Offshore wind power structured cemented riprap anti-scour composite structure and construction method
By using mesh-pocketed stone throwing body and glue-injected structure around the offshore wind power foundation, combining gravel particles and gelling materials to form a composite structure, the problem of the seabed around the offshore wind power foundation cannot be effectively thrown and filled, and the anti-solution ability and stability.
Patent Information
- Application Number
- CN202310015200.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-05
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-01-05
AI Technical Summary
The seabed around the offshore wind power foundation cannot be effectively disassembled, resulting in the most severely eroded area close to the infrastructure, affecting its safe and stable operation.
The stone throwing body and glue-injected structure are adopted. The stone throwing body of the net bag includes gravel particles, the first gel and the second gel. The gravel particles in the net bag are bonded to the seabed and the first gel is filled. The gap in the mesh bag, and the second gel fills the gap in the neighboring mesh bag, forming a composite structure surrounding the offshore wind power foundation, enhancing the anti-shrinkage ability.
The adaptive filling and anti-shrinking performance of seabed erosion pits has been improved, the risk of seabed soil erosion is reduced, and the stability and anti-shrinking ability of offshore wind power infrastructure have been improved.
Smart Images

Figure CN116163334B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of marine engineering foundation protection, and in particular to an offshore wind power structured cemented riprap anti-scour composite structure and a construction method thereof. Background Art
[0002] Offshore wind power has the advantages of being clean and efficient, and is an important support for the country's energy transformation. Offshore wind turbines consist of wind turbine units, towers and foundation structures. After the foundation structure is installed on the seabed, it will change the flow field of the ocean currents and form local scour pits around the foundation. According to the scour test results of offshore wind power foundations and single-column composite tube foundations in the offshore wind farm in Jiangsu waters of my country, two years after the installation of the offshore wind power foundation, the maximum scour depth around the foundation exceeded 7m, and the scour range exceeded 30m, which seriously affected the bearing capacity of the foundation structure and threatened the safe and stable operation of the wind turbine unit.
[0003] There are two main existing riprap construction methods: the first method is to use an excavator to throw riprap directly around the offshore wind power foundation structure. At this time, there is great uncertainty in the riprap landing point under the action of water flow, and the distribution of riprap is random. On the one hand, it leads to waste of riprap and fails to form an effective protective structure. On the other hand, the riprap cannot form a dense accumulation body, and the riprap particles are easily dispersed by the water flow. At the same time, the porosity of the riprap accumulation body is large, and the seabed soil may be eroded from the pores of the riprap accumulation body; the second method is to use a conduit to throw riprap around the offshore wind power foundation structure. The filling effect of this method is better than the first method. Considering that the conduit cannot be moved in real time during the construction process, multiple riprap points are usually selected for filling. Since there is a repose angle in the accumulation process of riprap, the outer contour of the riprap accumulation body is conical. The riprap protection structure after the completion of multiple riprap points presents a peak and valley shape. At the same time, the seabed scouring pit is not a plane, so the seabed near the foundation structure area usually cannot achieve good filling, resulting in the area near the foundation structure being the most severely dispersed area, which has an important impact on the safety and stability of the foundation structure. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect in the prior art that the seabed around the offshore wind power foundation cannot be well filled and the area close to the foundation is most severely scoured, thereby providing an offshore wind power structured cemented riprap anti-scour composite structure and construction method.
[0005] In order to solve the above problems, the present invention provides an offshore wind power structured cemented riprap anti-scour composite structure, comprising:
[0006] A net bag riprap body, the net bag riprap body comprising a net bag and a plurality of crushed stone particles arranged in the net bag, the net bag riprap body being suitable for surrounding the outer periphery of an offshore wind power foundation;
[0007] The glue injection structure includes a first cementitious material and a second cementitious material. In the constructed state, the stone body in the net bag is suitable for fitting with the seabed scouring pit, and the crushed stone particles fill the seabed scouring pit. The first cementitious material fills the gaps between the crushed stone particles in the net bag of the net bag riprap body close to the offshore wind power foundation to form a net bag cemented stone body, and the second cementitious material fills the gaps between adjacent net bags to form a composite structure arranged on the periphery of the offshore wind power foundation.
