Mobile device charging method, charging device and mobile device charging system

By obtaining the initial power in a movable device and charging in sequence, and timely monitoring and adjusting the execution of equipment tasks, the problem of equipment queue charging is solved, and the peak charging and production requirements are met.

CN115384331BActive Publication Date: 2024-11-12GREE ELECTRIC APPLIANCE INC OF ZHUHAI +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211123403.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-15
Publication Date
2024-11-12
Estimated Expiration
2042-09-15

Smart Images

  • Figure CN115384331B_ABST
    Figure CN115384331B_ABST
Patent Text Reader

Abstract

The present application provides a method for charging a mobile device, a charging device and a charging system for a mobile device. The method includes: obtaining the initial power of all mobile devices in a preset area; selecting a preset number of target mobile devices from multiple mobile devices in order of initial power from low to high, and controlling the charging pile to charge the target mobile devices; determining whether the non-target mobile device in operation meets the preset conditions after a predetermined time period; if the preset conditions are met, controlling the non-target mobile device to suspend the operation, and controlling the target mobile device to perform the operation that the non-target mobile device intends to perform. This solution first arranges the mobile devices with low power to charge, and then when other devices cannot meet the preset conditions, the first charged mobile device is allowed to replace other devices to perform the task, so as to ensure the smooth execution of the operation while ensuring orderly charging.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of charging, and in particular to a method for charging a mobile device, a charging device, a computer-readable storage medium, and a charging system for a mobile device. Background Art

[0002] In order to achieve a high degree of automation of the dispatching system, the dispatching system is generally equipped with an automatic charging module, which divides the charging area on the map and equips it with automatic charging piles. At the same time, it sets the charging threshold of the movable device. When the power of the movable device is lower than the set threshold, the dispatching system will automatically issue a charging task, thereby realizing charging automation.

[0003] However, in actual production, it is inevitable that there are multiple movable devices with different or similar power levels. If the power levels of multiple movable devices are lower than the set charging threshold, the scheduling system will issue charging tasks to the low-power movable devices respectively, resulting in congestion in the charging queues of the movable devices. The movable devices that cannot be charged in time cannot perform tasks, thus delaying production progress. Summary of the invention

[0004] The main purpose of the present application is to provide a mobile device charging method, a charging device, a computer-readable storage medium and a mobile device charging system to solve the problem of mobile devices being crowded and queued for charging in the prior art.

[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for charging a movable device is provided, comprising: obtaining the initial power of all movable devices in a preset area; selecting a preset number of target movable devices from a plurality of movable devices in order of the initial power from low to high, and controlling a charging pile to charge the target movable devices, wherein the preset number is equal to the number of the charging piles in the preset area, and the charging piles correspond one-to-one to the target movable devices; determining whether a non-target movable device that is operating meets a preset condition after a predetermined time period, wherein the preset condition comprises: the battery life of the current remaining power of the non-target movable device is less than a preset duration; if the preset condition is met, controlling the non-target movable device to suspend operation, and controlling the target movable device to perform the operation that the non-target movable device intends to perform.

[0006] Optionally, the method also includes: obtaining an estimated charging time for each of the non-target mobile devices, the estimated charging time refers to the time taken for the non-target mobile device to charge from a current remaining power to a full power; determining an estimated battery life of a first non-target mobile device based on the current remaining power of the non-target mobile device and the estimated charging time, the estimated battery life of the first non-target mobile device referring to the remaining battery life of the first non-target mobile device when the second non-target mobile device is charged to a full power from the current moment, wherein the battery life of the current remaining power of the first non-target mobile device is greater than the battery life of the current remaining power of the second non-target mobile device.

[0007] Optionally, the estimated charging time of each of the non-target movable devices is obtained, including: obtaining the total time required to fully charge each of the non-target movable devices; obtaining the percentage of the current remaining power of each of the non-target movable devices to the full power; and determining the estimated charging time of each of the non-target movable devices based on the total time required to fully charge and the percentage.

[0008] Optionally, the method also includes: when the estimated battery life of the first non-target movable device is less than the preset time length, controlling the second non-target movable device to temporarily operate, the estimated battery life of the first non-target movable device refers to the remaining battery life of the first non-target movable device when the second non-target movable device is charged to full power from the current moment, wherein the battery life of the current remaining power of the first non-target movable device is greater than the battery life of the current remaining power of the second non-target movable device; controlling the fully charged target movable device to perform the operation that the second non-target movable device intends to perform.

