A kind of narrow foundation pit water steel support installation platform and construction method thereof
Through the water steel support installation platform assembled in standardized module boxes, the cross-operation problems of steel support installation in narrow foundation pits and ground-connected wall chiseling construction are solved, and an efficient and safe construction process is achieved, which significantly shortens the construction period.
Patent Information
- Application Number
- CN202211077727.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-05
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-09-05
AI Technical Summary
In narrow foundation pits, under the traditional dry operation mode, steel support installation and ground-connected wall chiseling construction have cross-operation between upper and lower ladder cage settings, construction equipment layout and steel support installation, resulting in low construction efficiency and frequent lifting and lifting , there are great risks and it is difficult to meet construction needs.
The water-mounted steel supporting installation platform is used assembled from a standard module box. The platform is divided into tool storage unit, material stacking unit and equipment installation unit. The floating block is made of PVC material, has a detachable roof panel and a hollow structure, and is spliced by the module box. Form a horizontal and vertical array structure to avoid cross-operation and realize layer-by-layer steel support installation and chiseling treatment from top to bottom.
It significantly shortens the construction period, improves construction efficiency, avoids the risk of cross-operation, achieves safe and convenient operation in a narrow space, and meets the construction needs of complex working conditions.
Smart Images

Figure CN115419080B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of bridge anchor foundation construction, and in particular relates to an above-water steel support installation platform for a narrow foundation pit and a construction method thereof. Background Art
[0002] In recent years, a super-large U-shaped composite ground-connected wall structure has been used as an anchor foundation in the construction of long-span bridges. This type of anchor foundation combines the ground-connected wall construction technology and the characteristics of the caisson structure. The ground-connected wall divides the structure into an outer circle of small compartments and an inner circle of large compartments. For example, in a certain project anchor, the plane size of its small compartment is only 4.3m×9.55m, but the excavation depth is as deep as 45m. After underwater excavation and bottom sealing, the ground-connected wall surface needs to be roughened layer by layer and 13 steel supports need to be installed to prepare for the core filling of dry operation construction.
[0003] If the traditional dry operation method is used for the installation of steel supports and the roughening of ground-connected walls in a narrow space, it will cause cross-operation between the setting of upper and lower ladder cages, the layout of construction equipment and the erection of steel supports, which will restrict the construction efficiency. In addition, the frequent lifting and hoisting will cause a high risk of lifting injuries and it is difficult to meet the construction needs. At present, there is no simple and reliable method for roughening ground-connected walls and installing steel supports on the water in small compartments. A new type of steel support installation platform and construction method for narrow foundation pits on the water is urgently needed. Summary of the invention
[0004] At present, there is no water-based steel support installation platform and construction method for the narrow foundation pit of composite ground-connected wall and caisson foundation. If the traditional dry operation method is used, the installation of steel support and the roughening of ground-connected wall in a narrow space will cause cross-operation between the setting of upper and lower ladder cages, the layout of construction equipment and the erection of steel support. The limited working space restricts the construction efficiency, and the frequent lifting and hoisting have a high risk of lifting injury, which is difficult to meet the construction needs. There is an urgent need for a water-based steel support installation platform and construction method for a narrow space.
[0005] The present invention provides a narrow space water steel support installation platform and a construction method thereof. The platform components are standardized and processed by the factory, and are easy to install and disassemble; compared with the traditional dry operation construction method, the water steel support installation platform is adopted, and the steel support, roughening equipment, etc. can be stored on the platform, and the ground-connected wall surface is roughened from top to bottom layer by layer as the foundation pit is pumped, and the steel support is installed. The problem of limited cross-operation space and difficult operation in a narrow foundation pit is solved; compared with the traditional dry operation method, it can significantly shorten the construction period and has a very high value for promotion and use.
[0006] The object of the present invention is achieved through the following technical solutions:
[0007] A narrow foundation pit water steel support installation platform includes an installation platform, the installation platform includes a plurality of module boxes assembled to each other, adjacent module boxes are connected to each other, the module box includes a floating block of a rectangular structure, the four edges of the floating block are a left front chamfer structure, a right front chamfer structure, a left rear chamfer structure and a right rear chamfer structure, a groove block is provided at the left front chamfer structure along the height direction, a limit plate is provided at the right rear chamfer structure along the height direction, a splicing positioning space is formed between the adjacent left front chamfer structure, right front chamfer structure, left rear chamfer structure and right rear chamfer structure, the limit plate and the groove block are located in the splicing positioning space, and the limit plate matches the shape of the groove block.
