A mobile monitoring rendezvous method and system

By using the coordinates of the measured point of the previous section as the reference point and combining the coordinate system conversion method, the problem of the total station requiring resetting the station in mobile monitoring is solved, and efficient monitoring and accurate measurement in mobile state is achieved.

CN115507818BActive Publication Date: 2024-11-29SHANDONG UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210957273.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-10
Publication Date
2024-11-29
Estimated Expiration
2042-08-10

AI Technical Summary

Technical Problem

In the prior art, the total station needs to reset the reference point during the mobile monitoring process, resulting in inefficient monitoring.

Method used

By using the coordinates of the measured point of the previous section as the reference point for the next section measurement, the coordinate system conversion method is used to avoid the process of resetting the station.

Benefits of technology

In the mobile state, it can efficiently monitor changes in the tunnel, improve the efficiency of the total station, and ensure measurement accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115507818B_ABST
    Figure CN115507818B_ABST
Patent Text Reader

Abstract

The present invention relates to a mobile monitoring rear intersection method and system, comprising the following steps: setting an initial reference point before measuring the first section, measuring the coordinates of the measuring points on the first section according to the initial reference point, converting the coordinate system according to the spatial position of the measuring points, unifying one of the coordinate values ​​of all the measuring points on the first section, arbitrarily selecting two points on the first section and one point in the initial reference point as new reference points, measuring the coordinates of the measuring points on the second section, unifying one of the coordinate values ​​of all the measuring points on the second section, arbitrarily selecting two points on the second section and one point in the previous section as new reference points, measuring the coordinate values ​​of the points on the next section, and so on, to complete the entire monitoring and measurement process. Using the measured points as reference points avoids re-stationing during the monitoring process and reduces the workload; unifying one of the coordinate values ​​of each point on each section reduces error accumulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel monitoring, and in particular to a mobile monitoring resection method and system. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Tunnel monitoring and measurement is an important part of tunnel construction and an important measure to timely grasp the deformation of tunnel surrounding rock and support. According to the monitoring and measurement results, information construction can be carried out, and the construction method and support plan can be adjusted in real time and effectively, forming a dynamic mutual feedback excavation and reinforcement system, while providing a reliable source of information for tunnel safety assessment.

[0004] The current monitoring and measurement methods mainly include three-dimensional laser scanning method, total station distance measurement method, etc. Among them, total station is widely used in tunnel engineering due to its convenient operation mode and accurate measurement results. The total station in the prior art has multiple functions, such as automatic point finding function after installing servo motor, small range precise aiming function after installing photosensitive components, etc. Although the multiple functions can meet different monitoring needs, the basic principle of monitoring has not changed in essence.

[0005] The basic method of total station measurement is the principle of rear intersection, which means setting up a station only at the point to be determined, observing a horizontal angle between two known control points, and then calculating the coordinate value of the point to be determined through relevant formulas. This method is mostly used for fixed-point measurement under standing conditions. For mobile monitoring and measurement processes, the reference point needs to be reset. The point setting process is time-consuming and labor-intensive, resulting in low monitoring efficiency for mobile monitoring in a mobile state. Summary of the invention

[0006] In order to solve at least one technical problem existing in the above-mentioned background technology, the present invention provides a rear intersection method and system for mobile monitoring, which uses the coordinates of the measured points of the previous section as the reference points for measuring the next section, solves the problem of mobile monitoring requiring re-setting the station, eliminates the process of re-setting the points while ensuring the measurement accuracy, can monitor the tunnel in a mobile state, and indirectly improves the efficiency of using the total station.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A first aspect of the present invention provides a mobile monitoring resection method, comprising the following steps:

[0009] Step 1: Set the initial reference point, measure the coordinates of all measuring points on the first section according to the initial reference point and save them;

[0010] Step 2: According to the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the second section, the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion are obtained through coordinate system conversion;

[0011] Step 3: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all the measuring points on the second section; according to the conversion process of step 2, reversely deduce the point coordinate values ​​of the measuring points on the second section in the coordinate system of the first section;

[0012] Step 4, take any two points on the second section and a point in the first section to update the reference point again, and obtain the coordinate value of the measuring point on the third section after the coordinate system conversion based on the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the third section;

[0013] Step 5: Repeat steps 2-4 to obtain the coordinates of all measuring points on the cross section.

