A smelting method for a high-efficiency smelting system of a European-metallurgical furnace reduction shaft furnace

By introducing high-temperature coal gas and decarbonization purification gas into the Ouye furnace reduction vertical furnace and using nitrogen purge to control the temperature, the metallization rate reduction caused by the increase in the temperature of the reduction vertical furnace in traditional smelting systems is solved, and the smelting efficiency and coal gas are improved Unit consumption achieves reduced fuel consumption and cost.

CN116200567BActive Publication Date: 2024-11-12XINJIANG BAYI IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310160382.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-24
Publication Date
2024-11-12
Estimated Expiration
2043-02-24

AI Technical Summary

Technical Problem

During the continuous reaction of traditional reduction shaft furnaces, the increase in internal temperature leads to a decrease in metallization rate and reduction effect, affecting the smelting efficiency.

Method used

The high-efficiency smelting system of Ouye furnace reduction vertical furnace, including gas ring pipe and nitrogen purge pipeline, is adopted to introduce high-temperature gas and decarbonization purification gas, and use nitrogen purge in the reduction vertical furnace to control the temperature, improve the quality of reduced gas and metals rate of change.

Benefits of technology

It significantly improves the reduction effect and metallization rate of the reduction vertical furnace, reduces the raw material use of melt gasifier, reduces fuel consumption and carbon emissions, and reduces production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116200567B_ABST
    Figure CN116200567B_ABST
Patent Text Reader

Abstract

The invention relates to the field of metallurgical technology, and specifically discloses an efficient smelting system of an Ouye furnace reduction shaft furnace, comprising a reduction shaft furnace, a gas ring pipe connected to the reduction shaft furnace and used for supplying decarbonization purification gas, a gas pipeline connected to the gas ring pipe and used for supplying high-temperature coal gas, and a nitrogen purge pipeline connected to the gas pipeline and used for supplying nitrogen. A reduction shaft furnace short pipe is connected to one side of the reduction shaft furnace, a metal hose is connected between the reduction shaft furnace short pipe and the gas ring pipe, a short pipe one-way valve and a hose hard-sealed ball valve are arranged on the metal hose in sequence along the gas travel direction, and a shaft furnace blowing burner is also arranged at the connection between the reduction shaft furnace short pipe and the metal short pipe, thereby solving the problem that the metallization rate and reduction effect of the reduction shaft furnace are reduced due to the increase of internal temperature in the continuous reaction process of the traditional reduction shaft furnace.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of metallurgical technology, and specifically discloses an efficient smelting system of a European metallurgical furnace reduction shaft furnace. Background Art

[0002] With the progress of the times and the development of science and technology, human beings are gradually innovating and developing in their transformation of nature, the way they use natural resources, and the scale of their use. As a result, the amount of natural resources used is increasing year by year. However, after years of long-term use, the amount of natural resources in some areas has reached a precarious point. With the consumption of resources, the pollutants generated after use are also increasing day by day. The damage to the environment and ecology caused by excess pollutants has become an important problem for the global ecological environment today.

[0003] Nowadays, the environmental problems that threaten human survival and have been recognized by humans mainly include greenhouse effect, ozone layer depletion, acid rain, fog and haze weather changes, etc. The main cause of global warming and haze weather is the large amount of greenhouse gases emitted by human activities and nature, such as carbon dioxide, and carbon dioxide mainly comes from enterprises that use a lot of coal, oil and natural gas, mainly the steel industry.

[0004] my country's steel industry is facing overall overcapacity and increasing pressure on raw material costs. In addition, multi-metal co-existing ores, represented by iron-based polymetallic ores, make blast furnace ironmaking more difficult, with low output and more waste and waste gas generated.

[0005] Among them, Ouye furnace, as a representative of blast furnace ironmaking, uses non-coking coal as the main fuel and mainly uses oxygen as the combustion-supporting gas. During combustion, it mainly relies on oxygen to enter the furnace from the gasification furnace tuyere and the gasification furnace dome. After combustion, reducing gases such as carbon monoxide and hydrogen are formed and heat is generated. The generated reducing coal gas is introduced into the reduction shaft furnace through the coal gas pipeline to preheat and reduce the raw ore, sintering, and pelletizing of the reduction shaft furnace. How to improve the metallization rate of the reduction shaft furnace, increase the reduction effect, and increase the amount of coal gas has become one of the important ways to save energy and reduce emissions.

