Method, system and device for lowering steel casing based on verticality of deep foundation pit back pressure soil
By determining the lowering positioning points based on geological data during the construction of deep foundation pits and using angle sensors to adjust the verticality of the steel casing, the problem of insufficient verticality accuracy of the steel casing was solved and the safety of the deep foundation pit was ensured.
Patent Information
- Application Number
- CN202211624819.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-12-16
AI Technical Summary
During the construction of deep foundation pits, the vertical accuracy of the steel casing in the back-pressure soil layer cannot meet the requirements, which affects the safety of the deep foundation pit.
After the steel casing is positioned, several lowering positioning points are determined based on pre-obtained geological data, and angle sensors are set up at these points to detect and adjust the vertical deviation of the steel casing in real time to ensure that it is lowered to the target positioning point. The method includes setting a number of lowering positioning points on the steel casing, setting angle sensors at each point in turn, detecting deviations and making adjustments until the lowering is completed.
The verticality of the steel casing is accurately lowered, ensuring the accuracy of the counter-pressure soil layer in the deep foundation pit, thereby ensuring the safety of the deep foundation pit.
Smart Images

Figure CN116145670B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of building construction technology, and in particular to a method, system and device for lowering a steel casing based on the verticality of a back pressure soil in a deep foundation pit. Background Art
[0002] With the development of urbanization, in the complex environment of urban renewal, deep foundation pit support often reserves a back pressure soil layer for deep foundation pit construction in consideration of the impact on the protection of surrounding subways or pipelines, so as to reduce the impact on the safety of surrounding key structures during excavation. Steel casings will be set in the back pressure soil layer to support the back pressure soil layer. However, in the process of lowering the steel casing in the back pressure soil layer, the vertical accuracy of the steel casing often fails to meet the requirements.
[0003] Therefore the prior art still needs to be improved and enhanced. Summary of the invention
[0004] The technical problem to be solved by the present application is to provide a method, system and device for lowering the steel casing based on the verticality of the back pressure soil of a deep foundation pit in view of the deficiencies in the prior art.
[0005] In order to solve the above technical problems, the first aspect of the embodiment of the present application provides a method for lowering a steel casing based on the verticality of a deep foundation pit counter-pressure soil, the method comprising:
[0006] After the steel casing is positioned, a number of lowering positioning points of the steel casing are determined according to the geological data acquired in advance;
[0007] The first lowering positioning point in the lowering sequence is used as the target lowering positioning point, and an angle sensor is set at the target lowering positioning point;
[0008] The verticality deviation of the steel casing is obtained by the angle sensor, and the steel casing is adjusted based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point;
[0009] The angle sensor of the target lowering positioning point is removed, and the lowering positioning point located second in the lowering sequence is used as the target lowering positioning point;
[0010] Repeat the steps of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is used as the target lowering positioning point to complete the lowering of the steel casing.
[0011] The method for lowering the verticality of the steel casing based on the back pressure soil of the deep foundation pit, wherein the angle sensor is a suction-type attitude angle sensor, so that the angle sensor and the steel casing can be detachably connected.
[0012] The method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil, wherein after the steel casing is positioned, determining several lowering positioning points of the steel casing according to the geological data acquired in advance specifically includes:
[0013] After the steel casing is positioned, a safety evaluation finite element analysis model for the deep foundation pit back pressure soil layer is constructed based on the preset geological data;
[0014] Based on the safety evaluation finite element analysis model, a plurality of lowering positioning points of the steel casing are determined, wherein the plurality of lowering positioning points are arranged at intervals along the lowering direction of the steel casing.
[0015] The method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil, wherein the several lowering positioning points of the steel casing determined based on the safety evaluation finite element analysis model specifically include:
[0016] Determining a maximum disturbance degree deformation control value based on the safety evaluation finite element analysis model;
[0017] Based on the maximum disturbance degree deformation control value, the lowering positioning spacing corresponding to the steel casing is determined, and based on the lowering positioning spacing and the length of the steel casing, a plurality of lowering positioning points of the steel casing are determined.
