Carbon fiber composite seawater and sea sand concrete component formwork and integrated molding method thereof
By using the combination technology of carbon fiber composite formwork and polymer conductive mortar in the seawater sea sand concrete structure, combined with applied current protection, the problems of deterioration of durability and poor bonding strength of seawater sea sand concrete structure are solved, and an efficient structure is achieved The reinforcement and conductive performance increase, extending the service life of the structure.
Patent Information
- Application Number
- CN202211245193.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-12
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-10-12
AI Technical Summary
During the long-term service process, the existing seawater sea sand concrete structures have deteriorated durability due to corrosion of steel bars, which poses safety hazards. In the prior art, the bonding strength between carbon fiber reinforced prefabricated pipes and seawater sea sand concrete base is poor, which is prone to hollowing. Influences the compactness and conductivity of the structure.
The carbon fiber composite seawater sea sand concrete component formwork and its integrated forming method are adopted. By setting up carbon fiber mesh cloth and polymer conductive mortar on the formwork, combined with the external current cathode protection, the efficient molding and structural reinforcement of seawater sea sand concrete is achieved. Ensure that the steel bars are not eroded by chloride ions.
It improves the bonding ability between the carbon fiber composite system and the concrete structure, enhances compactness and conductivity, avoids hollowing, extends the service life of seawater and sea sand concrete, and ensures the safety and durability of the structure.
Smart Images

Figure CN115416141B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of reinforced concrete, and in particular to a carbon fiber composite seawater and sea sand concrete component template and an integrated molding method thereof. Background Art
[0002] High-quality fresh water and river sand resources for construction are relatively scarce in my country's coastal areas, but seawater and sea sand resources are relatively abundant. On the basis of ensuring the safety of modern engineering structures, the safe and reliable resource application of seawater and sea sand in the field of civil engineering can alleviate the contradiction between the resource limitations of freshwater and river sand and the urgent needs of sustained and healthy development of the national economy, and has very important social and economic significance. However, due to the influence of chloride salts, the durability of reinforced concrete structures with seawater and sea sand mixed with a large amount of chloride ions deteriorates during long-term service due to steel corrosion, which brings safety hazards to the quality and structure of construction projects and seriously affects the service life of the structure. Therefore, in order to ensure the durability of seawater and sea sand concrete, additional durability protection measures must be taken.
[0003] The prior art can add mechanical reinforcement structures or durability reinforcement structures to cast-in-place seawater sand concrete structures, and mostly use seawater sand concrete base and composite material layers. Through searching, the prior art uses fiber-reinforced prefabricated pipes with excellent electrical conductivity and mechanical properties, and cooperates with filled seawater sand reinforced concrete to form a new seawater sand reinforced concrete composite component based on the triple functions of physical properties, mechanical properties and electrochemical properties of fiber-reinforced prefabricated pipes. The carbon fiber reinforced prefabricated pipe in this design is a cement-based composite material reinforced with carbon fiber mesh cloth prefabricated by a corresponding mold, and then concrete is poured, and then the preparation of the concrete component is completed by curing, and finally the finished product is energized, which solves the problem of durability degradation of seawater sand reinforced concrete structures with a large amount of chloride ions added during long-term service; the cast-in-place seawater sand concrete base is added with a prefabricated composite material layer, the bonding strength between the two is poor, hollowing phenomenon is prone to occur, and due to the inconsistent force caused by hollowing, the mechanical reinforcement effect is quite different from the assumption; the poor bonding strength between the two leads to poor density of the composite layer material and low electrical conductivity, resulting in reduced quality of the prepared concrete structure. Summary of the invention
[0004] The purpose of the present invention is to provide a carbon fiber composite seawater and sea sand concrete component template and an integrated molding method thereof, so as to solve the technical problems existing in the prior art.
[0005] In order to solve the above technical problems, the carbon fiber composite seawater and sea sand concrete component template provided by the present invention comprises: a first outer mold and a first inner mold;
[0006] The first outer mold is used to form a closed surface of the carbon fiber composite seawater and sea sand concrete component;
[0007] The first outer mold includes: a bottom plate, a first side plate, and a second side plate;
[0008] One or more first side panels are arranged on the bottom plate along the length direction;
[0009] One or more second side plates are arranged on the bottom plate along the width direction;
[0010] The first inner mold is used for the construction of carbon fiber composite seawater and sea sand concrete components. The bottom plate, the first side plate and the second side plate are connected end to end to form a rectangular cavity for the preparation and molding of the components.