[0006] Therefore, in view of this, the inventor provides an Ouye furnace reduction vertical furnace high-efficiency smelting system to solve the above problems. Summary of the invention

[0007] The purpose of the present invention is to solve the problem that the metallization rate and reduction effect of the traditional reduction shaft furnace are reduced due to the increase of the internal temperature during the continuous reaction process.

[0008] In order to achieve the above-mentioned object, the basic scheme of the present invention provides an Ouye furnace reduction shaft furnace high-efficiency smelting system, comprising a reduction shaft furnace, a gas ring pipe connected to the reduction shaft furnace and used to supply decarbonization purification gas, a gas pipeline connected to the gas ring pipe and used to supply high-temperature coal gas, and a nitrogen purge pipeline connected to the gas pipeline and used to supply nitrogen;

[0009] The gas pipeline is provided with a gas control component for controlling the flow of high-temperature gas and preventing gas backflow, and the nitrogen purge pipeline is provided with a nitrogen control component for controlling the flow of nitrogen and preventing gas backflow;

[0010] A reduction vertical furnace short pipe is provided on one side of the reduction vertical furnace. A metal hose is connected between the reduction vertical furnace short pipe and the gas ring pipe. The metal hose is provided with a gas control component for controlling gas circulation and preventing gas reflux. The connection between the reduction vertical furnace short pipe and the metal short pipe is also connected to a vertical furnace blowing burner.

[0011] Furthermore, the gas control assembly includes a one-way valve for a short tube and a hard-sealed ball valve for a hose, which are sequentially arranged on the metal hose along the direction of gas travel.

[0012] Furthermore, a pipeline connection structure is provided between the reduction shaft furnace short tube and the metal short tube, and the pipeline connection structure includes a tee, a flange cover connected to one end of the tee, and a seamless steel pipe connected to the other end of the tee. The remaining end of the tee is connected to a hose with a hard-sealed ball valve, and both ends of the shaft furnace blowing burner are respectively connected to the seamless steel pipe and the reduction shaft furnace short tube.

[0013] Furthermore, the three pipe openings of the three-way pipe are all provided with flanges.

[0014] Furthermore, the gas control assembly includes a gas flow meter, a gas pressure gauge, a gas quick-cut valve and a gas regulating valve which are sequentially arranged on the gas pipeline along the gas travel direction.

[0015] Furthermore, the nitrogen purge pipeline includes a nitrogen flowmeter, a nitrogen pressure gauge, a nitrogen quick-cut valve and a nitrogen regulating valve which are arranged on the nitrogen purge pipeline in sequence along the gas travel direction, and the end of the nitrogen purge pipeline is connected to the gas pipeline between the gas quick-cut valve and the gas regulating valve.

[0016] Furthermore, the vertical furnace blowing burner includes a tube body and a boss arranged in the tube body, and the boss includes a connected inward inclined platform, a transition platform and an outward inclined platform in sequence along the direction of gas travel. The inner diameter of the inward inclined platform gradually decreases, the inner diameter of the transition platform remains unchanged, and the inner diameter of the outward inclined platform gradually increases until it is equal to the diameter of the tube body.

[0017] Furthermore, a section inside the boss in the tube body is a first chamber, and the inwardly inclined platform, transition platform and outwardly inclined platform in the boss are the second chamber, the third chamber and the fourth chamber respectively.

[0018] Furthermore, the gas pipeline, gas ring pipe and nitrogen purge pipeline are all seamless pipes.

[0019] Furthermore, the model of the seamless pipe is DN150.

[0020] The principle and effect of this scheme are:

[0021] 1. The present invention introduces high-temperature coal gas into the reduction shaft furnace through the gas main to preheat and pre-reduce the iron-containing raw materials, and is used in combination with the process of decarbonization treatment of the Ouye furnace coal gas. Decarbonization purified gas is introduced into the reduction shaft furnace through the gas ring pipe, and the purified gas generated by decarbonization in the Ouye furnace is sprayed back to the reduction shaft furnace, which significantly improves the quality of the reduction gas of the reduction shaft furnace, enhances the reduction potential of the reduction shaft furnace, and improves the pre-reduction effect of the shaft furnace.