[0008] Optionally, the glue injection structure also includes a pouring pipe, which transports the first cementitious material to the upper part of the net bag of the net bag riprap body. The first cementitious material fills the gaps in the same net bag riprap body under the action of gravity to form a net bag cemented stone body. The pouring pipe transports the second cementitious material to the upper part of the net bag. The second cementitious material fills the gaps between adjacent net bag cemented stone bodies and net bag cemented stone bodies, between net bag cemented stone bodies and net bag riprap bodies, and between net bag riprap bodies, so as to form a composite structure surrounding the periphery of the offshore wind power foundation by cementation.
[0009] Optionally, the glue injection structure further includes a delivery tube and a protective agent, and the delivery tube delivers the protective agent to construct a bonding space.
[0010] Optionally, the composite structure is divided into a rigid zone, a transition zone and a flexible zone from the inside to the outside along the circumference of the offshore wind power foundation.
[0011] Optionally, the proportion of the net bag cemented stone in the rigid zone is 60%-100%, the proportion of the net bag cemented stone in the transition zone is 30%-70%, and the proportion of the net bag cemented stone in the flexible zone is 0-30%.
[0012] Optionally, the first cementitious material is underwater self-compacting mortar, the second cementitious material is underwater self-compacting concrete, the underwater expansion of the first cementitious material is 250-350 mm, and the underwater expansion of the second cementitious material is 550-800 mm.
[0013] Optionally, the net bag riprap body is located at the lower layer and outer edge of the composite structure, and the net bag cemented stone body is located at the upper layer and inner periphery of the composite structure.
[0014] Optionally, the first and second cementitious materials are slow-setting and early-strength cement-based materials, the cement components of the cement-based materials include ordinary Portland cement and sulphoaluminate cement, the expansion loss rate of the cementitious materials within 90 minutes of plastic preservation time is less than 5%, and the compressive strength of the cementitious materials after 6 hours is 3-10MPa.
[0015] A method for constructing an offshore wind power structured cemented riprap anti-scour composite structure comprises the following steps:
[0016] When constructing the offshore wind power structured cemented riprap anti-scour composite structure, the first cementitious material is transferred to part of the net bag riprap body, and the first cementitious material fills the gaps between the crushed stone particles in the net bag of the net bag riprap body close to the offshore wind power foundation to form a net bag cemented stone body, and then the second cementitious material is used to fill the gaps between adjacent net bags to form a composite structure surrounding the outer periphery of the offshore wind power foundation.
[0017] Optionally, the protective agent is first transported to the periphery of the offshore wind power foundation through the delivery pipe, and then the first cementitious material is transported into the mesh bag riprap body through the casting pipe, and the second cementitious material is transported between adjacent mesh bag riprap bodies.
[0018] The technical solution of the present invention has the following advantages:
[0019] 1. The method for constructing an offshore wind power structured cemented riprap anti-scour composite structure provided by the present invention comprises: a net bag riprap body, the net bag riprap body comprises a net bag and a plurality of gravel particles arranged in the net bag, the net bag riprap body is suitable for surrounding the offshore wind power foundation; a glue injection structure comprises a first cementitious material and a second cementitious material, in the constructed state, the gravel particles in the net bag are suitable for fitting with the seabed scour pit, the gravel particles fill the seabed scour pit, the first cementitious material fills the gaps between the gravel particles in the net bag of the net bag riprap body close to the offshore wind power foundation to form a net bag cemented stone body, and the second cementitious material fills the gaps between adjacent net bags to form a composite structure arranged at the periphery of the offshore wind power foundation. When in the construction state, the gravel particles in the net bag will fit with the seabed scour pits, and at the same time, the gravel particles will fill the seabed scour pits to adapt to the unevenness of the seabed and the diversity of the scour pit shapes. The first cementitious material fills the gaps between the gravel particles in the net bag near the offshore wind power foundation net bag riprap body to form a net bag cemented stone body so that the area close to the offshore wind power foundation forms a larger net bag cemented stone body with stronger scour resistance. The second cementitious material fills the gaps between adjacent net bags to form a composite structure arranged on the periphery of the offshore wind power foundation. That is, the connection between the composite structure net bag riprap body and the net bag riprap body, the net bag riprap body and the net bag cemented stone body, and the net bag cemented stone body and the net bag cemented stone body ensures the adaptive filling of the seabed scour pit around the offshore wind power foundation structure and improves the anti-scour ability. At the same time, due to the limitations of offshore construction operations, the net bag riprap body is difficult to be tightly arranged around the offshore wind power foundation as required by the design. The use of the second cementitious material to fill the gaps between adjacent net bags can reduce the gaps between adjacent net bags and prevent the seabed soil from being easily eroded from the gaps between adjacent net bags.
