A hydrogen supply system and method for a long tube trailer

By designing a long-tube trailer hydrogen supply system with multiple working modes, the problems of hydrogen cylinder not being filled and pressure reduction are solved, the hydrogen charging efficiency of hydrogen-energy vehicles is optimized, and the service life of the compressor is extended.

CN115479208BActive Publication Date: 2024-11-26HYDREXIA (SHANGHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211132939.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-16
Publication Date
2024-11-26
Estimated Expiration
2042-09-16

AI Technical Summary

Technical Problem

Due to the limited capacity of the existing long-tube trailer hydrogen supply system, the hydrogen pressure is reduced, which affects the working efficiency and energy consumption of the hydrogen press, and may cause the hydrogen cylinder to be not filled, which in turn affects the hydrogen charging speed and efficiency of the hydrogen energy vehicle.

Method used

A hydrogen supply system including a long-tube trailer, a control unit, a circulation unit and a compressor was designed. Through components such as pneumatic ball valves and pressure regulating valves, a variety of working modes are realized, including compressor boosting process, hydrogen supply process and hydrogen gas. The circulation process is preferred to ensure that the hydrogen cylinder is filled and 20Mpa hydrogen is provided.

Benefits of technology

It can meet various working needs of hydrogen refueling stations under the premise of simple structure, optimize the filling of hydrogen cylinders, improve the hydrogen charging speed and efficiency of hydrogen-energy vehicles, reduce the working frequency of compressors, and extend the life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115479208B_ABST
    Figure CN115479208B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of hydrogenation systems, and provides a long-tube trailer hydrogen supply system and method, including: a long-tube trailer, a control unit, a circulation unit, a hydrogenation unit and a compressor; the long-tube trailer is connected to the control unit, the control unit is connected to the circulation unit, and the circulation unit is connected to the hydrogenation unit and the compressor. The present invention provides a long-tube trailer hydrogen supply system, which can provide multiple working modes under the premise of simple structure to meet various working requirements of hydrogenation stations; the long-tube trailer hydrogen supply system of the present invention can realize the compressor pressurizing process for the long-tube trailer, and when there is no additional hydrogen replenishment, it is prioritized to ensure that a part of the hydrogen cylinders can be filled to provide 20Mpa hydrogen for hydrogen energy vehicles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of hydrogenation systems, and in particular to a long-tube trailer hydrogen supply system and method. Background Art

[0002] Currently, the number of hydrogen-powered vehicles is increasing, and the corresponding number of hydrogen refueling stations is also increasing. The existing hydrogen refueling stations use long-tube trailers for external hydrogen supply. As hydrogen is used, the pressure will decrease due to the limited volume of the long-tube trailer. The exhaust capacity of the hydrogen compressor is closely related to the inlet pressure (that is, the higher the inlet pressure, the greater the displacement of the hydrogen compressor), which will affect the working efficiency and energy consumption of the hydrogen compressor.

[0003] In addition, when filling the hydrogen cylinders in the long-tube trailer, some of the hydrogen cylinders may not be full, and as the hydrogen cylinders are used, the hydrogen pressure in the hydrogen cylinders will become lower and lower when there is no additional hydrogen replenishment; and when the incomplete hydrogen cylinders are used to fill hydrogen vehicles, the hydrogen pressure is less than 20Mpa, which will cause the filling speed to be too slow, resulting in low hydrogen filling efficiency for hydrogen vehicles.

[0004] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a long tube trailer hydrogen supply system, comprising: a long tube trailer, a control unit, a circulation unit, a hydrogenation unit and a compressor;

[0006] The long tube trailer is connected to the control unit, the control unit is connected to the circulation unit, and the circulation unit is connected to the hydrogenation unit and the compressor.

[0007] Preferably, the long tube trailer comprises: k hydrogen cylinders; k is a positive integer between 2 and 16;

[0008] The control unit includes: a control module A and a control module B;

[0009] The inlet of the i-th hydrogen cylinder is connected to the i-th outlet of the control module A, and the outlet of the i-th hydrogen cylinder is connected to the i-th inlet of the control module B; i is the number of the hydrogen cylinder, and the maximum value is k;

[0010] If the hydrogen cylinder is full, it is defined as a high-pressure hydrogen cylinder, and if the hydrogen cylinder is not full, it is defined as a low-pressure hydrogen cylinder.

