Heavy metal detection device for soil monitoring

By designing a heavy metal detection device for soil monitoring, the spiral discharge pipe and conical spiral head of the spiral soil cleaning assembly and the spiral sampling assembly are used to achieve accurate sampling of deep soil, solving the problem of inaccurate sampling in the prior art. Improves the efficiency and accuracy of soil monitoring.

CN115420540BActive Publication Date: 2024-11-15BEIJING SHOUFA TIANREN ECOLOGICAL LANDSCAPE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210859377.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-21
Publication Date
2024-11-15
Estimated Expiration
2042-07-21

AI Technical Summary

Technical Problem

The prior art is difficult to effectively and accurately monitor the heavy metal content in soil, especially when sampling in deep soil, it is susceptible to surface coverings and difficult to ensure sampling accuracy.

Method used

A heavy metal detection device for soil monitoring is designed, including a spiral soil cleaning assembly and a spiral sampling assembly. The drilling and sampling of deep soil is achieved through a spiral discharge pipe and a conical spiral head. The spiral sampling rod can be inserted downward into the soil. Drive the conical spiral head to unfold to prevent non-sampled soil from entering and ensure sample accuracy.

Benefits of technology

It can quickly take soil samples from deep, avoid the influence of surface coverings, ensure sampling accuracy, and facilitate testing by detecting personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115420540B_ABST
    Figure CN115420540B_ABST
Patent Text Reader

Abstract

The invention relates to the field of soil detection, and in particular to a heavy metal detection device for soil monitoring, comprising a detection box, a mobile cart and a vertical moving mechanism, and also comprising an installation frame, an outer shell, a horizontal installation plate, a spiral soil cleaning component, a spiral soil discharge pipe, a conical spiral head, a first connecting shaft, a spiral sampling component, a spiral sampling rod, a driving component, a connecting gear, a first horizontal connecting plate, a connecting device and an unfolding starter. The outer side of the installation frame is fixedly sleeved with an outer shell having a horizontal mounting plate fixed at the bottom, the driving component comprises a first horizontal connecting plate and two connecting gears, the spiral soil cleaning group comprises a spiral soil discharge pipe, a conical spiral head and a first connecting shaft, the spiral sampling component comprises a spiral sampling rod, two groups of connecting devices are respectively connected to the first connecting shaft and the spiral sampling rod, and the unfolding starter is used to drive the conical spiral head to unfold. The invention can obtain soil samples from deep depths, the sampling is convenient and quick, and the sampling accuracy is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of soil detection, and in particular to a heavy metal detection device for soil monitoring. Background Art

[0002] In recent years, heavy metal pollution has become a global environmental problem. Studies have shown that the mining and consumption of fossil fuels, metal mining and smelting, waste incineration, and the use of agricultural inputs such as fertilizers and pesticides will all lead to the input of heavy metals into the soil environment to a certain extent. In order to timely, effectively and accurately understand the heavy metal content in the soil, it is necessary to design a heavy metal detection device for soil monitoring. Summary of the invention

[0003] Based on this, it is necessary to provide a heavy metal detection device for soil monitoring in response to existing technical problems.

[0004] In order to solve the existing technical problems, the technical solution adopted by the present invention is: a heavy metal detection device for soil monitoring, including a detection box, a mobile cart and a vertical moving mechanism, the detection box and the vertical moving mechanism are fixedly arranged on the mobile cart, and also includes:

[0005] The mounting frame is fixedly connected to the output end of the vertical moving mechanism, the outer fixed sleeve of the mounting frame is provided with a shell, and the bottom of the shell is fixedly connected to a horizontal mounting plate;

[0006] The spiral soil cleaning assembly is located on the lower end of the horizontal mounting plate, and includes a vertical spiral soil discharge pipe for discharging soil, an openable and closable conical spiral head for drilling holes, and a vertical first connecting shaft;

[0007] A driving assembly is fixedly arranged on the mounting frame, and the driving assembly includes two horizontal connecting gears and a first horizontal connecting plate which moves vertically synchronously with the two connecting gears;

[0008] The spiral sampling assembly includes a spiral sampling rod located inside the spiral soil discharge pipe for sampling materials, the upper end of the spiral sampling rod passes through the horizontal mounting plate and the first horizontal connecting plate upward, and the lower end of the spiral sampling rod can pass through the spiral soil discharge pipe vertically downward;

[0009] Two sets of detachable connecting devices, two ends of one set of connecting devices are respectively connected to a connecting gear and the first connecting shaft, and two ends of the other set of connecting devices are respectively connected to another connecting gear and the spiral sampling rod;

[0010] The expansion starter is used to drive the conical spiral head to expand when the spiral sampling rod moves vertically downward.

