An assembled building positioning monitoring device
By designing a prefabricated building positioning monitoring device and using infrared lasers to achieve accurate positioning, the problem of relying on manual operation of the positioning of underlying templates in the existing technology is solved, and the work efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202211216516.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-30
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2042-09-30
AI Technical Summary
During the forming process of existing prefabricated building, the positioning monitoring of the underlying formwork relies on manual operations, which is inefficient and consumes a lot of manpower and material resources.
A prefabricated building positioning monitoring device is designed, including a cart, lifting component, translation component and positioning monitoring component, and an infrared laser is used to achieve precise positioning and reduce manual operation.
It improves positioning accuracy and work efficiency, can be operated by a worker alone, reduces manpower and material consumption, and is suitable for prefabricated construction sites of various sizes.
Smart Images

Figure CN115468547B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of prefabricated buildings, and in particular to a positioning monitoring device for prefabricated buildings. Background Art
[0002] With the acceleration of the pace of life in my country and the advancement of related technologies, the application of prefabricated buildings is becoming more and more extensive. Prefabricated buildings refer to the transfer of a large number of on-site operations in traditional construction methods to factories. Building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in factories, transported to construction sites, and assembled and installed on site through reliable connection methods. Prefabricated buildings have short construction periods, are green and environmentally friendly, and have low costs, which are in line with the development trend of contemporary society. However, in the current prefabricated building forming process, there is no positioning monitoring device during the installation of the bottom template. The positioning of the bottom template and the foundation is basically based on manual groping or mirror reflection. The alignment process of the steel bars on the foundation and the steel bar holes on the bottom template requires two workers to operate at the same time. The operation process is that two workers hold the bottom template lifted by the tower crane and slowly move the bottom template by feeling to match the steel bar holes on the bottom template with the steel bars on the foundation. Alternatively, when positioning, a third worker bends down and takes a small mirror to observe whether the steel bar holes on the bottom template and the steel bars on the foundation correspond.
[0003] Traditional positioning monitoring methods, no matter which method they are, are too primitive and require two or more workers to participate in the operation. They are inefficient and consume a lot of manpower and material resources. In addition, the implementation method is not convenient enough and cannot be quick and easy. Therefore, it is necessary to design a positioning monitoring device that is convenient, efficient, time-saving and labor-saving. Summary of the invention
[0004] Based on this, it is necessary to provide a prefabricated building positioning monitoring device to address the existing technical problems.
[0005] In order to solve the problems of the prior art, the technical solution adopted by the present invention is:
[0006] An assembled building positioning monitoring device, characterized by comprising:
[0007] The load-bearing trolley is located at the bottom of the entire device, and the load-bearing trolley plays a supporting role and provides displacement;
[0008] A lifting assembly is arranged on the upper end of the carrying trolley;
[0009] A translation assembly is connected to the lifting assembly. The translation assembly includes a moving mechanism and two reinforcement mechanisms. The moving mechanism is connected to the lifting assembly. The moving mechanism includes four translation slides. The translation slides are arranged in groups of two. Both ends of a reinforcement mechanism are fixedly connected to the two translation slides in each group.
[0010] The positioning monitoring component includes an infrared laser, a positioning mechanism and an alarm. The infrared laser is fixedly installed at one end of the translation slide, the positioning mechanism is fixedly installed at the other end of the translation slide, and the alarm is fixedly installed on the upper end of the carrying trolley.
[0011] Furthermore, the load-bearing trolley includes a supporting platform, a supporting sleeve and a supporting top plate, which are arranged in sequence from bottom to top above the load-bearing trolley, wherein the supporting platform is fixedly connected to the body of the load-bearing trolley in a horizontal state, the supporting sleeve is fixedly installed on the supporting platform in a vertical state, an avoidance through hole is formed on one side of the tube wall of the supporting sleeve, and the supporting top plate is fixedly installed on the upper end of the supporting sleeve in a horizontal state.
[0012] Furthermore, the lifting assembly includes a motor, a screw rod, a lifting slider, a base and two limit rods. The motor output end is fixedly installed downward above the support top plate, the base is fixedly installed on the support platform and located inside the support sleeve, the screw rod is arranged in a vertical state, one end of the screw rod is connected to the movable shaft of the base, and the other end is fixedly connected to the motor output end through a coupling, the two limit rods are symmetrically fixedly installed on both sides of the avoidance through hole, the lifting slider is threadedly connected to the outside of the screw rod, and the two ends of the lifting slider are against the two limit rods.
[0013] Furthermore, the moving mechanism also includes a support rod, two support arms, four sliding support frames, four pulleys and two slide rails. The support rod is arranged in a horizontal state, the support rod is connected to the lifting slider, extension arms are formed at both ends of the support rod, the two support arms are respectively fixedly connected to the extension arms at both ends of the support rod, a movable slide groove is formed on the support arm, the two slide rails are arranged in a horizontal state and parallel to the support rod, the lower end of the sliding support frame is fixedly connected to the end of the slide rail, and the upper end is slidably connected to the support arm, the pulley is movably arranged in the sliding support frame, and the pulley rim matches the movable slide groove, and the translation slide is movably connected to the slide rail.