[0020] 2. The present invention provides a method for constructing an offshore wind power structured cemented riprap anti-scour composite structure, wherein the injection structure further comprises a pouring pipe, which transports the first cementing material to the upper part of the net bag of the net bag riprap body, and the first cementing material fills the gaps in the same net bag riprap body to form a net bag cemented stone body, and the pouring pipe transports the second cementing material to the upper part of the adjacent net bag, and the second cementing material fills the gaps between the adjacent net bag cemented stone bodies and the net bag cemented stone bodies, the net bag cemented stone bodies and the net bag riprap bodies, and the net bag riprap bodies and the net bag riprap bodies, so as to form a composite structure surrounding the outer periphery of the offshore wind power foundation by cementation. The net bag cemented stone body is first formed by the first cementing material, and then the composite structure is formed by the second cementing material.
[0021] 3. The method for constructing the offshore wind power structured bonded riprap anti-scour composite structure provided by the present invention, the glue injection structure also includes a protective agent, the protective agent is used to construct a bonding space so that the cementitious material can be bonded in the bonding space.
[0022] 4. The present invention provides a method for constructing an offshore wind power structured cemented riprap anti-scour composite structure. The composite structure is divided into a rigid zone, a transition zone and a flexible zone from the inside to the outside along the circumference of the offshore wind power foundation. The proportion of the net bag cemented stone body in the rigid zone is 60%-100%, the proportion of the net bag cemented stone body in the transition zone is 30%-70%, and the proportion of the net bag cemented stone body in the flexible zone is 0-30%. The net bag cemented stone body has strong rigidity, and the higher the proportion, the stronger the ability to resist seawater scour. The proportion of the net bag cemented stone body in the rigid zone of the same offshore wind power foundation is higher than the proportion of the net bag cemented stone body in the transition zone to ensure that the strength of the rigid zone is higher than that of the transition zone.
[0023] 5. The present invention provides a method for constructing an offshore wind power structured cemented riprap anti-scour composite structure, wherein the first cementitious material is an underwater self-compacting mortar, and the second cementitious material is an underwater self-compacting concrete. The underwater expansion of the first cementitious material is 250-350 mm, and the underwater expansion of the second cementitious material is 550-800 mm. The first cementitious material uses underwater self-compacting mortar to flow and adhere to the gravel particles in the net bag, and the second cementitious material uses underwater self-compacting concrete to fill the gaps between the net bags.
[0024] 6. The construction method of the offshore wind power structured cemented riprap anti-scour composite structure provided by the present invention is that the first cementitious material and the second cementitious material are slow-setting and early-strength cement-based materials, and the cement components of the cement-based materials include ordinary Portland cement and sulphoaluminate cement. The expansion loss rate of the cementitious material within the 90-minute plastic preservation time is less than 5%, and the compressive strength of the cementitious material after 6 hours is 3-10MPa. The first cementitious material and the second cementitious material have slow-setting properties to prevent clogging of the casting pipe and ensure the flow process in the crushed stone particles, and have early-strength properties to quickly form a composite structure that can withstand the impact of water flow. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 It is a schematic diagram of an offshore wind power structured cemented riprap anti-scour composite structure in a construction state provided in an embodiment of the present invention;
[0027] Figure 2 A schematic structural diagram of an offshore wind power structured cemented riprap anti-scour composite structure provided in an embodiment of the present invention;
[0028] Figure 3 A schematic diagram of an offshore wind power structured cemented riprap anti-scour composite structure provided in an embodiment of the present invention;
[0029] Figure 4 A schematic diagram of a pouring tube provided in an embodiment of the present invention;
[0030] Figure 5 A top view of a pouring tube provided in an embodiment of the present invention;
[0031] Figure 6 It is a schematic structural diagram of a net bag riprap body and a net bag cemented stone body in a rigid zone provided in an embodiment of the present invention;
[0032] Figure 7 It is a schematic structural diagram of a net bag riprap body and a net bag cemented stone body in a transition zone provided in an embodiment of the present invention;
[0033] Figure 8 It is a schematic structural diagram of the net bag riprap body and the net bag cemented stone body in the flexible zone provided in an embodiment of the present invention.
