A waterproof protection system for deep pit type stereo garage
By incorporating precast wall panels and connecting plates into the cement-soil wall, the waterproofing and maintenance system of the deep pit-type three-dimensional parking garage solves the problems of resource waste and construction complexity of temporary retaining structures in foundation pit engineering. It achieves efficient and environmentally friendly waterproofing and soil retention effects, improving construction progress and environmental protection.
Patent Information
- Application Number
- CN202210026827.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-11
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-01-11
AI Technical Summary
In existing foundation pit projects, temporary retaining structures result in significant resource waste, are difficult to dismantle, affect construction progress, and are costly. Traditional diaphragm wall construction is complex, faces significant environmental protection challenges, and underwater concrete pouring is difficult to control in terms of quality, posing a risk of water leakage.
The deep pit-type three-dimensional garage adopts a waterproof maintenance system with precast wall panels and connecting plates built into the cement-soil wall. The precast wall panels and connecting plates are connected by mortise and tenon joints to form a stable waterproof retaining structure. The large width of the precast wall panels can withstand lateral earth pressure, the height of the connecting plates increases stability, and the cement-soil covering accelerates the setting.
It achieves energy-saving and environmentally friendly foundation pit support, reduces resource waste, improves construction efficiency, enhances waterproofing and soil retention effects, and reduces environmental impact.
Smart Images

Figure CN115354684B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to an underground deep pit maintenance system, and in particular relates to a deep pit well type stereo garage waterproof maintenance system. Background Art
[0002] The construction of civil engineering is inseparable from the development of foundation pit engineering, especially for high-rise buildings in cities. The importance and safety of foundation pit engineering are more prominent. In foundation pit engineering, temporary retaining structures such as anchor rods, concrete supports, bored piles, etc. will be abandoned inside the soil after the project is completed, causing a huge waste of resources and making it difficult for the expansion of subsequent projects in the future. The main reason is that these temporary supports are difficult to remove, affecting the construction progress. Temporary retaining structures are expensive and difficult to remove. Therefore, a new type of support system that is energy-saving, green, environmentally friendly and economical is needed.
[0003] Considering the extremely limited land resources in densely populated urban areas, the excavation depth of foundation pits is getting deeper and deeper. The existing subway stations in the city, the numerous municipal pipelines buried underground, and the structures close to the foundation pits, the foundation pit support means in this part of the area mostly use the combination of ultra-deep underground continuous walls and internal supports. However, with the development of green and low-carbon concepts, underground continuous walls have exposed some problems: 1. A large amount of mud wall protection is required during the trenching process, and the exhaust gas and mud are difficult to discharge, forming a large environmental protection pressure; 2. The on-site construction process is complicated and the construction time is long; 3. The wall construction process has a certain disturbance to the adjacent foundation. The longer the trenching time, the deeper the wall, and the thicker the wall, the greater the difficulty of environmental protection; the quality control of underwater concrete pouring is difficult, and improper handling can easily form the hidden danger of joint leakage. Summary of the invention
[0004] The present invention provides a deep pit type three-dimensional car park waterproof maintenance system, in which prefabricated wall panels are placed in cement soil walls, the prefabricated wall panels are connected by connecting plates, and cement soil covers the prefabricated wall panels and the connecting plates, thereby forming an effective waterproof maintenance system. The built-in prefabricated wall panels are relatively wide, so they can effectively withstand lateral soil pressure and play a dual role of water retaining and soil retaining.
[0005] The specific technical solution of the present invention is: a waterproof maintenance system for a deep pit-type three-dimensional car park, which adopts a structure of prefabricated panels built into cement soil walls. The prefabricated panels include prefabricated wall panels and prefabricated connecting panels connecting the prefabricated wall panels. The length of the prefabricated wall panels coincides with the distance between the inner partition walls in the deep pit, and the position of the prefabricated connecting panels corresponds to the position of the inner partition walls; the prefabricated wall panels and the prefabricated connecting panels are connected by tongue and groove joints, the thickness of the prefabricated wall panels and the prefabricated connecting panels are both less than the thickness of the cement soil walls, and the height of the prefabricated connecting panels is greater than the height of the prefabricated wall panels.
