By using a water-absorbing sleeve equipment during the photocatalyst preparation process, the moisture in the precipitate is screwed off and scraped in combination with push-panel scraping, the problem of low adhesion and drying efficiency of precipitate is solved, and a more efficient photocatalyst preparation is achieved.
Patent Information
- Application Number
- CN202211629718.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-19
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-12-19
AI Technical Summary
During the preparation of existing photocatalysts, the washed precipitates are prone to adhere to the inner wall of the drying box during the drying process, resulting in high collection difficulty and low drying efficiency.
Using a preparation device including a water absorbing sleeve, the washed white precipitate is placed in the water absorbing sleeve to screw off excess moisture, and the precipitate is thoroughly collected and crushed by the tightening and loosening of the water absorbing sleeve and scraping the push plate. , improve drying efficiency.
It effectively avoids the phenomenon of precipitate sticking to the wall, improves the preparation efficiency of the photocatalyst, and ensures the thorough collection and drying effect of the precipitate.
Smart Images

Figure CN115727637B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of photocatalyst preparation, in particular to a photocatalyst preparation method and preparation equipment for wastewater treatment. Background Art
[0002] Photocatalyst, also known as photocatalyst, is a general term for semiconductor materials with photocatalytic function, represented by nano-scale titanium dioxide. Under light conditions, photocatalyst can cause hydroxyl, halide, carboxylic acid and other substances in water to undergo redox reactions and gradually degrade, eventually turning into harmless small molecules. Under sunlight, the removal efficiency of olive oil wastewater treated with nano-TiO2-loaded sepiolite is 80%.
[0003] The preparation method of photocatalyst can be roughly divided into: material preparation → reaction → precipitate centrifugation → washing → drying; drying is a necessary preparation step for photocatalyst; the existing technology will place the washed precipitate directly into a drying box for hot air drying, but because there is a large amount of moisture on the surface of the precipitate just after washing, the precipitate will adhere to the inner wall of the drying box, and after drying, it will be difficult to collect the precipitate; and the precipitate with a large amount of moisture on the outer surface will cause low drying efficiency.
[0004] In view of this, in order to overcome the above technical problems, the present invention proposes a method for preparing a photocatalyst for wastewater treatment and a preparation device thereof, which solves the above technical problems. Summary of the invention
[0005] In order to make up for the shortcomings of the prior art, the present invention proposes a photocatalyst preparation method and preparation equipment for wastewater treatment. The present invention places the washed white precipitate in a water absorption sleeve and squeezes out excess water, thereby preventing the white precipitate with excessive water from sticking to the wall in the dryer, and also greatly improves the drying efficiency of the white precipitate, that is, improves the preparation efficiency of the photocatalyst.
[0006] The technical solution adopted by the present invention to solve the technical problem is: a photocatalyst preparation device for wastewater treatment according to the present invention comprises:
[0007] The middle tube is in a cylindrical shape, and both ends are open and connected;
[0008] End tube; both ends of the end tube are open and connected; there are two end tubes; the end tubes are rotatably connected to the end of the middle tube; the outer surface of one of the end tubes is fixedly connected to the internal gear; the outer wall of the other end tube is fixedly connected to the external gear;
[0009] A water-absorbing sleeve; the water-absorbing sleeve is located inside the middle tube; the ends of the water-absorbing sleeve are connected to the corresponding inner sides of the end tubes through elastic ropes; the water-absorbing sleeve is made of a water-absorbing material, such as cotton;
[0010] A double-headed motor; the body of the double-headed motor is fixedly connected to the outer wall of the middle cylinder; the output shaft of the double-headed motor is fixedly connected to the column gear; one of the column gears is meshed with the internal gear; the other column gear is meshed with the external gear;
[0011] Controller; the controller is used to control the automatic operation of the preparation equipment.
[0012] Preferably, the outer wall of the middle part of the middle cylinder is rotatably connected to the bracket through a rotating shaft; the outer wall of the middle cylinder is fixedly connected to the grip rod; the grip rod is arranged away from the bracket; an electric push rod is provided at the opening of the end cylinder; the outer wall of the electric push rod is fixedly connected to the middle cylinder through a U-shaped block; the output shaft of the electric push rod is fixedly connected to the push plate; the outer diameter of the push plate matches the inner diameter of the water absorption sleeve; the middle cylinder is hollow.
[0013] Preferably, the water absorption sleeve is connected to the inner wall of the middle tube via an elastic rope; the hollow shape of the middle tube is arranged at the lower part of the middle tube placed horizontally; and the elastic force of the elastic rope is greater than the elastic force of the elastic rope.
[0014] Preferably, an annular groove is provided on the inner wall of the middle part of the middle tube; the diameter of the annular groove is reduced from the middle part to the end part; and the hollowing of the middle tube is provided in the middle part of the middle tube.
[0015] Preferably, arc-shaped elastic sheets are evenly arranged on one side of the push plate close to the water absorption jacket; the elastic sheets are arranged close to the edge of the push plate; the outer edge diameter formed in the middle of the elastic sheet is larger than the inner diameter of the water absorption jacket; the outer edge diameter formed at the end of the elastic sheet is smaller than the inner diameter of the water absorption jacket.
[0016] Preferably, the diameter of the middle portion of the water absorbent sleeve is larger than the diameter of the end portion of the water absorbent sleeve; and the elastic ropes are evenly distributed along the circumference of the water absorbent sleeve.
[0017] Preferably, a rotating hole is provided on the upper part of the bracket; the rotating shaft is rotatably connected in the rotating hole; the lower part of the bracket is fixedly connected to the upper base; a rectangular groove is provided on the bottom of the bracket; the rectangular groove is connected to the rotating hole; a rectangular rod is provided in the rectangular groove; the lower end surface of the rectangular rod is fixedly connected to the lower base; the upper base and the lower base are connected by a spring; the rectangular rod is away from the rotating shaft in the initial state.
