Automatic gas filling system, valve group cabinet with the system and filling method thereof

By designing an automatic gas filling system, the low efficiency and safety risks of compressed gas filling caused by manual operation are solved, and efficient and accurate gas cylinder filling and safe and reliable automated operations are achieved.

CN116182062BActive Publication Date: 2024-12-06GUANGDONG SOUTHCHINA SPECIAL GAS INST
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202211338803.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-28
Publication Date
2024-12-06
Estimated Expiration
2042-10-28

AI Technical Summary

Technical Problem

The filling of existing compressed gas cylinders relies on manual operations, resulting in low filling efficiency, low product quality and high labor costs, and risks of gas purity not meeting standards, inaccurate filling amount and safety.

Method used

An automatic gas filling system is designed, including an inflation device, a vacuum control device, an automatic control device, an ventilation device, a gas buffer device and an inflation pipe pressure relief device. By automatically controlling the operation of valves and pumps, the automatic gas cylinder is realized. Vacuum, ventilate and fill to ensure filling accuracy and safety.

Benefits of technology

It realizes automatic operation of the gas filling process, improves filling efficiency and product quality, reduces labor costs, ensures filling accuracy and safety, and avoids errors and safety risks caused by manual operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116182062B_ABST
    Figure CN116182062B_ABST
Patent Text Reader

Abstract

The present invention relates to an automatic gas filling system, including a gas filling device, a gas buffer device, a vacuum control device, an automatic control device, a ventilation device, a buffer device, a gas filling pipe pressure relief device and a gas cylinder temperature detection device. The gas-to-be-filled unit is divided into two groups, the gas filling device, the vacuum control device, the automatic control device, the ventilation device, the buffer device, the gas filling pipe pressure relief device and the gas cylinder temperature detection device are respectively connected to the two groups of gas-to-be-filled units, and the present invention also discloses a valve group cabinet with the system and a filling method thereof. The present invention solves the safety problems of the gas cylinder vacuum data not meeting the gas purity standard due to human reading errors, the gas cylinder filling amount being excessive or insufficient, and the gas cylinder temperature being too high during the gas cylinder filling process, and at the same time resolves the potential safety risk of excessive pipeline pressure during the traditional gas cylinder filling process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of automatic inflation technology, and in particular to an automatic filling device and a working method thereof. Background Art

[0002] With the development of industry, the demand for compressed gas in various industries is growing. The existing compressed gas cylinder filling is mainly done manually, including manual vacuuming of the cylinder, manual replacement of the cylinder gas and manual cylinder filling. Since manual operation cannot ensure the accuracy of cylinder handling and cylinder filling volume, the filling efficiency is low, the product quality is low, and the labor cost reduces the economic benefits. Summary of the invention

[0003] In view of the above-mentioned defects, the purpose of the present invention is to propose an automatic gas filling system, a valve group cabinet with the system and a filling method thereof, so as to solve the safety problems caused by human reading errors in the vacuum pumping data of gas cylinders, such as gas purity not meeting the standards, excessive or insufficient filling of gas cylinders, and excessive temperature of gas cylinders during the filling process, while also eliminating the potential safety risk of excessive pipeline pressure in the traditional gas cylinder filling process.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] A gas automatic filling system, including a filling device, the filling device including a gas source, an air pump, a unit to be filled, and an air filling pipeline, characterized in that it also includes a vacuum control device, an automatic control device, and the filling device also includes an automatic filling valve and a pressure gauge. The gas source, the air pump, the automatic filling valve, the pressure gauge and the unit to be filled are arranged on the filling pipeline in sequence, and the vacuum control device, the air pump, the automatic filling valve and the pressure gauge are respectively connected to the automatic control device. When the vacuum control device detects that the vacuum value of the gas cylinder meets the standard, it sends information to the automatic control device, and the automatic control device controls the automatic filling valve and the air pump to open, and fills the unit to be filled through the filling pipeline.

[0006] Furthermore, the vacuum control device includes a vacuum pump, an exhaust pipeline, an automatic exhaust valve, and a second pressure gauge. The vacuum pump is arranged at one end of the exhaust pipeline, and the other end of the exhaust pipeline is connected to the unit to be inflated. The exhaust pipeline is provided with an automatic exhaust valve and a second pressure gauge, and the automatic exhaust valve, the second pressure gauge and the vacuum pump are respectively connected to the automatic control device.

[0007] Furthermore, it also includes a ventilation device, which includes a ventilation pipeline and an automatic ventilation valve. One end of the ventilation pipeline is connected to the inflation pipeline between the inflation pump and the automatic inflation valve, and the other end of the ventilation pipeline is connected to the unit to be inflated. The ventilation pipeline is connected with the automatic ventilation valve, and the automatic ventilation valve is connected to the automatic control device; it also includes a gas buffer device, which includes a buffer gas bottle, and the buffer gas bottle is arranged on the inflation pipeline between the inflation pump and the joint of the ventilation pipeline.

