Solid rocket booster vertical lifting and bundling docking method
Through the vertical lifting and bundling method of solid rocket booster, the problem of long assembly time and low efficiency between rocket booster and rocket core stage is solved, and a faster and more efficient assembly process is achieved, and safe and stable in a narrow space is achieved. Complete docking in the ground.
Patent Information
- Application Number
- CN202310290415.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-03-23
AI Technical Summary
During the assembly process of existing rocket boosters and rocket core stages, due to the small position and high assembly accuracy requirements, the assembly time and low efficiency are problems.
The vertical lifting and binding docking method of solid rocket booster is adopted, including fixing the rocket core stage on the temporary support plate, flipping and vertically lifting the booster, hoisting it along the set path to a preset position, adjusting the verticality and rolling angle , use the connecting tensioning mechanism to insert the ball head into the ball socket, and docking is completed through the binding link.
It effectively shortens the assembly time of rocket booster and rocket core stage, improves assembly efficiency, and avoids overload problems in narrow spaces, reducing the risk of rocket damage.
Smart Images

Figure CN116332018B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of rocket assembly, and in particular to a method for vertically hoisting and bundling and docking a solid rocket booster. Background Art
[0002] In the process of assembling the booster on the core stage of the existing rocket with boosters, the core stage of the rocket needs to be fixed vertically, and then the booster is hoisted to the side of the core stage by hoisting equipment such as a crane to achieve the assembly of the two. The rocket is large in size and weight, and the assembly precision is high. Especially with the continuous development of my country's aerospace industry, the requirements for rocket carrying capacity are getting higher and higher.
[0003] In the process of fixing the rocket booster to the rocket core stage, due to the narrow space between the rocket booster and the rocket core stage during the assembly process, it is difficult to operate large equipment, resulting in long assembly time and low assembly efficiency between the rocket booster and the rocket core stage.
[0004] In view of this, it is necessary to provide a new technical solution to solve the above problems. Summary of the invention
[0005] In order to solve the above-mentioned technical problems, the present application provides a method for vertical lifting and bundling docking of solid rocket boosters, which can be applied to the vertical assembly of rockets, effectively shortening the assembly time between the rocket booster and the rocket core stage, and improving the assembly efficiency.
[0006] The method for vertically hoisting and bundling a solid rocket booster includes:
[0007] Step S1, fixing the rocket core stage 1 on the core stage 1 temporary support plate;
[0008] Step S2, turning over the rocket booster and lifting the rocket booster vertically;
[0009] Step S3, after the rocket booster is lifted, adjusting its verticality to within the required range;
[0010] Step S4, hoisting the rocket booster in the horizontal direction along the set path to a preset hoisting position;
[0011] Step S5, adjusting the rocket booster hoisted to the preset hoisting position to a preset hoisting height, so that the ball head of the rocket booster and the ball socket of the first stage of the rocket core are within a preset size range;
[0012] Step S6, installing a connection and tightening mechanism, using the connection and tightening mechanism to pull the ball head of the rocket booster into the ball socket of the first stage of the rocket core, and installing a ball head blocking cover;
[0013] Step S7, adjusting the distance between the rocket booster and the first stage of the rocket core, and installing the lower binding connecting rod;
[0014] Step S8, supporting the rocket booster with a booster support plate;
[0015] Step S9, evacuate the vertical lifting device of the rocket booster, thereby completing the bundling and docking of a single rocket booster with the first stage of the rocket core.
[0016] Preferably, step S4 comprises:
[0017] Step S41, vertically hoisting the rocket booster to a first preset hoisting position along the horizontal direction, and adjusting the rolling angle of the rocket booster;
[0018] Step S42, vertically hoisting the rocket booster along the first planned path to a second preset hoisting position;
[0019] Step S43, vertically hoisting the rocket booster along the second planned path to a third preset hoisting position;
[0020] Among them, the third preset lifting position is the vertical straight line where the axis of the preset installation position of the rocket booster is located; the second planned path is located on the straight line passing through the axis of the rocket booster; the angle between the first planned path and the second planned path is 45°.
[0021] Preferably, the distance between the second preset hoisting position and the theoretical installation center of the rocket booster in the straight line direction along the first planned path is 200 mm; the distance between the second preset hoisting position and the theoretical installation center of the rocket booster in the straight line direction perpendicular to the first planned path is 200 mm.