[0018] A method for preparing a photocatalyst for wastewater treatment, which is applicable to the above-mentioned photocatalyst preparation device for wastewater treatment, and the steps of the method are as follows:
[0019] S1: Add cobalt nitrate, incl3 and thioacetamide to a solution composed of dimethylformamide and diethylene glycol, stir to fully dissolve, pour into a reaction kettle, place in an oven to fully react, centrifuge the white precipitate, and wash with deionized water;
[0020] S2: After checking that the preparation equipment is fault-free, the handle is moved to drive the middle cylinder to rotate around the upper part of the bracket so that the electric push rod is located below the water absorption jacket, and the upper base is stepped on with the foot. The controller is started to control the electric push rod to drive the push plate to block the opening of the water absorption jacket, and the washed white precipitate is poured into the water absorption jacket to complete the feeding process;
[0021] S3: After the foot is removed from the upper base, the grip is turned to control the middle tube and the water absorption sleeve to be in a horizontal position, and the electric push rod drives the push plate away from the water absorption sleeve and locks the rotating shaft. Then the double-headed motor drives the end tube to rotate in two opposite directions through meshing, and the end tube drives the water absorption sleeve to tighten. The water absorption sleeve is tightened from the end to the middle under the cooperation of the elastic rope and the elastic rope. The gas and liquid in the water absorption sleeve are discharged to the annular groove along the water absorption sleeve under compression, and are discharged along the hollow gap of the middle tube as the water absorption sleeve continues to twist. Then the double-headed motor drives the water absorption sleeve to unfold and twist in the opposite direction, and repeats this process until water stops flowing out of the hollow gap of the middle tube.
[0022] S4: Finally, unlock the rotating shaft, keep the water absorption sleeve in a tightened state, rotate the middle cylinder so that the end cylinder without the electric push rod faces downward, and after the material collection bag is placed on the upper base, lock the rotating shaft, start the double-headed motor and rotate it back and forth repeatedly, so that the white precipitate falls from the water absorption sleeve into the material collection bag, and place the white precipitate in an oven to make it completely dry.
[0023] The beneficial effects of the present invention are as follows:
[0024] 1. The present invention places the washed white precipitate into a water absorption sleeve to squeeze out excess water, thereby preventing the white precipitate with excessive water from sticking to the wall in the dryer, and also greatly improves the drying efficiency of the white precipitate, that is, improves the preparation efficiency of the photocatalyst.
[0025] 2. The present invention controls the tightening and loosening of the water absorption jacket during the pouring process of the white precipitate, and cooperates with the push plate to scrape the inner wall of the water absorption jacket, so that the white precipitate in the water absorption jacket can be collected more thoroughly, and the white precipitate can also be crushed before being collected.
[0026] 3. In the process of twisting the water-absorbing sleeve of the present invention, the elastic force of the elastic rope is greater than the elastic force of the elastic rope, so the end of the water-absorbing sleeve is twisted first, on the one hand, to prevent the gas that has just entered the inner side of the water-absorbing sleeve from leaking from the opening, on the other hand, to prevent the white precipitate in the water-absorbing sleeve from being squeezed out, so the water-absorbing sleeve is twisted from the end first and gradually extends to the middle part. The pressure of the gas that has just been sucked into the water-absorbing sleeve will increase after being compressed, so that the gas will move out along the middle part of the water-absorbing sleeve, and the gas will take away a large amount of water during the discharge process along the middle part of the water-absorbing sleeve, thereby accelerating the wringing out of the water in the white precipitate and also accelerating the wringing out process of the water-absorbing sleeve itself. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The present invention is further described below in conjunction with the accompanying drawings and implementation modes.
[0028] Figure 1 is a three-dimensional diagram of the preparation device of the present invention;
[0029] Figure 2 It is a three-dimensional diagram of the preparation equipment in instant noodles from another angle;
[0030] Figure 3 yes Figure 2 The enlarged view of point A in the middle;
[0031] Figure 4 It is the internal structure diagram of the middle tube in the present invention;
[0032] Figure 5 is a radial cross-sectional view of the water absorbing jacket in the present invention;
[0033] Figure 6 It is a flow chart of the method of the present invention:
[0034] In the figure: middle cylinder 1, rotating shaft 11, gripping rod 12, annular groove 13, end cylinder 2, internal meshing gear 21, external meshing gear 22, water absorption sleeve 3, elastic rope 31, elastic rope 32, double-headed motor 4, column gear 41, bracket 5, rotating hole 51, upper base 52, rectangular groove 53, rectangular rod 54, lower base 55, spring 56, electric push rod 6, U-shaped block 61, push plate 62, elastic sheet 63. DETAILED DESCRIPTION
[0035] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0036] like Figures 1 to 6 As shown, the photocatalyst preparation device for wastewater treatment according to the present invention comprises:
[0037] The middle tube 1 is cylindrical, and both ends are open and connected;
[0038] End tube 2; both ends of the end tube 2 are open and connected; there are two end tubes 2; the end tubes 2 are rotatably connected to the end of the middle tube 1; the outer surface of one of the end tubes 2 is fixedly connected to the internal gear 21; the outer wall of the other end tube 2 is fixedly connected to the external gear 22;
[0039] The water-absorbing sleeve 3 is located inside the middle tube 1; the end of the water-absorbing sleeve 3 is connected to the inner side of the corresponding end tube 2 through an elastic rope 31; the water-absorbing sleeve 3 is made of a water-absorbing material, such as cotton;
[0040] A double-headed motor 4; the body of the double-headed motor 4 is fixedly connected to the outer wall of the middle tube 1; the output shaft of the double-headed motor 4 is fixedly connected to a column gear 41; one of the column gears 41 is meshed with the internal gear 21; the other column gear 41 is meshed with the external gear 22;
[0041] Controller; the controller is used to control the automatic operation of the preparation equipment;
[0042] During operation, the prior art will directly place the washed sediment into a drying box for hot air drying. However, since the surface of the sediment just after washing has a large amount of moisture, the sediment will adhere to the inner wall of the drying box, and after drying, it will be difficult to collect the sediment. In addition, the sediment with a large amount of moisture on the outer surface will cause low drying efficiency.
