A double-layer anti-bottom arch anti-bottom bulge structure at the bottom of a tunnel and a construction method thereof

By setting up a double-layer anti-bottom arch structure at the bottom of the tunnel to disperse the ground stress in the middle section of the bottom plate, the problem of tunnel bottom drum control is solved and the stability and economic benefits of tunnel construction are improved.

CN115467675BActive Publication Date: 2024-11-22SHANGHAI INST OF TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202211104892.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-09
Publication Date
2024-11-22
Estimated Expiration
2042-09-09

AI Technical Summary

Technical Problem

The prior art is difficult to effectively control the internal transportation and traffic obstacles caused by tunnel drums, threatening the safety of operators, and the management effect is not ideal and affecting economic benefits.

Method used

A double-layer anti-bottom arch structure at the bottom of the tunnel is adopted, including the upper and lower anti-bottom arch areas, fixed steel plates and structural units. By pouring a concrete cushion layer, structural units are set to disperse the ground stress in the middle section of the bottom plate to suppress the occurrence of the kick drum.

Benefits of technology

Effectively control the deformation difference between the middle section and left and right sections of the tunnel floor plate, ensure the smooth floor plate, improve the construction stability of the tunnel surrounding rock, reduce economic costs, and simplify the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115467675B_ABST
    Figure CN115467675B_ABST
Patent Text Reader

Abstract

The present invention relates to a measure for preventing bottom bulge in a tunnel, and specifically to a double-layer anti-bottom bulge structure of a tunnel bottom and a construction method thereof. The anti-bottom bulge structure is arranged at the tunnel bottom along the axial direction of the tunnel, and comprises an upper anti-bottom bulge area, a lower anti-bottom bulge area, a fixed steel plate and a structural unit; the upper anti-bottom bulge area is arranged in the tunnel along the entire axial section; the lower anti-bottom bulge area is arranged at intervals along the axial direction in the tunnel, and the lower anti-bottom bulge area is wider than the tunnel width; the lower anti-bottom bulge area is arranged below the upper anti-bottom bulge area; the fixed steel plate is embedded in the bottom corners on both sides of the tunnel; the structural unit is arranged in the lower anti-bottom bulge area, and both ends are fixedly connected to the fixed steel plate; the structural unit is a double-layer structure, the upper layer is attached to the bottom edge of the upper anti-bottom bulge area, and the lower layer is attached to the bottom edge of the lower anti-bottom bulge area; concrete cushion layers are poured in the upper anti-bottom bulge area and the lower anti-bottom bulge area. Compared with the prior art, the present invention realizes effective control of bottom bulge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a tunnel bottom bulging prevention measure, and in particular to a tunnel bottom double-layer reverse bottom arch bottom bulging prevention structure and a construction method thereof. Background Art

[0002] Coal mines in my country are mainly mined underground, and a large number of tunnels need to be excavated underground. The use of tunnel support to keep the tunnels unobstructed and the surrounding rock stable is of great significance to coal mine construction and production. The basic purpose of tunnel support is to ease and reduce the movement of the surrounding rock so that the tunnel section does not shrink excessively, and at the same time prevent the scattered and damaged surrounding rock from falling. The effect of tunnel support depends not only on the supporting force of the support itself, but also on a series of factors such as the surrounding rock properties, the mechanical properties of the support (support force and shrinkability), the density of the support installation, the early or late installation time of the support, the quality of the support installation, and the contact mode with the surrounding rock (point contact or surface contact).

[0003] With the continuous development of tunnel support technology, there are many effective means to control the deformation of the tunnel roof and two sides, but it is still difficult to effectively control the deformation of the bottom plate such as the tunnel floor drum. The tunnel floor drum is caused by the deformation of the surrounding rock of the two sides and the bottom plate under the action of ground stress and deviates into the tunnel. It seriously hinders the transportation and passage inside the tunnel, threatens the life safety of the operators, and reduces the work efficiency of the tunnel.

[0004] Existing methods for treating tunnel floor heave include: tunnel anti-bottom arch, tunnel bottom cushion of various materials, layout of anchor rods and cables at the tunnel bottom, etc. However, most of these methods do not pay attention to the impact of the two sides on the floor and the maximum deformation of the middle end of the floor. Even if the above methods are used to treat tunnel floor heave, the effect is still not ideal, which may cause repeated maintenance of the floor in the subsequent process, thus affecting economic benefits. Summary of the invention

[0005] The purpose of the present invention is to provide a double-layer anti-bottom drum structure with a reverse bottom arch at the bottom of a tunnel and a construction method thereof in order to solve at least one of the above problems, so as to solve the problem that it is difficult to alleviate or eliminate the influence of the two sides on the bottom plate in the prior art, and the problem that the middle end of the bottom plate has the largest deformation during bottom drum, thereby achieving effective control of the bottom drum.

