Intelligent control system based on Internet of Things and big data analysis

Through the intelligent control system of the Internet of Things and big data analysis, the problems of potential fault detection and unreasonable allocation of maintenance resources in the production equipment control system are solved, and the efficient operation of equipment and maximum resource utilization are achieved.

CN116483041BActive Publication Date: 2024-11-19HEBEI XIONGAN QINGYUN INTELLIGENT INVESTMENT TECHNOLOGY CO LTD
View PDF 28 Cites 0 Cited by

Patent Information

Application Number
CN202310497093.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-05
Publication Date
2024-11-19
Estimated Expiration
2043-05-05

AI Technical Summary

Technical Problem

It is difficult to detect potential faults in time for existing production equipment control systems, resulting in sudden equipment failures and economic losses. It is also impossible to reasonably select maintenance personnel for maintenance, affecting the efficiency of equipment maintenance.

Method used

Using an intelligent control system based on the Internet of Things and big data analysis, including data acquisition module, production analysis module, operation monitoring module, equipment management module and personnel evaluation module, to calculate production coefficients by collecting and analyzing the historical records and operation data of production equipment. and the operation detection coefficient, generate early warning signals, and allocate maintenance personnel according to the maintenance coefficient and dimension superiority.

Benefits of technology

It realizes timely early warning of production equipment and reasonable maintenance tasks allocation, improves the production efficiency and resource utilization of equipment, and ensures the normal operation of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116483041B_ABST
    Figure CN116483041B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent control system based on the Internet of Things and big data analysis, which relates to the technical field of production equipment control, and includes a production analysis module, an operation monitoring module, a cloud platform and an equipment management module; the production analysis module is used to perform production coefficient SC analysis on the production equipment according to the historical production records stored in the database; the operation monitoring module is used to collect the operation data of the production equipment and analyze it, calculate the limit deviation coefficient GF, and judge whether the operation of the production equipment is normal; so as to remind the management personnel to perform maintenance on the production equipment and improve the production efficiency of the equipment; when receiving the early warning signal, the cloud platform is used to generate equipment maintenance tasks to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance tasks, and allocate the equipment maintenance tasks to maintenance personnel of different levels according to the maintenance coefficient JY, so as to maximize the resource utilization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production equipment control, and in particular to an intelligent control system based on the Internet of Things and big data analysis. Background Art

[0002] Production equipment includes blast furnaces, machine tools, reactors, printing and dyeing machines, etc. After leaving the factory, various complex problems may occur. A large number of production equipment are distributed throughout the country. Due to the complexity of the engineering machinery products themselves, the uneven technical literacy of the operators of the production equipment, the uncertainty of the operation methods, and other factors, various problems may occur during the use of the production equipment;

[0003] Most of the existing production equipment control systems only perform corresponding inspections and maintenance on the production equipment on a regular basis. However, general inspections and maintenance cannot guarantee that some potential problems of the machine can be discovered, resulting in some sudden failures of the machine, causing large economic losses. After an equipment abnormality occurs, there is a problem that it is impossible to reasonably select the corresponding maintenance personnel to perform inspections and maintenance based on the production coefficient of the equipment and the maintenance personnel's maintenance value, thereby improving the equipment maintenance efficiency. Based on the above deficiencies, the present invention proposes an intelligent control system based on the Internet of Things and big data analysis. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes an intelligent control system based on the Internet of Things and big data analysis.

[0005] To achieve the above-mentioned purpose, an embodiment according to the first aspect of the present invention provides an intelligent control system based on the Internet of Things and big data analysis, including a data acquisition module, a production analysis module, an operation monitoring module, an equipment management module and a personnel evaluation module;

[0006] The data acquisition module is used to collect historical production records of production equipment on the SMT production line and store the historical production records in a database; the historical production records include the production start time, production end time, power consumption of the entire production process, the number of products produced, and the product qualification rate;

[0007] The production analysis module is used to analyze the production coefficient SC of the production equipment according to the historical production records stored in the database; and to timestamp the production coefficient SC and store it in the cloud platform;