[0011] Furthermore, the spiral soil cleaning assembly also includes:

[0012] A connecting cylinder coaxial with the spiral soil discharge pipe has an open upper end, and the upper and lower ends are respectively axially connected to the lower end of the horizontal mounting plate and fixedly connected to the upper end of the spiral soil discharge pipe;

[0013] A first annular rack and a first gear meshing therewith, the first gear being fixedly sleeved on the lower end of the first connecting shaft, and the first annular rack being fixedly sleeved on the outer wall of the connecting cylinder;

[0014] Two protective pipe sleeves are located between the horizontal mounting plate and the first horizontal connecting plate, and are sleeved on the first connecting shaft. The two protective pipe sleeves are respectively fixed to the horizontal mounting plate and the first horizontal connecting plate;

[0015] A return spring is sleeved on the two protection sleeves, and two ends thereof are respectively in contact with the horizontal mounting plate and the first horizontal connecting plate;

[0016] An inner round tube is arranged coaxially with the spiral soil discharge pipe, is located inside the spiral soil discharge pipe, is sleeved on the outside of the spiral sampling rod, and has two ends connected to the two ends of the spiral soil discharge pipe respectively, and the upper end of the inner round tube passes through the connecting cylinder upward and is fixedly connected to the horizontal mounting plate;

[0017] A connecting circular tube is arranged coaxially with the inner circular tube, and the upper end of the connecting circular tube is formed with a flange portion fixedly connected to the lower end of the spiral soil discharge pipe;

[0018] The connecting mechanism is connected with the unfolding start device, and the connecting mechanism passes through the spiral soil discharge pipe and is hinged with the conical spiral head.

[0019] Furthermore, the conical spiral head is composed of a plurality of arc-shaped plates evenly distributed along the circumferential direction of the flange portion, each arc-shaped plate is hinged to the flange portion, and a first outer spiral portion is formed on the outer side of the arc-shaped plate.

[0020] Furthermore, the spiral soil discharge pipe is composed of a second outer spiral portion and an outer cylindrical tube, the second outer spiral portion is welded and fixed to the outer cylindrical tube, and the side wall of the outer cylindrical tube is formed with a plurality of strip-shaped grooves of the same length and evenly distributed along the circumferential direction for the connection mechanism to pass through.

[0021] Furthermore, the connecting mechanism comprises:

[0022] A plurality of slide bars correspondingly slide through a plurality of strip-shaped slide grooves, the end of each slide bar slides through the flange portion and extends between the connecting round tube and the arc-shaped plate, the other end of each slide bar slides upward through the connecting cylinder and is hinged with a connecting rod, the free ends of the connecting rods are hinged to the inner sides of the corresponding arc-shaped plates, and the ends of the connecting rods hinged to the arc-shaped plates are arranged away from the axis of the connecting round tube;

[0023] An annular sheet slidably sleeved on the inner circular tube is located in the connecting cylinder, and the annular sheet is fixedly connected to the ends of a plurality of sliding strips;

[0024] A plurality of closing springs are arranged one by one on a plurality of slide bars, and two ends of each closing spring are respectively in conflict with the annular sheet and the bottom of the connecting cylinder.

[0025] Furthermore, the driving assembly further comprises:

[0026] The motor is fixed on the mounting frame, the output shaft of the motor is connected with a vertical second connecting shaft, and the second connecting shaft passes downward through the first horizontal connecting plate and is axially connected with the horizontal mounting plate;

[0027] The second gear is fixedly sleeved on the second connecting shaft, the second gear is meshed with the two connecting gears, and the width of the second gear is greater than the width of the connecting gears, and each connecting gear is axially connected to the first horizontal connecting plate.

[0028] Furthermore, the connecting device comprises:

[0029] A first tubular ferrule is coaxially arranged with the first connecting shaft, the sliding sleeve is arranged on the outside of the first connecting shaft, the first tubular ferrule is axially connected with the first horizontal connecting plate, the outer side of the first tubular ferrule is fixedly sleeved with a second annular rack, and the second annular rack is meshed with the corresponding connecting gear;

[0030] The second tubular ferrule is coaxially arranged with the first connecting shaft, and is fixedly sleeved on the upper end of the first connecting shaft, and the lower end of the second tubular ferrule is clamped with the upper end of the first tubular ferrule.

[0031] Furthermore, the first tubular ferrule of another group of connecting devices is coaxially arranged with the spiral sampling rod, the first tubular ferrule is slidably sleeved on the spiral sampling rod, the first tubular ferrule is axially connected to the first horizontal connecting plate, the second annular rack on the first tubular ferrule is meshed with another connecting gear, the second tubular ferrule is fixedly sleeved on the upper end of the spiral sampling rod, and the second tubular ferrule is located above the first tubular ferrule.

[0032] Furthermore, the spiral sampling assembly also includes:

[0033] An electric push rod is fixed on the mounting frame, a second horizontal connecting plate is fixedly connected to the vertical downward output end of the electric push rod, the second horizontal connecting plate is axially connected to the upper end of the spiral sampling rod, and the second horizontal connecting plate is located above the second tubular ferrule;

[0034] A support sleeve, fixed to the lower end of the second horizontal connecting plate;

[0035] The portion of the spiral sampling rod located between the first horizontal connecting plate and the second horizontal connecting plate is located outside the housing.

[0036] Furthermore, the deployment start device comprises:

[0037] The connecting arm is in a vertical state, the upper end of which passes through the support sleeve and slides through the second horizontal connecting plate, and the lower end of which slides through the first horizontal connecting plate, and is located between the second connecting shaft and the spiral sampling rod;

[0038] A limiting ring, fixedly sleeved on the connecting arm, and located between the first horizontal connecting plate and the second horizontal connecting plate;

[0039] There are two support springs, both of which are sleeved on the connecting arm, and two ends of one support spring are respectively in conflict with the limit ring and the first horizontal connecting plate, and two ends of the other support spring are respectively in conflict with the limit ring and the second horizontal connecting plate;

[0040] A sliding sleeve, the sliding sleeve is arranged on the connecting arm, and the upper end of the sliding sleeve is fixedly connected to the lower end of the second horizontal connecting plate;

[0041] The lower end of the vertical push arm slides downward through the first horizontal connecting plate and is slidably connected with the annular sheet, and the upper end of the push arm abuts against the sliding sleeve and the lower end of the connecting arm.

