bottom plate and the concrete ribs.
8. The construction method of the composite floor according to claim 6 or 7, characterized in that: It also includes step 4. Filling the bottom seam: filling the gap between two adjacent concrete bottom plates with caulking materials.
9. The construction method of the composite floor according to claim 8, characterized in that: Also included are the steps of: Placing a concrete top slab: Connecting the concrete top slab to the concrete ribs.