[0022] 2. The present invention adds a nitrogen purge pipeline. Before spraying the decarbonization purification gas into the reduction shaft furnace, nitrogen can be blown into it first. With the increase of the nitrogen spraying amount, the temperature in the reduction shaft furnace can be effectively reduced, the reduction gas unit consumption can be increased, the metallization rate can be increased, and the raw material usage of the melt gasification furnace can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0024] Figure 1 A schematic diagram showing the connection of pipelines and valves of an efficient smelting system of a reduction shaft furnace of an Ouye furnace proposed in an embodiment of the present application is shown;

[0025] Figure 2 A schematic diagram showing a pipeline connection structure of an Ouye furnace reduction shaft furnace high-efficiency smelting system proposed in an embodiment of the present application is shown;

[0026] Figure 3 A schematic structural diagram of a vertical furnace injection burner of an Ouye furnace reduction vertical furnace high-efficiency smelting system proposed in an embodiment of the present application is shown. Implementation

[0027] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.

[0028] The reference numerals in the drawings of the specification include: flange 1, flange cover 2, connecting flange 3, hard-sealed ball valve for short pipe 4, seamless steel pipe 5, processing nozzle 6, tee pipe 7, inward inclined platform 8, transition platform 9, outward inclined platform 10, pipe body 11, reduction vertical furnace 12, reduction vertical furnace short pipe 13, hard-sealed ball valve 14, one-way valve for hose 15, gas ring pipe 16, gas regulating valve 17, gas quick-cut valve 18, gas main pipe 19, nitrogen main pipe 20, nitrogen quick-cut valve 21, nitrogen regulating valve 22, nitrogen safety valve 23.

[0029] An efficient smelting system of a European metallurgical furnace reduction shaft furnace, for example Figure 1 As shown:

[0030] The system includes a reduction shaft furnace 12 , a gas ring pipe 16 connected to the reduction shaft furnace 12 , a gas pipeline connected to the gas ring pipe 16 , and a nitrogen purge pipeline connected to the gas pipeline and used to introduce nitrogen into the reduction shaft furnace 12 .

[0031] Among them, the gas pipeline includes, in sequence, a gas main pipe 19 connected to the gas outlet of the melting vaporizer, a gas flow meter installed on the gas main pipe 19 and connected to the gas main pipe 19, a gas pressure gauge installed on the gas main pipe 19 behind the gas flow meter and connected to the gas main pipe 19, a gas quick-cut valve 18 installed on the gas main pipe 19 behind the gas pressure gauge and connected to the gas main pipe 19, and a gas regulating valve 17 installed on the gas main pipe 19 behind the gas quick-cut valve 18 and connected to the gas main pipe 19.

[0032] The gas main pipe 19 connected to the rear of the gas regulating valve 17 is also connected to a gas ring pipe 16. In this embodiment, the gas main pipe 19 and the gas ring pipe 16 are both seamless pipes, and the model of the seamless pipes is DN150.

[0033] The gas ring pipe 16 is connected to the Ouye furnace and is used to introduce the purified gas generated by decarburization.

[0034] The specific functions of the gas flow meter, gas pressure gauge, gas quick cut-off valve 18 and gas regulating valve 17 installed in sequence along the gas inlet direction of the gas main pipe 19 are as follows:

[0035] Gas flow meter: used to monitor the real-time flow and real-time flow rate of the gas flowing in the gas main 19;

[0036] Gas pressure gauge: used to monitor the real-time pressure value of the gas flowing in the gas main 19;

[0037] Gas quick cut-off valve 18: used to control the gas flow state in the gas main pipe 19 of this section;

[0038] Gas regulating valve 17: used to control the gas flow state in this section of the gas main 19.

[0039] Among them, the nitrogen purge pipeline includes a nitrogen main pipe 20 for introducing nitrogen, a nitrogen flowmeter installed on the nitrogen main pipe 20 and connected to the nitrogen main pipe 20, a nitrogen pressure gauge installed on the nitrogen main pipe 20 behind the nitrogen flowmeter and connected to the nitrogen main pipe 20, a nitrogen quick-cut valve 21 installed on the nitrogen main pipe 20 behind the nitrogen pressure gauge and connected to the nitrogen main pipe 20, and a nitrogen regulating valve 22 installed on the nitrogen main pipe 20 behind the nitrogen quick-cut valve 21 and connected to the nitrogen main pipe 20.

[0040] A nitrogen safety valve 23 is also installed on the nitrogen main pipe 20 behind the nitrogen regulating valve 22. The valve ports on both sides of the nitrogen safety valve 23 are connected to a nitrogen main pipe 20, and the pipe port at the end of the rear nitrogen main pipe 20 is connected to the gas main pipe 19 between the gas quick cut valve 18 and the gas regulating valve 17. In this embodiment, the nitrogen main pipe 20 still adopts a seamless pipe, and the model of the seamless pipe is DN80.

