A coil material logistics system in a production workshop and an operation method thereof

By adopting a logistics system combining stacked AGV vehicles and inlet shelves in the workshop, the problems of high cost, low degree of automation and low flow efficiency of the coiled material logistics system in the prior art are solved, and efficient and automated coiled material is achieved circulation.

CN115849253BActive Publication Date: 2025-02-18SHANGHAI DEHUI SUPPLY CHAIN CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202211507009.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-29
Publication Date
2025-02-18
Estimated Expiration
2042-11-29

AI Technical Summary

Technical Problem

The existing workshop coil logistics system has problems such as high cost, low degree of automation, low flow efficiency and high operating costs.

Method used

The logistics system is adopted that combines a stacked AGV truck for coils and a loading shelf for coils. The automatic storage and transportation of coils are achieved through the lifting fork rack and the support rod coil shaft fixing groove, simplifying the flow process of coils. .

Benefits of technology

It improves the flow efficiency of coil materials in the workshop, reduces operating costs, realizes fully mechanized and fully automated logistics operations, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115849253B_ABST
    Figure CN115849253B_ABST
Patent Text Reader

Abstract

The present invention discloses a coil material logistics system in a production workshop and its operation method, the logistics system includes a stacking AGV vehicle for coil materials and a drive-in shelf for coil materials; the AGV vehicle includes a lifting fork frame; the lifting fork frame includes a lifting plate, a transfer rod and a lifting support rod, the lifting plate is connected to the fork frame lifting device, the lifting support rod is fixed to the vertically arranged lifting plate through the transfer rod, and the two lifting support rods are provided with support rod coil material shaft fixing grooves that match each other and are used to fix the coil material shaft; the drive-in shelf includes a plurality of vertically arranged, parallel and spaced grid-shaped support frames, and a fixing frame connecting each support frame is installed on the top of the support frame; the support frame includes a horizontal cross bar and a vertical vertical bar connected to each other, and the cross bar is provided with a shelf coil material shaft fixing groove for fixing the coil material shaft, and the shelf coil material shaft fixing grooves on adjacent support frames match each other. The coil material logistics system of the present invention has low cost, simplified logistics procedures, and high circulation efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of workshop coil material logistics, and in particular to a coil material logistics system and an operating method in a production workshop, which is low in cost, simple in coil material logistics procedure, convenient in coil material circulation and high in circulation efficiency. Background Art

[0002] Mechanization and automation are the development directions of modern factories. Many types of raw materials, including printing raw materials, raw materials for lithium battery / copper foil / power diaphragm production lines, are stored / transported in the form of coils. At present, coils are generally placed on pallets in a vertical state during storage to avoid damage to the surface layer of the coils due to pressure. However, subsequent factory processes generally require the coils to be in a horizontal state. Therefore, the coils need to be unpacked, rolled up, and then stored in a cache in a horizontal manner. When the coils need to be replaced, a piggyback AGV vehicle is generally used (such as a two-stage lifting device and automatic guided transport vehicle disclosed in CN115092857A, a piggyback AGV specially used for horizontal film and paper roll transportation disclosed in CN213011031U, and a suitable for automatic The coil lifting device of the three-dimensional warehouse, the fully automatic coil handling AGV robot disclosed in CN108861514A, and the coil lifting AGV disclosed in CN217458699U are all piggyback AGV vehicles) for transportation. There are also those that directly use clamping forklifts to directly complete the coil rolling and transportation, but the use scenarios of piggyback AGV vehicles are relatively limited, that is, to fully meet the use needs of the factory, it needs to be used in conjunction with other types of AGVs. At the same time, the piggyback AGV vehicle also needs to be used with a special rolling device, which greatly increases the operating cost of the factory and the difficulty of factory scheduling. Although the clamping forklift can directly complete the coil rolling and transportation, it is not only large in size, which affects the layout in the factory, that is, the factory space utilization rate is low, but also requires an operator to drive, and the operating cost is high.