[0011] Furthermore, the first outer mold comprises a front surface in contact with the casting material and a back surface opposite to the front surface, and a release agent is sprayed on the front surface of the first outer mold for rapid demoulding of the component.
[0012] Furthermore, adjacent first side panels are detachably connected.
[0013] Furthermore, adjacent second side panels are detachably connected.
[0014] Preferably, adjacent first side panels are detachably connected via a mortise and tenon structure.
[0015] Preferably, adjacent second side panels are detachably connected via a mortise and tenon structure.
[0016] Furthermore, the bottom plate is connected to the first side plate and the second side plate respectively through fixing members.
[0017] Furthermore, the second side panel is connected to the first side panel via a fixing member.
[0018] Furthermore, sealant is provided at the connection between the bottom plate, the first side plate and the second side plate to prevent the slurry from overflowing.
[0019] Furthermore, a steel plate is provided at the connection between the first outer mold and the first inner mold.
[0020] Furthermore, the thickness of the steel plate is preferably 1.00 mm-1.25 mm.
[0021] Furthermore, it also includes a through hole matched with the steel bar arranged on the second side plate, and the steel bar in the concrete component extends to the outside through the through hole to be connected to an external power source.
[0022] Furthermore, the bottom plate, the first side plate and the second side plate are respectively made of wooden boards.
[0023] Furthermore, in order to facilitate the disassembly of the template, the fixing piece is driven in from the outside to the inside;
[0024] The fixing member may be in many forms, including but not limited to screw connection, expansion tube connection and other existing connection methods.
[0025] Further, it also includes a second outer mold and a second inner mold;
[0026] The second outer mold is used to form a closed surface of the carbon fiber composite seawater and sea sand concrete column component;
[0027] The second outer mold includes: a third side plate and a fourth side plate with an arc-shaped cross section;
[0028] One or more of the third side plates are arranged opposite to one or more fourth side plates in the axial direction;
[0029] The second inner mold is used for the construction of carbon fiber composite seawater and sea sand concrete column components; the third side plate and the fourth side plate are connected end to end to form a cylindrical cavity, which is used for the preparation of concrete column components.
[0030] Furthermore, the cylindrical cavity enclosed by the third side plate and the fourth side plate includes an unclosed front end and a rear end, wherein a closing plate is installed at the rear end of the cylindrical cavity, and the front end serves as a feeding port.
[0031] Furthermore, a steel cylinder is provided at the connection between the second outer mold and the second inner mold.
[0032] Furthermore, the second outer mold comprises a front surface in contact with the casting material and a back surface opposite to the front surface, and a release agent is sprayed on the front surface of the second outer mold for rapid demoulding of the component.
[0033] Furthermore, sealant is provided at the connection between the closing plate, the third side plate and the fourth side plate to prevent the slurry from overflowing.
[0034] Furthermore, the thickness of the steel cylinder is preferably 1.25±0.25 mm.
[0035] Furthermore, it also includes a handle arranged on the steel plate and / or steel cylinder for taking out the steel plate and / or steel cylinder after the material casting is completed.
[0036] Furthermore, the third side panel, the fourth side panel and the closing panel are all made of PVC.
[0037] The integrated molding method of carbon fiber composite seawater and sea sand concrete components specifically comprises the following steps:
[0038] Step S10: Construction preparation:
[0039] Familiarize yourself with the design drawings before construction, prepare detailed concrete beam construction methods, allocate an appropriate number of construction workers and corresponding management personnel according to the size of the project and the factors of the working environment, prepare the materials and construction equipment and other resources required for construction, and allocate corresponding processing materials and equipment according to the actual situation on site;
[0040] Step S20, supporting formwork;
[0041] Step S30: placing steel bars:
[0042] Place the steel bars in the mold, tie them up, and insulate the exposed steel bar tying wires and auxiliary metal components (hooks, steel bar brackets);
[0043] Step S40, arranging wires and installing reference electrodes;
[0044] Step S50, seawater sand concrete and polymer conductive mortar are constructed simultaneously;
[0045] Step S60, ICCP-SS seawater sand concrete component maintenance;
[0046] Step S70, hardening and demoulding;
[0047] Step S80, connecting the four-side carbon fiber mesh cloth;
[0048] Step S90: After the concrete is hardened and demoulded, the missing concrete sections are filled by artificial plastering:
[0049] After the concrete is hardened and demoulded, the corner formwork is not completely removed. After removing the edge strips, the corner formwork is re-fixed, and the polymer conductive mortar is still injected into the pores by pressure grouting to complete the cross section.
