A battery charging method, device, electronic device and storage medium thereof
By adopting a staged charging method in the battery swap station of electric vehicles, flexibly allocate charging conditions based on the demand of the battery swap station and charging consumption information, the rapid battery attenuation caused by long-term high-rate charging and high residual power storage is solved, and the battery usage is realized Optimization of lifespan.
Patent Information
- Application Number
- CN202211486422.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-24
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2042-11-24
AI Technical Summary
In electric vehicle battery swap stations, long-term high-rate charging and high residual power storage lead to rapid attenuation of the battery, shortening the battery's service life.
A staged charging method is adopted to control the charging of the first and second stages of the battery to be recharged, and the charging conditions are flexibly allocated according to the battery swap demand and charging consumption information of the battery swap station to avoid the battery being fully charged or under power. Long-term storage.
Through the staged charging method, the battery service life is optimized, the battery capacity attenuation is reduced, and the battery life is extended.
Smart Images

Figure CN115742781B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of battery charging, and in particular to a battery charging method, device, electronic equipment and storage medium thereof. Background Art
[0002] In recent years, the development of electric vehicles has become an inevitable trend in the development of the automobile industry. For pure electric vehicles, there are mainly two energy supply modes: vehicle charging and battery replacement.
[0003] At present, electric vehicles are charged by whole vehicle AC slow charging, which takes a long time and has limited parking spaces; DC fast charging has high power and short charging time, but has a greater impact on the power grid and reduces the battery life. The battery replacement mode is used to charge by allocating different charging powers to the peak and valley frequencies of battery replacement. During the peak period of battery replacement, the charging power is increased to speed up the charging speed of the battery pack, and during the valley period of battery replacement, the charging power is lowered for trickle charging, and the fully charged batteries are stored for vehicle battery replacement.
[0004] Based on the above-mentioned existing technical solutions, when charging in battery replacement mode is adopted, different charging powers are allocated to the peak and valley frequencies of battery replacement until the battery is fully charged. The storage method of the battery replacement battery is generally to store it when the battery is fully charged. Such a storage method is not conducive to the use of the battery, and will accelerate the attenuation of the battery capacity to varying degrees and shorten the battery life. Summary of the invention
[0005] The present invention provides a battery charging method, device, electronic device and storage medium thereof, so as to solve the problem of rapid battery attenuation caused by long-term high-rate charging and high residual power storage of batteries in battery swap stations.
[0006] According to one aspect of the present invention, there is provided a battery charging method, comprising:
[0007] For the battery to be charged, controlling the first stage of charging of the battery to be charged;
[0008] When the power of the battery to be charged meets the storage power condition, the first stage of charging is ended;
[0009] Based on the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment, the starting time information of the second stage of the battery to be charged is determined, and based on the starting time information of the second stage, the second stage charging of the battery to be charged is controlled.
[0010] Optionally, before controlling the first stage charging of the rechargeable battery, the method further includes:
[0011] According to the battery type of the battery to be charged, a storage power condition corresponding to the battery to be charged is determined, wherein the storage power condition includes a storage power threshold.
[0012] Optionally, based on the battery swapping demand of the battery swapping station, determining the start time information of the second stage of the battery to be charged includes:
[0013] Determine the peak period of battery swapping in the battery swapping demand of the battery swapping station, and determine the starting time information of the second stage based on the peak period of battery swapping and the charging duration of the second stage.
[0014] Optionally, determining the peak period of battery swapping in the battery swapping demand of the battery swapping station includes:
[0015] Obtain historical battery replacement data, count the battery replacement amount in each historical unit period, and determine the peak battery replacement period based on the battery replacement amount in each historical unit period; or,
[0016] Obtain historical battery swap data, process the historical battery swap data based on the battery swap prediction model, obtain the predicted battery swap volume for each time period within the prediction time range, and determine the peak battery swap period based on the predicted battery swap volume for each time period.
[0017] Optionally, determine the peak time period for battery swapping in the battery swapping demand of the battery swapping station, including: obtaining battery swapping reservation orders, counting the reservation order data for each future time period, and determining the peak time period for battery swapping based on the reservation order data for each future time period.
[0018] Optionally, based on the charging consumption information at each moment, determining the start time information of the second stage of the battery to be charged includes:
[0019] Determine at least one charging period with the lowest total consumption according to the charging duration of the second stage and the charging consumption information at each moment;
[0020] The starting time information of at least one sub-phase in the second phase is determined based on the starting time information of the charging period.