[0006] The purpose of the present invention is achieved through the following technical solutions:

[0007] The first aspect of the present invention discloses a double-layer anti-bottom-drum structure at the bottom of a tunnel, wherein the anti-bottom-drum structure is arranged at the bottom of the tunnel along the axial direction of the tunnel, and comprises an upper anti-bottom-drum area, a lower anti-bottom-drum area, a fixed steel plate and a structural unit;

[0008] The upper layer anti-bottom arch area is arranged in the whole section along the axial direction in the tunnel; the lower layer anti-bottom arch area is arranged in the tunnel along the axial direction at intervals, and the lower layer anti-bottom arch area is wider than the tunnel width; the lower layer anti-bottom arch area is arranged below the upper layer anti-bottom arch area;

[0009] The fixed steel plates are embedded in the bottom corners on both sides of the tunnel;

[0010] The structural unit is arranged in the lower anti-bottom arch area, and both ends are fixedly connected to the fixed steel plate; the structural unit is a double-layer structure, the upper layer is attached to the bottom edge of the upper anti-bottom arch area, and the lower layer is attached to the bottom edge of the lower anti-bottom arch area;

[0011] Concrete cushion layers are poured in the upper anti-bottom arch area and the lower anti-bottom arch area.

[0012] The upper anti-bottom arch area is arranged in full sections, and the lower anti-bottom arch area is arranged below the upper anti-bottom arch area, and the lower anti-bottom arch area is wider than the width of the tunnel, so as to buffer the stress and surrounding rock deformation on both sides.

[0013] Preferably, the lower anti-bottom arch areas are arranged at intervals of 0.8-1m along the axial direction of the tunnel.

[0014] Preferably, the fixed steel plate is synchronously arranged with the structural unit. Synchronous arrangement here means that each time a lower anti-bottom arch area is excavated, the bottom corners of both sides of the tunnel at the corresponding position are conveniently embedded with the fixed steel plate, that is, the fixed steel plate is only arranged at the position where the lower anti-bottom arch area is excavated.

[0015] Preferably, the thickness of the fixed steel plate is 5 cm.

[0016] Preferably, the structural unit comprises a lateral waist support section, a top layer reverse bottom arch section, a middle layer connection section and a bottom layer reverse bottom arch section;

[0017] The side waist support section is fixedly connected to the top layer anti-bottom arch section and the bottom layer anti-bottom arch section; the side waist support section is fixedly connected to the fixed steel plate;

[0018] The middle layer connection section connects the side waist support section with the bottom layer anti-bottom arch section.

[0019] Preferably, the structural units are axially symmetrically arranged on both sides of the lower anti-bottom arch area, and the structural units on both sides are fixedly connected by top-layer cables and bottom-layer cables; the top-layer cables connect the top-layer anti-bottom arch sections on both sides; the bottom-layer cables connect the bottom-layer anti-bottom arch sections on both sides and the middle-layer connecting section and the bottom-layer anti-bottom arch section.

[0020] The middle-layer connecting section in the structural unit connects the side waist support sections on both sides with the bottom anti-bottom arch section, and cooperates with the top anti-bottom arch section to form an inverted triangle with three sides bent inward, thereby dispersing the ground stress of the bottom middle section to both sides of the tunnel.

[0021] Preferably, a pair of the structural units are arranged in the lower anti-bottom arch area and spaced apart along the axial direction of the tunnel.

[0022] Preferably, the structural unit is made of U-shaped steel.

[0023] Preferably, the concrete cushion layer is cast by fine sand cement mortar or medium sand cement mortar. Fine sand cement mortar can rapidly develop the strength of concrete so as to better maintain the shape of the lower anti-bottom arch area.

[0024] More preferably, when the concrete cushion layer of the lower anti-bottom arch area is cast with medium sand cement mortar, a concrete early strength agent is used to improve the early strength of the concrete cushion layer of the lower anti-bottom arch area. The concrete early strength agent is selected according to the conditions of the construction site.

