A framework component based on PEM electrolysis stack

By arranging baffles and other structures in the frame assembly of the PEM electrolysis stack, the problem of unstable pure water flow rate in the water inlet channel is solved, the hydrogen/oxygen gas volume and the reliability of the electrolysis stack are improved, and the stability of the water flow field is ensured. performance and component security.

CN115652348BActive Publication Date: 2024-10-01GUANGDONG CAVORO HYDROGEN TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211224672.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-09
Publication Date
2024-10-01
Estimated Expiration
2042-10-09

AI Technical Summary

Technical Problem

The flow rate of pure water input into the frame water inlet channel of the existing PEM electrolysis reactor is unstable, resulting in a reduction in the amount of hydrogen/oxygen gas, which affects the gas output and operational reliability of the electrolysis reactor.

Method used

Design a frame assembly based on PEM electrolysis stack, using at least two stacked frames. Each water flow channel is equipped with a guide plate. The slope of the guide plate is set to 3.5°-4.1°, and is set on the inner edge of the frame. Water/ventilation grooves, lips, sealing ribs and other structures to improve water flow stability and sealing.

Benefits of technology

By setting the slope of the guide plate and other structures, the stability and consistency of the pure water flow rate are improved, the electrolysis components are prevented from dry burning, and the operational safety of the electrolysis stack and the overall strength of the frame are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115652348B_ABST
    Figure CN115652348B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of electrolytic stacks, and discloses a frame assembly based on a PEM electrolytic stack with a stable pure water flow and high reliability, comprising at least two stacked frames (10), a plurality of water flow channels (101) being radially arranged on one end face of the frame (10), a guide plate (101a) being arranged in the water flow channel (101), the outer end of the guide plate (101a) forming a slope along the inner end direction; the slope gradient is set to be 3.5°-4.1°.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electrolytic stacks, and more particularly to a frame assembly based on a PEM electrolytic stack. Background Art

[0002] PEM pure water electrolysis technology is currently the key development and even the preferred method in the field of hydrogen production. High-purity hydrogen and oxygen can be obtained by using a proton exchange membrane water electrolysis device. The principle is that an electrode catalyst layer is provided on both sides of the proton exchange membrane to obtain a membrane electrode. Among them, the membrane electrode is fixed by a frame on both sides, and multiple groups of water inlet channels are provided at both ends of the frame to provide pure water for membrane electrode electrolysis, and the pure water is decomposed to generate hydrogen ions and oxygen. The hydrogen ions pass through the proton exchange membrane to reach the cathode side and combine with electrons to generate hydrogen.

[0003] However, the water inlet channel of the frame passes pure water into the anode side, forming an electrolytic water flow field within the multiple stacked frames. When the flow rate of pure water input into the water inlet channel is unstable, it may lead to a reduction in the amount of hydrogen / oxygen produced by electrolysis; or cause the electrolytic components to dry burn, thereby affecting the gas output and operational reliability of the electrolytic stack.

[0004] Therefore, how to ensure the stability and consistency of the water flow rate of the water inlet / drainage channels at both ends of the frame has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0005] The technical problem to be solved by the present invention is that, in view of the defect of the prior art that when the flow rate of pure water input into the water inlet channel is unstable, the amount of hydrogen / oxygen produced by electrolysis may be reduced, thereby affecting the gas output of the electrolytic stack, a frame assembly based on a PEM electrolytic stack with stable pure water flow and high reliability is provided.

[0006] The technical solution adopted by the present invention to solve the technical problem is: construct a frame assembly based on a PEM electrolytic stack,

[0007] The invention comprises at least two stacked frames,

[0008] A plurality of water flow channels are radially arranged on one end surface of the frame, a guide plate is arranged in the water flow channel, and the outer end of the guide plate forms a slope along the inner end direction;

[0009] The slope of the slope is set to 3.5°-4.1°.

[0010] In some embodiments, the slope of the slope is set to 3.7°-3.9°.