[0008] Furthermore, the installation platform is divided into a tool storage unit, a material stacking unit and an equipment installation unit.
[0009] Furthermore, the module boxes are assembled to form a horizontal and vertical array structure.
[0010] Furthermore, the floating block is made of PVC material.
[0011] Furthermore, the floating block includes a detachable top plate, and a hollow structure is provided inside the floating block.
[0012] Furthermore, the four edges of the floating block are all 45-degree chamfered structures of the same size.
[0013] Furthermore, the cross section of the limiting plate is U-shaped, the cross section of the groove block is rectangular, and the U-shaped cross section of the limiting plate is not less than the cross section of the groove block.
[0014] Furthermore, the limiting plate includes a groove bottom plate located at the bottom of the U-shape.
[0015] Furthermore, a lifting belt is provided on the upper end surface of the floating block.
[0016] Furthermore, lifting belts are provided on the four sides of the floating block.
[0017] Furthermore, a joint plate is provided on the upper end surface of the floating block, and two adjacent floating blocks are connected by the joint plate and bolts.
[0018] Furthermore, the four sides of the floating block are all provided with joint plates.
[0019] Furthermore, the joint plate is L-shaped.
[0020] Furthermore, the joint plate of the floating block at the outermost edge is detachably connected to the guardrail.
[0021] Furthermore, the joint plate at the equipment installation unit is detachably connected to the equipment.
[0022] A construction method includes the above-mentioned narrow foundation pit water steel support installation platform, including the following steps: hoisting the assembled installation platform into a compartment, the installation platform floats on the water surface, hoisting construction tools and materials in a tool storage unit, hoisting the steel support to a steel support material stacking unit, installing equipment in an equipment installation unit, then pumping water from the compartment, installing the first steel support after the water level in the compartment drops to the first steel support installation position, and roughening the surface of the ground-connected wall, and after completion, continuing to pump water to the second steel support installation position, erecting the steel support and roughening the wall until all the steel supports are erected, and finally dismantling the installation platform, hoisting it out and transporting it to the next compartment for construction.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] (1) The rectangular floating block provided by the present invention is assembled from standardized module boxes, which can be assembled flexibly and are suitable for narrow foundation pits of various shapes. When the mud skin on the wall is partially peeled off due to the disturbance of the construction of the retaining structure, the wall surface is uneven, the wall bulges during the pouring process, etc., resulting in changes in the size of the structure, the module box units can be disassembled / assembled to adapt to the size changes.
[0025] (2) The steel support installation platform of the present invention integrates steel support installation, roughening equipment and winch, and can be flexibly set up according to the process requirements to meet the construction needs of complex working conditions.
[0026] (3) The steel support installation platform of the present invention can avoid conflicts between the construction platform, equipment and support structures, avoid cross-operation, realize safe and convenient installation of steel supports on water in a narrow space, solve the problem of connection between the excavation and support installation processes, and improve construction efficiency.
[0027] The aforementioned main scheme of the present invention and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection by the present invention; and in the present invention, (non-conflicting options) options and other options can also be freely combined. After understanding the scheme of the present invention, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present invention, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the installation platform of the present invention.
[0029] Figure 2 It is a schematic diagram of the module box structure of the present invention.
[0030] Figure 3 It is a construction schematic diagram of the present invention.
[0031] Figure 4 It is a construction flow chart of the present invention.
[0032] In the figure: 1-installation platform, 2-module box, 3-tool storage unit, 4-material stacking unit, 5-equipment installation unit, 6-ground wall, 7-steel support; 21-floating block, 22-limiting plate, 23-lifting belt, 24-slot block, 25-section connecting plate, 26-bolt hole. DETAILED DESCRIPTION
[0033] The following non-limiting examples serve to illustrate the invention.
[0034] Embodiment 1:
[0035] refer to Figure 1 and Figure 2 As shown, a narrow foundation pit water-based steel support installation platform includes an installation platform 1, which includes a plurality of module boxes 2 assembled with each other, and the adjacent module boxes 2 are tightly connected and assembled to form a horizontal and vertical array structure. The installation platform 1 is divided into a tool storage unit 3, a material stacking unit 4 and an equipment installation unit 5.
