A metakaolin preparation system and method capable of realizing decoupling function

By decoupling fuel combustion and material decomposition in the metakaolin preparation system, the problems of high energy consumption and color control in calcined kaolin preparation systems have been solved, achieving efficient and low-energy metakaolin preparation and ensuring that the product activity and color meet the requirements of finished cement products.

CN116535117BActive Publication Date: 2024-11-22TIANJIN CEMENT IND DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310508826.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-22
Estimated Expiration
2043-05-08

AI Technical Summary

Technical Problem

Existing calcined kaolin preparation systems suffer from high energy consumption, low processing capacity, difficulty in controlling product quality, and the color of calcined kaolin does not meet the requirements of finished cement products, affecting sales.

Method used

A decoupled metakaolin preparation system is adopted, including a suspension preheating system, a decomposition furnace system, a first cooling system, a second cooling system, and a hot air furnace system. By rationally designing the decoupling of fuel combustion and material decomposition processes, the temperature and oxygen content in the decomposition furnace are controlled. Low-oxygen flue gas and reducing gas are used for cooling to ensure that the kaolin is fully decomposed and its color is controllable.

Benefits of technology

This method enables the efficient and low-energy preparation of metakaolin, with the product's activity index and color meeting the requirements of finished cement products, thereby reducing production costs and improving product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116535117B_ABST
    Figure CN116535117B_ABST
Patent Text Reader

Abstract

The invention discloses a metakaolin preparation system and preparation method capable of realizing a decoupling function, comprising a suspension preheating system, a decomposition furnace system, a first cooling system, a second cooling system and a hot blast furnace system, wherein the decomposition furnace outlet is connected to the final cyclone preheater inlet, the final cyclone preheater material outlet is connected to the first cooling system material inlet, the penultimate cyclone preheater discharge port is connected to the decomposition furnace raw material feeding port, and the decomposition furnace is not provided with a fuel feeding port; the oxygen content in the flue gas discharged by the suspension preheating system is 1-3%, the suspension preheating system flue gas outlet is connected to the first cooling system flue gas inlet, the first cooling system flue gas outlet is connected to the decomposition furnace flue gas inlet, the second cooling system gas outlet is connected to the hot blast furnace combustion-supporting air inlet, and the hot blast furnace flue gas outlet is connected to the first cooling system flue gas outlet pipeline. The invention can produce metakaolin meeting the color and activity index requirements, and the system has low energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of metakaolin preparation, and in particular to a metakaolin preparation system and method capable of realizing a decoupling function. Background Art

[0002] Kaolin (Al2O3·2SiO2·2H2O, AS2H2) is a common mineral in natural kaolin or kaolin tailings. When heated in the air, it undergoes several structural changes. When heated to about 600°C, the layered structure of kaolin is destroyed due to the removal of hydroxyl groups, forming an amorphous transition phase - metakaolin (Al2O3·2SiO2, AS2). The molecules of metakaolin are irregularly arranged, presenting a thermodynamic metastable state, and have gelling properties under alkali excitation. It can react with calcium hydroxide (Ca(OH)2) and water to produce a volcanic ash reaction to produce a highly active hydration product similar to cement.

[0003] Taking advantage of the above characteristics, calcining kaolin containing kaolinite and similar structural aluminum-silica minerals to prepare mixed materials, and then compounding with gypsum, silicate cement clinker or limestone to prepare calcined kaolin-based composite cement has become a research hotspot in the international cement and concrete industry in recent years. This type of cement uses calcined kaolin with high activity to replace clinker, which can reduce the amount of cement clinker from 70% to 75% to 45% to 50%, while maintaining the 28-day compressive strength of cement and increasing the flexural strength by more than 20%, achieving the technical goals of low clinker coefficient, low carbon emissions and high strength in the cement preparation process.

[0004] Since the preparation cost of calcined kaolin is lower than that of clinker, the CO2 emissions in the preparation process of calcined kaolin are also lower than those in the preparation process of clinker. In addition, the sources of kaolin raw materials are very wide. In the context of the active promotion of carbon emission reduction in the building concrete and cement industries, the use of large amounts of calcined kaolin to replace clinker in the concrete and cement industries to reduce the amount of clinker in cement has significant competitive advantages.

[0005] The existing methods for preparing calcined kaolin mainly include fixed bed, semi-fixed bed, fluidized bed and suspension calcination. Among them, the preparation of calcined kaolin by rotary kiln calcination and suspension calcination is a commonly used method, but when using rotary kiln calcination, there are often problems such as high system heat consumption, easy overburning and deactivation of products and difficult quality control. Although suspension calcination can effectively reduce the system heat consumption, conventional suspension calcination often couples the combustion of fuel and the decomposition process of kaolin in the decomposition furnace. Since the decomposition temperature range of kaolin is relatively narrow, and the combustion temperature of fuel is difficult to stably control within a relatively narrow temperature range, when the temperature in the decomposition furnace is low, the kaolin is not completely decomposed (the so-called "underburning"); and when the temperature in the decomposition furnace is high, the kaolin will recrystallize and deactivate (the so-called "overburning"), which makes the design and development of the suspension calcination decomposition furnace significantly more difficult. On the other hand, the kaolin raw material usually contains a certain amount of iron, mainly in the form of goethite, hematite and siderite. The iron phase decomposes during the calcination of kaolin and eventually turns into red hematite (iron phase is Fe 3+ ) form, making the calcined kaolin appear obvious red. Directly using red calcined kaolin to prepare cement will affect the color of the finished cement product, and it is easy to be mistaken for inferior cement by the market and affect sales. Therefore, the key to large-scale production and wide application of calcined kaolin and calcined kaolin-limestone composite cement is to adopt reasonable process technology to produce calcined kaolin with high activity and color consistent with cement clinker with low energy consumption and high efficiency.