[0022] Preferably, the step S43 specifically includes:
[0023] Continue to approach the rocket core along the second planned path. During the approach process, the trolley and the driving vehicle move alternately, and finally control the distance between the end face of the ball head and the end face of the ball socket to be 40mm to 50mm;
[0024] Among them, the walking step length of the cart and the driving vehicle is no more than 10mm, and the distance from the second planned path is no more than 5mm; the walking process needs to be coordinated with the fine-tuning of the rolling angle to ensure that the docking surface is perpendicular to the second planned path.
[0025] Preferably, in step S3, the verticality requirement of the rocket booster is: the angle of the rocket booster within the docking surface should be controlled within the range of 0-0.1°, and at the same time, when measured with a plumb bob, the deviation of the lower end frame of the tail section of the rocket booster is controlled within the range of 0-22mm.
[0026] Preferably, fixing the rocket core stage 1 on the core stage 1 temporary support plate in step S1 comprises:
[0027] Step S11, adjust the four core-level temporary support plates so that each core-level temporary support plate is in the middle position;
[0028] Step S12, hoisting the rocket core stage 1, connecting the rocket core stage 1 tail tray to four core stage 1 temporary support plates, monitoring and adjusting the core stage 1 temporary support plate load, so that the load deviation of each core stage 1 temporary support plate is no more than 10%;
[0029] Step S13, loosen the suspension rope, and do not remove the suspension hook, so that the suspension device can protect the rocket body during the vertical adjustment process;
[0030] Step S14, adjusting the temporary support plate of the rocket core stage, measuring the rocket inclination through the dual-axis horizontal inclination sensor, so that the verticality of the rocket body meets the 1′ requirement;
[0031] Step S15, after leveling, lock the temporary support plate of the first stage of the core and the tail tray of the first stage of the rocket core, and remove the lifting device.
[0032] Preferably, in step S5, the ball head of the rocket booster and the ball socket of the first stage of the rocket core are within a preset size range, and the positioning deviation in the vertical direction is no more than ±1mm based on the ball socket, and the positioning deviation in the tangential direction of the core stage is no more than ±1mm.
[0033] Preferably, in step S6, the connection and tensioning mechanism includes an operating member, an adjusting member, a tension sensor and a connecting member; the connecting member includes a first connecting member for detachably fixedly connected to the first stage of the rocket core and a second connecting member for detachably fixedly connected to the rocket booster; the first connecting member, the operating member, the adjusting member, the tension sensor and the second connecting member are detachably fixedly connected in sequence; the operating member is configured to drive the first connecting member and the adjusting member to move toward each other or relative to each other by relying on its clockwise rotation or counterclockwise rotation.
[0034] Preferably, the step S6 specifically includes:
[0035] Step S61, a connection and tensioning mechanism is provided on both sides of the ball head, and a first connection member and a second connection member of the connection and tensioning mechanism are fixedly connected to the first stage of the rocket core and the rocket booster respectively;
[0036] Step S62, the operating members on both sides are rotated synchronously to adjust the length of the connection tensioning mechanism, and the adjustment amount of the operating member each time is 1 / 4 turn. At the same time, the tension change of the connection tensioning mechanism is observed. When the tension values on both sides differ by more than 10%, the operating member of the connection tensioning mechanism on the side with smaller tension is adjusted separately to control the tension deviation within 2%;
[0037] Among them, when adjusting the operating parts of the connecting tensioning mechanism, the load suddenly changes from uniform change to a sharp rise, and the tensioning operation is stopped; the loads of the connecting tensioning mechanisms on both sides are slowly loaded to 25000N through synchronization, and the operation is stopped.
[0038] Compared with the prior art, this application has at least the following beneficial effects:
[0039] 1. The present invention can effectively shorten the assembly time between the rocket booster and the rocket core stage and improve the assembly efficiency.
[0040] 2. The connection and tightening mechanism of the present invention can be operated in a narrow space, and the ball head on the rocket booster can be effectively inserted into the ball socket of the first stage of the rocket core, and can effectively avoid the overload problem caused by excessive tension, and effectively avoid damage to the rocket core stage and the rocket booster.
[0041] 3. The present invention performs hoisting along a set path, which can effectively reduce the hoisting time, thereby improving the bundling and docking efficiency of the rocket booster and the rocket core stage as a whole. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Hereinafter, some specific embodiments of the present invention will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:
[0043] Figure 1 It is a schematic diagram of the overall process of the present invention;
[0044] Figure 2 It is a schematic diagram of the state in which the rocket core stage of the present invention is hoisted and fixed on the temporary support plate of the core stage;
[0045] Figure 3 A schematic diagram of a path for hoisting a rocket booster of the present invention along a set path in the horizontal direction to a preset hoisting position;
[0046] Figure 4 It is a schematic diagram of the angle of the rocket booster of the present invention within the docking surface;
[0047] Figure 5 It is a schematic diagram of the state in which the ball head is pulled into the ball socket by using the connection and tightening mechanism of the present invention;
[0048] Figure 6 It is a structural schematic diagram of the connection and tensioning mechanism of the present invention;
[0049] Figure 7 It is a schematic diagram of the cross-sectional structure of the ball head and the ball socket of the present invention;
[0050] Figure 8It is a schematic diagram of the state of vertical lifting and binding docking of the rocket booster and the first stage of the rocket core of the present invention.