[0011] In some embodiments, parallel water / ventilation grooves are provided on the inner edge of the frame, and the interval between the water / ventilation grooves is set to 1.8 mm-2.5 mm.

[0012] The height of the water / ventilation groove is set to 1.2mm-1.6mm.

[0013] In some embodiments, an extended lip is provided on the inner edge of the frame, and the lip is annularly arranged on the inner side of the frame.

[0014] In some embodiments, a horizontal direction of the lip forms an obtuse angle of 100°-120° with a vertical direction of the frame.

[0015] In some embodiments, a first sealing rib is provided on the inner edge of the frame.

[0016] A second sealing rib is provided in an annular manner on the outer edge end surface of the frame.

[0017] The first sealing rib and the second sealing rib cooperate with the sealing component to limit the water flow field.

[0018] In some embodiments, a third sealing rib is provided in an annular manner on the outer edge of the water flow channel.

[0019] A fourth sealing rib is provided between an end of the first sealing rib and an end of the third sealing rib, and the fourth sealing rib is connected to the first sealing rib and the third sealing rib respectively.

[0020] In some embodiments, a proton exchange membrane is disposed between the stacked frames.

[0021] In some embodiments, the frame is configured in a square or circular shape.

[0022] In the frame assembly based on the PEM electrolytic stack described in the present invention, at least two stacked frames are included, multiple groups of water flow channels are radially arranged on one end face of the frame, a guide plate is arranged in the water flow channel, and the outer end of the guide plate forms a slope along the inner end direction; the slope is set to 3.5°-4.1°. Compared with the prior art, by arranging a guide plate in each water flow channel, and the slope of the guide plate is set between 3.5°-4.1°, when pure water is introduced, the guide plate with a slope can increase the flow rate of the water flow, thereby improving the flow rate stability and consistency of the pure water, so as to ensure the amount of gas generated by electrolysis of the PEM electrolytic stack, and the stable water flow field can also prevent the electrolytic component from burning dry, thereby improving the safety of the operation of the electrolytic component.

[0023] On the other hand, the overall strength of the frame can be improved by providing a sloped deflector. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0025] Figure 1 It is a frame structure diagram of an embodiment of a frame assembly based on a PEM electrolytic stack provided by the present invention;

[0026] Figure 2 It is a frame structure diagram of another embodiment of a frame assembly based on a PEM electrolytic stack provided by the present invention;

[0027] Figure 3 It is a partial enlarged view of another embodiment of a frame assembly based on a PEM electrolysis stack provided by the present invention;

[0028] Figure 4 The present invention provides a framework structure Figure 1 An enlarged view of an embodiment at A in the middle;

[0029] Figure 5 The present invention provides a framework structure Figure 2 An enlarged view of an embodiment at B in the figure. DETAILED DESCRIPTION

[0030] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0031] like Figure 1-Figure 5 As shown, in the first embodiment of the frame assembly based on the PEM electrolytic stack of the present invention, the frame assembly based on the PEM electrolytic stack includes at least two frames 10 stacked together.

[0032] The frame 10 is configured as a square or circular body with a hollow structure.

[0033] The frame 10 includes at least one set of anode frames and at least one set of cathode frames.

[0034] Specifically, the cathode frame is arranged on the upper end surface of the anode frame;

[0035] The proton exchange membrane (not shown) is disposed between the anode frame and the cathode frame;

[0036] Furthermore, if Figure 1 and Figure 2 As shown, a plurality of groups of water flow channels 101 are radially arranged on one end face of the frame 10, wherein the water flow channels 101 are relatively arranged on the inner edge of the frame 10, and pure water is introduced from the outside through the water flow channels 101 on one side of the frame 10, and then flows out from the water flow channels 101 on the other side (or the opposite side) of the frame 10 to form a water flow field.