[0043] Therefore, after the staff of the present invention washes the white precipitate with deionized water and places the white precipitate on the inner side of the water absorption sleeve 3, the controller is started to control the double-headed motor 4 to rotate. The rotating double-headed motor 4 drives the two output shafts to rotate synchronously, thereby driving the corresponding column gears 41 to rotate through the double-headed motor 4, one of the column gears 41 will drive the internal meshing gear 21 to rotate, and the other column gear 41 will drive the external meshing gear 22 to rotate, so that the two end tubes 2 rotate in different directions at the ends of the middle tube 1, and the rotation of the end tube 2 will drive the ends of the water absorption sleeve 3 to rotate in different directions, so that the water absorption sleeve 3 is twisted into a twist shape, and the white precipitate is filled in the water absorption sleeve 3, so that the water remaining in the gap of the white precipitate is squeezed out under the twisting and squeezing of the water absorption sleeve 3, the middle part of the water absorption sleeve 3 is twisted first, and after the twisting, the end of the water absorption sleeve 3 is also twisted, and the end of the water absorption sleeve 3 will pull the elastic rope 31 under the twisting action, so that the elastic rope 31 completes the power storage process, and the white precipitate After being squeezed, the water will be absorbed by the water absorption sleeve 3, and then the controller controls the double-headed motor 4 to rotate in the opposite direction, so that the two end tubes 2 drive the water absorption sleeve 3 to twist in the opposite direction to form a twisted shape again, and this is repeated. The water absorption sleeve 3 absorbs the moisture of the white precipitate while draining water under the twisting action, and the excess water is squeezed out, ensuring that the water absorption sleeve 3 can repeatedly absorb moisture until the white precipitate inside the water absorption sleeve 3 can no longer squeeze out moisture. Then the staff controls the double-headed motor 4 to rotate to the initial position, so that the water absorption sleeve 3 recovers to a cylindrical shape under the drive of the elastic rope 31 without the action of the twisting force. After the staff tilts the preparation equipment, the raw materials in the water absorption sleeve 3 are moved out from the inside of the water absorption sleeve 3 under the action of gravity, and the removed white precipitate is then placed in a dryer for simple drying to form a photocatalyst; and after the white precipitate is poured out, the water absorption sleeve 3 repeats the above-mentioned twisting action to squeeze out the excess water, ensuring the water absorption effect of the water absorption sleeve 3, and performing pre-drying pretreatment of the next component of white precipitate;
[0044] The present invention places the washed white precipitate into the water absorption sleeve 3 to squeeze out excess water, thereby preventing the white precipitate with excessive water from sticking to the wall in the dryer, and greatly improving the drying efficiency of the white precipitate, that is, improving the preparation efficiency of the photocatalyst.
[0045] As an embodiment of the present invention, the outer wall of the middle part of the middle cylinder 1 is rotatably connected to the bracket 5 through the rotating shaft 11; the outer wall of the middle cylinder 1 is fixedly connected to the gripping rod 12; the gripping rod 12 is arranged away from the bracket 5; an electric push rod 6 is arranged at the opening of the end cylinder 2; the outer wall of the electric push rod 6 is fixedly connected to the middle cylinder 1 through a U-shaped block 61; the output shaft of the electric push rod 6 is fixedly connected to a push plate 62; the outer diameter of the push plate 62 matches the inner diameter of the water absorption sleeve 3; the middle cylinder 1 is hollow;
[0046] During work, the staff drives the middle cylinder 1 to rotate on the bracket 5 by holding the handle 12, thereby changing the angle of the middle cylinder 1. Before pouring the white precipitate into the inner side of the water absorption sleeve 3, the middle cylinder 1 is kept vertical, and the electric push rod 6 is located below the middle cylinder 1. Then, the controller is started to control the electric push rod 6 to extend. The electric push rod 6 will drive the push plate 62 to approach the end cylinder 2 and move to the opening of the water absorption sleeve 3, blocking one of the openings of the water absorption sleeve 3. Then, the staff pours the white precipitate into the inner side of the water absorption sleeve 3 along the other opening of the water absorption sleeve 3. Then, the staff controls the middle cylinder 1 to shake back and forth by the handle 12 while ensuring that the other opening of the water absorption sleeve 3 is facing upward, so that the white precipitate is evenly distributed on the inner side of the water absorption sleeve 3 under shaking. Then, the middle cylinder 1 is controlled to be in a horizontal state, and the water absorption sleeve 3 is driven to twist by the two end cylinders 2, so that the water in the white precipitate is squeezed out, and the excess water flows into the inner side of the middle cylinder 1 , and flows to the ground along the hollow gap of the middle tube 1. After no water drips through the outer wall of the middle tube 1, the end tube 2 without the electric push rod 6 is turned downward, and the material flowing out of the end tube 2 is caught by the material collecting bag. The controller controls the double-headed motor 4 to rotate back and forth, so that the water absorption sleeve 3 is sometimes unfolded and restored to its original position, and sometimes tightened. In the time interval of unfolding, the white precipitate will fall along the inner wall of the water absorption sleeve 3, and in the process of twisting and unfolding, the blocky white precipitate is squeezed and dispersed, so that the white precipitate quickly flows out of the water absorption sleeve 3. After the white precipitate inside the water absorption sleeve 3 has been poured out for a period of time, the push plate 62 is pushed by the electric push rod 6 to slide along the inner wall of the water absorption sleeve 3, so that the white precipitate on the inner wall of the water absorption sleeve 3 is scraped off and falls into the material collecting bag, so as to avoid the residual white precipitate on the inner wall of the water absorption sleeve 3 affecting the use of the water absorption sleeve 3 next time, and also avoid the waste of incomplete collection of the white precipitate;
[0047] In this embodiment, the white precipitate in the water absorption sleeve 3 is collected more thoroughly by controlling the tightening and loosening of the water absorption sleeve 3 during the pouring process of the white precipitate, and the pushing plate 62 scrapes the inner wall of the water absorption sleeve 3, and the white precipitate can also be crushed before being collected.