[0014] Step 2 is specifically as follows: one of the coordinate axes of the coordinate system where the first section is located is rotated to a position parallel to the direction of the second section, and the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the transformation are obtained;

[0015] Step 2 The formula for coordinate system conversion is:

[0016] x=x'sinα-y'cosα, y=x'cosα+y'sinα;

[0017] x'=xsinα+ycosα, y'=ysinα-xcosα;

[0018] Where xy is the coordinate system of the first section, x′-y′ is the coordinate system of the second section, angle a is the angle between the y axis in the original coordinate system and the x′ axis in the second section coordinate system, and angle θ is the angle between the y axis in the original coordinate system and the y′ axis in the second section coordinate system.

[0019] Step 2: After the coordinate system is converted, the average value of the converted coordinate values ​​is taken as the required coordinate value and saved;

[0020] After the coordinate transformation, the average value of one of the coordinate values ​​of all target points on the first section is taken to obtain the unified coordinate value to reduce error accumulation.

[0021] Step 4 is as follows: take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system of the first section to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section.

[0022] The second aspect of the present invention provides a mobile monitoring resection system, including a total station, through which the coordinates of the measured points of the previous tunnel section are obtained as reference points for measuring the next tunnel section, specifically:

[0023] Step 1: Set the initial reference point, measure the coordinates of all measuring points on the first section according to the initial reference point and save them;

[0024] Step 2: According to the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the second section, the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion are obtained through coordinate system conversion;

[0025] Step 3: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all the measuring points on the second section; according to the conversion process of step 2, reversely deduce the point coordinate values ​​of the measuring points on the second section in the coordinate system of the first section;

[0026] Step 4: Take any two points on the second section and a point in the first section to update the reference point again. After the coordinate system is converted based on the angle between one of the coordinate axes of the coordinate system of the first section and the direction of the third section, the coordinate value of the measuring point on the third section is obtained.

[0027] Step 5: Repeat steps 2-4 to obtain the coordinates of all measuring points on the cross section.

[0028] Step 2 is specifically as follows: one of the coordinate axes of the coordinate system where the first section is located is rotated to a position parallel to the direction of the second section, and the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion are obtained.

[0029] Step 2: After the coordinate system is converted, take the average value of the converted coordinate values ​​as the required coordinate value and save it; take the average value of one of the coordinate values ​​of all target points on the first section to obtain a unified coordinate value to reduce error accumulation.

[0030] Step 4 is as follows: take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system of the first section to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section.

[0031] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects:

[0032] The coordinates of the measured points in the previous section are used as the reference points for measuring the next section to solve the problem of mobile monitoring requiring re-station setting. The process of re-setting points can be eliminated while ensuring measurement accuracy. The tunnel can be monitored in a mobile state and the efficiency of using the total station can be indirectly improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0034] Figure 1 is a schematic diagram of the resection principle provided by one or more embodiments of the present invention;

[0035] Figure 2 is a schematic diagram of a resection for mobile monitoring provided by one or more embodiments of the present invention;

[0036] Figure 3 It is a schematic diagram of the coordinate transformation principle provided by one or more embodiments of the present invention. DETAILED DESCRIPTION

[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0038] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0039] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0040] As described in the background technology, the basic method of total station measurement is the rear intersection principle, which means setting up a station only on the point to be determined, observing a horizontal angle to two known control points, and then calculating the coordinate value of the point to be determined through relevant formulas. This method is mostly used for fixed-point measurement under standing conditions. For mobile monitoring and measurement processes, the reference point needs to be reset. The point setting process is time-consuming and labor-intensive, resulting in low monitoring efficiency for mobile monitoring in a mobile state.

