A method for changing cutters at normal pressure in rock jacking pipe under high water pressure

By setting up a shield tail brush at the tail of the pipe jacking machine for grouting and water-stopping, the tool changing operation of rock pipe jacking can be carried out in a normal pressure environment, and the safety risks and low efficiency of opening a chamber to change tools under high water pressure are solved. , which improves the safety and efficiency of tool changing.

CN115387806BActive Publication Date: 2024-10-01NUCLEAR IND WELL LANE CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211161711.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-23
Publication Date
2024-10-01
Estimated Expiration
2042-09-23

AI Technical Summary

Technical Problem

In rock pipe jacking construction, there are safety risks and low efficiency problems in opening the warehouse and changing tools under high water pressure. The existing technology requires professionals to work at high pressure or in water, and multiple water pumps are often used to occupy space, posing a risk of electric shock.

Method used

By arranging several shield tail brushes at the tail of the pipe jacking machine, and relying on the shield tail brushes for grouting and water-stopping, the tool changing operation in a normal pressure environment is realized, and the safety and efficiency of the tool changing operation are improved.

Benefits of technology

Completing the tool changing operation in a normal pressure environment reduces the physical condition requirements of the tool changing personnel, improves the safety and efficiency of tool changing, avoids the risks of high pressure and underwater operations, and ensures water-free conditions in the tool changing chamber.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115387806B_ABST
    Figure CN115387806B_ABST
Patent Text Reader

Abstract

A method for changing cutters at normal pressure for rock pipe jacking under high water pressure comprises the following steps: step 1: preparation for changing cutters, the preparation for changing cutters comprising a gas detection step, a lifting equipment positioning step and a new cutter positioning step; step 2: grouting and water stopping, the grouting and water stopping comprising a drainage system layout step in the pipe, a polyurethane water stopping step and a water stopping grouting step; step 3: preparation for opening the warehouse, the preparation for opening the warehouse comprising a drainage step in the warehouse; step 4: opening the warehouse and changing cutters, the opening the warehouse and changing cutters comprising a step of cleaning the cutter disc mud and slag, a step of checking the wear of the cutters and a step of replacing the cutters; step 5: sealing the warehouse and continuing jacking. The present invention completes the cutter changing of a pipe jacking machine under normal pressure through the cutter changing preparation step, the grouting and water stopping step, the warehouse opening preparation step and the warehouse opening and changing cutters step. The whole process comprises gas detection and water level observation, so as to avoid the cutter changing personnel from being placed in high pressure or water for operation. The physical condition of the cutter changing personnel is not high, and the whole cutter changing process is safe and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of rock pipe jacking construction, and in particular relates to a method for changing cutters of rock pipe jacking under normal pressure under high water pressure. Background Art

[0002] Pipe jacking construction is a trenchless method of laying underground pipelines by using a jack or other thrust force to push the pipe jacking machine and the subsequent pipe sections from a working well of a certain depth to a preset receiving well according to the design requirements, and then taking out the pipe jacking machine. Pipe jacking construction has a history of more than 100 years. It has developed and improved rapidly in the past 20 years and has been continuously endowed with various modern innovative technologies. With the progress of society and the development of urbanization, the demand for various underground pipelines is increasing. The laying of most pipelines will rely on pipe jacking construction, which also means that pipe jacking machines will adapt to different geological conditions.

[0003] When the pipe jacking machine is advancing in the rock formation, as the advancing distance becomes longer and the rock strength becomes higher, it is inevitable to open the chamber and change the cutter. Due to the incompleteness of the rock structure, groundwater in the rock formation will enter the cutter changing chamber of the pipe jacking machine through the rock cracks and the gaps between the outer wall of the pipe and the rock, affecting the efficiency of the cutter replacement and the working environment. If the rock fissure water is pressurized water or fault water, the water volume and flow rate will increase, and the time and safety of opening the chamber to change the cutter cannot be guaranteed. At the same time, the drag-reducing thixotropic mud used for jacking on the outer wall of the pipe will also flow into the cutter changing chamber of the pipe jacking machine, increasing the difficulty of the cutter changing operation and causing the loss of slurry, affecting the subsequent pipe jacking.