[0042] Compared with the prior art, the present invention has the following beneficial effects: firstly, the present invention can obtain soil samples from deep depths, avoiding the influence of surface covering on sampling, making sampling convenient and quick;

[0043] Secondly, the spiral soil discharge pipe can not only drill holes, but also transport excess soil to the ground, so that the soil samples taken by the spiral sampling rod are all deep soil, ensuring the accuracy of sampling;

[0044] Thirdly, the conical spiral head can not only make holes, but also prevent non-sampled soil from entering the inner tube. When the conical spiral head is unfolded, the spiral sampling rod can be inserted downward into the soil for sampling, ensuring the accuracy of sampling.

[0045] Fourthly, the spiral sampling rod transports the soil sample to the horizontal mounting plate, making it convenient for testers to conduct sampling and testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 is a schematic diagram of the three-dimensional structure of an embodiment;

[0047] Figure 2 is a schematic diagram of the three-dimensional structure of the embodiment without the installation frame and the housing;

[0048] Figure 3 Schematic diagram of the three-dimensional structure of the spiral soil cleaning assembly of the embodiment;

[0049] Figure 4 is a cross-sectional view of an auger soil cleaning assembly of an embodiment;

[0050] Figure 5 Schematic diagram of the three-dimensional structure of the spiral soil discharge pipe of the embodiment;

[0051] Figure 6 It is an embodiment of Figure 4 The enlarged schematic diagram of the center C;

[0052] Figure 7 It is an embodiment of Figure 4 The enlarged schematic diagram of point D in the middle;

[0053] Figure 8 is a schematic diagram of the three-dimensional structure of the driving assembly of the embodiment;

[0054] Fig. 9 It is an embodiment of Figure 2 The enlarged schematic diagram of point A in the middle;

[0055] Fig.10 It is an embodiment of Figure 2 The enlarged schematic diagram of point B in the middle;

[0056] Fig.11 is a schematic diagram of the three-dimensional structure of the spiral sampling assembly of the embodiment;

[0057] Fig.12 It is a schematic diagram of the three-dimensional structure of the deployment and starting device of the embodiment.

[0058] The numbers in the figure are: 1, mounting frame; 2, housing; 3, horizontal mounting plate; 4, spiral soil cleaning assembly; 5, spiral soil discharge pipe; 6, conical spiral head; 7, first connecting shaft; 8, spiral sampling assembly; 9, spiral sampling rod; 10, driving assembly; 11, connecting gear; 12, first horizontal connecting plate; 13, connecting device; 14, unfolding start device; 15, connecting cylinder; 16, first annular rack; 17, first gear; 18, protective tube sleeve; 19, reset spring; 20, inner tube; 21, connecting tube; 22, flange; 23, connecting mechanism; 24, arc plate; 25, first outer spiral part; 26, second outer spiral part; 27. Outer tube; 28. Strip slide; 29. ​​Slide; 30. Connecting rod; 31. Annular plate; 32. Closing spring; 33. Motor; 34. Second connecting shaft; 35. Second gear; 36. First tubular ferrule; 37. Second annular rack; 38. Second tubular ferrule; 39. Electric push rod; 40. Second horizontal connecting plate; 41. Support sleeve; 42. Connecting arm; 43. Limiting ring; 44. Support spring; 45. Slide; 46. Push arm; 47. Vertical partition plate; 48. Corrugated partition plate. DETAILED DESCRIPTION

[0059] In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0060] refer to Figures 1 to 12 As shown, a heavy metal detection device for soil monitoring includes a detection box, a mobile cart and a vertical moving mechanism, wherein the detection box and the vertical moving mechanism are both fixedly arranged on the mobile cart, and further includes:

[0061] A mounting frame 1 is fixedly connected to the output end of the vertical moving mechanism, a housing 2 is fixedly sleeved on the outer side of the mounting frame 1, and a horizontal mounting plate 3 is fixedly connected to the bottom of the housing 2;

[0062] The spiral soil cleaning assembly 4 is located on the lower end of the horizontal mounting plate 3, and includes a vertical spiral soil discharge pipe 5 for soil discharge, an openable and closable conical spiral head 6 for drilling holes, and a vertical first connecting shaft 7;

[0063] A driving assembly 10 is fixedly mounted on the mounting frame 1. The driving assembly 10 includes two horizontal connecting gears 11 and a first horizontal connecting plate 12 that moves vertically synchronously with the two connecting gears 11;

[0064] The spiral sampling assembly 8 includes a spiral sampling rod 9 located inside the spiral soil discharge pipe 5 for sampling materials, the upper end of the spiral sampling rod 9 passes through the horizontal mounting plate 3 and the first horizontal connecting plate 12 upward, and the lower end of the spiral sampling rod 9 can pass through the spiral soil discharge pipe 5 vertically downward;

[0065] Two sets of detachable connecting devices 13, two ends of one set of connecting devices 13 are respectively connected to a connecting gear 11 and the first connecting shaft 7, and two ends of the other set of connecting devices 13 are respectively connected to another connecting gear 11 and the spiral sampling rod 9;

[0066] The expansion starter 14 is used to drive the conical spiral head 6 to expand when the spiral sampling rod 9 moves vertically downward.