[0041] The following embodiment provides a resection method for mobile monitoring, which uses the coordinates of the measured points of the previous section as the reference points for measuring the next section, thereby solving the problem of mobile monitoring requiring re-station setting. The process of re-setting points is eliminated while ensuring measurement accuracy, and the tunnel can be monitored in a mobile state, thereby indirectly improving the efficiency of using a total station.

[0042] Embodiment 1:

[0043] like Figure 1-3 As shown, the purpose of this embodiment is to provide a mobile monitoring resection method, comprising the following steps:

[0044] Step 1: Set the initial reference point, measure the coordinates of all measuring points on the first section according to the initial reference point and save them;

[0045] Step 2: Rotate one of the coordinate axes of the coordinate system of the first section to a position parallel to the direction of the second section, and obtain the coordinate values ​​of all the measuring points of the coordinate system of the first section after the transformation;

[0046] Step 3: Take the average value of the converted coordinate values ​​as the required coordinate value and save it;

[0047] Step 4: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all measuring points on the second section; according to the conversion process of step 2, reversely deduce the coordinate values ​​of the measuring points on the second section in the coordinate system of the first section;

[0048] Step 5, take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system where the first section is located to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section;

[0049] Step 6, and so on, to obtain the coordinates of all measuring points on the cross section.

[0050] The above method uses the coordinates of the measured points of the previous section as the reference points for the next section measurement, solving the problem of mobile monitoring requiring re-stationing; the measuring points on the same section can be unified into one coordinate value by rotating the coordinate system, for example, in theory Figure 2 The y coordinate values ​​of points D, E, and F are the same, and the monitoring error of the y value can be reduced by resolving them separately and then taking the average value.

[0051] Specific:

[0052] Step 1: first set an initial reference point at a set position, measure the coordinates of all measuring points on the first section according to the initial reference point, and record the coordinates of all points in the original coordinate system after obtaining the coordinate values;

[0053] like Figure 1 As shown, the calculation formula for measuring point P is:

[0054]

[0055]

[0056] In actual measurement, a total station is usually used to measure the three direction angles PA, PB, and PC. The following six variables are calculated based on these three direction angles, and then substituted into the above formula to calculate the coordinates of point P.

[0057] α=PC-PB, β=PA-PC, γ=PB-PA;

[0058]

[0059]

[0060]

[0061] According to the above formula, we can get Figure 2 The coordinates of all measured points on the first section.

[0062] Step 2, perform coordinate transformation, rotate one of the coordinate axes of the original coordinate system to a position parallel to the direction of the second section, and compile a computer program to record the transformation process;

[0063] according to Figure 3 The coordinate transformation is performed according to the principle shown, and the transformation formula is:

[0064] x=x'sinα-y'cosα, y=x'cosα+y'sinα;

[0065] x'=xsinα+ycosα, y'=ysinα-xcosα;

[0066] Where xy is the original coordinate system, x′-y′ is the second section coordinate system, angle a is the angle between the y axis in the original coordinate system and the x′ axis in the second section coordinate system, and angle θ is the angle between the y axis in the original coordinate system and the y′ axis in the second section coordinate system.

[0067] Compile a computer program to calculate the conversion process. Figure 2 Rotate one of the coordinate axes of the original coordinate system to a position parallel to the direction of the second section.

[0068] Step 3: After the coordinate conversion, one of the coordinate values ​​of all the target points on the first section is theoretically the same, but due to the existence of measurement errors, the coordinate values ​​cannot be exactly the same. Here, the average value of the coordinate value of each point is taken to unify the coordinate value, thereby reducing the error;

[0069] Pick Figure 2 The three points A, B, and C in the figure are taken as reference points. The coordinates of points D, E, and F on the first section are measured using the principle of rear intersection. Since points D, E, and F are located on the same section, their y coordinate values ​​are theoretically the same, that is, y D =y E =y F However, due to measurement errors, it is impossible to achieve the same three y values. Here, we can take the average of the three y values. As its true value, the coordinates of D, E, and F are (x D ,y a ), (x E ,y a ), (x F ,y a ), by reducing the measurement error in this way, and thus reducing the error accumulation when using the measured point as the reference point for the next section measurement.