[0006] Therefore, based on market demand and the key technical difficulties faced, it is of great practical significance to provide a kaolin preparation system and method that can realize decoupling function, which fully considers the cement concrete industry's requirements for color control and activity index control of calcined kaolin, and at the same time solves the problems of high energy consumption, small processing capacity, and difficult product quality control of the calcined kaolin preparation system. Summary of the invention

[0007] In order to solve the problems existing in the prior art, the present invention provides a kaolin preparation system and a preparation method which can realize a decoupling function. The system can fully consider the control requirements of the cement concrete industry on the color and activity index of the kaolin finished product, produce kaolin that meets the color and activity index control requirements, and solve the problems of high energy consumption, small processing capacity, and difficult product quality control of the kaolin preparation system.

[0008] The present invention is implemented as follows: a metakaolin preparation system capable of realizing a decoupling function comprises a suspension preheating system, a decomposition furnace system, a first cooling system, a second cooling system and a hot blast furnace system, wherein the decomposition furnace system comprises a decomposition furnace, the bottom of the decomposition furnace is a flue gas inlet, the top outlet of the decomposition furnace is connected to the inlet of the last stage cyclone preheater of the suspension preheating system, the material outlet at the bottom of the last stage cyclone preheater of the suspension preheating system is connected to the material inlet of the first cooling system, the discharge port of the penultimate stage cyclone preheater of the suspension preheating system is connected to the raw material feeding port of the decomposition furnace, the decomposition furnace is not provided with a fuel feeding port, and the temperature in the decomposition furnace is controlled at 650-850°C;

[0009] The top flue gas outlet of the suspension preheating system is connected to the flue gas inlet of the indirect heat exchanger, the flue gas outlet of the indirect heat exchanger is connected to the flue gas inlet of the first cooling system, the first cooling system is used to rapidly cool the material to a temperature range of 300-350°C and below, the flue gas outlet of the first cooling system is connected to the flue gas inlet of the decomposition furnace, the oxygen content in the flue gas discharged from the top of the suspension preheating system is 1-3%; the material outlet of the first cooling system is connected to the material inlet of the second cooling system, the gas outlet of the second cooling system is connected to the combustion-supporting air inlet of the hot blast furnace system, and the flue gas outlet of the hot blast furnace system is connected to the flue gas outlet pipe of the first cooling system; the O2 concentration in the flue gas at the outlet of the hot blast furnace system is controlled at 1-3%, and the CO content is controlled at 1000-2000ppm.

[0010] Preferably, the temperature of the high-temperature flue gas at the outlet of the hot blast furnace system is controlled at 800-1000°C, the hot blast furnace system comprises a hot blast furnace, a fuel feeding port is arranged at the top of the hot blast furnace, the combustion air inlet of the hot blast furnace system is located on one side of the fuel feeding port, a slag discharge port is arranged at the bottom of the hot blast furnace, and the flue gas outlet of the hot blast furnace system is located on one side of the lower part of the hot blast furnace. Preferably, the decomposition furnace is provided with a plurality of raw material feeding ports in the height direction, and the temperature distribution in the decomposition furnace can be controlled within a reasonable range by adjusting the amount of raw material fed into the decomposition furnace, the amount of flue gas entering the decomposition furnace, and the flue gas temperature.

[0011] Preferably, the indirect heat exchanger is used to indirectly cool the flue gas discharged from the suspension preheating system to 80-120°C. A cooling medium inlet and a flue gas outlet are provided at the bottom of the indirect heat exchanger, and a flue gas inlet and a cooling medium outlet are provided at the top, so that the flue gas and the cooling medium exchange heat in countercurrent. The cooling medium channel of the indirect heat exchanger is filled with cooling medium.

[0012] Further preferably, the cooling medium of the indirect heat exchanger is cooling water, cooling oil or other applicable cooling medium.

[0013] Preferably, a flue gas circulation fan is provided between the indirect heat exchanger and the first-stage cyclone preheater of the suspension preheating system, and between the indirect heat exchanger and the first cooling system, respectively.

[0014] Preferably, the gas outlet of the second cooling system is connected to the combustion-supporting air inlet of the hot blast furnace system via a dust collector and a combustion-supporting air circulation fan in sequence.

[0015] Preferably, the second cooling system comprises at least one stage of cyclone cooler for cooling the material to below 100°C.