[0036] The module box 2 includes a floating block 21 of a rectangular parallelepiped structure, preferably with a square cross section. The floating block 21 is made of PVC material and has good strength. At the same time, the inside of the floating block 21 is a hollow structure to ensure that the floating block 21 has reliable buoyancy. The floating block 21 is provided with a chamfered structure, a limit plate 22, a lifting belt 23, a slot block 24 and a joint plate 25.
[0037] The four edges of the floating block 21 are respectively a left front chamfer structure, a right front chamfer structure, a left rear chamfer structure and a right rear chamfer structure, and the four chamfer structures are 45-degree chamfer structures of the same size to ensure shape and structure matching during splicing.
[0038] A groove block 24 is provided along the height direction at the left front chamfer structure, and a limit plate 22 is provided along the height direction at the right rear chamfer structure. A splicing positioning space is formed between the adjacent left front chamfer structure, right front chamfer structure, left rear chamfer structure and right rear chamfer structure. The limit plate 22 and the groove block 24 are located in the splicing positioning space, and the shape of the limit plate 22 matches that of the groove block 24.
[0039] A splicing positioning space is formed between four adjacent floating blocks 21 to provide an operating space for the limit plate 22 and the slot block 24 . The limit plate 22 and the slot block 24 are engaged with each other to improve the stability of the connection between the floating blocks 21 .
[0040] The cross-section of the limiting plate 22 is U-shaped, and the groove block 24 and the cross-section are rectangular, preferably square. The cross-sectional dimension of the U-shape of the limiting plate 22 is not less than the cross-sectional dimension of the groove block 24, the bottom of the groove is 2 cm longer than the square groove block, and the U-shape of the limiting plate 22 is provided with a bottom plate structure so that the square groove block 24 can be inserted into the U-shape and fixed.
[0041] The floating block 21 is a hollow rectangular parallelepiped structure formed by connecting PVC boards, including a detachable top plate. The module box 2, when used as a submodule of the tool storage unit 3, the top PVC plate can be detached and the hollow structure thereof can be used as a tool material storage box.
[0042] The upper end surface of the floating block 21 is provided with four lifting straps 23, which are respectively located at the four sides of the floating block 21. The lifting straps 23 are used to lift the floating block 21, or to facilitate the lifting operation of the floating block 21. The upper end surface of the floating block 21 is provided with four joint plates 25, which are respectively located at the four sides of the floating block 21. The joint plates 25 are L-shaped, one side of the joint plates 25 is connected to the floating block 21, and the other side of the joint plates 25 is reserved with a connection hole. Two adjacent floating blocks 21 are connected by the joint plates 25 and bolts.
[0043] When the module box 2 is the outermost box of the installation platform 1, the outermost joint plate 25 is connected to the detachable guardrail pole by bolts, which serves as a protection measure for the edge of the narrow foundation pit water steel support installation platform 1. When the module box 2 is used as a submodule of the equipment installation unit 5, the joint plate 25 is aligned with the bolt hole of the equipment base through the bolt hole 26, and the winch, roughing equipment and other equipment are fixed on the module box 2 after the bolt connection.
[0044] During assembly, first determine the size of the installation platform 1 and the installation position of the steel support, determine the number of module boxes 2, the position of the tool storage unit 3, the position of the material stacking unit 4 and the position of the equipment installation unit 5. Next, fix the first module box 2 on the ground, align the slot block 24 of the second module box 2 and press it into the U-shape of the first module box 2, so that the top surfaces of the two module boxes 2 are flush, and then use bolts to connect the adjacent joint plates of the two adjacent module boxes 2. Then install the module boxes in sequence until the platform is formed.
[0045] The present invention is assembled from modular boxes produced in a standardized manner. The assembled steel support installation platform is hoisted into a narrow foundation pit, and the roughening equipment, steel support and winch are stored on the installation platform. As the water level in the pit drops, the roughening of the wall surface of each layer of the ground-connected wall and the installation of the steel support are completed from top to bottom in sequence. Finally, the installation platform is dismantled, hoisted out of the narrow foundation pit and reused.
[0046] The narrow foundation pit water steel support installation platform of the present invention has a simple structure, and each component is standardized and processed by the factory, which is easy to install and disassemble, and solves the problem of limited cross-operation space and difficult operation in narrow spaces such as small compartments. Compared with the method of erecting a ladder cage and an operating platform, there is no need to fix and extend the platform to the ground wall, which saves steel and significantly shortens the construction period, and has a very high promotion and use value.