[0025] The second aspect of the present invention discloses a construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel as described above, comprising the following steps:

[0026] S1: The upper anti-bottom arch area is excavated along the axial direction of the tunnel in the entire section of the tunnel floor;

[0027] S2: excavate the lower anti-bottom arch area at intervals along the axial direction of the tunnel below the upper anti-bottom arch area, and embed fixed steel plates at the bottom corners of both sides of the tunnel in the lower anti-bottom arch area, and fix the structural unit by fixing the steel plates;

[0028] S3: After the fixed installation of all structural units in the tunnel is completed, the lower anti-bottom arch area is poured to form the lower concrete cushion layer, and the steel mesh is laid in the entire tunnel section;

[0029] S4: Pour the upper anti-bottom arch area until it completely covers the structural unit and the steel mesh, and compact it with a vibrator to form an upper concrete cushion.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1. The present invention provides a double-layer anti-bottom-bulge structure of a tunnel bottom, which has a double-layer anti-bottom-bulge, wherein the lower anti-bottom-bulge area is larger than the tunnel width and side arcs are arranged on the left and right sides, which can hinder the energy of the left and right sides of the tunnel from transferring to the tunnel floor to a certain extent after pouring concrete, thereby suppressing the bottom bulge; the structural unit in the double-layer anti-bottom-bulge structure is presented as an inverted triangle with three inwardly curved edges to connect the left and right lower sides, and through this structure, the ground stress on the tunnel floor is dispersed from the middle section to the left and right, so as to control the difference in deformation between the middle section and the left and right sections of the tunnel floor, and ensure the overall flatness of the floor; the lower anti-bottom-bulge adopts a method of segmented excavation and a method of digging a section to support a section of the structural unit, so as to prevent the left and right sides from collapsing during the excavation of the anti-bottom-bulge, so as to ensure the stability of the tunnel surrounding rock during construction, and save economic costs at the same time.

[0032] 2. The present invention sets a double-layer anti-bottom arch structure at the bottom of the tunnel, and adjusts the distribution of the stress at the bottom of the tunnel from the middle to the two sides on the basis of suppressing the bottom bulge of the tunnel, so as to prevent the stress from being too concentrated in the middle section of the bottom plate, resulting in a large difference in deformation between the middle section of the tunnel bottom plate and the two sides, thus causing a large bottom bulge. The present invention has the advantages of simple construction and installation, high overall structural strength, and strong toughness, and can effectively suppress the bottom bulge of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 A schematic diagram of the side structure of the tunnel in which the anti-bottom drum structure is installed;

[0034] Figure 2 This is a schematic diagram of the structure of the tunnel in which the anti-bottom drum structure is installed;

[0035] Figure 3 A schematic diagram of the boundary line between the upper and lower concrete cushion layers of the roadway where the anti-bottom heave structure is installed;

[0036] Figure 4 It is a schematic diagram of the structure for fixing the steel plate;

[0037] Figure 5 It is a structural schematic diagram of the side waist support section;

[0038] Figure 6 It is a schematic diagram of the structure of the connection between each section of the structural unit;

[0039] Figure 7 It is a structural schematic diagram of an angle at the end of the middle layer connection section;

[0040] Figure 8 It is a structural schematic diagram of another angle of the end of the middle layer connection section;

[0041] Fig. 9 It is a top view structural diagram of the top-layer cable connection;

[0042] Fig.10It is a top view structural diagram of the bottom layer cable connection;

[0043] In the figure: 1-fixed steel plate; 2-lateral lumbar support section; 3-top layer anti-bottom arch section; 4-middle layer connecting section; 5-bottom layer anti-bottom arch section; 6-lower layer anti-bottom arch area; 7-upper layer anti-bottom arch area; 8-steel plate screw hole; 9-top screw hole; 10-welding point; 11-middle upper screw hole; 12-raised steel section; 13-end screw hole; 14-middle layer connecting bolt; 15-bottom layer connecting bolt; A-top layer cable clamp; B-bottom layer cable clamp; Ⅰ-anti-bottom drum structure; Ⅱ-end of middle layer connecting section. DETAILED DESCRIPTION

[0044] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0045] Example 1

[0046] A double-layer anti-bottom-drum structure at the bottom of the tunnel, such as Figure 1-10 As shown, the anti-bottom bulge structure I is arranged at the bottom of the tunnel along the axial direction of the tunnel, and includes an upper anti-bottom bulge area 7, a lower anti-bottom bulge area 6, a fixed steel plate 1 and a structural unit;