[0016] Preferably, the smoke outlet of the suspension preheating system and the gas outlet of the second cooling system are also connected to a drying crusher or other waste heat utilization equipment.

[0017] The method for preparing metakaolin by using the above system comprises the following steps: the raw material is preheated by a suspension preheating system and then enters a decomposition furnace; the decomposed material and the generated hot flue gas leave the decomposition furnace and enter the final cyclone preheater of the suspension preheating system; the material separated by the final cyclone preheater of the suspension preheating system enters a first cooling system; the flue gas discharged from the top of the suspension preheating system is cooled by an indirect heat exchanger and then enters the first cooling system to exchange heat with the material entering the first cooling system; the flue gas discharged from the first cooling system enters the decomposition furnace system; and the gas discharged from the second cooling system enters the hot blast furnace The system assists combustion, and the high-temperature flue gas from the hot blast furnace system is mixed with the flue gas from the outlet of the first cooling system and then enters the decomposition furnace. The amount of raw material fed into the decomposition furnace, the amount of flue gas entering the decomposition furnace and the flue gas temperature are adjusted to control the temperature distribution in the decomposition furnace to be between 650 and 850°C, so that the kaolin can be fully decomposed without overburning, and the activity index of the finished kaolin meets the subsequent production requirements; the first cooling system rapidly cools the material to a temperature range of 300 to 350°C and below, and then enters the second cooling system, and is cooled by the second cooling system to obtain a finished kaolin with controllable color.

[0018] Preferably, the residence time of the flue gas in the decomposition furnace is 2 to 10 seconds.

[0019] Preferably, the temperature of the high-temperature flue gas from the hot blast furnace system is controlled at 800-1000° C., the O2 concentration in the flue gas is controlled at 1-3%, and the CO content is controlled at 1000-2000 ppm.

[0020] Preferably, the cooling medium of the first cooling system is flue gas with a temperature of 80-120°C after being cooled by an indirect heat exchanger, the oxygen content in the flue gas is 1-3%, and the temperature of the flue gas at the outlet of the first cooling system is 500-600°C.

[0021] Preferably, the cooling medium of the second cooling system is air at room temperature, and the material temperature is cooled to below 100° C. by the second cooling system.

[0022] The specific principles of the present invention are:

[0023] The key to controlling the activity of the metakaolin finished product is to uniformly control the temperature field in the decomposition furnace system. The present invention completely decouples the fuel combustion and material decomposition processes, and through the reasonable design of the first cooling system and the hot air furnace system, ensures that the heat enthalpy carried by the flue gas entering the decomposition furnace can promote the kaolin material to be fully decomposed in the decomposition furnace system. At the same time, the temperature of the flue gas can avoid the high-temperature deactivation of the kaolin material, ensuring that the activity index of the metakaolin finished product meets the subsequent production needs.

[0024] The key to controlling the color of the finished kaolin product is decomposition control and cooling control, among which decomposition control requires strict control of the decomposition atmosphere and decomposition temperature; cooling control requires comprehensive control of the cooling atmosphere and cooling temperature. In order to control the color of the finished kaolin product, in the process of kaolin decomposition to form kaolin, the present invention controls the excess air coefficient at the outlet of the hot blast furnace system, thereby achieving the oxygen content in the kiln tail flue gas at the outlet of the hot blast furnace system and the suspension preheating system within the preferred oxygen content range. At the same time, considering that the content of the reducing gas CO at the outlet of the hot blast furnace is controlled in a reasonable range of 1000-2000ppm, it is easy to reduce the Fe content in the kaolin material in the decomposition furnace system. 3+ Reduction to Fe 2+ During the cooling process of high-temperature metakaolin, it is necessary to comprehensively consider the cooling atmosphere and cooling temperature control. After detailed experimental research, if the cooling medium of metakaolin is an inert gas (such as N2, etc.) or low-oxygen flue gas (the oxygen concentration in the flue gas is preferably controlled at 1-3%), the Fe 2+ It will not be oxidized to Fe again during the cooling process 3+ ; Experimental studies have also verified that the Fe in the metakaolin prepared by reduction decomposition 2+ It is stable in the temperature range of 300-350℃ and below, and will not be oxidized to Fe again even when in contact with normal air. 3+ Based on the above theoretical research work, considering that the oxygen concentration in the flue gas at the outlet of the suspension preheating system can be controlled at 1-3%, it is an ideal cooling medium. At the same time, the flue gas contains a certain amount of reducing gas CO, which can protect the hot material from Fe 2+ Will not be oxidized to Fe 3+ , so it can be used to achieve the first stage of rapid cooling of hot materials. Therefore, the present invention first fully cools the flue gas at the outlet of the suspension preheating system, and then cools the hot materials entering the first cooling system. After detailed theoretical calculations, the hot materials can be rapidly cooled to a temperature range of 300-350°C or below. The materials after the first stage of rapid cooling enter the second cooling system and are cooled to about 100°C with normal temperature air.

