A method for hoisting large parts of offshore self-climbing crane

By using tugs and self-launched cranes in offshore wind turbines combined with self-climbing cranes and sub-crunks, the problem of difficult, high cost and time-consuming replacement of offshore wind turbine components is solved, and efficient parts replacement is achieved.

CN115434862BActive Publication Date: 2024-12-06YANSHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211067340.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-01
Publication Date
2024-12-06
Estimated Expiration
2042-09-01

AI Technical Summary

Technical Problem

Replacing parts of offshore wind turbine units is difficult, costly and time-consuming. Traditional maintenance methods require large cranes and ships, which increases the maintenance cost and time.

Method used

The use of tugboats and self-carrying equipment, combined with self-climbing cranes and secondary cranes, the lifting of parts is achieved through specific spreaders and winches, reducing the dependence on large cranes.

Benefits of technology

Without using large cranes, the replacement of offshore wind turbine components is effectively completed, reducing costs and time, and improving the efficiency of replacing parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115434862B_ABST
    Figure CN115434862B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for hoisting large parts of an offshore self-climbing crane, which can be implemented by using existing tugboats, winches, auxiliary cranes, self-climbing cranes, installation platforms, pulley frames, special hoists, and lifting equipment that comes with the engine room. The method of the present invention is used to replace parts of an offshore wind turbine generator set without using a large crane, and only the lifting equipment that comes with the engine room on the engine room and the self-climbing crane and auxiliary crane on the tugboat can be used to replace large parts. Specifically, two cranes and a small amount of other auxiliary tools can effectively solve the problems of difficulty in replacing parts of an offshore wind turbine generator set, high cost, long time consumption, and uncontrollable specific time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind power generation maintenance and hoisting, and in particular to a hoisting method for large parts of an offshore self-climbing crane. Background Art

[0002] As a new energy source, wind power generation has gradually entered people's field of vision. It has the advantages of being environmentally friendly and having large power generation capacity. Wind turbines mainly include blades, low-speed shafts, gearboxes, rotors, generators, etc. When the wind drives the impeller to rotate, the low-speed shaft rotates accordingly, and through the gearbox, it is converted into high-speed rotation, and then the generator generates electricity, which is then stored. During the power generation process, the gearbox of the wind turbine needs to rotate continuously, which causes wear in the process. When it reaches a certain level, the parts in the gearbox need to be replaced.

[0003] When replacing wind turbine parts in the traditional way, a higher crane is needed because the wind turbine is very high. However, in the case of offshore wind turbines, a larger ship is needed to transport the crane, which increases the maintenance cost and time. In addition, when replacing wind turbines on land, since many onshore wind turbines are on grasslands, a road needs to be opened first and then restored after the maintenance is completed, which results in unnecessary cost increase. Summary of the invention

[0004] In view of the above problems, the purpose of the present invention is to provide a method for lifting large components of an offshore self-climbing crane, which is used to realize the replacement of components of offshore wind turbines without using large cranes. Large components can be replaced by using only the lifting equipment in the cabin and the self-climbing crane and auxiliary crane on the tugboat. Two cranes, one and a small amount of other tools are used to solve the problems of difficulty, high cost, long time consumption and uncontrollable specific time in replacing parts of offshore wind turbines.

[0005] The technical solution adopted by the present invention is as follows:

[0006] The invention provides a method for hoisting large parts of an offshore self-climbing crane, which uses a tugboat and special hoisting equipment; the special hoisting equipment includes a winch, a self-climbing crane, a pulley frame, an auxiliary crane, an installation platform, a special hoisting device and a self-contained lifting device for the engine room; the winch, the self-climbing crane, the pulley frame, the auxiliary crane, the installation platform and the special hoisting device are placed on the tugboat in sequence, and the steel wire rope at one end of the winch is wound on the pulley frame; the self-contained lifting device for the engine room is at the end of the wind turbine tower;

[0007] The method comprises the following steps:

[0008] S1. The mechanical equipment placed on the tugboat is transported by the tugboat close to the wind turbine tower to the designated location;

[0009] S2. Start the crane equipment on the nacelle of the tower, lift the installation platform to the top of the nacelle and install it securely;

[0010] S3. Start the crane built into the engine room again to lift the pulley frame with the wire rope wound around it and install it on the installation platform;

[0011] S4, start the winch to make the self-climbing crane climb onto the nacelle and fix it on the end surface of the installation platform;

[0012] S5. Start the self-lifting crane on the tower, lift the first rotation point of the specific lifting device on the tugboat, and use the lifting device to lift the parts to be replaced;

[0013] S6, release the cable from the climbing crane, and when the second rotation point is parallel to the hook of the auxiliary crane, lift the second rotation point with the hook of the auxiliary crane;

[0014] S7, the self-climbing crane releases the cable, the auxiliary crane remains stationary, the parts remain vertical due to gravity, and the specific lifting device rotates;

[0015] S8, continue to release the cable of the self-climbing crane, and the sling continues to rotate. When it rotates 90 degrees, the cable of the self-climbing crane stops releasing and remains motionless;

[0016] S9. Remove the hook from the rotating shaft, and place the parts on the ship by the auxiliary crane to complete the lifting operation of the parts;

[0017] When transporting parts from a ship to a wind turbine nacelle, this operation can be repeated in reverse.