[0004] The existing warehouse opening and tool changing operations mainly use an air pressure chamber, which is used to balance the water pressure inside and outside the warehouse, reduce the entry of groundwater into the warehouse, and the tool changers perform tool changing operations under high pressure working conditions, such as the Chinese utility model patent application number CN201720661197.2, entitled A local air pressure balance pipeline construction system. Alternatively, multiple water pumps are used to force drainage of the tool changing warehouse to achieve tool changing operations. Both of the above methods have technical limitations and safety risks. For example, tool changing under pressure requires very high physical conditions of the tool changers, and professional personnel are required to perform tool changing operations; while using normal pressure strong drainage tool changing operations, multiple water pumps will occupy the small tool changing warehouse operating space, and there is a risk of electric shock for operators working in water.

[0005] Therefore, how to open the warehouse safely and change the cutter efficiently under the action of groundwater in the rock strata has always been the direction of exploration and innovation in rock jacking construction. Summary of the invention

[0006] The present invention aims to overcome the defects in the above-mentioned prior art and provide a method for changing cutters under normal pressure in rock pipe jacking under high water pressure. A plurality of shield tail brushes are arranged at the rear of the pipe jacking machine, and grouting and water stopping are carried out by relying on the shield tail brushes, so as to realize the cutter changing operation under normal pressure environment, thereby improving the safety and efficiency of the cutter changing operation.

[0007] In order to achieve the above purpose, the technical solution adopted by the present invention is: a method for changing cutters of rock jacking pipe under normal pressure under high water pressure, comprising the following steps:

[0008] Step 1: tool change preparation, determine whether the tool needs to be replaced, and if so, prepare for tool change; the tool change preparation includes a gas detection step, a lifting equipment placement step, and a new tool placement step;

[0009] Step 2: Grouting and water stopping. After the preparation for tool change is completed, grouting and water stopping are performed. The grouting and water stopping includes the steps of laying out the drainage system in the pipe and polyurethane water stopping.

[0010] Step 3: Preparation for opening the warehouse. After the grouting and water stopping are completed, preparation for opening the warehouse is carried out, and the preparation for opening the warehouse includes the step of draining water from the warehouse;

[0011] Step 4: Opening the warehouse and changing the tool. After the opening preparation is completed, the opening and changing of the tool is carried out. The opening and changing of the tool includes the steps of cleaning the mud and slag of the cutter disc, checking the tool wear, and replacing the tool.

[0012] Step 5: Seal the warehouse and continue to push forward. After opening the warehouse and changing the tool, close the warehouse door and the pipe jacking machine continues to push forward.

[0013] As a preferred embodiment of the present invention, the gas detection step in step 1 includes deploying a plurality of composite multi-gas detectors in the pipe jacking machine, and the composite multi-gas detectors can detect and alarm for multiple gases; the lifting equipment placement step includes extending the cylinder rod of the reverse thrust cylinder a small section to form an oil pad at the front end of the pipe jacking machine. After the oil pad is formed, the cylinder rod of the reverse thrust cylinder retracts to the bottom, and a movable space is reserved between the cutter head of the pipe jacking machine and the rock surface; the new tool placement step is to transport the new tool into the pipe jacking machine after the gas detection and lifting equipment placement steps are completed.

[0014] As a preferred solution of the present invention, the step 2 of laying out the drainage system in the pipe includes changing the slurry discharge pipe and the water inlet pipe into outward water pumping pipes; laying out a water pump in the mud and water bin; laying out two water pumps in the pressure cabin, one for mud discharge and the other for standby.

[0015] As a preferred embodiment of the present invention, the polyurethane water-stopping step in step 2 includes injecting polyurethane into the outside of the pipe jacking machine shell through the grouting holes between the shield tail brushes to stop the fissure water behind the grouting holes.

[0016] As a preferred solution of the present invention, the polyurethane is injected in an amount of 200-300 kg each time through the grouting hole.