[0050] Step S100: Finished product maintenance, and power on the finished product.
[0051] Furthermore, the step S20, supporting the formwork, specifically comprises the following steps:
[0052] Step S20-1, according to the design drawings, prepare: two or more second side panels, two or more first side panels, a bottom plate, and a carbon fiber mesh cloth;
[0053] Step S20-2, prepare a plurality of upper wooden strips and lower wooden strips, fix the carbon fiber mesh cloth between the upper wooden strips and the lower wooden strips, use artificial tensioning to ensure the tension of the carbon fiber mesh cloth, and install the carbon fiber mesh cloth on the bottom plate and the first side plate respectively;
[0054] Step S20-3: splice and fix the bottom plate, the first side plate, and the second side plate to form a concrete component preparation space, and inject sealant into the joints for sealing.
[0055] Furthermore, the step S50 specifically includes:
[0056] Step S50-1, placing the steel plate at the dividing point between the first outer mold and the first inner mold and fixing it by an inner support member;
[0057] Step S50-2, watering and wetting the first inner mold and the first outer mold, laying polymer conductive mortar on the bottom of the first inner mold, and passing it through the carbon fiber mesh cloth on the bottom plate to soak it;
[0058] Step S50-3: After the bottom slurry is close to initial setting, the polymer mortar on both sides of the first outer mold is constructed by grouting to 3 / 4 of the height of the first outer mold, and the seawater sand concrete is poured to 1 / 2 of the height of the first inner mold;
[0059] Step S50-4, pull out some of the inner support members at the same time, complete the grouting on both sides of the first outer mold, complete the pouring of seawater and sea sand concrete, pull out the remaining inner support members, pull out the steel plate after 30 minutes, and complete the overall pouring.
[0060] Furthermore, for the carbon fiber mesh cloth laid at the bottom, it should be laid promptly and evenly on the polymer conductive mortar that has not yet solidified during construction. Use a roller to roll back and forth carefully on the carbon fiber mesh cloth to allow the polymer conductive mortar to pass through the carbon fiber mesh cloth and completely soak it. Non-metallic fasteners can be used to fix the mesh cloth. The mesh cloth should be cut to a predetermined length and width, leaving the necessary overlap length, and the overlapped part should be connected by binding with metal wire.
[0061] By adopting the above technical solution, the present invention has the following beneficial effects:
[0062] The carbon fiber composite seawater and sea sand concrete component template and its integrated molding method provided by the present invention use seawater and sea sand as raw materials to prepare concrete beams, and use a carbon fiber composite system of impressed current cathodic protection and structural reinforcement to enhance the durability of the seawater and sea sand concrete structure. The two are integrally molded, and on the basis of structural reinforcement, the steel bars inside the concrete are protected from chloride ion corrosion, so that the seawater and sea sand concrete can be used normally within its service life.
[0063] The carbon fiber composite seawater and sea sand concrete component template and its integrated molding method provided by the present invention adopt a process of simultaneously pouring seawater and sea sand concrete and polymer conductive mortar to realize the integrated molding design of the structural entity. While the carbon fiber mesh cloth reinforces the concrete structure, it improves the bonding ability of the carbon fiber composite system and the concrete structure, so that the carbon fiber composite system has better density, which is conducive to giving full play to the auxiliary anode performance and mechanical reinforcement performance of the carbon fiber mesh cloth as an impressed current, so that the carbon fiber composite system maintains better conductive performance. After structural improvement, hollowing and peeling will not occur, and it has strong durability. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0065] Figure 1 It is the construction flow chart of the present invention;
[0066] Figure 2 This is a schematic diagram of the overall structure of the template in Example 1 of the present invention;
[0067] Figure 3 It is a side view structural diagram of the template structure of the present invention;
[0068] Figure 4 This is a schematic diagram of the finished product structure of the present invention;
[0069] Figure 5 This is a schematic diagram of the overall structure of the template in Example 2 of the present invention;
[0070] Figure 6 This is a schematic diagram of the development of the second outer mold of the present invention;
[0071] Figure 7 It is a schematic diagram of a concrete column member template of the present invention;
[0072] Figure 8 A schematic diagram of preparing a concrete column formwork according to the present invention.