[0018] Furthermore, the self-climbing crane and the auxiliary crane are A-frames or trusses.

[0019] Furthermore, the main boom of the self-climbing crane is a fixed-length boom or a telescopic boom; and the auxiliary crane is a fixed-length boom.

[0020] Furthermore, the winch is a hydraulic winch or an electric winch.

[0021] Furthermore, the connection between the self-climbing crane and the installation platform is a bolt connection or a pin connection.

[0022] Furthermore, the hoisting method can also be used for hoisting large parts of a self-climbing crane on land.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The present invention proposes a new method for lifting large components of an offshore self-climbing crane, which can realize the replacement of components of offshore wind turbines without using a large crane. Important components can be replaced using only the main crane on the nacelle and the auxiliary crane on the tugboat. Through two cranes and a small amount of other auxiliary tools, the problems of difficulty in replacing parts of offshore wind turbines, high cost, long time consumption, and uncontrollable specific time can be effectively solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall equipment structure used in the method of the present invention;

[0026] Figure 2 A schematic diagram of a tugboat carrying equipment close to a wind turbine tower;

[0027] Figure 3 Schematic diagram of the cabin's own lifting equipment lifting the installation platform to the cabin and installing it;

[0028] Figure 4 Schematic diagram of lifting the self-climbing crane pulley frame with wire rope and installing it on the installation platform for the cabin's own lifting equipment;

[0029] Figure 5 A schematic diagram showing the use of a winch to allow the self-climbing crane to climb onto the nacelle and be installed on a supporting frame;

[0030] Figure 6 A schematic diagram of the first rotation point of a specific lifting device for lifting the lifting device by a self-climbing crane so that the lifting device can lift the parts;

[0031] Figure 7 Schematic diagram of the second rotation point of the auxiliary crane's hook lifting a specific lifting device for releasing the cable from the climbing crane;

[0032] Figure 8 Schematic diagram of the release of the cable for the self-climbing crane, the auxiliary crane remains stationary, and the specific spreader is rotated;

[0033] Fig. 9 Schematic diagram of the self-climbing crane releasing the cable, the specific spreader rotates to 90°, and the self-climbing crane stops releasing the cable;

[0034] Fig.10 Schematic diagram of removing the hook from the self-climbing crane and placing the parts on the ship by the auxiliary crane.

[0035] Among them, the figure numbers are: 1-tugboat; 2-winch; 3-self-climbing crane; 4-self-climbing crane pulley frame; 5-auxiliary crane; 6-installation platform; 7-specific lifting equipment. DETAILED DESCRIPTION

[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] See attached Figures 1 to 10 , gives the complete process of an embodiment of a method for hoisting large parts of an offshore self-climbing crane proposed by the present invention. Figure 1 As shown, the method of the present invention can be implemented by using an existing tugboat (1) and special lifting equipment; the special lifting equipment includes a winch (2), a self-climbing crane (3), a self-climbing crane pulley frame (4), an auxiliary crane (5), a mounting platform (6), a special lifting device (7) and a cabin self-contained lifting device; the winch (2), the self-climbing crane (3), the pulley frame (4), the auxiliary crane (5), the mounting platform (6) and the special lifting device (7) are placed on the tugboat in sequence, and the steel wire rope at one end of the winch is wound around the self-climbing crane pulley frame (4); the cabin self-contained lifting device is installed at the top of the wind turbine cabin tower, wherein the self-climbing crane (3) and the auxiliary crane (5) are A-frames or trusses; the main boom of the self-climbing crane (3) is a fixed-length boom or a telescopic boom; the auxiliary crane (5) is a fixed-length boom; the winch (2) is a hydraulic winch or an electric winch.