[0018] The method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil, wherein the step of adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point specifically includes:
[0019] Detecting whether the verticality deviation reaches a preset deviation threshold;
[0020] When the verticality deviation reaches a preset deviation threshold, stopping lowering the steel casing;
[0021] Adjusting the verticality of the steel casing, and re-measuring the target verticality deviation of the adjusted steel casing;
[0022] When the target verticality deviation is less than the predicted deviation threshold, the steel casing is continued to be lowered so that the steel casing is lowered to the target lowering positioning point.
[0023] The method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil, wherein the adjusting the verticality of the steel casing specifically includes:
[0024] Determine x-direction and y-direction offsets based on the perpendicularity deviation;
[0025] The adjustment direction of the steel casing is determined according to the offsets in the x-direction and the y-direction, and the steel casing is adjusted along the adjustment direction.
[0026] The method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil, wherein a balancing pressure plate is provided at the top of the steel casing; the adjustment of the steel casing is specifically as follows:
[0027] The steel casing is adjusted by a press connected by the balanced pressure plate.
[0028] A second aspect of the embodiment of the present application provides a lowering system based on the verticality of a deep foundation pit back pressure soil steel casing, the system comprising:
[0029] A determination module is used to determine a number of lowering and positioning points of the steel casing according to pre-acquired geological data after the steel casing is positioned;
[0030] A setting module is used to set the first lowering positioning point according to the lowering sequence as the target lowering positioning point, and to set an angle sensor at the target lowering positioning point;
[0031] An adjustment module, used for obtaining the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point;
[0032] A disassembly module is used to disassemble the angle sensor of the target lowering positioning point, and use the lowering positioning point located second in the lowering sequence as the target lowering positioning point;
[0033] The control module is used to repeatedly execute the steps of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is used as the target lowering positioning point to complete the lowering of the steel casing.
[0034] A third aspect of an embodiment of the present application provides a computer-readable storage medium, which stores one or more programs, and the one or more programs can be executed by one or more processors to implement any of the steps in the method for lowering the verticality of the deep foundation pit back pressure soil steel casing as described above.
[0035] A fourth aspect of the embodiments of the present application provides a terminal device, comprising: a processor, a memory, and a communication bus; the memory stores a computer-readable program that can be executed by the processor;
[0036] The communication bus realizes the connection and communication between the processor and the memory;
[0037] When the processor executes the computer-readable program, the steps in any of the above-described methods for lowering the steel casing based on the verticality of the back pressure soil of a deep foundation pit are implemented.
[0038] Beneficial effect: Compared with the prior art, the present application provides a method, system and device for lowering a steel casing based on the verticality of back-pressure soil in a deep foundation pit. The method includes determining several lowering positioning points of the steel casing according to geological data after the steel casing is positioned; setting an angle sensor at the first lowering positioning point according to the lowering sequence of the steel casing, and using the first lowering positioning point as the target lowering positioning point; acquiring the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point; removing the angle sensor at the target lowering positioning point, setting an angle sensor at the second lowering positioning point according to the lowering sequence of the steel casing, and using the second lowering positioning point as the target lowering positioning point; and re-executing the step of collecting the posture deviation of the steel casing through the angle sensor until the lowering of the steel casing is completed at the last lowering positioning point according to the lowering sequence of the steel casing. The present application sets a number of lowering positioning points on the steel casing, and then sets angle sensors at the lowering positioning points. The angle sensors are used to obtain the verticality deviation of the steel casing, and the steel casing is adjusted based on the verticality deviation. This ensures the accurate verticality of the steel casing, and further ensures the disturbance accuracy of the steel casing on the back pressure soil of the deep foundation pit, thereby ensuring the safety of the deep foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without inventive work.
[0040] Figure 1 A flow chart of a method for lowering a deep foundation pit back pressure soil steel casing based on verticality provided in this application.