[0011] Preferably, the circulation unit includes: pneumatic ball valve XV-3001, pneumatic ball valve XV-3002, pneumatic ball valve XV-3003, pneumatic ball valve XV-3004, pneumatic ball valve XV-3005, pressure regulating valve PCV-3001, shell and tube heat exchanger E-3001 and compressor membrane head;

[0012] The outlet of the control module B is connected to one end of the pneumatic ball valve XV-3001, and the other end of the pneumatic ball valve XV-3001 is connected to the inlet of the compressor diaphragm head and one end of the pneumatic ball valve XV-3005;

[0013] The other end of the pneumatic ball valve XV-3005 is connected to one end of the pneumatic ball valve XV-3003 and one end of the pressure regulating valve PCV-3001, and the other end of the pneumatic ball valve XV-3003 is connected to the inlet of the control module A;

[0014] The other end of the pressure regulating valve PCV-3001 is connected to one end of the pneumatic ball valve XV-3004, and the other end of the pneumatic ball valve XV-3004 is connected to one end of the pneumatic ball valve XV-3002 and one end of the shell-and-tube heat exchanger E-3001;

[0015] The other end of the pneumatic ball valve XV-3002 is connected to the hydrogenation unit, and the other end of the shell-and-tube heat exchanger E-3001 is connected to the outlet of the compressor membrane head, and the compressor membrane head is connected to the compressor.

[0016] A method for supplying hydrogen using a long tube trailer, comprising:

[0017] Determine the working status of the hydrogen refueling station;

[0018] If the working status of the hydrogen refueling station is: no hydrogen refueling task, the compressor will pressurize the long tube trailer;

[0019] If the working status of the hydrogen refueling station is: there is a hydrogen refueling task, the long-tube trailer hydrogen supply process will be carried out;

[0020] If the working status of the hydrogen refueling station is: hydrogen circulation is required, the hydrogen circulation process is carried out.

[0021] Preferably, the compressor is a long tube trailer pressurization process specifically as follows:

[0022] Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, open the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005;

[0023] The long-tube trailer starts from the i-th hydrogen cylinder and inputs hydrogen with a pressure less than 20Mpa into the compressor through the control module B, the pneumatic ball valve XV-3001 and the compressor diaphragm head. If the i-th hydrogen cylinder is empty, the i+1-th hydrogen cylinder will provide hydrogen; i is the number of the hydrogen cylinder; the initial value of i is 1 and the maximum value is k;

[0024] The compressor compresses the hydrogen gas less than 20Mpa to 45Mpa hydrogen gas, and the 45Mpa hydrogen gas is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004;

[0025] The pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen. The 20Mpa hydrogen is input into the kth hydrogen cylinder in the long tube trailer through the pneumatic ball valve XV-3003 and the control module A. If the kth hydrogen cylinder is full, the k-1th hydrogen cylinder will receive the hydrogen to ensure that the hydrogen cylinders with larger numbers are filled first.

[0026] Preferably, the long tube trailer hydrogen supply process is specifically as follows:

[0027] Open the pneumatic ball valve XV-3001, open the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, close the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005;

[0028] The high-pressure hydrogen cylinder in the long-tube trailer inputs 20Mpa hydrogen into the hydrogenation unit for hydrogenation through control module B, pneumatic ball valve XV-3001, compressor membrane head, shell and tube heat exchanger E-3001 and pneumatic ball valve XV-3002.

[0029] Preferably, the hydrogen circulation process is specifically as follows:

[0030] Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and open the pneumatic ball valve XV-3005;

[0031] The outlet of control module B inputs a preset amount of 20Mpa hydrogen into the circulation unit;

[0032] 20Mpa hydrogen is compressed to 45Mpa hydrogen by the compressor, and 45Mpa hydrogen is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004; the pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen, and 20Mpa hydrogen is input into the compressor through the pneumatic ball valve XV-3005 and the compressor diaphragm head, and the compressor compresses 20Mpa hydrogen to 45Mpa hydrogen, completing a hydrogen cycle;

[0033] The hydrogen cycle is repeated until the operating state of the hydrogen refueling station changes.

[0034] The present invention has the following beneficial effects:

[0035] 1. Provide a long-tube trailer hydrogen supply system that can provide multiple working modes under the premise of simple structure to meet various working requirements of hydrogen refueling stations;

[0036] 2. The long-tube trailer hydrogen supply system of the present invention can realize the process of the compressor pressurizing the long-tube trailer. When there is no additional hydrogen replenishment, it is prioritized to ensure that a part of the hydrogen cylinders can be filled to provide 20Mpa hydrogen for the hydrogen-powered vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a system structure diagram of an embodiment of the present invention;

[0038] Among them, 1-No. 1 hydrogen cylinder, 2-No. 2 hydrogen cylinder, 3-compressor, 4-compressor membrane head, 5-hydrogenation unit, 6-control module A, 7-control module B;

[0039] Figure 2 This is a flow chart of a method according to an embodiment of the present invention;

[0040] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0041] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0042] Reference Figure 1 , the present invention provides a long tube trailer hydrogen supply system, comprising: a long tube trailer, a control unit, a circulation unit, a hydrogenation unit and a compressor;

[0043] The long tube trailer is connected to the control unit, the control unit is connected to the circulation unit, and the circulation unit is connected to the hydrogenation unit and the compressor.