[0017] As a preferred solution of the present invention, step 2 also includes a water-stopping cement slurry water-stopping step, which is located after the polyurethane water-stopping step. When polyurethane cannot block the fissure water, water-stopping cement slurry is injected into the outside of the pipe jacking machine shell through the grouting hole to stop the water again.

[0018] As a preferred embodiment of the present invention, the drainage step in the bin in step 3 includes draining the accumulated water in the mud and water bin into the pressure chamber, and then directly pumping the accumulated water in the pressure chamber to the mud discharge pipe, and discharging it to the mud pool through the mud discharge pipe.

[0019] As a preferred embodiment of the present invention, the step of cleaning the mud and debris on the cutter disc in step 4 includes detecting the combustible gas content in the cutter changing operation chamber, checking the water level in the cutter changing operation chamber, cleaning the mud and debris on the back of the cutter disc in the cutter changing operation chamber, and rotating the cutter disc to detect whether there are any hard objects on the bottom.

[0020] As a preferred solution of the present invention, the tool wear inspection step in step 4 includes checking whether all tool bolts in the cutter disc are fallen off or loose, whether the cutter ring on the cutter disc is intact, whether the cutter body in the cutter disc is leaking oil, and whether the retaining ring inside the cutter disc is broken or fallen off.

[0021] As a preferred solution of the present invention, the tool changing step in step 4 includes first retracting the cylinder rod of the reverse thrust cylinder to the bottom, and then the personnel opens the compartment door and enters the tool changing operation compartment to perform the tool changing operation.

[0022] The beneficial effects of the present invention are:

[0023] 1. The method for changing cutters at normal pressure for rock pipe jacking under high water pressure proposed in the present invention completes the cutter changing of the pipe jacking machine under normal pressure through the cutter changing preparation step, the grouting and water stopping step, the chamber opening preparation step, and the chamber opening and cutter changing step. The whole process includes gas detection and water level observation, which avoids the cutter changing personnel from being placed in high pressure or underwater operations. The physical condition of the cutter changing personnel is not high, and the whole cutter changing process is safe and efficient.

[0024] 2. The present invention proposes a method for changing cutters at normal pressure for rock pipe jacking under high water pressure. A plurality of shield tail brushes are arranged at the rear of the pipe jacking machine, and grouting and water stopping are performed through the grouting holes in the shield tail brushes to form a water stop wall, so that operators can change cutters at normal pressure, thereby improving the safety performance of the cutter changing operation and improving the efficiency of the cutter changing operation.

[0025] 3. The grouting and water-stopping steps of the method for changing cutters at normal pressure for rock pipe jacking under high water pressure proposed by the present invention include a polyurethane water-stopping step and a water-stopping cement slurry water-stopping step; the multiple water-stopping steps block the fissure water at the rear end of the pipe jacking machine from entering the front end of the pipe jacking machine, so that the cutter changing operation chamber is basically in a water-free environment.

[0026] 4. The tool wear inspection of the method for changing tools at normal pressure for rock jacking pipe under high water pressure proposed by the present invention is refined into 5 steps and the specified parameters of tool wear are set, which can better judge whether the tool is worn and replace the tool efficiently. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a schematic structural diagram of an embodiment of the present invention;

[0028] Figure 2 Schematic diagram of knife-changing and water-stopping according to an embodiment of the present invention;

[0029] Figure 3 is a flow chart of an embodiment of the present invention;

[0030] The accompanying drawings are numerals in the figure: tool changing operation chamber 1, secondary crushing chamber 2, bearing 3, reducer 4, motor 5, manhole 6, deviation correction cylinder 7, frequency converter 8, automatic control system 9, reverse thrust cylinder 10, front door of pressure chamber 11, pressure measuring mechanism 12, shield tail brush 13, grouting hole 14, slurry discharge pipe 15, water inlet pipe 16, mud and water chamber 17, pressure chamber 18, pipe jacking machine 100, and cutter disc 101. DETAILED DESCRIPTION

[0031] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0032] like Figure 1-Figure 3 As shown, a method for changing cutters at normal pressure in rock jacking pipe under high water pressure comprises the following steps:

[0033] Step 1: tool change preparation, determine whether the tool needs to be replaced, and if so, prepare for tool change; the tool change preparation includes a gas detection step, a lifting equipment placement step, and a new tool placement step;

[0034] Step 2: Grouting and water stopping. After the preparation for tool change is completed, grouting and water stopping are performed. The grouting and water stopping includes the steps of laying out the drainage system in the pipe and polyurethane water stopping.