[0048] As an embodiment of the present invention, the water absorbing sleeve 3 is connected to the inner wall of the middle tube 1 through an elastic rope 32; the hollow shape of the middle tube 1 is arranged at the lower part of the middle tube 1 placed horizontally; the elastic force of the elastic rope 32 is greater than the elastic force of the elastic rope 31;
[0049] During operation, the water absorption sleeve 3 is twisted when placed horizontally, and the wrung-out water will be slowly discharged along the hollow gap of the middle tube 1, and the water absorption sleeve 3 will be tightened and restored to its original position when the double-head motor 4 rotates back and forth. During the process of the water absorption sleeve 3 returning to its original position, since the outer wall of the water absorption sleeve 3 is provided with an elastic rope 32, the elastic rope 32 can realize the rapid expansion and restoration of the middle part of the water absorption sleeve 3, and after the water absorption sleeve 3 is pulled and expanded by the elastic rope 32 and the elastic rope 31, since there is water accumulation in the hollow position of the middle tube 1, the gas can only enter the inner side of the water absorption sleeve 3 from the opening of the water absorption sleeve 3, and then during the twisting process of the water absorption sleeve 3, the elastic force of the elastic rope 32 is greater than the elastic force of the elastic rope 31, so the end of the water absorption sleeve 3 is twisted first, on the one hand, to avoid the water absorption sleeve 3 just entering the water absorption sleeve 3 In order to prevent the gas on one side from leaking from the opening and on the other hand to prevent the white precipitate in the water absorption sleeve 3 from being squeezed out, the water absorption sleeve 3 is twisted from the end first and gradually extends to the middle part. The pressure of the gas just inhaled in the water absorption sleeve 3 will increase after being compressed, so that the gas will move out along the middle part of the water absorption sleeve 3, and the gas will take away a large amount of water in the process of being discharged along the middle part of the water absorption sleeve 3, thereby accelerating the wringing out of the water of the white precipitate and the wringing out process of the water absorption sleeve 3 itself, and the excess water continues to be discharged along the hollow gap on the outer wall of the middle tube 1; in the process of the elastic rope 31 and the elastic rope 32 driving the water absorption sleeve 3 to reset, the water absorption sleeve 3 can be pulled to collide with the inner wall of the middle tube 1, so that the white precipitate on the inner wall of the water absorption sleeve 3 falls off, which is conducive to the discharge of materials in the process of material arrival.
[0050] As an embodiment of the present invention, an annular groove 13 is provided on the inner wall of the middle part of the middle tube 1; the diameter of the annular groove 13 is reduced from the middle part to the end part; the hollowing of the middle tube 1 is provided in the middle part of the middle tube 1;
[0051] During operation, the annular groove 13 serves to gather water flow, so that excess water will gather to the middle of the annular groove 13 under the action of gravity, accumulate and slowly discharge along the hollow gap. During the twisting process of the water-absorbing sleeve 3, since the elastic force of the elastic rope 31 is less than the elastic force of the elastic rope 32, the end of the water-absorbing sleeve 3 will be knotted and thickened during the continuous twisting process of the water-absorbing sleeve 3. At the same time, the entire water-absorbing sleeve 3 will become shorter, and as the water-absorbing sleeve 3 continues to be twisted, the ends of the water-absorbing sleeve 3 will approach each other, and the ends of the water-absorbing sleeve 3 will be tied to the middle tube 1 and the end tube 1. 2 inner diameter is filled, and an extrusion cavity is formed between the water-absorbing sleeve 3, the annular groove 13 and the inner diameter of the middle cylinder 1, so that under the action of gas pressure, the accumulated water in the annular groove 13 is quickly discharged along the hollow gap, reducing the residual accumulated water in the annular groove 13, and avoiding the residual accumulated water being reabsorbed by the water-absorbing sleeve 3, thereby ensuring the efficiency and effect of removing moisture. During the resetting process of the water-absorbing sleeve 3, the elastic rope 31 and the elastic rope 32 as well as the end cylinder 2 drive the water-absorbing sleeve 3 to reset, and the external gas will enter the extrusion cavity along the hollow gap, and the extrusion cavity has a good dredging effect under the repeated flow of air and water.
[0052] As an embodiment of the present invention, the push plate 62 is evenly provided with arc-shaped elastic sheets 63 on one side close to the water absorption jacket 3; the elastic sheets 63 are arranged close to the edge of the push plate 62; the outer edge diameter formed in the middle of the elastic sheet 63 is larger than the inner diameter of the water absorption jacket 3; the outer edge diameter formed at the end of the elastic sheet 63 is smaller than the inner diameter of the water absorption jacket 3;
[0053] During operation, when the water absorbing sleeve 3 is unfolded, the electric push rod 6 drives the push plate 62 to move close to the water absorbing sleeve 3. The push plate 62 drives the elastic sheet 63 to move synchronously when it moves close to the water absorbing sleeve 3, so that the end of the elastic sheet 63 is inserted into the inner side of the water absorbing sleeve 3. Then, when the push plate 62 drives the elastic sheet 63 to continue to move toward the inner side of the water absorbing sleeve 3, the middle part of the elastic sheet 63 is squeezed by the inner diameter of the water absorbing sleeve 3, which pushes the end of the elastic sheet 63 to gather toward the center. In the process of the end of the elastic sheet 63 gathering, the block-like white precipitate in the water absorbing sleeve 3 will be crushed, and the elastic sheet 63 also plays a role in guiding the push plate 62 to the water absorbing sleeve 3, in the process of pushing the plate 62 to drive the elastic sheet 63 to move to the inside of the water absorbing sleeve 3, the controller will control the water absorbing sleeve 3 to twist and unfold repeatedly, the tightening of the water absorbing sleeve 3 will squeeze the elastic sheet 63 to move, and under the action of the elastic force of the elastic sheet 63 itself, the elastic sheet 63 squeezes and crushes the white precipitate inside the water absorbing sleeve 3, so that the white precipitate inside the water absorbing sleeve 3 is poured out in broken pieces, which is convenient for subsequent operations; the function of the pushing plate 62 can also be to move from the feeding position away from the feeding position when the white precipitate is added to the inside of the water absorbing sleeve 3, so that the white precipitate is more evenly distributed on the inside of the water absorbing sleeve 3.