[0014] Furthermore, the reinforcement mechanism includes a receiving tube, a sleeve rod, a plurality of sleeve tubes and a plurality of positioning pins. The interior of the receiving tube is hollow. The receiving tube is fixedly connected to a translation slide in each group. The sleeve rod is located inside the receiving tube. The sleeve rod is slidably connected to the receiving tube. A plurality of sleeve tubes are sleeved one by one on the outside of the sleeve rod, wherein the sleeve tube located on the outermost side is fixedly connected to another translation slide in each group. Limiting grooves are formed on the receiving tube and the sleeve tube, and a plurality of positioning pins pass through the positioning grooves and are respectively screwed into the sleeve rod and the sleeve tube.
[0015] Furthermore, a triangular support frame is formed at the bottom of the infrared laser instrument, and the positioning and monitoring assembly also includes a first positioning ring, a second positioning ring, a connecting short rod and a fixed gasket. The fixed gasket is fixedly installed on the side of the translation slide, the connecting short rod is arranged in a vertical state, the connecting short rod is fixedly connected to the fixed gasket, both ends of the connecting short rod extend out of the translation slide, one end of the connecting short rod is fixedly connected to the first positioning ring, and the other end is fixedly connected to the second positioning ring. The first positioning ring is horizontally arranged at one end of the translation slide, and the second positioning ring is horizontally arranged at the other end of the translation slide. Three first positioning notches are formed on the first positioning ring and are equally spaced along the circumferential direction. The second positioning ring is formed with a number of second positioning notches are equally spaced along the circumferential direction. The infrared laser instrument is fixedly installed on the first positioning ring, and the triangular support frame at the bottom of the infrared laser instrument cooperates with the first positioning notch.
[0016] Furthermore, the positioning mechanism includes a plurality of elastic tightening devices, which are arranged at equal intervals along the circumferential direction of the second positioning ring, and each elastic tightening device is fixedly connected to the second positioning notch. The elastic tightening device includes a spring, a conical top cap, a limiting shaft, a protective shell, a screw-in bolt, a support gasket and four limiting pins. The support gasket is fixedly installed at the second positioning notch inside the second positioning ring, and the limiting shaft passes through the second positioning notch. The head end of the limiting shaft points to the center of the second positioning ring, and the end of the limiting shaft extends out of the second positioning notch and the conical top cap and is fixedly screwed to the head end of the limiting shaft. The spring is sleeved on the outside of the limiting shaft, one end of the spring is abutted against the bottom of the conical top cap, and the other end is abutted against the support gasket. The four limiting pins pass through the support gasket and the second positioning notch at equal intervals along the circumferential direction. The end of the limiting shaft is sleeved with a protective shell, and the screw-in bolt passes through the protective shell and is fixedly installed at the end of the limiting shaft.
[0017] Furthermore, the alarm includes a battery, a sounder and four indicator lights. The four indicator lights are vertically fixed on the upper end of the support platform. The battery is located next to one of the indicator lights and is fixed on the upper end of the support platform. The sounder is located next to one of the indicator lights and is fixed on the upper end of the support platform.
[0018] Furthermore, the translation mechanism also includes a positioning bolt and two auxiliary bolts. The positioning bolt passes through the center of gravity of the support rod and is screwed onto the lifting slider. The two auxiliary bolts are symmetrically arranged in the vertical direction of the positioning bolt. The two auxiliary bolts pass through the support rod and are screwed onto the lifting slider.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] First: This equipment occupies a small area, is easy to move and carry, and is suitable for prefabricated building construction sites of various sizes;
[0021] Second: This device can accurately locate the steel bar holes through the infrared laser instrument, without the need for manual observation or observation with a small mirror, which is convenient and fast while improving accuracy;
[0022] Third: This device can be operated by one worker alone, without the need for two or more workers to participate in the construction, thus reducing manpower and material resources and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 The three-dimensional structure of the present invention is shown in FIG. Figure 1 ;
[0024] Figure 2 The three-dimensional structure of the present invention is shown in FIG. Figure 2 ;
[0025] Figure 3 yes Figure 1 Schematic diagram of the local structure of the three-dimensional decomposition;
[0026] Figure 4 It is a three-dimensional schematic diagram of the local structure of the present invention;
[0027] Figure 5 It is a partial three-dimensional structural schematic diagram of the positioning monitoring component of the present invention;
[0028] Figure 6 This is a schematic diagram of the structural three-dimensional decomposition of the elastic tightener of the present invention.
[0029] Figure 7 yes Figure 1 A schematic diagram of the structure enlargement at point A;
[0030] Figure 8 yes Figure 2 Schematic diagram of the enlarged structure at point B in FIG.