[0008] Furthermore, the inflation device also includes an automatic inflation valve 2, a left pressure gauge 1, an automatic inflation valve 3 and a right pressure gauge 1. The pressure gauge 1 is composed of a left pressure gauge 1 and a right pressure gauge 1. The unit to be inflated is divided into two left and right groups. The inflation pipeline is located between the unit to be inflated and the automatic inflation valve 1 and is forked to form a left inflation pipeline and a right inflation pipeline. The left inflation pipeline is connected with the automatic inflation valve 2, the left pressure gauge 1 and the left unit to be inflated in sequence. The right inflation pipeline is connected with the automatic inflation valve 3, the right pressure gauge 1 and the right unit to be inflated in sequence. The above-mentioned automatic inflation valves and pressure gauges are respectively connected to automatic control devices.

[0009] Furthermore, the automatic air extraction valve is composed of an automatic air extraction valve 1 and an automatic air extraction valve 2, the unit to be inflated is divided into two groups, the air extraction pipeline is located between the pressure gauge 2 and the unit to be inflated and forks into a left air extraction pipeline and a right air extraction pipeline, the left air extraction pipeline is sequentially connected with the automatic air extraction valve 1 and the left unit to be inflated, the right air extraction pipeline is sequentially connected with the automatic air extraction valve 2 and the right unit to be inflated, and the above-mentioned automatic air extraction valves are respectively connected to automatic control devices.

[0010] Furthermore, the automatic ventilation valve is composed of automatic ventilation valve 1 and automatic ventilation valve 2, the unit to be inflated is divided into two groups, the ventilation pipeline is located between the inflation pipeline joint and the unit to be inflated and forked to form a left ventilation pipeline and a right ventilation pipeline, the left ventilation pipeline is connected with automatic ventilation valve 1 and the left unit to be inflated in sequence, the right ventilation pipeline is connected with automatic ventilation valve 2 and the right unit to be inflated in sequence, and the above-mentioned automatic ventilation valves are respectively connected to automatic control devices.

[0011] Furthermore, it also includes an inflation pipe pressure relief device, which includes a pressure relief line 1, an automatic pressure relief valve, a muffler, a pressure relief line 2 and a pressure gauge 3. One end of the pressure relief line 1 is connected to the inflation line between the automatic inflation valve 1 and the inflation line bifurcation point, and the other end of the pressure relief line 1 is a free end. The pressure relief line 1 is sequentially connected with the pressure relief valve and the muffler, and the muffler is close to the free end; one end of the pressure relief line 2 is connected to the inflation line between the automatic inflation valve 1 and the inflation line bifurcation point, and the other end of the pressure relief line 2 is connected to the vacuum pump; a pressure gauge 3 is provided on the pressure relief line 2 near the inflation line, and a plurality of manual valves are also provided on the pressure relief line 2; the pressure gauge 3 and the automatic pressure relief valve are both connected to the automatic control device.

[0012] Furthermore, the unit to be inflated includes multiple gas cylinders and a container bar, and the multiple gas cylinders are fixedly installed on the container bar; it also includes a gas cylinder temperature detection device, and the gas cylinder temperature detection device includes multiple temperature sensors, each of which is fixedly set on the outer side wall of the corresponding gas cylinder, and the temperature sensor is connected to an automatic control device; the automatic control device is a PLC control cabinet.

[0013] A gas automatic filling valve group cabinet comprises at least one of the above-mentioned gas automatic filling systems.

[0014] Furthermore, a gas automatic filling valve cabinet includes the above-mentioned filling device, gas buffer device, vacuum control device, automatic control device, ventilation device, buffer device, filling pipe pressure relief device and gas cylinder temperature detection device, and the units to be filled are divided into left and right groups, the above-mentioned filling device, gas buffer device, vacuum control device, ventilation device, buffer device, filling pipe pressure relief device and gas cylinder temperature detection device are respectively connected to the left and right groups of units to be filled and the automatic control device, and the connection method is the same as the method of connecting the left and right groups of units to be filled in the invention content. The filling method of the automatic filling valve cabinet includes the following steps in sequence:

[0015] 1. Ventilation step: The automatic control device automatically controls the opening time of the ventilation automatic valve, and the automatic control device automatically sets the inflation pump to run the inflation, so as to achieve the effect of filling a certain amount of this gas into the unit to be inflated with residual gas for ventilation and purification. After this step is completed, the automatic control device closes the ventilation automatic valve.