[0038] The specific implementation process of the method is as follows:

[0039] S1, such as Figure 2 As shown, the mechanical equipment placed on the tugboat (1) is transported by the tugboat (1) to a designated location close to the wind turbine tower;

[0040] S2, such as Figure 3 As shown, the nacelle-mounted lifting equipment on the nacelle tower of the wind turbine generator is started to lift the installation platform (6) to the top of the nacelle tower and fix it;

[0041] S3, such as Figure 4 As shown, the crane cabin's own lifting equipment is started again to lift the self-climbing crane pulley frame (4) wound with a steel wire rope onto the tower and install it on the installation platform (6);

[0042] S4, such as Figure 5 As shown, the winch (2) is started to make the self-climbing crane (3) climb to the tower of the wind turbine nacelle and fixedly mounted on the upper end surface of the mounting platform (6); the connection between the self-climbing crane (3) and the mounting platform (6) is a bolt connection or a pin connection;

[0043] S5, such as Figure 6 As shown, a self-climbing crane (3) on the tower of a wind turbine generator is used to lift the first rotation point of a specific lifting device (7), and then the specific lifting device (7) is used to lift the components on the tower, so that the components leave the nacelle of the wind turbine generator;

[0044] S6, such as Figure 7 As shown, the cable from the climbing crane (3) is released, and when the second rotation point is parallel to the hook of the auxiliary crane (5), the second rotation point is lifted by the hook of the auxiliary crane (5);

[0045] S7, such as Figure 8 As shown, the cable of the self-climbing crane (3) continues to be released, the cable of the auxiliary crane (5) is kept stationary, and the specific lifting device (7) starts to rotate around the second rotation point under the action of gravity. When it rotates 90 degrees, the cable of the self-climbing crane (3) stops being released and remains stationary;

[0046] S8, such as Fig. 9 As shown, the hook is removed from the rotating shaft, and the auxiliary crane (5) places the parts on the ship, completing the lifting operation of the parts;

[0047] When transporting parts from a ship to a wind turbine nacelle, this operation can be repeated in reverse.

[0048] The method for hoisting large parts of a self-climbing crane at sea proposed by the present invention can also be used for hoisting large parts of a self-climbing crane on land.

[0049] Matters not covered by the present invention are known technologies.

[0050] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for hoisting large parts of an offshore self-climbing crane, implemented by using a tugboat and special hoisting equipment, characterized in that: The special lifting equipment includes a winch, a self-climbing crane, a pulley frame, an auxiliary crane, a mounting platform, a specific lifting device and a lifting device that comes with the cabin; the winch, the self-climbing crane, the pulley frame, the auxiliary crane, the mounting platform and the specific lifting device are placed on the tugboat in sequence, and the wire rope is wound around the pulley frame; the lifting device that comes with the cabin is installed at the end of the wind turbine tower; The method comprises the following steps: S1. The mechanical equipment placed on the tugboat is transported by the tugboat close to the wind turbine tower to the designated location; S2. Start the crane equipment on the nacelle of the tower, lift the installation platform to the top of the nacelle and install it securely; S3. Start the crane built into the engine room again to lift the pulley frame with the wire rope wound around it and install it on the installation platform; S4, start the winch to make the self-climbing crane climb onto the nacelle and fix it on the end surface of the installation platform; S5. Start the self-lifting crane on the tower, lift the first rotation point of the specific lifting device on the tugboat, and use the lifting device to lift the parts to be replaced; S6, release the cable from the climbing crane, and when the second rotation point is parallel to the hook of the auxiliary crane, lift the second rotation point with the hook of the auxiliary crane; S7, the self-climbing crane releases the cable, the auxiliary crane remains stationary, the parts remain vertical due to gravity, and the specific lifting device rotates; S8, continue to release the cable of the self-climbing crane, and the sling continues to rotate. When it rotates 90 degrees, the cable of the self-climbing crane stops releasing and remains motionless; S9. Remove the hook from the rotating shaft, and place the parts on the ship by the auxiliary crane to complete the lifting operation of the parts; When transporting parts from a ship to a wind turbine nacelle, this operation can be repeated in reverse.

2. A method for hoisting large parts of an offshore self-climbing crane according to claim 1, characterized in that: The self-climbing crane and the auxiliary crane are A-frames or trusses.

3. A method for hoisting large parts of an offshore self-climbing crane according to claim 2, characterized in that: The main boom of the self-climbing crane is a fixed-length boom or a telescopic boom; the auxiliary crane is a fixed-length boom.

4. The method for hoisting large parts of an offshore self-climbing crane according to claim 1, characterized in that: The winch is a hydraulic winch or an electric winch.

5. The method for hoisting large parts of an offshore self-climbing crane according to claim 1, characterized in that: The connection between the self-climbing crane and the installation platform is a bolt connection or a pin connection.

6. A method for hoisting large parts of an offshore self-climbing crane according to any one of claims 1 to 5, characterized in that: The hoisting method can also be used for hoisting large parts of a self-climbing crane on land.