[0021] Optionally, based on the charging consumption information at each moment, determining the start time information of the second stage of the battery to be charged includes:
[0022] Determine at least one charging period with the lowest total consumption based on the charging consumption information at each moment;
[0023] Determine the start time information of at least one sub-stage in the second stage using the start time information of the charging period; and determine the charging rate according to the charging amount of the second stage and the charging duration of at least one charging period;
[0024] Correspondingly, based on the start time information of the second stage, controlling the charging of the battery to be charged in the second stage includes: based on the start time information of at least one sub-stage and the charging rate, controlling the charging of the battery to be charged in the second stage.
[0025] Optionally, based on the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment, determining the start time information of the second stage of the battery to be charged includes:
[0026] Determine the peak period of battery swapping demand at the battery swapping station;
[0027] During the chargeable period between the current moment and the peak period for battery replacement, determine at least one charging period with the lowest total consumption based on the charging consumption information at each moment, and use the starting time information of the charging period to determine the starting time information of at least one sub-stage in the second stage.
[0028] According to another aspect of the present invention, there is provided a battery charging device, comprising:
[0029] The first stage charging control module is used to control the first stage charging of the battery to be charged;
[0030] The first stage charging end module is used to end the first stage charging when the power of the battery to be charged meets the storage power condition;
[0031] The second stage charging control module is used to determine the starting time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station and / or the charging consumption information at each moment, and control the second stage charging of the battery to be charged based on the starting time information of the second stage.
[0032] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0033] at least one processor; and
[0034] a memory communicatively connected to at least one processor; wherein,
[0035] The memory stores a computer program that can be executed by at least one processor. The computer program is executed by the at least one processor so that the at least one processor can execute the battery charging method according to any embodiment of the present invention.
[0036] According to another aspect of the present invention, a computer-readable storage medium is provided. The computer-readable storage medium stores computer instructions. The computer instructions are used to enable a processor to implement the battery charging method of any embodiment of the present invention when executed.
[0037] The technical solution of the embodiment of the present invention adopts a flexible battery swap station and management method to identify time periods and predict subsequent battery swap needs to flexibly adjust battery charging and storage conditions, thereby solving the problem of rapid battery degradation caused by long-term high-rate charging and high residual power storage of batteries in battery swap stations, and optimizing the battery life to the greatest extent.
[0038] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0040] Figure 1 is a flow chart of a battery charging method provided by Embodiment 1 of the present invention;
[0041] Figure 2 is a flow chart of a battery charging method provided by Embodiment 2 of the present invention;
[0042] Figure 3 is a flow chart of a battery charging method provided by Embodiment 3 of the present invention;
[0043] Figure 4 is a structural schematic diagram of a battery charging device provided by an embodiment of the present invention;
[0044] Figure 5 It is a schematic diagram of the structure of an electronic device implementing an embodiment of the present invention. DETAILED DESCRIPTION
[0045] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0046] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0047] Embodiment 1
[0048] Figure 1 This is a flow chart of a battery charging method provided in the first embodiment of the present invention. This embodiment is applicable to the case of charging and storing vehicle batteries. The method can be executed by a battery charging device, which can be implemented in the form of hardware and / or software. The battery charging device can be configured in an electronic device configured in a battery swap station, such as a battery swap station control system. The electronic device may include but is not limited to a computer, a mobile phone or a server. Figure 1 As shown, the method includes:
[0049] S110 : For a battery to be charged, controlling the battery to be charged to be charged in the first stage.
[0050] S120: When the power level of the battery to be charged meets the storage power condition, the first stage of charging is terminated.
[0051] Among them, the battery to be charged can be specifically understood as a battery with low remaining power or replaced from a battery-swapping vehicle. The remaining power is generally represented by a percentage, using the SOC (State of Charge) value, which can also be called the remaining power. A remaining power threshold can be set by the charging control system to determine whether the battery needs to be charged. For example, the battery threshold for the remaining power is set to 30%. If the battery's SOC value is less than 30%, the battery can be charged through charging equipment such as charging piles. The driver can also independently determine whether the vehicle battery needs to be charged based on his own itinerary. If necessary, the vehicle battery is also a battery to be charged.
[0052] For any battery to be charged, it is connected to a charging device, and the charging device charges the battery to be charged. At the same time, the battery power data of the battery to be charged is collected by the charging device, and the detected battery power data is transmitted to the battery swap station control system in this embodiment, wherein the charging device and the battery swap station control system can be communicatively connected and can perform data transmission.