[0067] The engine is prior art and is not shown in the figure. The engine is used for power supply.

[0068] The mobile cart can be pushed on the ground to the sampling site to facilitate sampling. The mobile cart and the vertical moving mechanism are both existing technologies, as shown in the figure. When sampling is required for testing, the output end of the vertical moving mechanism moves vertically downward, and the driving component 10 drives the two connecting gears 11 to rotate, and one set of connecting devices 13 drives the first connecting shaft 7 to rotate, thereby driving the spiral soil cleaning component 4 to start, and the spiral soil discharge pipe 5 and the conical spiral head 6 rotate. As the output end of the vertical connecting device 13 continues to move downward, the spiral soil cleaning component 4 drills a hole on the ground, and the spiral soil discharge pipe 5 can discharge excess soil to the ground. The other set of connecting devices 13 is in a separated state, thereby being unable to drive the spiral sampling component 8 to start. After the spiral soil cleaning component 4 completes the drilling, the spiral The sampling assembly 8 is started, driving the spiral sampling rod 9 to move vertically downward. The vertical downward movement of the spiral sampling rod 9 will trigger the unfolding starting device 14, unfold the conical spiral head 6, and allow the spiral sampling rod 9 to be inserted downward into the soil. When the spiral sampling rod 9 moves downward, the connecting device 13 for connecting the spiral sampling rod 9 and the connecting gear 11 is closed together, and the spiral sampling assembly 8 can drive the first horizontal connecting plate 12 to slide vertically downward, so that the connecting device 13 for connecting the connecting gear 11 and the first connecting shaft 7 is opened, so that the spiral soil cleaning assembly 4 stops working, the spiral sampling assembly 8 starts working, the spiral sampling rod 9 rotates, and the soil sample is sent upward to the first horizontal connecting plate 12 to complete the sampling. The operator sends the soil sample into the detection box for detection.

[0069] The spiral soil cleaning assembly 4 also includes:

[0070] A connecting cylinder 15 coaxial with the spiral soil discharge pipe 5 has an open upper end, and the upper and lower ends are axially connected to the lower end of the horizontal mounting plate 3 and the upper end of the spiral soil discharge pipe 5 respectively;

[0071] A first annular rack 16 and a first gear 17 meshing therewith, the first gear 17 being fixedly sleeved on the lower end of the first connecting shaft 7, and the first annular rack 16 being fixedly sleeved on the outer wall of the connecting cylinder 15;

[0072] Two protective sleeves 18 are located between the horizontal mounting plate 3 and the first horizontal connecting plate 12, and are sleeved on the first connecting shaft 7. The two protective sleeves 18 are fixed to the horizontal mounting plate 3 and the first horizontal connecting plate 12 respectively;

[0073] The return spring 19 is sleeved on the two protection sleeves 18, and the two ends thereof are respectively in contact with the horizontal mounting plate 3 and the first horizontal connecting plate 12;

[0074] The inner tube 20 is coaxially arranged with the spiral soil discharge pipe 5, is located inside the spiral soil discharge pipe 5, is sleeved on the outside of the spiral sampling rod 9, and its two ends are respectively connected to the two ends of the spiral soil discharge pipe 5, and the upper end of the inner tube 20 passes through the connecting cylinder 15 upward and is fixedly connected to the horizontal mounting plate 3;

[0075] A connecting circular tube 21 is coaxially arranged with the inner circular tube 20, and has a flange portion 22 formed on the upper end thereof, which is fixedly connected to the lower end of the spiral soil discharge tube 5;

[0076] The connecting mechanism 23 is connected to the unfolding and starting device 14 , and the connecting mechanism 23 passes through the spiral soil discharge pipe 5 and is hinged to the conical spiral head 6 .

[0077] When the connecting gear 11 drives the first connecting shaft 7 to rotate through the connecting mechanism 23, the first gear 17 is driven to rotate, and the connecting cylinder 15 is driven to rotate by driving the first annular rack 16 to rotate, thereby driving the spiral soil discharge pipe 5 and the conical spiral head 6 to rotate, drilling on the ground is carried out to prepare for sampling.

[0078] When the drilling is completed and the spiral sampling assembly 8 is started, it will drive the first horizontal connecting plate 12 to move vertically downward, so that the connecting mechanism 23 used to connect the connecting gear 11 and the first connecting shaft 7 is separated, and the reset spring 19 is compressed. At the same time, the first horizontal connecting plate 12 will also drive the connecting mechanism 23 to start, so that the conical spiral head 6 can be unfolded, so that the spiral sampling rod 9 can extend downward into the soil. When the spiral sampling assembly 8 completes the sampling reset, the reset spring 19 will push the first horizontal connecting plate 12 to move vertically upward, so that the connecting mechanism 23 is closed together, and the two protective pipe sleeves 18 can separate the reset spring 19 and the first connecting shaft 7 to prevent the reset spring 19 from hindering the rotation of the first connecting shaft 7.

[0079] The conical spiral head 6 is composed of a plurality of arc plates 24 evenly distributed along the circumferential direction of the flange portion 22 , each arc plate 24 is hinged to the flange portion 22 , and a first outer spiral portion 25 is formed on the outer side of the arc plate 24 .

[0080] A plurality of arc-shaped plates 24 are aggregated together to isolate the external soil. When the plurality of arc-shaped plates 24 are unfolded, it is convenient for the spiral sampling rod 9 to be inserted downward into the soil, and the first outer spiral portion 25 is conducive to drilling and draining soil.