[0035] Step 3: Preparation for opening the warehouse. After the grouting and water stopping are completed, preparation for opening the warehouse is carried out, and the preparation for opening the warehouse includes the step of draining water from the warehouse;

[0036] Step 4: Opening the warehouse and changing the tool. After the opening preparation is completed, the opening and changing of the tool is carried out. The opening and changing of the tool includes the steps of cleaning the mud and slag of the cutter disc, checking the tool wear, and replacing the tool.

[0037] Step 5: Seal the warehouse and continue to push forward. After opening the warehouse and changing the tool, close the warehouse door and the pipe jacking machine 100 continues to push forward.

[0038] Specifically, the pipe jacking machine 100 includes a tool changing operation chamber 1 at the front end, secondary crushing chambers 2 at both ends of the tool changing operation chamber 1, a mud and water chamber 17 located between the tool changing operation chamber 1 and the secondary crushing chamber 2, and an air pressure chamber 18 located in the middle of the pipe jacking machine 100. A plurality of shield tail brushes 13 are formed on the outside of the air pressure chamber 18, and grouting holes 14 are formed between the shield tail brushes 13. The grouting holes 14 are used to pressurize polyurethane or stop water slurry to the outside of the shell of the pipe jacking machine 100 to stop the fissure water behind the grouting holes 14, thereby preventing the fissure water behind the head of the pipe jacking machine 100 from flowing toward the head.

[0039] A slurry discharge pipe 15 and a water inlet pipe 16 are arranged in the tool changing operation chamber 1. The water inlet pipe 16 is used to flush away the slag cut by the tool. The slurry discharge pipe 15 cooperates with the water inlet pipe 16 to discharge the slag. Several cutter discs 101 are formed at the front end of the tool changing operation chamber 1, and several cutters are installed on the cutter discs 101.

[0040] A main compartment and a connecting compartment are arranged in sequence between the tool changing operation compartment 1 and the pressure cabin 18. A reducer 4 and a motor 5 for controlling the movement of the pipe jacking machine 100 are arranged in the main compartment, and an automatic control system 9 for controlling the operation of the reducer 4 and the motor 5 is arranged. A frequency converter 8 is installed in the automatic control system 9. A number of correction cylinders 7 are arranged circumferentially in the main compartment. A number of bearings 3 are arranged between the main compartment and the tool changing operation compartment 1. The main compartment enters the tool changing operation compartment 1 through a manhole 6; a number of reverse thrust cylinders 10 are arranged circumferentially in the connecting compartment, and the reverse thrust cylinders 10 are installed on a pressure measuring mechanism 12. The connecting compartment and the pressure cabin 18 are connected through a pressure cabin front door 11.

[0041] The situations in which the tool needs to be replaced in step 1 include the following three: first, the soil pressure value measured by the pressure measuring mechanism 12 arranged at the tail of the reverse thrust cylinder 10 is greater than 10% of the soil pressure value during normal jacking of the pipe jacking machine 100, then the tool needs to be replaced; second, when the slag content of the sand and powder slag body at the slag discharge port of the pipe jacking machine 100 is greater than 1.5 times the slag content of the block slag body, then the tool needs to be replaced; third, the current of the cutter disc 101 in front of the pipe jacking machine 100 increases, and the total power of the head of the pipe jacking machine 100 exceeds 70%. Accordingly, the jacking speed of the pipe jacking machine 100 slows down significantly, then the tool needs to be replaced.