[0047] The upper layer anti-bottom arch area 7 is arranged in the whole section along the axial direction in the tunnel; the lower layer anti-bottom arch area 6 is arranged in the tunnel along the axial direction at intervals, and the lower layer anti-bottom arch area 6 is wider than the tunnel width; the lower layer anti-bottom arch area 6 is arranged below the upper layer anti-bottom arch area 7;

[0048] The fixed steel plate 1 is embedded in the bottom corners on both sides of the tunnel;

[0049] The structural unit is arranged in the lower anti-bottom arch area 6, and both ends are fixedly connected to the fixed steel plate 1; the structural unit is a double-layer structure, the upper layer is attached to the bottom edge of the upper anti-bottom arch area 7, and the lower layer is attached to the bottom edge of the lower anti-bottom arch area 6;

[0050] Concrete cushion layers are poured in the upper anti-bottom arch area 7 and the lower anti-bottom arch area 6.

[0051] More specifically, in this embodiment:

[0052] The anti-bottom drum structure I is arranged in the entire section of the upper anti-bottom arch area 7, and the lower anti-bottom arch area 6 is arranged in sections below the upper anti-bottom arch area 7. It is a large elliptical arc shape that is wider than the tunnel, so as to buffer the stress and surrounding rock deformation on both sides; there is a middle-layer connecting section 4 in the structural unit, and the middle-layer connecting section 4 and the top anti-bottom arch section 3 together present an inverted triangle with three inwardly curved sides, so as to connect the side waist support sections 2 on both sides of the structural unit and the bottom anti-bottom arch section 5 at the bottom, so as to disperse the ground stress of the middle section of the bottom to both sides of the tunnel bottom, so as to effectively control the bottom drum.

[0053] like Figure 1As shown, the anti-bottom drum structure I in this embodiment is arranged in sections in sequence according to the lower anti-bottom arch area 6, and the adjacent intervals are controlled at 0.8-1m.

[0054] like Figure 2 and Figure 3 As shown, in this embodiment, the upper anti-bottom arch area 7 is excavated in full sections, and after the excavation is completed, the lower anti-bottom arch area 6 is excavated in sections. The lower anti-bottom arch area 6 is required to be wider than the width of the tunnel floor, and side arcs are set on both sides to form an elliptical arc to prevent the energy of the left and right sides of the tunnel from transferring to the tunnel floor. In order to prevent the left and right sides of the tunnel from sinking in advance, when the structural unit is excavated in sections in the lower anti-bottom arch area 6, one section is installed after each section is excavated. After the installation of the lower structural unit is completed, first use fine sand cement mortar to pour the lower anti-bottom arch area 6 of the lower segment, pour it to the position shown by the dotted line in the figure, appropriately expose part of the steel section of the middle connecting section 4, so that the groove on the lower surface of the top anti-bottom arch section 3 (the opening of the U-shaped steel) can be fitted with the protrusion on the upper surface of the middle connecting section 4. Then, the steel mesh is laid in the entire section of the upper anti-bottom arch area 7, and then the upper structural unit (top anti-bottom arch section 3) is installed. Then, fine sand cement mortar is poured in the upper anti-bottom arch area 7 of the entire upper section until all steel units and steel meshes are completely covered, and finally compacted with a vibrator.

[0055] The installation of structural units, in particular, Figure 4-10 shown.

[0056] like Figure 4 and Figure 5 As shown, fixed steel plates 1 are inserted into both sides of the bottom corners of the tunnel, and two steel plate screw holes 8 are provided at both ends of the fixed steel plate 1 close to the inner side of the tunnel for connecting the bottom structural unit. At the same time, top screw holes 9 corresponding to the steel plate screw holes 8 are opened on the top of the side waist support section 2, and bolts are passed through the steel plate screw holes 8 and the top screw holes 9 to fix the fixed steel plate 1 and the side waist support section 2. After the lower layer of the anti-bottom arch area 6 is cast, the side waist support section 2 and the top layer of the anti-bottom arch section 3 are welded and fixed at the welding point 10 to form a rigid connection to ensure the overall structural strength.