[0081] The spiral soil discharge pipe 5 is composed of a second outer spiral portion 26 and an outer cylindrical tube 27. The second outer spiral portion 26 is welded and fixed to the outer cylindrical tube 27. The side wall of the outer cylindrical tube 27 is formed with a plurality of strip-shaped grooves 28 of the same length and evenly distributed along the circumferential direction for the connection mechanism 23 to pass through.

[0082] The spiral soil discharge pipe 5 is composed of a second outer spiral portion 26 and an outer cylindrical tube 27 in order to form a strip chute 28 on the outer cylindrical tube 27 because the integral spiral soil discharge pipe 5 cannot form a strip chute 28 for the connecting mechanism 23 to pass through.

[0083] The connecting mechanism 23 comprises:

[0084] A plurality of slide bars 29 correspondingly slide through a plurality of strip-shaped slide grooves 28, the end of each slide bar 29 slides through the flange portion 22 and extends between the connecting tube 21 and the arc-shaped plate 24, the other end of each slide bar 29 slides upward through the connecting cylinder 15, and is hinged with a connecting rod 30, the free ends of the connecting rod 30 are hinged to the inner side of the corresponding arc-shaped plate 24, and the end of the connecting rod 30 hinged to the arc-shaped plate 24 is arranged away from the axis of the connecting tube 21;

[0085] The annular sheet 31 slidably sleeved on the inner tube 20 is located in the connecting cylinder 15, and the annular sheet 31 is fixedly connected to the ends of a plurality of slide bars 29;

[0086] A plurality of closing springs 32 are mounted one by one on a plurality of slide bars 29 , and two ends of each closing spring 32 are in contact with the annular sheet 31 and the bottom of the connecting cylinder 15 respectively.

[0087] When the spiral sampling assembly 8 is started, it drives the first horizontal connecting plate 12 to move vertically downward, drives the expansion starting device 14 to start, pushes the annular plate 31 to move vertically downward, the closing spring 32 is compressed, and the slide bar 29 slides in the strip slide groove 28 toward the arc plate 24, driving one end of the connecting rod 30 to move away from the spiral soil discharge pipe 5, and the other end of the connecting rod 30 pushes the arc plate 24 to rotate in the axial direction away from the spiral soil discharge pipe 5, so that the conical spiral head 6 is expanded.

[0088] When the spiral sampling assembly 8 takes out the soil sample and resets, the closing spring 32 pushes the annular sheet 31 to move toward the horizontal mounting plate 3, driving the plurality of slide bars 29 to slide in the strip slide groove 28 toward the horizontal mounting plate 3, and driving the plurality of arc plates 24 to gather together and close together to form a conical spiral head 6 through the connecting rod 30.

[0089] The drive assembly 10 further includes:

[0090] The motor 33 is fixed on the mounting frame 1, and a vertical second connecting shaft 34 is connected to the output shaft of the motor 33. The second connecting shaft 34 passes downward through the first horizontal connecting plate 12 and is axially connected to the horizontal mounting plate 3;

[0091] The second gear 35 is fixedly sleeved on the second connecting shaft 34 . The second gear 35 is meshed with the two connecting gears 11 . The width of the second gear 35 is greater than that of the connecting gears 11 . Each connecting gear 11 is axially connected to the first horizontal connecting plate 12 .

[0092] When the driving component 10 needs to be started, the motor 33 starts, driving the second connecting shaft 34 to start, driving the second gear 35 to rotate, thereby driving the two connecting gears 11 to rotate. The two connecting gears 11 are respectively connected to the two groups of connecting devices 13. When the spiral soil cleaning component 4 needs to be started, the connecting device 13 connected to the first connecting shaft 7 is combined together, and the connecting gear 11 drives the first connecting shaft 7 to rotate through the connecting device 13, while the other group of connecting devices 13 is disconnected. When the first horizontal connecting plate 12 moves vertically downward, the two connecting gears 11 move downward relative to the second gear 35, so the width of the second gear 35 needs to be greater than the width of the connecting gear 11, so that when the connecting gear 11 moves downward with the first horizontal connecting plate 12, the second gear 35 can also mesh with the two connecting gears 11, thereby driving the two connecting gears 11 to rotate. When the first horizontal connecting plate 12 moves downward, the connecting device 13 connected to the first connecting shaft 7 is disconnected, and the connecting device 13 connected to the spiral sampling rod 9 is combined together, thereby driving the spiral sampling rod 9 to rotate.

[0093] The connecting device 13 comprises:

[0094] A first tubular ferrule 36 is coaxially arranged with the first connecting shaft 7, and is slidably sleeved on the outside of the first connecting shaft 7. The first tubular ferrule 36 is axially connected to the first horizontal connecting plate 12. A second annular rack 37 is fixedly sleeved on the outside of the first tubular ferrule 36, and the second annular rack 37 is meshed with the corresponding connecting gear 11.

[0095] The second tubular ferrule 38 , which is coaxially arranged with the first connecting shaft 7 , is fixedly sleeved on the upper end of the first connecting shaft 7 , and the lower end of the second tubular ferrule 38 is clamped with the upper end of the first tubular ferrule 36 .