[0073] Reference numerals:
[0074] 1. First outer formwork, 2. Bottom plate, 3. First side plate, 4. Second side plate, 5. Steel plate, 6. Inner support, 7. Carbon fiber composite seawater and sea sand concrete beam component, 8. Carbon fiber mesh cloth, 9. Second outer formwork, 10. Third side plate, 11. Fourth side plate, 12. Carbon fiber composite seawater and sea sand concrete column component. DETAILED DESCRIPTION
[0075] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0076] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0077] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0078] The present invention is further explained below in conjunction with specific implementation modes.
[0079] Example 1
[0080] like Figure 2-4 As shown, the carbon fiber composite seawater and sea sand concrete component template provided in this embodiment is specifically a preparation mold for a concrete beam component, and specifically includes: a first outer mold 1 and a first inner mold;
[0081] The first outer mold 1 is used to form a closed surface of a carbon fiber composite seawater and sea sand concrete component;
[0082] The first outer mold 1 includes: a bottom plate 2, a first side plate 3, and a second side plate 4;
[0083] One or more first side panels 3 are arranged on the bottom panel 2 along the length direction;
[0084] One or more second side panels 4 are arranged on the bottom panel 2 along the width direction;
[0085] The first inner mold is used for the construction of carbon fiber composite seawater and sea sand concrete components. The bottom plate 2, the first side plate 3 and the second side plate 4 are connected end to end to form a rectangular cavity for the preparation and molding of the components.
[0086] Furthermore, the first outer mold 1 comprises a front surface in contact with the casting material and a back surface opposite to the front surface, and a release agent is sprayed on the front surface of the first outer mold 1 for rapid demoulding of the component.
[0087] Furthermore, adjacent first side panels 3 are detachably connected.
[0088] Furthermore, adjacent second side panels 4 are detachably connected.
[0089] Preferably, adjacent first side panels 3 are detachably connected via a mortise and tenon structure.
[0090] Preferably, adjacent second side panels 4 are detachably connected via a mortise and tenon structure.
[0091] Furthermore, the bottom plate 2 is connected to the first side plate 3 and the second side plate 4 respectively through fixing members.
[0092] Furthermore, the second side panel 4 is connected to the first side panel 3 via a fixing member.
[0093] Furthermore, sealant is provided at the connection between the bottom plate 2, the first side plate 3, and the second side plate 4 to prevent the slurry from overflowing.
[0094] Furthermore, a steel plate 5 is provided at the connection between the first outer mold 1 and the first inner mold.
[0095] Furthermore, the thickness of the steel plate 5 is preferably 1.00 mm-1.25 mm.
[0096] Furthermore, it also includes a through hole matched with the steel bar arranged on the second side plate 4, and the steel bar in the concrete component extends to the outside through the through hole to be connected to the external power supply.
[0097] Furthermore, the bottom plate 2, the first side plate 3, and the second side plate 4 are respectively made of wooden boards.
[0098] Furthermore, in order to facilitate the disassembly of the template, the fixing piece is driven in from the outside to the inside;
[0099] The fixing member may be in many forms, including but not limited to screw connection, expansion tube connection and other existing connection methods.
[0100] A handle is also provided on the steel plate 5 for taking out the steel plate 5 after the material pouring is completed.
[0101] like Figure 1As shown, a carbon fiber composite seawater and sea sand concrete component template and an integrated molding method thereof, a concrete beam component is prepared according to the above concrete component template, specifically comprising the following steps:
[0102] S10. Construction preparation:
[0103] Familiarize yourself with the design drawings before construction, prepare detailed concrete beam construction methods, allocate an appropriate number of construction workers and corresponding management personnel according to the size of the project and the factors of the working environment, prepare the materials and construction equipment and other resources required for construction, and allocate corresponding processing materials and equipment according to the actual situation on site;
[0104] S20, Formwork:
[0105] S10-1. Prepare five wooden boards and assemble them into a rectangular structure according to the design drawings. The joints between adjacent wooden boards are sealed with sealant.