[0003] Therefore, it is of great practical significance to develop a coil material logistics system in a production workshop with a reasonable overall design, simple structure, simplified coil material logistics procedures, convenient mechanical operation and high circulation efficiency. Summary of the invention

[0004] Due to the above-mentioned defects in the prior art, the present invention provides a coil material logistics system and an operation method for a production workshop with low cost, simple coil material logistics procedures, convenient coil material circulation and high circulation efficiency, so as to overcome the defects of complex coil material logistics procedures in the workshop, the need for coordination of multiple devices, low degree of automation, low circulation efficiency and high operating cost.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A production workshop coiled material logistics system, including a stacking AGV vehicle for coiled materials and a drive-in rack for coiled materials;

[0007] The stacking AGV vehicle for coiled materials includes an AGV shell, two legs, and a lifting fork frame;

[0008] The AGV shell is fixedly connected to the two legs. The two legs are parallel to each other and arranged at intervals. Shell wheels are installed on the lower side of the AGV shell, and leg wheels are installed on the lower side of the legs;

[0009] The lifting fork frame is arranged on the side of the AGV shell where the legs are installed. A fork frame lifting device connected to the lifting fork frame and used to drive the lifting fork frame to lift is installed on the AGV shell. The lifting fork frame includes a lifting plate, two transfer rods, and two lifting support rods. The lifting plate is connected to the fork frame lifting device. The arrangement direction of the lifting support rods is parallel to the legs. The lifting support rods are fixedly connected to the vertically arranged lifting plate through the transfer rods. The lifting plate, the two transfer rods, and the two lifting support rods form a U-shaped structure. Matching support rod coiled material shaft fixing grooves for fixing the coiled material shaft are opened on the two lifting support rods;

[0010] The distance between the center position of the support rod coiled material shaft fixing groove and the shell wheel is less than the distance between the center position of the leg wheel and the shell wheel, so as to improve the stability of the AGV vehicle during operation (specifically, to avoid the AGV vehicle from tipping over when the lifting fork frame lifts);

[0011] The drive-in rack for coiled materials includes multiple vertically arranged support frames;

[0012] The multiple support frames are parallel to each other and arranged at intervals. A horizontally arranged fixing frame is installed on the top of the support frame, and the fixing frame is simultaneously fixed to at least two support frames;

[0013] The support frame includes multiple horizontal bars and multiple vertical bars that are perpendicularly connected to each other. The multiple horizontal bars and vertical bars enclose a grid-shaped support frame. The vertical bars are vertically arranged and the horizontal bars are horizontally arranged. Coiled material shaft fixing grooves for fixing the coiled material shaft are provided on the horizontal bars, and the coiled material shaft fixing grooves on adjacent support frames match each other;

[0014] The distance between adjacent support frames is greater than the width of the stacking AGV vehicle for coiled materials and less than the length of the coiled material shaft.

[0015] The in-plant coiled material logistics system of the present invention has a reasonable overall design. It uses a stacking AGV for coiled materials in cooperation with a drive-in rack for coiled materials. The drive-in rack for coiled materials changes the current vertical storage form to a horizontal storage form, eliminating the original operation of turning the coiled materials in the workshop, which can greatly improve the transfer efficiency of coiled materials in the workshop. At the same time, the rack adopts a drive-in design. When the stacking AGV for coiled materials reaches a certain height, it drives into the rack between adjacent support frames. After the coiled material shafts are basically aligned with the coiled material shaft fixing grooves, the height of the coiled materials is lowered so that the coiled material shafts are clamped into the coiled material shaft fixing grooves, completing the storage of the coiled materials (the coiled material feeding and discharging operation process is similar). The operation is simple, and the loading and unloading can be quickly completed. The overall structure of the rack is simple and has good stability (the coiled materials are supported by the support frames on both sides), enabling the full mechanization and full automation of the transfer of coiled materials in the workshop. The structure of the stacking AGV for coiled materials is reasonably designed and relatively simple. The support rod coiled material shaft fixing grooves provided on the lifting fork can effectively fix the coiled material shafts, preventing the coiled material shafts from shaking during operation. At the same time, the support rod coiled material shaft fixing grooves are closer to the outer shell wheels than the leg wheels, which can greatly improve the stability of the AGV during lifting operations. It can be obtained by simply modifying the existing stacking AGV (welding the lifting fork), with low cost, good applicability, and the effect of multi-purpose use, which can reduce the operation cost of the factory and has high overall operation efficiency and good application prospects.

[0016] As a preferred technical solution:

[0017] For the in-plant coiled material logistics system as described above, the coiled material shaft fixing groove on the rack or the support rod coiled material shaft fixing groove is a V-shaped groove, a U-shaped groove, a C-shaped groove, or a trapezoidal groove, and its shape can be selected according to actual needs. Of course, the purpose of the fixing groove design is to fix the round rod-shaped coiled material shaft in the groove to prevent it from shaking.