[0009] Optionally, after controlling the second non-target movable device to temporarily operate, the method also includes: controlling the second non-target movable device to move to an idle charging pile closest to the second non-target movable device; controlling the idle charging pile closest to the second non-target movable device to charge the second non-target movable device.

[0010] Optionally, when the preset condition is met, the non-target mobile device is controlled to suspend operation, and the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform, including: when the preset condition is met and the target mobile device is fully charged, the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform; when the preset condition is met and the target mobile device is not fully charged, the target mobile device is controlled to temporarily charge and the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform. The method also includes: after controlling the target mobile device to suspend charging, controlling the non-target mobile device that meets the preset condition to move to an idle charging pile, and controlling the idle charging pile to charge the non-target mobile device.

[0011] Optionally, the method further includes: obtaining the percentage of the current remaining power of each of the movable devices to the full power and the full-power battery life of each of the movable devices; and determining the battery life of the current remaining power of each of the movable devices based on the percentage and the full-power battery life.

[0012] According to another aspect of the present application, a mobile device charging device is provided, including: a first acquisition unit, used to acquire the initial power of all mobile devices in a preset area; a processing unit, used to select a preset number of target mobile devices from a plurality of the mobile devices in order of the initial power from low to high, and control the charging pile to charge the target mobile devices, the preset number is equal to the number of the charging piles in the preset area, and the charging piles correspond one-to-one to the target mobile devices; a first determination unit, used to determine whether a non-target mobile device that is operating meets a preset condition after a predetermined time period, and the preset condition includes: the battery life of the current remaining power of the non-target mobile device is less than a preset duration; a first control unit, used to control the non-target mobile device to suspend operation when the preset condition is met, and control the target mobile device to perform the operation that the non-target mobile device intends to perform.

[0013] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the methods described.

[0014] According to another aspect of the present application, a mobile device charging system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the described methods.

[0015] By applying the technical solution of the present application, the initial power of all movable devices in a preset area is obtained, and then they are sorted in order from low to high according to the initial power, and the movable devices with relatively low initial power are selected for charging first. Then, after a predetermined time period, the power of other devices is monitored to see if it is relatively low. If it is relatively low, the power is replenished in time, and the devices with higher power are controlled to perform tasks, so as to achieve staggered charging while ensuring that production needs are met. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0017] Figure 1 A flow chart of a method for charging a mobile device according to an embodiment of the present application is shown;

[0018] Figure 2 A schematic diagram of a charging device for a movable device according to an embodiment of the present application is shown;

[0019] Figure 3 A specific vehicle dispatching schematic diagram according to an embodiment of the present application is shown. DETAILED DESCRIPTION

[0020] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0022] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0023] It should be understood that when an element (such as a layer, film, region, or substrate) is described as being "on" another element, the element may be directly on the other element, or there may be intermediate elements. Moreover, in the specification and claims, when an element is described as being "connected" to another element, the element may be "directly connected" to the other element, or "connected" to the other element through a third element.

[0024] For the convenience of description, some nouns or terms involved in the embodiments of the present application are explained below:

[0025] Automated Guided Vehicle (AGV): It is a transport vehicle with safety protection and various transfer functions. It can travel along a set guide path according to the automatic guidance device equipped, complete related transportation tasks, etc. After the AGV car is connected to the scheduling system, the scheduling system can issue relevant task information and send it to the AGV car. The AGV car receives the task information and executes it, thereby completing a series of transportation tasks.

[0026] As introduced in the background technology, there is a problem in the prior art that mobile devices are stuck in long queues for charging. To solve the problem, an embodiment of the present application provides a method for charging a mobile device, a charging device, a computer-readable storage medium, and a charging system for a mobile device.

[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0028] Example 1

[0029] According to an embodiment of the present invention, an embodiment of a method for charging a mobile device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0030] Figure 1 FIG. 1 is a flow chart of a method for charging a mobile device according to an embodiment of the present application. Figure 1 As shown, the method comprises the following steps:

[0031] Step S101, obtaining the initial power of all movable devices in a preset area;

[0032] In the above steps, the preset area may be a room, and the movable device may be an automatic guided vehicle. Of course, it is not limited to automatic guided vehicles and may also be other transportation scheduling tools that use map coordinates as moving points.