[0051] The above drawings include the following reference numerals:
[0052] 10. Rocket core stage 1, 20. Core stage temporary support plate, 30. Base, 40. Rocket booster, 50. Vertical sling, 60. Ball socket, 70. Ball head, 80. Connecting and tightening mechanism, 81. First connecting piece, 82. Operating piece, 83. Adjusting piece, 84. Tension sensor, 85. Second connecting piece, 90. Booster support plate, A. First preset lifting position, B. Second preset lifting position, C. Third preset lifting position, a. First planned path, b. Second planned path, θ. Angle of rocket booster in docking surface. DETAILED DESCRIPTION
[0053] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0054] like Figures 1 to 8 As shown, the solid rocket booster vertical lifting and bundling docking method includes:
[0055] Step S1, fix the rocket core stage 10 on the core stage temporary support plate 20.
[0056] Among them, the core first-level temporary support plate 20 is set on the base 30.
[0057] The specific steps include:
[0058] Step S11, adjust the four core-level temporary support plates 20 so that each core-level temporary support plate 20 is in the middle position.
[0059] Step S12, hoist the rocket core stage 10, connect the rocket core stage 1 tail tray with four core stage 1 temporary support plates 20, monitor and adjust the load of the core stage 1 temporary support plates 20, so that the load deviation of each core stage 1 temporary support plate 20 is no more than 10%.
[0060] Step S13, loosen the suspension rope and do not evacuate the suspension hook, so that the suspension device can protect the rocket body during the vertical adjustment process.
[0061] Step S14, adjust the temporary support plate 20 of the rocket core stage, measure the rocket inclination angle through the dual-axis horizontal inclination sensor, and make the verticality of the rocket body meet the 1′ requirement.
[0062] Step S15, after leveling, lock the temporary support plate 20 of the first stage of the core and the tail tray of the first stage of the rocket core, and remove the sling.
[0063] Step S2: flip the rocket booster 40 and lift the rocket booster 40 vertically.
[0064] Step S3: After the rocket booster 40 is lifted, its verticality is adjusted to within the required range.
[0065] The verticality requirement of the rocket booster 40 is as follows: the angle θ of the rocket booster 40 within the docking surface should be controlled within the range of 0-0.1°. At the same time, when a plumb bob is used for measurement, the deviation of the lower end frame of the tail section of the rocket booster 40 is controlled within the range of 0-22mm.
[0066] Step S4: hoist the rocket booster 40 in the horizontal direction along the set path to a preset hoisting position.
[0067] Specifically, the following steps are included:
[0068] Step S41, vertically hoist the rocket booster 40 to a first preset hoisting position A along the horizontal direction, and adjust the rolling angle of the rocket booster 40.
[0069] Step S42: vertically hoist the rocket booster 40 along the first planned path a to the second preset hoisting position B.
[0070] The distance between the second preset hoisting position B and the theoretical installation center of the rocket booster 40 along the straight line direction of the first planned path a is 200 mm. The distance between the second preset hoisting position B and the theoretical installation center of the rocket booster 40 perpendicular to the straight line direction of the first planned path a is 200 mm.
[0071] Step S43: vertically hoist the rocket booster 40 along the second planned path b to the third preset hoisting position C.
[0072] Specifically, the rocket core stage 10 continues to be approached along the second planned path b. During the approaching process, the trolley and the driving vehicle move alternately, and finally the distance from the end face of the ball head 70 to the end face of the ball socket 60 is controlled to be 40 mm to 50 mm.
[0073] The walking step length of the trolley and the driving vehicle is no more than 10 mm, and the distance from the second planned path b is no more than 5 mm. The rolling angle needs to be fine-tuned during the walking process to ensure that the docking surface is perpendicular to the second planned path b.
[0074] The third preset hoisting position C is a vertical straight line where the axis of the preset installation position of the rocket booster 40 is located. The second planned path b is located on a straight line passing through the axis of the rocket booster 40. The angle between the first planned path a and the second planned path b is 45°.