[0053] Since the battery to be charged is replaced from the battery-swapping vehicle, the battery needs to be stored during the process of being replaced in the vehicle next time, but both under-charged storage and fully-charged storage are not conducive to the battery life. In this embodiment, the battery to be charged is charged in stages. Staged charging is a strategy set to ensure that the battery to be charged can be in a good charging state. It is mainly judged and set based on the SOC value of the battery to be charged, the demand for battery replacement, the charging consumption information and other data. The prediction model can be used to analyze the SOC value of the battery to be charged, the demand for battery replacement, the charging consumption information and other data to obtain a staged charging strategy suitable for the battery to be charged.
[0054] Specifically, the charging process is divided into two stages, and the charging of the battery to be charged is controlled to be performed in the first stage. When the power storage condition is met, the battery to be charged is stored to optimize the service life of the battery. Specifically, the charging device can be controlled to charge the battery to be charged in the first stage by sending a control instruction to the charging device, wherein the control instruction includes but is not limited to the charging start time, the charging end time and the charging rate, etc. Optionally, the charging rate may correspond to the fast charging current (such as the maximum charging current) of the battery to be charged. For example, the first charging rate may be set to 1C. If the nominal capacity of the battery to be charged is 1000mAh, the corresponding fast charging current is 1A. If the nominal capacity of the battery to be charged is 2000mAh, the corresponding fast charging current is 2A. Among them, the charging rate of the first stage may be a preset rate that is conducive to optimizing the battery life, and the preset rate may be determined according to the battery type.
[0055] Optionally, before controlling the first stage charging of the battery to be charged, the method further includes: determining a storage power condition corresponding to the battery to be charged according to the battery type of the battery to be charged, wherein the storage power condition includes a storage power threshold.
[0056] Among them, the storage power threshold can be specifically understood as a storage power threshold that is beneficial to optimizing the battery life when the battery is in a storage state. If the battery is stored when the remaining power of the battery is equal to the storage power threshold, the decay rate of the battery capacity can be reduced. For different battery types, the corresponding storage power threshold may be different. The battery type and the storage power threshold are in a corresponding relationship. The storage power threshold corresponding to the battery type can be obtained through experimental data. Accordingly, by obtaining the battery type of the rechargeable battery, the storage power condition of the battery to be charged can be determined. The battery type of the battery to be charged can be obtained by a battery identification device, or determined by the charging device to which the battery to be charged is connected, such as by reading a preset field identifier of the data stored in the battery to be charged. Optionally, the charging device sends the charging device identifier and the battery type identifier of the connected battery to be charged to the battery swap station control system, and the battery swap station control system determines the corresponding storage power threshold, that is, the storage power condition, based on the battery type identifier.
[0057] For example, after the battery to be charged is replaced from the vehicle, it is connected to a charging device, which identifies the single cell voltage of the battery and charges it to about 50% SOC within a limit of 2.7V for storage, thereby increasing the SOC and shortening the battery charging time.
[0058] In this embodiment, basic information and a storage power threshold of the battery to be charged are determined, and the charging of the battery to be charged in the first stage is controlled according to the basic information and the storage power threshold of the battery to be charged.
[0059] The storage power condition can be specifically understood as the power condition under which the battery to be charged can enter the storage state. If the battery to be charged is charged until the battery storage power reaches the storage power threshold, it can be determined that the battery to be charged meets the storage power condition.
[0060] Specifically, the battery type of the battery to be charged can be identified and the storage power condition can be determined. During the charging process of the battery to be charged, the power of the battery to be charged can be detected in real time, and the detected power can be matched with the storage power condition. If the matching result is consistent, it means that the power of the battery to be charged meets the storage power condition. At this time, the charging of the battery to be charged can be stopped to end the first stage of charging. Specifically, the battery power sent by the charging device in real time or at a fixed time can be received, and when the battery power meets the storage power condition, a stop charging instruction can be sent to the charging device.
[0061] Exemplarily, the storage power condition is set to an SOC value of 50%, and low-power slow charging can be used to supplement the power. When the battery to be charged is charged to an SOC value of 50%, the charging can be terminated, ending the first stage of charging, waiting for the recharging instruction from the battery swap station control system to proceed to the next stage of charging.
[0062] In this embodiment, by real-time detection of the power of the battery to be charged during the charging process, if the power of the battery to be charged meets the storage power condition, it is determined that the power of the battery to be charged meets the storage power condition, and the battery control system can end the charging process of the battery to be charged, completing the first stage of the charging process. By controlling the end of the first stage of charging in this way, the remaining power of the battery to be charged is in a state suitable for storage, avoiding the attenuation of the battery capacitance caused by excessive storage power of the battery, so as to effectively optimize the service life of the battery.
[0063] S130. Determine the start time information of the second stage of the battery to be charged based on the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment, and control the second stage of charging of the battery to be charged based on the start time information of the second stage.