[0008] The operation monitoring module is used to collect and analyze the operation data of the production equipment, calculate the limit deviation coefficient GF, and judge whether the operation of the production equipment is normal; if GF is greater than the deviation coefficient threshold, it is judged that the operation of the production equipment is abnormal and an early warning signal is generated;

[0009] When receiving an early warning signal, the cloud platform is also used to generate an equipment maintenance task to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance task, calculate the maintenance coefficient JY of the equipment maintenance task, and allocate the equipment maintenance task to maintenance personnel of different levels according to the maintenance coefficient JY;

[0010] The personnel evaluation module is used to obtain the historical maintenance records of maintenance personnel for analysis, calculate the maintenance personnel's maintenance merit WY, and classify the maintenance personnel; specifically:

[0011] Compare the optimal value WY with a preset optimal threshold; the preset optimal threshold includes Y1 and Y2; wherein Y1 and Y2 are both preset fixed values ​​and Y1<Y2;

[0012] When WY≤Y1, the corresponding maintenance personnel are classified as low-level maintenance personnel;

[0013] When Y1<WY≤Y2, the corresponding maintenance personnel are classified as intermediate maintenance personnel;

[0014] When WY>Y2, the corresponding maintenance personnel are classified as senior maintenance personnel.

[0015] Furthermore, the specific analysis steps of the production analysis module are:

[0016] For any production equipment, within a preset time period, the total number of production times of the production equipment is counted as C1; the operating time, power consumption, number of dispensing products and dispensing qualified rate in each historical production record are marked as Ti, Di, Li and Gi in turn;

[0017] The operating value YXi of the production equipment is calculated using the formula YXi=(Li×g1+Gi×g2) / (Ti×g3+Di×g4), where g1, g2, g3, and g4 are all preset coefficient factors;

[0018] Compare the operating value YXi with the preset operating threshold value, the preset operating threshold value includes X2 and X3, and X2>X3; X2 and X3 are both fixed values;

[0019] When YXi≥X2, a high-yield signal is generated; when X3<YXi<X2, a medium-yield signal is generated; when YXi≤X3, a low-yield signal is generated;

[0020] The percentage of occurrences of high-yield signals, medium-yield signals, and low-yield signals are counted and marked as Zb1, Zb2, and Zb3 respectively; the production coefficient SC of the production equipment is calculated using the formula SC=C1×(Zb1×3+Zb2×2+Zb3)×η, where η is the preset compensation factor.

[0021] Furthermore, the specific analysis process of the operation monitoring module is as follows:

[0022] Collecting operation data of the production equipment, the operation data including the noise decibel value of the production equipment during operation, the energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature;

[0023] The noise decibel value, energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature are marked as Z1, Z2, and Z3 respectively; the operation detection coefficient GX of the production equipment is calculated using the formula GX=Z1×a1+Z2×a2+Z3×a3, where a1, a2, and a3 are all coefficient factors;

[0024] A curve graph of the operation detection coefficient GX changing with time is established, and the time required for the operation detection coefficient GX to reach the preset detection threshold G1 is counted as the operation limit time GTi; where G1 is the preset value;

[0025] Obtain the operation limit duration of each operation of the production equipment, take the values ​​of the operation limit durations of GTi and its previous X1 groups, and mark them as GS1, GS2, ..., GSn in chronological order;

[0026] When GSm≤GS(m-1), mark GS(m-1) as the first limit value; count the number of occurrences of the first limit value as the limit frequency P1; when GSm≤GS(m-1), obtain the difference between GS(m-1) and GSm and sum them to get the limit difference PX; use the formula GF=P1×k3+PX×k4 to calculate the limit deviation coefficient GF, where k3 and k4 are coefficient factors.