[0006] Prefabricated wall panels are placed in the cement soil wall, and the prefabricated wall panels are connected by connecting plates. The cement soil covers the prefabricated wall panels and the connecting plates, thereby forming an effective waterproof maintenance system. The built-in prefabricated wall panels are relatively wide, which coincides with the distance between the inner partition walls in the deep pit, that is, the prefabricated wall panels can withstand a large lateral soil pressure, and play a dual role of retaining soil and water; the prefabricated wall panels and the prefabricated connecting plates are connected by tongue-and-groove joints, and the connection is more stable and can withstand greater lateral forces. The wall panels and the connecting plates are both prefabricated structures, which are directly prefabricated and formed in the factory according to the designed dimensions, and then transported to the construction site for on-site installation, which speeds up the construction progress. In addition, the prefabricated wall panels are placed in the cement soil wall, which can speed up the setting speed of the cement soil wall; after the length of the prefabricated wall panels increases, considering the needs of transportation and production, the height will be limited. By increasing the height of the prefabricated connecting plates, one prefabricated connecting plate can connect at least two prefabricated wall panels, thereby improving the connection stability between the prefabricated wall panels and ensuring an effective retaining effect.
[0007] It is further preferred that the vertical edges on both sides of the prefabricated wall panel adopt a tenon structure, and bayonet holes are arranged at both sides of the root of the tenon, and the two vertical edges of the prefabricated connecting plate adopt a C-shaped groove that matches the tenon structure, and the notch of the C-shaped groove extends toward the middle to form a buckle edge, and the buckle edge matches the bayonet hole. Bayonet holes are arranged on both sides of the tenon, and the prefabricated connecting plate is provided with a C-shaped groove, and a buckle edge folded inward toward the middle is arranged at the notch position. When the prefabricated connecting plate is connected to the prefabricated wall panel, the C-shaped groove is plugged into the tenon, and the buckle edge buckles the bayonet holes on both sides of the tenon. This connection method makes the connection between the prefabricated wall panel and the prefabricated connecting plate stable, and the connection method is from top to bottom, which is also in line with the construction direction.
[0008] Further preferably, the vertical end surface of the tenon has an inclined portion so that the widths of the two sides of the tenon are different, that is, the width of the side facing the deep pit is smaller than the width of the side on the other side; the middle of the prefabricated connecting plate is an inner plate, and the two side surfaces of the inner plate have shapes that match the vertical end surface of the tenon. The vertical end surface of the tenon is provided with an inclined portion to change the rotation axis of the prefabricated wall panel for unilateral rotation, thereby increasing the resistance to rotation of the prefabricated wall panel.
[0009] Further preferably, the lower surface of the prefabricated wall panel is provided with a protruding pin, and the upper surface of the prefabricated wall panel is provided with a concave slot, the shape of the pin is adapted to the shape of the slot, and the position of the pin corresponds to the position of the slot in the vertical direction. The slot is provided on the upper side of the prefabricated wall panel, and the pin is provided on the lower side. When the prefabricated wall panel is placed, the pin will be inserted into the slot to form an upper and lower plug-in structure, which can ensure the positional relationship between the upper and lower prefabricated wall panels and improve the resistance of the area between the upper and lower prefabricated wall panels.
[0010] More preferably, the cross section of the pin is divided into two parts, including a rectangular part and a trapezoidal part, and the short side length of the trapezoidal part is equal to the length of the rectangular part. The pin has a trapezoidal part, so that when the pin is relatively plugged into the slot, it can play a guiding and correcting role.
[0011] Further preferably, the pins and slots of the prefabricated wall panel are spaced apart and arranged at equal intervals.
[0012] Further preferably, the upper surface of the prefabricated wall panel is provided with protruding pins, the lower surface of the prefabricated wall panel is provided with concave slots, the pins on the upper side of the prefabricated wall panel and the slots are arranged in a one-to-one interval, and the pins on the lower side of the prefabricated wall panel and the slots are arranged in a one-to-one interval.
[0013] Further preferably, a plurality of evenly distributed vertical through holes are provided in the prefabricated wall panel. The vertical through holes can reduce the strength of the prefabricated wall panel and improve the adaptability of the prefabricated wall panel to thermal expansion and contraction.
