A monitoring device and method for thermal expansion of platinum channel clarification section

By clamping the flange body and setting an expansion meter on the side of the flange of the platinum channel clarification section, the problem of measurement error and manual interference in the existing technology is solved, and accurate monitoring and management of the expansion of the platinum channel clarification section is achieved. , improving the expansion tracking accuracy.

CN115818930BActive Publication Date: 2024-10-01IRICO DISPLAY DEVICES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211589370.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-09
Publication Date
2024-10-01
Estimated Expiration
2042-12-09

AI Technical Summary

Technical Problem

The existing technology has problems with measurement errors and the need for manual intervention in the thermal expansion management of the platinum channel clarification section, resulting in inaccurate dilatometer measurements and unable to meet the needs for precise monitoring and expansion management.

Method used

Design a monitoring device for thermal expansion of the platinum channel clarification section. The flange body is clamped by a lead-out device on the side of the flange, and an expansion meter is set on the side to ensure that the thickness of the measuring surface is consistent with the flange body. It is made of 304 stainless steel. , the thickness of the clamping surface and extension rod is 4mm-7mm, the clamping structure uses clamping bolts, the clamping surface is a fan-shaped structure, and the length of the extension rod is between 500mm and 800mm to achieve stable clamping and accurate measurement.

Benefits of technology

Through the design of the side lead-out device, precise expansion monitoring of the flange of the clarification section of the platinum channel is achieved, which improves the tracking accuracy of expansion management by nearly 76%, reduces measurement errors, avoids human influence, and ensures the reliability and reliability of expansion monitoring. accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115818930B_ABST
    Figure CN115818930B_ABST
Patent Text Reader

Abstract

The present invention discloses a monitoring device for the thermal expansion of a platinum channel clarification section, comprising a clamping surface, a clamping structure, and an extension rod. Two clamping surfaces are provided, and the two clamping surfaces are arranged parallel to each other. A clamping structure is provided between the two clamping surfaces. The two clamping surfaces are connected to one end of the extension rod, and the distance between the two clamping surfaces is the same as the thickness of the flange body. One end of the extension rod is connected to a dilatometer. In terms of the management of the temperature increase expansion of the platinum channel clarification section, the flange position mark drawn from the side is designed to make the expansion tracking of each clarification section more accurate. And the dilatometer on the side is used to monitor it, which effectively solves the above-mentioned problem.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of substrate glass manufacturing, and in particular to a monitoring device and method for thermal expansion of a platinum channel clarification section. Background Art

[0002] The platinum channel is one of the key equipment in the production of substrate glass. It is expensive and cannot be reused. The cooling installation requirements for the platinum channel are very high, including the elevation and center position, which determine the positional relationship between the platinum channel and the pool furnace in the cold state and the docking relationship between the pool furnace and the forming after the thermal expansion is completed. The thermal expansion management of the platinum channel is one of the important projects in the heating process of the substrate glass equipment. Since the total length of the platinum channel reaches more than ten meters and the structure and function of each section are different, its expansion management also needs to be comprehensively considered in combination with the system structure.

[0003] For the clarification section, it is the area with the highest temperature and the greatest challenge to life reliability during the operation of the platinum channel. Therefore, during the heating process of the clarification section, it is necessary to ensure that the expansion of each section is in a free state, and no local stress or overall unbalanced stress should occur. Although the clarification pipe is designed with a bellows structure, which has a certain effect on buffering the expansion amount, it does not completely cover the effect of the flange root. The root of the clarification section flange is the weakest area in the life of the clarification section. After several years of operation, damage generally begins in this area.

[0004] After the clarification section is built, only the flange root area is exposed, and the large area of ​​the main section has been wrapped with filling materials and various refractory materials. Therefore, the current expansion tracking of this area is mainly based on the flange displacement of each section, such as Figure 1 As shown, the expansion meter is installed on the terminal block on the upper part of the flange, and the actual displacement of each section of the clarification section is determined by measuring the displacement of the terminal block. This method has long had certain problems, that is, the upper terminal block will have a suspension suspended on its upper part due to its own weight to prevent the terminal block from tilting due to its own weight and further causing the flange to tilt. In the actual operation process, as the flange moves, the terminal block is pulled by the suspension, and although it has a certain pulling effect, this force cannot currently achieve a completely synchronous balance with the displacement of the flange, and there will be a lag in the suspension. In the actual process, manual regular resetting is required, and the expansion meter is located on the side of the terminal block, which results in the expansion meter's measurement being unable to correspond to the actual internal expansion, and is often affected by the tilt of the terminal block and has large errors. At present, this process still needs to rely on manual means for regular assistance, which is not enough for accurate monitoring and subsequent continuous and greater platinum channel expansion management. Summary of the invention

[0005] In view of the measurement errors and the need for manual intervention in the prior art, the present invention provides a monitoring device and method for the thermal expansion of the platinum channel clarification section; in terms of the management of the temperature increase expansion of the platinum channel clarification section, the flange position mark drawn from the side is designed to make the expansion tracking of each clarification section more accurate. And combined with the expansion meter on the side to monitor it, the above problems are effectively solved.