[0034] Explanation of the accompanying reference numerals: 1. Offshore wind power foundation; 2. Composite structure; 3. Seabed scour pit; 4. Lifting rope; 5. Casting pipe; 6. Release pipe; 7. Positioning system; 8. Crushed stone particles; 9. Cementitious material; 10. Rigid zone; 11. Transition zone; 12. Flexible zone; 21. Net bag cemented stone body; 22. Net bag riprap body; 51. Discharge port; 52. Telescopic structure. DETAILED DESCRIPTION
[0035] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0038] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0039] Example 1
[0040] The offshore wind power structured cemented riprap anti-scour composite structure provided by the present invention includes: a net bag riprap body 22, the net bag riprap body 22 includes a net bag and a plurality of gravel particles 8 arranged in the net bag, and the net bag riprap body is suitable for surrounding the offshore wind power foundation 1; a glue injection structure, including a first cementitious material and a second cementitious material 9, in the construction state, the gravel particles 8 in the net bag are suitable for fitting with the seabed scour pit 3, and the gravel particles 8 fill the seabed scour pit 3, the first cementitious material fills the gaps between the gravel particles 8 in the net bag of the net bag riprap body 22 close to the offshore wind power foundation to form a net bag cemented stone body 21, and the second cementitious material 9 fills the gaps between adjacent net bags to form a composite structure 2 arranged on the periphery of the offshore wind power foundation 1.
[0041] When in the construction state, the gravel particles 8 in the net bag will fit with the seabed scour pit 3, and at the same time, the gravel particles 8 will fill the seabed scour pit 3 to adapt to the unevenness of the seabed and the diversity of the scour pit shape. The first cementitious material fills the gaps between the gravel particles 8 in the net bag of the net bag riprap body 22 close to the offshore wind power foundation to form a net bag cemented stone body 21, so that the area close to the offshore wind power foundation 1 forms a net bag riprap body 22 with a larger volume and stronger scour resistance. The second cementitious material 9 fills the gaps between adjacent net bags to form a composite structure arranged on the periphery of the offshore wind power foundation 1. That is, the composite structure is fixed by the mesh bag riprap body 22 and the mesh bag riprap body 22, the mesh bag riprap body 22 and the mesh bag cemented stone body 21, and the mesh bag cemented stone body 21 and the mesh bag cemented stone body 21, so as to ensure the adaptive filling of the seabed scour pit around the offshore wind power foundation structure and improve the anti-scour ability. At the same time, due to the limitations of offshore construction operations, the mesh bag riprap body 22 is difficult to be tightly arranged around the offshore wind power foundation 1 as required by the design. The use of the second cementitious material 9 to fill the gaps between adjacent mesh bags can reduce the gaps between adjacent mesh bags, thereby preventing the seabed soil from being easily eroded from the gaps between adjacent mesh bags.