[0031] The numbers in the figure are:
[0032] 1. Carrying trolley; 2. Support platform; 3. Support sleeve; 4. Avoidance hole; 5. Support top plate; 6. Lifting assembly; 7. Motor; 8. Limit rod; 9. Screw rod; 10. Lifting slider; 11. Base; 12. Translation assembly; 13. Moving mechanism; 14. Support rod; 15. Extension arm; 16. Support arm; 17. Moving slide; 18. Sliding support frame; 19. Pulley; 20. Slide rail; 21. Translation slide; 22. Positioning bolt; 23. Auxiliary bolt; 24. Reinforcement mechanism; 25. Accommodating tube; 26. Sleeve rod; 27. Sleeve tube; 2 8. Limiting slide groove; 29. Positioning pin; 30. Positioning monitoring component; 31. Second positioning ring; 32. Second positioning notch; 33. Infrared laser; 34. Triangular support frame; 35. First positioning ring; 36. First positioning notch; 37. Connecting short rod; 38. Fixing gasket; 39. Positioning mechanism; 40. Elastic tightener; 41. Support gasket; 42. Limiting pin; 43. Spring; 44. Conical top cap; 45. Limiting shaft; 46. Protective shell; 47. Screw-on bolt; 48. Alarm; 49. Indicator light; 50. Battery; 51. Buzzer. DETAILED DESCRIPTION
[0033] In order to further understand the features, technical means, specific objectives and functions of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0034] refer to Figures 1 to 8 , an assembled building positioning monitoring device, comprising:
[0035] The load-bearing trolley 1 is located at the bottom of the entire device, and the load-bearing trolley 1 plays a supporting role and provides displacement;
[0036] A lifting assembly 6 is arranged at the upper end of the carrying trolley 1;
[0037] The translation assembly 12 is connected to the lifting assembly 6. The translation assembly 12 includes a moving mechanism 13 and two reinforcement mechanisms 24. The moving mechanism 13 is connected to the lifting assembly 6. The moving mechanism 13 includes four translation slides 21. The translation slides 21 are grouped in pairs. Both ends of a reinforcement mechanism 24 are fixedly connected to the two translation slides 21 in each group.
[0038] The positioning monitoring assembly 30 includes an infrared laser instrument 33, a positioning mechanism 39 and an alarm 48. The infrared laser instrument 33 is fixedly mounted on one end of the translation slide 21, the positioning mechanism 39 is fixedly mounted on the other end of the translation slide 21, and the alarm 48 is fixedly mounted on the upper end of the carrying trolley 1.
[0039] The load-bearing trolley 1 comprises a support platform 2, a support sleeve 3 and a support top plate 5, which are arranged in sequence from bottom to top above the load-bearing trolley 1, wherein the support platform 2 is horizontally fixedly connected to the body of the load-bearing trolley 1, the support sleeve 3 is vertically fixedly installed on the support platform 2, a side of the tube wall of the support sleeve 3 is formed with an avoidance through hole 4, and the support top plate 5 is horizontally fixedly installed on the upper end of the support sleeve 3. When the device is working, the load-bearing trolley 1 can move freely on the construction site. Since the load-bearing trolley 1 is overall low, it is convenient to install and position the bottom templates of different sizes. Other equipment can be installed on the support platform 2 of the trolley. The support sleeve 3 is used to install the lifting assembly 6. The avoidance through hole 4 facilitates the lifting assembly 6 to drive the translation assembly 12 and the positioning monitoring assembly 30 to move up and down. The support top plate 5 is fixedly installed on the top of the support sleeve 3. The support top plate 5 is used to limit the upper end of the lifting assembly 6, and the support top plate 5 also supports the lifting assembly 6.
[0040] The lifting assembly 6 includes a motor 7, a screw rod 9, a lifting slider 10, a base 11 and two limit rods 8. The output end of the motor 7 is fixedly installed downward above the support top plate 5. The base 11 is fixedly installed on the support platform 2 and is located inside the support sleeve 3. The screw rod 9 is arranged in a vertical state. One end of the screw rod 9 is movably connected to the base 11, and the other end is fixedly connected to the output end of the motor 7 through a coupling. The two limit rods 8 are symmetrically fixedly installed on both sides of the avoidance through hole 4. The lifting slider 10 is threadedly connected to the outside of the screw rod 9, and the two ends of the lifting slider 10 are against the two limit rods 8. When the device is working, the motor 7 is fixedly installed on the upper side of the supporting top plate 5 through the motor 7 frame, and the motor 7 drives the screw rod 9 to rotate. The screw rod 9 rotates in the lifting slider 10 to drive the lifting slider 10 to move in the vertical direction. The lifting slider 10 is limited by the limit rods 8 on both sides during the lifting process. The limit rods 8 ensure that the lifting slider 10 will not move during the movement, thereby improving the stability of the device. The movable shaft at the lower end of the screw rod 9 is connected to the base 11, and the base 11 ensures that the screw rod 9 will not separate from the device when it rotates.
