Energy-saving optimization system for dynamic auxiliary equipment

By introducing auxiliary systems to the dynamic auxiliary equipment system for the application of heat exchange technology, the problems of complexity of water pump energy consumption detection system and energy waste are solved, and more efficient energy consumption utilization and environmentally friendly operation are achieved.

CN116292171BActive Publication Date: 2025-02-18FUJIAN DEKEN ENERGY TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310334818.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2025-02-18
Estimated Expiration
2043-03-31

AI Technical Summary

Technical Problem

The energy consumption detection system of the water pump in the existing dynamic auxiliary equipment system is complex, with large errors, large investment, low efficiency, and ineffective use of the heat emitted by the water pump for work, resulting in waste of energy.

Method used

Design an energy-saving and optimization system for dynamic auxiliary equipment, including the main power system and the auxiliary system. The auxiliary system uses heat exchange technology to recover the heat emitted by the water pump's work, and uses refrigerant to perform heat absorption cooling cycles to improve energy consumption utilization and avoid energy waste.

Benefits of technology

It improves the utilization rate of the energy consumption of the water pump system, avoids the reduction or damage of the motor efficiency caused by overheating, and achieves a more energy-saving and environmentally friendly operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116292171B_ABST
    Figure CN116292171B_ABST
Patent Text Reader

Abstract

The present invention discloses an energy-saving optimization system for dynamic auxiliary equipment, which belongs to the technical field of dynamic auxiliary equipment system detection. The energy-saving optimization system for dynamic auxiliary equipment includes a main power system and an auxiliary system. The auxiliary system is used to perform heat exchange on the power end of the main power system. When the working temperature of the water pump exceeds the preset temperature threshold, the auxiliary system is started to recover the heat generated by the water pump. The edge computing module can perform energy consumption analysis based on the data signals collected by the first pressure sensor, the second pressure sensor, the flow sensor and the multi-function electric meter. The energy-saving optimization system for dynamic auxiliary equipment disclosed by the present invention can improve the energy efficiency and optimization work of the equipment, improve the utilization rate of the energy consumption of the water pump system, and at the same time effectively utilize the heat generated by the system to avoid energy waste, which is more energy-saving and environmentally friendly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power auxiliary equipment system detection, and in particular to an energy-saving optimization system for power auxiliary equipment. Background Art

[0002] Water pumps are widely used in the water supply and drainage industry. They are the main power equipment in the auxiliary equipment system and also the equipment with large energy consumption. Generally, the power consumption of water pump stations accounts for more than 60%-70% of the total power consumption of the auxiliary equipment system, and accounts for the vast majority of the operating costs of the auxiliary equipment system. In practical applications, in order to meet the water consumption and water pressure requirements of the auxiliary equipment system, the water pump needs to be adjusted. The traditional mechanical valve adjustment method changes the working condition of the pump, and its energy loss is large. The existing auxiliary equipment system energy consumption detection system is generally more complicated, and some need to be modified and installed on the pipeline system. In most cases, it is necessary to combine the knowledge of electrical and fluid machinery to complete the improvement of the pump system, and manual measurement and analysis and calculation are also used. On the one hand, the error is large, and on the other hand, the investment is large and the efficiency is low.

[0003] Chinese patent document publication number CN 111472970 A discloses a portable water pump energy consumption analysis system, including: a water inlet pipe, a water pump, a water outlet pipe, a data transmission unit and a cloud platform; the water inlet pipe is provided with an inlet pressure sensor, the water outlet pipe is provided with an outlet pressure sensor and a flow meter, the water pump is provided with a power meter, the power meter is powered by a power supply, the data transmission unit is used to synchronously collect data signals of the inlet pressure sensor, the outlet pressure sensor, the power meter and the flow meter, and the cloud platform calculates the energy consumption of the water pump system according to the data signals collected by the data transmission unit. However, the above-mentioned water pump energy consumption analysis system is prone to reduced efficiency or even damage due to overheating of the water pump motor, and it is impossible to reasonably utilize the energy generated by heat and work, resulting in energy waste. Summary of the invention

[0004] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to propose an energy-saving optimization system for dynamic auxiliary equipment, which can improve the energy efficiency and optimization work of the equipment, improve the utilization rate of the energy consumption of the water pump system, and at the same time effectively utilize the heat generated by the system to avoid energy waste, which is more energy-saving and environmentally friendly.