[0044] Furthermore, the long tube trailer comprises: k hydrogen cylinders; k is a positive integer between 2 and 16;

[0045] The control unit includes: a control module A and a control module B;

[0046] The inlet of the i-th hydrogen cylinder is connected to the i-th outlet of the control module A, and the outlet of the i-th hydrogen cylinder is connected to the i-th inlet of the control module B; i is the number of the hydrogen cylinder, and the maximum value is k;

[0047] If the hydrogen cylinder is full, it is defined as a high-pressure hydrogen cylinder, and if the hydrogen cylinder is not full, it is defined as a low-pressure hydrogen cylinder.

[0048] Specifically, refer to Figure 1 In this embodiment, the value of k is taken as 2. At this time, there are two hydrogen cylinders in the system, including: No. 1 hydrogen cylinder and No. 2 hydrogen cylinder; the hydrogen cylinders are divided into high-pressure hydrogen cylinders and low-pressure hydrogen cylinders according to the current hydrogen pressure in the cylinders; when the hydrogen cylinder is full, that is, the hydrogen pressure in the cylinder is 20Mpa, the hydrogen cylinder is considered to be a high-pressure hydrogen cylinder; when the hydrogen cylinder is not full, that is, the hydrogen pressure in the cylinder is less than 20Mpa, the hydrogen cylinder is considered to be a low-pressure hydrogen cylinder.

[0049] Further, the circulation unit includes: pneumatic ball valve XV-3001, pneumatic ball valve XV-3002, pneumatic ball valve XV-3003, pneumatic ball valve XV-3004, pneumatic ball valve XV-3005, pressure regulating valve PCV-3001, shell and tube heat exchanger E-3001 and compressor membrane head;

[0050] The outlet of the control module B is connected to one end of the pneumatic ball valve XV-3001, and the other end of the pneumatic ball valve XV-3001 is connected to the inlet of the compressor diaphragm head and one end of the pneumatic ball valve XV-3005;

[0051] The other end of the pneumatic ball valve XV-3005 is connected to one end of the pneumatic ball valve XV-3003 and one end of the pressure regulating valve PCV-3001, and the other end of the pneumatic ball valve XV-3003 is connected to the inlet of the control module A;

[0052] The other end of the pressure regulating valve PCV-3001 is connected to one end of the pneumatic ball valve XV-3004, and the other end of the pneumatic ball valve XV-3004 is connected to one end of the pneumatic ball valve XV-3002 and one end of the shell-and-tube heat exchanger E-3001;

[0053] The other end of the pneumatic ball valve XV-3002 is connected to the hydrogenation unit, and the other end of the shell-and-tube heat exchanger E-3001 is connected to the outlet of the compressor membrane head, and the compressor membrane head is connected to the compressor.

[0054] Specifically, a pneumatic ball valve is a ball valve equipped with a pneumatic actuator. The execution speed of the pneumatic actuator is relatively fast, and the fastest switching speed is 0.05 seconds per time. Pneumatic ball valves are usually equipped with various accessories, such as solenoid valves, air source processing triplet, limit switches, positioners, control boxes, etc., to achieve local control and remote centralized control. The opening and closing of the pneumatic ball valve can be controlled in the control room.

[0055] The present invention provides a long tube trailer hydrogen supply method, comprising:

[0056] Determine the working status of the hydrogen refueling station;

[0057] If the working status of the hydrogen refueling station is: no hydrogen refueling task, the compressor will pressurize the long tube trailer;

[0058] If the working status of the hydrogen refueling station is: there is a hydrogen refueling task, the long-tube trailer hydrogen supply process will be carried out;

[0059] If the working status of the hydrogen refueling station is: hydrogen circulation is required, the hydrogen circulation process is carried out.