[0042] Example 2
[0043] like Figure 1 - Figure 8 A specific embodiment of the offshore wind power structured cemented riprap anti-scour composite structure 2 shown includes: a composite structure 2 formed by cementing a net bag riprap body 22 and a net bag cemented stone body 21, and a cemented structure for cementing the net bag riprap body 22, wherein the composite structure 2 is arranged around the periphery of the offshore wind power foundation 1, and the composite structure 2 is a rigid zone 10, a transition zone 11 and a flexible zone 12 from the inside to the outside of the circumference of the offshore wind power foundation 1. It should be noted that the proportion of the net bag cemented stone body 21 in the rigid zone 10 is 60%-100%, the proportion of the net bag cemented stone body 21 in the transition zone 11 is 30%-70%, and the proportion of the net bag cemented stone body 21 in the flexible zone 12 is 0-30%. At the same time, the proportion of the net bag cemented stone body 21 in the rigid zone 10 of the same offshore wind power foundation 1 is higher than the proportion of the net bag cemented stone body 21 in the transition zone 11. It should be noted that the net bag riprap body 22 is located at the lower layer and outer edge of the composite structure 2 , and the net bag cemented stone body 21 is located at the upper layer and inner periphery of the composite structure 2 .
[0044] like Figure 1As shown in FIG. 8 , the net bag riprap body 22 includes a net bag and a plurality of crushed stone particles 8 arranged in the net bag, and the pore filling rate is 15-50%, wherein the net bag has a plurality of through holes. It should be noted that the particle size gradation of the crushed stone particles 8 of the net bag riprap body 22 used to form the net bag cemented stone body 21 is: the first level particle size gradation, d15 (d15 means that the volume content of crushed stone particles smaller than this particle size accounts for 15% of all crushed stone particles) is 14-20cm, d50 (d50 means that the volume content of crushed stone particles smaller than this particle size accounts for 50% of all crushed stone particles) is 21-27cm, d85 (d85 means that the volume content of crushed stone particles smaller than this particle size accounts for 85% of all crushed stone particles) is 29-36cm, or the second level particle size gradation, d15 is 18-26cm, d50 is 29-36cm, d85 is 40-47cm, or the third level particle size gradation, d15 is 23-33cm, d50 is 37-45cm, d85 is 50-60cm. When the particle size of the crushed stone particles 8 is smaller than the particle size gradation of the first-level crushed stone particles 8, the pores between the crushed stones in the net bag riprap body 22 are small, and the first cementitious material is easily deposited on the surface of the net bag riprap body 22. However, when the particle size of the crushed stone particles 8 is larger than the particle size gradation of the third-level crushed stone particles 8, the pores between the crushed stone particles 8 in the net bag riprap body 22 are larger. On the one hand, the first cementitious material is not easy to adhere to and deposit on the contact points of the crushed stone particles 8, and on the other hand, the seabed soil is easily eroded from the pores of the crushed stone particles 8.
[0045] Specifically, the material of the net bag is renewable polyester. To form a net bag cementing stone body 21, such as Figure 2 As shown, the bonding structure includes a protective agent, a first cementitious material, a second cementitious material 9, a pouring pipe 5 and an underwater protective agent delivery pipe 6, wherein the first cementitious material is an underwater self-compacting mortar, the second cementitious material 9 is an underwater self-compacting concrete, the underwater expansion of the first cementitious material is 250-350mm, the underwater expansion of the second cementitious material 9 is 550-800mm, and the pouring pipe 5 is connected to the construction ship. The first cementitious material and the second cementitious material 9 are slow-setting and early-strength cement-based materials, the cement components of the cement-based materials include ordinary silicate cement and sulphoaluminate cement, the expansion loss rate of the first cementitious material and the second cementitious material 9 within the 90min plastic preservation time is less than 5%, and the compressive strength of the cementitious material after 6 hours is 3-10MPa. The second cementitious material 9 is underwater self-compacting concrete, which prevents the second cementitious material 9 from filling the gaps between the crushed stone particles 8 in the net bags of the net bag riprap body 22 when filling the gaps between adjacent net bags, thereby forming a composite structure arranged on the periphery of the offshore wind power foundation 1 and reducing the deformation capacity of the composite foundation.
[0046] In order to construct the offshore wind power structured cemented riprap anti-scour composite structure 2, a construction vessel is also provided, and the construction vessel is arranged with a positioning system 7 and a lifting rope 4.