[0006] The present invention is achieved through the following technical scheme: a monitoring device for the thermal expansion of a platinum channel clarification section, comprising a clamping surface, a clamping structure, and an extension rod, wherein two clamping surfaces are provided, the two clamping surfaces are arranged parallel to each other, a clamping structure is arranged between the two clamping surfaces, the two clamping surfaces are connected to one end of the extension rod, the distance between the two clamping surfaces is the same as the thickness of the flange body, and one end of the extension rod is connected to an expansion meter.

[0007] Furthermore, a measuring surface is provided at the connection between the extension rod and the dilatometer.

[0008] Furthermore, the thickness of the measuring surface is the same as the thickness of the flange body.

[0009] Furthermore, the clamping structure uses a clamping bolt, and the clamping bolt fixes the distance between the two clamping surfaces.

[0010] Furthermore, the clamping surface is configured as a fan-shaped structure.

[0011] Furthermore, the length of the extension rod is set between 500 mm and 800 mm.

[0012] Furthermore, the clamping surface and the extension rod are both made of 304 stainless steel.

[0013] Furthermore, the thickness of the clamping surface and the extension rod is set to 4mm-7mm.

[0014] A monitoring method for thermal expansion of the platinum channel clarification section based on the above-mentioned method comprises the following steps:

[0015] The flange body is clamped by a flange side lead-out device, wherein the flange side lead-out device and the axis of the flange body are perpendicular to each other;

[0016] An expansion meter is connected and installed at the lead-out device on the side of the flange;

[0017] The detection head is set on top to monitor the displacement of the flange.

[0018] Furthermore, the clamping depth of the flange side lead-out device on the flange body is 30 mm to 50 mm.

[0019] Compared with the prior art, the present invention has the following beneficial technical effects:

[0020] A monitoring device for thermal expansion of a platinum channel clarification section. The invention realizes stable clamping of the device by extending the clamping surface of the device flange body. At the same time, the clamping effect is ensured in the device by limiting the collective size.

[0021] Furthermore, the setting of the measuring surface further ensures the accuracy of the measurement and effectively reduces the generation of errors. In addition, in this device, the distance between the clamping surfaces is ensured by setting the clamping structure, thereby preventing the possibility of human influence on the measurement results.

[0022] A method for monitoring the thermal expansion of a platinum channel clarification section mainly performs precise measurement of the expansion of each section of the platinum channel clarification section during the heating process to ensure the reliability of the expansion; the flange lead-out device is designed to match the expansion meter on the side to accurately monitor the actual expansion amount of each section of the clarification flange; the expansion monitoring without deformation and without the influence of gravity is realized; the expansion management method of the present invention is adopted, and the tracking accuracy of each section of the flange is improved by nearly 76%, and there is basically no jump in the measurement data. It has been verified in practice that the effect of the present invention is significant. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 A schematic diagram of an existing monitoring structure provided as background technology;

[0025] Figure 2 A schematic diagram of the structure of a device for monitoring thermal expansion of a platinum channel clarification section provided in an embodiment of the present invention;

[0026] Figure 3 A schematic diagram of the device structure connection of a device for monitoring thermal expansion of a platinum channel clarification section provided by an embodiment of the present invention;

[0027] Figure 4 A schematic diagram of the overall structure connection of a device for monitoring thermal expansion of a platinum channel clarification section provided by an embodiment of the present invention;

[0028] In the figure: measuring surface 1-1, clamping surface 1-2, clamping bolt 1-3, extension rod 1-4, flange side lead-out device 1, terminal block 2, flange body 3, platinum body 4, refractory material 5, expansion meter 6, flange hanger 7. DETAILED DESCRIPTION

[0029] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.

[0030] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0031] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0033] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0034] Embodiment 1:

[0035] In a preferred embodiment provided by the present invention, a method for monitoring the thermal expansion of the clarification section of a platinum channel is provided. The method is mainly used in the expansion management of the heating process of the platinum channel, mainly involving the expansion management of the clarification section. The method belongs to the TFT-LCD substrate glass industry.