[0018] For the in-plant coiled material logistics system as described above, the width of the coiled material is less than the distance between the two lifting support rods, and the length of the coiled material shaft is greater than the distance between the two lifting support rods;

[0019] The length of the coiled material shaft is less than M + 2N, where M is the distance between adjacent support frames and N is the length of the coiled material shaft fixing groove on the rack. The length direction of the coiled material shaft fixing groove on the rack is perpendicular to the plane where the support frames are located.

[0020] For the in-plant coiled material logistics system as described above, the distance between the two lifting support rods is greater than the distance between the two legs.

[0021] For the in-plant coiled material logistics system as described above, the grid-shaped support frame is provided with diagonal reinforcing rods arranged in an X shape to enhance the overall structural strength of the support frame;

[0022] The ratio of the distance between the center position of the support rod coil shaft fixing groove and the outer shell wheel and the distance between the center position of the leg wheel and the outer shell wheel is 5 to 8:10. If the ratio is too small, the AGV leg length is too long, which affects the flexibility of the AGV. If the ratio is too large, the stability during the lifting operation is affected, that is, the lifting height is not easy to be too high, and the coil lifting height is limited.

[0023] A plurality of shelf coil shaft fixing grooves are evenly spaced on a cross bar, and the shelf coil shaft fixing grooves are symmetrically arranged on two sides of the cross bar that are perpendicular to the length direction.

[0024] In the above-mentioned coil material logistics system in a production workshop, the upper and lower sides of the cross bar are fixed with vertical bar fixing strips, the vertical bar fixing strips are arranged along the length direction of the cross bar and installed in the middle of the cross bar, the vertical bar fixing strips are provided with vertical bar fixing grooves matching the vertical bars, and the vertical bars can be inserted into the vertical bar fixing grooves to complete the fixation with the cross bar, and the cross bar and the vertical bars can be quickly assembled and disassembled conveniently;

[0025] The shelf coil shaft fixing groove on a horizontal rod is arranged on both sides of the vertical rod fixing strip.

[0026] The coil material logistics system in the production workshop as described above further includes a coil material head and tail buffer library;

[0027] The coil head and tail cache is arranged at the head or tail of the production line in the production workshop, and includes at least one group of cache brackets. A group of cache brackets includes at least two cache rods arranged horizontally, parallel to each other and spaced apart. The cache rods are provided with cache coil shaft fixing grooves for fixing the coil shaft, and the cache coil shaft fixing grooves on all cache rods in the same group of cache brackets match each other.

[0028] In the above-mentioned coil material logistics system in a production workshop, the coil material thread head and thread tail buffer warehouse further comprises a bracket fixing frame fixedly connected to at least one set of buffer brackets, and the buffer brackets are fixed to a wall or the ground through the bracket fixing frame;

[0029] A cache reinforcement rod is also provided under the cache rod, and the cache rod, the cache reinforcement rod and the bracket fixing frame form a triangular structure;

[0030] Some coils use drive-in racks as raw material intensive storage and are arranged in the raw material storage area. Some coils use drive-in racks as multi-layer line-side semi-finished storage and are arranged next to the production line. Another part of the coils use drive-in racks as product intensive storage and are arranged in the product storage area. Each warehouse in the workshop can be reasonably arranged according to the actual situation, which can make full use of the space in the workshop. Due to the horizontal layout, the multi-layer layout can be adopted through the shelf / cache bracket, which can maximize the utilization rate within the effective floor area.

[0031] A coil material logistics system in a production workshop as described above, wherein the coil material logistics system in the production workshop further includes an AGV scheduling system;

[0032] A battery, a drive motor and a controller are installed in the AGV shell, and an AGV control panel and an AGV environmental sensor are also fixed on the AGV shell. The battery supplies power to the fork frame lifting device, the drive motor, the controller, the AGV control panel and the AGV environmental sensor. The AGV environmental sensor, the AGV control panel, the drive motor and the fork frame lifting device are electrically connected to the controller respectively. The drive motor is connected to the outer shell wheel and the outrigger wheel to drive the outer shell wheel and the outrigger wheel to roll.

[0033] The AGV dispatching system is connected to the controllers of all the coil stacking AGVs, and the AGV dispatching system controls the coil stacking AGVs to transport coils in the production workshop according to the production plan of the production workshop. The control logic of the AGV is the same as that of the existing stacking AGVs, that is, its control logic is the existing mature technology.