[0027] Furthermore, the specific working steps of the device management module are:

[0028] Obtain the production equipment corresponding to the equipment maintenance task, and automatically obtain the production coefficient SC of the production equipment from the cloud platform; within a preset time period, count the number of maintenance times of the production equipment as FZ;

[0029] The maintenance coefficient JY of the equipment maintenance task is calculated using the formula JY=SC×k1+FZ×k2, where k1 and k2 are coefficient factors;

[0030] The maintenance level is judged according to the maintenance coefficient JY of the equipment maintenance task, specifically:

[0031] Compare the maintenance coefficient JY with a preset maintenance threshold; the preset maintenance threshold includes X1 and X2, X1 and X2 are both preset fixed values ​​and X1<X2;

[0032] When JY≤X1, the corresponding equipment maintenance task is assigned to low-level maintenance personnel;

[0033] When X1<JY≤X2, the corresponding equipment maintenance task will be assigned to the intermediate maintenance personnel;

[0034] When JY>X2, the corresponding equipment maintenance task will be assigned to senior maintenance personnel.

[0035] Furthermore, the equipment management module is also used to display the operating status information of the production equipment, operate the production equipment, and upload and issue the maintenance information of the production equipment; the operations include starting, stopping, and resetting; the management personnel use the equipment management module to score the maintenance services of the maintenance personnel, with a full score of 100 points; the historical maintenance records include the maintenance duration and the administrator's score.

[0036] Furthermore, the specific analysis steps of the personnel assessment module are:

[0037] In the preset time period, the total number of maintenance personnel's maintenance is counted as maintenance frequency PT; the maintenance time in each historical maintenance record is marked as JTi, and the administrator score is marked as PFi;

[0038] The service coefficient YDi of the maintenance personnel is calculated using the formula YDi=(PFi×d1) / (JTi×d2), where d1 and d2 are coefficient factors; the service coefficient YDi is compared with a preset service threshold;

[0039] The proportion of times when the statistical service coefficient YDi is greater than the preset service threshold is Yb; when YDi is greater than the preset service threshold, the difference between YDi and the preset service threshold is obtained and summed to obtain the total over-service value Mz;

[0040] The maintenance personnel's maintenance optimization value WY is calculated using the formula WY=η×[PT×d3+((Yb×d4+Mz×d5) / PT], where d3, d4, and d5 are all proportional factors; η is a preset compensation factor.

[0041] Furthermore, the operation monitoring module is used to upload the early warning signal to the cloud platform. After receiving the early warning signal, the cloud platform controls the alarm module to sound an alarm to remind the management personnel to perform maintenance on the production equipment.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] 1. The operation monitoring module of the present invention is used to collect and analyze the operation data of the production equipment, calculate the operation detection coefficient GX of the production equipment; establish a curve graph of the operation detection coefficient GX changing with time, and count the time required for the operation detection coefficient GX to reach the preset detection threshold G1 as the operation limit time GTi; obtain the operation limit time of each operation of the production equipment for comparison, and calculate the limit deviation coefficient GF; if GF is greater than the deviation coefficient threshold, it is determined that the operation of the production equipment is abnormal, and an early warning signal is generated to remind the management personnel to repair and maintain the production equipment to improve the production efficiency of the equipment;

[0044] 2. The production analysis module is used to analyze the production coefficient SC of the production equipment according to the historical production records stored in the database; when an early warning signal is received, the cloud platform is also used to generate equipment maintenance tasks to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance tasks, calculate the maintenance coefficient JY of the equipment maintenance tasks, and allocate them to maintenance personnel of different levels according to the maintenance coefficient JY; when JY≤X1, the corresponding equipment maintenance tasks are allocated to low-level maintenance personnel; when X1<JY≤X2, the corresponding equipment maintenance tasks are allocated to intermediate maintenance personnel; when JY>X2, the corresponding equipment maintenance tasks are allocated to senior maintenance personnel to maximize resource utilization;

[0045] 3. The personnel evaluation module described in the present invention is used to obtain and analyze the historical maintenance records of maintenance personnel, calculate the maintenance personnel's maintenance merit WY, and classify the maintenance personnel according to the maintenance merit WY; when WY≤Y1, the corresponding maintenance personnel are classified as low-level maintenance personnel; when Y1<WY≤Y2, the corresponding maintenance personnel are classified as intermediate maintenance personnel; when WY>Y2, the corresponding maintenance personnel are classified as senior maintenance personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0047] Figure 1 This is a system block diagram of the intelligent control system based on the Internet of Things and big data analysis of the present invention. DETAILED DESCRIPTION