[0016] 2. The vacuuming step is to have the vacuum pump and the automatic vacuum valve automatically controlled by the automatic control device to start vacuuming the left unit to be inflated and the right unit to be inflated. Pressure gauge 2 automatically determines whether the vacuum values ​​of the left unit to be inflated and the right unit to be inflated meet the standards by detecting the air pressure on the vacuum pipeline. After this step is completed, the vacuum pump and the automatic vacuum valve are closed by the automatic control device.

[0017] 3. Inflation step: The automatic control device automatically detects whether the vacuum value and temperature value of the gas cylinder meet the standards, and automatically controls the first inflation automatic valve, the second inflation automatic valve and the third inflation automatic valve to be opened (the other is closed), and automatically controls the inflation pump to inflate the unit to be inflated. The left unit to be inflated and the right unit to be inflated are set and exist in a group of systems. The automatic control device can automatically switch the first inflation automatic valve, the second inflation automatic valve and the third inflation automatic valve to be opened (the other is closed), so as to inflate one of the left unit to be inflated and the right unit to be inflated respectively, avoiding manual replacement of the units to be inflated and improving work efficiency. During the inflation process, the inflation pump is always turned on in the working state, and the role of the buffer bottle is to play a gas buffering role to avoid excessive gas flow entering the inflation pipeline, damaging the pipeline or too rapid gas filling into the unit to be inflated, which brings safety hazards.

[0018] 4. Stop charging step: After a period of inflation, when pressure gauge 1 detects that the gas pressure is greater than the first preset value, the automatic control device automatically controls the inflation automatic valve 1 to close according to the feedback. This is because the gas pressure in the buffer gas cylinder is too high at this time and has no buffering effect. At the same time, the high-pressure gas in the inflation pipeline will continue to inflate the device to be inflated. When pressure gauge 1 detects that the gas pressure is greater than the second preset value, the automatic control device automatically controls the inflation automatic valve 2 or the inflation automatic valve 3 to close according to the feedback to avoid over-inflation of the inflation cylinder.

[0019] 5. Inflation switching and pressure relief steps: Since the system is divided into two groups, the left unit to be inflated and the right unit to be inflated, when the left unit to be inflated stops inflating and switches to the right unit to be inflated to start inflating, it is necessary to successively close the inflation automatic valve 1 and the inflation automatic valve 2 (refer to the description in the previous paragraph), and successively open the inflation automatic valve 1 and the inflation automatic valve 3. The valve switching process requires a certain time interval. During this period of time, since the inflation pump has been turned on and continuously inflated the buffer bottle, the inflation automatic valve 1 is suddenly opened, and the buffer bottle is filled with air. The pressure of the gas suddenly charged into the inflation pipeline may exceed the third preset value (greater than the third set value of the pressure gauge three). At this time, the automatic control device automatically opens the pressure relief valve according to the numerical feedback of the pressure gauge three. Part of the excess gas in the inflation pipeline is discharged from the pressure relief pipeline one after being silenced by the muffler, which has the effect of dividing the pressure of the inflation pipeline. When the gas pressure of the inflation pipeline is less than the fourth preset value (the pressure value that the inflation pipeline can withstand), the automatic control device automatically closes the pressure relief valve according to the numerical feedback of the pressure gauge three, and then opens the inflation automatic valve two. At the same time, the pressure relief pipeline two and the manual valve on it play the role of emergency opening to prevent the pressure of the gas suddenly charged into the inflation pipeline from being too high. Before the danger occurs, the vacuum pump will remove the excess gas in the inflation pipeline and quickly reduce the pressure.

[0020] The technical solution provided by the present invention may include the following beneficial effects:

[0021] 1. The automatic gas filling system proposed in the present invention realizes the automated operation of the gas filling process, avoids manual vacuuming of gas cylinders, manual replacement of gas in gas cylinders, manual determination of gas cylinder temperature and manual filling of gas cylinders, can ensure the accuracy of steel cylinder processing and steel cylinder filling volume, has high filling efficiency, high product quality and reduced labor costs, and improves economic benefits.

[0022] 2. The system is equipped with two sets of switching operations for the units to be inflated at the same time, avoiding manual switching of the units to be inflated, and the gas filling efficiency is high.

[0023] 3. The system is equipped with gas buffer and gas pipeline pressure relief devices to improve the safety and reliability of system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the automatic gas filling system of the present invention.

[0025] Figure 2 It is a front view of the gas automatic filling valve group cabinet of the present invention (without the front side panel).