[0034] The present invention also provides a method for operating the coil material logistics system in a production workshop as described above, comprising the following steps:

[0035] (1) The AGV dispatching system sends an instruction to the stacking AGV vehicle to take out the target coil from the raw material storage and deliver it to the target cache rack;

[0036] (2) The target coil stacking AGV drives into the target position of the raw material intensive storage warehouse so that the support rod coil shaft fixing groove on the coil stacking AGV is aligned with the coil shaft of the target coil;

[0037] (3) The lifting fork is raised so that the coil shaft of the target coil is inserted into the coil shaft fixing groove of the support rod on the coil stacking AGV vehicle and the coil shaft of the target coil is higher than the cross bar of the target coil placement position;

[0038] (4) The stacking AGV vehicle for coil materials is driven out from the target position of the raw material intensive storage warehouse and moved to the coil material head and tail buffer warehouse;

[0039] (5) After the height of the lifting fork frame of the coil stacking AGV is adjusted so that the coil shaft is higher than the target buffer bracket, the position of the coil stacking AGV is adjusted so that the coil shaft of the target coil is aligned with the buffer coil shaft fixing groove on the target buffer bracket;

[0040] (6) The lifting fork frame is lowered so that the coil shaft of the target coil is inserted into the buffer coil shaft fixing groove on the target buffer bracket;

[0041] (7) The AGV dispatching system sends an instruction to the target coil stacking AGV to take the target coil from the target buffer bracket and install it at the coil installation position of the production line. The operation process of the target coil stacking AGV is basically the same as steps (2) to (6), except for the material taking and placing positions.

[0042] (8) The AGV dispatching system sends an instruction to the stacking AGV for the target coil to take the target coil from the coil installation position of the production line and deliver it to the multi-layer line-side semi-finished warehouse. The operation process of the stacking AGV for the target coil is basically the same as steps (2) to (6), except for the material taking and placing positions.

[0043] (9) The AGV dispatching system sends an instruction to the stacking AGV vehicle for the target coil to take the target coil from the multi-layer line-side semi-finished warehouse and send it to the product intensive storage warehouse. The operation process of the stacking AGV vehicle for the target coil is basically the same as steps (2) to (6), except for the material picking and placing positions, that is, completing the circulation of the coil in the production workshop.

[0044] The operation method of the coil material logistics system in the above-mentioned production workshop is reasonably planned. The control logic of the coil material stacking AGV vehicle involved therein is all existing mature technology. The coil material stacking AGV vehicle equipped with sensors can complete the above-mentioned instructions. The coil material can complete fully mechanical and automated circulation in the workshop with high circulation efficiency, which can greatly improve the overall efficiency of the workshop.

[0045] The above technical solution is only a feasible technical solution of the present invention, and the protection scope of the present invention is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.

[0046] The above invention has the following advantages or beneficial effects:

[0047] (1) The coil material logistics system in the production workshop of the present invention has a reasonable overall design, and the use of the coil material stacking AGV vehicle and the coil material drive-in shelf to greatly improve the circulation efficiency of the coil materials in the workshop;

[0048] (2) The coil material logistics system in the production workshop of the present invention changes the current vertical storage form into a horizontal storage form by using the drive-in shelf for coil materials, eliminating the operation of turning over the coil materials in the original workshop. At the same time, the shelf adopts a drive-in design. After the coil material stacking AGV reaches a certain height, it drives into the shelf between adjacent support frames, so that the position of the coil material shaft and the coil material shaft fixing groove is basically aligned. Then, the height of the coil material is lowered so that the coil material shaft is stuck in the coil material shaft fixing groove, and the storage of the coil material is completed (the coil material retrieval operation process is similar to it). The operation is simple and can quickly complete loading and unloading. The overall structure of the shelf is simple and stable (the coil material is supported by the support frames on both sides thereof), which can realize the full mechanization and automation of the circulation of coil materials in the workshop.

[0049] (3) The coil material logistics system in the production workshop of the present invention and the coil material stacking AGV have a reasonable and relatively simple structural design. The support rod coil material shaft fixing groove on the lifting fork frame can effectively fix the coil material shaft to prevent the coil material shaft from shaking during operation. At the same time, the support rod coil material shaft fixing groove is closer to the outer shell wheel than the support leg wheel, which can greatly improve the stability of the AGV during lifting operation. It can be obtained by simply modifying the existing stacking AGV (welding the lifting fork frame). It has low cost and good applicability, can achieve the effect of one machine for multiple uses, thereby reducing the operating cost of the factory and increasing the overall operating efficiency, and has great application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.