[0042] Among them, the measurement process of soil pressure includes first extending the cylinder rod of the reverse thrust cylinder 10 a small section, for example, extending the cylinder rods of the four reverse thrust cylinders 10 by 30 mm, forming an oil cushion at the front end of the pipe jacking machine. When the pipe jacking machine is pushed forward again, the oil cushion is compressed to produce a reaction force and display the pressure value through the touch screen of the pressure measuring mechanism, thereby measuring the soil pressure of the entire section of the pipe jacking machine.

[0043] The gas detection step in step 1 includes deploying a number of composite multi-gas detectors in the pipe jacking machine 100. The model of the composite multi-gas detector is preferably BH-4. The composite multi-gas detector can detect and alarm for multiple gases. The detected gases include carbon monoxide, hydrogen sulfide, oxygen, etc.; the step of placing the lifting equipment in place includes extending the cylinder rod of the reverse thrust cylinder 10 by a small section, for example, extending the cylinder rods of the four reverse thrust cylinders 10 by 30 mm, so that an oil pad is formed at the front end of the pipe jacking machine 100. After the oil pad is formed, the cylinder rod of the reverse thrust cylinder 10 retracts to the bottom, and a movable space is reserved between the cutter disc 101 of the pipe jacking machine 100 and the rock surface. The cutter disc 101 can rotate flexibly and freely in the movable space, thereby facilitating the tool change; the step of placing the new tool in place is to transport the new tool into the pipe jacking machine 100 after the two steps of gas detection and lifting equipment placement are completed.

[0044] Furthermore, not only does it need to perform gas detection on each chamber in the pipe jacking machine 100 when preparing for a tool change, but it also needs to perform gas detection on the front end of the cutter disc 101 before preparing for a tool change to ensure that the gas is qualified before preparing for a tool change.

[0045] Step 2: The step of laying out the drainage system in the pipe includes changing the slurry discharge pipe 15 and the water inlet pipe 16 into outward water pumping pipes; laying out a water pump in the mud and water bin 17; laying out two water pumps in the air pressure cabin 18, one for mud discharge and the other for standby.

[0046] The polyurethane water-stopping step in step 2 includes injecting polyurethane into the outside of the shell of the pipe jacking machine 100 through the grouting holes 14 between the shield tail brushes 13, stopping the fissure water behind the grouting holes 14, and preventing the fissure water behind the head of the pipe jacking machine 100 from flowing to the head, so that the tool changing operation chamber 1 is basically in a water-free environment. The amount of polyurethane injected through the grouting holes 14 each time is about 200~300kg, and the injection is suspended when the pressure reaches 0.4MPa.

[0047] After injecting polyurethane, wait for 48 hours and open the pressure relief valve of the mud and water bin 17. If the water output of the pressure relief valve is greater than 15 cubic meters per hour, polyurethane is refilled through the grouting hole 14, and the amount of polyurethane added is twice the initial injection amount.

[0048] Step 2 also includes a water-stopping step using cement slurry. The water-stopping step using cement slurry is located after the water-stopping step using polyurethane. When polyurethane cannot block the fissure water, cement slurry is injected into the outside of the casing of the pipe jacking machine 100 through the grouting hole 14 to stop the water again.

[0049] Specifically, when the fissure water in the rock formation is large and the polyurethane water-stopping agent cannot completely block the fissure water, water-stopping slurry is injected into the outside of the pipe jacking machine 100 to stop the water again, thereby improving the efficiency and safety of personnel when inspecting and replacing tools.

[0050] The parameters of the stop cement slurry to be used are determined according to the formation conditions, and the stop cement slurry ratio test is carried out according to the required mud setting time, mud strength after setting and other parameters, and finally a set of ratio parameters that can meet the requirements are determined.

[0051] After the mud ratio parameters are determined, the mud is made according to the test ratio. During the production process, the specified ratio parameters are strictly followed. Each time the mud is mixed, a sample is kept and the sampling time and other data are noted to facilitate the determination of the mud forming state and the opening time. When the mud is added, it should be injected by a dedicated person, and the records of mud addition and formation pressure changes should be kept.