[0106] S10-2, using the upper and lower rectangular frames to directly fix the carbon fiber mesh cloth 8 to the first outer mold 1, and ensure that the carbon fiber mesh cloth 8 is tensioned so that the thickness of the casting material on both sides of the carbon fiber mesh cloth 8 is consistent, and the frame is fixed with an air nail gun;
[0107] S30, place steel bars:
[0108] Place the steel bars in the first inner mold, tie them up, and insulate the exposed steel bar tying wires and auxiliary metal components (hooks, steel bar brackets);
[0109] S40, arrange the wires and install the reference electrode
[0110] S50, seawater sand concrete, and polymer conductive mortar construction are carried out simultaneously:
[0111] S50-1, watering and wetting the first inner mold and the first outer mold 1, grouting the bottom of the first inner mold, after the slurry at the bottom is close to initial setting, grouting the two sides of the first outer mold 1 to 3 / 4 of the height of the first outer mold, and pouring seawater and sea sand concrete to 1 / 2 of the height of the first inner mold;
[0112] S50-2, pull out part of the inner support members 6 at the same time, complete the grouting of the two sides of the first outer mold 1, complete the pouring of seawater and sea sand concrete, pull out the remaining inner support members 6, pull out the steel plate 5 after 30 minutes, and complete the overall pouring;
[0113] S60, ICCP-SS seawater sand concrete beam component maintenance;
[0114] S70, hardening and demoulding;
[0115] S80, four-side carbon fiber mesh cloth 8 connection;
[0116] S90, After the concrete is hardened and demoulded, the missing concrete sections are filled by artificial plastering:
[0117] After the concrete is hardened and demoulded, the corner formwork is not completely removed. After removing the edge strips, the corner formwork is re-fixed, and the polymer conductive mortar is still injected into the pores by pressure grouting to complete the cross section.
[0118] S100, finished product maintenance, finished product power supply is powered on.
[0119] Among them, the carbon fiber mesh cloth 8 laid at the bottom should be laid promptly and flatly on the polymer conductive mortar that has not yet solidified during construction. Use a roller to roll back and forth carefully on the carbon fiber mesh cloth 8 to allow the polymer conductive mortar to pass through the carbon fiber mesh cloth 8 and completely soak it. Non-metallic fasteners can be used to fix the mesh cloth. The mesh cloth should be cut according to the preset length and width, leaving the necessary overlap length, and the overlapped part should be connected by binding with metal wire.
[0120] Example 2
[0121] like Figure 5-7 As shown, this embodiment is basically the same as the previous embodiment, except that: the template of this embodiment is a preparation mold for a concrete column component, specifically comprising: a second outer mold 9 and a second inner mold;
[0122] The second outer mold 9 is used to form a closed surface of the carbon fiber composite seawater and sea sand concrete column component 12;
[0123] The second outer mold 9 includes: a third side plate 10 and a fourth side plate 11 with an arc-shaped cross section;
[0124] One or more third side plates 10 are arranged opposite to one or more fourth side plates 11 along the axial direction;
[0125] The second inner mold is used for the construction of the carbon fiber composite seawater and sea sand concrete column component 12; the third side plate 10 and the fourth side plate 11 are connected end to end to form a cylindrical cavity, which is used for the preparation of the concrete column component.
[0126] Furthermore, the cylindrical cavity enclosed by the third side plate 10 and the fourth side plate 11 includes an unclosed front end and a rear end, wherein a closing plate is installed at the rear end of the cylindrical cavity, and the front end serves as a feeding port.
[0127] Furthermore, a steel cylinder is provided at the connection between the second outer mold 9 and the second inner mold.
[0128] Furthermore, the second outer mold 9 comprises a front surface in contact with the casting material and a back surface opposite to the front surface, and a release agent is sprayed on the front surface of the second outer mold 9 for rapid demoulding of the component.
[0129] Furthermore, sealant is provided at the connection between the closing plate, the third side plate 10 and the fourth side plate 11 to prevent the slurry from overflowing.
[0130] Furthermore, the thickness of the steel cylinder is preferably 1.25±0.25 mm.
[0131] Furthermore, it also includes a handle arranged on the steel cylinder, which is used to take out the steel cylinder after the material pouring is completed.
[0132] Furthermore, the third side panel 10, the fourth side panel 11 and the closing panel are all made of PVC.