[0033] In the above steps, the initial power refers to the power available to all movable devices in the preset area obtained at the start of timing.

[0034] Step S102, selecting a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and controlling the charging piles to charge the target mobile devices, the preset number being equal to the number of the charging piles in the preset area, and the charging piles corresponding to the target mobile devices one by one;

[0035] Specifically, there are multiple movable devices in the preset area. The power levels of the multiple movable devices are sorted, and the charging piles are controlled to charge the devices with low power first. For example, there are six devices and two charging piles, so the two devices with the lowest power are recharged first to facilitate subsequent scheduling.

[0036] Step S103, after a predetermined period of time, determining whether the non-target movable device in operation meets a preset condition, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration;

[0037] Further, after a predetermined time period, it is determined how long the power of the previously uncharged devices can last. For example, after twenty minutes, the remaining power of the remaining four devices can be determined.

[0038] Specifically, the preset duration can be set to 50 minutes, 40 minutes, or 60 minutes. Of course, those skilled in the art can adjust the preset duration according to actual conditions.

[0039] Step S104, when the preset conditions are met, the non-target movable device is controlled to suspend the operation, and the target movable device is controlled to execute the operation that the non-target movable device intends to execute.

[0040] That is to say, when the battery life of the uncharged device is relatively short, for example, it can only last for half an hour, the device needs to be recharged in time, but the execution of the task cannot be delayed. Therefore, at this time, the device that is charged first is allowed to replace the device with a shorter battery life to work. While ensuring orderly charging, the smooth execution of the task can be guaranteed.

[0041] Exemplarily, the method further includes: obtaining an estimated charging time for each of the non-target mobile devices, the estimated charging time refers to the time taken to charge the non-target mobile device from the current remaining power to the full power; determining an estimated battery life of the first non-target mobile device based on the battery life of the current remaining power of the non-target mobile device and the estimated charging time, the estimated battery life of the first non-target mobile device refers to the remaining battery life of the first non-target mobile device when the second non-target mobile device is charged to the full power from the current moment, wherein the battery life of the current remaining power of the first non-target mobile device is greater than the battery life of the current remaining power of the second non-target mobile device. For example, the current remaining power of the first non-target mobile device is 80, the current remaining power endurance time is 288 minutes, and the estimated charging time is 18 minutes. The current remaining power of the second non-target mobile device is 79, the current remaining power endurance time is 284 minutes, and the estimated charging time is 19 minutes. If the second non-target mobile device starts to charge at this time, then after the second non-target mobile device is fully charged, the estimated endurance time of the first non-target mobile device is 288-19=269 minutes.

[0042] In a specific implementation, obtaining the estimated charging time of each of the above non-target mobile devices includes: obtaining the total time required for each of the above non-target mobile devices to be fully charged; obtaining the percentage of the current remaining power of each of the above non-target mobile devices to the full power; and determining the estimated charging time of each of the above non-target mobile devices according to the total time required for full charging and the percentage. For example, if the total time required for the non-target mobile device to be fully charged is 100 minutes, and the current remaining power of the non-target mobile device to the full power percentage is 60%, then the estimated charging time of the non-target mobile device is 100×(1-60%)=40 minutes.

[0043] Furthermore, the method further includes: when the estimated battery life of the first non-target mobile device is less than the preset duration, controlling the second non-target mobile device to temporarily operate, the estimated battery life of the first non-target mobile device refers to the remaining battery life of the first non-target mobile device when the second non-target mobile device is charged to full power from the current moment, wherein the battery life of the current remaining power of the first non-target mobile device is greater than the battery life of the current remaining power of the second non-target mobile device; controlling the fully charged target mobile device to perform the operation that the second non-target mobile device intends to perform. For example, after working for a period of time, it is found that the estimated battery life of the first non-target mobile device is less than 50 minutes, that is, if the second non-target mobile device is charged to full power from the current moment, the battery life of the first non-target mobile device is relatively short, which will affect the execution of the task, so in order to avoid this situation, the second non-target mobile device is temporarily operated, and the fully charged device is allowed to replace the second non-target mobile device to execute, that is, to buy more time for the second non-target mobile device to charge. Equipment with relatively sufficient electricity consumption can promptly replace equipment with relatively insufficient electricity to ensure production needs.