[0060] Furthermore, the compressor is a long tube trailer pressurization process specifically as follows:

[0061] Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, open the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005;

[0062] The long-tube trailer starts from the i-th hydrogen cylinder and inputs hydrogen with a pressure less than 20Mpa into the compressor through the control module B, the pneumatic ball valve XV-3001 and the compressor diaphragm head. If the i-th hydrogen cylinder is empty, the i+1-th hydrogen cylinder is used to provide hydrogen; i is the number of the hydrogen cylinder, the initial value of i is 1, and the maximum value is k;

[0063] The compressor compresses the hydrogen gas less than 20Mpa to 45Mpa hydrogen gas, and the 45Mpa hydrogen gas is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004;

[0064] The pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen. The 20Mpa hydrogen is input into the kth hydrogen cylinder in the long tube trailer through the pneumatic ball valve XV-3003 and the control module A. If the kth hydrogen cylinder is full, the k-1th hydrogen cylinder will receive the hydrogen to ensure that the hydrogen cylinders with larger numbers are filled first.

[0065] Specifically, refer to Figure 1 For example, if the system has two hydrogen cylinders, if both hydrogen cylinders are not full, that is, both hydrogen cylinders are low-pressure hydrogen cylinders, then the No. 1 hydrogen cylinder will input less than 20Mpa hydrogen into the compressor through the control module B, the pneumatic ball valve XV-3001 and the compressor diaphragm head (i.e., the a-1 route). After compression and decompression, the 20Mpa hydrogen will be input into the No. 2 hydrogen cylinder through the control module A (i.e., the a-2 route). When the air pressure in the No. 2 hydrogen cylinder reaches 20Mpa, it will be identified as a high-pressure hydrogen cylinder. At this time, the compressor will be stopped for the long-tube trailer pressurization process; if the No. 1 hydrogen cylinder is empty in the middle, the compressor will be stopped for the long-tube trailer pressurization process.

[0066] Furthermore, the long tube trailer hydrogen supply process is specifically as follows:

[0067] Open the pneumatic ball valve XV-3001, open the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, close the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005;

[0068] The high-pressure hydrogen cylinder in the long-tube trailer inputs 20Mpa hydrogen into the hydrogenation unit for hydrogenation through control module B, pneumatic ball valve XV-3001, compressor membrane head, shell and tube heat exchanger E-3001 and pneumatic ball valve XV-3002.

[0069] Specifically, when filling hydrogen vehicles with hydrogen, 20Mpa hydrogen has the best filling effect. After the compressor pressurizes the long tube trailer, the hydrogen cylinders with larger numbers will be filled first. Therefore, the hydrogen cylinders with larger numbers will be defined as high-pressure hydrogen cylinders. At this time, the 20Mpa hydrogen in the high-pressure hydrogen cylinders can be used for the hydrogen filling operation of hydrogen vehicles.

[0070] Furthermore, the hydrogen circulation process is specifically as follows:

[0071] Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and open the pneumatic ball valve XV-3005;

[0072] The outlet of control module B inputs a preset amount of 20Mpa hydrogen into the circulation unit;

[0073] 20Mpa hydrogen is compressed to 45Mpa hydrogen by the compressor, and 45Mpa hydrogen is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004; the pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen, and 20Mpa hydrogen is input into the compressor through the pneumatic ball valve XV-3005 and the compressor diaphragm head, and the compressor compresses 20Mpa hydrogen to 45Mpa hydrogen, completing a hydrogen cycle;

[0074] The hydrogen cycle is repeated until the operating state of the hydrogen refueling station changes.

[0075] Specifically, when the hydrogen refueling station is working, if the compressor is repeatedly started and shut down, the working life of the compressor will be greatly reduced. Therefore, when the hydrogen refueling station completes the hydrogenation operation and fills the high-pressure hydrogen cylinder, in order to keep the compressor running continuously, the large circulation mode will be turned on. At this time, the hydrogen will continue to circulate in the circulation unit, and the compressor will also continue to work, avoiding repeated start and stop of the compressor.

[0076] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0077] The serial numbers of the embodiments of the present invention are for descriptive purposes only and do not represent the superiority or inferiority of the embodiments. In a unit claim that lists several means, several of these means may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order and these words may be interpreted as identifiers.