[0052] At the same time, the precautions for injection of stopcock cement slurry include the following four points: First, prepare the stopcock cement slurry according to the mix ratio, do not change the mix ratio without permission, and collect samples after each grouting; second, close the manual valve of the slurry discharge pipe before injecting the stopcock cement slurry to prevent the mud from clogging the pipeline; third, observe and record the changes in water and soil pressure during the injection of the stopcock cement slurry, and the injection pressure is about 3MPa; fourth, close the grouting gate valve in the bin after the injection is completed, and record the water and soil pressure fluctuations during the curing period.

[0053] The drainage step in the bin in step 3 includes draining the accumulated water in the mud and water bin 17 into the air pressure chamber 18, and then directly pumping the accumulated water in the air pressure chamber 18 to the mud discharge pipe, and then draining it to the mud pool through the mud discharge pipe.

[0054] Specifically, when the accumulated water in the mud and water bin 17 is discharged into the air pressure cabin 18, the slurry discharge pipe 15 and the water inlet pipe 16 are both changed into outward pumping pipes, one for use and the other for standby to prepare for pumping water outward.

[0055] A water pump with a power of 3.5kW and a flow rate of 40m3 / h is arranged in the mud and water tank to discharge the water in the mud and water tank 17 into the pressure cabin 18. A water pump with a power of 7.5kW and a flow rate of 60m3 / h is arranged in the pressure cabin 18 to directly pump the water in the pressure cabin 18 to the mud discharge pipe and then discharge it to the mud pool through the mud discharge pipe. In addition, a water pump with a power of 5.5kW and a flow rate of 45m3 / h is used as a standby to assist in mud discharge.

[0056] The step of cleaning the cutter disc mud and debris in step 4 includes detecting the combustible gas content in the cutter changing operation chamber 1, checking the water level in the cutter changing operation chamber 1, cleaning the mud and debris on the back of the cutter disc 101 in the cutter changing operation chamber 1, and rotating the cutter disc 101 to detect whether there is any hard object at the bottom.

[0057] Specifically, enter the chamber of the pipe jacking machine 100, open the connecting valve near the door of the knife-changing operation chamber, check the water level of the excavation face, and open the door of the knife-changing operation chamber only after no water flows out of the connecting valve and the combustible gas content does not exceed the limit value after a period of stability. Perform gas detection in the knife-changing operation chamber 1, report the detection value to the monitoring personnel, and fill in the detection value on the gas detection table; check the stability of the excavation face, and enter the back of the cutter disc to clean the mud and slag after confirming safety; the cleaned mud and slag are all packed into woven bags and transferred to the main chamber; after the next group of personnel enters, check the completion of the work of the previous group, confirm it on the working surface, take photos to confirm, report it to the monitoring leader by phone, and make detailed records; when the slag is cleaned to a certain extent, after confirmation and discussion by the person in charge of the monitoring room, the cutter disc can be slowly rotated. If the cutter disc can rotate, check the cutter directly. If it cannot rotate, it is necessary to clean to the bottom to check whether there are hard objects; further, due to the small space inside the mud and water chamber and the cutter disc, the cutter should be hoisted and disassembled with caution to prevent injuries to personnel or damage to equipment.

[0058] The tool wear inspection step in step 4 includes checking whether all tool bolts in the cutter disc 101 are fallen off or loose, whether the cutter ring on the cutter disc 101 is intact and has no breakage; whether the cutter body in the cutter disc 101 has oil leakage; whether the retaining ring in the cutter disc 101 is broken or fallen off. When the retaining ring falls off, it should also be checked whether the cutter ring is displaced.

[0059] Specifically, when the wear of the edge hob is 10mm, the wear of the front hob is 20mm, the wear of the edge scraper is 5~10mm, and the wear of the tooth cutter is about 8mm, the tool is worn out and must be replaced. The determination of this indicator is closely related to the thickness of the tool wear-resistant layer.