[0044] Furthermore, after controlling the second non-target movable device to temporarily operate, the method further includes: controlling the second non-target movable device to move to an idle charging pile closest to the second non-target movable device; and controlling the idle charging pile closest to the second non-target movable device to charge the second non-target movable device. That is, for the temporarily operated device, the power is replenished in time to prepare for the subsequent task scheduling.

[0045] Furthermore, for any movable device that has stopped working, as long as there is an idle charging station, the power can be replenished in time according to the principle of proximity to ensure peak-shifting charging and improve work efficiency.

[0046] In some embodiments, when the above preset conditions are met, the non-target mobile device is controlled to suspend operation, and the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform, including: when the above preset conditions are met and the target mobile device is fully charged, the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform; that is, if there is a non-target mobile device that meets the above preset conditions, and all or part of the target mobile devices are fully charged, the fully charged target mobile device is preferentially selected to replace the non-target mobile device operation; when the above preset conditions are met and the target mobile device is not fully charged, the target mobile device is controlled to temporarily charge and the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform. If the target mobile devices are not fully charged, the target mobile devices are selected in order from high to low in terms of power, and are replaced according to the principle of proximity to improve work efficiency. After the target mobile device is controlled to suspend charging, the non-target mobile device that meets the above preset conditions is controlled to move to an idle charging pile, and the idle charging pile is controlled to charge the non-target mobile device. That is, in the case of insufficient power, the power should be replenished in time.

[0047] Furthermore, the method further includes: obtaining the percentage of the current remaining power of each of the above-mentioned movable devices to the full power and the full-power battery life of each of the above-mentioned movable devices; and determining the battery life of the current remaining power of each of the above-mentioned movable devices according to the percentage and the full-power battery life. If the full-power battery life is 100 minutes, and the current remaining power of the movable device accounts for 50% of the full power, then the battery life of the current remaining power is 100×50%=50 minutes.

[0048] The mobile device charging method of the present application obtains the initial power of all mobile devices in a preset area, and then sorts them in order from low to high according to the initial power, selects the mobile devices with relatively low initial power to charge first, and then monitors whether the power of other devices is relatively low after a predetermined time period. If the power is relatively low, the power is replenished in time, and the devices with higher power are controlled to perform tasks, thereby achieving staggered charging while ensuring that production needs are met.

[0049] Example 2

[0050] The embodiment of the present application also provides a mobile device charging device. It should be noted that the mobile device charging device of the embodiment of the present application can be used to execute the mobile device charging method provided in the embodiment of the present application. The mobile device charging device provided in the embodiment of the present application is introduced below.

[0051] Figure 2Schematic diagram of a charging device for a mobile device according to an embodiment of the present application. Figure 2 As shown, the device comprises:

[0052] A first acquisition unit 10 is used to acquire the initial power of all movable devices in a preset area;

[0053] The processing unit 20 is used to select a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and control the charging piles to charge the target mobile devices, the preset number is equal to the number of the charging piles in the preset area, and the charging piles correspond to the target mobile devices one by one;

[0054] The first determination unit 30 is used to determine whether the non-target movable device in operation meets a preset condition after a predetermined period of time, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration;

[0055] The first control unit 40 is used to control the non-target movable device to suspend operation and control the target movable device to perform the operation that the non-target movable device intends to perform when the preset conditions are met.

[0056] In the above scheme, the first acquisition unit obtains the initial power of all movable devices in a preset area, the processing unit sorts them in order from low to high according to the initial power, and selects the movable devices with relatively low initial power to charge first, and the first determination unit determines whether the power of other devices is relatively low after a predetermined time period. If it is relatively low, the first control unit replenishes the power in time and controls the devices with higher power to perform tasks, thereby achieving staggered charging while ensuring that production needs are met.