[0041] Figure 2 Schematic diagram of steel casing.
[0042] Figure 3 The structural principle diagram of the lowering system based on the verticality of the deep foundation pit back pressure soil steel casing provided for this application.
[0043] Figure 4 This is a schematic diagram of the structure of the terminal device provided in this application. DETAILED DESCRIPTION
[0044] The present application provides a method, system and device for lowering a steel casing based on the verticality of a deep foundation pit counter-pressure soil. In order to make the purpose, technical solution and effect of the present application clearer and more specific, the present application is further described in detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0045] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.
[0046] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.
[0047] It should be understood that the sequence numbers and sizes of the steps in this embodiment do not mean the order of execution. The execution order of each process is determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present application.
[0048] After research, it was found that with the development of urbanization, in the current complex environment of urban renewal, deep foundation pit support often considers the impact on the protection of surrounding subways or pipelines. The deep foundation pit construction usually reserves a back pressure soil layer to reduce the impact on the safety of surrounding key structures during the excavation process. Steel casings will be set in the back pressure soil layer to support the back pressure soil layer. However, in the process of lowering the steel casing in the back pressure soil layer, the vertical accuracy of the steel casing often fails to meet the requirements.
[0049] In order to solve the above problems, in an embodiment of the present application, after the steel casing is positioned, several lowering positioning points of the steel casing are determined according to geological data; an angle sensor is set at the first lowering positioning point according to the lowering order of the steel casing, and the first lowering positioning point is used as the target lowering positioning point; the verticality deviation of the steel casing is obtained by the angle sensor, and the steel casing is adjusted based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point; the angle sensor of the target lowering positioning point is removed, and an angle sensor is set at the second lowering positioning point according to the lowering order of the steel casing, and the second lowering positioning point is used as the target lowering positioning point; the step of collecting the posture deviation of the steel casing by the angle sensor is re-executed until the lowering of the steel casing is completed at the last lowering positioning point according to the lowering order of the steel casing. The present application sets a number of lowering positioning points on the steel casing, and then sets angle sensors at the lowering positioning points. The angle sensors are used to obtain the verticality deviation of the steel casing, and the steel casing is adjusted based on the verticality deviation. This ensures the accurate verticality of the steel casing, and further ensures the disturbance accuracy of the steel casing on the back pressure soil of the deep foundation pit, thereby ensuring the safety of the deep foundation pit.
[0050] The application content is further explained below through the description of embodiments in conjunction with the accompanying drawings.
[0051] This embodiment provides a method for lowering the steel casing based on the verticality of the deep foundation pit back pressure soil. Figure 1 As shown, the method includes:
[0052] S10, after the steel casing is positioned, determining a number of lowering positioning points of the steel casing according to the geological data acquired in advance;
[0053] S20, taking the first lowering positioning point according to the lowering sequence as the target lowering positioning point, and setting an angle sensor at the target lowering positioning point;
[0054] S30, obtaining the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point;
[0055] S40, disassembling the angle sensor of the target lowering positioning point, and taking the lowering positioning point located second in the lowering sequence as the target lowering positioning point;
[0056] S50, repeating the step of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is used as the target lowering positioning point, so as to complete the lowering of the steel casing.
[0057] This embodiment sets a number of lowering positioning points on the steel casing, and then sets an angle sensor at each of the lowering positioning points in turn. When the angle sensor is set at the lowering positioning point, the angle sensor is used to detect the verticality deviation of the steel casing in the process of lowering it to the lowering positioning point, and then the steel casing is adjusted based on the verticality deviation. In this way, the verticality of the steel casing is accurately lowered, and the verticality deviation exceeds the maximum allowable interference degree of the steel casing on the counter-pressure soil layer, thereby ensuring the interference accuracy of the steel casing on the counter-pressure soil of the deep foundation pit and ensuring the safety of the deep foundation pit.
