A method for controlling the arc frame opening in the aircraft canopy remanufacturing process
In the process of remanufacturing of the aircraft canopy, the method of positioning and fixing, adjusting the thickness of the intermediate layer, filling sealant and progressive installation bolts is solved, and the problem of difficulty in controlling the arc frame opening is achieved. Control and installation reliability simplify the production process.
Patent Information
- Application Number
- CN202210996138.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-08-19
AI Technical Summary
During the remanufacturing of the aircraft canopy, the arc frame opening is difficult to control. The existing methods cannot ensure that no obvious internal stress is generated after the bolt is installed, resulting in the arc frame opening being uncontrollable, affecting the normal installation of the canopy.
Through the steps of positioning and fixing of the canopy cover skeleton, adjusting the thickness of the arc frame intermediate layer, excessive filling of sealant, installing positioning bolt sets, progressive installation of arc frame bolts, curing, fastening and loosening inspection, ensure that the bolt holes of arc frame are the same The shaft reduces the internal stress of the assembly and achieves controllable arc frame opening.
It realizes the minimization of internal stress in assembly, controllable arc frame opening, improves the reliability and installation efficiency of canopy remanufacturing, avoids complex mechanical knowledge operations, and simplifies the production process.
Smart Images

Figure CN115384806B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of aerospace technology and relates to an arc frame opening control method in a remanufacturing process of an aircraft canopy. Background Art
[0002] 1. Aircraft canopy remanufacturing
[0003] Military aircraft canopy( Figure 1 ) is generally made of organic polymer transparent materials, which have good processing properties, light weight, and high specific strength, and are ideal cockpit cover glass materials. However, the cockpit cover glass made of such organic polymer transparent materials has the characteristics of short life, easy damage, and difficult repair. After the aircraft is put into use for a period of time, it is usually necessary to remanufacture the cockpit cover including glass replacement on the basis of retaining the original cockpit cover metal frame 102.
[0004] 2. Changes in the opening of the canopy arc frame
[0005] The appearance of a conventional aircraft canopy is usually a semi-cylindrical hollow structure, and at least one of the front and rear ends is a nearly semi-circular arc frame structure 103. The appearance of such an arc frame structure is usually not restricted by other structural parts, has a high degree of freedom, and the arc frame opening 104 is very easy to change. When the canopy is first manufactured, the canopy is assembled first, and then the various connecting parts are installed. Therefore, if the arc frame opening changes due to assembly, it will not affect the installation of the canopy on the aircraft; when the canopy is remanufactured, the original aircraft canopy frame is used. Therefore, if the arc frame opening changes due to assembly, the installation position of each connecting part cannot be adjusted, which will cause the canopy to be unable to be installed normally on the original fuselage.
[0006] 3. Existing cockpit cover arc frame opening control method
[0007] The canopy arc frame is usually composed of a multi-layer arc structure consisting of an inner arc frame 201, an outer arc skin 202 and an intermediate layer of cleaning rods / polyester ribbons 203 ( Figure 2 ). It is known that the reason for the assembly internal stress during the remanufacturing of the canopy is that after assembly, the bolt mounting holes 204 between different parts of the multi-layer arc-shaped structure are offset (coaxiality difference), resulting in local torsional stress at the bolt 205 after assembly ( Figure 3 ), the overall arc frame deformation caused by the accumulation of local stresses in multiple places ( Figure 4 ).
[0008] At present, the main method adopted for controlling the opening of the canopy arc frame is to conduct multiple inspections before assembly, replace the middle layer cleaning rod and change its thickness, or install a layer of arc-shaped metal strip, rubber sheet or polyester acrylic sheet between the middle layer cleaning rod and the outer arc skin to adjust the thickness of the middle layer, thereby improving the coaxiality between the bolt holes of the inner arc frame and the outer arc skin, thereby reducing the internal stress of the assembly.