[0041] The moving mechanism 13 also includes a support rod 14, two support arms 16, four sliding support frames 18, four pulleys 19 and two slide rails 20. The support rod 14 is arranged in a horizontal state, the support rod 14 is connected to the lifting slider 10, and extension arms 15 are formed at both ends of the support rod 14. The two support arms 16 are respectively fixedly connected to the extension arms 15 at both ends of the support rod 14, and a movable slide groove 17 is formed on the support arm 16. The two slide rails 20 are arranged in a horizontal state and parallel to the support rod 14. The lower end of the sliding support frame 18 is fixedly connected to the end of the slide rail 20, and the upper end is slidably connected to the support arm 16. The pulley 19 is arranged in the sliding support frame 18, and the pulley 19 wheel rim matches the movable slide groove 17, and the translation slide 21 is slidably connected to the slide rail 20. The up and down movement of the lifting slider 10 can drive the support rod 14 to move up and down. Therefore, when the lifting slider 10 determines the position, the position of the support rod 14 is also determined. At this time, the two support arms 16 are fixedly installed on the extension arms 15 at both ends of the support rod 14. The distance between the two support arms 16 is greater than the distance between the steel bars on the foundation of the prefabricated building. Therefore, the two support arms 16 can include at least four steel bars. When the device is working, since the production specifications and standards of the same batch of prefabricated buildings must be the same, that is, the relative positions of the steel bars formed on the prefabricated buildings produced in this batch are the same, the specific position parameters of the pulley 19 and the slide rail 20 in this device can be adjusted in advance. The pre-adjusted device can be repeatedly applied to multiple prefabricated buildings when positioning and monitoring the steel bars and steel bar holes. Compared with the special drive The positioning monitoring device that automatically adjusts the driving component and the automatic identification and positioning component has three significant advantages: first, the device only needs to be pre-adjusted before use, and after the pre-adjustment, there is no need to readjust the position parameters every time positioning monitoring is performed, so the work efficiency is higher; second, the device has no special driving components and automatic identification and positioning components, and there is no software coding for automatic identification and positioning, so the manufacturing and processing costs of the device are lower, which is conducive to large-scale production in the market later and improves economic benefits. In addition, since the device does not have those complex mechanisms, the trolley has a smaller load-bearing capacity and improves the endurance of the trolley; third, the device has a simple structural design and is easy for workers to operate, so there is no need for excessive training for workers, and because of the simple structure, it is easier to inspect and maintain in the later stage.Based on this, the device pre-adjusts according to the position parameters of the steel bars on the foundation of each prefabricated building. Specifically, when the pulley 19 moves in the slide rail 20, the movement of the pulley 19 will drive the sliding support frame to move, and the sliding support frame drives the slide rail 20 to move. When the slide rail 20 is adjusted to be directly above the steel bars, the four translation slides 21 are adjusted so that the four translation slides 21 move to the top of the specific corresponding steel bars. Due to the high degree of standardization of the construction site, the position of the steel bar distribution on the foundation can be known in advance. Therefore, in order to improve work efficiency, the positions of the slide rail 20 and the translation slide 21 can be pre-adjusted in advance, and there is no need to equip additional drive components to drive the slide rail 20 and the translation slide 21.
[0042] The reinforcement mechanism 24 includes a accommodating tube 25, a sleeve rod 26, a plurality of sleeve tubes 27 and a plurality of positioning pins 29. The interior of the accommodating tube 25 is hollow. The accommodating tube 25 is fixedly connected to a translation slide 21 in each group. The sleeve rod 26 is located inside the accommodating tube 25. The sleeve rod 26 is slidably connected to the accommodating tube 25. A plurality of sleeve tubes 27 are sleeved one by one on the outside of the sleeve rod 26, wherein the sleeve tube 27 located on the outermost side is fixedly connected to another translation slide 21 in each group. Limiting grooves 28 are formed on the accommodating tube 25 and the sleeve tube 27. A plurality of positioning pins 29 pass through the positioning grooves and are respectively screwed into the sleeve rod 26 and the sleeve tube 27. When the device is working, in order to improve the stability of the device and facilitate the determination of the relative position and relative distance between the two translation slides 21 in each group, the accommodating tube 25 is fixedly connected to one translation slide 21 in each group, and the outermost sleeve tube 27 is fixedly connected to the other translation slide 21 in each group. When the two translation slides 21 are pulled apart, according to the change in the distance between the two translation slides 21, several sleeve tubes 27 are pulled apart layer by layer under the limitation of the limit slide groove 28 and the limit pin 42. When a sleeve tube 27 is pulled to the extreme position, the positioning pin 29 will position it so that it cannot move further.