[0057] like Figure 6 As shown, a raised steel section 12 is arranged at the bottom of the lateral waist support section 2, and a bottom screw hole is opened on the raised steel section 12. At the same time, an end screw hole 13 corresponding to the bottom screw hole is arranged at the end of the bottom reverse bottom arch section 5. The bottom connecting bolt 15 is passed through the bottom screw hole and the end screw hole 13 to fix the lateral waist support section 2 and the bottom reverse bottom arch section 5.

[0058] like Figure 7 and Figure 8As shown, at the end II of the middle layer connecting section, a thick steel sheet is welded and fixed inside, and a pair of thick steel sheet screw holes are opened on the thick steel sheet. At the same time, a middle-upper screw hole 11 corresponding to the thick steel sheet screw hole is opened in the middle and upper part of the side waist support section 2. The middle layer connecting bolt 14 passes through the thick steel sheet screw hole and the middle-upper screw hole 11 to fix the middle layer connecting section 4 and the side waist support section 2.

[0059] like Fig. 9 As shown, the top layer anti-bottom arch sections 3 on both sides are fixedly connected by the top layer cable A.

[0060] like Fig.10 As shown, the bottom reverse bottom arch sections 5 on both sides are fixedly connected by the bottom cable B. At the same time, the bottom cable B also fixes the middle connecting section 4 and the bottom reverse bottom arch section 5. Therefore, the bottom cable B adopts a cable with a six-screw hole design. Accordingly, long bolts are required to connect and fix each section.

[0061] A pair of structural units are arranged in the lower anti-bottom arch area 6, one in front and one behind, and are spaced apart, and the two are respectively fixed to the front end and the rear end of the same fixed steel plate 1.

[0062] It is important to note that:

[0063] The thickness of the fixed steel plate 1 is 5 cm. The fixed steel plate 1 is arranged at the bottom corners on both sides of the lane. The axial length of the fixed steel plate 1 along the lane is adapted to the installation requirements of the bottom structural unit of the lane. Two steel plate screw holes 8 are respectively provided at both ends of the fixed steel plate 1 close to the inner side of the lane for the connection of the bottom structural unit (side waist support section 2);

[0064] The contour of the lower anti-bottom arch area 6 is an elliptical large arc shape;

[0065] Each section of the structural unit is made of U-shaped steel;

[0066] The middle and upper screw holes 11 of the side waist support section 2 are screw holes arranged radially toward the laneway, and the bottom screw holes of the side waist support section 2 are screw holes arranged axially toward the laneway; the thick steel sheet screw holes of the thick steel sheet are consistent with the middle and upper screw holes 11 of the side waist support section 2, and are screw holes arranged radially toward the laneway; the end screw holes 13 of the bottom anti-bottom arch section 5 are consistent with the bottom screw holes of the side waist support section 2, and are screw holes arranged axially toward the laneway;

[0067] The thickness of the thick steel sheet is determined according to actual needs and can meet the structural connection strength.

[0068] After the top layer anti-bottom arch section 3 is installed in place, its upper surface is aligned with the arc of the upper layer anti-bottom arch area 7.

[0069] The construction method of the anti-bottom drum structure I comprises the following steps:

[0070] S1: excavate the upper anti-bottom arch area 7 along the axial direction of the tunnel in the entire section of the tunnel floor;

[0071] S2: excavate the lower layer anti-bottom arch area 6 at intervals of 0.8 to 1 m along the axial direction of the tunnel below the full section excavation of the upper layer anti-bottom arch area 7. When each lower layer anti-bottom arch area 6 is excavated, a fixed steel plate 1 is embedded in the two bottom corners of the tunnel in the excavation section, and the side waist support section 2 is first installed using the fixed steel plate 1, and then the middle layer connection section 4 and the bottom layer anti-bottom arch section 5 are respectively installed on the side waist support section 2, and the middle layer connection section 4 and the bottom layer anti-bottom arch section 5 and the bottom layer anti-bottom arch sections 5 on both sides are fixed by the bottom layer cable B;

[0072] S3: After the excavation of all lower anti-bottom arch areas 6 and the installation of structural units described in S2 are completed in order, the lower anti-bottom arch area 6 is cast with fine sand cement mortar, and then the top anti-bottom arch section 3 is welded to the side waist support section 2 and the top anti-bottom arch sections 3 on both sides are fixedly installed to align with the arc shape of the bottom edge of the upper anti-bottom arch area 7 through the top cable A, and then the steel mesh fitting the upper anti-bottom arch area 7 is laid in the entire tunnel section;

[0073] S4: Use fine sand cement mortar to pour the upper anti-bottom arch area 7 until all structural units and steel meshes are completely covered, and then use a vibrator to compact it.