[0005] To achieve this object, the present invention adopts the following technical solutions:

[0006] The present invention provides an energy-saving optimization system for power-assisted equipment, comprising a main power system and an auxiliary system, wherein the auxiliary system is used to perform heat exchange on the power end of the main power system, wherein the main power system comprises a water pump and a temperature sensor, wherein the signal sensing end of the temperature sensor is arranged on the power working end of the water pump, and is used to detect the working temperature of the power working end of the water pump, and when the working temperature of the water pump exceeds a preset temperature threshold, the auxiliary system is started to recover the heat generated by the water pump when the water pump does work, and the auxiliary system realizes heat exchange by transmitting a refrigerant agent, and comprises a compressor, a condenser, a first electronic valve, a second electronic valve, and a heat absorption pipeline, wherein the pipeline outlet end of the compressor is connected to the first inlet end of the condenser, the first outlet end of the condenser is connected to the inlet end of the first electronic valve, the outlet end of the first electronic valve is connected to the pipeline inlet end of the heat absorption pipeline, the pipeline outlet end of the heat absorption pipeline is connected to the inlet end of the second electronic valve, the outlet end of the second electronic valve is connected to the pipeline inlet end of the compressor, and the heat absorption pipeline is laid under the power working end of the water pump to absorb the heat generated by the water pump when the water pump does work.

[0007] The preferred technical solution of the present invention is that the main power system includes a first pressure sensor, a second pressure sensor, a flow sensor and a multi-function electric meter. The first pressure sensor is arranged on the pipeline inlet end of the water pump, the second pressure sensor and the flow sensor are respectively arranged on the pipeline outlet end of the water pump, and the water pump is provided with a multi-function electric meter for collecting water pump power supply parameters, including current, voltage, power, power factor and electric energy data.

[0008] The preferred technical solution of the present invention is that the main power system includes an edge computing module and a cloud platform. The edge computing module is used to synchronously collect data signals from the first pressure sensor, the second pressure sensor, the flow sensor and the multi-function electric meter, and transmit the data signals to the cloud platform. The cloud platform calculates the energy consumption of the main power system based on the data signals collected by the edge computing module.

[0009] The preferred technical solution of the present invention is that the main power system includes a timer, and a pressure regulating switch is provided on the compressor. The edge computing module calculates the temperature change value per unit time according to the time parameters of the timer and the temperature parameters of the temperature sensor. When the temperature change value exceeds the preset temperature change threshold, the pressure of the compressor is increased through the pressure regulating switch to increase the flow rate of the refrigerant.

[0010] The preferred technical solution of the present invention is that the heat absorption pipeline includes an input pipeline, a heat exchange pipeline and an output pipeline. The heat exchange pipeline is laid under the power working end of the water pump to absorb the heat generated by the water pump. The outlet end of the first electronic valve is connected to the pipeline inlet end of the heat exchange pipeline through the input pipeline, and the pipeline outlet end of the heat exchange pipeline is connected to the inlet end of the second electronic valve through the output pipeline.

[0011] A preferred technical solution of the present invention is that the pipe diameter of the input pipe is smaller than the pipe diameter of the heat exchange pipe.

[0012] A preferred technical solution of the present invention is that the input pipeline is configured as a capillary pipeline, and the pipeline diameter of the capillary pipeline is less than one tenth of the pipeline diameter of the heat exchange pipeline.

[0013] A preferred technical solution of the present invention is that the heat exchange pipeline is configured as a coiled zigzag loop.

[0014] A preferred technical solution of the present invention is that the second inlet end of the condenser is connected to a condensate pump, the second outlet end of the condenser is connected to a water tank, and the outlet end of the water tank is connected to the inlet end of the condensate pump.

[0015] The preferred technical solution of the present invention is that the second outlet end of the condenser is connected to the inlet end of the water tank through a heating component, the heating component includes a water PTC component and a heater, the second outlet end of the condenser is connected to the inlet end of the heater through the water PTC component, and the outlet end of the heater is connected to the inlet end of the water tank.

[0016] The beneficial effects of the present invention are:

[0017] 1. The energy-saving optimization system of the auxiliary equipment includes the main power system and the auxiliary system. The auxiliary system is used to perform heat exchange on the power end of the main power system. When the working temperature of the water pump exceeds the preset temperature threshold, the auxiliary system is started to recover the heat generated by the water pump. The main power system performs heat absorption and cooling cycles through the auxiliary system, so that the energy-saving optimization system of the auxiliary equipment can dissipate heat better when working, avoid the motor from being overheated and causing the efficiency to be reduced or even damaged, and improve the utilization rate of the energy consumption of the water pump system. At the same time, the heat generated by the system can be effectively utilized, which is more energy-saving and environmentally friendly.

