A processing and installation method for the stern thruster base of an offshore wind power operation and maintenance ship
By preheating before welding and slow cooling after welding, combined with symmetrical welding and groove design, the problem of easy damage to the stern thruster base of offshore wind power operation and maintenance ships has been solved, the quality and fatigue resistance of the base have been improved, and the service life has been extended. life.
Patent Information
- Application Number
- CN202310606694.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-05-26
AI Technical Summary
The stern thruster base of an offshore wind power operation and maintenance ship is prone to fatigue damage when immersed in seawater for a long time and subjected to large loads. The quality of the existing welding process is insufficient, which affects the service life of the base.
Preheating before welding and slow cooling after welding are used to process and install the propeller base. The specific steps include assembly and welding of flange plates, symmetrical welding of flanges and cylinders, welding of webs and flanges, and welding of webs and cylinders. body, and improve the welding quality by creating grooves on the components and selecting different welding materials.
The quality and fatigue resistance of the thruster base are significantly improved, the service life is extended, and the load-bearing capacity and welding firmness are improved through detailed welding process parameters.
Smart Images

Figure CN116748725B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a marine vessel installation technology, and in particular to a method for processing and installing a thruster base at the rear of an offshore wind power operation and maintenance vessel. Background Art
[0002] The propeller of the offshore wind power operation and maintenance vessel is installed on the propulsion shaft below the waterline at the stern of the boat. The main engine drives the propulsion shaft to rotate together, sucking water from the suction surface of the blade and discharging it from the discharge surface, using the reaction force of the water to propel the boat forward. The propeller is installed on the boat through the base at the stern.
[0003] The base of the thruster not only has to be immersed in seawater for a long time, but also has to bear a large load during the movement of the offshore wind power operation and maintenance ship. The base is prone to fatigue damage, especially the size of the base, which is generally made up of various components spliced and welded. Welding is the most critical link in the base processing and directly affects the quality of the base. Summary of the invention
[0004] The object of the present invention is to provide a method for processing and installing a thruster base at the rear of an offshore wind power operation and maintenance vessel, which improves the processing quality of the base.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] A method for processing and installing a propeller base at the rear of an offshore wind power operation and maintenance ship comprises the following steps:
[0007] Step S1, flange processing of the thruster base: first assemble and weld the flange plate, then process and weld the flange joint;
[0008] Step S2, symmetrically welding the flange and the cylinder in the thruster base: preheating the joint of the flange and the joint on the cylinder to a set temperature, and then symmetrically welding them together;
[0009] Step S3, welding the web and flange on the thruster base: preheating the joint between the web and the flange to a set temperature before welding, so that a plurality of webs are radially distributed around the flange joint and perpendicular to the flange plate surface;
[0010] Step S4, welding the web and the cylinder on the thruster base: first preheating the joint between the web and the cylinder to a set temperature, and then welding the joint between the web and the cylinder together to form the thruster base;
[0011] Step S5, slowly cooling the propeller base: Wrap the propeller base tightly with at least 3 layers of thermal insulation cotton to slowly cool it to ambient temperature;
[0012] Step S6, installation of the thruster base: After the slow cooling of the thruster base is completed, the thruster base is arranged at symmetrical positions on the left and right sides of the stern, the flange on the thruster base is fixed to the stern by screws, and the center line of the cylinder of the thruster base is tilted downward by 7° relative to the horizontal plane and the center line of the cylinder is tilted outward by 4° relative to the longitudinal section of the hull.
[0013] Furthermore, in the step S1, the specific steps of flange processing are as follows: step S1.1, assembling the three processed flange arc panels into a circular flange plate, preheating and welding them, and each flange arc panel is provided with a flange hole; step S1.2, beveling the flange plate from 120mm thick to 110mm thick as a whole, beveling the outer ring of the flange plate to 50mm according to the requirements of the drawing, and opening a groove according to the requirements of the drawing; step S1.3, opening a circular hole identical to the center hole of the flange plate on the 50mm thick panel to make a flange joint, and fitting the 110mm thick flange plate and the flange joint together, preheating and welding them to form the flange of the thruster base.