[0037] Furthermore, a guide plate 101a is provided in each water flow channel 101, wherein the outer end of the guide plate 101a (corresponding to the outer edge direction of the frame 10) forms a slope along the inner end (corresponding to the inner edge direction of the frame 10), and the slope is set to 3.5°-4.1°.

[0038] The slope of the guide plate 101a can also be set to 3.7°-3.9°, thereby improving the water inlet / outlet performance of the frame 10;

[0039] On the other hand, a guide plate 101 a is provided in the water flow channel 101 to increase the strength of the frame 10 and improve the stability of the frame 10 when stacked.

[0040] Specifically, when external pure water is introduced through one side of the frame 10, most of the pure water enters the frame 10 through the water flow channel 101 to form an electrolytic water flow field, and the other part of the pure water enters the frame 10 through a slope with a certain slope. By setting a guide plate 101a in each water flow channel 101, and the slope of the guide plate 101a is set between 3.5° and 4.1°, when pure water is introduced, the guide plate 101a with a slope can increase the flow rate of pure water entering the water flow channel 101, so as to ensure the stability and consistency of the pure water input / output flow rate, so as to ensure the amount of gas produced by electrolysis of the PEM electrolytic stack; and the stable water flow field can also prevent the electrolytic component from dry burning, thereby improving the safety of the operation of the electrolytic component.

[0041] On the other hand, the overall strength of the frame 10 can be improved by providing the sloped guide plate.

[0042] In some embodiments, in order to improve the reliability of water / ventilation of the frame 10 , parallel water / ventilation grooves 102 may be provided on the inner edge of the frame 10 , wherein the water / ventilation grooves 102 are symmetrically arranged.

[0043] Furthermore, if Figure 3 As shown, in order to ensure the consistency and stability of water / ventilation, the interval of the flow channel groove 102a of the water / ventilation groove 102 can be set to 1.8mm-2.5mm, and the height of the flow channel groove 102a of the water / ventilation groove 102 can be set to 1.2mm-1.6mm.

[0044] In this embodiment, by setting the interval of the flow groove 102a of the water / ventilation groove 102 to 1.8mm-2.5mm and the height to 1.2mm-1.6mm, when the proton exchange membrane (not shown) and the multi-layer sealing component arranged on the frame 10 are compressed and sealed, the flow groove 102a has sufficient width and height, which can prevent the proton exchange membrane (not shown) and the sealing component (not shown) from sinking into the flow groove 102a due to compression or deformation, affecting the flow rate or flow of water inlet / outlet and air outlet.

[0045] In some embodiments, in order to reduce the axial shear force of hydrogen in the electrolytic stack, an extended lip 106 may be provided on the inner edge of the frame 10 , wherein the lip 106 is annularly disposed on the inner side of the frame 10 .

[0046] For example, the annular lip 106 provided at the inner edge of the frame 10 can provide axial support force to the contact side of the proton exchange membrane (not shown) with the inner edge of the frame 10, thereby improving the reliability of the proton exchange membrane (not shown) in the membrane electrode frame assembly.

[0047] Furthermore, the horizontal direction of the lip 106 forms an obtuse angle of 100°-120° with the vertical direction of the frame 10. By setting the intersection groove of the lip 106 and the frame 10 to an obtuse angle of 100°-120°, the stacked proton exchange membrane (not shown) and the sealing component (not shown) are embedded in the lip 106, and the bending parts of the proton exchange membrane (not shown) and the sealing component (not shown) form a certain slope, which can reduce the tearing of the proton exchange membrane (not shown) by the axial shear force, so as to improve the working reliability of the proton exchange membrane (not shown).

[0048] In some embodiments, Figure 4 and Figure 5 As shown, in order to ensure the sealing performance of the frame 10, the proton exchange membrane (not shown) and the sealing component (not shown), a first sealing rib 103 arranged in an annular manner may be provided on the inner edge end surface of the frame 10, and

[0049] A second sealing rib 108 may be provided in an annular manner on the outer edge end face of the frame 10, wherein the first sealing rib 103 and the second sealing rib 108 cooperate with a sealing component (not shown) to limit the water flow field, and the first sealing rib 103 and the second sealing rib 108 squeeze the proton exchange membrane (not shown) and the sealing component (not shown) to ensure the sealing of the frame 10, the proton exchange membrane (not shown) and the sealing component (not shown) to avoid water leakage and air leakage during the electrolysis process.