[0064] Specifically, the battery swap demand can be understood as the demand for available batteries for battery swap vehicles at the battery swap station in the future time period, and the battery swap demand includes the demand for available batteries in each unit time period in the future time period. The battery swap demand can be predicted based on historical battery swap data, or it can be determined based on the number of battery replacement requests received. For example, the battery swap demand information reported by users can be received through SMS, phone calls, applications, etc., which can include information such as battery model and battery swap time.
[0065] The charging consumption information at each time specifically refers to the electricity charge standards at each time. For example, the peak hours are 7:00-11:00 and 19:00-23:00, and the electricity price is 0.5583 yuan / kWh; the off-peak hours are 23:00-7:00 the next day, and the electricity price is 0.3583 yuan / kWh; the normal period is 11:00-19:00, and the electricity price is 0.5283 yuan / kWh, etc. The electricity charge standards may vary at different times or in different regions.
[0066] The second stage can be specifically understood as the second stage in the staged charging of the battery to be charged, which is used to charge the battery to be charged until it is fully charged. The start time information of the second stage is determined based on further analysis of the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment. The battery swapping demand of the battery swapping station and / or the charging consumption information at each moment can be analyzed through the demand analysis model to obtain the start time of the second stage of the battery to be charged. Based on the determined start time of the second stage, the battery is charged for the second stage.
[0067] Specifically, the battery swap station control system can analyze the received battery swap demand information and charging consumption information at each moment, and can process it through a data analysis model to obtain the corresponding second-stage charging duration, charging power and other information of the battery to be charged, determine the start time of the second stage, and the battery charging system controls the second-stage charging of the battery to be charged according to the obtained start time.
[0068] A control instruction is sent to the charging device according to the determined start time information of the second stage, so that the charging device charges the battery to be charged based on the start time information of the second stage until the power of the battery to be charged meets the charging end condition, and the charging of the second stage is stopped.
[0069] The technical solution of this embodiment is to obtain the battery swap demand and / or charging consumption information at each moment received by the battery swap station through the control system of the battery swap station, and the data analysis model analyzes the information to obtain the time of staged charging, storage power conditions, and the start time of the second stage, so as to complete the segmented charging of the battery to be recharged. The battery to be recharged is charged in stages, and the battery that has completed the first stage of charging is stored according to the obtained storage power conditions. The battery control system controls the execution of the second stage of charging according to the start time of the second stage, so that the battery to be recharged can be charged as needed, avoiding the situation where it cannot be replaced in time after being fully charged and the situation where it is replaced before being fully charged, thereby reducing energy consumption.
[0070] Embodiment 2
[0071] Figure 2 This is a flow chart of a battery charging method provided in the second embodiment of the present invention. This embodiment optimizes the method based on the above embodiment, and determines the starting time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station. Optionally, the peak period of battery replacement in the battery replacement demand of the battery replacement station is determined, and the starting time information of the second stage is determined based on the peak period of battery replacement and the charging duration of the second stage. Figure 2 As shown, the method includes:
[0072] S210: For the battery to be charged, control the battery to be charged to perform the first stage of charging.
[0073] S220: When the power level of the battery to be charged meets the storage power condition, the first stage of charging is terminated.
[0074] S230. Determine the peak period of battery swapping in the battery swapping demand of the battery swapping station, and determine the starting time information of the second stage based on the peak period of battery swapping and the charging duration of the second stage.
[0075] Among them, the peak period of battery swapping refers to the period when the demand for battery swapping is high. Specifically, it can be understood as one or more periods in a day when the number of battery swapping requests received by the control system of the battery swapping station is relatively large. This period includes but is not limited to one hour, two hours, etc., and the judgment can be completed by setting a threshold for the number of battery swapping requests. For example, the peak period of battery swapping in a day is calculated, and the threshold for battery swapping requests is set to 100 per hour. The actual number of battery swapping requests in each hour is compared with the threshold for the number of battery swapping requests. The time period exceeding this threshold for the number of battery swapping requests can be regarded as the peak period of battery swapping; it can also be judged by the battery swapping prediction model. The charging time of the second stage can be specifically understood as the length of time required for the storage capacity of the battery to be charged to be charged from the state of charge that meets the storage conditions to the full state. It can be calculated by a formula model or by a control system.
[0076] Specifically, according to the battery swapping demand of the battery swapping station collected by the battery swapping station control system, a certain method is used to determine the peak battery swapping time of the day, such as setting a battery swapping request number threshold, dividing the day into hours, and subtracting the actual number of battery swapping requests received in each time period from the battery swapping request number threshold. If the difference is greater than zero, it means that the time period can be regarded as a peak battery swapping time period. Similarly, the time periods that meet the battery swapping request number threshold are obtained in turn. Based on the battery swapping time, battery swapping demand, and SOC value of the battery to be charged, the start time information of the second stage of the battery to be charged is calculated.