[0014] Furthermore, in the step S1.1, the preheating is carried out by means of an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is L-S3 welding wire, and is matched with 888 flux, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 300*300*120mm.
[0015] Furthermore, in step S1.1, the specific welding steps are as follows:
[0016] Step S1.1.1 preheats the processed three-section flange arc-shaped panels to the set temperature; Step S1.1.2 completes the 1 / 2 depth welding of the three splicing weld grooves in the center hole on the front side of the flange; Step S1.1.3 turns the flange over and cleans the root with a carbon planer; Step S1.1.4 completes the 1 / 2 depth welding of the three splicing weld grooves in the center hole on the back side of the flange; Step S1.1.5 turns the flange over to complete the welding of the three splicing welds on the front surface of the flange; Step S1.1.6 turns the flange over to complete the welding of the three splicing welds on the back surface of the flange.
[0017] Furthermore, in step S2 and step S1.3, the preheating is carried out by means of an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*55mm.
[0018] Furthermore, in step S3 and step S4, the preheating adopts an electric heating plate, and the set temperature after preheating is 113°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*35mm.
[0019] Furthermore, in step S2, during symmetrical welding, four welders should perform symmetrical welding on all welds of the same type.
[0020] Furthermore, after preheating, the upper, lower, left and right surfaces of the preheated part are temperature-detected using thermocouples. The temperatures of the upper, lower, left and right surfaces of the preheated part should all reach the set temperature and the temperature difference between the upper, lower, left and right surfaces of the preheated part should not exceed 30°C.
[0021] Furthermore, in step S6, the positioning center of the thruster base after installation is 5400 mm away from the centerline of the ship.
[0022] The beneficial effects of the present invention are:
[0023] 1. The processing method of the propeller base of this patent greatly improves the quality of the propeller base and extends the service life of the base;
[0024] 2. This patent provides a specific welding method, especially the method of preheating before welding and wrapping with insulation cotton to slow down cooling after welding, so that the thruster base has stronger fatigue resistance and greater load-bearing capacity;
[0025] 3. This patent improves the firmness of welding by opening a groove at the welding point on the component;
[0026] 4. This patent strictly controls the preheating temperature, selects different welding materials according to different parts, and provides detailed welding process parameters, which further improves the welding effect;
[0027] 5. In the base of the thruster, the flange is the most critical component. This patent provides a detailed flange processing method. Compared with the traditional method, the bearing capacity of the flange has been enhanced and the quality has been further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention is further described with the aid of the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other accompanying drawings according to the following drawings without creative work:
[0029] Figure 1 It is a schematic diagram of the three-section flange arc-shaped panels after assembly according to the present invention;
[0030] Figure 2It is a schematic diagram of the flange plate and the flange joint of the present invention being fitted together;
[0031] Figure 3 It is a schematic diagram of the thruster base of the present invention.
[0032] In the figure: 1. flange arc plate; 2. flange plate; 3. flange joint; 4. cylinder; 5. joint; 6. web. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features therein can be combined with each other without conflict.
[0034] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper surface", "lower surface", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "forward", "reverse", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0035] A method for processing and installing a propeller base at the rear of an offshore wind power operation and maintenance ship comprises the following steps:
[0036] Step S1, flange processing of the thruster base: first assemble and weld the flange, then process and weld the flange joint. The specific steps are as follows:
[0037] Step S1.1, assemble the processed three sections of flange arc panels 1 into a circular flange plate 2, preheat and weld them, each flange arc panel is provided with a flange hole, such as Figure 1 As shown; the preheating adopts an electric heating plate, and the set temperature after preheating is 150°C; the welding material used is L-S3 welding wire, and it is matched with 888 flux, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 300*300*120mm.