[0036] The method is implemented through a monitoring device for the thermal expansion of the clarification section of a platinum channel, specifically, including a measuring surface 1-1, a clamping surface 1-2, a clamping bolt 1-3, an extension rod 1-4, a flange side lead-out device 1, a terminal block 2, a flange body 3, a platinum body 4, a refractory material 5, an expansion meter 6, and a flange hanger 7.

[0037] The flange side lead-out device 1 comprises a measuring surface 1-1, a clamping surface 1-2, a clamping bolt 1-3 and an extension rod 1-4; the flange side lead-out device 1 is made of 304 stainless steel, and the clamping bolt 1-3 is made of 304 stainless steel, or the same nickel material as the outer side of the flange;

[0038] The flange side lead-out device 1 has two clamping surfaces 1-2, which are clamped separately on the outside of the flange body 3, and the clamping depth is set between 30 mm and 50 mm. In this embodiment, the clamping depth is set at 40 mm. The spacing between the two clamping surfaces 1-2 and the measuring surface 1-1 is designed to be consistent with the thickness of the outer clamping area of ​​the flange body 3; the inner wall surface of the clamping surface 1-2 is designed as a concentric arc like the flange body 3, with an arc of 10° to 30°, and the outer side of the clamping surface 1-2 is also designed as a concentric arc with the flange body 3, and the inner and outer widths are generally designed to be in the range of 30mm to 50mm; the clamping surface 1-2 is connected to the extension rod 1-4 by triangular ribs, and the specific size of the triangular ribs can act on about 1 / 3 of the total length of the extension rod 1-4; the clamping bolts 1-3 are set to 2, and can also be designed to be 3, 4 or more. The bolts are generally M10, M12, M16, and the length of the clamping bolts 1-3 is determined according to the thickness of the flange body 3 and the clamping surface 1-2; the extension rod 1-4 is designed to be between 500mm and 800mm in length, 30mm in width, and the side shape is a standard rectangle;

[0039] The clamping surface 1-2 and the extension rod 1-4, both of which have a thickness set to a range of 4mm to 7mm; the measuring surface 1-1, the measuring surface 1-1 connects two clamping and extension rod structures, and the measuring surface 1-1 can also be used to connect the measuring surface 1-4 contacted by the expansion meter 6;

[0040] The measuring surface 1-1 is made of a solid stainless steel block, the width of the measuring surface 1-1 is the same as that of the extension rod, and the length is in the range of 40mm to 60mm; in this clarification section flange monitoring method, its main contents include canceling the tracking point of the existing expansion 8, installing the side lead-out device 1 on the positive side of the flange body 3, and then leading it horizontally, installing a new expansion meter 6 on the same side as the side lead-out device 1, and making the detection head of the expansion meter contact the measuring surface 1-1 of the side lead-out device 1.

[0041] Embodiment 2:

[0042] A method for monitoring the thermal expansion of a platinum channel clarification section mainly implements accurate monitoring of the actual expansion amount of each clarification section flange by designing a flange lead-out device to match the expansion meter on the side.

[0043] The flange side lead-out device has a structure as follows: Figure 2 As shown, it includes a measuring surface 1-1, a clamping surface 1-2, a clamping bolt 1-3 and an extension rod 1-4; the side lead-out device is made of 304 stainless steel to ensure that the material has no damaging components to platinum, that is, a large amount of reducing impurities such as C, including the selected bolts also need to be made of the same material. In addition, this device can also use the same nickel material as the outer side of the flange, and has the same material as the measuring connector; the relative position of the flange side device 1 and the platinum channel is as shown Figure 3 As shown, the platinum body 4 is connected to the flange, and the flange is divided into a flange body 3 and a terminal block 2, and a side lead-out device 1 is horizontally led out from one side of the flange;

[0044] The specific installation of the flange side device 1 is combined with Figure 2 and Figure 3 It is explained that the clamping surface 1-2 of the flange side lead-out device 1 is provided with two, and the two clamping surfaces 1-2 are separately clamped on the side of the flange body 3, with a clamping depth of 50mm, which mainly acts on the outermost nickel plate of the flange. During the design process, the distance between the two clamping surfaces 1-2 and the measuring surface 1-1 is designed to be the same as the thickness of the outer clamping area of ​​the flange body 3, ensuring that the entire side lead-out device 1 and the flange surface are in a coplanar state after clamping;

[0045] The inner side of the clamping surface 1-2 is designed to be concentric with the flange body 3, with an arc of 15°. The specific selection of the arc is related to the range of clamping required. The outer side of the clamping surface 1-2 is also designed to be concentric with the flange body 3. The inner and outer widths are generally designed to be in the range of 30mm to 50mm. In addition, the clamping surface 1-2 is connected to the extension rod 1-4 by a large triangular rib. The specific size of the triangular rib can act on about 1 / 3 of the total length of the extension rod 1-4 to ensure the overall structural strength;

[0046] The clamping bolts 1-3 are provided with two to ensure the stability of clamping. The bolts are M12 and the length is determined according to the thickness of the flange body 3 and the clamping surface 1-2.