[0041] The specific functions of the nitrogen flow meter, nitrogen pressure gauge, nitrogen quick cut valve 21, nitrogen regulating valve 22 and nitrogen safety valve 23 installed in sequence along the nitrogen main pipe 20 inlet direction are as follows:

[0042] Nitrogen flow meter: used to monitor the real-time flow rate and real-time flow velocity of nitrogen flowing in the nitrogen main pipe 20;

[0043] Nitrogen pressure gauge: used to monitor the real-time pressure value of nitrogen flowing in the nitrogen main pipe 20;

[0044] Nitrogen quick-cut valve 21: used to control the nitrogen flow state in this section of nitrogen main pipe 20;

[0045] Nitrogen regulating valve 22: used to control the flow state of nitrogen in the nitrogen main pipe 20;

[0046] Nitrogen safety valve 23 is used to actively adjust the opening and closing of the nitrogen main pipe 20 to supply nitrogen into the gas main pipe 19 and transport it to the reduction shaft furnace 12 through the gas main pipe 19 or to close the nitrogen main pipe 20 .

[0047] In this embodiment, the pipeline connection relationship between the gas ring pipe 16 and the reduction shaft furnace 12 is as follows:

[0048] Along the gas flow direction in the gas ring pipe 16, a section of the gas ring pipe 16 located behind the gas main 19 is connected to a metal hose, a hose check valve 15 is installed at the inlet of the metal hose, and eight check valves and eight hose hard-sealed ball valves 14 are installed in sequence on the metal hose behind the hose check valve 15.

[0049] The reduction shaft furnace 12 is also connected to a reduction shaft furnace short pipe 13. The metal hose connected behind the hose hard-sealed ball valve 14 is connected to the reduction shaft furnace short pipe 13, and the gas flowing in the metal hose can be introduced into the reduction shaft furnace 12 through the reduction shaft furnace 12 hose.

[0050] In this embodiment, the specific structure of the pipe connection structure of the reduction shaft furnace short tube 13 is as follows:

[0051] First, it includes a tee 7, and each of the three pipe openings of the tee 7 is equipped with a flange 1. A flange cover 2 is installed on the outside of the flange 1 at the left end of the tee 7. A short-tube hard-sealed ball valve 4 is also installed on the outside of the flange 1 above the tee 7. This short-tube hard-sealed ball valve 4 is a hose hard-sealed ball valve 14 at the end of the metal hose. A flange 1 is installed at both ends of the short-tube hard-sealed ball valve 4. The short-tube hard-sealed ball valve 4 and the tee 7 are connected by flange 1, and the short-tube hard-sealed ball valve 4 is also connected to the metal hose through the top flange 1. A seamless steel pipe 5 is connected to the right end of the tee 7, and the tee 7 and the seamless steel pipe 5 are also connected by flange 1, which is the connecting flange 3. At the same time, a processing nozzle 6 connected to the inner cavity of the reduction shaft furnace 12 is installed at the right end of the seamless steel pipe 5.

[0052] like Figure 3 As shown, the specific structure of the processing nozzle 6 (i.e., pipeline gas injection nozzle, vertical furnace injection burner) is as follows:

[0053] The outer layer is a cylindrical tube body 11, the left end of the tube body 11 is the first chamber, and a circle of bosses is integrally formed on the inner side of the tube body 11 on the right side of the first chamber. The bosses are divided into three sections, which are divided into an inward inclined platform 8, a transition platform 9 and an outward inclined platform 10 in sequence from the air inlet direction of the tube mouth to the air outlet direction of the tube mouth. The transition platform 9 connects the ends of the inward inclined platform 8 and the outward inclined platform 10, and the inward inclined platform 8 gradually shrinks inward, and the inner diameter gradually decreases, the inner diameter of the transition platform 9 remains unchanged, and the outward inclined platform 10 gradually expands outward, and the inner diameter gradually increases.

[0054] The chamber of the tube body 11 on the inner side of the inward inclined platform 8 is the second chamber, the chamber of the tube body 11 on the inner side of the transition platform 9 is the third chamber, and the chamber of the tube body 11 on the inner side of the outward inclined platform 10 is the fourth chamber.

[0055] The first chamber, the second chamber, the third chamber and the fourth chamber in the tube body 11 are connected in sequence and are used to output gas to the reduction shaft furnace 12 in sequence.

[0056] Before the construction of this system, the reduction shaft furnace 12 of Ouyelu relied on the coal gas generated by the melter gasifier to preheat and reduce the raw materials. During use, the carbon monoxide content of the coal gas generated in the melter gasifier was about 62%, the carbon dioxide content fluctuated between 8-10%, and the metallization rate in the reduction shaft furnace 12 fluctuated between 20-30%.