[0051] Figure 1 , 2 3 and 4 are respectively the front view, left view and top view of the coil stacking AGV;

[0052] Figure 4 A three-dimensional schematic diagram of a drive-in rack for coil materials;

[0053] Figure 5 It is a partial top view of the shelf (between the two support frames);

[0054] Figure 6 It is a front view of the crossbar of Example 1;

[0055] Figure 7 It is a front view of the crossbar of Example 2;

[0056] Figure 8 This is a schematic diagram of a buffer library for the head and tail of a coil;

[0057] Among them, 1-AGV shell, 2-shell wheel, 3-support leg, 4-support leg wheel, 5-lifting plate, 6-lifting support rod, 7-support rod coil shaft fixing groove, 8-AGV control panel, 9-AGV environmental sensor, 10-adapter rod, 11-support frame, 12-coil, 13-cross bar, 14-vertical bar fixing strip, 15-shelf coil shaft fixing groove, 16-vertical bar, 17-oblique reinforcement rod, 18-coil shaft, 19-fixed frame, 20-cache rod, 21-cache reinforcement rod, 22-bracket fixing frame. DETAILED DESCRIPTION

[0058] The structure of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but is not intended to limit the present invention.

[0059] Example 1

[0060] A coil material logistics system in a production workshop, comprising: Figures 1 to 3 The coil stacking AGV shown in the figure is used Figures 4 to 6 The coils shown are driven into the rack, such as Figure 8 The coil head and tail buffer library and AGV scheduling system shown;

[0061] The stacking AGV for coil materials comprises an AGV housing 1, two legs 3 and a lifting fork frame;

[0062] The AGV housing 1 is fixedly connected to the two legs 3, the two legs 3 are parallel to each other and arranged at a distance, a housing wheel 2 is installed on the lower side of the AGV housing 1, and a leg wheel 4 is installed on the lower side of the leg 3. A battery, a drive motor and a controller are installed in the AGV housing, and an AGV control panel and an AGV environmental sensor are also fixed on the AGV housing. The battery supplies power to the fork lifting device, the drive motor, the controller, the AGV control panel and the AGV environmental sensor. The AGV environmental sensor, the AGV control panel, the drive motor and the fork lifting device are electrically connected to the controller respectively, and the drive motor is connected to the housing wheel and the leg wheel to drive the housing wheel and the leg wheel to roll;

[0063] The lifting fork frame is arranged on the side where the legs of the AGV shell are installed. A fork frame lifting device connected to the lifting fork frame and used to drive the lifting fork frame to lift is installed on the AGV shell 1. The lifting fork frame includes a lifting plate 5, two transfer rods 10 and two lifting support rods 6. The lifting plate 5 is connected to the fork frame lifting device. The arrangement direction of the lifting support rods 6 is parallel to the legs 3. The lifting support rods 6 are fixedly connected to the vertically arranged lifting plate 5 through the transfer rods 10. The lifting plate 5, the two transfer rods 10 and the two lifting support rods 6 are connected to form a U-shaped structure. The two lifting support rods 6 are provided with support rod coil shaft fixing grooves 7 (U-shaped grooves) that match each other and are used to fix the coil shaft. The width of the coil 12 is less than the spacing between the two lifting support rods 6 and the length of the coil shaft 18 is greater than the spacing between the two lifting support rods 6. The spacing between the two lifting support rods 6 is greater than the spacing between the two legs 3.

[0064] The ratio of the distance between the center position of the support rod coil shaft fixing groove 7 and the outer shell wheel 2 and the distance between the center position of the leg wheel 4 and the outer shell wheel 2 is 5 to 8:10;

[0065] The drive-in rack for coils includes a plurality of vertically arranged support frames 11;

[0066] The multiple support frames 11 are parallel to each other and arranged at intervals. A horizontally arranged fixing frame 19 is installed on the top of the support frame 11, and the fixing frame 19 is fixed to at least two support frames 11 at the same time.