[0074] Example 2

[0075] The structure and construction method are basically the same as those of Example 1, except that medium sand cement mortar is used during pouring, and a concrete early strength agent is used in conjunction with pouring the lower anti-bottom arch area 6 to ensure that the early strength of the lower anti-bottom arch area 6 can meet the standard, thereby maintaining the shape of the lower anti-bottom arch area 6. The specific concrete early strength agent selected should be determined according to the conditions of the construction site.

[0076] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A construction method for a double-layer anti-bottom-drum structure at the bottom of a tunnel, wherein the anti-bottom-drum structure (I) is arranged at the bottom of the tunnel along the axial direction of the tunnel, and is characterized in that: It includes an upper anti-bottom arch area (7), a lower anti-bottom arch area (6), a fixing steel plate (1) and a structural unit; The upper layer anti-bottom arch area (7) is arranged in the whole axial section in the tunnel; the lower layer anti-bottom arch area (6) is arranged in the tunnel along the axial interval, and the lower layer anti-bottom arch area (6) is wider than the tunnel width; the lower layer anti-bottom arch area (6) is arranged below the upper layer anti-bottom arch area (7); The fixed steel plates (1) are embedded in the bottom corners on both sides of the tunnel; The structural unit is arranged in the lower anti-bottom arch region (6), and its two ends are fixedly connected to the fixed steel plate (1); the structural unit is a double-layer structure, the upper layer is in contact with the bottom edge of the upper anti-bottom arch region (7), and the lower layer is in contact with the bottom edge of the lower anti-bottom arch region (6); A concrete cushion layer is poured in the upper anti-bottom arch area (7) and the lower anti-bottom arch area (6); The lower anti-bottom arch area (6) is arranged at intervals of 0.8-1m along the axial direction of the tunnel; The structural unit comprises a lateral waist support section (2), a top layer reverse bottom arch section (3), a middle layer connection section (4) and a bottom layer reverse bottom arch section (5); The side waist support section (2) is fixedly connected to the top layer anti-bottom arch section (3) and the bottom layer anti-bottom arch section (5); the side waist support section (2) is fixedly connected to the fixed steel plate (1); The middle layer connection section (4) connects the side waist support section (2) and the bottom layer anti-bottom arch section (5); The structural units are axially symmetrically arranged on both sides of the lower anti-bottom arch area (6), and the structural units on both sides are fixedly connected by a top-layer cable (A) and a bottom-layer cable (B); the top-layer cable (A) connects the top-layer anti-bottom arch sections (3) on both sides; the bottom-layer cable (B) connects the bottom-layer anti-bottom arch sections (5) on both sides and the middle-layer connecting section (4) and the bottom-layer anti-bottom arch section (5); The construction method includes the following steps: S1: excavate the upper anti-bottom arch area (7) along the axial direction of the tunnel in the entire section of the tunnel floor; S2: excavating the lower layer anti-bottom arch area (6) at intervals along the axial direction of the tunnel below the upper layer anti-bottom arch area (7), and at the same time embedding the fixing steel plates (1) at the bottom corners of both sides of the tunnel of the lower layer anti-bottom arch area (6), and fixing the installation structural unit by the fixing steel plates (1); S3: After the fixing and installation of all structural units in the tunnel are completed, the lower anti-bottom arch area (6) is poured to form a lower concrete cushion layer, and a steel mesh is laid in the entire tunnel section; S4: Cast the upper anti-bottom arch area (7) until it completely covers the structural unit and the steel mesh, and compact it with a vibrator to form an upper concrete cushion.

2. The construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel according to claim 1, characterized in that: The fixed steel plate (1) is arranged synchronously with the structural unit.

3. The construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel according to claim 2, characterized in that: The fixing steel plate (1) has a thickness of 5 cm.

4. The construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel according to claim 1, characterized in that: A pair of the structural units are arranged in the lower anti-bottom arch area (6) at intervals along the axial direction of the tunnel.

5. The construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel according to claim 1, characterized in that: The structural unit is made of U-shaped steel.

6. The construction method of a double-layer anti-bottom-drum structure at the bottom of a tunnel according to claim 1, characterized in that: The concrete cushion layer is cast by fine sand cement mortar or medium sand cement mortar.