[0050] In some embodiments, Figure 5As shown, in order to ensure the sealing of the frame 10 with the proton exchange membrane (not shown) and the sealing component (not shown), a third sealing rib 104 arranged in an annular manner may be provided on the outer edge end faces of the water flow channel 101 and the air flow channel (not shown), wherein the air flow channel (not shown) is arranged on the adjacent side of the water flow channel 101.

[0051] Specifically, a fourth sealing rib 105 is provided between the end of the first sealing rib 103 and the end of the third sealing rib 104, and the fourth sealing rib 105 is respectively closed and connected with the first sealing rib 103 and the third sealing rib 104. By providing the fourth sealing rib 105, the sealing strength of the back side of the frame 10 can be increased when the frames 10 are stacked and bonded.

[0052] Specifically, due to the 500m 3 / h frame 10 has a relatively large overall size (approximately 1.2m*1.2m). When there are more areas without sealing ribs between the positioning holes (not shown) and the positioning holes (not shown) of the frame 10 or between the water flow channel 101 and the air flow channel (not shown), the sealing component (not shown) may cause local subsidence during sealing, resulting in poor sealing. Therefore, a fourth sealing rib 105 is provided between the end of the first sealing rib 103 and the end of the third sealing rib 104, thereby reducing the problem of water leakage and air leakage in the electrolytic stack due to the subsidence or deformation of the sealing component (not shown) when the frame 10 cooperates with the proton exchange membrane (not shown) and the sealing component (not shown) between the water flow channel 101 and the air flow channel (not shown) due to the lack of the fourth sealing rib 105.

[0053] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.

Claims

1. A framework assembly based on a PEM electrolysis stack, characterized in that: The invention comprises at least two stacked frames, A plurality of water flow channels are radially arranged on one end surface of the frame, a guide plate is arranged in the water flow channel, and the outer end of the guide plate forms a slope along the inner end direction; The slope of the slope is set to 3.5°-4.1°; An extended lip is provided on the inner edge of the frame, and the lip is annularly arranged on the inner side of the frame; A first sealing rib is provided in an annular manner on the inner edge end surface of the frame. A second sealing rib is provided in an annular manner on the outer edge end surface of the frame. The first sealing rib and the second sealing rib cooperate with the sealing component to limit the water flow field.

2. The frame assembly based on the PEM electrolysis stack according to claim 1, characterized in that: The slope of the slope is set to 3.7°-3.9°.

3. The frame assembly based on the PEM electrolysis stack according to claim 1, characterized in that: The inner edge of the frame is provided with parallel water / ventilation grooves, and the interval between the water / ventilation grooves is set to 1.8mm-2.5mm. The height of the water / ventilation groove is set to 1.2mm-1.6mm.

4. The PEM electrolysis stack-based frame assembly according to claim 3, characterized in that: The horizontal direction of the lip forms an obtuse angle of 100°-120° with the vertical direction of the frame.

5. The PEM electrolysis stack-based frame assembly according to claim 1, characterized in that: A third sealing rib is provided in an annular arrangement on the outer edge of the water flow channel. A fourth sealing rib is provided between an end of the first sealing rib and an end of the third sealing rib, and the fourth sealing rib is connected to the first sealing rib and the third sealing rib respectively.

6. The PEM electrolysis stack-based frame assembly according to claim 5, characterized in that: Proton exchange membranes are arranged between the stacked frames.

7. The frame assembly based on the PEM electrolysis stack according to any one of claims 1 to 6, characterized in that: The frame is configured to be square or circular.