[0054] As an embodiment of the present invention, the middle diameter of the water absorbing sleeve 3 is larger than the end diameter of the water absorbing sleeve 3; the elastic rope 32 is evenly distributed along the circumference of the water absorbing sleeve 3;
[0055] During operation, after the middle diameter of the water-absorbing sleeve 3 is made larger than the end diameter, each time the water-absorbing sleeve 3 is expanded, the white precipitate at the end moves toward the middle of the water-absorbing sleeve 3 under the action of gravity, and then during the twisting process of the water-absorbing sleeve 3, the water-absorbing sleeve 3 is tightened and rotated, and during the twisting process of the water-absorbing sleeve 3, one end of the elastic rope 32 is pulled, and the other end of the elastic rope 32 is fixedly connected to the inner wall of the middle tube 1 and does not move. Therefore, the elastic rope 32 will be tied to the water-absorbing sleeve 3 after the water-absorbing sleeve 3 is twisted and rotated, so that the middle part of the water-absorbing sleeve 3 is tightened, so that the block-like white precipitate gathered in the middle part of the water-absorbing sleeve 3 is crushed, and during the loosening and tightening process of the water-absorbing sleeve 3, the white precipitate can absorb water evenly.
[0056] As an embodiment of the present invention, a rotating hole 51 is provided on the upper part of the bracket 5; the rotating shaft 11 is rotatably connected in the rotating hole 51; the lower part of the bracket 5 is fixedly connected to the upper base 52; a rectangular groove 53 is provided at the bottom of the bracket 5; the rectangular groove 53 is connected to the rotating hole 51; a rectangular rod 54 is provided in the rectangular groove 53; the lower end surface of the rectangular rod 54 is fixedly connected to the lower base 55; the upper base 52 and the lower base 55 are connected by a spring 56; the rectangular rod 54 is away from the rotating shaft 11 in the initial state;
[0057] During operation, when the water-absorbing jacket 3 is filled with white sediment, the upper base 52 and the lower base 55 are in a distanced state under the action of the spring 56, that is, the rectangular rod 54 is away from the rotating shaft 11; and when the rotating shaft 11 needs to be locked on the bracket 5 and kept stationary, it is only necessary to step on the upper base 52 or place a heavy object on the upper base 52, so that the upper base 52 moves downward under the action of gravity and approaches the lower base 55, and the downward movement of the upper base 52 will drive the bracket 5 to move downward, so that the rectangular groove 53 and the rectangular rod 54 produce relative movement, and the rectangular rod 54 will move relative to the rotating shaft 11 after moving. When the rotating shaft 11 is in contact with the rectangular rod 54, static friction will be generated, so that the rotating shaft 11 cannot rotate under the friction force with the rectangular rod 54, thereby ensuring the stability of feeding, extruding and discharging materials. When the rotating shaft 11 needs to be unlocked, it is only necessary to move the foot off the upper base 52, or move the heavy object off the upper base 52, so that the upper base 52 is away from the lower base 55 under the elastic force of the spring 56, that is, the rectangular rod 54 is away from the rotating shaft 11, so that the rotating shaft 11 can rotate freely, that is, the middle tube 1 and the end tube 2 can rotate freely driven by the handle 12, which is convenient for the staff to use.
[0058] A method for preparing a photocatalyst for wastewater treatment, which is applicable to the above-mentioned photocatalyst preparation device for wastewater treatment, and the steps of the method are as follows:
[0059] S1: Add cobalt nitrate, incl3 and thioacetamide to a solution composed of dimethylformamide and diethylene glycol, stir to fully dissolve, pour into a reaction kettle, place in an oven to fully react, centrifuge the white precipitate, and wash with deionized water;
[0060] S2: After checking that the preparation equipment is fault-free, the handle 12 is moved to drive the middle cylinder 1 to rotate around the upper part of the bracket 5, so that the electric push rod 6 is located below the water absorption jacket 3, and the upper base 52 is stepped on with the foot, and the controller is started to control the electric push rod 6 to drive the push plate 62 to block the opening of the water absorption jacket 3, and the washed white precipitate is poured into the water absorption jacket 3, completing the feeding process;
[0061] S3: After the foot is removed from the upper base 52, the grip 12 is rotated to control the middle tube 1 and the water absorption sleeve 3 to be in a horizontal position, and the electric push rod 6 drives the push plate 62 to move away from the water absorption sleeve 3 and locks the rotating shaft 11. Then, the double-headed motor 4 drives the end tube 2 to rotate in two opposite directions by meshing, and the end tube 2 drives the water absorption sleeve 3 to be tightened. The water absorption sleeve 3 is tightened from the end to the middle under the cooperation of the elastic rope 32 and the elastic rope 31. The gas and liquid in the water absorption sleeve 3 are discharged to the annular groove 13 along the water absorption sleeve 3 under compression, and are discharged along the hollow gap of the middle tube 1 when the water absorption sleeve 3 continues to be twisted. Then, the double-headed motor 4 drives the water absorption sleeve 3 to unfold and twist in the opposite direction, and repeats this process until the hollow gap of the middle tube 1 stops discharging water.