[0025] In the process, in terms of material flow, the kaolin raw materials are subjected to the raw material pretreatment process to obtain raw material powder that meets the production needs. The raw material powder is fed into the suspension preheating system after gas-solid separation by the feeding device or cyclone separator through the raw material elevator. The suspension preheating system includes a multi-stage cyclone preheater, an efficient spreading device and connecting pipes. The raw material powder is preheated and gas-solid separated in the cyclone preheater. After multiple heat exchanges and gas-solid separation, the raw material powder enters the decomposition furnace system from the discharge pipe of the penultimate cyclone preheater of the suspension preheating system. The decomposition furnace system includes a decomposition furnace, an efficient spreading device, a flue gas inlet pipe, and a flue gas outlet pipe. By adjusting the amount of material fed into the decomposition furnace, the amount of flue gas entering the decomposition furnace and the flue gas temperature, the temperature distribution in the decomposition furnace can be controlled within a reasonable range. The reasonable temperature distribution in the decomposition furnace can ensure the full decomposition of kaolin, and at the same time ensure that the kaolin is not overburned, and the activity index of the finished kaolin meets the subsequent production requirements. The hot materials decomposed in the decomposition furnace system and the hot flue gas generated leave the decomposition furnace, and then the hot materials and hot flue gas enter the first cooling system after gas-solid separation in the last cyclone preheater of the suspension preheating system. The first cooling system includes one or more cyclone coolers, a high-efficiency material spreading device and connecting pipes, etc. The hot materials are cooled and gas-solid separated in the cyclone cooler of the first cooling system, and the materials cooled by the first cooling system enter the second cooling system after gas-solid separation. The second cooling system includes one or more cyclone coolers, a high-efficiency material spreading device and connecting pipes, etc. The materials are further cooled and gas-solid separated in the cyclone cooler of the second cooling system. Finally, most of the materials leave the discharge pipe of the lowest cyclone cooler of the second cooling system and fall into the finished zipper machine. A small part of the materials fall into the finished zipper machine after dust collection by the dust collector, and finally a finished product that meets the needs is obtained. In terms of gas flow, room temperature air enters the second cooling system, and then cools the materials entering the second cooling system. The air that has completed heat exchange leaves from the outlet of the uppermost cyclone cooler of the second cooling system, and then enters the dust collector to separate the kaolin products contained in the air to the finished zipper machine. The air at the dust collector outlet is divided into the following two routes: the first route enters the hot air furnace system for combustion assistance, and the second route enters the drying crusher to dry the raw materials or perform other forms of waste heat utilization.By reasonably controlling the amount of fuel entering the hot blast furnace, the temperature of the flue gas at the hot blast furnace outlet is controlled within a reasonable range of 800-1000°C. At the same time, the O2 concentration in the flue gas is controlled at 1-3%, and the CO content is controlled at 1000-2000ppm; the high-temperature flue gas from the hot blast furnace is mixed with the flue gas at the outlet of the first cooling system and then enters the decomposition furnace. The water vapor generated by the material in the decomposition furnace absorbs heat and fully decomposes and then mixes with the flue gas and leaves the decomposition furnace system. Subsequently, the raw material powder fed into the suspension preheating system is preheated and separated from the gas and solid for multiple times, and finally discharged from the top cyclone preheater of the suspension preheating system. The flue gas leaves the vent and is then divided into the following two paths: one path enters the indirect heat exchanger through the flue gas circulation fan. The indirect heat exchanger fully cools the flue gas by using cooling water, cooling oil or other suitable cooling media. The fully cooled flue gas enters the first cooling system and then cools the high-temperature materials entering the first cooling system. The cooled circulating flue gas leaves the outlet of the top cyclone cooler of the first cooling system and then mixes with the high-temperature flue gas at the outlet of the hot blast furnace and enters the decomposition furnace; the second path enters the drying crusher to dry the raw materials or utilize the waste heat in other forms, and is discharged into the atmosphere after flue gas treatment.

[0026] Compared with the prior art, the present invention has the following advantages and positive effects:

[0027] 1. In order to prepare a metakaolin finished product whose activity index meets subsequent requirements, the present invention completely decouples the fuel combustion and material decomposition processes, and through the reasonable design of the first cooling system and the hot blast furnace system, ensures that the heat enthalpy carried by the flue gas entering the decomposition furnace can promote the kaolin material to be fully decomposed in the decomposition furnace system, and at the same time, the temperature of the flue gas can avoid the high-temperature deactivation of the kaolin material, thereby ensuring that the activity index of the metakaolin finished product meets subsequent production requirements.

[0028] 2. The present invention reasonably designs the hot blast furnace system, thereby achieving the oxygen content in the flue gas at the outlet of the hot blast furnace system and the suspension preheating system within the preferred oxygen content range, and the flue gas contains a certain amount of reducing gas CO, and uses an indirect heat exchanger to cool the circulating flue gas to a suitable temperature range, which is then used to perform primary quenching of the high-temperature metakaolin (the oxygen concentration in the flue gas is low, and it contains a certain amount of reducing gas CO), which can effectively avoid the Fe 2+ Contact with oxygen-containing cooling medium is reoxidized to Fe 3+ , and then lose control of the color of the kaolin product; at the same time, the circulating flue gas after heat exchange is mixed with the flue gas at the outlet of the hot blast furnace, so that the temperature in the decomposition furnace is distributed between 650 and 850 ° C, and the content of reducing gas CO at the outlet of the hot blast furnace is controlled in a reasonable range, which can easily reduce the Fe in the kaolin material in the decomposition furnace system. 3+ Reduction to Fe 2+ That is, the present invention focuses on the design of both the decomposition and cooling stages, thereby achieving control over the color of the finished metakaolin product.