[0060] Considering the formation conditions and the parameters of the pipe jacking machine cutter head, the worn cutter is replaced with a hard rock cutter. The tool wear inspection steps are as follows:

[0061] The first step is that each time a tool is replaced, the staff should first clear the dirt around the tool to ensure that there is a certain amount of working space; the second step is to check the wear of the tools one by one from the outside of the cutter disc to the inside. When it is determined that a replacement is needed, mark it with a tool of the corresponding number and record it; the third step is to check whether all the tool bolts on the cutter disc are falling off or loose; whether the cutter ring is intact and has no breakage; whether the cutter body is leaking oil; whether the retaining ring is broken or falling off. If the retaining ring falls off, check whether the cutter ring is displaced; the fourth step is to knock on the bolt pad with a hammer during inspection and listen to its sound to determine the tightness of the bolt, or knock while feeling its vibration with your hand to determine the tightness of the bolt; the fifth step is to tighten the tool one by one after replacing it to reduce the number of times the cutter disc rotates.

[0062] The tool replacement is determined according to the specific wear situation. If the tool wear is not serious, only some of the seriously worn tools can be replaced; if the tool wear is serious, all tools need to be replaced. In addition, if the cutter disc structure is worn, it needs to be repaired by welding in time.

[0063] To ensure that the tool can be replaced in time before the wear reaches the limit value, the potential relationship or corresponding law between tool wear and jacking parameters should be summarized according to the construction situation of the starting section of the jacking pipe, and the tool inspection and replacement plan should be optimized to enhance the effectiveness and controllability of tool monitoring work.

[0064] Special cases such as uneven wear of the hob cutter ring, breakage of the cutter ring, broken bolts, and deformation of the cutter seat must be repaired or replaced in a timely manner.

[0065] The tool replacement step in step 4 includes first retracting the cylinder rod of the reverse thrust cylinder 10 to the bottom, and reserving a movable space between the cutter head 101 and the rock surface to facilitate tool replacement. Further, the personnel open the cabin door and enter the tool replacement operation cabin 1 through the manhole 6 to perform the tool replacement operation.

[0066] Specifically, when the geology is stable and the groundwater is controllable, personnel can directly open the door to enter the tool changing operation chamber 1 to check and replace the tool. The manhole channel size is 490*350mm, and personnel can enter and exit easily. The space size on the back of the cutter disc is D2008*500mm, and two people can enter the space to change the tool.

[0067] Although this article uses more of the figure markings: tool changing operation chamber 1, secondary crushing chamber 2, bearing 3, reducer 4, motor 5, manhole 6, correction cylinder 7, frequency converter 8, automatic control system 9, reverse thrust cylinder 10, air pressure chamber front door 11, pressure measuring mechanism 12, shield tail brush 13, grouting hole 14, slurry discharge pipe 15, water inlet pipe 16, mud and water chamber 17, air pressure chamber 18, pipe jacking machine 100, cutter head 101 and other terms, it does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.