[0018] 2. The edge computing module can perform energy consumption analysis based on the data signals collected by the first pressure sensor, the second pressure sensor, the flow sensor and the multi-function electric meter, thereby improving the energy efficiency and optimization of the equipment, effectively reducing the complexity of the energy consumption analysis of the water pump system, and improving the efficiency of the energy consumption analysis of the water pump system. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall module line connection of the energy-saving optimization system of the dynamic auxiliary equipment provided in the specific implementation mode of the present invention.

[0020] Figure 2 It is a schematic diagram of the module line connection details of the energy-saving optimization system for dynamic auxiliary equipment provided in a specific implementation manner of the present invention.

[0021] Figure 3It is a schematic diagram of the structural assembly of the water pump and the heat absorption pipeline provided in the specific implementation manner of the present invention.

[0022] Figure 4 It is a structural schematic diagram of a heat absorption pipeline provided in a specific embodiment of the present invention.

[0023] In the figure:

[0024] Main power system A, water pump 1, temperature sensor 2, first pressure sensor 3, second pressure sensor 4, flow sensor 5, multi-function electric meter 6, edge computing module 7, cloud platform 8, timer 9;

[0025] Auxiliary system B, compressor 10, condenser 11, first electronic valve 12, second electronic valve 13, heat absorption pipeline 14, input pipeline 141, heat exchange pipeline 142, output pipeline 143, pressure regulating switch 15, condensate pump 16, water tank 17, heating component 18, water PTC component 181, heater 182. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0027] like Figures 1 to 4 As shown, in order to improve the energy efficiency and optimize the work of the equipment, the utilization rate of the energy consumption of the water pump system is improved, and at the same time, the heat generated by the work of the system can be effectively utilized to avoid energy waste, which is more energy-saving and environmentally friendly. Furthermore, an energy-saving optimization system for a dynamic auxiliary equipment provided in this embodiment includes a main power system A and an auxiliary system B. The auxiliary system B is used to perform heat exchange on the power end of the main power system A. The main power system A includes a water pump 1 and a temperature sensor 2. The signal sensing end of the temperature sensor 2 is arranged on the power working end of the water pump 1 to detect the working temperature of the power working end of the water pump 1. When the working temperature of the water pump 1 exceeds the preset temperature threshold, the auxiliary system B is started to recover the heat generated by the work of the water pump 1. The auxiliary system B realizes heat exchange by transmitting a refrigerant agent, and includes a compressor 10, The condenser 11, the first electronic valve 12, the second electronic valve 13 and the heat absorption pipeline 14, the pipeline outlet end of the compressor 10 is connected to the first inlet end of the condenser 11, the first outlet end of the condenser 11 is connected to the inlet end of the first electronic valve 12, the outlet end of the first electronic valve 12 is connected to the pipeline inlet end of the heat absorption pipeline 14, the pipeline outlet end of the heat absorption pipeline 14 is connected to the inlet end of the second electronic valve 13, the outlet end of the second electronic valve 13 is connected to the pipeline inlet end of the compressor 10, and the heat absorption pipeline 14 is laid under the power working end of the water pump 1 to absorb the heat generated by the water pump 1 when doing work.