[0009] However, the existing cockpit cover arc frame opening control method can only roughly determine the required increase or decrease mode of the arc frame middle layer parts according to the overall trend of the original bolt hole axis deviation of the inner and outer parts of the arc frame, but cannot specifically determine the optimal thickness of the middle layer parts, and needs to constantly change the thickness of the middle layer parts for repeated inspection and assembly attempts. At the same time, this method cannot take into account the hole axis deviation of each bolt position, and can only reduce the number of bolts that generate local internal stress to a certain extent, or reduce the assembly internal stress of some of the bolt positions, and cannot fully achieve the expected effect of minimizing the assembly internal stress and controlling the cockpit cover arc frame opening.
[0010] Based on this, the present invention aims to provide a method for ensuring that each bolt in the arc frame of the canopy does not generate obvious internal stress after installation during the canopy remanufacturing process, thereby ensuring that the arc frame opening is controllable after the canopy remanufacturing work is completed. Summary of the invention
[0011] The purpose of the present invention is to provide a method for controlling the opening of an arc frame in the remanufacturing process of an aircraft canopy, which is mainly aimed at the remanufacturing of a conventional aircraft canopy with a semi-cylindrical hollow structure and at least one of the front and rear ends being a nearly semi-circular arc frame structure. The steps are mainly divided into positioning and fixing the canopy frame, adjusting the thickness of the arc frame middle layer, overfilling the sealant, installing the positioning bolt group, progressively installing the arc frame bolts, curing, tightening, loosening and checking, etc. The process design is shown in FIG. Figure 5 .
[0012] The technical solution of the present invention is:
[0013] A method for controlling the arc frame opening in a remanufacturing process of an aircraft canopy comprises the following steps:
[0014] (1) Positioning and fixing of canopy frame
[0015] Before the canopy remanufacturing work is carried out, the canopy's on-board matching status should be checked, and the original shape feature dimensions of the canopy should be measured and recorded. The canopy should be disassembled according to the existing method, and after the new glass is made, the records should be checked. If the original shape features of the canopy match the fuselage, the canopy frame shape should be adjusted according to the original shape of the canopy and positioned and fixed; if the original shape features of the canopy do not match the fuselage, the canopy frame should be adjusted in a targeted manner and then positioned and fixed.
[0016] (2) Adjust the thickness of the arc frame middle layer
[0017] Check the parts status of the middle layer of the original cockpit canopy arc frame. If the thickness of the original machine's cleaning rod does not meet the requirements of the drawing, or a thickness adjustment pad is installed between the cleaning rod / polyester belt assembly and the skin, all adjustment pads should be removed and the cleaning rod should be replaced according to the drawing requirements. According to the structural characteristics and design requirements of the cockpit canopy arc frame, the sealant is not filled between the arc frame parts at this time, which can ensure that the total thickness of the cleaning rod / polyester belt must be slightly less than the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial.
[0018] (3) Excessive filling of sealant
[0019] The canopy assembly work is performed according to the existing method. The sealant is overfilled between the parts of the canopy arc frame structure to ensure that the total thickness of the cleaning rod / polyester ribbon and the sealant is significantly greater than the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial.
[0020] (4) Install the positioning bolt assembly
[0021] Select the reference bolt at the arc frame. If the total number of bolts installed at the arc frame is an odd number, select the bolt in the middle as the reference bolt; if the total number of bolts installed at the arc frame is an even number, select any one of the two bolts in the middle as the reference bolt.
[0022] According to the existing method, align and assemble the canopy glass (with cleaning strip / polyester ribbon) and the outer arc skin at the canopy arc frame with the above-mentioned reference bolt position as the reference, insert the reference bolt, adjust the position and angle of the canopy glass, cleaning strip, outer arc skin and other parts, ensure that the reference bolt can rotate freely without tightness, and ensure that the parts of each layer at the arc frame have no position deviation such as torsion. Insert 2 installation bolts on both sides of the reference bolt (due to excessive filling of sealant, the deviation of the bolt hole increases hole by hole, and too many bolts cannot be inserted at this time), together with the reference bolt to form a 5-piece positioning bolt group, gently screw the installation nut onto these 5 bolts, and do not tighten them for the time being.