[0047] Embodiment 2:
[0048] refer to Figure 3 and Figure 4 As shown, a construction method includes the narrow foundation pit water steel support installation platform described in Example 1, the assembled installation platform 1 is hoisted into the compartment, the installation platform 1 floats on the water surface, the construction tools and materials are hoisted in the tool storage unit 3, the steel support is hoisted to the material stacking unit 4, the equipment is installed in the equipment installation unit 5, and then the water in the compartment is pumped out. After the water level in the compartment drops to the installation position of the first steel support 7, the first steel support 7 is installed, and the surface of the ground-connected wall 6 is roughened. After completion, water is continued to be pumped to the installation position of the second steel support 7, the steel support 7 is erected and the wall is roughened until all the steel supports 7 are erected. Finally, the installation platform 1 is dismantled, hoisted out and transported to the next compartment for construction.
[0049] The above basic examples of the present invention and their further optional examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection by the present invention. In the scheme of the present invention, each optional example can be arbitrarily combined with any other basic examples and optional examples.
[0050] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A narrow foundation pit water-based steel support installation platform, comprising an installation platform (1), characterized in that: The installation platform (1) comprises a plurality of module boxes (2) assembled with each other, adjacent module boxes (2) are connected with each other, the module box (2) comprises a floating block (21) of a rectangular parallelepiped structure, the four edges of the floating block (21) are respectively a left front chamfer structure, a right front chamfer structure, a left rear chamfer structure and a right rear chamfer structure, a groove block (24) is provided at the left front chamfer structure along the height direction, a limit plate (22) is provided at the right rear chamfer structure along the height direction, a splicing positioning space is formed between adjacent left front chamfer structures, right front chamfer structures, left rear chamfer structures and right rear chamfer structures, the limit plate (22) and the groove block (24) are located in the splicing positioning space, and the limit plate (22) matches the groove block (24) in shape; The four edges of the floating block are all 45-degree chamfered structures of the same size; the cross section of the limiting plate (22) is U-shaped, the cross section of the groove block (24) is rectangular, and the U-shaped cross section of the limiting plate (22) is not less than the cross section of the groove block (24).
2. The narrow foundation pit water steel support installation platform according to claim 1 is characterized by: The floating block (21) comprises a detachable top plate, and a hollow structure is provided inside the floating block (21).
3. The narrow foundation pit water steel support installation platform according to claim 1 is characterized by: The limiting plate (22) comprises a groove bottom plate located at the bottom of the U-shape.
4. The narrow foundation pit water-based steel support installation platform according to claim 1 is characterized by: The upper end surface of the floating block (21) is provided with a lifting belt (23).
5. The narrow foundation pit water-based steel support installation platform according to claim 1 or 4, characterized in that: The upper end surface of the floating block (21) is provided with a joint plate (25), and two adjacent floating blocks (21) are connected via the joint plate (25) and bolts.
6. The narrow foundation pit water-based steel support installation platform according to claim 5 is characterized by: The joint plate (25) of the floating block (21) at the outermost edge is detachably connected to the guardrail.
7. The narrow foundation pit water-based steel support installation platform according to claim 5 is characterized by: The installation platform (1) is divided into a tool storage unit (3), a material stacking unit (4) and an equipment installation unit (5); the joint plate (25) at the equipment installation unit (5) is detachably connected to the equipment.
8. A construction method, comprising the narrow foundation pit water-based steel support installation platform according to any one of claims 1 to 6, characterized in that: The method comprises the following steps: the installation platform (1) is divided into a tool storage unit (3), a material stacking unit (4) and an equipment installation unit (5); the assembled installation platform (1) is hoisted into a compartment, the installation platform (1) floats on the water surface, the construction tools and materials are hoisted into the tool storage unit (3), the steel support is hoisted to the steel support material stacking unit (4), the equipment is installed in the equipment installation unit (5), then the water in the compartment is pumped out, and after the water level in the compartment drops to the installation position of the first steel support (7), the first steel support (7) is installed, and the surface of the ground-connected wall (6) is roughened, and after completion, water is continuously pumped out to the installation position of the second steel support (7), the steel support (7) is erected and the wall surface is roughened until all the steel supports (7) are erected, and finally the installation platform (1) is dismantled, hoisted out and transported to the next compartment for construction.