[0028] Among them, the power working end of the water pump 1 includes the motor end, the impeller end, the rotating shaft and other transmission parts that are easy to generate work heat. After working for a long time, the power working end of the water pump 1 will cause the work efficiency to decrease or the motor to be damaged due to overheating. By setting the temperature sensor 2, the working temperature of the power working end of the water pump 1 can be monitored. When the working temperature of the water pump 1 exceeds the preset temperature threshold, the auxiliary system B is started to recover the heat generated by the work of the water pump 1. Among them, the refrigerant can be Freon. At this time, the compressor 10 compresses the refrigerant in the pipeline. After opening the valve of the first electronic valve 12, the refrigerant flows toward the heat absorption pipeline 14 due to the pressure being released. The refrigerant passes through the condenser 11 from the compressor 10, can be cooled and cooled, and becomes a normal temperature high-pressure liquid, and then enters the heat absorption pipeline 14 through the pipeline from the outlet end of the first electronic valve 12. At this time, the refrigerant will absorb the heat generated by the working end of the water pump 1 through the heat absorption pipeline 14, helping the water pump 1 to achieve heat dissipation and cooling. After absorbing heat, the refrigerant will change from a normal temperature and high pressure liquid to a high temperature and low pressure gas. Then, the valve of the second electronic valve 13 is opened, and the refrigerant enters the compressor 10 through the pipeline from the outlet end of the second electronic valve 13. At this time, after the refrigerant is compressed by the compressor 10, it changes from a high temperature and low pressure gas to a high temperature and high pressure gas or a high temperature and high pressure liquid, and then changes to a normal temperature and high pressure liquid after the cooling and cooling effect of the condenser 11. The auxiliary system B performs a heat absorption cooling cycle through the above loop, so that the energy-saving optimization system of the auxiliary equipment has better heat dissipation when working, and avoids the motor from being overheated and causing the efficiency to be reduced or even damaged. Through the above process, the energy efficiency and optimization work of the equipment are improved, and the utilization rate of the energy consumption of the water pump system is improved. At the same time, the heat generated by the system working can be effectively utilized to avoid energy waste, which is more energy-saving and environmentally friendly.

[0029] In other examples, as a further improvement, the main power system A may further include a first pressure sensor 3, a second pressure sensor 4, a flow sensor 5 and a multi-function electric meter 6. The first pressure sensor 3 is arranged on the pipeline inlet end of the water pump 1, and the second pressure sensor 4 and the flow sensor 5 are respectively arranged on the pipeline outlet end of the water pump 1. The water pump 1 is provided with a multi-function electric meter 6 for collecting the power supply parameters of the water pump 1, including current, voltage, power, power factor and electric energy data. Through the above structure, the pipeline pressure, flow and power supply parameters in the main power system A can be obtained, which is convenient for calculating and optimizing the energy efficiency of the equipment.

[0030] In order to improve the energy efficiency and optimization of the equipment, effectively reduce the complexity of the energy consumption analysis of the water pump system, and improve the efficiency of the energy consumption analysis of the water pump system, further, the main power system A includes an edge computing module 7 and a cloud platform 8. The edge computing module 7 is used to synchronously collect data signals from the first pressure sensor 3, the second pressure sensor 4, the flow sensor 5, and the multi-function electric meter 6, and transmit the data signals to the cloud platform 8. The cloud platform 8 calculates the energy consumption of the main power system A according to the data signals collected by the edge computing module 7. The edge computing module 7 can perform energy consumption analysis according to the data signals collected by the first pressure sensor 3, the second pressure sensor 4, the flow sensor 5, and the multi-function electric meter 6, thereby improving the energy efficiency and optimization of the equipment, effectively reducing the complexity of the energy consumption analysis of the water pump system, and improving the efficiency of the energy consumption analysis of the water pump system.

[0031] The calculation formula of water pump efficiency is:

[0032]

[0033] P 有 =ρ×g×Q×H×10 -3 (1.2);

[0034] P 轴 =P 电 ×η 电 ×η 传 (1.3);

[0035] H=(P2-P1) / ρ×g+Z2-Z1(1.4);

[0036]

[0037] In formula (1.1): η is the pump efficiency, the unit is 100%; P 有 P is the effective power (output power) of the water pump, in kilowatts (kW); 轴 is the pump shaft power (input power), in kilowatts (kW);

[0038] In formula (1.2): ρ is the fluid density, in kilograms per cubic meter (kg / m3); g is the fluid gravity acceleration, g = 9.81m / s2; Q is the pump flow rate, in cubic meters per second (m3 / s); H is the pump head, in meters (m);

[0039] In formula (1.3): P 电 is the water pump motor power, in kilowatts (kW); η 电 is the motor efficiency of the water pump, the unit is 1; η 传 is the mechanical transmission efficiency of the water pump, the unit is 100%;

[0040] In formula (1.4): P1 is the liquid pressure at the pump inlet, in Pascals (Pa); P2 is the liquid pressure at the pump outlet, in Pascals (Pa); Z1 is the height of the pump inlet, in meters (m); Z2 is the height of the pump outlet, in meters (m);

[0041] In formula (1.5): U 实 is the actual operating voltage of the water pump motor, in volts (V); I 实 is the actual operating current of the water pump motor, in ampere (A); cosθ is the power factor of the water pump motor;

[0042] The edge computing module 7 obtains the actual energy consumption data of the water pump through the above process, and at the same time calls the data in the knowledge base of water pump fault diagnosis and energy efficiency standards in the cloud platform 8, and obtains the energy efficiency analysis and fault diagnosis results after energy efficiency analysis and comparison between the two. The edge computing module 7 can also use the display module to display the results in real time, and issue real-time warnings or alarms according to preset fault conditions.