[0047] The length of the extension rod 1-4 is generally related to the outer contour of the clamping surface and the main refractory material of the refractory channel. According to the current size design, it is generally between 500mm and 800mm, the width is designed to be 30mm, and the side shape is a standard rectangle; the clamping surface 1-2 and the extension rod 1-4 are both designed with the same thickness. According to the current usage, the thickness is generally designed to be 4mm to 7mm to meet the requirements; the measuring surface 1-1 has two main functions, the first is to connect the two clamping and extension rod structures, and the second is the measuring surface contacted by the dilatometer. This area is made of a solid stainless steel block to ensure that it will not be deformed due to temperature. The width of the measuring surface 1-1 is the same as that of the extension rod, and the length is generally 40mm to 60mm, ensuring that the dilatometer 6 has sufficient contact surface and appropriate movement range;

[0048] The system layout of the clarification section flange monitoring method is as follows: Figure 1 As shown, based on the original equipment structure, namely the flange terminal block 2, the flange body 3, the platinum body 4, the refractory material 5, the flange hanger 7 and the existing expansion meter 8, the tracking point of the existing expansion meter 8 is cancelled, mainly considering that it is affected by the hanger 7 and cannot be precisely coplanar with the flange in real time;

[0049] The system layout of the present invention is as follows Figure 4 As shown, the side lead-out device 1 is installed on the right side of the flange body 3 and led out horizontally, and the new expansion meter 6 is installed on the same side as the side lead-out device 1, and the detection head of the expansion meter is in contact with the measuring surface 1-1 of the side lead-out device 1. In the actual operation process, as the temperature of each section of the channel increases and expands, the flange will move accordingly, and the measuring point acting on the side flange body 3 will not be tilted due to the displacement of the upper wiring row 2 and the suspension 7. The new expansion meter 6 can monitor the displacement of the flange in real time more accurately and without interference.

[0050] After a new application on a new line, the expansion management method of the present invention was adopted, and the tracking accuracy of each flange section was improved by nearly 76%, and there was basically no jump in the measurement data. It has been verified in practice that the effect of the present invention is significant.

[0051] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0052] In addition, it should be understood that although this specification is described in accordance with the implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art. The above content is only to illustrate the technical idea of ​​the present invention, and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution according to the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.

Claims

1. A monitoring device for thermal expansion of a platinum channel clarification section, characterized in that: The invention comprises a flange side lead-out device (1) and an expansion meter (6), wherein the flange side lead-out device (1) comprises a clamping surface (1-2), a clamping structure, and an extension rod (1-4), two clamping surfaces (1-2) are provided, the two clamping surfaces (1-2) are arranged parallel to each other, a clamping structure is arranged between the two clamping surfaces (1-2), the two clamping surfaces (1-2) are connected to one end of the extension rod (1-4), the distance between the two clamping surfaces (1-2) is the same as the thickness of the flange body (3), and one end of the extension rod (1-4) is connected to the expansion meter (6); A measuring surface (1-1) is provided at the connection between the extension rod (1-4) and the expansion meter (6).

2. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The thickness of the measuring surface (1-1) is the same as the thickness of the flange body (3).

3. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The clamping structure adopts a clamping bolt (1-3), and the clamping bolt (1-3) fixes the distance between the two clamping surfaces (1-2).

4. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The clamping surface (1-2) is configured as a fan-shaped structure.

5. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The length of the extension rod (1-4) is set between 500mm and 800mm.

6. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The clamping surface (1-2) and the extension rod (1-4) are both made of 304 stainless steel.

7. A monitoring device for thermal expansion of a platinum channel clarification section according to claim 1, characterized in that: The thickness of the clamping surface (1-2) and the extension rod (1-4) is set to 4 mm-7 mm.

8. A monitoring method based on the monitoring device for thermal expansion of a platinum channel clarification section according to any one of claims 1 to 7, characterized in that: The monitoring method comprises the following steps: The flange body (3) is clamped by means of a flange side lead-out device (1), wherein the axes of the flange side lead-out device (1) and the flange body (3) are perpendicular to each other; An expansion meter (6) is connected and arranged at a measuring surface (1-1) of the flange side lead-out device (1); The detection head of the expansion meter (6) is arranged on the measuring surface (1-1) to monitor the displacement of the flange.

9. The monitoring method according to claim 8, characterized in that: The clamping depth of the flange side lead-out device (1) on the flange body (3) is 30 mm to 50 mm.