[0043] A triangular support frame 34 is formed at the bottom of the infrared laser instrument 33. The positioning monitoring assembly 30 also includes a first positioning ring 35, a second positioning ring 31, a connecting short rod 37 and a fixed gasket 38. The fixed gasket 38 is fixedly installed on the side of the translation slide 21. The connecting short rod 37 is arranged in a vertical state. The connecting short rod 37 is fixedly connected to the fixed gasket 38. Both ends of the connecting short rod 37 extend out of the translation slide 21. One end of the connecting short rod 37 is fixedly connected to the first positioning ring 35, and the other end is fixedly connected to the second positioning ring 31. The first positioning ring 35 is arranged at one end of the translation slide 21 in a horizontal state, and the second positioning ring 31 is arranged at the other end of the translation slide 21 in a horizontal state. Three first positioning notches 36 are formed on the first positioning ring 35 and are evenly spaced in the circumferential direction. The second positioning ring 31 is formed with a plurality of second positioning notches 32 that are evenly spaced in the circumferential direction. The infrared laser instrument 33 is fixedly installed on the first positioning ring 35. The triangular support frame 34 at the bottom of the infrared laser instrument 33 cooperates with the first positioning notch 36. When the device is working, the first positioning ring 35 is fixedly installed on one end of the translation slide 21, the second positioning ring 31 is fixedly installed on the other end of the translation slide 21, and the infrared laser 33 is fixedly installed on the upper side of the first positioning ring 35. The triangular support frame 34 at the bottom of the infrared laser 33 cooperates with the first positioning notch 36 formed on the first positioning ring 35. This cooperation ensures that the emitting end of the infrared laser 33 is facing upward. During the positioning and monitoring process, the infrared laser 33 locates the prefabricated building by irradiating the steel bar holes.
[0044] The positioning mechanism 39 includes a plurality of elastic retainers 40, which are arranged at equal intervals along the circumferential direction of the second positioning ring 31. Each elastic retainer 40 is fixedly connected to the second positioning notch 32. The elastic retainer 40 includes a spring 43, a conical top cap 44, a limiting shaft 45, a protective shell 46, a screw bolt 47, a support washer 41 and four limiting pins 42. The support washer 41 is fixedly installed at the second positioning notch 32 inside the second positioning ring 31. The limiting shaft 45 passes through the second positioning notch 32. The limiting shaft 45 The head end points to the center of the second positioning ring 31, the end of the limiting shaft 45 extends out of the second positioning notch 32 and the conical top cap 44 and is fixedly screwed to the head end of the limiting shaft 45, the spring 43 is sleeved on the outside of the limiting shaft 45, one end of the spring 43 is against the bottom of the conical top cap 44, and the other end is against the support gasket 41, four limiting pins 42 pass through the support gasket 41 and the second positioning notch 32 at equal intervals in the circumferential direction, the end of the limiting shaft 45 is sleeved with a protective shell 46, and the screw-on bolt 47 passes through the protective shell 46 and is fixedly installed at the end of the limiting shaft 45. When the device is working, after the translation slide 21 is located directly above the steel bar, the translation slide 21 slowly descends, and at this time, a number of elastic tightening devices 40 slowly press down. When the steel bar contacts the elastic tightening devices 40, the elastic tightening devices 40 will adjust themselves according to the diameter of the steel bar. Specifically, the steel bar contacts the conical top cap 44 and moves up along the conical surface of the conical top cap 44. At this time, the conical top cap 44 moves away from the center of the circle. The movement of the conical top cap 44 will drive the limit shaft 45 to move. One end of the spring 43 abuts against the lower end of the conical top cap 44, and the other end abuts against the support gasket 41. When the conical top cap 44 moves, the limit shaft 45 moves. During the movement, the spring 43 will be compressed and deformed. When the device is positioned and detached from the steel bar, the compressed spring 43 pushes the conical top cap 44 to reset due to elastic reset. During the movement of the conical top cap 44, the four limit pins 42 assist in limiting the limit shaft 45. The four limit pins 42 prevent the limit shaft 45 from moving during the movement, thereby improving the stability of the positioning mechanism 39. The protective shell 46 is fixed to the tail of the limit shaft 45 by the screw-on bolts 47. The protective shell 46 encloses the four limit pins 42 to protect the limit pins 42 from being contaminated by dust on the construction site, thereby improving the sensitivity of the device.
[0045] The alarm 48 includes a battery 50, a sounder 51 and four indicator lights 49. The four indicator lights 49 are vertically fixedly mounted on the upper end of the support platform 2. The battery 50 is located next to one of the indicator lights 49. The battery 50 is fixedly mounted on the upper end of the support platform 2. The sounder 51 is located next to one of the indicator lights 49. The sounder 51 is fixedly mounted on the upper end of the support platform 2. The indicator light 49, the infrared laser instrument 33 and the buzzer 51 are all electrically connected to the controller. When the infrared laser instrument 33 detects that the positioning is not successful, the signal is transmitted to the controller, and the controller controls the indicator light 49 to flash. Specifically, each indicator light 49 corresponds to an infrared laser instrument 33. When the infrared laser instrument 33 detects that the positioning is not successful, the infrared laser instrument 33 transmits the signal to the controller. The controller set in the indicator light 49 corresponding to the infrared laser instrument 33 will receive the signal and control the indicator light 49 to flash. When the indicator light 49 flashes, the signal is transmitted to the buzzer 51 through the controller, and the buzzer 51 will emit a warning sound to prompt. At this time, the operator can fine-tune the assembly template according to the flashing indicator light 49. Since the indicator light 49 and the buzzer 51 have low energy consumption, it is only necessary to set a battery 50 separately to power the indicator light 49 and the buzzer 51.