[0043] Based on the results of energy efficiency analysis and fault diagnosis, the edge computing module 7 outputs a control signal to the drive motor of the water pump 1 according to the preset control rules to control the start and stop of the equipment. At the same time, according to the preset process control requirements, the current flow and temperature data are used for logical operations and PID operations, and the control signal is output to the drive motor of the water pump 1 according to the operation results to adjust the equipment operation state, thereby realizing the integrated measurement of energy efficiency and safety of dynamic auxiliary equipment.

[0044] Preferably, the main power system A includes a timer 9, and a pressure regulating switch 15 is provided on the compressor 10. The edge computing module 7 calculates the temperature change value per unit time according to the time parameter of the timer 9 and the temperature parameter of the temperature sensor 2. When the temperature change value exceeds the preset temperature change threshold, the pressure of the compressor 10 is increased through the pressure regulating switch 15 to increase the flow rate of the refrigerant. By providing the pressure regulating switch 15, it is convenient to adjust the pressure of the refrigerant, so that the flow rate of the refrigerant can be changed by adjusting the pressure according to the demand, and the refrigerant flow rate can be increased to achieve rapid cooling of the power working end of the water pump 1.

[0045] As a further improvement, in other embodiments, when the main power system A works normally at different preset input powers and different gears, the temperature of the water pump 1 can be controlled within a preset range by controlling different refrigerant flow rates. In other words, as the preset input power increases, that is, the speed increases, the flow rate of the refrigerant needs to be increased to control the temperature of the water pump 1 within a preset range. The refrigerant flow rate can be learned from the actual working process of the water pump 1. Specifically, in actual work, a gear is input for normal operation. When the preset temperature is reached, the flow rates of different refrigerants are input from small to large to determine whether the temperature of the water pump 1 can be controlled within a preset range (for example, within 40 to 50 degrees Celsius). If so, the flow rate of the corresponding refrigerant is associated with the corresponding gear. Otherwise, the flow rate test adjustment is continued to establish a matching relationship between the refrigerant flow rate and the corresponding power gear under the temperature threshold condition. Repeat the above steps until all gears obtain the corresponding refrigerant flow rate. The advantage of this is that the accurate flow rate can be obtained in real time under different use conditions according to the actual use conditions of the water pump, which has a greater impact on its temperature, and the interference caused by environmental factors can be reduced. Generally speaking, through the above corresponding settings, the water pump 1 can control the temperature within a preset range at different powers.

[0046] In other embodiments, as a further improvement, when the water pump 1 is under normal working conditions, the temperature of the water pump 1 can be further obtained through the temperature sensor 2. When the temperature exceeds the preset temperature range, for example, when it exceeds 50 degrees Celsius, it can be further determined that the water pump 1 or one of the auxiliary systems B may have a fault, and then an alarm is issued. For example, when one of the blades in the water pump 1 is damaged, or the rotating shaft is offset, the rotating shaft will deviate and increase the friction, causing the water pump 1 to overheat; for another example, when the heat absorption pipeline 14 is broken, it will also cause the refrigerant to be lost, causing the water pump 1 to overheat. At this time, it can be roughly determined whether it is the water pump 1 that is at fault or the auxiliary system B in combination with the energy consumption data of the water pump system. Specifically, if the energy consumption data of the water pump system also produces an abnormality at this time, it can be determined that the water pump 1 is at fault, otherwise it is the auxiliary system B that is at fault. The advantage of this is that different faults in the system of the present invention can be predicted in advance, so that corresponding responses and repairs can be made quickly.

[0047] Preferably, the heat absorption pipeline 14 includes an input pipeline 141, a heat exchange pipeline 142 and an output pipeline 143. The heat exchange pipeline 142 is laid under the power working end of the water pump 1 to absorb the heat generated by the water pump 1. The outlet end of the first electronic valve 12 is connected to the pipeline inlet end of the heat exchange pipeline 142 through the input pipeline 141, and the pipeline outlet end of the heat exchange pipeline 142 is connected to the inlet end of the second electronic valve 13 through the output pipeline 143. The refrigerant enters the heat exchange pipeline 142 through the input pipeline 141, and exchanges heat with the power working end of the water pump 1 in the heat exchange pipeline 142 to achieve heat dissipation and cooling of the motor. At this time, after the refrigerant absorbs heat, it will change from a normal temperature and high pressure liquid to a high temperature and low pressure gas, and then flow out of the heat exchange pipeline 142 through the output pipeline 143, thereby taking away the heat generated by the power working end of the water pump 1 and further utilizing it.