[0057] Furthermore, the above-mentioned device also includes a second acquisition unit and a second determination unit, the second acquisition unit is used to obtain the estimated charging time of each of the above-mentioned non-target movable devices, and the above-mentioned estimated charging time refers to the time taken for the above-mentioned non-target movable device to be charged from the current remaining power to the full power; the second determination unit is used to determine the estimated battery life of the first non-target movable device based on the battery life of the current remaining power of the above-mentioned non-target movable device and the estimated charging time, and the estimated battery life of the first non-target movable device refers to the remaining battery life of the first non-target movable device when the second non-target movable device is charged to the full power from the current moment, wherein the battery life of the current remaining power of the above-mentioned first non-target movable device is greater than the battery life of the current remaining power of the above-mentioned second non-target movable device.

[0058] Specifically, the second acquisition unit includes a first acquisition module, a second acquisition module and a determination module. The first acquisition module is used to obtain the total time required for fully charging each of the above-mentioned non-target mobile devices; the second acquisition module is used to obtain the percentage of the current remaining power of each of the above-mentioned non-target mobile devices to the full power; the determination module is used to determine the estimated charging time of each of the above-mentioned non-target mobile devices based on the above-mentioned total time required for full charging and the above-mentioned percentage.

[0059] In some embodiments, the above-mentioned device also includes a second control unit and a third control unit, the second control unit is used to control the second non-target mobile device to temporarily operate when the estimated battery life of the first non-target mobile device is less than the above-mentioned preset time length, the estimated battery life of the above-mentioned first non-target mobile device refers to the remaining battery life of the above-mentioned first non-target mobile device when the second non-target mobile device is charged to full power from the current moment, wherein the battery life of the current remaining power of the above-mentioned first non-target mobile device is greater than the battery life of the current remaining power of the above-mentioned second non-target mobile device; the third control unit is used to control the above-mentioned target mobile device that has been fully charged to perform the operation that the above-mentioned second non-target mobile device intends to perform.

[0060] In some embodiments, the above-mentioned device also includes a fourth control unit and a fifth control unit. The fourth control unit is used to control the second non-target movable device to move to an idle charging pile closest to the second non-target movable device after controlling the second non-target movable device to temporarily operate; the fifth control unit is used to control the idle charging pile closest to the second non-target movable device to charge the second non-target movable device.

[0061] More specifically, the first control unit includes a first control module and a second control module. The first control module is used to control the target mobile device to perform the operation that the non-target mobile device intends to perform when the above-mentioned preset conditions are met and the above-mentioned target mobile device is fully charged; the second control module is used to control the target mobile device to temporarily charge and control the target mobile device to perform the operation that the non-target mobile device intends to perform when the above-mentioned preset conditions are met and the above-mentioned target mobile device is not fully charged.

[0062] The above-mentioned device also includes a sixth control unit, which is used to control the above-mentioned non-target movable device that meets the above-mentioned preset conditions to move to an idle charging pile after controlling the above-mentioned target movable device to suspend charging, and control the above-mentioned idle charging pile to charge the above-mentioned non-target movable device.

[0063] In some embodiments, the above-mentioned device also includes a third acquisition unit and a third determination unit, the third acquisition unit is used to obtain the percentage of the current remaining power of each of the above-mentioned movable devices to the full power and the full-power battery life of each of the above-mentioned movable devices; the third determination unit is used to determine the battery life of the current remaining power of each of the above-mentioned movable devices based on the above-mentioned percentage and the above-mentioned full-power battery life.

[0064] The above-mentioned movable device charging device includes a processor and a memory. The above-mentioned first acquisition unit, processing unit, first determination unit and first control unit are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.

[0065] The processor includes a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the charging method can be optimized by adjusting the kernel parameters.

[0066] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0067] Example 3

[0068] According to an embodiment of the present application, a specific vehicle scheduling charging method is provided, such as Figure 3 As shown, the following steps are included:

[0069] S1. The configuration file sets the AGV's full-charge endurance time (minutes), total time required for full charge (minutes), and endurance warning time (critical power, which is also equivalent to the preset duration). The system is initialized and the lowest-power vehicle is scheduled to charge.

[0070] S11. According to the hardware description of the car, configure the dispatching system: the full-charge endurance time (minutes) of the AGV car, the total time required for a full charge, and the endurance alarm time. For example, the full-charge endurance time of the AGV car is 6 hours (360 minutes), the endurance alarm time is 50 minutes, and the total time required for a full charge is 90 minutes (1%-100%). After the system is started, a communication connection is established with all AGV cars. Before receiving the task data sent by the WMS (Warehouse Management System) upper system, the dispatching system will poll the status of all AGV cars including the current remaining power, screen out the AGV car with the lowest power among all available AGV cars, and dispatch the AGV car to the charging pile for charging and standby.