Claims

1. A method for changing cutters under normal pressure in rock jacking pipe under high water pressure, characterized in that: The following steps are included: Step 1: tool change preparation, determine whether the tool needs to be replaced, if it needs to be replaced, then prepare for tool change. The situations in which the tool needs to be replaced include: "First, the soil pressure value measured by the pressure measuring mechanism (12) arranged at the rear of the reverse thrust cylinder (10) is greater than 10% of the soil pressure value when the pipe jacking machine (100) is normally pushed forward, then the tool needs to be replaced, wherein the soil pressure measurement process includes first extending the cylinder rod of the reverse thrust cylinder (10) a small section to form an oil pad at the front end of the pipe jacking machine. When the pipe jacking machine is pushed forward again, the oil pad is compressed to generate a reaction force and the pressure value is displayed through the touch screen of the pressure measuring mechanism, thereby measuring the soil pressure of the entire cross-section of the pipe jacking machine;" the tool change preparation includes a gas detection step, a lifting equipment positioning step, and a new tool positioning step; Step 2: Grouting and water stopping. After the preparation for blade change is completed, grouting and water stopping are performed. The grouting and water stopping comprises a step of laying out the drainage system in the pipe, a polyurethane water stopping step, and a water stopping grouting and water stopping step. The polyurethane water stopping step in step 2 comprises injecting polyurethane into the exterior of the casing of the pipe jacking machine (100) through the grouting holes (14) between the shield tail brushes (13) to stop the water in the fissure behind the grouting holes (14). After injecting the polyurethane, wait for 48 hours and open the pressure relief valve of the mud and water tank (17). If the water output of the pressure relief valve is greater than 15 cubic meters per hour, polyurethane is refilled through the grouting holes (14). The amount of refilled polyurethane is twice the amount of the initial injection. The water stopping grouting and water stopping step is located after the polyurethane water stopping step. The injection pressure is 3 MPa. Step 3: Preparation for opening the warehouse. After the grouting and water stopping are completed, preparation for opening the warehouse is carried out, and the preparation for opening the warehouse includes the step of draining water from the warehouse; Step 4: Opening the warehouse and changing the tool. After the opening preparation is completed, the opening and changing of the tool is carried out. The opening and changing of the tool includes the steps of cleaning the mud and slag of the cutter disc, checking the tool wear, and replacing the tool. Step 5: The chamber is sealed and the jacking is continued. After the chamber is opened and the cutter is changed, the chamber door is closed and the pipe jacking machine (100) continues to jack.

2. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The gas detection step in step 1 includes arranging a plurality of composite multi-gas detectors in the pipe jacking machine (100), wherein the composite multi-gas detectors can detect and alarm for a variety of gases; the lifting equipment placement step includes extending the cylinder rod of the reverse thrust cylinder (10) by a small section, so that an oil pad is formed at the front end of the pipe jacking machine (100); after the oil pad is formed, the cylinder rod of the reverse thrust cylinder (10) is retracted to the bottom, and a movable space is reserved between the cutter head (101) of the pipe jacking machine (100) and the rock surface; and the new tool placement step includes transporting the new tool into the pipe jacking machine (100) after the gas detection and lifting equipment placement steps are completed.

3. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The step 2 of laying out the drainage system in the pipe includes changing the slurry discharge pipe (15) and the water inlet pipe (16) into outward water pumping pipes; laying out a water pump in the mud and water bin (17); and laying out two water pumps in the air pressure chamber (18), one for mud discharge and the other as a standby.

4. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The polyurethane is injected through the grouting hole (14) in an amount of 200-300 kg each time.

5. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The step 2 also includes a water-stopping step using a stop-water slurry. The water-stopping step using a stop-water slurry is located after the water-stopping step using the polyurethane. When the polyurethane is unable to block the fissure water, the stop-water slurry is injected into the exterior of the casing of the pipe jacking machine (100) through the grouting hole (14) to stop the water again.

6. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The step of draining water from the silo in step 3 comprises draining the accumulated water in the mud and water silo (17) into the air pressure chamber (18), and then directly pumping the accumulated water in the air pressure chamber (18) into the mud discharge pipe, and then draining the water into the mud pool through the mud discharge pipe.

7. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 1, characterized in that: The step of cleaning the cutter disc mud and debris in step 4 comprises detecting the combustible gas content in the cutter changing operation chamber (1), checking the water level in the cutter changing operation chamber (1), cleaning the mud and debris on the back of the cutter disc (101) in the cutter changing operation chamber (1), and rotating the cutter disc (101) to detect whether there is any hard object on the bottom thereof.

8. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 7, characterized in that: The tool wear inspection step in step 4 includes inspecting whether all tool bolts in the cutter disc (101) are detached or loose, whether the cutter ring on the cutter disc (101) is intact, whether the cutter body in the cutter disc (101) is leaking oil, and whether the inner retaining ring of the cutter disc (101) is broken or detached.

9. The method for changing cutters of rock jacking pipes at normal pressure under high water pressure according to claim 8, characterized in that: The tool replacement step in step 4 includes first retracting the cylinder rod of the reverse thrust cylinder (10) to the bottom, and then a person opens the door and enters the tool replacement operation chamber (1) to perform the tool replacement operation.