[0026] Among them: 1-automatic filling system; 11-air pump; 12-buffer gas cylinder; 13-inflating pipeline; 14-inflating automatic valve 1; 15-temperature sensor; 16-left inflating pipeline; 17-right inflating pipeline; 18-inflating automatic valve 2; 19-inflating automatic valve 3; 20-left pressure gauge 1; 21-pressure gauge 3; 22-pressure relief pipeline 1; 23-pressure relief automatic valve; 24-pressure relief pipeline 2; 25-manual valve; 26-air exchange automatic valve 1 ; 27-Automatic ventilation valve 2; 28-Right pressure gauge 1; 29-Automatic exhaust valve 1; 30-Left exhaust pipeline; 31-Right exhaust pipeline; 32-Automatic exhaust valve 2; 33-Exhaust pipeline; 34-Pressure gauge 2; 35-Vacuum pump; 36-Left unit to be inflated; 37-Right unit to be inflated; 38-Ventilation pipeline; 39-Left ventilation pipeline; 40-Right ventilation pipeline; 41-Muffler; 42-Regulating valve; 43-Automatic filling valve cabinet. DETAILED DESCRIPTION

[0027] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0028] In the description of the present invention, it is necessary to understand that the terms "longitudinal", "transverse", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, features defined as "first" or "second" may explicitly or implicitly include one or more of the features, and are used to distinguish and describe features, without distinction of order or importance.

[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0030] like Figure 1As shown, a gas automatic filling system 11 includes a charging device, the charging device includes a gas source (not shown), an air pump 11, a unit to be charged, a charging pipeline 13, a vacuum control device, an automatic control device, and the charging device also includes an automatic charging valve 14 and a pressure gauge. The gas source, the air pump 11, the automatic charging valve 14, the pressure gauge and the unit to be charged are arranged on the charging pipeline 13 in sequence, and the vacuum control device, the air pump 11, the automatic charging valve 14 and the pressure gauge are connected to the automatic control device respectively. When the vacuum control device detects that the vacuum value of the gas cylinder meets the standard, it sends information to the automatic control device, and the automatic control device controls the automatic valve and the air pump 11 to open, and inflates the unit to be charged through the charging pipeline 13. Specifically, the inflation device also includes an automatic inflation valve 2, a left pressure gauge 1, an automatic inflation valve 3 and a right pressure gauge 1. The unit to be inflated is divided into two groups, left and right. The inflation pipeline 13 is located between the unit to be inflated and the automatic inflation valve 14 and is forked to form a left inflation pipeline 16 and a right inflation pipeline 17. The left inflation pipeline 16 is connected with an automatic inflation valve 2 18, a left pressure gauge 20 and a left unit to be inflated 36 in sequence. The right inflation pipeline 17 is connected with an automatic inflation valve 3 19, a right pressure gauge 28 and a right unit to be inflated 37 in sequence. In this embodiment, the pressure gauge 1 is actually arranged on the left and right forked pipelines of the inflation pipeline 13, and is composed of a left pressure gauge 20 and a right pressure gauge 28. The automatic control device automatically detects whether the vacuum value of the gas cylinder meets the standard, thereby avoiding the inaccuracy of manual detection, and automatically controls the opening of the automatic inflation valve 14 to the automatic inflation valve 3 19, and automatically controls the inflation pump 11 to inflate the unit to be inflated, thereby avoiding the workload of manual inflation, improving the automation level and economic benefits, and automatically detecting the inflation amount of the gas cylinder by the pressure gauge 1, thereby avoiding the problem of excessive or insufficient filling of the gas cylinder manually, which is more reliable. In addition, the left unit to be inflated 36 and the right unit to be inflated 37 are set and exist in a group of systems, and the automatic control device can automatically switch one of the automatic inflation valve 14 and the automatic inflation valve 2 18 and the automatic inflation valve 3 19 to open (the other is closed), so as to realize the inflation of one of the left unit to be inflated 36 and the right unit to be inflated 37, thereby avoiding the manual replacement of the units to be inflated, and improving the work efficiency.