[0067] The support frame 11 includes a plurality of cross bars 13 and a plurality of vertical bars 16 connected vertically to each other, and the plurality of cross bars 13 and the vertical bars 16 form a grid-like support frame 11, the vertical bars 16 are arranged vertically and the cross bars 13 are arranged horizontally, and the cross bars 13 are provided with shelf coil shaft fixing grooves 15 (such as Figure 6 The U-shaped groove shown in the figure) and the shelf coil shaft fixing grooves 15 on adjacent support frames 11 match each other, the length of the coil 18 is less than M+2N, M is the spacing between adjacent support frames 11, N is the length of the shelf coil shaft fixing groove 15, the length direction of the shelf coil shaft fixing groove 15 is perpendicular to the plane where the support frame 11 is located, and the grid-shaped support frame is provided with an oblique reinforcing rod 17 arranged in an X shape, and the upper and lower sides of the cross bar 13 are fixed with vertical rod fixing strips 14, the vertical rod fixing strips 14 are arranged along the length direction of the cross bar 13 and installed in the middle of the cross bar 13, the vertical rod fixing strips 14 are opened with vertical rod fixing grooves matching the vertical rod 16, and a plurality of shelf coil shaft fixing grooves 15 are evenly spaced on a cross bar 13, and the shelf coil shaft fixing grooves 15 are symmetrically arranged on both sides of the cross bar 13 perpendicular to the length direction;

[0068] The spacing between adjacent support frames 11 is greater than the width of the coil stacking AGV and the spacing between adjacent support frames 11 is less than the length of the coil shaft 18;

[0069] The coiled material head and tail buffer is arranged at the head or tail of the production line in the production workshop, and includes a plurality of buffer brackets arranged up and down and a bracket fixing frame 22 fixed to the plurality of buffer brackets. The buffer brackets are fixed to the wall or the ground through the bracket fixing frame 22.

[0070] A group of buffer brackets includes at least two buffer rods 20 arranged horizontally, parallel to each other and spaced apart. The buffer rods 20 are provided with buffer coil shaft fixing grooves for fixing the coil shaft, and the buffer coil shaft fixing grooves on all buffer rods 20 in the same group of buffer brackets match each other. A buffer reinforcing rod 21 is also provided under the buffer rod 20. The buffer rod 20, the buffer reinforcing rod 21 and the bracket fixing frame 22 form a triangular structure.

[0071] A portion of the coils use drive-in racks as a raw material intensive storage warehouse, which is arranged in the raw material storage area; a portion of the coils use drive-in racks as a multi-layer line-side semi-finished warehouse, which is arranged next to the production line; and a portion of the coils use drive-in racks as a product intensive storage warehouse, which is arranged in the product storage area;

[0072] The AGV dispatching system is connected to the controllers of all the coil stacking AGVs. The AGV dispatching system controls the coil stacking AGVs to transport coils in the production workshop according to the production plan of the production workshop.

[0073] The method for operating the coil material logistics system in the above production workshop comprises the following steps:

[0074] (1) The AGV dispatching system sends an instruction to the stacking AGV vehicle to take out the target coil from the raw material storage and deliver it to the target cache rack;

[0075] (2) The target coil stacking AGV drives into the target position of the raw material intensive storage warehouse so that the support rod coil shaft fixing groove on the coil stacking AGV is aligned with the coil shaft of the target coil;

[0076] (3) The lifting fork is raised so that the coil shaft of the target coil is inserted into the coil shaft fixing groove of the support rod on the coil stacking AGV vehicle and the coil shaft of the target coil is higher than the cross bar of the target coil placement position;

[0077] (4) The stacking AGV vehicle for coil materials is driven out from the target position of the raw material intensive storage warehouse and moved to the coil material head and tail buffer warehouse;

[0078] (5) After the height of the lifting fork frame of the coil stacking AGV is adjusted so that the coil shaft is higher than the target buffer bracket, the position of the coil stacking AGV is adjusted so that the coil shaft of the target coil is aligned with the buffer coil shaft fixing groove on the target buffer bracket;

[0079] (6) The lifting fork frame is lowered so that the coil shaft of the target coil is inserted into the buffer coil shaft fixing groove on the target buffer bracket;

[0080] (7) The AGV dispatching system sends an instruction to the target coil stacking AGV to take the target coil from the target buffer bracket and install it at the coil installation position of the production line. The operation process of the target coil stacking AGV is basically the same as steps (2) to (6), except for the material taking and placing positions.

[0081] (8) The AGV dispatching system sends an instruction to the stacking AGV for the target coil to take the target coil from the coil installation position of the production line and deliver it to the multi-layer line-side semi-finished warehouse. The operation process of the stacking AGV for the target coil is basically the same as steps (2) to (6), except for the material taking and placing positions.

[0082] (9) The AGV dispatching system sends an instruction to the stacking AGV vehicle for the target coil to take the target coil from the multi-layer line-side semi-finished warehouse and send it to the product intensive storage warehouse. The operation process of the stacking AGV vehicle for the target coil is basically the same as steps (2) to (6), except for the material picking and placing positions, that is, completing the circulation of the coil in the production workshop.