[0096] When the first tubular ferrule 36 and the second tubular ferrule 38 are clamped together, the connecting gear 11 drives the second annular rack 37 to rotate, thereby driving the first tubular ferrule 36 to rotate, driving the first tubular ferrule 36 to rotate, and driving the first connecting shaft 7 to rotate.

[0097] When the first horizontal connecting plate 12 moves downward, the first tubular ferrule 36 and the second tubular ferrule 38 are separated, so that the first tubular ferrule 36 cannot drive the second tubular ferrule to rotate.

[0098] The first tubular ferrule 36 of another set of connecting devices 13 is coaxially arranged with the spiral sampling rod 9, the first tubular ferrule 36 is slidably sleeved on the spiral sampling rod 9, the first tubular ferrule 36 is axially connected with the first horizontal connecting plate 12, the second annular rack 37 on the first tubular ferrule 36 is meshed with another connecting gear 11, the second tubular ferrule 38 is fixedly sleeved on the upper end of the spiral sampling rod 9, and the second tubular ferrule 38 is located above the first tubular ferrule 36.

[0099] When the second horizontal connecting plate 40 moves downward, it drives the second tubular ferrule 38 to move vertically downward and engage with the first tubular ferrule 36. The spiral sampling rod 9 continues to move downward, driving the first horizontal connecting plate 12 to move downward, so that the connecting device 13 connected to the first connecting shaft 7 is separated, so that the connecting gear 11 drives the spiral sampling rod 9 to rotate through the connecting device 13 to take out the soil.

[0100] The spiral sampling assembly 8 also includes:

[0101] The electric push rod 39 is fixed on the mounting frame 1. The vertical downward output end of the electric push rod 39 is fixedly connected with a second horizontal connecting plate 40. The second horizontal connecting plate 40 is axially connected to the upper end of the spiral sampling rod 9. The second horizontal connecting plate 40 is located above the second tubular ferrule 38.

[0102] A support sleeve 41 is fixed to the lower end of the second horizontal connecting plate 40;

[0103] The portion of the spiral sampling rod 9 between the first horizontal connecting plate 12 and the second horizontal connecting plate 40 is located outside the housing 2 .

[0104] When the spiral sampling assembly 8 is needed to take samples, the output end of the electric push rod 39 drives the second horizontal connecting plate 40 to move vertically downward, driving the spiral sampling rod 9 to move vertically downward. When the first tubular ferrule 36 and the second tubular ferrule 38 are engaged with each other, the lower end of the support sleeve 41 just contacts the first horizontal connecting plate 12. The output end of the electric push rod 39 continues to push the second horizontal connecting plate 40 to move vertically downward, so that the connecting device 13 connected to the first connecting shaft 7 is separated, the reset spring 19 is squeezed, and the spiral sampling rod 9 is driven to move downward and inserted into the soil. The connecting gear 11 drives the spiral sampling rod 9 to rotate through the connecting device 13 to take the soil onto the horizontal mounting plate 3.

[0105] When the spiral sampling assembly 8 completes sampling, the electric push rod 39 drives the second horizontal connecting plate 40 to move upward to return to its original position, and the connecting device 13 connected to the spiral sampling rod 9 is separated, and the return spring 19 pushes the first horizontal connecting plate 12 to move vertically upward, so that the connecting device 13 connected to the first connecting shaft 7 is closed together.

[0106] The deployment and activation device 14 comprises:

[0107] The connecting arm 42 is in a vertical state, the upper end of which passes through the support sleeve 41 and slides through the second horizontal connecting plate 40, and the lower end of which slides through the first horizontal connecting plate 12, and is located between the second connecting shaft 34 and the spiral sampling rod 9;

[0108] A limiting ring 43 is fixedly sleeved on the connecting arm 42 and is located between the first horizontal connecting plate 12 and the second horizontal connecting plate 40;

[0109] There are two support springs 44, both of which are sleeved on the connecting arm 42, and the two ends of one support spring 44 are respectively in conflict with the limiting ring 43 and the first horizontal connecting plate 12, and the two ends of the other support spring 44 are respectively in conflict with the limiting ring 43 and the second horizontal connecting plate 40;

[0110] A sliding sleeve 45, which is disposed on the connecting arm 42, and the upper end of the sliding sleeve 45 is fixedly connected to the lower end of the second horizontal connecting plate 40;

[0111] The lower end of the vertical push arm 46 slides downward through the first horizontal connecting plate 12 and is slidably connected to the annular sheet 31 , and the upper end of the push arm 46 abuts against the lower ends of the sliding sleeve 45 and the connecting arm 42 .

[0112] When the second horizontal connecting plate 40 moves vertically downward, before the support sleeve 41 contacts the first horizontal connecting plate 12, the two support springs 44 are squeezed, causing the limit ring 43 to move downward, driving the connecting arm 42 to move downward, and the connecting arm 42 pushes the pushing arm 46 to move vertically downward, and the connecting arm 42 pushes the annular sheet 31 downward, thereby unfolding the conical spiral head 6. Since the downward moving distance of the connecting arm 42 is small, the conical spiral head 6 cannot be fully opened, but it can allow the spiral sampling rod 9 to pass through. When the second horizontal connecting plate 40 continues to move downward, the support sleeve 41 pushes the first horizontal connecting plate 12 to move downward, and the first horizontal connecting plate 12 drives the sliding sleeve 45 to move downward and contact the upper end of the pushing arm 46. The second horizontal connecting plate 40 continues to move downward, and the lower end of the sliding sleeve 45 will push the pushing arm 46 to move downward, completely opening the conical spiral head 6. Therefore, the unfolding of the conical spiral head 6 is divided into two stages.