[0031] The vacuum control device includes a vacuum pump 35, an air extraction pipeline 33, an automatic air extraction valve, and a pressure gauge 34. The vacuum pump 35 is arranged at one end of the air extraction pipeline 33, and the other end of the air extraction pipeline 33 is connected to the unit to be inflated. The air extraction pipeline 33 is provided with an automatic air extraction valve and a pressure gauge 34. The automatic air extraction valve, the pressure gauge 34 and the vacuum pump 35 are respectively connected to the automatic control device. The unit to be inflated is divided into two groups, the left and right groups. The air extraction pipeline 33 is located between the pressure gauge 34 and the unit to be inflated and bifurcates to form a left air extraction pipeline 30 and a right air extraction pipeline 31. The left air extraction pipeline 30 is connected with an automatic air extraction valve 29 and a left unit to be inflated 36 in sequence, and the right air extraction pipeline 31 is connected with an automatic air extraction valve 22 and a right unit to be inflated 37 in sequence. The automatic air extraction valve is composed of an automatic air extraction valve 29 and an automatic air extraction valve 32. The vacuuming step is located before the above-mentioned inflation step. The automatic control device automatically controls the vacuum pump 35 and the automatic air extraction valve to open, and starts to automatically evacuate the left unit 36 ​​to be inflated and the right unit 37 to be inflated. The pressure gauge 34 automatically determines whether the vacuum values ​​of the left unit 36 ​​to be inflated and the right unit 37 to be inflated meet the standards by detecting the air pressure on the air extraction pipeline 33, thereby avoiding the previous situation in which the gas purity of the gas cylinder vacuuming data does not meet the standards due to human reading errors.

[0032] It also includes a ventilation device, which includes a ventilation pipeline 38, a regulating valve 42, and an automatic ventilation valve. One end of the ventilation pipeline 38 is connected to the inflation pipeline 13 between the inflation pump 11 and the automatic inflation valve 14, and the other end of the ventilation pipeline 38 is connected to the unit to be inflated. The ventilation pipeline 38 is connected to the regulating valve 42 for regulating gas flow and the automatic ventilation valve, and the automatic ventilation valve is connected to the automatic control device. The unit to be inflated is divided into two groups, the left and right ventilation pipelines 39 and the right ventilation pipeline 40. The left ventilation pipeline 39 is connected to the automatic ventilation valve 126 and the left unit to be inflated 36 in sequence, and the right ventilation pipeline 40 is connected to the automatic ventilation valve 27 and the right unit to be inflated 37 in sequence. The automatic ventilation valve is composed of the automatic exhaust valve 129 and the automatic exhaust valve 232. This ventilation step is located before the above-mentioned vacuuming step. The opening time of the ventilation automatic valve is automatically controlled by the automatic control device, and the inflation operation of the inflation pump 11 is automatically set by the automatic control device to achieve the effect of filling a certain amount of this gas into the unit to be inflated with residual gas for ventilation and purification. The ventilation operation is carried out automatically and can improve the purity of the unit to be inflated, avoid errors in manual operation, and reduce labor.

[0033] It also includes a gas buffer device, which includes a buffer gas bottle 12, which is arranged on the gas charging pipeline 13 between the joint of the gas charging pump 11 and the ventilation pipeline 38. The gas charging pump 11 is always turned on in the working state, and the role of the buffer bottle is to play a gas buffering role to prevent the gas flow entering the gas charging pipeline 13 from being too large, damaging the pipeline or the gas being filled into the unit to be charged too quickly, which brings safety hazards. After a period of inflation, when the pressure gauge 1 detects that the gas pressure is greater than the first preset value, the automatic control device automatically controls the gas charging automatic valve 1 14 to close according to the feedback, because at this time the gas pressure in the buffer gas bottle 12 is too large and has no buffering effect. At the same time, the high-pressure gas in the gas charging pipeline 13 will continue to inflate the device to be charged. When the pressure gauge 1 detects that the gas pressure is greater than the second preset value, the automatic control device automatically controls the gas charging automatic valve 2 18 or the gas charging automatic valve 3 19 to close according to the feedback to avoid excessive inflation of the gas charging bottle.