[0046] The translation mechanism also includes a positioning bolt 22 and two auxiliary bolts 23. The positioning bolt 22 passes through the center of gravity of the support rod 14 and is screwed on the lifting slider 10. The two auxiliary bolts 23 are symmetrically arranged in the vertical direction of the positioning bolt 22. The two auxiliary bolts 23 pass through the support rod 14 and are screwed on the lifting slider 10. Due to different construction standards of each construction site, there are two forms of cooperation between the bottom module of the prefabricated building and the foundation. One is that the bottom module is provided with steel bars and the foundation is provided with steel bar holes. The other is that the bottom module is provided with steel bar holes and the foundation is provided with steel bars. In order to adapt to these two forms, a positioning bolt 22 is provided at the connection between the support rod 14 and the lifting slider 10. When switching the assembly form, it is only necessary to pull out the positioning bolt 22 and the two auxiliary bolts 23, turn the support rod 14 around the center of gravity by 180 degrees, and then insert the positioning bolt 22 and the two auxiliary bolts 23. The two auxiliary bolts 23 ensure that the support rod 14 will not move after being fixed in position, thereby improving the stability of the device.
[0047] Working principle of the device: take the foundation provided with steel bars and the bottom module provided with steel bar holes as an example, when the device is working, the carrying trolley 1 approaches and presses against the part of the foundation exposed to the ground, the motor 7 works to drive the screw rod 9 to rotate, the screw rod 9 rotates in the base 11 to drive the lifting slider 10 to move up and down, and the lifting slider 10 is adjusted to an appropriate position. At this time, the two support arms 16 are located above the steel bars. The two support arms 16 include the four steel bars used for positioning. The device will position the four steel bars. Specifically, the vertical direction is specified as the Z axis, the moving direction of the slide rail 20 is the X axis, and the moving direction of the translation slide 21 is the Y axis. When the corresponding position of a certain position positioning point on the three axes is determined, this position is determined. At this time, the lifting slider 10 has moved the Y axis of the steel bar The coordinate point is positioned, the operator moves the sliding support frame 18, and the slide rail 20 connected to the sliding support frame 18 moves to the top of the corresponding steel bar. At this time, the slide rail 20 positions the X-axis coordinate point of the steel bar, and finally moves the translation slide 21. When moving the translation slide 21, in order to ensure the relative position and relative distance between the two translation slides 21 in each group, moving the translation slide 21 will cause the accommodating tube 25, the sleeve rod 26 and the sleeve tube 27 to produce relative displacement, and several sleeve tubes 27 are withdrawn layer by layer. When each sleeve tube 27 moves to the extreme position, the positioning pin 29 will limit the sleeve tube 27 at this time to ensure that the several sleeve tubes 27 will not separate from each other. When the accommodating tube 25, the sleeve rod 26 and the sleeve tube 27 are moved, the translation slide 21 moves To the top of the steel bar, at this time, the translation slide 21 locates the Y-axis coordinate point of the steel bar. After the coordinate point of the steel bar in the spatial coordinate axis is uniquely defined, the device is operated to perform positioning monitoring on the prefabricated building. Specifically, when the lower end of the translation slide 21 is aligned with the steel bar, in order to adapt to steel bars of different specifications, the elastic tightener 40 has self-adaptive adjustability. When the second positioning ring 31 of the steel bar is sleeved on the steel bar, as the steel bar is slowly inserted into the second positioning ring 31, the elastic tightener 40 starts to work. At this time, the conical top cap 44 moves to a position away from the center of the circle, and the limiting shaft 45 is fixedly connected to the conical top cap 44. The limiting shaft 45 also moves to a position away from the center of the circle. Since one end of the spring 43 is against the bottom end of the conical top cap 44, and the other end is against the support gasket 41, as The conical top cap 44 moves in the direction away from the center of the circle, and the spring 43 is deformed by the force. When the positioning monitoring is completed, the device is separated from the steel bar, and the compressed spring 43 will return to its original position under the action of the elastic force, driving the other parts in the elastic tightener 40 to return to their original positions, and prepare for the next positioning. During the movement of the limit shaft 45, in order to prevent the limit shaft 45 from moving and causing positioning errors, the four limit pins 42 limit the movement of the limit shaft 45 to ensure the accuracy of the positioning result. Due to the high dust on the construction site, the protective shell 46 is used to protect the limit pins 42 from being contaminated by dust, which improves the accuracy of the device and facilitates later inspection and maintenance. After several conical top caps 44 have positioned and limited the steel bars, the infrared laser instrument 33 located on the first positioning ring 35 starts to operate.The light emitted by the infrared laser instrument 33 illuminates the steel bar hole of the upper assembly base plate. When the light does not penetrate into the bottom of the steel bar hole, the light path is short. The infrared laser instrument 33 captures this signal and