[0133] A carbon fiber composite seawater and sea sand concrete component template and an integrated molding method thereof, wherein a concrete column component is prepared according to the above-mentioned concrete column component template, specifically comprising the following steps:
[0134] S10. Construction preparation:
[0135] Familiarize yourself with the design drawings before construction, prepare detailed concrete column construction methods, allocate an appropriate number of construction workers and corresponding management personnel according to the size of the project and the factors of the working environment, prepare the materials and construction equipment and other resources required for construction, and allocate corresponding processing materials and equipment according to the actual situation on site;
[0136] S20, Formwork:
[0137] S10-1. According to the design drawings, prepare two or more PVC pipes and assemble them into a cylindrical structure. The rear end is fixed by a closing plate, and the joints of adjacent pipes are sealed by sealant;
[0138] S10-2, using upper and lower cylindrical frames to directly fix the carbon fiber mesh cloth 8 and the second outer mold 9, and ensure that the carbon fiber mesh cloth 8 is tensioned so that the thickness of the casting material on both sides of the carbon fiber mesh cloth 8 is consistent, and the frame is fixed with an air nail gun;
[0139] S30, place steel bars:
[0140] Place the steel bars in the first inner mold, tie them up, and insulate the exposed steel bar tying wires and auxiliary metal components (hooks, steel bar brackets);
[0141] S40, wire arrangement, strain gauge
[0142] S50. Place the formwork vertically on the ground, and carry out the construction of seawater sand concrete and polymer conductive mortar simultaneously:
[0143] S50-1, watering and wetting the second inner mold and the second outer mold 9, grouting the bottom of the second inner mold, after the slurry at the bottom is close to initial setting, grouting is performed on both sides of the second outer mold 9 to 3 / 4 of the height of the second outer mold, and seawater and sea sand concrete is poured to 1 / 2 of the height of the second inner mold;
[0144] S50-2, pull out part of the inner support members 6 at the same time, complete the grouting of the two sides of the second outer mold 9, complete the pouring of seawater and sea sand concrete, pull out the remaining inner support members 6, and pull out the steel cylinder (not shown) after 30 minutes, and complete the overall pouring;
[0145] S60, ICCP-SS seawater sand concrete beam component maintenance;
[0146] S70, hardening and demoulding;
[0147] S80, carbon fiber mesh cloth 8 connection;
[0148] S90. After the concrete is hardened and demoulded, the missing concrete sections are filled by manual plastering:
[0149] After the concrete is hardened and demoulded, the corner formwork is not completely removed. After removing the edge strips, the corner formwork is re-fixed, and the polymer conductive mortar is still injected into the pores by pressure grouting to complete the cross section.
[0150] S100, finished product maintenance, finished product power supply is powered on.
[0151] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. Carbon fiber composite seawater and sea sand concrete component formwork, characterized in that: include: a first outer mold and a first inner mold; The first outer mold is used to form a closed surface of the carbon fiber composite seawater and sea sand concrete component; The first outer mold includes: a bottom plate, a first side plate, and a second side plate; One or more first side panels are arranged on the bottom plate along the length direction; One or more second side plates are arranged on the bottom plate along the width direction; The first inner mold is used for the construction of carbon fiber composite seawater and sea sand concrete components, and the bottom plate, the first side plate and the second side plate are connected end to end to form a rectangular cavity for the preparation and molding of the components; The bottom plate and the first side plate are provided with carbon fiber mesh cloth, the carbon fiber mesh cloth is fixed between the upper wooden strips and the lower wooden strips, the carbon fiber mesh cloth is manually stretched to ensure its tension, and the carbon fiber mesh cloth is respectively installed on the bottom plate and the first side plate; The first outer mold comprises a front side in contact with the casting material and a back side opposite to the front side, and a release agent is sprayed on the front side of the first outer mold for rapid demoulding of the component; A steel plate is provided between the first outer mold and the first inner mold; The steel plate is placed at the dividing point between the first outer mold and the first inner mold and fixed by the inner support member; A polymer conductive mortar is laid on the bottom of the first inner mold, and is passed through the carbon fiber mesh cloth on the bottom plate to soak the carbon fiber mesh cloth. After the polymer conductive mortar is initially set, the conductive mortar on both sides of the first outer mold is grouting constructed to 3 / 4 of the height of the first outer mold, and the seawater and sea sand concrete is poured to 1 / 2 of the height of the first inner mold. After some inner support members are pulled out, the grouting of both sides of the first outer mold is completed, and the remaining inner support members are pulled out. After waiting for 30 minutes, the steel plate is pulled out to complete the overall pouring; Adjacent first side panels are detachably connected; Adjacent second side panels are detachably connected; The bottom plate is connected to the first side plate and the second side plate respectively through fixing members; The second side plate is connected to the first side plate via a fixing member; Sealant is provided at the connection between the bottom plate, the first side plate and the second side plate to prevent the slurry from overflowing; It also includes a through hole adapted to the steel bar provided on the second side plate, through which the steel bar in the concrete member extends to the outside to be connected to an external power source; The bottom plate, the first side plate and the second side plate are respectively made of wooden boards.