[0062] S4: Finally, unlock the rotating shaft 11, and keep the water absorption sleeve 3 in a tightened state, rotate the middle cylinder 1 so that the end cylinder 2 without the electric push rod 6 faces downward, and after the material collection bag is placed on the upper base 52, lock the rotating shaft 11, start the double-headed motor 4 and rotate it back and forth repeatedly, so that the white precipitate falls from the water absorption sleeve 3 into the material collection bag, and place the white precipitate in an oven to make it completely dry.
[0063] The specific workflow is as follows:
[0064] After the staff washes the white precipitate with deionized water and places the white precipitate on the inner side of the water absorption sleeve 3, they start the controller to control the double-headed motor 4 to rotate. The rotating double-headed motor 4 drives the two output shafts to rotate synchronously, thereby driving the corresponding column gears 41 to rotate through the double-headed motor 4, one of the column gears 41 will drive the internal meshing gear 21 to rotate, and the other column gear 41 will drive the external meshing gear 22 to rotate, so that the two end tubes 2 rotate in different directions at the ends of the middle tube 1. The rotation of the end tube 2 will drive the ends of the water absorption sleeve 3 to rotate in different directions, so that the water absorption sleeve 3 is twisted into a twist shape, and the water absorption sleeve 3 is filled with white precipitate, so that the water remaining in the gap of the white precipitate is squeezed out under the twisting and squeezing of the water absorption sleeve 3, the middle part of the water absorption sleeve 3 is twisted first, and after the twisting, the end of the water absorption sleeve 3 is also twisted, and the end of the water absorption sleeve 3 will pull the elastic rope 31 under the twisting action, so that the elastic rope 31 completes the power storage process, and the water in the white precipitate is squeezed out. After being pressed, it will be absorbed by the water absorption sleeve 3, and then the controller controls the double-headed motor 4 to rotate in the opposite direction, so that the two end tubes 2 drive the water absorption sleeve 3 to twist in the opposite direction to form a twisted shape again, and this is repeated. The water absorption sleeve 3 absorbs the moisture of the white precipitate while draining water under the twisting action, and the excess moisture is squeezed out, ensuring that the water absorption sleeve 3 can repeatedly absorb moisture until the white precipitate inside the water absorption sleeve 3 can no longer squeeze out moisture. Then the staff controls the double-headed motor 4 to rotate to the initial position, so that the water absorption sleeve 3 can restore to a cylindrical shape under the drive of the elastic rope 31 without the action of the twisting force. After the staff tilts the preparation equipment, the raw materials in the water absorption sleeve 3 are moved out from the inside of the water absorption sleeve 3 under the action of gravity, and the removed white precipitate is then placed in a dryer for simple drying to form a photocatalyst; and after the white precipitate is poured out, the water absorption sleeve 3 repeats the above-mentioned twisting action to squeeze out the excess moisture, thereby ensuring the water absorption effect of the water absorption sleeve 3, and performing pre-drying pretreatment of the next component of white precipitate;
[0065] Among them, the staff drives the middle cylinder 1 to rotate on the bracket 5 by holding the handle 12, thereby changing the angle of the middle cylinder 1. Before pouring the white precipitate into the inner side of the water absorption sleeve 3, the middle cylinder 1 is kept vertical, and the electric push rod 6 is located below the middle cylinder 1. Then, the controller is started to control the electric push rod 6 to extend. The electric push rod 6 will drive the push plate 62 to approach the end cylinder 2 and move to the opening of the water absorption sleeve 3, blocking one of the openings of the water absorption sleeve 3. Then, the staff pours the white precipitate into the inner side of the water absorption sleeve 3 along the other opening of the water absorption sleeve 3. Then, the staff controls the middle cylinder 1 to shake back and forth through the handle 12 while ensuring that the other opening of the water absorption sleeve 3 is facing upward, so that the white precipitate is evenly distributed on the inner side of the water absorption sleeve 3 under shaking, and then controls the middle cylinder 1 to be in the water In a horizontal state, the water absorption sleeve 3 is driven to twist by the two end tubes 2, so that the water in the white precipitate is squeezed out, and the excess water flows into the inner side of the middle tube 1 and flows to the ground along the hollow gap of the middle tube 1. After no water drips through the outer wall of the middle tube 1, the end tube 2 without the electric push rod 6 is turned downward, and the material flowing out of the end tube 2 is caught by the material collecting bag. The controller controls the double-headed motor 4 to rotate back and forth, so that the water absorption sleeve 3 is sometimes unfolded and restored to its original position, and sometimes tightened. In the time interval of unfolding, the white precipitate will fall along the inner wall of the water absorption sleeve 3, and in the process of twisting and unfolding, the blocky white precipitate is squeezed and dispersed, so that the white precipitate quickly flows out of the water absorption sleeve 3, and after the white precipitate inside the water absorption sleeve 3 is poured out for a period of time, it is then The electric push rod 6 pushes the push plate 62 to slide along the inner wall of the water absorption jacket 3, so that the white sediment on the inner wall of the water absorption jacket 3 is scraped off and falls into the material collection bag; the water absorption jacket 3 is twisted when it is placed horizontally, and the wrung-out water will be slowly discharged along the hollow gap of the middle tube 1, and the water absorption jacket 3 will be tightened and restored to its original position when the double-headed motor 4 rotates back and forth. During the process of the water absorption jacket 3 returning to its original position, since the outer wall of the water absorption jacket 3 is provided with an elastic rope 32, the elastic rope 32 can realize the rapid expansion and reset of the middle part of the water absorption jacket 3, and after the water absorption jacket 3 is pulled and expanded by the elastic rope 32 and the elastic rope 31, since there is water accumulated in the hollow position of the middle tube 1, the gas can only enter the inner side of the water absorption jacket 3 from the opening of the water absorption jacket 3, and then during the twisting process of the water absorption jacket 3 In the embodiment, the elastic force of the elastic rope 32 is greater than the elastic force of the elastic rope 31, so the end of the water-absorbing sleeve 3 is twisted first, on the one hand, to prevent the gas that has just entered the inner side of the water-absorbing sleeve 3 from leaking from the opening, and on the other hand, to prevent the white precipitate in the water-absorbing sleeve 3 from being squeezed out. Therefore, the water-absorbing sleeve 3 is twisted from the end first and