transmits it to the controller. After receiving the signal, the controller controls the corresponding indicator light 49 to flash. At the same time, the controller is also electrically connected to the buzzer 51. When this signal commands the indicator light 49 to flash, this signal is transmitted to the buzzer 51 through the controller to control the buzzer 51 to roar. From the operator's perspective: when positioning is not successful, the indicator light 49 that has not been successfully positioned flashes, and the buzzer 51 roars to remind the operator to fine-tune the bottom module; when the light penetrates into the bottom of the steel bar hole, the contact point between the light and the bottom template suddenly changes from the surface of the bottom template to the bottom of the steel bar hole, and the infrared laser instrument 33 captures this signal. At this time, the irradiation distance of the light becomes longer than the previous distance. When the four infrared laser instruments 33 capture this mutation signal at the same time, that is, at this time, all the four steel bar holes are successfully positioned. After the positioning is successful, the infrared laser instrument 33 captures this signal and transmits this signal to the controller. After receiving the signal, the controller controls the corresponding indicator light 49 to execute the instruction. At this time, the corresponding indicator light 49 stops flashing. Similarly, the controller is also electrically connected to the sounder 51. When this signal commands the indicator light 49 to stop flashing, this signal is transmitted to the sounder 51 through the controller to control the sounder 51 to roar. From the operator's perspective: when the positioning is successful, all the indicator lights 49 stop flashing, and the sounder 51 stops roaring. At this time, the positioning is accurate. The operator can notify the crane to control the bottom module to descend, and the carrying trolley 1 can be pulled out during the descent. Due to different construction standards on construction sites, there is another form of foundation and bottom module corresponding to prefabricated buildings, that is, the bottom module is provided with steel bar holes, and the foundation is provided with steel bars. At this time, the positioning bolts 22 and the two auxiliary bolts 23 are pulled out, and the support rod 14 is turned 180 degrees around the center of gravity, and then the positioning bolts 22 and the two auxiliary bolts 23 are inserted. After the flip, the positioning monitoring device can perform positioning monitoring on the inverted steel bars and steel bar holes, and the monitoring principle does not change. The two auxiliary bolts 23 set in a symmetrical state ensure that the support rod 14 will not move after the fixed position, thereby improving the stability of the device.
[0048] The above embodiments only express one or several implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.
Claims
1. An assembled building positioning monitoring device, characterized in that: include: The load-bearing trolley (1) is located at the bottom of the entire device, and the load-bearing trolley (1) plays a supporting role and provides displacement; A lifting assembly (6) is arranged on the upper end of the carrying trolley (1); A translation assembly (12) is connected to the lifting assembly (6), the translation assembly (12) comprises a moving mechanism (13) and two reinforcement mechanisms (24), the moving mechanism (13) is connected to the lifting assembly (6), the moving mechanism (13) comprises four translation slides (21), the translation slides (21) are arranged in groups of two, and two ends of a reinforcement mechanism (24) are fixedly connected to two translation slides (21) in each group; A positioning monitoring assembly (30) comprises an infrared laser instrument (33), a positioning mechanism (39) and an alarm (48), wherein the infrared laser instrument (33) is fixedly mounted on one end of the translation slide (21), the positioning mechanism (39) is fixedly mounted on the other end of the translation slide (21), and the alarm (48) is fixedly mounted on the upper end of the carrying trolley (1); The reinforcement mechanism (24) comprises a receiving tube (25), a sleeve rod (26), a plurality of sleeve tubes (27) and a plurality of positioning pins (29); the interior of the receiving tube (25) is hollow; the receiving tube (25) is fixedly connected to a translation slide (21) in each group; the sleeve rod (26) is located inside the receiving tube (25); the sleeve rod (26) is slidably connected to the receiving tube (25); a plurality of sleeve tubes (27) are sleeved one by one on the outside of the sleeve rod (26); the sleeve tube (27) located on the outermost side is fixedly connected to another translation slide (21) in each group; a limiting slide groove (28) is formed on both the receiving tube (25) and the sleeve tube (27); and a plurality of positioning pins (29) pass through the positioning slide groove and are respectively screwed into the sleeve rod (26) and the sleeve tube (27).
2. The assembled building positioning monitoring device according to claim 1, characterized in that: The load-bearing trolley (1) comprises a support platform (2), a support sleeve (3) and a support top plate (5), wherein the support platform (2), the support sleeve (3) and the support top plate (5) are arranged in order from bottom to top above the load-bearing trolley (1), wherein the support platform (2) is fixedly connected to the body of the load-bearing trolley (1) in a horizontal state, the support sleeve (3) is fixedly installed on the support platform (2) in a vertical state, an avoidance through hole (4) is formed on one side of the tube wall of the support sleeve (3), and the support top plate (5) is fixedly installed on the upper end of the support sleeve (3) in a horizontal state.