[0023] Tighten the second bolt on the left and right sides of the reference bolt one by one (no more than half a turn each time) and synchronously. The reference bolt should always be able to rotate freely during the whole tightening process, and after each tightening, immediately check whether the first bolt on the left and right sides of the reference bolt can rotate freely. When it is found that the first bolt on the left and right sides of the reference bolt can rotate freely (that is, the bolt holes of the inner and outer arc parts are coaxial), stop tightening the second bolt on the left and right sides of the reference bolt, without having to consider whether the bolts are securely installed.
[0024] Tighten the reference bolt and the first bolts on the left and right sides until the nut just touches the arc frame parts. At this time, the reference bolt and the first bolts on the left and right sides can rotate freely, proving that the total thickness of the arc frame middle layer cleaning rod / polyester ribbon and sealant near these three bolts is just the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial, which can ensure that no assembly internal stress is generated at these three bolts.
[0025] (5) Progressive installation of arc frame bolts
[0026] Insert the third bolt on the left and right sides of the reference bolt, screw in the nut and start tightening slowly (the two bolts can be tightened simultaneously or one by one, and each tightening should not exceed half a turn). After each tightening, immediately check whether the second bolt on the left and right sides of the reference bolt can rotate freely. When it is found that the second bolt on the left and right sides of the reference bolt can rotate freely (that is, the bolt holes of the inner and outer arc parts are coaxial), stop tightening the third bolt on the left and right sides of the reference bolt, regardless of whether the bolt is securely installed. Check whether there is a gap between the installation nut of the second bolt on the left and right sides of the reference bolt and the arc frame part. If there is a gap, tighten the second bolt on the left and right sides of the reference bolt until the nut just touches the arc frame part.
[0027] According to the above method, insert and tighten the remaining mounting bolts at the arc frame one by one. When tightening the newly inserted bolts, stop tightening immediately when you find that the bolts tightened in the previous step can rotate freely. Check whether there is a gap between the mounting nut of the bolt tightened in the previous step and the arc frame part. If there is a gap, tighten it until the nut just touches the arc frame part.
[0028] At this time, all bolts at the canopy arc frame can rotate freely, the bolt mounting holes of the parts at each layer of the arc frame are coaxial, no obvious internal stress is generated at each bolt position, and the total thickness of the cleaning rod / polyester ribbon and sealant in the middle layer of the arc frame is the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial. Keep the semi-tightened state of the mounting bolts at the arc frame unchanged, and assemble the mounting bolts of the parts outside the arc frame according to the existing method.
[0029] (6) Curing
[0030] Keep the canopy frame firmly positioned and fixed on the special tooling, and perform curing work in accordance with relevant sealant standards.
[0031] (7) Fastening
[0032] After the sealant is cured, tighten the mounting bolts at the arc frame as required. If the mounting bolts at the arc frame involve the airtightness of the cabin, it is necessary to ensure that the bolts do not rotate during the tightening process, otherwise the bolts need to be disassembled, reinstalled with sealant, and re-applied with sealant at all mounting nuts at the arc frame.
[0033] (8) Loosening inspection
[0034] Loosen the fixtures that position and fix the canopy on the special tooling, and measure and check the canopy arc frame opening. If the canopy frame is positioned and fixed according to the original aircraft appearance characteristics before assembly, the canopy arc frame opening will usually not change after loosening because no obvious internal stress is generated at the arc frame during the remanufacturing process; if the canopy frame appearance is adjusted and positioned and fixed before assembly, and the canopy frame has a rebound tendency, since the axis of the bolt installation holes of each layer of parts at the arc frame during the remanufacturing process does not produce obvious deviations, the rebound tendency of the canopy frame after loosening will be hindered by the reverse internal stress generated at each bolt hole, and ultimately reduce or even eliminate the change in the canopy arc frame opening after loosening.
[0035] If the arc frame opening is significantly different from the expected size and the canopy cannot be installed normally on the fuselage, it proves that the canopy frame rebounds and has a large rebound stress, and the strength of the sealant cannot effectively prevent the rebound of the canopy after it is loosened. In this case, the canopy should be replaced as a whole to prevent the large rebound stress after forced assembly from damaging the canopy glass and posing a flight safety hazard.