[0034] It also includes an inflation pipe pressure relief device, which includes a pressure relief pipeline 1 22, an automatic pressure relief valve 23, a muffler 41, a pressure relief pipeline 24 and a pressure gauge 3 21. One end of the pressure relief pipeline 1 22 is connected to the inflation pipeline 13 between the automatic inflation valve 14 and the inflation pipeline 13 bifurcation point, and the other end of the pressure relief pipeline 1 22 is a free end. The pressure relief pipeline 1 22 is sequentially connected with the pressure relief valve 23 and the muffler 41. The muffler 41 Close to the free end; one end of the pressure relief pipeline 24 is connected to the inflation pipeline 13 between the inflation automatic valve 14 and the inflation pipeline 13 bifurcation point, the other end of the pressure relief pipeline 24 is connected to the vacuum pump 35, and a pressure gauge 3 21 is provided on the pressure relief pipeline 24 near the inflation pipeline 13, and a plurality of manual valves 25 are also provided on the pressure relief pipeline 24; the pressure gauge 3 21 and the pressure relief automatic valve 23 are both connected to the automatic control device. Since the present embodiment is divided into two groups, the left unit to be inflated 36 and the right unit to be inflated 37, when the left unit to be inflated 36 stops inflating and switches to the right unit to be inflated 37 to start inflating, it is necessary to successively close the automatic inflation valve 14 and the automatic inflation valve 2 18 (refer to the description in the previous paragraph), and successively open the automatic inflation valve 14 and the automatic inflation valve 3 19. The valve switching process requires a certain time interval. During this period of time, since the inflation pump 11 is always turned on and continuously inflates the buffer bottle, when the automatic inflation valve 14 is suddenly opened, the buffer bottle is suddenly inflated. However, the pressure of the gas charged into the gas-charging pipeline 13 may exceed the third preset value (greater than the third set value of the pressure gauge three 21). At this time, the automatic control device automatically opens the pressure relief automatic valve 23 according to the numerical feedback of the pressure gauge three 21, and part of the excess gas in the gas-charging pipeline is discharged from the pressure relief pipeline one 22 after being silenced by the muffler 41, which has the effect of dividing the pressure of the gas-charging pipeline 13. When the gas pressure of the gas-charging pipeline 13 is less than the fourth preset value (the pressure value that the gas-charging pipeline 13 can bear), the automatic control device automatically closes the pressure relief automatic valve 23 according to the numerical feedback of the pressure gauge three 21. At the same time, the pressure relief pipeline two 24 and the manual valve 25 thereon play the role of emergency opening to prevent the gas pressure suddenly charged into the gas-charging pipeline 13 from being too high. Before the danger occurs, the vacuum pump 35 removes the excess gas in the gas-charging pipeline 13 to quickly reduce the pressure.

[0035] The unit to be inflated includes a plurality of gas cylinders and a container bar, wherein the plurality of gas cylinders are fixedly mounted on the container bar; and also includes a gas cylinder temperature detection device, wherein the gas cylinder temperature detection device includes a plurality of temperature sensors 15, each of which is fixedly mounted on the outer side wall of the corresponding gas cylinder, and the temperature sensor 15 is connected to an automatic control device; the automatic control device is a PLC control cabinet. The temperature sensor 15 automatically detects the temperature of the gas cylinder and transmits it to the automatic control device. When the temperature is determined to be suitable for inflatable operation, the automatic control device will control the opening of the automatic inflatable valve to inflate the gas cylinder, thereby avoiding the occurrence of inaccurate manual determination of the temperature of the gas cylinder.

[0036] like Figure 2 As shown, an automatic filling valve group cabinet 43 is disclosed, which includes the present embodiment and Figure 1 The automatic gas filling system 1 described in the invention comprises the inflation device, the gas buffer device, the vacuum control device, the automatic control device, the ventilation device, the buffer device, the inflation tube pressure relief device and the gas cylinder temperature detection device at the same time. The units to be inflated are divided into two groups on the left and right. The inflation device, the vacuum control device, the ventilation device, the buffer device, the inflation tube pressure relief device and the gas cylinder temperature detection device are respectively connected to the two groups of units to be inflated and the automatic control device on the left and right, and the connection method is as described in the above embodiment.

[0037] The working steps of the automatic gas filling system 1 of this embodiment are as follows:

[0038] 1. Ventilation step: The automatic control device automatically controls the opening time of the ventilation automatic valve, and the automatic control device automatically sets the inflation pump 11 to inflate, so as to achieve the effect of filling a certain amount of this gas into the unit to be inflated with residual gas for ventilation and purification. After this step is completed, the automatic control device closes the ventilation automatic valve.

[0039] 2. The vacuuming step is to automatically control the vacuum pump 35 and the automatic vacuum valve to open by the automatic control device, and start to automatically vacuum the left unit 36 ​​and the right unit 37 to be inflated. The pressure gauge 34 automatically determines whether the vacuum value of the left unit 36 ​​and the right unit 37 to be inflated meets the standard by detecting the air pressure on the vacuum pipeline 33. After this step is completed, the vacuum pump 35 and the automatic vacuum valve are closed by the automatic control device.

[0040] 3. Inflating step: the automatic control device automatically detects whether the vacuum value and temperature value of the gas cylinder meet the standards, and automatically controls the automatic inflation valve 14, the automatic inflation valve 2 18 and the automatic inflation valve 3 19 to be opened (the other is closed), and automatically controls the inflation pump 11 to inflate the unit to be inflated. The left unit to be inflated 36 and the right unit to be inflated 37 are set and exist in a group of systems. The automatic control device can automatically switch the automatic inflation valve 14, the automatic inflation valve 2 18 and the automatic inflation valve 3 19 to be opened (the other is closed), so as to inflate one of the left unit to be inflated 36 and the right unit to be inflated 37 respectively, avoid manual replacement of the units to be inflated, and improve work efficiency; during the inflation process, the inflation pump 11 is always turned on in the working state, and the role of the buffer bottle is to play a gas buffering role to avoid excessive gas flow entering the inflation pipeline 13, damaging the pipeline or the gas filling into the unit to be inflated too quickly, which brings safety hazards.