[0070] Step 4, take any two points on the first section and one of the initial reference points as new reference points, measure the coordinates of all measured points on the second section based on the new reference points, and reversely deduce the point coordinate values ​​of the measured points on the second section in the original coordinate system based on the conversion process recorded in step 2 (since the average value of the y value has been calculated once in step 3, its coordinate value will be slightly adjusted, so it is necessary to reversely deduce again, and use the reversed result to calculate the coordinate value of the next section).

[0071] Step 5, take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the original coordinate system to a position parallel to the direction of the third section, and measure the coordinates of the measuring point on the third section.

[0072] Step 6: Similarly, calculate the coordinates of all measuring points on the cross section.

[0073] The above method sets an initial reference point before measuring the first section, measures the coordinates of the measuring points on the first section according to the initial reference point, converts the coordinate system according to the spatial position of the measuring points, unifies one of the coordinate values ​​of all the measuring points on the first section, arbitrarily selects two points on the first section and one of the initial reference points as new reference points, measures the coordinates of the measuring points on the second section, unifies one of the coordinate values ​​of all the measuring points on the second section, arbitrarily selects two points on the second section and one of the previous section as new reference points, measures the coordinate values ​​of the points on the next section, and so on, to complete the entire monitoring and measurement process.

[0074] The above method uses the coordinates of the measured points of the previous section as the reference points for measuring the next section, solving the problem of mobile monitoring requiring re-setting the station. It eliminates the process of re-setting points while ensuring measurement accuracy, enables monitoring in the tunnel while on the move, and indirectly improves the efficiency of using the total station.

[0075] Embodiment 2:

[0076] The purpose of this embodiment is to provide a mobile monitoring resection system, including a total station, which obtains the coordinates of the measured points of the previous tunnel section as the reference points for measuring the next tunnel section, specifically:

[0077] Step 1: Set the initial reference point, measure the coordinates of all measuring points on the first section according to the initial reference point and save them;

[0078] Step 2: According to the angle between one of the coordinate axes of the coordinate system of the first section and the direction of the second section, the coordinate values ​​of all the measuring points of the coordinate system of the first section after the conversion are obtained through coordinate system conversion; specifically: one of the coordinate axes of the coordinate system of the first section is rotated to a position parallel to the direction of the second section to obtain the coordinate values ​​of all the measuring points of the coordinate system of the first section after the conversion; after the coordinate system conversion in step 2, the average value of the converted coordinate values ​​is taken as the required coordinate value and saved; after the coordinate conversion, the average value of one of the coordinate values ​​of all the target points on the first section is taken to obtain the unified coordinate value to reduce error accumulation;

[0079] Step 3: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all the measuring points on the second section; according to the conversion process of step 2, reversely deduce the point coordinate values ​​of the measuring points on the second section in the coordinate system of the first section;

[0080] Step 4, take any two points on the second section and a point in the first section to update the reference point again, and obtain the coordinate value of the measuring point on the third section after the coordinate system is converted according to the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the third section; specifically: take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system where the first section is located to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section;

[0081] Step 5: Repeat steps 2-4 to obtain the coordinates of all measuring points on the cross section.

[0082] The coordinates of the measured points in the previous section of the tunnel are used as the reference points for measuring the next section, which solves the problem of mobile monitoring requiring re-station setting. The process of re-setting points is eliminated while ensuring measurement accuracy. The tunnel can be monitored in a mobile state and the efficiency of using the total station is indirectly improved.