[0036] Beneficial effects of the present invention:
[0037] (1) The present invention analyzes the relationship between the local assembly stress and the overall deformation of the canopy arc frame structure, and proposes a theory that by ensuring that all bolt holes of the inner and outer layers of the arc frame are coaxial, the desired effects of minimizing the internal assembly stress and controlling the opening of the canopy arc frame can be achieved, thereby clarifying the defects of the original assembly method and the direction of improvement.
[0038] (2) The present invention abandons the original cockpit cover arc frame opening control method, which first determines the total thickness of the arc frame middle layer parts and then assembles them; instead, it adopts the method of assembling first, adjusting the bolt tightness to squeeze the sealant to flow, and automatically adjusting the thickness to a reasonable gradual state, so as to achieve the ideal expected effect of coaxial bolt holes at all mounting bolt positions, improve the controllability of the cockpit cover arc frame opening, and ensure that the cockpit cover can be smoothly installed on the fuselage after remanufacturing.
[0039] (3) When the canopy is remanufactured according to the method of the present invention, it is not necessary to repeatedly try to inspect and assemble to determine the optimal thickness of the arc frame middle layer parts before assembly. The assembly work can be carried out directly, and the total thickness of the arc frame middle layer can be formed in one step, thereby significantly improving work efficiency.
[0040] (4) The method described in the present invention does not require effort to directly control the total thickness of the arc frame middle layer parts. It only needs to pay attention to whether each bolt can rotate freely when installing the bolts. The operation is simple and the effect is significant. It does not require the operator to master complex mechanical knowledge and can solve complex and difficult problems in the production process, which is conducive to the implementation and promotion of the method. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1Schematic diagram of the appearance features of a traditional aircraft canopy.
[0042] Figure 2 It is a schematic diagram of the cross-section of the canopy arc frame structure.
[0043] Figure 3 Schematic diagram of local internal stress in the canopy arc frame.
[0044] Figure 4 Schematic diagram of local internal stress accumulation and opening change of the arc frame.
[0045] Figure 5 Remanufacture arc frame opening control flow chart for the canopy.
[0046] Figure 6 This is a schematic diagram of the installation status of the positioning bolt group.
[0047] Figure 7 This is the effect diagram of all the bolt holes of the inner and outer parts of the arc frame being coaxial.
[0048] In the figure: 101 glass parts; 102 metal frame; 103 arc frame structure; 104 arc frame opening; 201 inner arc frame; 202 outer arc skin; 203 cleaning rod / polyester ribbon; 204 bolt mounting hole; 205 bolt; 601 reference bolt; 602 reference bolt left and right first bolt; 603 reference bolt left and right second bolt; 604 reference bolt left and right third bolt. DETAILED DESCRIPTION
[0049] The specific implementation of the present invention is further explained below in conjunction with the examples and drawings, but is not intended to limit the present invention.
[0050] like Figure 5 As shown, the present invention provides a method for controlling the arc frame opening in the aircraft canopy remanufacturing process, and the steps are mainly divided into positioning and fixing the canopy frame, adjusting the thickness of the arc frame middle layer, overfilling the sealant, installing the positioning bolt group, progressively installing the arc frame bolts, curing, tightening, loosening and checking, etc.; the specific steps are as follows:
[0051] (1) Positioning and fixing of canopy frame
[0052] The canopy of this model aircraft has an arc frame structure only at the front end ( Figure 1 ). Before the canopy remanufacturing work is carried out, the canopy's on-machine matching status is checked, and the original shape feature dimensions of the canopy are measured and recorded. The canopy is disassembled according to the existing method, and after the new glass is produced, the records are checked. If the original shape features of the canopy are in good matching with the fuselage, the canopy frame shape is adjusted and positioned and fixed on the special tooling according to the original shape of the canopy; if the original shape features of the canopy are not in good matching with the fuselage, the canopy frame is adjusted on the special tooling and then positioned and fixed.