[0077] Optionally, historical battery replacement data is obtained, the battery replacement amount in each historical unit time period is counted, and the peak battery replacement period is determined based on the battery replacement amount in each historical unit time period.
[0078] Among them, the historical battery swap data can be specifically understood as the battery swap history record in the battery swap station, which can be read from the database in the battery swap station control system or from the server, without limitation here. The amount of battery swaps in the historical unit time period can be specifically understood as the total amount of battery swaps accumulated in the past unit time period, where the unit time period can be set according to actual needs, and can be set to one day, one week, etc., without limitation here. The peak time period for battery swaps is determined based on the statistical amount of battery swaps in each historical time period, which can be determined by setting parameter thresholds or by a prediction model.
[0079] Specifically, the historical battery swap data obtained is divided into time periods for statistics. The division of time periods can be set according to demand. For example, if you want to obtain the peak time period of the day, you can set one hour as the unit time period, and count the amount of battery swaps in each hour to obtain the amount of battery swaps in each unit time period. The peak value threshold of battery swaps is set by setting the parameter threshold method. If the amount of battery swaps in a unit time period is greater than the peak value threshold of battery swaps, this period is the peak time period of battery swaps.
[0080] Optionally, historical battery swapping data is obtained, and the historical battery swapping data is processed based on a battery swapping prediction model to obtain predicted battery swapping amounts for each time period within the prediction time range, and peak battery swapping periods are determined based on the predicted battery swapping amounts for each time period.
[0081] Among them, the prediction model is a model that analyzes historical data through a certain analysis method to obtain the data development law to predict the corresponding data in the future time period. The battery swap prediction model can be specifically understood as a model that analyzes historical battery swap data to obtain the predicted battery swap volume within the prediction time range, thereby determining the peak battery swap period within the prediction time period. Optionally, the prediction model can be a machine learning model, and further, the prediction model can be a neural network model.
[0082] Exemplarily, the acquired historical battery swapping data is analyzed, the unit time is set to one hour, the battery swapping amounts within all unit times in the past month are counted, the battery swapping amount value within the unit time period is obtained, the battery swapping amount within each unit time period is input as an input parameter into the battery swapping prediction model, the predicted battery swapping amount within each unit time period is output, the predicted battery swapping amount is analyzed again, a peak power threshold is set, and the unit time period to which the battery swapping amount exceeding this threshold belongs is the peak battery swapping time period.
[0083] Optionally, obtain battery swap reservation orders, count the reservation order data for each future time period, and determine the peak time period for battery swap based on the reservation order data for each future time period.
[0084] Among them, the battery swap reservation order can be specifically understood as a battery swap reservation request sent by the user to the battery swap station control system through an application, telephone, etc.
[0085] Specifically, the battery swapping station control system receives the battery swapping demands issued by users for battery swapping in future time periods, and stores and counts the received reservation information to obtain the reservation order data for each time period. A reservation order threshold can be set. If the number of reservation orders exceeds this threshold, it can be judged that the unit time period is in the peak period for battery swapping. Otherwise, it is not the peak period for battery swapping.
[0086] On the basis of determining the peak period of battery swapping, the starting time information of the second stage is determined based on the starting time of the peak period of battery swapping and the charging duration of the second stage, wherein the starting time information of the second stage is the time difference between the starting time of the peak period of battery swapping and the starting time of the peak period of battery swapping, which is greater than or equal to the charging duration of the second stage.
[0087] S240: Based on the start time information of the second stage, control the charging of the battery to be charged to perform the second stage.
[0088] For example, when the battery swap is in the idle stage and there is no demand for battery swap, a small rate of charging, that is, constant current 0.3C charging to 50% storage can be used, and subsequent charging above 50% SOC can be charged in advance based on the estimated time of 0.3C charging. Relatively speaking, if the battery swap is busy and the demand for battery swap is at a peak, a large rate of fast charging, constant current 1.2C fast charging, can be used to meet actual operational needs.
[0089] In the technical solution of this embodiment, based on the battery swap demand information obtained by the battery swap station, including historical battery swap demand, swap point reservation order and other information, it is analyzed through the prediction model to obtain the peak battery swap period and the predicted peak battery swap period, and then the start time of the second stage is obtained to control the start and end of the second stage of the battery to be charged. This method can help the battery swap station complete the charging and scheduling of the battery to be charged, so that users can complete the vehicle battery swap without waiting too long.