[0048] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] like Figure 1 As shown, the intelligent control system based on the Internet of Things and big data analysis includes a data acquisition module, a database, a production analysis module, a cloud platform, an operation monitoring module, an alarm module, an equipment management module, and a personnel evaluation module;

[0050] The data acquisition module is used to collect the historical production records of the production equipment on the SMT production line and store the historical production records in the database; the historical production records include the production start time, production end time, power consumption of the entire production process, the number of products produced, and the product qualification rate;

[0051] The production analysis module is used to analyze the production coefficient SC of production equipment based on the historical production records stored in the database; the specific analysis steps are:

[0052] For any production equipment, within a preset time period, the total number of production times of the production equipment is counted as C1; the operating time, power consumption, number of dispensing products and dispensing qualified rate in each historical production record are marked as Ti, Di, Li and Gi in turn;

[0053] The operating value YXi of the production equipment is calculated using the formula YXi=(Li×g1+Gi×g2) / (Ti×g3+Di×g4), where g1, g2, g3, and g4 are all preset coefficient factors;

[0054] Compare the operating value YXi with the preset operating threshold value, the preset operating threshold value includes X2 and X3, and X2>X3; X2 and X3 are both fixed values;

[0055] When YXi≥X2, a high-yield signal is generated; when X3<YXi<X2, a medium-yield signal is generated; when YXi≤X3, a low-yield signal is generated;

[0056] The percentage of occurrences of high-yield signals, medium-yield signals, and low-yield signals are counted and marked as Zb1, Zb2, and Zb3 respectively; the production coefficient SC of the production equipment is calculated using the formula SC=C1×(Zb1×3+Zb2×2+Zb3)×η, where η is the preset compensation factor; the production analysis module is used to timestamp the production coefficient SC of the production equipment and store it on the cloud platform;

[0057] The operation monitoring module is used to collect and analyze the operation data of production equipment to determine whether the production equipment is operating normally; the specific analysis process is as follows:

[0058] Collect the operating data of production equipment, including the noise decibel value, energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature during operation;

[0059] The noise decibel value, energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature are marked as Z1, Z2, and Z3 respectively; the operation detection coefficient GX of the production equipment is calculated using the formula GX=Z1×a1+Z2×a2+Z3×a3, where a1, a2, and a3 are all coefficient factors;

[0060] A curve graph of the operation detection coefficient GX changing with time is established, and the time required for the operation detection coefficient GX to reach the preset detection threshold G1 is counted as the operation limit time GTi; where G1 is the preset value;

[0061] Obtain the operating limit duration of each operation of the production equipment, take the values ​​of the operating limit duration of GTi and its previous X1 groups, and mark them in chronological order as GS1, GS2, ..., GSn;

[0062] When GSm≤GS(m-1), mark GS(m-1) as the first limit value; count the number of occurrences of the first limit value as the limit frequency P1; when GSm≤GS(m-1), obtain the difference between GS(m-1) and GSm and sum them to get the limit difference PX; use the formula GF=P1×k3+PX×k4 to calculate the limit deviation coefficient GF, where k3 and k4 are coefficient factors;

[0063] Compare the limit deviation coefficient GF with the deviation coefficient threshold; if GF is greater than the deviation coefficient threshold, it is determined that the production equipment is operating abnormally and an early warning signal is generated;

[0064] The operation monitoring module is used to upload the early warning signal to the cloud platform. After receiving the early warning signal, the cloud platform controls the alarm module to issue an alarm to remind the management personnel to repair and maintain the production equipment and improve the production efficiency of the equipment.