[0071] S2. According to the full-charge endurance of the AGV in the configuration file and the total time required for full charging, obtain the current remaining power of the available car, calculate the endurance of the current remaining power of the current car and the estimated charging time, and obtain the charging threshold based on the minimum endurance time.

[0072] S21. Before assigning tasks, the scheduling system will read the set values ​​of the AGV vehicle's full-charge endurance and the total time required for full charging in the configuration file, and obtain the current power of the available vehicle. Based on the three conditions, it will calculate the endurance of the current remaining power of the current vehicle and the estimated charging time of the current vehicle.

[0073] The formula for calculating the current remaining battery life of the car is:

[0074]

[0075] Among them, T is the current remaining battery life of the current car, T1 is the full battery life of the AGV car, and X is the current remaining battery life of the car. For example, the full battery life of car No. 1 is 360 minutes, and the current remaining battery life is 60. Substitute it into formula 1 It is calculated that the current remaining battery life of the car is 216 minutes.

[0076] The formula for calculating the estimated charging time of the current car is:

[0077]

[0078] Among them, T is the estimated charging time of the current car, T2 is the total time required to fully charge, and X is the current power of the car. For example, if the total time required to fully charge car No. 1 is 90 minutes and the current remaining power is 60, substitute it into the formula It is calculated that the current estimated charging time for the car is 36 minutes.

[0079] S22. According to the calculation in step S21, the current remaining battery life and the estimated charging time of all current vehicles can be obtained. According to the relationship between the vehicle endurance alarm time and the current remaining battery life and the estimated charging time between the vehicles, it is determined whether the critical charging condition is met.

[0080] Among them, the charging criticality is defined as the system will check whether there is an AGV in the available vehicle queue whose estimated endurance time or current remaining battery life is less than or equal to the endurance alarm time.

[0081] If so, it is determined that the available vehicle queue meets the critical charging condition; if not, it is determined that it does not meet the critical charging condition.

[0082] If car 1 and car 2 are both fully charged, car 3 has 40 remaining power when it is turned on, which is the lowest power, and is scheduled to go for charging. After executing a task, the scheduling system calculates the current remaining power endurance and estimated charging time between the cars. If the current remaining power of car 1 is 80, the current remaining power endurance is 288 minutes, and the estimated charging time is 18 minutes. The current remaining power of car 2 is 79, and the current remaining power endurance is 284 minutes, and the estimated charging time is 19 minutes. Car 3 is in the charging state. The scheduling system uses the endurance alarm time as a condition to calculate that if car 2 goes to charge and is fully charged, the estimated endurance of car 1 is 288-19=269 minutes. The judgment is based on the critical charging condition, that is, checking whether there is an AGV car with the estimated endurance or the current remaining power endurance in the available vehicle queue. The time is lower than or equal to the endurance warning time. After calculation, the estimated endurance time of vehicle No. 1 is 269 minutes and the current remaining battery endurance time is 288 minutes, both of which are greater than the endurance warning time. At this time, the critical charging condition is not met. After executing a task for a long time, the battery of vehicle No. 1 is 32, the current remaining battery endurance time is 115 minutes, and the estimated charging time is 61 minutes. The current remaining battery of vehicle No. 2 is 29, the current remaining battery endurance time is 104 minutes, and the estimated charging time is 65 minutes. Vehicle No. 3 is in a fully charged standby state at the charging pile. At this time, it is calculated that if vehicle No. 2 goes to charge and is fully charged, the estimated endurance time of vehicle No. 1 is 115-65=50 minutes. Based on the critical charging condition, it is judged that the estimated endurance time of vehicle No. 1 is 50 minutes after calculation, which is equal to the endurance warning time. At this time, the critical charging condition is met.

[0083] S3. Receive tasks issued by WMS, allocate tasks, and determine whether the available vehicle queue meets the critical charging conditions.