[0053] (2) Adjust the thickness of the arc frame middle layer
[0054] Check the parts status of the original machine's middle layer cleaning rod. If the original machine's cleaning rod thickness does not meet the requirements of the drawing, or a thickness adjustment pad is installed between the cleaning rod / polyester belt assembly and the skin, all adjustment pads should be removed and the cleaning rod should be replaced according to the drawing requirements. According to the structural characteristics and design requirements of the cockpit cover arc frame, the sealant is not filled between the arc frame parts at this time, which can ensure that the total thickness of the cleaning rod / polyester belt must be less than the ideal thickness of the middle layer when all the bolt holes of the inner and outer arc parts are coaxial.
[0055] (3) Excessive filling of sealant
[0056] The canopy assembly work is performed according to the existing method. The sealant is overfilled between the parts of the canopy arc frame structure to ensure that the total thickness of the cleaning rod / polyester ribbon and the sealant is significantly greater than the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial.
[0057] (4) Install the positioning bolt assembly
[0058] Select the reference bolt at the arc frame. Since the total number of bolts installed at the arc frame of the cockpit canopy of this model aircraft is an odd number, the middle bolt is selected as the reference bolt 601 ( Figure 6 ).
[0059] According to the existing method, the cockpit cover glass (with cleaning strip / polyester ribbon) and the outer arc skin of the cockpit cover arc frame are aligned and assembled with the above-mentioned reference bolt 601 position as the reference, and the reference bolt 601 is inserted to adjust the position and angle of the cockpit cover glass, cleaning strip, outer arc skin and other parts to ensure that the reference bolt 601 can rotate freely without tightness and to ensure that the parts of each layer at the arc frame have no position deviation such as torsion. Insert 2 installation bolts on both sides of the reference bolt (due to excessive filling of sealant, the deviation of the bolt hole increases hole by hole, and too many bolts cannot be inserted at this time), and together with the reference bolt, form a 5-piece positioning bolt group, and gently screw the installation nut onto these 5 bolts, and do not tighten them temporarily.
[0060] Tighten the second bolts 603 on the left and right sides of the reference bolt one by one (no more than half a turn each time) and synchronously. During the whole tightening process, the reference bolt 601 should always be able to rotate freely. After each tightening, immediately check whether the first bolts 602 on the left and right sides of the reference bolt can rotate freely. When it is found that the first bolts 602 on the left and right sides of the reference bolt are able to rotate freely (that is, the bolt holes of the inner and outer arc parts are coaxial), stop tightening the second bolts 603 on the left and right sides of the reference bolt, without having to consider whether the bolts are securely installed.
[0061] Tighten the reference bolt 601 and the first bolts 602 on the left and right sides until the nuts just touch the arc frame parts. At this time, the reference bolt and the first bolts on the left and right sides can rotate freely, proving that the total thickness of the arc frame middle layer cleaning rod / polyester ribbon and sealant near these three bolts is just the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial, which can ensure that no assembly internal stress is generated at these three bolts.
[0062] (5) Progressive installation of arc frame bolts
[0063] Insert the third bolt 604 on the left and right sides of the reference bolt, screw in the nut and start tightening slowly (the two bolts 604 can be tightened synchronously or one by one, and each tightening should not exceed half a turn). After each tightening, immediately check whether the second bolt 603 on the left and right sides of the reference bolt can rotate freely. When it is found that the second bolt 603 on the left and right sides of the reference bolt can rotate freely (that is, the bolt holes of the inner and outer arc parts are coaxial), stop tightening the third bolt 604 on the left and right sides of the reference bolt, and do not need to consider whether the bolt is installed securely. Check whether there is a gap between the installation nut of the second bolt 603 on the left and right sides of the reference bolt and the arc frame part. If there is a gap, tighten the second bolt 603 on the left and right sides of the reference bolt until the nut just contacts the arc frame part.
[0064] According to the above method, insert and tighten the remaining mounting bolts at the arc frame one by one. When tightening the newly inserted bolts, stop tightening immediately when you find that the bolts tightened in the previous step can rotate freely. Check whether there is a gap between the mounting nut of the bolt tightened in the previous step and the arc frame part. If there is a gap, tighten it until the nut just touches the arc frame part.