[0057] In the daily iron smelting process, the metallization rate of the reduction shaft furnace 12 is affected by the coal gas consumption and quality. When the coal gas consumption decreases and the carbon monoxide content in the coal gas decreases, the metallization rate will decrease. According to production practice, in the production process of the European Metallurgical Furnace, the metallization rate is generally maintained at around 30%, and when the coal gas consumption decreases and the carbon monoxide content in the coal gas decreases, the metallization rate will decrease to between 10% and 20%, seriously affecting the degree of metallization.

[0058] When the metallization rate decreases, it is necessary to add fuel to the melter-gasifier to maintain the stability of the furnace condition in the reduction shaft furnace 12 .

[0059] According to production practice, for every 1% decrease in the metallization rate in the reduction shaft furnace 12, at least 10kg / t of metallurgical coke needs to be added to the vaporizer. At the same time, the furnace conditions need to be adjusted to increase the metallization rate of the reduction shaft furnace 12, and the coal injection ratio of the melting vaporizer arch needs to be increased by 20kg / t. After the low metallization rate of the reduction shaft furnace 12 is improved and stabilized, the metallurgical coke is gradually reduced according to the improvement of the metallization rate of the shaft furnace and the temperature of the molten iron until the metallurgical coke is reduced to a normal level.

[0060] Since the carbon monoxide content of the decarbonization purified gas of the Ouye furnace is about 75%, and the carbon dioxide content is about 0.8%, when the reduction shaft furnace 12 is sprayed with the decarbonization purified gas, the overall reduction potential of the reduction shaft furnace 12 can be improved according to the amount of purified gas sprayed by the reduction shaft furnace 12. Through the construction of this system, when the content of purified gas sprayed by the reduction shaft furnace 12 reaches 10,000 m³ / h, the carbon monoxide content of the reduction coal gas of the shaft furnace is increased by 2%. When the content of purified gas sprayed by the reduction shaft furnace 12 reaches 20,000 m³ / h, the carbon monoxide content of the reduction coal gas of the shaft furnace is increased by 4%. Since the temperature of the decarbonization purified gas is 50°C, spraying 20,000 m³ / h can reduce the overall temperature of the reduction shaft furnace 12 by 5°C, and increase the amount of coal gas entering the reduction shaft furnace 12 of the melting vaporization furnace by 30,000 m³ / h.

[0061] Due to the high carbon monoxide content of the decarbonized purified gas, the injection of 20,000 m³ / h of purified gas into the reduction shaft furnace 12 can increase the overall gas volume of the reduction shaft furnace 12 by 50,000 m³ / h, increase the gas consumption of the reduction shaft furnace 12 by 50 m³ / t, and simultaneously increase the metallization rate by 5%, reducing the fuel of the melting gasification furnace by 50 kg / t.

[0062] Before the reduction shaft furnace 12 is sprayed with purified gas, the reduction shaft furnace 12 is tested with industrial nitrogen. When the reduction shaft furnace 12 is sprayed with nitrogen, the original spiral nitrogen blowing of the reduction shaft furnace 12 and the newly erected nitrogen pipeline are used to spray the reduction shaft furnace 12. During the test, nitrogen has no effect on the reduction potential of the reduction shaft furnace 12, and the carbon monoxide content in the reduction coal gas has no obvious change. When the nitrogen injection amount of the reduction shaft furnace 12 reaches 10,000 m³ / h, the temperature of the reduction shaft furnace 12 can be reduced by 5°C, and the reduction coal gas amount can be increased by 15,000 m³ / h.

[0063] When the nitrogen injection volume reaches 20,000 m³ / h, the temperature of the reduction shaft furnace 12 can be reduced by 8°C, the reduction gas volume can be increased by 30,000 m³ / h, the reduction gas unit consumption can be increased by 40 m³ / t, the metallization rate can be increased by 3%, and the fuel of the melting gasification furnace can be reduced by 30 kg / t.

[0064] After the system is built, a blast furnace with an annual output of 1.2 million tons of molten iron can reduce the fuel ratio of ton iron by 50kg, with an annual benefit of 1200000×50÷1000=60000 tons, which can reduce 60000 tons of fuel and reduce carbon emissions. At the same time, the cost is reduced by 60000×2113=126780000 yuan. When purified gas is used instead of the reduction shaft furnace 12 for injection, nitrogen consumption and nitrogen consumption costs can be reduced. The annual benefit is 0.14×20000×24×365=24528000 yuan.