[0084] S31, the WMS host system sends task information to the scheduling system by calling the task interface provided by the scheduling system. After receiving the task information, the scheduling system allocates the task according to the principle of giving priority to the AGV with the highest power and closest to the task point based on the criticality of charging;

[0085] If it is detected that the available vehicle queue meets the critical charging condition, that is, there is an AGV in the available vehicle queue with an estimated endurance time lower than or equal to the endurance alarm time, the vehicle with the lowest power in the available vehicle queue will be suspended from receiving tasks, and the remaining available vehicles can continue to perform tasks. The AGVs ready to charge will be rescheduled and assigned tasks, the charging resource lock will be released, and the AGV with the lowest power will be dispatched to charge and obtain the charging resource lock.

[0086] S4. Through the above steps, the optimization method for realizing AGV off-peak charging is used. Compared with the automatic charging scheduling method of the previous scheduling system, it can combine the estimated current remaining power endurance and charging time, and perform reasonable charging scheduling based on the charging criticality, thereby realizing off-peak charging, ensuring vehicle demand and power endurance, and solving the problem of AGV queuing for charging congestion, thereby maximizing the satisfaction of production needs.

[0087] Example 4

[0088] According to an embodiment of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for charging a movable device.

[0089] Example 5

[0090] According to an embodiment of the present application, a mobile device charging system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include means for executing any one of the methods described above.

[0091] Example 6

[0092] According to an embodiment of the present application, a processor is provided, and the processor is used to run a program, wherein the above-mentioned movable device charging method is executed when the above-mentioned program is run.

[0093] Example 7

[0094] An embodiment of the present invention provides a device, the device including a processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the following steps are implemented:

[0095] Step S101, obtaining the initial power of all movable devices in a preset area;

[0096] Step S102, selecting a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and controlling the charging piles to charge the target mobile devices, the preset number being equal to the number of the charging piles in the preset area, and the charging piles corresponding to the target mobile devices one by one;

[0097] Step S103, after a predetermined period of time, determining whether the non-target movable device in operation meets a preset condition, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration;

[0098] Step S104, when the preset conditions are met, the non-target movable device is controlled to suspend the operation, and the target movable device is controlled to execute the operation that the non-target movable device intends to execute.

[0099] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0100] Example 8

[0101] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:

[0102] Step S101, obtaining the initial power of all movable devices in a preset area;

[0103] Step S102, selecting a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and controlling the charging piles to charge the target mobile devices, the preset number being equal to the number of the charging piles in the preset area, and the charging piles corresponding to the target mobile devices one by one;

[0104] Step S103, after a predetermined period of time, determining whether the non-target movable device in operation meets a preset condition, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration;

[0105] Step S104, when the preset conditions are met, the non-target movable device is controlled to suspend the operation, and the target movable device is controlled to execute the operation that the non-target movable device intends to execute.

[0106] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0107] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0108] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0109] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0110] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0111] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0112] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0113] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0114] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0115] 1) The mobile device charging method of the present application obtains the initial power of all mobile devices in a preset area, and then sorts them in order from low to high according to the initial power, selects the mobile devices with relatively low initial power to charge first, and then monitors whether the power of other devices is relatively low after a predetermined time period. If the power is relatively low, the power is replenished in time, and the devices with higher power are controlled to perform tasks, so as to achieve peak-shifting charging while ensuring that production needs are met.

[0116] 2) In the mobile device charging device of the present application, the first acquisition unit acquires the initial power of all mobile devices in a preset area, the processing unit sorts them in order from low to high according to the initial power, and selects the mobile devices with relatively low initial power to charge first, and the first determination unit determines whether the power of other devices is relatively low after a predetermined time period. If it is relatively low, the first control unit replenishes the power in time and controls the devices with higher power to perform tasks, thereby achieving staggered charging while ensuring that production needs are met.