[0113] The lower end of the push arm 46 is slidably connected to the annular plate 31 because the annular plate 31 needs to rotate, while the push arm 46 cannot rotate.

[0114] When the second horizontal connecting plate 40 moves upward, without the support sleeve 41 to resist the first horizontal connecting plate 12, the first horizontal connecting plate 12 will also move upward. When the first horizontal connecting plate 12 moves to the connecting device 13 on the first connecting shaft 7 and is combined, it can no longer move upward, while the second horizontal connecting plate 40 continues to move upward. The two support springs 44 unfold, causing the limit ring 43 to move upward, driving the connecting arm 42 to move upward, and the annular plate 31 will move upward without the pressure of the push arm 46. The annular plate 31 moves upward, causing the conical spiral head 6 to unfold, pushing the push arm 46 vertically upward, so that the lower end of the push arm 46 always resists the lower end of the connecting arm 42.

[0115] A vertical partition plate 47 is fixedly provided on the upper end of the horizontal mounting plate 3, and the vertical partition plate 47 is located between the pushing arm 46 and the spiral sampling rod 9. A corrugated partition plate 48 is fixedly provided on the upper end of the vertical partition plate 47, and the upper end of the corrugated partition plate 48 is fixedly connected to the first horizontal connecting plate 12. The vertical partition plate 47 and the corrugated partition plate 48 separate the soil taken out by the spiral sampling rod 9.

[0116] The above embodiments only express one or several implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.

Claims

1. A heavy metal detection device for soil monitoring, comprising a detection box, a mobile cart and a vertical moving mechanism, wherein the detection box and the vertical moving mechanism are both fixedly arranged on the mobile cart, and characterized in that: Also includes: A mounting frame (1) is fixedly connected to the output end of the vertical moving mechanism, an outer fixed sleeve of the mounting frame (1) is provided with a housing (2), and a horizontal mounting plate (3) is fixedly connected to the bottom of the housing (2); The spiral soil cleaning assembly (4) is located on the lower end of the horizontal mounting plate (3), and comprises a vertical spiral soil discharge pipe (5) for discharging soil, an openable and closable conical spiral head (6) for drilling holes, and a vertical first connecting shaft (7); A driving assembly (10) is fixedly mounted on the mounting frame (1), the driving assembly (10) comprising two horizontal connecting gears (11) and a first horizontal connecting plate (12) which moves vertically synchronously with the two connecting gears (11); A spiral sampling assembly (8) comprises a spiral sampling rod (9) located inside the spiral soil discharge pipe (5) for sampling materials, wherein the upper end of the spiral sampling rod (9) passes through the horizontal mounting plate (3) and the first horizontal connecting plate (12) upwards, and the lower end of the spiral sampling rod (9) can pass through the spiral soil discharge pipe (5) vertically downwards; Two sets of detachable connecting devices (13), wherein two ends of one set of connecting devices (13) are respectively connected to a connecting gear (11) and a first connecting shaft (7), and two ends of the other set of connecting devices (13) are respectively connected to another connecting gear (11) and a spiral sampling rod (9); An expansion starter (14) is used to drive the conical spiral head (6) to expand when the spiral sampling rod (9) moves vertically downward; The spiral soil cleaning assembly (4) further comprises: A connecting cylinder (15) coaxial with the spiral soil discharge pipe (5), the upper end of which is an open end, and the upper and lower ends of which are axially connected to the lower end of the horizontal mounting plate (3) and fixedly connected to the upper end of the spiral soil discharge pipe (5) respectively; A first annular rack (16) and a first gear (17) meshing therewith, the first gear (17) being fixedly sleeved on the lower end of the first connecting shaft (7), and the first annular rack (16) being fixedly sleeved on the outer wall of the connecting cylinder (15); Two protective pipe sleeves (18) are both located between the horizontal mounting plate (3) and the first horizontal connecting plate (12), and are both sleeved on the first connecting shaft (7). The two protective pipe sleeves (18) are respectively fixed to the horizontal mounting plate (3) and the first horizontal connecting plate (12); A return spring (19) is sleeved on the two protection sleeves (18), and two ends thereof are respectively in contact with the horizontal mounting plate (3) and the first horizontal connecting plate (12); An inner circular tube (20) arranged coaxially with the spiral soil discharge tube (5) is located inside the spiral soil discharge tube (5), and its two ends are respectively axially connected to the two ends of the spiral soil discharge tube (5), and the upper end of the inner circular tube (20) passes upward through the connecting cylinder (15) and is fixedly connected to the horizontal mounting plate (3); A connecting circular tube (21) is coaxially arranged with the inner circular tube (20), sleeved on the outside of the spiral sampling rod (9), and has a flange portion (22) formed on the upper end thereof and fixedly connected to the lower end of the spiral soil discharge tube (5); A connecting mechanism (23) is connected to the unfolding start device (14), and the connecting mechanism (23) passes through the spiral soil discharge pipe (5) and is hinged to the conical spiral head (6); The connecting device (13) comprises: A first tubular ferrule (36) is coaxially arranged with the first connecting shaft (7), and is slidably sleeved on the outside of the first connecting shaft (7). The first tubular ferrule (36) is axially connected to the first horizontal connecting plate (12). A second annular rack (37) is fixedly sleeved on the outside of the first tubular ferrule (36), and the second annular rack (37) is meshed with a corresponding connecting gear (11); A second tubular ferrule (38) is coaxially arranged with the first connecting shaft (7), fixedly sleeved on the upper end of the first connecting shaft (7), and the lower end of the second tubular ferrule (38) is clamped with the upper end of the first tubular ferrule (36); The first tubular ferrule (36) of the other connecting device (13) is coaxially arranged with the spiral sampling rod (9), the first tubular ferrule (36) is slidably sleeved on the spiral sampling rod (9), the first tubular ferrule (36) is axially connected to the first horizontal connecting plate (12), the second annular rack (37) on the first tubular ferrule (36) is meshed with another connecting gear (11), the second tubular ferrule (38) is fixedly sleeved on the upper end of the spiral sampling rod (9), and the second tubular ferrule (38) is located above the first tubular ferrule (36).