[0048] Preferably, the pipe diameter of the input pipe 141 is smaller than the pipe diameter of the heat exchange pipe 142. After the liquid refrigerant enters the heat exchange pipe 142 with a larger pipe diameter, the space suddenly increases and the pressure decreases, and the liquid refrigerant at room temperature will be vaporized and turned into a gaseous low-temperature refrigerant, thereby absorbing a large amount of heat.

[0049] Preferably, the input pipeline 141 is configured as a capillary pipeline, and the diameter of the capillary pipeline is less than one tenth of the diameter of the heat exchange pipeline 142. After the liquid refrigerant enters the heat exchange pipeline 142 through the capillary pipeline, the space suddenly increases and the pressure decreases, and the liquid refrigerant at room temperature will be vaporized and become a gaseous low-temperature refrigerant, thereby absorbing a large amount of heat. At this time, the power working end of the water pump 1 set nearby will become cold and the temperature will be reduced. The refrigerant after absorbing heat will become a gaseous high-temperature refrigerant and flow out of the heat exchange pipeline 142 through the output pipeline 143, thereby taking away the heat of the work done by the power working end of the water pump 1 and further utilizing it.

[0050] Preferably, the heat exchange pipeline 142 is configured as a zigzag loop with winding distribution. The heat exchange pipeline 142 adopts a zigzag structure and is laid under the power working end of the water pump 1 in a serpentine shape, which increases the length of the heat exchange pipeline 142 and the contact area with the power working end of the water pump 1, ensuring a better heat absorption and cooling effect on the power working end of the water pump 1. At the same time, since the heat exchange pipeline 142 is zigzag (serpentine), more refrigerant is retained during evaporation and heat absorption, so it is suitable for a vertical continuous long-term evaporation heat absorption or reflux device.

[0051] Preferably, the second inlet end of the condenser 11 is connected to a condensing water pump 16, the second outlet end of the condenser 11 is connected to a water tank 17, and the outlet end of the water tank 17 is connected to the inlet end of the condensing water pump 16. The energy absorbed by the refrigerant from the power working end of the water pump 1 is transferred to the water circulation loop of the condenser 11 for further utilization after heat exchange in the condenser 11.

[0052] Preferably, the second outlet of the condenser 11 is connected to the inlet of the water tank 17 through the heating component 18, and the heating component 18 includes a water PTC component 181 and a heater 182. The second outlet of the condenser 11 is connected to the inlet of the heater 182 through the water PTC component 181, and the outlet of the heater 182 is connected to the inlet of the water tank 17. The condenser 11 utilizes the heat conducted by the power working end of the water pump 1 for heating, and generates heat through the heater 182 to realize external heating or heating. When the heating temperature is insufficient, the water PTC component 181 can be further started to heat the managed water to ensure that the heating temperature of the heater 182 meets the user's needs.

[0053] The present invention is described by preferred embodiments, and those skilled in the art will appreciate that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. The present invention is not limited to the specific embodiments disclosed herein, and other embodiments falling within the claims of this application are within the scope of protection of the present invention.

[0054] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of technical features or steps not listed in the claims. The word "a" or "an" preceding a technical feature does not exclude the presence of a plurality of such technical features. The present invention may be implemented by means of hardware comprising several different technical features and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.

[0055] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0056] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0057] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0058] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0059] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0060] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

[0061] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0062] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms should not be understood as necessarily referring to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0063] The above description is only a preferred embodiment of the present invention. All equivalent changes and modifications made according to the scope of the patent application of the present invention should fall within the scope of the present invention.