[0065] At this time, all bolts on the canopy arc frame can rotate freely, and the bolt mounting holes of each layer of the arc frame parts are coaxial ( Figure 7 ), no obvious internal stress is generated at each bolt position, and the total thickness of the arc frame middle layer cleaning rod / polyester ribbon and sealant is the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial. Keep the semi-tightened state of the mounting bolts at the arc frame unchanged, and assemble the mounting bolts at the parts other than the arc frame according to the existing method.
[0066] (6) Curing
[0067] Keep the canopy frame firmly positioned and fixed on the special tooling, and perform curing work in accordance with relevant sealant standards.
[0068] (7) Fastening
[0069] After the sealant is cured, tighten the mounting bolts at the arc frame according to the fixed force assembly requirements specified in the cockpit cover drawing of this model of aircraft. Because the mounting bolts of the cockpit cover arc frame of this model do not involve the airtightness of the cockpit, it is not necessary to restrict the rotation of the bolts in the bolt holes when tightening, and it is not necessary to reapply sealant.
[0070] (8) Loosening inspection
[0071] Loosen the fixtures that position and fix the canopy on the special tooling, and measure and check the canopy arc frame opening. If the canopy frame is positioned and fixed according to the original aircraft appearance characteristics before assembly, the canopy arc frame opening will usually not change after loosening because no obvious internal stress is generated at the arc frame during the remanufacturing process; if the canopy frame appearance is adjusted and positioned and fixed before assembly, and the canopy frame has a rebound tendency, since the axis of the bolt installation holes of each layer of parts at the arc frame during the remanufacturing process does not produce obvious deviations, the rebound tendency of the canopy frame after loosening will be hindered by the reverse internal stress generated at each bolt hole, and ultimately reduce or even eliminate the change in the canopy arc frame opening after loosening.
[0072] After loosening, if the arc frame opening is significantly different from the expected size, the canopy cannot be installed normally on the fuselage, indicating that the canopy frame has a large rebound amount and rebound stress, and the strength of the sealant cannot effectively prevent the rebound of the canopy after loosening. At this time, the canopy should be replaced as a whole to prevent the large rebound stress after forced assembly from damaging the canopy glass and leaving a flight safety hazard.
Claims
1. A method for controlling the arc frame opening in the aircraft canopy remanufacturing process, It is characterized in that The method comprises the following steps: (1) Positioning and fixing of the canopy frame Before the canopy remanufacturing work is carried out, the canopy's on-board matching status is checked, and the original shape feature dimensions of the canopy are measured and recorded; the canopy is disassembled according to the existing method, and after the new glass is made, the records are checked. If the original shape features of the canopy match the fuselage, the shape of the canopy frame is adjusted according to the original shape of the canopy and fixed in position; if the original shape features of the canopy do not match the fuselage, the canopy frame is adjusted in a targeted manner and then fixed in position; (2) Adjust the thickness of the arc frame middle layer Check the parts status of the middle layer cleaning rod of the original cockpit canopy arc frame. If the thickness of the original cleaning rod does not meet the requirements of the drawing, and a thickness adjustment pad is added between the cleaning rod or polyester belt assembly and the skin, then all adjustment pads should be removed and a new cleaning rod should be replaced according to the requirements of the drawing. According to the structural characteristics and design requirements of the cockpit canopy arc frame, at this time, no sealant is filled between the arc frame parts, and the total thickness of the cleaning rod or polyester belt is less than the ideal thickness of the middle layer when all the bolt holes of the inner and outer arc parts are coaxial. (3) Excessive filling of sealant Carry out the canopy assembly work; excessively fill the sealant between the parts of the canopy arc frame structure. At this time, the total thickness of the cleaning rod or polyester ribbon and the sealant is greater than the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial; (4) Install the positioning bolt assembly Select the reference bolt at the arc frame: If the total number of bolts installed at the arc frame is an odd number, select the middle bolt as the reference bolt; if the total number of bolts installed at the arc frame is an even number, select any one of the two middle bolts as the reference bolt; Align and assemble the canopy glass with cleaning rod or polyester ribbon and the outer arc skin of the canopy arc frame with the above-mentioned reference bolt position as the reference, insert the reference bolt, adjust the position and angle of the canopy glass, cleaning rod and outer arc