[0014] Further preferably, a transverse through groove is provided on the upper side of the prefabricated wall panel, and the position of the transverse through groove corresponds to the upper end position of the vertical through hole and is connected to the vertical through hole. The transverse through groove connected to the vertical through hole is provided on the prefabricated wall panel, so that when the prefabricated wall panel is assembled and plugged in, the cement soil will flow from the transverse through groove into the vertical through hole, so that the cement soil and the prefabricated wall panel form a staggered connection, thereby improving the stability of the prefabricated wall panel.
[0015] Further preferably, the deep pit is square, and a cross structure is adopted at the corners of the deep pit. The corners adopt a structure of prefabricated cross wall panels built into the cement soil wall. The cross-section of the prefabricated cross wall panels is cross-shaped, and two adjacent vertical edges adopt a tenon structure. The length and width directions of the deep pit are both prefabricated cross wall panels, and the prefabricated wall panels and prefabricated connecting plates are connected by mortise and tenon joints.
[0016] The beneficial effects of the present invention are as follows: prefabricated wall panels are placed in cement soil walls, the prefabricated wall panels are connected by connecting plates, cement soil covers the prefabricated wall panels and the connecting plates, thereby forming an effective waterproof maintenance system, and the built-in prefabricated wall panels are relatively wide, so that they can effectively withstand lateral soil pressure and play a dual role of water retaining and soil retaining. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the present invention;
[0018] Figure 2 It is a schematic diagram of a prefabricated wall panel structure of the present invention;
[0019] Figure 3 It is a connection schematic diagram of a prefabricated wall panel and a prefabricated connecting plate of the present invention;
[0020] Figure 4The present invention Figure 3 An enlarged schematic diagram of location I of the structure shown;
[0021] Figure 5 This is a schematic diagram of the upper and lower plug-in structure of a prefabricated wall panel of the present invention;
[0022] Figure 6 It is a three-dimensional schematic diagram of a structure of the present invention;
[0023] Figure 7 It is a structural schematic diagram of a prefabricated wall panel of the present invention;
[0024] In the figure: 1. cement soil wall, 2. prefabricated board, 3. prefabricated cross wall board, 4. prefabricated wall board, 5. prefabricated connecting board, 6. tenon, 7. vertical through hole, 8. inclined part, 9. bayonet, 10. inner board, 11. buckle edge, 12. pin, 13. slot, 14. C-shaped slot, 15. horizontal through slot. DETAILED DESCRIPTION
[0025] The present invention will be further described below through specific embodiments in conjunction with the accompanying drawings.
[0026] Example:
[0027] like Figure 1 Figure 2 Figure 3 Figure 4 As shown, a deep pit-type three-dimensional carport waterproof maintenance system, the deep pit is square, and the corners of the deep pit adopt a cross structure. The overall structure is a cement soil wall 1 with a prefabricated panel 2 built in. The positions corresponding to the four sides of the deep pit adopt a flat prefabricated panel structure, and the corresponding corners adopt a cross prefabricated panel structure. The prefabricated panels include flat prefabricated wall panels 4, prefabricated cross wall panels 3 and prefabricated connecting panels 5 for connection. The prefabricated connecting panels are connected to the prefabricated wall panels and the prefabricated cross wall panels by tongue and groove buckle. The thickness of the prefabricated panels is less than the thickness of the cement soil wall for waterproof maintenance of the deep pit. The length of the prefabricated wall panels coincides with the distance between the inner partition walls in the deep pit, and the position of the prefabricated connecting panels corresponds to the position of the inner partition walls.