[0075] Step S5, adjust the rocket booster 40 hoisted to the preset hoisting position to the preset hoisting height, so that the ball head 70 of the rocket booster 40 and the ball socket 60 of the rocket core first stage 10 are within the preset size range.
[0076] The ball head 70 of the rocket booster 40 and the ball socket 60 of the rocket core stage 10 are within the preset size range requirements: taking the ball socket 60 as a reference, the positioning deviation in the vertical direction is no more than ±1mm, and the positioning deviation in the core stage tangent direction is no more than ±1mm.
[0077] Step S6, install the connection and tensioning mechanism 80, use the connection and tensioning mechanism 80 to pull the ball head 70 of the rocket booster 40 into the ball socket 60 of the rocket core first stage 10, and install the ball head cover.
[0078] Specifically, the connection and tensioning mechanism 80 includes an operating member 82, an adjusting member 83, a tension sensor 84 and a connecting member. The connecting member includes a first connecting member 81 for detachably fixedly connected to the rocket core stage 10 and a second connecting member 85 for detachably fixedly connected to the rocket booster 40. The first connecting member 81, the operating member 82, the adjusting member 83, the tension sensor 84 and the second connecting member 85 are detachably fixedly connected in sequence. The operating member 82 is configured to drive the first connecting member 81 and the adjusting member 83 to move toward or relative to each other by rotating clockwise or counterclockwise. The operating member 82 has a mounting hole inside, and the two ends of the mounting hole have a clockwise internal thread and a counterclockwise internal thread respectively. The connection between the first connecting member 81 and the adjusting member 83 and the operating member 82 is provided with an external thread connected thereto.
[0079] Step S61, a connecting and tightening mechanism 80 is provided on both sides of the ball head 70, and the first connecting member 81 and the second connecting member 85 of the connecting and tightening mechanism 80 are fixedly connected to the rocket core first stage 10 and the rocket booster 40 respectively.
[0080] Step S62, synchronously rotate the operating parts 82 on both sides to adjust the length of the connecting tensioning mechanism 80, and each adjustment amount of the operating part 82 is 1 / 4 turn. At the same time, observe the change in the tension of the connecting tensioning mechanism 80. When the tension values on both sides differ by more than 10%, adjust the operating part 82 of the connecting tensioning mechanism 80 on the side with smaller tension separately to control the tension deviation within 2%.
[0081] When the operating member 82 of the connection tensioning mechanism 80 is adjusted, the load suddenly changes from a uniform change to a sharp rise, and the tensioning operation is stopped. The loads of the connection tensioning mechanisms 80 on both sides are slowly loaded to 25000N synchronously, and the operation is stopped.
[0082] Step S7, adjust the distance between the rocket booster 40 and the rocket core first stage 10, and install the lower binding connecting rod.
[0083] Step S8: Use the booster support plate 90 to support the rocket booster 40.
[0084] Slowly raise the booster support plate 90, contact the booster tray connection position, measure the support load, control the load in the range of 4000-5000N, and complete the three leg lifting operations in sequence. Slowly release the hook, and monitor the load status of the rocket core stage and rocket booster during the process.
[0085] Step S9, evacuate the vertical hanger 50 of the rocket booster 40, thereby completing the bundling and docking of the single rocket booster 40 and the rocket core first stage 10.
[0086] Repeat steps S2 to S9 until all rocket boosters 40 are hoisted and tied and docked with the rocket core first stage 10.
[0087] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.