[0083] Example 2

[0084] A coil material logistics system in a production workshop, which is basically the same as Example 1, except that the shelf coil material shaft fixing groove and the support rod coil material shaft fixing groove are as follows Figure 7 V-groove shown.

[0085] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.

[0086] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.

Claims

1. A coil material logistics system in a production workshop, characterized by: It includes a stacking AGV vehicle for coil materials, a drive-in rack for coil materials, and a head and tail buffer library for coil materials; The stacking AGV vehicle for coil materials includes an AGV housing, two legs, and a lifting fork frame; The AGV housing is fixedly connected to the two legs. The two legs are parallel to each other and arranged at intervals. Shell wheels are installed on the lower side of the AGV housing, and leg wheels are installed on the lower side of the legs; The lifting fork frame is arranged on the side where the legs of the AGV housing are installed. A fork frame lifting device connected to the lifting fork frame and used to drive the lifting of the lifting fork frame is installed on the AGV housing. The lifting fork frame includes a lifting plate, two transfer rods, and two lifting support rods. The lifting plate is connected to the fork frame lifting device. The arrangement direction of the lifting support rods is parallel to the legs. The lifting support rods are fixedly connected to the vertically arranged lifting plate through the transfer rods. The lifting plate, the two transfer rods, and the two lifting support rods form a C-shaped structure. Support rod coil shaft fixing grooves that are mutually matched and used to fix the coil shaft are formed on the two lifting support rods; The distance between the center position of the support rod coil shaft fixing groove and the shell wheel is less than the distance between the center position of the leg wheel and the shell wheel; The drive-in rack for coil materials includes multiple vertically arranged support frames; The multiple support frames are parallel to each other and arranged at intervals. A horizontally arranged fixed frame is installed at the top of the support frame, and the fixed frame is fixedly connected to at least two support frames at the same time; The support frame includes multiple horizontal bars and multiple vertical bars that are perpendicularly connected to each other. The multiple horizontal bars and vertical bars enclose a grid-shaped support frame. The vertical bars are vertically arranged and the horizontal bars are horizontally arranged. Shelf coil shaft fixing grooves used to fix the coil shaft are provided on the horizontal bars, and the shelf coil shaft fixing grooves on adjacent support frames are mutually matched; The distance between adjacent support frames is greater than the width of the stacking AGV vehicle for coil materials and less than the length of the coil shaft; The head and tail buffer library for coil materials is arranged at the head or tail of the production line in the production workshop. It includes at least one group of buffer brackets. One group of buffer brackets includes at least two buffer rods that are horizontally arranged, parallel to each other, and arranged at intervals. Buffer coil shaft fixing grooves used to fix the coil shaft are formed on the buffer rods, and the buffer coil shaft fixing grooves on all buffer rods in the same group of buffer brackets are mutually matched; The head and tail buffer library for coil materials also includes a bracket fixing frame fixedly connected to at least one group of buffer brackets. The buffer brackets are fixed to the wall or the ground through the bracket fixing frame; A buffer strengthening rod is also provided under the buffer rod. The buffer rod, the buffer strengthening rod, and the bracket fixing frame form a triangular structure; Part of the drive-in rack for coil materials is used as a raw material intensive storage library and is arranged in the raw material storage area. Part of the drive-in rack for coil materials is used as a multi-layer in-line semi-finished product library and is arranged beside the production line. Another part of the drive-in rack for coil materials is used as a product intensive storage library and is arranged in the product storage area.

2. A coil material logistics system in a production workshop according to claim 1, characterized in that: The shelf coil shaft fixing groove or the support rod coil shaft fixing groove is a V-shaped groove, a U-shaped groove, a C-shaped groove, or a trapezoidal groove.

3. A coil material logistics system in a production workshop according to claim 1, characterized in that: The width of the coil material is less than the distance between the two lifting support rods, and the length of the coil shaft is greater than the distance between the two lifting support rods; The length of the coil shaft is less than M+2N, where M is the spacing between adjacent support frames, and N is the length of the shelf coil shaft fixing groove, and the length direction of the shelf coil shaft fixing groove is perpendicular to the plane where the support frame is located.

4. A coil material logistics system in a production workshop according to claim 3, characterized in that: The distance between the two lifting support rods is greater than the distance between the two legs.