[0058] Specifically, in step S10, the geological data is the data of the back pressure soil layer acquired in advance, wherein the geological data includes soil layer density, elastic modulus of each soil layer, Poisson's coefficient, friction angle and cohesion, etc. In practical applications, the geological data can be obtained by reading a geological survey report. The distance between each two adjacent lowering positioning points among a plurality of lowering positioning points is equal, and they are arranged on the steel casing in sequence according to the lowering sequence of the steel casing, wherein the distance between the lowering positioning point located first in the lowering sequence and the lowering end of the steel casing is equal to the distance between the two adjacent lowering positioning points, such as Figure 2 As shown, a plurality of lowering positioning points 20 are provided on the steel casing 10, and the plurality of lowering positioning points 20 are arranged at equal distances.
[0059] In one implementation, after the steel casing is positioned, determining a number of lowering positioning points of the steel casing according to pre-acquired geological data specifically includes:
[0060] S11. After the steel casing is positioned, a safety evaluation finite element analysis model of the deep foundation pit back pressure soil layer is constructed according to the preset geological data;
[0061] S12. Determine several lowering positioning points of the steel casing based on the safety evaluation finite element analysis model.
[0062] Specifically, the plurality of lowering positioning points are arranged at intervals along the lowering direction of the steel casing, and the distance between two adjacent lowering positioning points is equal. The safety evaluation finite element analysis model is constructed based on geological data and is used to determine the deformation control value of the deep foundation pit back pressure soil. In other words, the maximum disturbance deformation control value that the deep foundation pit back pressure soil can withstand is analyzed based on the safety evaluation finite element analysis model. Among them, the safety evaluation finite element analysis model is constructed using the existing finite element analysis model construction method, which will not be described in detail here.
[0063] In one implementation, the step of determining the plurality of lowering positioning points of the steel casing based on the safety evaluation finite element analysis model specifically includes:
[0064] S121, determining a maximum disturbance degree deformation control value based on the safety evaluation finite element analysis model;
[0065] S122. Based on the maximum disturbance degree deformation control value, determine the lowering positioning spacing corresponding to the steel casing, and based on the lowering positioning spacing and the length of the steel casing, determine a plurality of lowering positioning points of the steel casing.
[0066] Specifically, the maximum disturbance degree deformation control value is the maximum disturbance value that the deep foundation pit counter-pressure soil can accept, wherein the maximum disturbance degree deformation control value can be obtained by simulating the lowering working condition of the preset number of pressures of the safety evaluation finite element analysis model, and each pressure in the preset number of pressures is different. In other words, the lowering working condition of the steel casing under different pressures can be simulated by finite element simulation to obtain the disturbance degree deformation control value under different pressures, and then the maximum disturbance degree deformation control value of the deep foundation pit counter-pressure soil is selected from the obtained disturbance degree deformation control values, and then the lowering positioning spacing of the segmented lowering is determined based on the maximum disturbance degree deformation control value. Among them, the lowering positioning spacing can be the maximum spacing that satisfies the maximum disturbance degree deformation control value, that is, when the segmented lowering is performed according to the lowering positioning spacing, the deformation caused by the steel casing to the deep foundation pit counter-pressure soil is the maximum deformation that the deep foundation pit counter-pressure soil can withstand. For example, the lowering positioning spacing is 200m, etc.
[0067] In addition, after obtaining the maximum disturbance degree deformation control value, the lowering positioning spacing can be determined based on the maximum disturbance degree deformation control value by setting the initial lowering positioning spacing, and then determining the lowering positioning spacing that satisfies the maximum disturbance degree deformation control value by iteration. Of course, in practical applications, other existing methods can also be used, such as the example verification method, etc., which will not be described one by one here.