[0028] The prefabricated wall panels are in a planar shape, and the cross-section of the prefabricated cross wall panels is in a cross shape. The vertical edges on both sides of the prefabricated wall panels adopt a tenon structure, and the two adjacent vertical edges of the prefabricated cross wall panels adopt a tenon structure. The vertical end face of the tenon has an inclined portion 8 so that the widths of the two side faces of the tenon are different, that is, the width of the side facing the deep pit is smaller than the width of the side face on the other side, and bayonet 9 is set on both sides of the root of the tenon. The two vertical edges of the prefabricated connecting plate adopt a C-shaped groove 14 that matches the tenon structure. The notch of the C-shaped groove extends toward the middle to form a buckle edge 11, which matches the bayonet, and the bayonet can be placed in the C-shaped groove and disengaged horizontally. The middle of the prefabricated connecting plate is an inner plate 10, and the two side faces of the inner plate have a shape that matches the vertical end face of the tenon. The tenon extends along the vertical edge of the prefabricated panel, and the C-shaped groove extends along the vertical edge of the prefabricated connecting plate. When the prefabricated panel is placed, it is also placed in a vertical manner. The prefabricated connecting plate can be connected to the C-shaped groove and the tenon by vertical insertion. The height of the prefabricated wall panel and the prefabricated cross wall panel is 2.7-3m, which generally corresponds to the height of the first floor of the deep pit building. The height of the prefabricated connecting plate is greater than the height of the prefabricated wall panel, so that one prefabricated connecting plate can connect at least two prefabricated wall panels. The thickness of the tenon is less than the thickness of the prefabricated wall panel. After the prefabricated connecting plate is plugged into the prefabricated wall panel, the outer surface of the prefabricated panel is flush, and the inner surface of the prefabricated panel is also flush, which also makes the cement soil layer on the surface of the prefabricated panel have sufficient thickness.
[0029] like Figure 5 Figure 6 As shown, the prefabricated wall panels are stacked in a plug-in structure. The lower surface of the prefabricated wall panels is provided with a protruding pin 12, and the upper surface of the prefabricated wall panels is provided with a concave slot 13. The shape of the pin matches the shape of the slot, and the position of the pin corresponds to the position of the slot in the vertical direction. The lower surface of the prefabricated cross wall panel is provided with a protruding pin 12, and the upper surface of the prefabricated cross wall panel is provided with a concave slot 13. The shape of the pin matches the shape of the slot, and the position of the pin corresponds to the position of the slot in the vertical direction. In this way, when the prefabricated wall panels are placed, the pins are inserted into the slots, and the upper and lower prefabricated panels establish a stable plug-in structure. The cross section of the pin is divided into two parts, including a rectangular part and a trapezoidal part, and the short side length of the trapezoidal part is equal to the length of the rectangular part. The inclined surface of the trapezoidal part is equivalent to the guide structure of the pin, which can guide the pin to smoothly cooperate with the slot.
[0030] Furthermore, the upper surface of the prefabricated wall panel is provided with protruding pins, the lower surface of the prefabricated wall panel is provided with concave slots, the pins on the upper side of the prefabricated wall panel and the slots are arranged one-to-one, the pins on the lower side of the prefabricated wall panel and the slots are arranged one-to-one, and the pins on the upper and lower side surfaces correspond to the slots one-to-one in the vertical direction. Similarly, the upper surface of the prefabricated cross wall panel is provided with protruding pins, the lower surface of the prefabricated cross wall panel is provided with concave slots, the pins on the upper side of the prefabricated cross wall panel and the slots are arranged one-to-one, the pins on the lower side of the prefabricated cross wall panel and the slots are arranged one-to-one, and the pins on the upper and lower side surfaces correspond to the slots one-to-one in the vertical direction. The cooperation of the pins and the slots allows the tenons of the upper and lower prefabricated connecting plates to remain in a straight line.
[0031] The prefabricated wallboard is provided with multiple evenly distributed vertical through holes 7, which are circular in shape. The prefabricated cross wallboard is also provided with multiple evenly distributed vertical through holes, and the positions of the vertical through holes are staggered with the positions of the pins and the slots. The provision of the vertical through holes enables the prefabricated panels to adapt to the needs of thermal expansion and contraction during prefabrication, and at the same time, when placed, cement soil can flow into the vertical through holes to establish a connection between the cement soil and the prefabricated panels.
[0032] like Figure 7 As shown, the upper side of the prefabricated wall panel is provided with a transverse through groove 15, the position of which corresponds to the upper end of the vertical through hole and is connected to the vertical through hole. The transverse through groove can be connected to the vertical through hole in one direction or in two directions.