gradually extends to the middle part. The pressure of the gas that has just been sucked into the water-absorbing sleeve 3 will increase after being compressed, so that the gas will move out along the middle part of the water-absorbing sleeve 3, and a large amount of water will be taken away during the discharge of the gas along the middle part of the water-absorbing sleeve 3, and the excess water will continue to be discharged along the hollow gaps on the outer wall of the middle tube 1; in the process of the elastic rope 31 and the elastic rope 32 driving the water-absorbing sleeve 3 to reset, the water-absorbing sleeve 3 can be pulled to collide with the inner wall of the middle tube 1, so that the white precipitate on the inner wall of the water-absorbing sleeve 3 falls off;The annular groove 13 serves the purpose of converging water flow, so that excess water will gather to the middle of the annular groove 13 under the action of gravity, accumulate and slowly discharge along the hollow gap. During the twisting process of the water-absorbing sleeve 3, since the elastic force of the elastic rope 31 is less than the elastic force of the elastic rope 32, the end of the water-absorbing sleeve 3 will become knotted and thicker during the continuous twisting of the water-absorbing sleeve 3. At the same time, the entire water-absorbing sleeve 3 will become shorter, and as the water-absorbing sleeve 3 continues to twist, the ends of the water-absorbing sleeve 3 will approach each other. After being knotted, the ends of the water-absorbing sleeve 3 fill the inner diameters of the middle tube 1 and the end tube 2, and an extrusion cavity is formed between the water-absorbing sleeve 3, the annular groove 13 and the inner diameter of the middle tube 1. , so that under the action of gas pressure, the accumulated water in the annular groove 13 is quickly discharged along the hollow gap; when the water absorption sleeve 3 is unfolded, the electric push rod 6 drives the push plate 62 to move close to the water absorption sleeve 3, and the push plate 62 drives the elastic sheet 63 to move synchronously during the movement of the push plate 62 close to the water absorption sleeve 3, so that the end of the elastic sheet 63 is inserted into the inner side of the water absorption sleeve 3, and then when the push plate 62 drives the elastic sheet 63 to continue to move toward the inner side of the water absorption sleeve 3, the middle part of the elastic sheet 63 is squeezed by the inner diameter of the water absorption sleeve 3, which will push the end of the elastic sheet 63 to gather toward the center, and the block white in the water absorption sleeve 3 will be pulled out during the gathering of the end of the elastic sheet 63 The white precipitate is crushed, and the elastic sheet 63 also serves the purpose of guiding the push plate 62 to the inner side of the water absorption sleeve 3. In the process of the push plate 62 driving the elastic sheet 63 to move the inner side of the water absorption sleeve 3, the controller will control the water absorption sleeve 3 to twist and expand repeatedly. The tightening of the water absorption sleeve 3 will squeeze the elastic sheet 63 to move, and under the elastic force of the elastic sheet 63 itself, the elastic sheet 63 squeezes and crushes the white precipitate inside the water absorption sleeve 3, so that the white precipitate inside the water absorption sleeve 3 is poured out in a broken shape; after the middle diameter of the water absorption sleeve 3 is larger than the end diameter, the white precipitate at the end is poured out under the action of gravity after each expansion of the water absorption sleeve 3. The water absorbing sleeve 3 is moved downward toward the middle part of the water absorbing sleeve 3. Then, during the twisting process of the water absorbing sleeve 3, the water absorbing sleeve 3 is tightened and rotated. During the twisting process of the water absorbing sleeve 3, one end of the elastic rope 32 is pulled, and the other end of the elastic rope 32 is fixedly connected to the inner wall of the middle cylinder 1 and does not move. Therefore, the elastic rope 32 is tied to the water absorbing sleeve 3 after the water absorbing sleeve 3 is twisted and rotated, so that the middle part of the water absorbing sleeve 3 is tightened, so that the block-like white sediment gathered in the middle part of the water absorbing sleeve 3 is crushed; when the water absorbing sleeve 3 is filled with white sediment, the upper base 52 and the lower base 55 are in a state of being separated from each other under the action of the spring 56, that is, the rectangular rod 54 is separated from the rotating shaft 11;When the rotating shaft 11 needs to be locked on the bracket 5 and remains stationary, one only needs to step on the upper base 52 or place a heavy object on the upper base 52, so that the upper base 52 moves downward under the action of gravity and approaches the lower base 55. The downward movement of the upper base 52 will drive the bracket 5 to move downward, so that the rectangular groove 53 and the rectangular rod 54 move relative to each other. After the movement, the rectangular rod 54 will contact the rotating shaft 11, and the rotating shaft 11 and the rectangular rod 54 will produce static friction, so that the rotating shaft 11 cannot rotate under the friction force with the rectangular rod 54, ensuring the stability of feeding, extruding materials and discharging materials. When the rotating shaft 11 needs to be unlocked, one only needs to move the foot off the upper base 52 or move the heavy object off the upper base 52, so that the upper base 52 is away from the lower base 55 under the elastic force of the spring 56, that is, the rectangular rod 54 is away from the rotating shaft 11, so that the rotating shaft 11 can rotate freely, that is, the middle tube 1 and the end tube 2 can rotate freely under the drive of the grip 12. ;
[0066] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the attached Figure 1 The orientation or positional relationship shown is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, it cannot be understood as limiting the scope of protection of the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0067] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A photocatalyst preparation device for wastewater treatment, characterized in that: include: The middle tube (1) is in a cylindrical shape, and both ends are open and connected; End tube (2); both ends of the end tube (2) are open and connected; there are two end tubes (2); the end tubes (2) are rotatably connected to the end of the middle tube (1); the outer surface of one of the end tubes (2) is fixedly connected to the inner gear (21); the outer wall of the other end tube (2) is fixedly connected to the outer gear (22); A water absorbing sleeve (3); the water absorbing sleeve (3) is located inside the middle tube (1); the end of the water absorbing sleeve (3) is connected to the inner side of the corresponding end tube (2) through an elastic rope (31); A double-headed motor (4); the body of the double-headed motor (4) is fixedly connected to the outer wall of the middle cylinder (1); the output shaft of the double-headed motor (4) is fixedly connected to a column gear (41); one of the column gears (41) is meshed with the internal meshing gear (21); the other column gear (41) is meshed with the external meshing gear (22); Controller; the controller is used to control the automatic operation of the preparation equipment.