[0068] In step S20, the order of lowering refers to the order in which the steel casing is lowered into the deep foundation pit counter-pressure soil layer, wherein, since after the steel casing is positioned, one end of the steel casing is in contact with the deep foundation pit counter-pressure soil layer, and the other end is away from the deep foundation pit counter-pressure soil layer, the order of lowering refers to the order from the end in contact with the deep foundation pit counter-pressure soil layer to the end away from the foundation pit counter-pressure soil layer. The first lowering positioning point refers to the closest lowering positioning point to the end in contact with the deep foundation pit counter-pressure soil layer, wherein the surface of the first lowering positioning point is pre-processed, and the angle sensor can be set at the lowering positioning point through the pre-processing. In addition, each of the plurality of lowering positioning points will be pre-processed, and each lowering positioning point can be pre-processed before the angle sensor is set, or after determining the plurality of lowering positioning points, each lowering positioning point can be pre-processed synchronously, and then when the angle sensor needs to be set, the angle sensor can be directly set.
[0069] Furthermore, the angle sensor is a suction-type attitude angle sensor, through which the attitude information of the steel casing can be obtained, wherein the attitude information includes the attitude angles in the x-direction, the y-direction and the z-direction. In other words, the angle sensor is a three-axis attitude angle sensor, and the three-axis attitude angle sensor is a portable suction-type attitude angle sensor, so that after the steel casing is lowered to each lowering positioning point, the angle sensor can be easily removed, which can avoid the influence of the angle sensor on the back soil layer of the deep foundation pit on the one hand, and on the other hand, the angle sensor can be reused, so that a large number of angle sensors do not need to be placed on the construction site.
[0070] In step S30, the angle sensor is connected to the external host, and the collected posture information of the steel casing is transmitted to the external host, so as to obtain the posture information of the steel casing in real time during the lowering process, and determine the real-time vertical deviation of the steel casing based on the real-time posture information and the initial posture information of the steel casing. For example, the initial posture information of the steel casing is ,in, Indicates the angular deviation increment in the X direction at the initial moment, Indicates the angular deviation increment in the Y direction, Indicates the angular deviation increment in the Z direction, is 90°, is 0°, is 180°, the angle sensor Attitude information collected at all times , Indicates time The angular deviation increment, the vertical deviation can be expressed as:
[0071]
[0072] in, Indicates the time frequency of the release.
[0073] In one implementation, adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point specifically includes:
[0074] S31, detecting whether the verticality deviation reaches a preset deviation threshold;
[0075] S32, when the verticality deviation reaches a preset deviation threshold, stopping lowering the steel casing;
[0076] S33, adjusting the verticality of the steel casing, and re-measuring the target verticality deviation of the adjusted steel casing;
[0077] S34. When the target verticality deviation is less than the predicted deviation threshold, continue to lower the steel casing so that the steel casing is lowered to the target lowering positioning point.
[0078] Specifically, the preset deviation threshold is pre-set as a basis for measuring whether the steel casing needs to be adjusted. The preset deviation threshold can be expressed as:
[0079]
[0080] in, for The maximum rotation angle value of the three axes at the moment, Indicates the time frequency of the release.
[0081] After obtaining the verticality deviation, the verticality deviation is compared with the preset deviation threshold. and ,when > ,or, < It indicates that the steel casing needs to be adjusted.
[0082] In addition, the lowering of the steel casing will be stopped and the verticality of the steel casing will be adjusted. During the adjustment process, the target verticality deviation of the adjusted steel casing will be remeasured so that the adjusted target verticality deviation is less than the predicted deviation threshold. The target verticality deviation of the remeasured and adjusted steel casing can be positioned by laying out the line using a total station.
[0083] In one implementation, adjusting the verticality of the steel casing specifically includes:
[0084] Determine x-direction and y-direction offsets based on the perpendicularity deviation;
[0085] The adjustment direction of the steel casing is determined according to the offsets in the x-direction and the y-direction, and the steel casing is adjusted along the adjustment direction.