5. The coil material logistics system in a production workshop according to claim 1, characterized in that: The grid-like support frame is provided with oblique reinforcing rods arranged in an X shape; The ratio of the distance between the center position of the supporting rod coil shaft fixing groove and the outer shell wheel and the distance between the center position of the supporting leg wheel and the outer shell wheel is 5 to 8:10; A plurality of shelf coil shaft fixing grooves are evenly spaced on a cross bar, and the shelf coil shaft fixing grooves are symmetrically arranged on two sides of the cross bar that are perpendicular to the length direction.

6. A coil material logistics system in a production workshop according to claim 5, characterized in that: The upper and lower sides of the crossbar are fixed with vertical bar fixing strips, the vertical bar fixing strips are arranged along the length direction of the crossbar and installed in the middle of the crossbar, and the vertical bar fixing strips are provided with vertical bar fixing grooves matching the vertical bars; The shelf coil shaft fixing groove on a horizontal rod is arranged on both sides of the vertical rod fixing strip.

7. A coil material logistics system in a production workshop according to claim 1, characterized in that: The coil material logistics system in the production workshop also includes an AGV scheduling system; A battery, a drive motor and a controller are installed in the AGV shell, and an AGV control panel and an AGV environmental sensor are also fixed on the AGV shell. The battery supplies power to the fork frame lifting device, the drive motor, the controller, the AGV control panel and the AGV environmental sensor. The AGV environmental sensor, the AGV control panel, the drive motor and the fork frame lifting device are electrically connected to the controller respectively. The drive motor is connected to the outer shell wheel and the outrigger wheel to drive the outer shell wheel and the outrigger wheel to roll. The AGV scheduling system is in communication connection with the controllers of all the coil stacking AGV vehicles, and the AGV scheduling system controls the coil stacking AGV vehicles to transport coils in the production workshop according to the production plan of the production workshop.

8. A method for operating a coil material logistics system in a production workshop according to any one of claims 1 to 7, characterized in that: The following steps are involved: (1) The AGV dispatching system sends an instruction to the stacking AGV vehicle to take out the target coil from the raw material storage and deliver it to the target cache rack; (2) The target coil stacking AGV drives into the target position of the raw material intensive storage warehouse so that the support rod coil shaft fixing groove on the coil stacking AGV is aligned with the coil shaft of the target coil; (3) The lifting fork is raised so that the coil shaft of the target coil is inserted into the coil shaft fixing groove of the support rod on the coil stacking AGV vehicle and the coil shaft of the target coil is higher than the cross bar of the target coil placement position; (4) The stacking AGV vehicle for coil materials is driven out from the target position of the raw material intensive storage warehouse and moved to the coil material head and tail buffer warehouse; (5) After the height of the lifting fork frame of the coil stacking AGV is adjusted so that the coil shaft is higher than the target buffer bracket, the position of the coil stacking AGV is adjusted so that the coil shaft of the target coil is aligned with the buffer coil shaft fixing groove on the target buffer bracket; (6) The lifting fork frame is lowered so that the coil shaft of the target coil is inserted into the buffer coil shaft fixing groove on the target buffer bracket; (7) The AGV dispatching system sends an instruction to the target coil stacking AGV to take the target coil from the target buffer bracket and install it at the coil installation position of the production line. The operation process of the target coil stacking AGV is basically the same as steps (2) to (6), except for the material taking and placing positions. (8) The AGV dispatching system sends an instruction to the stacking AGV for the target coil to take the target coil from the coil installation position of the production line and deliver it to the multi-layer line-side semi-finished warehouse. The operation process of the stacking AGV for the target coil is basically the same as steps (2) to (6), except for the material taking and placing positions. (9) The AGV dispatching system sends an instruction to the stacking AGV vehicle for the target coil to take the target coil from the multi-layer line-side semi-finished warehouse and send it to the product intensive storage warehouse. The operation process of the stacking AGV vehicle for the target coil is basically the same as steps (2) to (6), except for the material picking and placing positions, that is, completing the circulation of the coil in the production workshop.

Citation Information

Patent Citations

  • Full-automatic winding and carrying AGV robot and control method thereof

    CN108861514A

  • Two-stage lifting device and automated guided vehicle

    CN115092857A

  • Coil stock hoisting device suitable for automatic three -dimensional storehouse

    CN207861133U

  • Piggyback AGV special for transverse film and paper roll transportation

    CN213011031U

  • Coil material lifting AGV (Automatic Guided Vehicle)

    CN217458699U