[0047] A method for constructing an offshore wind power structured cemented riprap anti-scour composite structure 2 mainly comprises the following steps:
[0048] 1) Filling crushed stone particles 8 and stones into a net bag on land to form a plurality of net bag riprap bodies 22, and then transporting the net bag riprap bodies 22 to the vicinity of the offshore wind power foundation 1 by a construction ship;
[0049] 2) The pouring pipe 5 and the underwater protective agent delivery pipe 6 are tied to the suspension rope 4 in advance, and the delivery port of the underwater protective agent delivery pipe 6 is higher than the discharge port 51 of the pouring pipe 5, and a positioning system 7 is installed at the end of the suspension rope 4;
[0050] 3) On the construction ship, a mixer is used to prepare the first gelling material, the second gelling material 9 and the protective agent respectively;
[0051] 4) According to the design requirements, the crane on the construction ship lifts the net bag riprap 22 through the lifting rope 4 and the positioning system 7 and lowers it around the offshore wind power foundation 1;
[0052] 5) When a part of the net bag riprap body 22 reaches the designed position, the protective agent is put into the seawater above the net bag through the underwater protective agent delivery pipe 6. When the protective agent concentration around the net bag riprap body 22 reaches the required concentration, the pouring pipe 5 rotates within 360° with the suspension rope 4 as the center, and pours the first cementing material into the net bag of the net bag riprap body 22 close to the offshore wind power foundation 1. The first cementing material flows downward and around the gaps between the crushed stone particles 8, and forms a net bag cemented stone body 21 after being attached and hardened. During the cementing process, the protective agent is continuously delivered around the pouring point through the underwater protective agent delivery pipe 6, and the net bag riprap body 22 is slowly placed at the designed position;
[0053] 6) Repeat steps 4) and 5), and fill the second cementitious material 9 into the gaps between the net bags through the pouring pipe to form a composite structure 2 around the offshore wind power foundation 1;
[0054] 7) Importing the spatial position data of each net bag riprap body 22 and net bag cemented stone body 21 into a computer, and constructing a numerical model of the offshore wind power structured cemented riprap anti-scour composite structure 2 according to the stacking form of the composite structure 2;
[0055] 8) A wave flume numerical model is established, and the numerical model of the offshore wind power structured cemented riprap anti-scour composite structure 2 is imported into the wave flume numerical model to conduct an anti-scour analysis of the offshore wind power structured cemented riprap anti-scour composite structure 2 under the action of typhoon season wave currents. Based on the analysis structure, a second cementitious material 9 is poured into a local area of the offshore wind power structured cemented riprap anti-scour composite structure 2 to further enhance the overall strength of the offshore wind power structured cemented riprap anti-scour composite structure 2.
[0056] As an alternative embodiment, the pouring pipe 5 can also open multiple discharge ports 51 through the telescopic structure 52 with the hanging rope 4 as the center, so as to perform multi-point bonding on the surface of the net bag riprap body 22.
[0057] The offshore wind power structured cemented riprap anti-scour composite structure 2 provided by the present invention can adapt to the complex structure of the seabed and scour pit, and can also enhance the anti-scour ability. The gravel particles 8 of the net bag riprap body 22 are restricted by the net bag to prevent the gravel particles 8 from being dispersed under the action of water flow, thereby improving the stability of the gravel particles 8 themselves. At the same time, the net bag is a flexible structure to adapt to the ups and downs and deformation of the seabed. The net bag cemented stone body 21 is cast and bonded by the net bag riprap body 22 to bond the gravel particles 8 into a whole, thereby improving the overall anti-scour ability and preventing the composite structure 2 from moving over a large range.
[0058] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.