[0088] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0089] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
[0090] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for vertically hoisting and bundling solid rocket boosters, characterized in that: include: Step S1, fixing the rocket core stage 1 on the core stage 1 temporary support plate; Step S2, turning over the rocket booster and lifting the rocket booster vertically; Step S3, after the rocket booster is lifted, adjusting its verticality to within the required range; Step S4, hoisting the rocket booster in the horizontal direction along the set path to a preset hoisting position; Step S5, adjusting the rocket booster hoisted to the preset hoisting position to a preset hoisting height, so that the ball head of the rocket booster and the ball socket of the first stage of the rocket core are within a preset size range; Step S6, installing a connection and tightening mechanism, using the connection and tightening mechanism to pull the ball head of the rocket booster into the ball socket of the first stage of the rocket core, and installing a ball head blocking cover; Step S7, adjusting the distance between the rocket booster and the first stage of the rocket core, and installing the lower binding connecting rod; Step S8, supporting the rocket booster with a booster support plate; Step S9, evacuating the vertical hanger of the rocket booster, thereby completing the bundling and docking of the single rocket booster with the first stage of the rocket core; The step S4 comprises: Step S41, vertically hoisting the rocket booster to a first preset hoisting position along the horizontal direction, and adjusting the rolling angle of the rocket booster; Step S42, vertically hoisting the rocket booster along the first planned path to a second preset hoisting position; Step S43, vertically hoisting the rocket booster along the second planned path to a third preset hoisting position; The third preset hoisting position is a vertical straight line where the axis of the preset installation position of the rocket booster is located; the second planned path is located on a straight line passing through the axis of the rocket booster; and the angle between the first planned path and the second planned path is 45°; The distance between the second preset hoisting position and the theoretical installation center of the rocket booster along the straight line direction of the first planned path is 200 mm; the distance between the second preset hoisting position and the theoretical installation center of the rocket booster perpendicular to the straight line direction of the first planned path is 200 mm; The step S43 specifically includes: Continue to approach the rocket core along the second planned path. During the approach process, the trolley and the driving vehicle move alternately, and finally control the distance between the end face of the ball head and the end face of the ball socket to be 40mm to 50mm; The walking step length of the trolley and the driving vehicle is no more than 10 mm, and the distance from the second planned path is no more than 5 mm. The rolling angle needs to be fine-tuned during the walking process to ensure that the docking surface is perpendicular to the second planned path. In step S6, the connection and tensioning mechanism includes an operating member, an adjusting member, a tension sensor and a connecting member; the connecting member includes a first connecting member for detachably fixedly connected to a first stage of a rocket core and a second connecting member for detachably fixedly connected to a rocket booster; the first connecting member, the operating member, the adjusting member, the tension sensor and the second connecting member are detachably fixedly connected in sequence; the operating member is configured to drive the first connecting member and the adjusting member to move toward or relative to each other by rotating clockwise or counterclockwise; The step S6 specifically includes: Step S61, a connection and tensioning mechanism is provided on both sides of the ball head, and a first connection member and a second connection member of the connection and tensioning mechanism are fixedly connected to the first stage of the rocket core and the rocket booster respectively; Step S62, the operating members on both sides are rotated synchronously to adjust the length of the connection tensioning mechanism, and the adjustment amount of the operating member each time is 1 / 4 turn. At the same time, the tension change of the connection tensioning mechanism is observed. When the tension values on both sides differ by more than 10%, the operating member of the connection tensioning mechanism on the side with smaller tension is adjusted separately to control the tension deviation within 2%; Among them, when adjusting the operating parts of the connecting tensioning mechanism, the load suddenly changes from uniform change to a sharp rise, and the tensioning operation is stopped; the loads of the connecting tensioning mechanisms on both sides are slowly loaded to 25000N through synchronization, and the operation is stopped.
2. The method for vertically hoisting and bundling a solid rocket booster as claimed in claim 1, characterized in that: In step S3, the verticality requirement of the rocket booster is: the angle of the rocket booster in the docking surface should be controlled within the range of 0-0.1°, and at the same time, when measured with a plumb bob, the deviation of the lower end frame of the tail section of the rocket booster is controlled within the range of 0-22mm.
3. The method for vertically hoisting and bundling a solid rocket booster as claimed in claim 1, characterized in that: The step S1 of fixing the rocket core stage 1 on the core stage 1 temporary support plate comprises: Step S11, adjust the four core-level temporary support plates so that each core-level temporary support plate is in the middle position; Step S12, hoisting the rocket core stage 1, connecting the rocket core stage 1 tail tray to four core stage 1 temporary support plates, monitoring and adjusting the core stage 1 temporary support plate load, so that the load deviation of each core stage 1 temporary support plate is no more than 10%; Step S13, loosen the suspension rope, and do not remove the suspension hook, so that the suspension device can protect the rocket body during the vertical adjustment process; Step S14, adjusting the temporary support plate of the rocket core stage, measuring the rocket inclination through the dual-axis horizontal inclination sensor, so that the verticality of the rocket body meets the 1′ requirement; Step S15, after leveling, lock the temporary support plate of the first stage of the core and the tail tray of the first stage of the rocket core, and remove the lifting device.
4. The method for vertically hoisting and bundling a solid rocket booster as claimed in claim 1, characterized in that: In step S5, the ball head of the rocket booster and the ball socket of the first stage of the rocket core are within the preset size range, and the positioning deviation in the vertical direction is no more than ±1mm based on the ball socket, and the positioning deviation in the tangential direction of the core stage is no more than ±1mm.
Citation Information
Cited By
A verticalization docking vehicle for rocket and booster docking
CN224915791U