[0065] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A smelting method for a high-efficiency smelting system of a European metallurgical furnace reduction shaft furnace, characterized in that: It includes a reduction shaft furnace, a gas ring pipe connected to the reduction shaft furnace and used for supplying decarbonized purified gas, a gas pipeline connected to the gas ring pipe and used for supplying high-temperature coal gas, and a nitrogen purge pipeline connected to the gas pipeline and used for supplying nitrogen; The gas pipeline is provided with a gas control component for controlling the flow of high-temperature gas and preventing gas backflow, and the nitrogen purge pipeline is provided with a nitrogen control component for controlling the flow of nitrogen and preventing gas backflow; A reduction shaft furnace short pipe is provided on one side of the reduction shaft furnace. A metal hose is connected between the reduction shaft furnace short pipe and the gas ring pipe. A gas control component for controlling gas flow and preventing gas backflow is provided on the metal hose. A shaft furnace injection burner is also connected at the connection between the reduction shaft furnace short pipe and the metal short pipe. The smelting method includes: before the reduction shaft furnace is sprayed with purified gas, the reduction shaft furnace is tested with industrial nitrogen, and when the reduction shaft furnace is sprayed with nitrogen, the original spiral nitrogen blowing and nitrogen purge pipeline of the reduction shaft furnace are used to spray the reduction shaft furnace. During the test, the nitrogen has no effect on the reduction potential of the reduction shaft furnace, and the carbon monoxide content in the reduction coal gas has no obvious change. When the nitrogen injection amount of the reduction shaft furnace reaches 10,000 m³ / h, the temperature of the reduction shaft furnace can be reduced by 5°C, and the reduction coal gas amount can be increased by 15,000 m³ / h; When the nitrogen injection volume reaches 20,000 m³ / h, the temperature of the reduction shaft furnace can be reduced by 8°C, the reduction gas volume can be increased by 30,000 m³ / h, the reduction gas consumption can be increased by 40 m³ / t, the metallization rate can be increased by 3%, and the fuel of the melting gasification furnace can be reduced by 30 kg / t.

2. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 1 is characterized in that: The gas control component comprises a one-way valve for a short tube and a hard-sealed ball valve for a hose, which are sequentially arranged on the metal hose along the gas traveling direction.

3. The smelting method of a European metallurgical furnace reduction shaft furnace high-efficiency smelting system according to claim 2 is characterized in that: A pipeline connection structure is also provided between the reduction shaft furnace short tube and the metal short tube. The pipeline connection structure includes a tee, a flange cover connected to one end of the tee and a seamless steel pipe connected to the other end of the tee. The remaining end of the tee is connected to a hose by a hard-sealed ball valve. Both ends of the shaft furnace blowing burner are respectively connected to the seamless steel pipe and the reduction shaft furnace short tube.

4. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 3 is characterized in that: The three pipe openings of the three-way pipe are all provided with flanges.

5. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 1, characterized in that: The gas control assembly comprises a gas flow meter, a gas pressure gauge, a gas quick-cut valve and a gas regulating valve which are sequentially arranged on the gas pipeline along the gas travel direction.

6. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 5, characterized in that: The nitrogen purge pipeline includes a nitrogen flow meter, a nitrogen pressure gauge, a nitrogen quick-cut valve and a nitrogen regulating valve which are sequentially arranged on the nitrogen purge pipeline along the gas travel direction, and the end of the nitrogen purge pipeline is connected to the gas pipeline between the gas quick-cut valve and the gas regulating valve.

7. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 1, characterized in that: The vertical furnace blowing burner includes a tube body and a boss arranged in the tube body. The boss includes a connected inward inclined platform, a transition platform and an outward inclined platform in sequence along the gas travel direction. The inner diameter of the inward inclined platform gradually decreases, the inner diameter of the transition platform remains unchanged, and the inner diameter of the outward inclined platform gradually increases until it is equal to the diameter of the tube body.

8. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 7, characterized in that: A section inside the boss in the tube body is a first chamber, and the inwardly inclined platform, transition platform and outwardly inclined platform in the boss are respectively a second chamber, a third chamber and a fourth chamber.

9. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 1, characterized in that: The gas pipeline, gas ring pipe and nitrogen purge pipeline are all seamless pipes.

10. The smelting method of the European Metallurgical Furnace Reduction Shaft Furnace High Efficiency Smelting System according to claim 9, characterized in that: The model of the seamless pipe is DN150.