[0090] Embodiment 3
[0091] Figure 3 This is a flow chart of a battery charging method provided in the third embodiment of the present invention. This embodiment optimizes the method based on the above embodiment. Optionally, based on the charging consumption information at each moment, the starting time information of the second stage of the battery to be charged is determined. According to the charging consumption information at each moment, at least one charging time period with the lowest total consumption is determined; the starting time information of the charging time period is used to determine the starting time information of at least one sub-stage in the second stage; and the charging rate is determined according to the charging amount of the second stage and the charging duration of at least one charging time period; based on the starting time information and the charging rate of at least one sub-stage, the second stage charging of the battery to be charged is controlled. Figure 3 As shown, the method includes:
[0092] S310: For a battery to be charged, control the battery to be charged to perform a first stage of charging.
[0093] S320: When the power level of the battery to be charged meets the storage power condition, the first stage of charging is terminated.
[0094] S330: Determine the start time information of the second stage of the battery to be charged based on the charging consumption information at each moment.
[0095] Optionally, based on the charging consumption information at each moment, at least one charging time period with the lowest total consumption is determined as at least one sub-stage in the second stage.
[0096] The total consumption can be specifically understood as the total amount consumed when the battery to be recharged is fully charged. Since there are certain differences in charging consumption information at different times, the charging consumption during the peak charging period is generally higher than that during other periods. The lowest total consumption can be specifically understood as the least electricity cost required to fully charge the battery to be recharged. According to the different charging consumption information at each time, the charging period of the second stage can also be divided into multiple charging periods.
[0097] Specifically, the amount of electricity required to fully charge the battery to be charged can be obtained by the difference between the battery capacity of the battery to be charged and the remaining power of the battery. An appropriate charging power is selected to charge the battery. The difference between the battery capacity and the remaining power of the battery is divided by the charging power to obtain the charging time. The charging time is multiplied by the charging consumption information at each moment, and the result is the total consumption of the battery to be charged. The charging consumption of the battery to be charged at different time periods can be calculated by a calculation model to obtain the time period with the lowest consumption, wherein there is at least one time period with the lowest consumption.
[0098] Optionally, the start time information of at least one sub-stage in the second stage is determined based on the start time information of the charging period; and the charging rate is determined according to the charging amount of the second stage and the charging duration of at least one charging period.
[0099] Among them, the charging rate can be specifically understood as a measure of charging speed, which refers to the current value required for the battery to be charged to its rated capacity within a certain period of time, that is, charging rate = charging current / battery rated capacity. The rated capacity of the battery can be obtained by identifying the battery identification device in the control system of the battery swap station. The sub-stage can be specifically understood as part of the charging period in the second stage of charging or the entire charging period.
[0100] Specifically, the charging period of the second stage can be set into multiple sub-stages according to the different consumption information at each moment. The starting time of the first sub-stage can be at least determined by the starting information of the charging period, that is, the starting time of the charging period is the starting time of the first sub-stage. The charging amount of the second stage is determined by the difference between the battery capacity of the battery to be charged and the remaining power of the battery to be charged. The charging time of the second stage is obtained according to the charging consumption information and the charging amount, and then the charging current information of the second stage is obtained. The charging rate is determined according to the formula charging rate = charging current / battery rated capacity.
[0101] S340: Based on the start time information and the charging rate of at least one sub-stage, control the charging of the battery to be charged to perform the second stage.
[0102] Specifically, the battery charging control system performs the second stage charging operation on the battery to be charged according to the obtained charging multiple and starting time, and stops charging after the battery is fully charged.
[0103] On the basis of the above embodiments, based on the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment, the starting time information of the second phase of the battery to be charged is determined, and it also includes: determining the peak battery swapping period in the battery swapping demand of the battery swapping station; within the rechargeable period between the current moment and the peak battery swapping period, according to the charging consumption information at each moment, determining at least one charging period with the lowest total consumption, and using the starting time information of the charging period to determine the starting time information of at least one sub-phase in the second phase.
[0104] Specifically, the peak period of battery replacement is first determined through the battery replacement demand received by the battery replacement station. In the rechargeable time period between the current time and the peak period of battery replacement, the time period with the lowest total consumption in the rechargeable time period is obtained based on the charging consumption information at each time obtained, and there is at least one such time period. By obtaining the time period with the lowest total consumption, the starting time of the charging time period is obtained, and this starting time can be used as the starting time of the second stage of charging, wherein the second stage includes at least one sub-stage, and then the starting time of the charging time period is the starting time information of at least one sub-stage in the second stage.