Claims

1. An energy-saving optimization system for power-assisted equipment, comprising a main power system (A) and an auxiliary system (B), wherein the auxiliary system (B) is used to perform heat exchange on the power end of the main power system (A), and is characterized in that: The main power system (A) comprises a water pump (1) and a temperature sensor (2); The signal sensing end of the temperature sensor (2) is arranged on the power working end of the water pump (1) and is used to detect the working temperature of the power working end of the water pump (1); The main power system (A) comprises a first pressure sensor (3), a second pressure sensor (4), a flow sensor (5) and a multi-function electric meter (6); The first pressure sensor (3) is arranged on the inlet end of the pipeline of the water pump (1), and the second pressure sensor (4) and the flow sensor (5) are respectively arranged on the outlet end of the pipeline of the water pump (1); The water pump (1) is provided with a multifunctional electric meter (6) for collecting power supply parameters of the water pump (1), including current, voltage, power, power factor and electric energy data; The main power system (A) comprises an edge computing module (7) and a cloud platform (8); The edge computing module (7) is used to synchronously collect data signals from the first pressure sensor (3), the second pressure sensor (4), the flow sensor (5) and the multi-function electric meter (6), and transmit the data signals to the cloud platform (8); The cloud platform (8) performs energy consumption calculation of the main power system (A) according to the data signal collected by the edge computing module (7); When the operating temperature of the water pump (1) exceeds a preset temperature threshold, the auxiliary system (B) is activated to recover the heat generated by the water pump (1); The auxiliary system (B) realizes heat exchange by transmitting a refrigerant, and comprises a compressor (10), a condenser (11), a first electronic valve (12), a second electronic valve (13) and a heat absorption pipeline (14), wherein the heat absorption pipeline (14) comprises an input pipeline (141), a heat exchange pipeline (142) and an output pipeline (143); The heat exchange pipeline (142) is laid under the power working end of the water pump (1) to absorb the heat generated by the water pump (1) when doing work; The outlet end of the first electronic valve (12) is connected to the pipeline inlet end of the heat exchange pipeline (142) through the input pipeline (141), and the pipeline outlet end of the heat exchange pipeline (142) is connected to the inlet end of the second electronic valve (13) through the output pipeline (143); the pipeline diameter of the input pipeline (141) is smaller than the pipeline diameter of the heat exchange pipeline (142); the input pipeline (141) is configured as a capillary pipeline; The pipe diameter of the capillary pipe is smaller than one tenth of the pipe diameter of the heat exchange pipe (142); The pipeline outlet end of the compressor (10) is connected to the first inlet end of the condenser (11), the first outlet end of the condenser (11) is connected to the inlet end of the first electronic valve (12), the outlet end of the first electronic valve (12) is connected to the pipeline inlet end of the heat absorption pipeline (14), the pipeline outlet end of the heat absorption pipeline (14) is connected to the inlet end of the second electronic valve (13), and the outlet end of the second electronic valve (13) is connected to the pipeline inlet end of the compressor (10); The heat absorption pipeline (14) is laid under the power working end of the water pump (1) to absorb the heat generated by the water pump (1) when doing work.

2. The energy-saving optimization system for dynamic auxiliary equipment according to claim 1 is characterized in that: The main power system (A) includes a timer (9), and the compressor (10) is provided with a pressure regulating switch (15); The edge computing module (7) calculates the temperature change value per unit time according to the time parameter of the timer (9) and the temperature parameter of the temperature sensor (2); When the temperature change value exceeds a preset temperature change threshold, the pressure of the compressor (10) is increased through the pressure regulating switch (15) to increase the flow rate of the refrigerant.

3. The energy-saving optimization system for dynamic auxiliary equipment according to claim 1 is characterized in that: The heat exchange pipeline (142) is configured as a coiled zigzag loop.

4. The energy-saving optimization system for dynamic auxiliary equipment according to claim 1 is characterized in that: The second inlet end of the condenser (11) is connected to a condensate pump (16), and the second outlet end of the condenser (11) is connected to a water tank (17); The outlet end of the water tank (17) is connected to the inlet end of the condensate pump (16).

5. The energy-saving optimization system for dynamic auxiliary equipment according to claim 4 is characterized in that: The second outlet end of the condenser (11) is connected to the inlet end of the water tank (17) via a heating component (18); The heating component (18) comprises a water PTC component (181) and a heater (182); The second outlet end of the condenser (11) is connected to the inlet end of the heater (182) through the water PTC component (181), and the outlet end of the heater (182) is connected to the inlet end of the water tank (17).

Citation Information

Patent Citations

  • Portable water pump energy consumption analysis system

    CN111472970A

  • Liquid cooling source system and control method thereof

    CN113803908A

  • Heat pump assembly assisted in driving by expansion kinetic energy of coolant.

    TW201122382A