3. The assembled building positioning monitoring device according to claim 2, characterized in that: The lifting assembly (6) comprises a motor (7), a screw rod (9), a lifting slider (10), a base (11) and two limit rods (8). The output end of the motor (7) is fixedly mounted on the top of the support top plate (5) with the output end facing downward. The base (11) is fixedly mounted on the support platform (2) and is located inside the support sleeve (3). The screw rod (9) is arranged in a vertical state. One end of the screw rod (9) is movably connected to the base (11), and the other end is fixedly connected to the output end of the motor (7) through a coupling. The two limit rods (8) are fixedly mounted on both sides of the avoidance through hole (4) in a symmetrical state. The lifting slider (10) is threadedly connected to the outside of the screw rod (9). The two ends of the lifting slider (10) are against the two limit rods (8).
4. The assembled building positioning monitoring device according to claim 3, characterized in that: The moving mechanism (13) further comprises a support rod (14), two support arms (16), four sliding support frames (18), four pulleys (19) and two slide rails (20). The support rod (14) is arranged in a horizontal state. The support rod (14) is connected to the lifting slider (10). Extension arms (15) are formed at both ends of the support rod (14). The two support arms (16) are respectively fixedly connected to the extension arms (15) at both ends of the support rod (14). A movable slide groove (17) is formed on the support arm (16). The two slide rails (20) are arranged in a horizontal state and are parallel to the support rod (14). The lower end of the sliding support frame (18) is fixedly connected to the end of the slide rail (20), and the upper end is slidably connected to the support arm (16). The pulley (19) is movably arranged in the sliding support frame (18), and the pulley (19) wheel rim matches the movable slide groove (17). The translation slide (21) is movably connected to the slide rail (20).
5. The assembled building positioning monitoring device according to claim 1, characterized in that: A triangular support frame (34) is formed at the bottom of the infrared laser instrument (33). The positioning monitoring assembly (30) further includes a first positioning ring (35), a second positioning ring (31), a connecting short rod (37) and a fixing gasket (38). The fixing gasket (38) is fixedly mounted on the side of the translation slide (21). The connecting short rod (37) is arranged in a vertical state. The connecting short rod (37) is fixedly connected to the fixing gasket (38). Both ends of the connecting short rod (37) extend out of the translation slide (21). One end of the connecting short rod (37) is fixedly connected to the first positioning ring (35), and the other end is fixedly connected to the second positioning ring (31). ) are fixedly connected, the first positioning ring (35) is horizontally arranged at one end of the translation slide (21), the second positioning ring (31) is horizontally arranged at the other end of the translation slide (21), the first positioning ring (35) is formed with three first positioning notches (36) distributed at equal intervals along the circumferential direction, the second positioning ring (31) is formed with a plurality of second positioning notches (32) distributed at equal intervals along the circumferential direction, the infrared laser instrument (33) is fixedly mounted on the first positioning ring (35), and the triangular support frame (34) at the bottom of the infrared laser instrument (33) cooperates with the first positioning notches (36).
6. The assembled building positioning monitoring device according to claim 5, characterized in that: The positioning mechanism (39) comprises a plurality of elastic retainers (40), the plurality of elastic retainers (40) being arranged at equal intervals along the circumferential direction of the second positioning ring (31), each elastic retainer (40) being fixedly connected to the second positioning notch (32), the elastic retainer (40) comprising a spring (43), a conical cap (44), a limiting shaft (45), a protective shell (46), a screw bolt (47), a support washer (41) and four limiting pins (42), the support washer (41) being fixedly mounted at the second positioning notch (32) inside the second positioning ring (31), the limiting shaft (45) passing through the second positioning notch (32), the limiting shaft (41) 5) points to the center of the second positioning ring (31), the end of the limiting shaft (45) extends out of the second positioning notch (32) and the conical cap (44) and is fixedly screwed to the end of the limiting shaft (45), the spring (43) is sleeved on the outside of the limiting shaft (45), one end of the spring (43) abuts against the bottom of the conical cap (44), and the other end abuts against the support washer (41), four limiting pins (42) pass through the support washer (41) and the second positioning notch (32) at equal intervals in the circumferential direction, the end of the limiting shaft (45) is sleeved with a protective shell (46), and the screw bolt (47) passes through the protective shell (46) and is fixedly installed on the end of the limiting shaft (45).
7. The assembled building positioning monitoring device according to claim 2, characterized in that: The alarm (48) comprises a battery (50), a sounder (51) and four indicator lights (49), wherein the four indicator lights (49) are fixedly mounted on the upper end of the support platform (2) in a vertical state, the battery (50) is located beside one of the indicator lights (49), the battery (50) is fixedly mounted on the upper end of the support platform (2), the sounder (51) is located beside one of the indicator lights (49), and the sounder (51) is fixedly mounted on the upper end of the support platform (2).
8. The assembled building positioning monitoring device according to claim 1, characterized in that: The translation mechanism further comprises a positioning bolt (22) and two auxiliary bolts (23); the positioning bolt (22) passes through the support rod (14) and is screwed onto the lifting slider (10) at the center of gravity; the two auxiliary bolts (23) are symmetrically arranged in the vertical direction of the positioning bolt (22); the two auxiliary bolts (23) pass through the support rod (14) and are screwed onto the lifting slider (10).