[0083] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A mobile monitoring resection method, characterized in that: The following steps are involved: Step 1: Measure the coordinates of all measuring points on the first section according to the set initial reference point and save them; Step 2: According to the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the second section, the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion are obtained through coordinate system conversion; Step 3: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all the measuring points on the second section; according to the conversion process of step 2, reversely deduce the point coordinate values ​​of the measuring points on the second section in the coordinate system of the first section; Step 4: Take any two points on the second section and a point in the first section to update the reference point again. After the coordinate system is converted based on the angle between one of the coordinate axes of the coordinate system of the first section and the direction of the third section, the coordinate value of the measuring point on the third section is obtained. Step 5: Repeat steps 2-4 to obtain the coordinates of all measuring points on the cross section.

2. A mobile monitoring resection method as claimed in claim 1, characterized in that: The step 2 is specifically as follows: rotating one of the coordinate axes of the coordinate system where the first section is located to a position parallel to the direction of the second section, and obtaining the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion.

3. The mobile monitoring resection method according to claim 1, characterized in that: Step 2 The formula for coordinate system conversion is: x=x'sinα-y'cosα, y=x'cosα+y'sinα; x'=xsinα+ycosα, y'=ysinα-xcosα; Where xy is the coordinate system of the first section, x′-y′ is the coordinate system of the second section, angle a is the angle between the y axis in the original coordinate system and the x′ axis in the second section coordinate system, and angle θ is the angle between the y axis in the original coordinate system and the y′ axis in the second section coordinate system.

4. The mobile monitoring resection method according to claim 1, characterized in that: After step 2, the average value of the converted coordinate values ​​is taken as the required coordinate value and saved.

5. A mobile monitoring resection method as claimed in claim 4, characterized in that: After the coordinate transformation, the average value of one of the coordinate values ​​of all target points on the first section is taken to obtain the unified coordinate value.

6. The mobile monitoring resection method according to claim 1, characterized in that: Step 4 is as follows: take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system of the first section to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section.

7. A mobile monitoring rendezvous system, characterized in that: Including total station, through which the coordinates of the measured points of the previous tunnel section are obtained as the reference points for measuring the next tunnel section, specifically: Step 1: Measure the coordinates of all measuring points on the first section according to the set initial reference point and save them; Step 2: According to the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the second section, the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion are obtained through coordinate system conversion; Step 3: Take any two points on the first section after coordinate conversion and one of the initial reference points as new reference points, and measure the coordinate values ​​of all the measuring points on the second section; according to the conversion process of step 2, reversely deduce the point coordinate values ​​of the measuring points on the second section in the coordinate system of the first section; Step 4, take any two points on the second section and a point in the first section to update the reference point again, and obtain the coordinate value of the measuring point on the third section after the coordinate system conversion based on the angle between one of the coordinate axes of the coordinate system where the first section is located and the direction of the third section; Step 5: Repeat steps 2-4 to obtain the coordinates of all measuring points on the cross section.

8. The mobile monitoring rendezvous system according to claim 7, characterized in that: The step 2 is specifically as follows: rotating one of the coordinate axes of the coordinate system where the first section is located to a position parallel to the direction of the second section, and obtaining the coordinate values ​​of all the measuring points of the coordinate system where the first section is located after the conversion.

9. The mobile monitoring resection system according to claim 7, characterized in that: After step 2, the average value of the converted coordinate values ​​is taken as the required coordinate value and saved; the average value of one of the coordinate values ​​of all target points on the first section is taken to obtain a unified coordinate value.

10. The mobile monitoring rendezvous system according to claim 7, characterized in that: Step 4 is as follows: take any two points on the second section and a point in the first section to update the reference point again, rotate one of the coordinate axes of the coordinate system of the first section to a position parallel to the direction of the third section, and measure the coordinate value of the measuring point on the third section.

Citation Information

Patent Citations

  • Fixed-point scanning type rapid tunnel section clearance measurement and convergence measurement method

    CN102692210A

  • Survey method and program for displaying result thereof

    JP3410465B1