[0029] 3. The present invention sequentially arranges a first cooling system and a second cooling system, and the two cooling systems have clear functional positioning. Among them, the first cooling system fully utilizes the low-oxygen flue gas at the outlet of the suspension preheating system to perform primary cooling on the metakaolin, thereby avoiding the Fe 2+ During the cooling process, it comes into contact with oxygen-containing cooling medium (such as air at room temperature) and is oxidized to Fe 3+ At the same time, the properly designed low-oxygen flue gas volume can cool the metakaolin to a safe temperature range of 300-350℃ or below. The second cooling system makes full use of room temperature air to cool the metakaolin to about 100℃;

[0030] 4. The exhaust gas at the outlet of the suspension preheating system and the exhaust air at the outlet of the second cooling system of the present invention both take into account sufficient waste heat recovery and utilization, which can effectively reduce system heat consumption and production costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions of the specific embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the specific embodiments. Obviously, the drawings described below are some specific embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0032] Figure 1 It is a system flow chart of a metakaolin preparation system capable of realizing a decoupling function provided by an embodiment of the present invention.

[0033] Among them: 1. Suspension preheating system; 1-1. Cyclone preheater; 2. Decomposition furnace system; 2-1. Decomposition furnace; 3. First cooling system; 3-1. First cyclone cooler; 4. Second cooling system; 4-1. Second cyclone cooler; 4-2. Third cyclone cooler; 6. Indirect heat exchanger; 7. Dust collector; 8. Hot blast furnace system; 8-1. Hot blast furnace. DETAILED DESCRIPTION

[0034] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, it should be noted that the terms "upper", "lower", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In the description of the present invention, "plurality" means two or more, unless otherwise clearly and specifically defined.

[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] Example

[0038] See also Figure 1 An embodiment of the present invention provides a kaolin preparation system capable of realizing a decoupling function, comprising a suspension preheating system 1, a decomposition furnace system 2, a first cooling system 3, a second cooling system 4 and a hot air furnace system 8.

[0039] The suspension preheating system 1 includes a multi-stage cyclone preheater 1-1, an efficient material spreading device, and connecting pipes, etc. The preferred number of stages of the cyclone preheater 1-1 of the suspension preheating system 1 is three to seven, which is used to preheat the raw material; in this embodiment, the preferred number of stages of the cyclone preheater 1-1 of the suspension preheating system 1 is five, namely the first, second, third, fourth and fifth cyclone preheaters. The decomposition furnace system 2 includes a decomposition furnace 2-1, an efficient material spreading device, a flue gas inlet pipe and a flue gas outlet pipe, etc. The preferred number of stages of the cyclone cooler of the first cooling system 3 is one to four. In this embodiment, a first-stage cyclone cooler is selected. The first cooling system 3 includes a first cyclone cooler 3-1, an efficient material spreading device and connecting pipes, etc. The preferred number of stages of the cyclone cooler of the second cooling system 4 is one to four. In this embodiment, a second-stage cyclone cooler is selected. The second cooling system 4 includes a second cyclone cooler 4-1, a third cyclone cooler 4-2, an efficient material spreading device and connecting pipes, etc. The hot blast furnace system 8 includes a hot blast furnace 8-1, a combustion air inlet pipe, a burner, a flue gas outlet pipe, a slag discharge pipe, etc.

[0040] The bottom of the decomposition furnace 2-1 is a flue gas inlet, the top outlet of the decomposition furnace 2-1 is connected to the inlet of the fifth cyclone preheater of the suspension preheating system 1, the material outlet at the bottom of the fifth cyclone preheater of the suspension preheating system 1 is connected to the material inlet of the first cyclone cooler 3-1 of the first cooling system 3, the discharge port of the fourth cyclone preheater of the suspension preheating system 1 is connected to the raw material feeding port of the decomposition furnace 2-1, and the decomposition furnace 2-1 is not provided with a fuel feeding port. Specifically, the decomposition furnace 2-1 is provided with multiple raw material feeding ports in the height direction, and the temperature distribution in the decomposition furnace 2-1 can be controlled within a reasonable range by adjusting the amount of raw material fed into the decomposition furnace 2-1, the amount of flue gas entering the decomposition furnace, and the flue gas temperature.

[0041] A fuel feeding port is arranged at the top of the hot blast furnace 8-1, a combustion-supporting air inlet of the hot blast furnace is located on one side of the fuel feeding port, a slag discharge port is arranged at the bottom of the hot blast furnace, a smoke outlet of the hot blast furnace is located on one side of the lower part of the hot blast furnace 8-1, and the smoke outlet of the hot blast furnace 8-1 is connected to the smoke outlet pipe of the first cooling system 3.