[0086] Specifically, since the verticality deviation is caused by the steel casing being tilted in the x direction or in the y direction, when adjusting the verticality of the steel casing, the offset in the x direction and the y direction can be determined based on the verticality deviation, and then the steel casing is adjusted in the x direction and / or the y direction so that the adjusted target verticality deviation is less than the predicted deviation threshold. Among them, the adjustment of the steel casing in the x direction and / or the y direction can be adjusted in the direction opposite to the offset according to the offset in the x direction and the y direction, that is, the verticality deviation is a verticality deviation with a direction, and the deviation direction of the steel casing can be determined based on the verticality deviation, and then adjusted in the opposite direction.
[0087] In one implementation, a balance pressure plate 30 is provided at the top of the steel casing; the adjustment of the steel casing is specifically: adjusting the steel casing through a press connected to the balance pressure plate 30. It can be understood that an adjustable balance pressure plate is fixedly installed at one end of the steel casing away from the back pressure soil of the deep foundation pit, and the balance pressure plate is connected to the press machine to mechanically press the steel casing, wherein an adjustable balance pressure plate is provided inside the adjustable balance pressure plate, and the adjustment of the steel casing is achieved by rotating the adjustable device, so that when the steel casing has a correction deviation direction, the correction deviation adjustment is achieved during the sinking process of the steel casing, and the verticality of the steel casing is ensured.
[0088] In step S40, after the steel casing is lowered to the target lowering positioning point, the angle sensor of the target lowering positioning point is removed, and it is detected whether the target lowering positioning point is the last lowering positioning point. If it is the last lowering positioning point, the lowering of the steel casing is completed; if it is not the last lowering positioning point, the next lowering positioning point of the target lowering positioning point is used as the target lowering positioning point, that is, when the target lowering positioning point is the first lowering positioning point, the second lowering positioning point is used as the target lowering positioning point.
[0089] In step S50, the steps of setting an angle sensor at the target lowering positioning point, collecting the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point are repeated until the target lowering positioning point is the final lowering positioning point.
[0090] In summary, the present embodiment provides a method for lowering a steel casing based on the verticality of back-pressure soil in a deep foundation pit, the method comprising: after positioning the steel casing, determining a number of lowering positioning points of the steel casing according to geological data; setting an angle sensor at a first lowering positioning point according to the lowering sequence of the steel casing, and using the first lowering positioning point as a target lowering positioning point; acquiring the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point; removing the angle sensor at the target lowering positioning point, setting an angle sensor at a second lowering positioning point according to the lowering sequence of the steel casing, and using the second lowering positioning point as the target lowering positioning point; and re-executing the step of collecting the posture deviation of the steel casing through the angle sensor until the lowering of the steel casing is completed at the last lowering positioning point according to the lowering sequence of the steel casing. The present application sets a number of lowering positioning points on the steel casing, and then sets angle sensors at the lowering positioning points. The angle sensors are used to obtain the verticality deviation of the steel casing, and the steel casing is adjusted based on the verticality deviation. This ensures the accurate verticality of the steel casing, and further ensures the disturbance accuracy of the steel casing on the back pressure soil of the deep foundation pit, thereby ensuring the safety of the deep foundation pit.
[0091] Based on the above-mentioned method for lowering the steel casing of the deep foundation pit based on the verticality of the back pressure soil, this embodiment provides a system for lowering the steel casing of the deep foundation pit based on the verticality of the back pressure soil, such as Figure 3 As shown, the system comprises:
[0092] The determination module 100 is used to determine a number of lowering positioning points of the steel casing according to the geological data acquired in advance after the steel casing is positioned;
[0093] A setting module 200 is used to set the first lowering positioning point according to the lowering sequence as the target lowering positioning point, and to set an angle sensor at the target lowering positioning point;
[0094] An adjustment module 300 is used to collect the verticality deviation of the steel casing through the angle sensor, and adjust the steel casing based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point;
[0095] A disassembly module 400 is used to disassemble the angle sensor of the target lowering positioning point, and use the lowering positioning point located second in the lowering sequence as the target lowering positioning point;
[0096] The control module 500 is used to repeatedly execute the steps of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is set as the target lowering positioning point, so as to complete the lowering of the steel casing.