[0041] 4. Stop charging step. After a period of inflation, when the pressure gauge detects that the gas pressure is greater than the first preset value, the automatic control device automatically controls the inflation automatic valve 14 to close according to the feedback. This is because the gas pressure in the buffer gas cylinder 12 is too high at this time and has no buffering effect. At the same time, the high-pressure gas in the inflation pipeline 13 will continue to inflate the device to be inflated. When the pressure gauge detects that the gas pressure is greater than the second preset value, the automatic control device automatically controls the inflation automatic valve 2 18 or the inflation automatic valve 3 19 to close according to the feedback to avoid over-inflation of the inflation cylinder.

[0042] 5. Inflation switching and pressure relief steps. Since the system is divided into two groups, the left unit to be inflated 36 and the right unit to be inflated 37, when the left unit to be inflated 36 stops inflating and switches to the right unit to be inflated 37 to start inflating, it is necessary to successively close the automatic inflation valve 14 and the automatic inflation valve 2 18 (refer to the description in the previous paragraph), and successively open the automatic inflation valve 14 and the automatic inflation valve 3 19. The valve switching process requires a certain time interval. During this period of time, since the inflation pump 11 is always turned on and continuously inflates the buffer bottle, when the automatic inflation valve 14 is suddenly opened, the gas pressure suddenly filled into the inflation pipeline 13 by the buffer bottle may exceed the third preset value (greater than the third set value of the pressure gauge 3 21). At this time The automatic control device automatically opens the automatic pressure relief valve 23 according to the numerical feedback of the pressure gauge three 21, and part of the excess gas in the inflation pipeline is discharged from the pressure relief pipeline one 22 after being silenced by the muffler 41, which has the effect of dividing the pressure of the inflation pipeline 13. When the gas pressure of the inflation pipeline 13 is less than the fourth preset value (the pressure value that the inflation pipeline 13 can withstand), the automatic control device automatically closes the automatic pressure relief valve 23 according to the numerical feedback of the pressure gauge three 21, and then opens the automatic inflation valve two 18; at the same time, the pressure relief pipeline two 24 and the manual valve 25 thereon play the role of emergency opening to prevent the gas pressure suddenly filled into the inflation pipeline 13 from being too high. Before the danger occurs, the vacuum pump 35 will extract the excess gas in the inflation pipeline 13 to quickly reduce the pressure.

[0043] When the preparation work of the left unit to be inflated 36 or the right unit to be inflated 37 is not confirmed to be completed, the corresponding ventilation, bottle washing, vacuuming and inflation procedures cannot be selected. When the preparation work of the left unit to be inflated 36 is confirmed to be completed, the ventilation, bottle washing, vacuuming and inflation of the left unit to be inflated 36 can be selected to be executed in sequence or one of them can be executed separately; the same applies to the right side. The ventilation, bottle washing and vacuuming of the left unit to be inflated 36 and the ventilation, bottle washing and vacuuming of the right unit to be inflated 37 cannot be executed at the same time, and the inflation and stopping of the left unit to be inflated 36 and the inflation and stopping of the right unit to be inflated 37 cannot be executed at the same time. After executing each set of programs, the preparation completion button on the corresponding side (set on the PLC control cabinet) needs to be reset.

[0044] The technical principle of the present invention is described above in conjunction with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the scope of protection of the present invention in any way. Based on the explanations herein, those skilled in the art can associate other specific implementations of the present invention without paying creative labor, and these methods will fall within the scope of protection of the present invention.