skin, the reference bolt can rotate freely without being tight, and there is no torsional position deviation of the parts of each layer at the arc frame; insert 2 installation bolts on both sides of the reference bolt, which together with the reference bolt form a 5-piece positioning bolt group, screw the installation nuts onto these 5 bolts, and do not tighten them temporarily; Tighten the second bolts on the left and right sides of the reference bolts one by one and synchronously. The reference bolts should be kept free to rotate during the whole tightening process. After each tightening, check whether the first bolts on the left and right sides of the reference bolts can rotate freely. If it is found that the first bolts on the left and right sides of the reference bolts have rotated freely, stop tightening the second bolts on the left and right sides of the reference bolts. Tighten the reference bolt and the first bolts on the left and right sides until the nut just touches the parts at the arc frame; at this time, the reference bolt and the first bolts on the left and right sides can rotate freely, and the total thickness of the arc frame middle layer cleaning rod or polyester ribbon and sealant near these three bolts is the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial, and no assembly internal stress is generated at these three bolts; (5) Progressive installation of arc frame bolts Insert the third bolt on the left and right sides of the reference bolt, screw in the nut and start to tighten slowly. After each tightening, immediately check whether the second bolt on the left and right sides of the reference bolt can rotate freely. When it is found that the second bolt on the left and right sides of the reference bolt has rotated freely, stop tightening the third bolt on the left and right sides of the reference bolt; check whether there is a gap between the installation nut of the second bolt on the left and right sides of the reference bolt and the arc frame part. If there is a gap, tighten the second bolt on the left and right sides of the reference bolt until the nut just touches the arc frame part; According to the above method, insert and tighten the remaining installation bolts at the arc frame one by one. When tightening the newly inserted bolts, stop tightening immediately when you find that the bolts tightened in the previous step rotate freely; check whether there is a gap between the installation nut of the bolt tightened in the previous step and the arc frame parts. If there is a gap, tighten it until the nut just touches the arc frame parts; At this time, all bolts at the arc frame of the cockpit cover can rotate freely, the bolt mounting holes of the parts of each layer of the arc frame are coaxial, no obvious internal stress is generated at each bolt position, and the total thickness of the cleaning rod or polyester ribbon and sealant in the middle layer of the arc frame is the ideal thickness of the middle layer when the bolt holes of the inner and outer arc parts are all coaxial; keep the semi-tightened state of the mounting bolts at the arc frame unchanged, and assemble the mounting bolts of the parts other than the arc frame according to the existing method; (6) Curing Keep the canopy frame firmly positioned and fixed on the special tooling and perform the curing work; (7) Tightening After the sealant is cured, tighten the mounting bolts at the arc frame as required; (8) Loosening inspection Loosen the clamps that position and fix the canopy on the special tooling, and measure and check the opening of the canopy arc frame.
2. The method according to claim 1, It is characterized in that In step (7), if the mounting bolts at the arc frame are related to the airtightness of the cabin, ensure that the bolts do not rotate during the entire process of tightening. Otherwise, disassemble the bolts, reinstall them with sealant, and re-apply sealant to all mounting nuts at the arc frame.
3. The method according to claim 1 or 2, It is characterized in that When measuring and checking the canopy arc frame opening in the step (8), if the canopy frame is positioned and fixed according to the original aircraft shape characteristics before assembly, since no obvious internal stress is generated at the arc frame during the remanufacturing process, the canopy arc frame opening will not change after loosening; if the canopy frame shape is adjusted and positioned and fixed before assembly, the canopy frame has a rebound tendency, since no obvious deviation is generated in the axis of the bolt mounting holes of each layer of parts at the arc frame during the remanufacturing process, the rebound tendency of the canopy frame after loosening will be hindered by the reverse internal stress generated at each bolt hole, thereby reducing the change in the canopy arc frame opening after loosening; if the arc frame opening is significantly different from the expected size, the canopy cannot be normally installed on the fuselage, proving that the canopy frame rebound amount and rebound stress are large, and the strength of the sealant cannot effectively hinder the rebound of the canopy after loosening, then the canopy is replaced as a whole to prevent the rebound stress after forced assembly from damaging the canopy glass and leaving a flight safety hazard.