[0097] Based on the above-mentioned method for lowering steel casing based on the verticality of deep foundation pit counter-pressure soil, this embodiment provides a computer-readable storage medium, which stores one or more programs. The one or more programs can be executed by one or more processors to implement the steps in the method for lowering steel casing based on the verticality of deep foundation pit counter-pressure soil as described in the above-mentioned embodiment.
[0098] Based on the above-mentioned method for lowering the steel casing verticality of the deep foundation pit counter-pressure soil, the present application also provides a terminal device, such as Figure 4 As shown, it includes at least one processor 25; a display screen 21; and a memory 22, and may also include a communications interface 23 and a bus 24. The processor 25, the display screen 21, the memory 22, and the communications interface 23 may communicate with each other through the bus 24. The display screen 21 is configured to display a preset user guide interface in the initial setting mode. The communications interface 23 may transmit information. The processor 25 may call the logic instructions in the memory 22 to execute the method in the above embodiment.
[0099] In addition, the logic instructions in the memory 22 can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product.
[0100] The memory 22, as a computer-readable storage medium, can be configured to store software programs, computer executable programs, such as program instructions or modules corresponding to the methods in the embodiments of the present disclosure. The processor 25 executes functional applications and data processing by running the software programs, instructions or modules stored in the memory 22, that is, implementing the methods in the above embodiments.
[0101] The memory 22 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and at least one application required for a function; the data storage area may store data created according to the use of the terminal device, etc. In addition, the memory 22 may include a high-speed random access memory and may also include a non-volatile memory. For example, a variety of media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk, may also be a transient storage medium.
[0102] In addition, the specific process of loading and executing the multiple instruction processors in the above-mentioned storage medium and the terminal device has been described in detail in the above-mentioned method, and will not be described one by one here.
[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for lowering a steel casing based on the verticality of a deep foundation pit back pressure soil, characterized in that: The method includes: After the steel casing is positioned, a number of lowering positioning points of the steel casing are determined according to the geological data acquired in advance; The first lowering positioning point in the lowering sequence is used as the target lowering positioning point, and an angle sensor is set at the target lowering positioning point; The verticality deviation of the steel casing is obtained by the angle sensor, and the steel casing is adjusted based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point; The angle sensor of the target lowering positioning point is removed, and the lowering positioning point located second in the lowering sequence is used as the target lowering positioning point; Repeat the steps of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is used as the target lowering positioning point to complete the lowering of the steel casing; The adjusting of the steel casing based on the verticality deviation so that the steel casing is lowered to the target lowering positioning point specifically includes: detecting whether the verticality deviation reaches a preset deviation threshold; when the verticality deviation reaches the preset deviation threshold, stopping the lowering of the steel casing; adjusting the verticality of the steel casing, and re-measuring the target verticality deviation of the adjusted steel casing; when the target verticality deviation is less than the predicted deviation threshold, continuing to lower the steel casing so that the steel casing is lowered to the target lowering positioning point; The initial posture information of the steel casing is ,in, Indicates the angular deviation increment in the X direction at the initial moment, Indicates the angular deviation increment in the Y direction, Indicates the angular deviation increment in the Z direction, is 90°, is 0°, is 180°, the angle sensor Attitude information collected at all times , Indicates time The angular deviation increment is expressed as ,in, Indicates the frequency of the time of decentralization; The preset deviation threshold is expressed as ,in, for The maximum rotation angle value of the three axes at the moment, Indicates the frequency of the time of decentralization; After obtaining the verticality deviation, the verticality deviation is compared with the preset deviation threshold. and ,when > ,or, < It indicates that the steel casing needs to be adjusted.