[0038] The specific welding steps are as follows:
[0039] Step S1.1.1 preheats the processed three-section flange arc-shaped plate 1 to a set temperature; preheating before welding is used to make the flange more resistant to fatigue and have a greater load-bearing capacity.
[0040] Step S1.1.2: complete the welding of the three weld grooves in the center hole on the front of the flange to 1 / 2 depth; Step S1.1.3: turn the flange over and clean the root with a carbon planer;
[0041] Step S1.1.4 completes the welding of the three weld grooves in the center hole on the back of the flange to 1 / 2 depth;
[0042] Step S1.1.5: Turn the flange over to complete the welding of the three joint welds on the front surface of the flange;
[0043] Step S1.1.6: Turn the flange over and complete the welding of the three joint welds on the back surface of the flange.
[0044] Step S1.2, the flange is beveled from 120mm thick to 110mm thick, the outer ring of the flange is beveled to 50mm according to the requirements of the drawing, and a groove is opened according to the requirements of the drawing;
[0045] Step S1.3, a circular hole identical to the center hole of the flange is opened on the 50 mm thick panel to form a flange joint 3, and the 110 mm thick flange 2 and the flange joint 3 are attached together, preheated and welded to form the flange of the thruster base, as shown in FIG. Figure 2 The preheating adopts an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*55mm.
[0046] This patent improves the firmness of welding by opening a groove at the welding point on the component.
[0047] Step S2, symmetrically weld the flange and cylinder 4 in the thruster base: preheat the flange joint 3 and the joint 5 on the cylinder 4 to the set temperature, and then weld them together symmetrically. During symmetrical welding, 4 welders should perform symmetrical welding on all welds of the same category; the preheating adopts an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*55mm.
[0048] Step S3, welding the web 6 and the flange on the thruster base: preheat the web 6 and the flange joint 3 to the set temperature before welding, so that multiple webs are radially distributed around the flange joint and perpendicular to the flange plate surface; the preheating adopts an electric heating plate, and the set temperature after preheating is 113°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*35mm.
[0049] Step S4, welding the web and the cylinder on the propeller base: first preheat the joint 5 between the web 6 and the cylinder to a set temperature, and then weld the joint between the web and the cylinder together to form the propeller base. Figure 3 As shown; the preheating adopts an electric heating plate, and the set temperature after preheating is 113°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*35mm.
[0050] Step S5, slowly cooling the propeller base: Wrap the propeller base tightly with at least 3 layers of thermal insulation cotton to slowly cool it to ambient temperature.
[0051] Step S6, installation of the thruster base: After the slow cooling of the thruster base is completed, the thruster base is arranged at symmetrical positions on the left and right sides of the stern. The positioning center of the thruster base after installation is 5400mm away from the centerline of the ship. The flange on the thruster base is fixed to the stern with screws, and the centerline of the cylinder of the thruster base is tilted downward by 7° relative to the horizontal plane and tilted outward by 4° relative to the longitudinal section of the hull.
[0052] In the preheating process of each of the above steps, after preheating, the upper, lower, left and right surfaces of the preheated part are temperature-detected using thermocouples. The temperatures of the upper, lower, left and right surfaces of the preheated part should all reach the set temperature and the temperature difference between the upper, lower, left and right surfaces of the preheated part should not exceed 30°C.
[0053] This patent strictly controls the preheating temperature, selects different welding materials according to different parts, and provides detailed welding process parameters, which further improves the welding effect.
[0054] The processing method of the thruster base of this patent greatly improves the quality of the thruster base and extends the service life of the base; this patent provides a specific welding method, especially the method of preheating before welding and wrapping with insulation cotton for slow cooling after welding, so that the thruster base has stronger fatigue resistance and greater load-bearing capacity.