[0105] In this embodiment, the battery swapping demand received by the battery swapping station is combined with the charging consumption information at each time, and the charging time period between the peak battery swapping period and the current time and the peak battery swapping period is determined to obtain the minimum consumption time period within the charging time period, and the start time of at least one sub-stage in the second stage is obtained based on the above information. In this way, part or even all of the charging process in the second stage can be completed during the non-peak time period, effectively reducing the charging consumption required to fully charge the battery to be charged.
[0106] In the technical solution of this embodiment, based on the acquired charging consumption information, the start time and charging rate of the second stage are obtained through the calculation model and the battery replacement prediction model. Since the consumption information at different charging moments is different, the second stage is divided into multiple sub-stages to perform the charging task, which can reduce the charging consumption while ensuring that the battery to be charged can be fully charged in time. This charging method not only ensures battery safety but also reduces charging costs.
[0107] Embodiment 4
[0108] Figure 4 Schematic diagram of the structure of a battery charging device provided by the fourth embodiment of the present invention. Figure 4 As shown, the device comprises:
[0109] The first stage charging control module 410 is used to control the charging of the battery to be charged to perform the first stage charging on the battery to be charged;
[0110] The first stage charging termination module 420 is used to terminate the first stage charging when the power of the battery to be charged meets the storage power condition;
[0111] The second stage charging control module 430 is used to determine the starting time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station and / or the charging consumption information at each moment, and control the second stage charging of the battery to be charged based on the starting time information of the second stage.
[0112] Optionally, the first stage charging control module 410 is specifically configured to:
[0113] According to the battery type of the battery to be charged, a storage power condition corresponding to the battery to be charged is determined, wherein the storage power condition includes a storage power threshold.
[0114] Optionally, the second stage charging control module 430 includes:
[0115] A first starting time information determining unit, configured to determine the starting time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station;
[0116] A second starting time information determining unit, configured to determine the starting time information of the second stage of the battery to be charged based on the charging consumption information at each moment;
[0117] The third determination unit for the start time information is used to determine the start time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station and / or the charging consumption information at each moment.
[0118] Optionally, the first determination unit of the start time information is specifically used to:
[0119] Determine the peak period of battery swapping in the battery swapping demand of the battery swapping station, and determine the start time information of the second stage based on the peak period of battery swapping and the charging duration of the second stage;
[0120] Obtain historical battery replacement data, count the battery replacement amount in each historical unit period, and determine the peak battery replacement period based on the battery replacement amount in each historical unit period; or,
[0121] Obtain historical battery swap data, process the historical battery swap data based on the battery swap prediction model, obtain the predicted battery swap volume for each period within the prediction time range, and determine the peak battery swap period based on the predicted battery swap volume for each period;
[0122] Obtain battery swap reservation orders, count the reservation order data for each future time period, and determine the peak time period for battery swap based on the reservation order data for each future time period.
[0123] Optionally, the second starting time information determining unit is specifically configured to:
[0124] Determine at least one charging period with the lowest total consumption according to the charging duration of the second stage and the charging consumption information at each moment;
[0125] Determine the start time information of at least one sub-stage in the second stage using the start time information of the charging period;
[0126] Determine at least one charging period with the lowest total consumption based on the charging consumption information at each moment;
[0127] Determine the start time information of at least one sub-stage in the second stage using the start time information of the charging period; and determine the charging rate according to the charging amount of the second stage and the charging duration of at least one charging period;
[0128] Accordingly, based on the start time information of the second stage, controlling the charging of the battery to be charged in the second stage includes:
[0129] Based on the start time information of at least one sub-stage and the charging rate, the charging of the battery to be charged in the second stage is controlled.
[0130] Optionally, the third determination unit of the start time information is specifically used to:
[0131] Determine the peak period of battery swapping demand at the battery swapping station;
[0132] During the chargeable period between the current moment and the peak period for battery replacement, determine at least one charging period with the lowest total consumption based on the charging consumption information at each moment, and use the starting time information of the charging period to determine the starting time information of at least one sub-stage in the second stage.
[0133] The battery charging device provided in the embodiment of the present invention can execute the battery charging method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0134] Embodiment 5
[0135] Figure 51 is a schematic diagram of the structure of an electronic device provided in Embodiment 5 of the present invention. The electronic device 10 is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0136] like Figure 5 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0137] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0138] The processor 11 may be a variety of general and / or dedicated processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 performs the various methods and processes described above, such as a battery charging method.
[0139] In some embodiments, the battery charging method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the battery charging method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the battery charging method in any other appropriate manner (e.g., by means of firmware).