[0042] The top flue gas outlet of the suspension preheating system 1 is connected to the flue gas inlet of the indirect heat exchanger 6. The indirect heat exchanger 6 is used to indirectly cool the flue gas discharged from the suspension preheating system 1 to 80-120°C. The bottom of the indirect heat exchanger 6 is provided with a cooling medium inlet and a flue gas outlet, and the top is provided with a flue gas inlet and a cooling medium outlet, so that the flue gas and the cooling medium exchange heat in countercurrent. The cooling medium channel of the indirect heat exchanger 6 is passed through by the cooling medium. The cooling medium of the indirect heat exchanger 6 is cooling water, cooling oil or other applicable cooling medium.

[0043] Considering that the oxygen content in the flue gas at the outlet of the suspension preheating system 1 can be controlled at 1-3%, it can be used to achieve a first-stage rapid cooling of the hot material in the first cooling system 3. The flue gas outlet of the indirect heat exchanger 6 is connected to the flue gas inlet of the first cooling system 3. The first cooling system 3 is used to rapidly cool the material to a temperature range of 300-350°C and below. The flue gas outlet of the first cooling system 3 is connected to the flue gas inlet of the decomposition furnace 2-1, and the flue gas after heat exchange is mixed with the high-temperature flue gas from the hot blast furnace system and then sent to the decomposition furnace 2-1.

[0044] The material outlet of the first cooling system 3 is connected to the material inlet of the second cooling system 4. The cooling medium of the second cooling system 4 is air at normal temperature. The second cooling system 4 is used to cool the material to below 100°C. The gas outlet of the second cooling system 4 is connected to the combustion-supporting air inlet of the hot blast furnace 8-1 through the dust collector 7 and the combustion-supporting air circulation fan in turn, so as to support the combustion of the hot blast furnace 8-1.

[0045] The flue gas outlet of the suspension preheating system 1 and the gas outlet of the second cooling system 4 are also connected to a drying crusher for drying raw materials, or connected to other waste heat utilization equipment for other forms of waste heat utilization, which fully considers waste heat recovery and utilization, and can effectively reduce system heat consumption and production costs.

[0046] The specific method for preparing metakaolin using the above system is:

[0047] The raw material is preheated by the suspension preheating system 1 and then enters the decomposition furnace 2-1. The decomposed material and the generated hot flue gas leave the decomposition furnace 2-1 and enter the final cyclone preheater 1-1 of the suspension preheating system 1. The material separated by the final cyclone preheater 1-1 of the suspension preheating system 1 enters the first cooling system 3. The flue gas with an oxygen content of 1-3% discharged from the top of the suspension preheating system 1 is cooled to 80-120°C by the indirect heat exchanger 6 and then enters the first cooling system 3 to exchange heat with the material entering the first cooling system 3. The flue gas discharged from the first cooling system 3 enters the decomposition furnace 2-1, and the gas discharged from the second cooling system 4 enters The hot blast furnace 8-1 is fed to assist combustion; the high-temperature flue gas temperature out of the hot blast furnace 8-1 is controlled at 800-1000°C, the O2 concentration in the flue gas is controlled at 1-3%, and the CO content is controlled at 1000-2000ppm. The high-temperature flue gas out of the hot blast furnace 8-1 is mixed with the flue gas at the outlet temperature of 500-600°C of the first cooling system 3 and then fed to the decomposition furnace 2-1. The amount of raw material fed into the decomposition furnace 2-1, the amount of flue gas entering the decomposition furnace and the flue gas temperature are adjusted to control the temperature distribution in the decomposition furnace 2-1 to be 650-850°C. The residence time of the flue gas in the decomposition furnace is 2-10 seconds, and the Fe 3+ Reduction to Fe 2+ , so that the kaolin is fully decomposed while ensuring that the kaolin is not over-burned, and the activity index of the finished metakaolin meets the subsequent production requirements; the first cooling system 3 rapidly cools the decomposed hot material (metakaolin) to a temperature range of 300-350°C or below, so that the Fe in the metakaolin 2+ In this cooling process, it will not be oxidized to Fe 3+ The hot material is cooled and separated from the gas and solid in the first cyclone cooler 3-1 of the first cooling system 3; the material cooled by the first cooling system 3 then enters the second cooling system 4, the cooling medium of the second cooling system 4 is room temperature air, and is cooled to below 100°C by the second cooling system 4. The material is further cooled and separated from the gas and solid in the third cyclone cooler 4-2 of the second cooling system 4, and finally leaves from the discharge pipe of the second cyclone cooler 4-1 and falls into the finished zipper machine to obtain a finished product that meets the needs.