[0065] When an early warning signal is received, the cloud platform is also used to generate equipment maintenance tasks to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance tasks and assign them to maintenance personnel of different levels to maximize resource utilization; the specific steps are:

[0066] Obtain the production equipment corresponding to the equipment maintenance task, and automatically obtain the production coefficient SC of the production equipment from the cloud platform; within the preset time period, count the number of maintenance times of the production equipment as FZ;

[0067] The maintenance coefficient JY of the equipment maintenance task is calculated using the formula JY=SC×k1+FZ×k2, where k1 and k2 are coefficient factors;

[0068] The maintenance level is judged according to the maintenance coefficient JY of the equipment maintenance task, specifically:

[0069] Compare the maintenance coefficient JY with the preset maintenance threshold; the preset maintenance threshold includes X1 and X2, X1 and X2 are both preset fixed values ​​and X1<X2;

[0070] When JY≤X1, the corresponding equipment maintenance task is assigned to low-level maintenance personnel;

[0071] When X1<JY≤X2, the corresponding equipment maintenance task will be assigned to the intermediate maintenance personnel;

[0072] When JY>X2, the corresponding equipment maintenance task will be assigned to senior maintenance personnel; the equipment management module is also used to display the operating status information of production equipment, operate production equipment, and upload and issue production equipment maintenance information; operations include start, stop, and reset; management personnel use the equipment management module to score the maintenance service of maintenance personnel, with a full score of 100 points;

[0073] The personnel evaluation module is used to obtain and analyze the historical maintenance records of maintenance personnel and calculate the maintenance personnel's maintenance value WY. The historical maintenance records include maintenance time and administrator score. The specific analysis steps are as follows:

[0074] In the preset time period, the total number of maintenance personnel's maintenance is counted as maintenance frequency PT;

[0075] The maintenance time in each historical maintenance record is marked as JTi, and the administrator score is marked as PFi; the service coefficient YDi of the maintenance personnel is calculated using the formula YDi = (PFi × d1) / (JTi × d2), where d1 and d2 are coefficient factors;

[0076] Compare the service coefficient YDi with the preset service threshold; count the number of times when the service coefficient YDi is greater than the preset service threshold as Yb; when YDi is greater than the preset service threshold, obtain the difference between YDi and the preset service threshold and sum them to obtain the total over-service value Mz;

[0077] The maintenance personnel's maintenance optimization value WY is calculated using the formula WY=η×[PT×d3+((Yb×d4+Mz×d5) / PT], where d3, d4, and d5 are all proportional factors; η is the preset compensation factor;

[0078] The maintenance personnel are graded according to the maintenance merit WY. The larger the maintenance merit WY is, the better the technical quality of the maintenance personnel is and the higher the grade is. Specifically:

[0079] Compare the optimal value WY with a preset optimal threshold; the preset optimal threshold includes Y1 and Y2; Y1 and Y2 are both preset fixed values ​​and Y1<Y2;

[0080] When WY≤Y1, the corresponding maintenance personnel are classified as low-level maintenance personnel;

[0081] When Y1<WY≤Y2, the corresponding maintenance personnel are classified as intermediate maintenance personnel;

[0082] When WY>Y2, the corresponding maintenance personnel are classified as senior maintenance personnel.

[0083] The above formulas are all calculated by removing dimensions and taking numerical values. The formula is a formula that is closest to the actual situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained by simulating a large amount of data.

[0084] Working principle of the present invention:

[0085] The intelligent control system based on the Internet of Things and big data analysis, when working, the data acquisition module is used to collect the historical production records of the production equipment on the SMT production line and store the historical production records in the database; the production analysis module is used to analyze the production coefficient SC of the production equipment according to the historical production records stored in the database, and the production coefficient SC of the production equipment is timestamped and stored in the cloud platform; the operation monitoring module is used to collect the operation data of the production equipment and analyze it, and calculate the operation detection coefficient GX of the production equipment; establish a curve chart of the operation detection coefficient GX changing with time, and calculate the time required for the operation detection coefficient GX to reach the preset detection threshold G1 as the operation limit time GTi; obtain the operation limit time of each operation of the production equipment for comparison, and calculate the limit deviation coefficient GF; if GF is greater than the deviation coefficient threshold, it is determined that the production equipment is operating abnormally, and a warning signal is generated to remind management personnel to repair and maintain the production equipment and improve the equipment production efficiency;