2. The photocatalyst preparation device for wastewater treatment according to claim 1, characterized in that: The outer wall of the middle part of the middle cylinder (1) is rotatably connected to the bracket (5) via a rotating shaft (11); the outer wall of the middle cylinder (1) is fixedly connected to a gripping rod (12); the gripping rod (12) is arranged away from the bracket (5); an electric push rod (6) is arranged at the opening of the end cylinder (2); the outer wall of the electric push rod (6) is fixedly connected to the middle cylinder (1) via a U-shaped block (61); the output shaft of the electric push rod (6) is fixedly connected to a push plate (62); the outer diameter of the push plate (62) matches the inner diameter of the water absorption sleeve (3); the middle cylinder (1) is hollow.
3. The photocatalyst preparation device for wastewater treatment according to claim 2, characterized in that: The water absorbing sleeve (3) is connected to the inner wall of the middle tube (1) via an elastic rope (32); the hollow shape of the middle tube (1) is arranged at the lower part of the middle tube (1) placed horizontally; and the elastic force of the elastic rope (32) is greater than the elastic force of the elastic rope (31).
4. The photocatalyst preparation device for wastewater treatment according to claim 3, characterized in that: The inner wall of the middle part of the middle cylinder (1) is provided with an annular groove (13); the diameter of the annular groove (13) decreases from the middle part to the end part.
5. The photocatalyst preparation device for wastewater treatment according to claim 2, characterized in that: A side of the push plate (62) close to the water absorption jacket (3) is evenly provided with arc-shaped elastic sheets (63); the elastic sheets (63) are arranged close to the edge of the push plate (62).
6. The photocatalyst preparation device for wastewater treatment according to claim 3, characterized in that: The diameter of the middle portion of the water absorbing sleeve (3) is larger than the diameter of the end portion of the water absorbing sleeve (3); and the elastic ropes (32) are evenly distributed along the circumference of the water absorbing sleeve (3).
7. The photocatalyst preparation device for wastewater treatment according to claim 2, characterized in that: The upper portion of the bracket (5) is provided with a rotating hole (51); the rotating shaft (11) is rotatably connected in the rotating hole (51); the lower portion of the bracket (5) is fixedly connected to the upper base (52); the bottom of the bracket (5) is provided with a rectangular groove (53); the rectangular groove (53) is communicated with the rotating hole (51); a rectangular rod (54) is provided in the rectangular groove (53); the lower end surface of the rectangular rod (54) is fixedly connected to the lower base (55); the upper base (52) and the lower base (55) are connected via a spring (56).
8. A method for preparing a photocatalyst for wastewater treatment, the method being applicable to the photocatalyst preparation device for wastewater treatment according to any one of claims 1 to 7, characterized in that: The steps of this method are as follows: S1: Add cobalt nitrate, incl3 and thioacetamide to a solution composed of dimethylformamide and diethylene glycol, stir to fully dissolve, pour into a reaction kettle, place in an oven to fully react, centrifuge the white precipitate, and wash with deionized water; S2: After checking that the preparation equipment is fault-free, the handle (12) is moved to drive the middle cylinder (1) to rotate around the upper part of the bracket (5), so that the electric push rod (6) is located below the water absorption jacket (3), and the upper base (52) is stepped on with the foot, and the controller is started to control the electric push rod (6) to drive the push plate (62) to block the opening of the water absorption jacket (3), and the washed white precipitate is poured into the water absorption jacket (3), completing the feeding process; S3: After the foot is removed from the upper base (52), the handle (12) is rotated to control the middle tube (1) and the water absorption sleeve (3) to be in a horizontal position, and the electric push rod (6) drives the push plate (62) to move away from the water absorption sleeve (3) and locks the rotating shaft (11). Then, the double-headed motor (4) drives the end tube (2) to rotate in two opposite directions by meshing, and the end tube (2) drives the water absorption sleeve (3) to be tightened. The water absorption sleeve (3) is tightened from the end to the middle under the cooperation of the elastic rope (32) and the elastic rope (31). The gas and liquid in the water absorption sleeve (3) are discharged from the annular groove (13) along the water absorption sleeve (3) under compression, and are discharged along the hollow gap of the middle tube (1) as the water absorption sleeve (3) continues to be twisted. Then, the double-headed motor (4) drives the water absorption sleeve (3) to unfold and twist in the opposite direction, and repeats this process until the hollow gap of the middle tube (1) stops discharging water. S4: Finally, unlock the rotating shaft (11), keep the water absorption sleeve (3) in a tightened state, rotate the middle cylinder (1) so that the end cylinder (2) without the electric push rod (6) faces downward, and after the material collection bag is placed on the upper base (52), lock the rotating shaft (11), start the double-headed motor (4) to rotate back and forth repeatedly, so that the white precipitate falls from the water absorption sleeve (3) into the material collection bag, and place the white precipitate in an oven to completely dry it.