2. The heavy metal detection device for soil monitoring according to claim 1, characterized in that: The conical spiral head (6) is composed of a plurality of arc-shaped plates (24) evenly distributed along the circumferential direction of the flange portion (22), each arc-shaped plate (24) is hinged to the flange portion (22), and a first outer spiral portion (25) is formed on the outer side of the arc-shaped plate (24).

3. The heavy metal detection device for soil monitoring according to claim 2, characterized in that: The spiral soil discharge pipe (5) is composed of a second outer spiral portion (26) and an outer cylindrical tube (27). The second outer spiral portion (26) is welded and fixed to the outer cylindrical tube (27). The side wall of the outer cylindrical tube (27) is formed with a plurality of strip-shaped sliding grooves (28) of the same length and evenly distributed in the circumferential direction for the connection mechanism (23) to pass through.

4. The heavy metal detection device for soil monitoring according to claim 3, characterized in that: The connecting mechanism (23) comprises: A plurality of slide bars (29) slidingly passing through the plurality of strip-shaped slide grooves (28) in a one-to-one correspondence, the end of each slide bar (29) slidingly passing through the flange portion (22) and extending into between the connecting circular tube (21) and the arc-shaped plate (24), the other end of each slide bar (29) slidingly passing through the connecting cylinder (15) upward, being hingedly connected with a connecting rod (30), the free ends of the connecting rods (30) being hingedly connected to the inner side of the corresponding arc-shaped plate (24), and the ends of the connecting rods (30) hingedly connected to the arc-shaped plate (24) being arranged away from the axis of the connecting circular tube (21); An annular sheet (31) slidably sleeved on the inner circular tube (20) is located inside the connecting cylinder (15), and the annular sheet (31) is fixedly connected to the ends of a plurality of sliding strips (29); A plurality of closing springs (32) are arranged one by one on a plurality of slide bars (29), and two ends of each closing spring (32) are respectively in contact with the annular sheet (31) and the bottom of the connecting cylinder (15).

5. The heavy metal detection device for soil monitoring according to claim 1, characterized in that: The driving assembly (10) further comprises: The motor (33) is fixed on the mounting frame (1); the output shaft of the motor (33) is connected to a vertical second connecting shaft (34); the second connecting shaft (34) passes downward through the first horizontal connecting plate (12) and is axially connected to the horizontal mounting plate (3); The second gear (35) is fixedly sleeved on the second connecting shaft (34), the second gear (35) is meshed with the two connecting gears (11), and the width of the second gear (35) is greater than the width of the connecting gears (11), and each connecting gear (11) is axially connected to the first horizontal connecting plate (12).

6. The heavy metal detection device for soil monitoring according to claim 1, characterized in that: The spiral sampling assembly (8) further comprises: An electric push rod (39) is fixed on the mounting frame (1); a second horizontal connecting plate (40) is fixedly connected to a vertically downward output end of the electric push rod (39); the second horizontal connecting plate (40) is axially connected to the upper end of the spiral sampling rod (9); and the second horizontal connecting plate (40) is located above the second tubular ferrule (38); A support sleeve (41) fixed to the lower end of the second horizontal connecting plate (40); The portion of the spiral sampling rod (9) located between the first horizontal connecting plate (12) and the second horizontal connecting plate (40) is located outside the housing (2).

7. The heavy metal detection device for soil monitoring according to claim 6, characterized in that: The deployment and activation device (14) comprises: The connecting arm (42) is in a vertical state, the upper end of which passes through the support sleeve (41) and slides through the second horizontal connecting plate (40), and the lower end of which slides through the first horizontal connecting plate (12), and is located between the second connecting shaft (34) and the spiral sampling rod (9); A limiting ring (43) is fixedly sleeved on the connecting arm (42) and is located between the first horizontal connecting plate (12) and the second horizontal connecting plate (40); Two support springs (44) are sleeved on the connecting arm (42), two ends of one support spring (44) respectively abut against the limiting ring (43) and the first horizontal connecting plate (12), and two ends of the other support spring (44) respectively abut against the limiting ring (43) and the second horizontal connecting plate (40); A sliding sleeve (45), the sliding sleeve being arranged on the connecting arm (42), and the upper end of the sliding sleeve (45) being fixedly connected to the lower end of the second horizontal connecting plate (40); The lower end of the vertical push arm (46) slides downward through the first horizontal connecting plate (12) and is slidably connected to the annular plate (31), and the upper end of the push arm (46) abuts against the lower end of the sliding sleeve (45) and the connecting arm (42).