[0048] In terms of material flow, the kaolin raw materials are subjected to the raw material pretreatment process to obtain raw material powder that meets production needs. The raw material powder is fed into the suspension preheating system 1 after gas-solid separation by the feeding device or cyclone separator through the raw material elevator. The raw material powder is preheated and gas-solid separated in the cyclone preheater 1-1. After multiple heat exchanges and gas-solid separations, the raw material powder enters the decomposition furnace system 2 from the discharge pipe of the fourth cyclone preheater 1-1 of the suspension preheating system 1. The decomposition furnace system 2 includes a decomposition furnace 2-1, an efficient material spreading device, a flue gas inlet pipe, and a flue gas outlet pipe. The decomposition furnace is provided with multiple raw material feeding ports in the height direction. By adjusting the amount of material fed into the decomposition furnace 2-1, the amount of flue gas entering the decomposition furnace, and the flue gas temperature, the temperature distribution in the decomposition furnace can be controlled to be between 650 and 850°C. The reasonable temperature distribution in the decomposition furnace 2-1 can ensure the full decomposition of kaolin, and at the same time ensure that the kaolin is not over-burned, and the activity index of the finished kaolin meets the subsequent production requirements. The hot material decomposed in the decomposition furnace system 2 leaves the decomposition furnace, and then enters the first cooling system 3 after gas-solid separation with the hot flue gas in the fifth cyclone preheater 1-1 of the suspension preheating system 1. The hot material is cooled and gas-solid separated in the cyclone cooler of the first cooling system 3, and the material cooled in the first cooling system 3 enters the second cooling system 4 through the discharge pipe of the first cyclone cooler 3-1 after gas-solid separation. The material is further cooled and gas-solid separated in the third cyclone cooler 4-2 of the second cooling system 4, and finally most of the material leaves the discharge pipe of the second cyclone cooler 4-1 of the second cooling system 4 and falls into the finished zipper machine, and a small part of the material falls into the finished zipper machine after dust collection by the dust collector 7, and finally a finished product that meets the needs is obtained.

[0049] In terms of gas flow, air at room temperature enters the second cooling system 4, and then cools the material entering the second cooling system 4. The air after heat exchange leaves from the outlet of the third cyclone cooler 4-2 of the second cooling system 4, and then enters the dust collector 7 to separate the kaolin product contained in the air to the finished zipper machine. The air at the outlet of the dust collector 7 is divided into the following two routes: the first route enters the hot air furnace system 8 for combustion assistance, and the second route enters the drying crusher to dry the raw materials or perform other forms of waste heat utilization. By reasonably controlling the amount of fuel entering the hot air furnace 8-1, the temperature of the flue gas at the outlet of the hot air furnace is controlled within a reasonable range of 800 to 1000°C. At the same time, the O2 concentration in the flue gas is controlled at 1 to 3%, and the CO content is controlled at 1000 to 2000ppm; the high-temperature flue gas exiting the hot air furnace 8-1 is mixed with the flue gas at the outlet of the first cooling system 3 and enters the decomposition furnace, so that the temperature distribution in the decomposition furnace is 650 to 850°C, and the Fe in the kaolin raw material is reduced. 3+ Fully reduced to Fe 2+The water vapor generated by the material in the decomposition furnace absorbs heat and fully decomposes and then mixes with the flue gas and leaves the decomposition furnace system 8; then the raw material powder fed into the suspension preheating system 1 is preheated and separated from the gas and solid for multiple times, and finally leaves from the outlet of the first cyclone preheater 1-1 of the suspension preheating system 1, and then is divided into the following two paths: one of them enters the indirect heat exchanger 6 through the circulating fan, and the circulating flue gas is fully cooled by using cooling water, cooling oil or other suitable cooling media. The fully cooled flue gas enters the first cooling system 3, and then the high-temperature material entering the first cooling system 3 is cooled. The cooled circulating flue gas leaves from the outlet of the first cyclone cooler 3-1 of the first cooling system 3, and then mixes with the high-temperature flue gas at the outlet of the hot blast furnace and enters the decomposition furnace; the second path enters the drying crusher to dry the raw materials or perform other forms of waste heat utilization, and is discharged into the atmosphere after flue gas treatment.

[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A metakaolin preparation system capable of realizing a decoupling function, characterized in that: It comprises a suspension preheating system, a decomposition furnace system, a first cooling system, a second cooling system and a hot blast furnace system. The decomposition furnace system comprises a decomposition furnace. The bottom of the decomposition furnace is a smoke inlet. The top outlet of the decomposition furnace is connected to the inlet of the last-stage cyclone preheater of the suspension preheating system. The material outlet at the bottom of the last-stage cyclone preheater of the suspension preheating system is connected to the material inlet of the first cooling system. The discharge port of the penultimate cyclone preheater of the suspension preheating system is connected to the raw material feeding port of the decomposition furnace. The decomposition furnace is not provided with a fuel feeding port, so that the fuel combustion process and the material decomposition process are completely decoupled, that is, the fuel combustion process occurs in the hot blast furnace system, and the material decomposition process occurs in the decomposition furnace system. The temperature in the decomposition furnace is controlled at 650-850°C. The top flue gas outlet of the suspension preheating system is connected to the flue gas inlet of the indirect heat exchanger, and the indirect heat exchanger is used to indirectly cool the flue gas discharged from the suspension preheating system to 80-120°C. The flue gas outlet of the indirect heat exchanger is connected to the flue gas inlet of the first cooling system, and the first cooling system is used to rapidly cool the material to a temperature range of 300-350°C and below. The temperature of the flue gas at the outlet of the first cooling system is 500-600°C, and the flue gas outlet of the first cooling system is connected to the flue gas inlet of the decomposition furnace. The oxygen content in the flue gas discharged from the top of the suspension preheating system is 1-3%; the material outlet of the first cooling system is connected to the material inlet of the second cooling system, the gas outlet of the second cooling system is connected to the combustion-supporting air inlet of the hot blast furnace system, and the flue gas outlet of the hot blast furnace system is connected to the flue gas outlet pipeline of the first cooling system; the high-temperature flue gas temperature at the outlet of the hot blast furnace system is controlled at 800-1000°C, and the O2 concentration in the flue gas at the outlet of the hot blast furnace system is controlled at 1-3%, and the CO content is controlled at 1000-2000ppm.