[0117] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for charging a mobile device, It is characterized in that include: Get the initial power of all removable devices in a preset area; Selecting a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and controlling the charging piles to charge the target mobile devices, the preset number being equal to the number of the charging piles in the preset area, and the charging piles corresponding to the target mobile devices one by one; After a predetermined period of time, determining whether the non-target movable device in operation meets a preset condition, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration; When the preset condition is met, the non-target mobile device is controlled to suspend the operation, and the target mobile device is controlled to perform the operation that the non-target mobile device intends to perform; Wherein, the method further comprises: Obtaining an estimated charging time for each of the non-target mobile devices, where the estimated charging time refers to the time it takes for the non-target mobile device to charge from a current remaining power to a full power; Determine the estimated battery life of the first non-target mobile device according to the battery life of the current remaining power of the non-target mobile device and the estimated charging time, wherein the estimated battery life of the first non-target mobile device refers to the remaining battery life of the first non-target mobile device when the second non-target mobile device is charged to full power from the current moment, wherein the battery life of the current remaining power of the first non-target mobile device is greater than the battery life of the current remaining power of the second non-target mobile device; When the estimated endurance time of the first non-target movable device is less than the preset duration, controlling the second non-target movable device to temporarily operate; Controlling the fully charged target movable device to execute the operation to be executed by the second non-target movable device; After controlling the second non-target movable device to temporarily operate, the method further includes: Controlling the second non-target movable device to move to an idle charging pile closest to the second non-target movable device; The idle charging pile closest to the second non-target movable device is controlled to charge the second non-target movable device.

2. The method according to claim 1, It is characterized in that Obtaining an estimated charging time for each of the non-target mobile devices, including: Obtaining the total time required to fully charge each of the non-target mobile devices; Obtaining the percentage of the current remaining power of each of the non-target removable devices to the full power; The estimated charging time of each of the non-target movable devices is determined according to the total time required for full charging and the percentage.

3. The method according to any one of claims 1 or 2, It is characterized in that When the preset condition is met, controlling the non-target mobile device to suspend the operation, and controlling the target mobile device to perform the operation that the non-target mobile device intends to perform, includes: When the preset condition is met and the target movable device is fully charged, controlling the target movable device to execute the operation that the non-target movable device intends to execute; When the preset condition is met and the target mobile device is not fully charged, controlling the target mobile device to temporarily charge and controlling the target mobile device to perform the operation that the non-target mobile device intends to perform; The method further comprises: After controlling the target movable device to suspend charging, controlling the non-target movable device that meets the preset condition to move to an idle charging pile, and controlling the idle charging pile to charge the non-target movable device.

4. The method according to any one of claims 1 or 2, It is characterized in that The method further comprises: Obtaining the percentage of the current remaining power of each of the removable devices to the full power and the full-power endurance of each of the removable devices; The battery life of the current remaining power of each of the movable devices is determined according to the percentage and the full-power battery life.

5. A charging device for a mobile device, It is characterized in that include: A first acquisition unit, used to acquire the initial power of all movable devices in a preset area; a processing unit, configured to select a preset number of target mobile devices from the plurality of mobile devices in the order of the initial power from low to high, and control the charging piles to charge the target mobile devices, wherein the preset number is equal to the number of the charging piles in the preset area, and the charging piles correspond to the target mobile devices one by one; A first determination unit is used to determine whether the non-target movable device in operation meets a preset condition after a predetermined time period, wherein the preset condition includes: the battery life of the current remaining power of the non-target movable device is less than a preset duration; A first control unit is used to control the non-target movable device to suspend operation and control the target movable device to perform the operation that the non-target movable device intends to perform when the preset condition is met; The device also includes a second acquisition unit and a second determination unit, the second acquisition unit is used to acquire the estimated charging time of each of the non-target movable devices, the estimated charging time refers to the time taken for the non-target movable device to be charged from the current remaining power to the full power; the second determination unit is used to determine the estimated battery life of the first non-target movable device according to the battery life of the current remaining power of the non-target movable device and the estimated charging time, the estimated battery life of the first non-target movable device refers to the remaining battery life of the first non-target movable device when the second non-target movable device is charged to the full power from the current moment, wherein the battery life of the current remaining power of the first non-target movable device is greater than the battery life of the current remaining power of the second non-target movable device; The device further includes a second control unit and a third control unit, wherein the second control unit is used to control the second non-target mobile device to temporarily perform an operation when the estimated endurance time of the first non-target mobile device is less than the preset duration; and the third control unit is used to control the fully charged target mobile device to perform the operation that the second non-target mobile device intends to perform; The device also includes a fourth control unit and a fifth control unit. The fourth control unit is used to control the second non-target movable device to move to an idle charging pile closest to the second non-target movable device after controlling the second non-target movable device to temporarily operate; the fifth control unit is used to control the idle charging pile closest to the second non-target movable device to charge the second non-target movable device.

6. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 4.

7. A mobile device charging system, It is characterized in that include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of claims 1 to 4.