[0140] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0141] The computer program for implementing the battery charging method of the present invention can be written in any combination of one or more programming languages. These computer programs can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0142] Embodiment 6
[0143] Embodiment 6 of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to execute a battery charging method, the method comprising:
[0144] For the battery to be charged, controlling the first stage of charging of the battery to be charged;
[0145] When the power of the battery to be charged meets the storage power condition, the first stage of charging is ended;
[0146] Based on the battery swapping demand of the battery swapping station and / or the charging consumption information at each moment, the starting time information of the second stage of the battery to be charged is determined, and based on the starting time information of the second stage, the second stage charging of the battery to be charged is controlled.
[0147] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0148] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0149] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0150] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0151] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0152] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A battery charging method, characterized in that: include: For a battery to be charged, controlling the battery to be charged to be charged in the first stage; When the power of the battery to be charged meets the storage power condition, the charging of the first stage is terminated; Based on the battery swapping demand of the battery swapping station and the charging consumption information at each moment, determining the starting time information of the second stage of the battery to be charged, and based on the starting time information of the second stage, controlling the charging of the battery to be charged for the second stage; The determining the starting time information of the second stage of the battery to be charged based on the battery swapping demand of the battery swapping station and the charging consumption information at each moment includes: Determine a peak period of battery swapping in the battery swapping demand of the battery swapping station; During the chargeable period between the current moment and the peak period for battery replacement, at least one charging period with the lowest total consumption is determined based on the charging consumption information at each moment, and the start time information of the charging period is used to determine the start time information of at least one sub-stage in the second stage.
2. The method according to claim 1, characterized in that Before controlling the charging of the battery to be charged in the first stage, the method further includes: According to the battery type of the battery to be charged, a storage power condition corresponding to the battery to be charged is determined, wherein the storage power condition includes a storage power threshold.
3. The method according to claim 1, characterized in that Based on the battery swapping demand of the battery swapping station, determining the start time information of the second stage of the battery to be charged includes: Determine the peak period of battery swapping in the battery swapping demand of the battery swapping station, and determine the starting time information of the second stage based on the peak period of battery swapping and the charging duration of the second stage.
4. The method according to claim 3, characterized in that: The determining of the peak period of battery swapping in the battery swapping demand of the battery swapping station comprises: Obtain historical battery replacement data, count the battery replacement amount in each historical unit time period, and determine the battery replacement peak period according to the battery replacement amount in each historical unit time period; or, Obtain historical battery replacement data, process the historical battery replacement data based on a battery replacement prediction model to obtain the predicted battery replacement amount for each time period within the prediction time range, and determine the peak battery replacement period based on the predicted battery replacement amount for each time period.
5. The method according to claim 3, characterized in that: The determining of the peak period of battery swapping in the battery swapping demand of the battery swapping station comprises: Obtain battery replacement reservation orders, count the reservation order data for each future time period, and determine the battery replacement peak time period based on the reservation order data for each future time period.
6. The method according to claim 1, characterized in that The step of determining the start time information of the second stage of the battery to be charged based on the charging consumption information at each moment includes: Determine at least one charging period with the lowest total consumption according to the charging duration of the second stage and the charging consumption information at each moment; The start time information of the charging period is used to determine the start time information of at least one sub-stage in the second stage.
7. The method according to claim 1, characterized in that The step of determining the start time information of the second stage of the battery to be charged based on the charging consumption information at each moment includes: Determine at least one charging period with the lowest total consumption according to the charging consumption information at each moment; Determine the start time information of at least one sub-stage in the second stage using the start time information of the charging period; and determine the charging rate according to the charging amount of the second stage and the charging duration of the at least one charging period; Correspondingly, based on the start time information of the second stage, controlling the charging of the battery to be charged in the second stage includes: Based on the start time information of the at least one sub-stage and the charging rate, the charging of the battery to be charged in the second stage is controlled.
8. A battery charging device, the charging device being used to execute the method according to any one of claims 1 to 7, characterized in that: The battery charging device comprises: A first stage charging control module, used for controlling the first stage charging of the battery to be charged; A first-stage charging termination module, used to terminate the first-stage charging when the power of the battery to be charged meets the storage power condition; The second stage charging control module is used to determine the starting time information of the second stage of the battery to be charged based on the battery replacement demand of the battery replacement station and the charging consumption information at each moment, and control the second stage charging of the battery to be charged based on the starting time information of the second stage.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and A memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executed by the at least one processor so that the at least one processor can execute the battery charging method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the battery charging method according to any one of claims 1 to 7 when executed.
Citation Information
Patent Citations
Battery charging based on cost and life
CN101821121A
Charging method and charging device executed in battery replacing facility, and far-end server
CN110535196A
Charging management method, device and system for prolonging service life of battery
CN114597998A