[0033] After the milling machine cuts out the vertical groove, cement slurry is injected into the foundation and fully mixed with the original foundation. Then, before solidification, prefabricated wall panels and prefabricated cross wall panels are placed in the vertical groove according to their positions, and prefabricated connecting panels are vertically plugged in to form an overall waterproof maintenance system.
[0034] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent transformation made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A deep pit type three-dimensional parking garage waterproof protection system, characterized in that: The structure of prefabricated panels built into cement soil walls is adopted. The prefabricated panels include prefabricated wall panels and prefabricated connecting panels connecting the prefabricated wall panels. The length of the prefabricated wall panels coincides with the distance between the inner partition walls in the deep pit, and the position of the prefabricated connecting panels corresponds to the position of the inner partition walls. The prefabricated wall panels and the prefabricated connecting panels are connected by mortise and tenon buckling. The thickness of the prefabricated wall panels and the prefabricated connecting panels are both less than the thickness of the cement soil walls, and the height of the prefabricated connecting panels is greater than the height of the prefabricated wall panels. The vertical edges on both sides of the prefabricated wall panels adopt a tenon structure, and bayonet holes are arranged on both sides of the root of the tenon. The two vertical edges of the prefabricated connecting panels adopt C-shaped grooves that match the tenon structure, and the notch of the C-shaped groove extends to the middle. The tenon is formed by extending the top of the precast concrete slab to form a buckle edge, which cooperates with the bayonet; the vertical end face of the tenon has an inclined portion so that the widths of the two side faces of the tenon are different, that is, the width of the side facing the deep pit is smaller than the width of the side face on the other side; the middle of the precast connecting plate is an inner plate, and the two side faces of the inner plate have shapes that match the vertical end faces of the tenon; the deep pit is square, and a cross structure is adopted at the corner position of the deep pit, and a structure of a precast cross wall panel built into a cement soil wall is adopted at the corner position, and the cross section of the precast cross wall panel is cross-shaped, in which two adjacent vertical sides adopt a tenon structure, and the length and width directions of the deep pit are precast cross wall panels, and the precast wall panels and precast connecting plates are connected by tongue and groove buckle connection.
2. A deep pit type three-dimensional parking garage waterproof maintenance system according to claim 1, characterized in that: The lower surface of the prefabricated wall panel is provided with protruding pins, and the upper surface of the prefabricated wall panel is provided with concave slots. The shape of the pins matches the shape of the slots, and the positions of the pins correspond one to one with the positions of the slots in the vertical direction.
3. A deep pit type three-dimensional parking garage waterproof maintenance system according to claim 2, characterized in that: The cross section of the pin is divided into two parts, including a rectangular part and a trapezoidal part, and the length of the short side of the trapezoidal part is equal to the length of the rectangular part.
4. A deep pit type three-dimensional parking garage waterproof maintenance system according to claim 2, characterized in that: The pins and slots of the precast wall panels are evenly spaced.
5. The waterproof maintenance system for a deep pit type stereo garage according to claim 2 is characterized in that: The upper surface of the prefabricated wall panel is provided with protruding pins, the lower surface of the prefabricated wall panel is provided with concave slots, the pins on the upper side of the prefabricated wall panel and the slots are arranged one-to-one, and the pins on the lower side of the prefabricated wall panel and the slots are arranged one-to-one.
6. A deep pit type three-dimensional parking garage waterproof maintenance system according to claim 1, characterized in that: A plurality of evenly distributed vertical through holes are arranged in the prefabricated wall panel.
7. A deep pit type three-dimensional parking garage waterproof maintenance system according to claim 6, characterized in that: A transverse through groove is arranged on the upper side of the prefabricated wall panel, and the position of the transverse through groove corresponds to the upper end position of the vertical through hole and is connected with the vertical through hole.
Citation Information
Patent Citations
Underground building
CN105625468A
Assembled underground continuous wall transverse connecting structure
CN109881661A
Fabricated prefabricated component house and building method thereof
CN111206674A
Shaft type underground garage foundation pit supporting system in water-rich stratum and construction method
CN111535328A
Canal formula cutting assembled underground continuous wall
CN208748644U