[0086] When an early warning signal is received, the cloud platform is also used to generate equipment maintenance tasks to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance tasks, calculate the maintenance coefficient JY of the equipment maintenance tasks, and allocate them to maintenance personnel of different levels according to the maintenance coefficient JY; when JY≤X1, the corresponding equipment maintenance tasks are allocated to low-level maintenance personnel; when X1<JY≤X2, the corresponding equipment maintenance tasks are allocated to intermediate maintenance personnel; when JY>X2, the corresponding equipment maintenance tasks are allocated to senior maintenance personnel to maximize resource utilization; the personnel evaluation module is used to obtain and analyze the historical maintenance records of maintenance personnel, calculate the maintenance personnel's maintenance merit WY, and classify the maintenance personnel according to the maintenance merit WY; when WY≤Y1, the corresponding maintenance personnel are classified as low-level maintenance personnel; when Y1<WY≤Y2, the corresponding maintenance personnel are classified as intermediate maintenance personnel; when WY>Y2, the corresponding maintenance personnel are classified as senior maintenance personnel.

[0087] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0088] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. Intelligent control system based on Internet of Things and big data analysis, characterized by: It includes data acquisition module, production analysis module, operation monitoring module, equipment management module and personnel assessment module; The data acquisition module is used to collect historical production records of production equipment on the SMT production line and store the historical production records in a database; the historical production records include the production start time, production end time, power consumption of the entire production process, the number of products produced, and the product qualification rate; The production analysis module is used to perform production coefficient SC analysis on production equipment according to historical production records stored in the database; the specific analysis steps are: For any production equipment, within a preset time period, the total number of production times of the production equipment is counted as C1; the operating time, power consumption, number of dispensing products and dispensing qualified rate in each historical production record are marked as Ti, Di, Li and Gi in turn; The operating value YXi of the production equipment is calculated using the formula YXi=(Li×g1+Gi×g2) / (Ti×g3+Di×g4), where g1, g2, g3, and g4 are all preset coefficient factors; Compare the operating value YXi with the preset operating threshold value, the preset operating threshold value includes X2 and X3, and X2>X3; X2 and X3 are both fixed values; When YXi≥X2, a high-yield signal is generated; when X3<YXi<X2, a medium-yield signal is generated; when YXi≤X3, a low-yield signal is generated; The percentage of occurrences of high-yield signals, medium-yield signals, and low-yield signals are counted and marked as Zb1, Zb2, and Zb3 respectively; The production coefficient SC of the production equipment is calculated using the formula SC=C1×(Zb1×3+Zb2×2+Zb3)×η, where η is a preset compensation factor; the production analysis module is used to timestamp the production coefficient SC of the production equipment and store it on the cloud platform; The operation monitoring module is used to collect and analyze the operation data of the production equipment, calculate the limit deviation coefficient GF, and determine whether the production equipment is operating normally; the specific analysis process is as follows: Collecting operation data of the production equipment, the operation data including the noise decibel value of the production equipment during operation, the energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature; The noise decibel value, energy consumption per unit time, and the difference between the inner wall temperature of the production equipment and the ambient temperature are marked as Z1, Z2, and Z3 respectively; the operation detection coefficient GX of the production equipment is calculated using the formula GX=Z1×a1+Z2×a2+Z3×a3, where a1, a2, and a3 are all coefficient factors; A curve graph of the operation detection coefficient GX changing with time is established, and the time required for the operation detection coefficient GX to reach the preset detection threshold G1 is counted as the operation limit time GTi; where G1 is the preset value; Obtain the operation limit duration of each operation of the production equipment, take the values ​​of the operation limit durations of GTi and its previous X1 groups, and mark them as GS1, GS2, ..., GSn in chronological order; When GSm≤GS(m-1), mark GS(m-1) as the first limit value; The number of occurrences of the first limit