Claims

1. An automatic gas filling system, comprising a gas filling device, wherein the gas filling device comprises a gas source, a gas filling pump, a unit to be filled, and a gas filling pipeline, wherein: It also includes a vacuum control device, an automatic control device, and the inflation device also includes an automatic inflation valve and a pressure gauge. The gas source, the inflation pump, the automatic inflation valve, the pressure gauge and the unit to be inflated are sequentially arranged on the inflation pipeline. The vacuum control device, the inflation pump, the automatic inflation valve and the pressure gauge are respectively connected to the automatic control device. When the vacuum control device detects that the vacuum value of the gas cylinder meets the standard, it sends information to the automatic control device, and the automatic control device controls the automatic inflation valve and the inflation pump to open, and inflates the unit to be inflated through the inflation pipeline; The vacuum control device comprises a vacuum pump, an air extraction pipeline, an automatic air extraction valve, and a second pressure gauge. The vacuum pump is arranged at one end of the air extraction pipeline, and the other end of the air extraction pipeline is connected to the unit to be inflated. The air extraction pipeline is provided with an automatic air extraction valve and a second pressure gauge, and the automatic air extraction valve, the second pressure gauge and the vacuum pump are respectively connected to the automatic control device; The inflation device further comprises an automatic inflation valve 2, a left pressure gauge 1, an automatic inflation valve 3 and a right pressure gauge 1, the pressure gauge 1 is composed of a left pressure gauge 1 and a right pressure gauge 1, the unit to be inflated is divided into two groups, the inflation pipeline is located between the unit to be inflated and the automatic inflation valve 1 and bifurcates to form a left inflation pipeline and a right inflation pipeline, the left inflation pipeline is sequentially connected with the automatic inflation valve 2, the left pressure gauge 1 and the left unit to be inflated, the right inflation pipeline is sequentially connected with the automatic inflation valve 3, the right pressure gauge 1 and the right unit to be inflated, and the above-mentioned automatic inflation valves and pressure gauges are respectively connected to the automatic control device; It also includes an inflation pipe pressure relief device, which includes a pressure relief line 1, an automatic pressure relief valve, a muffler, a pressure relief line 2 and a pressure gauge 3. One end of the pressure relief line 1 is connected to the inflation line between the automatic inflation valve 1 and the bifurcation point of the inflation line, and the other end of the pressure relief line 1 is a free end. The pressure relief line 1 is sequentially connected with the automatic pressure relief valve and the muffler, and the muffler is close to the free end; one end of the pressure relief line 2 is connected to the inflation line between the automatic inflation valve 1 and the bifurcation point of the inflation line, and the other end of the pressure relief line 2 is connected to the vacuum pump; a pressure gauge 3 is arranged on the pressure relief line 2 near the inflation line, and a plurality of manual valves are also arranged on the pressure relief line 2; the pressure gauge 3 and the automatic pressure relief valve are both connected to the automatic control device.

2. The automatic gas filling system according to claim 1, characterized in that: It also includes a ventilation device, which includes a ventilation pipeline and an automatic ventilation valve. One end of the ventilation pipeline is connected to the inflation pipeline between the inflation pump and the automatic inflation valve, and the other end of the ventilation pipeline is connected to the unit to be inflated. The ventilation pipeline is connected with the automatic ventilation valve, and the automatic ventilation valve is connected to the automatic control device; it also includes a gas buffer device, which includes a buffer gas cylinder, and the buffer gas cylinder is arranged on the inflation pipeline between the inflation pump and the joint of the ventilation pipeline.

3. The automatic gas filling system according to claim 1, characterized in that: The automatic air extraction valve is composed of an automatic air extraction valve 1 and an automatic air extraction valve 2. The unit to be inflated is divided into two groups, the air extraction pipeline is located between the pressure gauge 2 and the unit to be inflated and is forked to form a left air extraction pipeline and a right air extraction pipeline. The left air extraction pipeline is connected with the automatic air extraction valve 1 and the left unit to be inflated in sequence, and the right air extraction pipeline is connected with the automatic air extraction valve 2 and the right unit to be inflated in sequence. The above-mentioned automatic air extraction valves are respectively connected to automatic control devices.

4. The automatic gas filling system according to claim 2, characterized in that: The automatic ventilation valve is composed of automatic ventilation valve 1 and automatic ventilation valve 2. The unit to be inflated is divided into two groups, left and right. The ventilation pipeline is located between the inflation pipeline joint and the unit to be inflated and forked to form a left ventilation pipeline and a right ventilation pipeline. The left ventilation pipeline is connected with automatic ventilation valve 1 and the left unit to be inflated in sequence, and the right ventilation pipeline is connected with automatic ventilation valve 2 and the right unit to be inflated in sequence. The above-mentioned automatic ventilation valves are respectively connected to automatic control devices.

5. The automatic gas filling system according to claim 1, characterized in that: The unit to be inflated includes multiple gas cylinders and a container bar, and the multiple gas cylinders are fixedly installed on the container bar; it also includes a gas cylinder temperature detection device, and the gas cylinder temperature detection device includes multiple temperature sensors, each of which is fixedly set on the outer side wall of the corresponding gas cylinder, and the temperature sensor is connected to an automatic control device; the automatic control device is a PLC control cabinet.

6. A gas automatic filling valve group cabinet, characterized by: An automatic gas filling system comprising the one of claims 1-5.

Citation Information

Patent Citations

  • Small methanol water hydrogen refueling station

    CN111453698A

  • Hydrogen supply system

    CN111578125A

  • Filling control system for single-component or multi-component gas

    CN114033965A

  • Automatic gas filling system and control method

    CN114183689A

  • Tank device for temperature pressure relief of a fuel cell tank

    DE102020213268A1