Claims
1. A structural cemented riprap anti-scour composite structure for offshore wind power, It is characterized in that include: A net bag riprap body (22), the net bag riprap body (22) comprising a net bag and a plurality of crushed stone particles (8) arranged in the net bag, the net bag riprap body (22) being suitable for surrounding the outer periphery of an offshore wind power foundation (1); The glue injection structure comprises a first cementitious material and a second cementitious material (9); in a constructed state, the gravel particles (8) in the net bag are suitable for fitting with the seabed scouring pit (3); the gravel particles (8) fill the seabed scouring pit (3); the first cementitious material fills the gaps between the gravel particles (8) in the net bag of the net bag riprap body (22) close to the offshore wind power foundation (1) to form a net bag cemented stone body (21); the second cementitious material (9) fills the gaps between adjacent net bags to form a composite structure (2) arranged on the periphery of the offshore wind power foundation (1); The composite structure (2) is composed of a rigid area (10), a transition area (11) and a flexible area (12) from the inside to the outside along the circumference of the offshore wind power foundation (1); The proportion of the net bag cemented stone body (21) in the rigid zone (10) is 60%-100%, the proportion of the net bag cemented stone body (21) in the transition zone (11) is 30%-70%, and the proportion of the net bag cemented stone body (21) in the flexible zone (12) is 0-30%; The net bag riprap body (22) is located at the lower layer and outer edge of the composite structure (2), and the net bag cemented stone body (21) is located at the upper layer and inner periphery of the composite structure (2).
2. The offshore wind power structured cemented riprap anti-scour composite structure according to claim 1, It is characterized in that The glue injection structure also includes a pouring pipe (5), wherein the pouring pipe (5) conveys a first cementitious material to the upper part of the net bag of the net bag riprap body (22), wherein the first cementitious material fills the gaps in the same net bag riprap body (22) under the action of gravity to form a net bag cemented stone body (21), and the pouring pipe (5) conveys a second cementitious material (9) to the upper part of an adjacent net bag, wherein the second cementitious material (9) fills the gaps between adjacent net bag cemented stone bodies (21) and net bag cemented stone bodies (21), between net bag cemented stone bodies (21) and net bag riprap bodies (22), and between net bag riprap bodies (22), so as to form a composite structure (2) surrounding the outer periphery of the offshore wind power foundation (1) by cementation.
3. The offshore wind power structured cemented riprap anti-scour composite structure according to claim 1, It is characterized in that The glue injection structure further comprises a delivery pipe (6) and a protective agent, wherein the delivery pipe (6) delivers the protective agent to construct a bonding space.
4. The offshore wind power structured cemented riprap anti-scour composite structure according to claim 3, It is characterized in that The first cementitious material is an underwater self-compacting mortar, the second cementitious material (9) is an underwater self-compacting concrete, the underwater expansion of the first cementitious material is 250-350 mm, and the underwater expansion of the second cementitious material (9) is 550-800 mm.
5. The offshore wind power structured cemented riprap anti-scour composite structure according to claim 4, It is characterized in that The first cementitious material and the second cementitious material (9) are slow-setting and early-strength cement-based materials, the cement components of the cement-based materials include ordinary Portland cement and sulphoaluminate cement, the expansion loss rate of the cementitious materials within the 90-minute plastic preservation time is less than 5%, and the compressive strength of the cementitious materials after 6 hours is 3-10 MPa.
6. A method for constructing an offshore wind power structured cemented riprap anti-scour composite structure, It is characterized in that The method for forming the offshore wind power structured cemented riprap anti-scour composite structure according to claim 1 comprises: during the construction method of the offshore wind power structured cemented riprap anti-scour composite structure, a first cementitious material is transferred into a part of the net bag riprap body (22), the first cementitious material fills the gaps between the crushed stone particles (8) in the net bag of the net bag riprap body (22) close to the offshore wind power foundation (1) to form a net bag cemented stone body (21), and then a second cementitious material (9) is used to fill the gaps between adjacent net bags to form a composite structure (2) surrounding the outer periphery of the offshore wind power foundation (1) by cementation.
7. The method for constructing the offshore wind power structured cemented riprap anti-scour composite structure according to claim 6, It is characterized in that First, a protective agent is transported to the periphery of the offshore wind power foundation (1) through a delivery pipe (6), and then a first cementitious material is transported into the net bag riprap body (22) through a pouring pipe (5), and a second cementitious material (9) is transported between adjacent net bags.
Citation Information
Cited By
Anti-scouring device for offshore wind power foundation
CN120174910A