[0078] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A long tube trailer hydrogen supply system, characterized in that: include: Tube trailer, control unit, circulation unit, hydrogenation unit and compressor; The long tube trailer is connected to the control unit, the control unit is connected to the circulation unit, and the circulation unit is connected to the hydrogenation unit and the compressor; The circulation unit includes: pneumatic ball valve XV-3001, pneumatic ball valve XV-3002, pneumatic ball valve XV-3003, pneumatic ball valve XV-3004, pneumatic ball valve XV-3005, pressure regulating valve PCV-3001, shell and tube heat exchanger E-3001 and compressor membrane head; The outlet of the control module B is connected to one end of the pneumatic ball valve XV-3001, and the other end of the pneumatic ball valve XV-3001 is connected to the inlet of the compressor diaphragm head and one end of the pneumatic ball valve XV-3005; The other end of the pneumatic ball valve XV-3005 is connected to one end of the pneumatic ball valve XV-3003 and one end of the pressure regulating valve PCV-3001, and the other end of the pneumatic ball valve XV-3003 is connected to the inlet of the control module A; The other end of the pressure regulating valve PCV-3001 is connected to one end of the pneumatic ball valve XV-3004, and the other end of the pneumatic ball valve XV-3004 is connected to one end of the pneumatic ball valve XV-3002 and one end of the shell-and-tube heat exchanger E-3001; The other end of the pneumatic ball valve XV-3002 is connected to the hydrogenation unit, the other end of the shell-and-tube heat exchanger E-3001 is connected to the outlet of the compressor membrane head, and the compressor membrane head is connected to the compressor; A method for supplying hydrogen to a long-tube trailer is implemented based on the long-tube trailer hydrogen supply system, comprising: Determine the working status of the hydrogen refueling station; If the working status of the hydrogen refueling station is: no hydrogen refueling task, the compressor will pressurize the long tube trailer; If the working status of the hydrogen refueling station is: there is a hydrogen refueling task, the long-tube trailer hydrogen supply process will be carried out; If the working state of the hydrogen refueling station is: hydrogen circulation is required, the hydrogen circulation process is carried out; The hydrogen circulation process is specifically as follows: Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and open the pneumatic ball valve XV-3005; The outlet of control module B inputs a preset amount of 20Mpa hydrogen into the circulation unit; 20Mpa hydrogen is compressed to 45Mpa hydrogen by the compressor, and 45Mpa hydrogen is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004; the pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen, and 20Mpa hydrogen is input into the compressor through the pneumatic ball valve XV-3005 and the compressor diaphragm head, and the compressor compresses 20Mpa hydrogen to 45Mpa hydrogen, completing a hydrogen cycle; The hydrogen cycle is repeated until the operating state of the hydrogen refueling station changes.

2. The long tube trailer hydrogen supply system according to claim 1, characterized in that: The long tube trailer comprises: k hydrogen cylinders; k is a positive integer between 2 and 16; The control unit includes: a control module A and a control module B; The inlet of the i-th hydrogen cylinder is connected to the i-th outlet of the control module A, and the outlet of the i-th hydrogen cylinder is connected to the i-th inlet of the control module B; i is the number of the hydrogen cylinder, and the maximum value is k; If the hydrogen cylinder is full, it is defined as a high-pressure hydrogen cylinder, and if the hydrogen cylinder is not full, it is defined as a low-pressure hydrogen cylinder.

3. The long tube trailer hydrogen supply system according to claim 2, characterized in that: The compressor is a long tube trailer pressurization process specifically as follows: Open the pneumatic ball valve XV-3001, close the pneumatic ball valve XV-3002, open the pneumatic ball valve XV-3003, open the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005; The long-tube trailer starts from the i-th hydrogen cylinder and inputs hydrogen with a pressure less than 20Mpa into the compressor through the control module B, the pneumatic ball valve XV-3001 and the compressor diaphragm head. If the i-th hydrogen cylinder is empty, the i+1-th hydrogen cylinder will provide hydrogen; i is the number of the hydrogen cylinder; the initial value of i is 1 and the maximum value is k; The compressor compresses the hydrogen gas less than 20Mpa to 45Mpa hydrogen gas, and the 45Mpa hydrogen gas is input into the pressure regulating valve PCV-3001 through the shell-and-tube heat exchanger E-3001 and the pneumatic ball valve XV-3004; The pressure regulating valve PCV-3001 reduces the pressure of 45Mpa hydrogen to 20Mpa hydrogen. The 20Mpa hydrogen is input into the kth hydrogen cylinder in the long tube trailer through the pneumatic ball valve XV-3003 and the control module A. If the kth hydrogen cylinder is full, the k-1th hydrogen cylinder will receive the hydrogen to ensure that the hydrogen cylinders with larger numbers are filled first.

4. The long tube trailer hydrogen supply system according to claim 2, characterized in that: The long tube trailer hydrogen supply process is specifically as follows: Open the pneumatic ball valve XV-3001, open the pneumatic ball valve XV-3002, close the pneumatic ball valve XV-3003, close the pneumatic ball valve XV-3004, and close the pneumatic ball valve XV-3005; The high-pressure hydrogen cylinder in the long-tube trailer inputs 20Mpa hydrogen into the hydrogenation unit for hydrogenation through control module B, pneumatic ball valve XV-3001, compressor membrane head, shell and tube heat exchanger E-3001 and pneumatic ball valve XV-3002.