value is counted as the limit frequency P1; when GSm≤GS(m-1), the difference between GS(m-1) and GSm is obtained and summed to obtain the limit difference PX; the limit deviation coefficient GF is calculated using the formula GF=P1×k3+PX×k4, where k3 and k4 are coefficient factors; Compare the limit deviation coefficient GF with the deviation coefficient threshold; If GF is greater than the deviation coefficient threshold, it is determined that the production equipment is operating abnormally and a warning signal is generated; The operation monitoring module is used to upload the early warning signal to the cloud platform. After receiving the early warning signal, the cloud platform controls the alarm module to sound an alarm to remind the management personnel to perform maintenance on the production equipment; When receiving an early warning signal, the cloud platform is also used to generate equipment maintenance tasks to the equipment management module; the equipment management module is used to judge the maintenance level of the equipment maintenance tasks and allocate the equipment maintenance tasks to maintenance personnel of different levels according to the maintenance coefficient JY; the specific steps are: Obtain the production equipment corresponding to the equipment maintenance task, and automatically obtain the production coefficient SC of the production equipment from the cloud platform; within a preset time period, count the number of maintenance times of the production equipment as FZ; The maintenance coefficient JY of the equipment maintenance task is calculated using the formula JY=SC×k1+FZ×k2, where k1 and k2 are coefficient factors; The maintenance level is judged according to the maintenance coefficient JY of the equipment maintenance task, specifically: Compare the maintenance coefficient JY with a preset maintenance threshold; the preset maintenance threshold includes X1 and X2, X1 and X2 are both preset fixed values ​​and X1<X2; When JY≤X1, the corresponding equipment maintenance task is assigned to low-level maintenance personnel; When X1<JY≤X2, the corresponding equipment maintenance task will be assigned to the intermediate maintenance personnel; When JY>X2, the corresponding equipment maintenance task will be assigned to senior maintenance personnel; The equipment management module is also used to display the operating status information of the production equipment, operate the production equipment, and upload and issue the maintenance information of the production equipment; the operations include starting, stopping, and resetting; the management personnel use the equipment management module to score the maintenance service of the maintenance personnel, with a full score of 100 points; the historical maintenance records include the maintenance time and the administrator's score; The personnel evaluation module is used to obtain the historical maintenance records of maintenance personnel for analysis, calculate the maintenance personnel's maintenance merit WY, and classify the maintenance personnel; specifically: In the preset time period, the total number of maintenance personnel's maintenance is counted as maintenance frequency PT; the maintenance time in each historical maintenance record is marked as JTi, and the administrator score is marked as PFi; The service coefficient YDi of the maintenance personnel is calculated using the formula YDi=(PFi×d1) / (JTi×d2), where d1 and d2 are coefficient factors; Compare the service coefficient YDi with the preset service threshold; count the number of times when the service coefficient YDi is greater than the preset service threshold as Yb; when YDi is greater than the preset service threshold, obtain the difference between YDi and the preset service threshold and sum them to obtain the total over-service value Mz; The maintenance personnel's maintenance merit WY is calculated using the formula WY=η×[PT×d3+((Yb×d4+Mz×d5) / PT], where d3, d4, and d5 are all proportional factors; η is the preset compensation factor; Compare the optimal value WY with a preset optimal threshold; the preset optimal threshold includes Y1 and Y2; wherein Y1 and Y2 are both preset fixed values ​​and Y1<Y2; When WY≤Y1, the corresponding maintenance personnel are classified as low-level maintenance personnel; When Y1<WY≤Y2, the corresponding maintenance personnel are classified as intermediate maintenance personnel; When WY>Y2, the corresponding maintenance personnel are classified as senior maintenance personnel.

Citation Information

Patent Citations

  • Metallurgical gas integrated dynamic balance scheduling system and method

    CN105787583A

  • Condition-based maintenance decision making system for gas turbines

    CN106681293A

  • Production line intelligent evaluation system based on cloud computing technology

    CN110378598A

  • Industrial control equipment maintenance scheduling system and method

    CN111080140A

  • After-sales service system for e-commerce platform

    CN112163874A