2. The method for lowering the steel casing based on the verticality of the deep foundation pit counter-pressure soil according to claim 1 is characterized in that: The angle sensor is a suction-type attitude angle sensor, so that the angle sensor and the steel casing can be detachably connected.
3. The method for lowering the steel casing based on the verticality of the deep foundation pit counter-pressure soil according to claim 1 is characterized in that: After the steel casing is positioned, the several lowering positioning points of the steel casing are determined according to the geological data acquired in advance, specifically including: After the steel casing is positioned, a safety evaluation finite element analysis model for the deep foundation pit back pressure soil layer is constructed based on the preset geological data; Based on the safety evaluation finite element analysis model, a plurality of lowering positioning points of the steel casing are determined, wherein the plurality of lowering positioning points are arranged at intervals along the lowering direction of the steel casing.
4. The method for lowering the steel casing based on the verticality of the deep foundation pit counter-pressure soil according to claim 3 is characterized in that: Determining the several lowering positioning points of the steel casing based on the safety evaluation finite element analysis model specifically includes: Determining a maximum disturbance degree deformation control value based on the safety evaluation finite element analysis model; Based on the maximum disturbance degree deformation control value, the lowering positioning spacing corresponding to the steel casing is determined, and based on the lowering positioning spacing and the length of the steel casing, a plurality of lowering positioning points of the steel casing are determined.
5. The method for lowering the steel casing based on the verticality of the deep foundation pit counter-pressure soil according to claim 1 is characterized in that: The step of adjusting the verticality of the steel casing specifically includes: Determine x-direction and y-direction offsets based on the perpendicularity deviation; The adjustment direction of the steel casing is determined according to the offsets in the x-direction and the y-direction, and the steel casing is adjusted along the adjustment direction.
6. The method for lowering the steel casing based on the verticality of the deep foundation pit counter-pressure soil according to claim 1 is characterized in that: A balance pressure plate is provided at the top of the steel casing; the adjustment of the steel casing is specifically as follows: The steel casing is adjusted by a press connected by the balanced pressure plate.
7. A lowering system based on the verticality of the steel casing of the deep foundation pit back pressure soil, characterized in that: The system comprises: A determination module is used to determine a number of lowering and positioning points of the steel casing according to pre-acquired geological data after the steel casing is positioned; A setting module is used to set the first lowering positioning point according to the lowering sequence as the target lowering positioning point, and to set an angle sensor at the target lowering positioning point; An adjustment module, used for obtaining the verticality deviation of the steel casing through the angle sensor, and adjusting the steel casing based on the verticality deviation so that the steel casing is lowered to a target lowering positioning point; A disassembly module is used to disassemble the angle sensor of the target lowering positioning point, and use the lowering positioning point located second in the lowering sequence as the target lowering positioning point; The control module is used to repeatedly execute the steps of setting the angle sensor at the target lowering positioning point until the last lowering positioning point is used as the target lowering positioning point to complete the lowering of the steel casing; The adjustment module is also used to detect whether the verticality deviation reaches a preset deviation threshold; when the verticality deviation reaches the preset deviation threshold, stop lowering the steel casing; adjust the verticality of the steel casing, and re-measure the target verticality deviation of the adjusted steel casing; when the target verticality deviation is less than the predicted deviation threshold, continue to lower the steel casing so that the steel casing is lowered to the target lowering positioning point; The initial posture information of the steel casing is ,in, Indicates the angular deviation increment in the X direction at the initial moment, Indicates the angular deviation increment in the Y direction, Indicates the angular deviation increment in the Z direction, is 90°, is 0°, is 180°, the angle sensor Attitude information collected at all times , Indicates time The angular deviation increment is expressed as ,in, Indicates the frequency of the time of decentralization; The preset deviation threshold is expressed as ,in, for The maximum rotation angle value of the three axes at the moment, Indicates the frequency of the time of decentralization; After obtaining the verticality deviation, the verticality deviation is compared with the preset deviation threshold. and ,when > ,or, < It indicates that the steel casing needs to be adjusted.