[0055] In addition, those skilled in the art may combine and combine the different embodiments or examples and the features of the different embodiments or examples described in this specification without contradiction. Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. Those skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A method for processing and installing a propeller base at the rear of an offshore wind power operation and maintenance vessel, characterized in that: The following steps are involved: Step S1, flange processing of the thruster base: first assemble and weld the flange, then process and weld the flange joint; the specific steps of flange processing are as follows: Step S1.1, assemble the three processed flange arc panels into a circular flange plate, preheat and weld them, and each flange arc panel is provided with a flange hole; the specific welding steps are as follows: Step S1.1.1 Preheat the three processed flange arc panels to the set temperature, and the preheating adopts an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is L-S3 welding wire, and it is matched with 888 flux, and the width * length * thickness of the arc extinguishing plate / arc starting plate used for welding is 300*300*120mm; Step S1.1.2 Complete the welding of 1 / 2 depth of the three splicing weld grooves in the center hole on the front side of the flange; Step S1.1.3 Turn over the flange and clean the root with a carbon planer; Step S1.1.4 Complete 1 / 2 of the three splicing weld grooves in the center hole on the back side of the flange Depth welding; Step S1.1.5 Turn the flange over to complete the welding of the three joint welds on the front surface of the flange; Step S1.1.6 Turn the flange over to complete the welding of the three joint welds on the back surface of the flange; Step S1.2, the flange is beveled from 120mm thick to 110mm thick, the outer ring of the flange is beveled to 50mm according to the requirements of the drawing, and a groove is opened according to the requirements of the drawing; Step S1.3, a circular hole identical to the center hole of the flange is opened on a 50 mm thick panel to form a flange joint, and a 110 mm thick flange and the flange joint are bonded together, and then preheated and welded to form the flange of the thruster base. The preheating is performed by an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*55mm; Step S2, symmetrically welding the flange and the cylinder in the thruster base: preheat the joint of the flange and the joint on the cylinder to a set temperature, and then symmetrically weld them together, the preheating adopts an electric heating plate, and the set temperature after preheating is 150°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*55mm; Step S3, welding the web and flange on the thruster base: preheat the joint of the web and the flange to a set temperature before welding, so that multiple webs are radially distributed around the flange joint and perpendicular to the flange plate surface, the preheating adopts an electric heating plate, and the set temperature after preheating is 113°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*35mm; Step S4, welding the web and the cylinder on the thruster base: first preheat the joint of the web and the cylinder to a set temperature, and then weld the joint of the web and the cylinder together to form the thruster base, the preheating adopts an electric heating plate, and the set temperature after preheating is 113°C; the welding material used for welding is DW-A55LSR welding wire, and the width*length*thickness of the arc extinguishing plate / arc striking plate used for welding is 150*200*35mm; Step S5, slowly cooling the propeller base: Wrap the propeller base tightly with at least 3 layers of thermal insulation cotton to slowly cool it to ambient temperature; Step S6, installation of the thruster base: after the slow cooling of the thruster base is completed, the thruster base is arranged at symmetrical positions on the left and right sides of the stern, the flange on the thruster base is fixed to the stern by screws, and the center line of the cylinder of the thruster base is tilted downward by 7° relative to the horizontal plane and the center line of the cylinder is tilted outward by 4° relative to the longitudinal section of the hull; the positioning center of the thruster base after installation is 5400mm away from the center line of the ship.
2. The method for processing and installing the stern thruster base of an offshore wind power operation and maintenance vessel according to claim 1 is characterized in that: In step S2, during symmetrical welding, four welders should perform symmetrical welding on all welds of the same type.
3. The method for processing and installing the stern thruster base of an offshore wind power operation and maintenance vessel according to claim 2 is characterized in that: In each step, after preheating, the upper, lower, left and right surfaces of the preheated part are tested for temperature using thermocouples. The temperatures of the upper, lower, left and right surfaces of the preheated part should all reach the set temperature and the temperature difference between the upper, lower, left and right surfaces of the preheated part should not exceed 30°C.
Citation Information
Patent Citations
Pod thruster capable of improving hydrodynamic performance and arrangement structure thereof
CN112124545A
Construction method of deep water dynamic positioning crude oil conveying device main propeller base
CN112658518A