2. The metakaolin preparation system capable of realizing the decoupling function according to claim 1, characterized in that: The hot blast stove system comprises a hot blast stove, a fuel feeding port is arranged at the top of the hot blast stove, a combustion air inlet of the hot blast stove system is located at one side of the fuel feeding port, a slag discharge port is arranged at the bottom of the hot blast stove, and a smoke outlet of the hot blast stove system is located at one side of the lower part of the hot blast stove.

3. The metakaolin preparation system capable of realizing decoupling function according to claim 1, characterized in that: The decomposition furnace is provided with a plurality of raw material feeding ports in the height direction.

4. The metakaolin preparation system capable of realizing decoupling function according to claim 1, characterized in that: The indirect heat exchanger is provided with a cooling medium inlet and a smoke outlet at the bottom and a smoke inlet and a cooling medium outlet at the top, so that the smoke and the cooling medium can exchange heat in countercurrent. The cooling medium channel of the indirect heat exchanger is filled with cooling medium.

5. The metakaolin preparation system capable of realizing the decoupling function according to claim 4, characterized in that: The cooling medium of the indirect heat exchanger is cooling water, cooling oil or other applicable cooling medium.

6. The metakaolin preparation system capable of realizing decoupling function according to claim 1, characterized in that: Flue gas circulation fans are respectively arranged between the indirect heat exchanger and the first stage cyclone preheater of the suspension preheating system, and between the indirect heat exchanger and the first cooling system.

7. The metakaolin preparation system capable of realizing a decoupling function according to claim 1, characterized in that: The gas outlet of the second cooling system is connected to the combustion-supporting air inlet of the hot blast furnace system through a dust collector and a combustion-supporting air circulation fan in sequence.

8. The metakaolin preparation system capable of realizing decoupling function according to claim 1, characterized in that: The second cooling system comprises at least one stage of cyclone cooler, which is used to cool the material to below 100°C.

9. The metakaolin preparation system capable of realizing a decoupling function according to claim 1, characterized in that: The smoke outlet of the suspension preheating system and the gas outlet of the second cooling system are also connected to a drying crusher or other waste heat utilization equipment.

10. A method for preparing metakaolin capable of realizing a decoupling function by using the system according to any one of claims 1 to 9, characterized in that: The method comprises the following steps: the raw material is preheated by a suspension preheating system and then enters a decomposition furnace; the decomposed material and the generated hot flue gas leave the decomposition furnace and enter the final cyclone preheater of the suspension preheating system; the material separated by the final cyclone preheater of the suspension preheating system enters a first cooling system; the flue gas discharged from the top of the suspension preheating system is cooled by an indirect heat exchanger and then enters the first cooling system to exchange heat with the material entering the first cooling system; the flue gas discharged from the first cooling system enters the decomposition furnace system; the gas discharged from the second cooling system enters the hot blast furnace system for combustion support; the high-temperature flue gas exiting the hot blast furnace system is mixed with the flue gas at the outlet of the first cooling system and then enters the decomposition furnace; the amount of raw material fed into the decomposition furnace, the amount of flue gas entering the decomposition furnace and the flue gas temperature are adjusted to control the temperature distribution in the decomposition furnace to be between 650°C and 850°C, so that the kaolin is fully decomposed and not overburned, and the activity index of the finished metakaolin meets the subsequent production requirements; the first cooling system rapidly cools the material to a temperature range of between 300°C and 350°C and below, and then enters the second cooling system, and is cooled by the second cooling system to obtain a finished metakaolin with controllable color.

11. The method for preparing metakaolin capable of realizing decoupling function according to claim 10, characterized in that: The residence time of the flue gas in the decomposition furnace is 2 to 10 seconds.

12. The method for preparing metakaolin capable of realizing decoupling function according to claim 10, characterized in that: The high-temperature flue gas temperature of the hot blast furnace system is controlled at 800-1000° C., the O2 concentration in the flue gas is controlled at 1-3%, and the CO content is controlled at 1000-2000 ppm.

13. The method for preparing metakaolin capable of realizing decoupling function according to claim 10, characterized in that: The cooling medium of the first cooling system is flue gas with a temperature of 80-120°C after cooling by an indirect heat exchanger, and the oxygen content in the flue gas is 1-3%; the cooling medium of the second cooling system is air at room temperature, and the material temperature after cooling by the second cooling system is below 100°C.