Market mechanism design method for integrated energy system to participate in power system regulation

By establishing the coupling mechanism and ADMM algorithm between the secondary market and the wholesale power market, the IES response capacity evaluation model is constructed, which solves the problems of information privacy and computational complexity of the integrated energy system participating in power system regulation, and achieves the balance between supply and demand of the power system and new energy. consumption needs and reduce operating costs.

CN116843406BActive Publication Date: 2024-10-01CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310550851.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-16
Publication Date
2024-10-01
Estimated Expiration
2043-05-16

AI Technical Summary

Technical Problem

Existing technology makes it difficult to effectively design a market mechanism for integrated energy systems to participate in power system regulation. In particular, there are challenges in information privacy and computational complexity, and it is difficult to meet the needs of power system supply and demand balance and new energy consumption.

Method used

A market mechanism design method for integrated energy systems to participate in power system regulation is proposed. By establishing a coupling mechanism between the secondary market and the wholesale power market, decoupling is achieved using the operating reserve demand curve, and a decentralized optimization model for IES response capacity evaluation is constructed based on the ADMM algorithm. , ensuring information privacy and decision-making independence.

Benefits of technology

This method can fully tap the response potential of the integrated energy system, reduce power system operating costs, improve resource utilization efficiency, and effectively promote the consumption of new energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116843406B_ABST
    Figure CN116843406B_ABST
Patent Text Reader

Abstract

The market mechanism design method for the participation of the integrated energy system in the regulation of the power system includes the following steps: Step 1: Establish a coupling mechanism between the secondary market SM and the wholesale power market, and realize the decoupling of the secondary market and the wholesale power market by running the reserve demand curve ORDC, so as to promote the coordinated optimization of the secondary market and the wholesale power market; Step 2: Under the premise of ensuring the information privacy and decision independence of IES, a decentralized optimization model for IES response capacity evaluation is proposed based on the coupling mechanism constructed in step 1; Step 3: Solve the decentralized optimization model for IES response capacity evaluation established in step 2 based on the ADMM algorithm. The market mechanism proposed by the present invention can fully tap the response potential of IES, and as a provider of DR resources, it can reduce the operating cost of the power system to a certain extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system optimization dispatching, and in particular to a market mechanism design method for a comprehensive energy system to participate in power system regulation. Background Art

[0002] The Integrated Energy System (IES) is a typical representative of a multi-energy coupling system, which includes multiple energy production units such as cogeneration units, electric boilers, and solar thermal power stations. In addition, the IES is often connected to the large power grid and receives power injection from it, so it can be regarded as a special load of the power system. Through strategies such as energy substitution and load transfer, the IES can change the exchange power between the IES and the large power grid, thereby providing the large power grid with regulatory resources to promote supply and demand balance and enhance the operational flexibility of the power system. Studies have shown that the participation of the IES in the optimization of the power system can improve the utilization efficiency of resources and is a demand response (DR) resource with great development potential. However, many key issues in the participation of the IES in the optimal dispatch of the power system, such as the design of the market mechanism, have not yet been maturely studied.

[0003] Existing research mainly dispatches and controls DR resources in centralized and decentralized ways. In the decentralized method, DR aggregators are used to integrate and quantify DR resources, and all DR resources with smaller individual capacities are aggregated to participate in the optimal dispatch of the power system, providing an effective way for users with relatively small individual capacities to participate in the power market. Existing research focuses on the energy trading problem of the integrated energy system IES, which regards the integrated energy system IES as a DR resource, and there are relatively few studies on its participation in the interaction of the power system. Centralized methods usually face high communication costs and involve information privacy issues; decentralized methods have high computational complexity, long calculation time, and are difficult to converge when the number is large. Considering the characteristics of the scattered distribution of the integrated energy system IES, limited individual scale, and high control difficulty, the existing methods are difficult to apply to the problem of the integrated energy system IES participating in the regulation of the power system. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a market mechanism design method for integrated energy systems to participate in power system regulation. The method establishes a DR model that takes into account both technical complexity and user privacy, taps the maximum DR potential of the integrated energy system IES, and ensures that the diversified integrated energy system IES can freely participate in the optimization and dispatching of the power system. It aims to meet the requirements of the supply and demand balance regulation capacity of the power system, reduce the operating cost of the power system to a certain extent, and promote the consumption of new energy.

[0005] The technical solution adopted by the present invention is:

[0006] The market mechanism design method for the integrated energy system to participate in the power system regulation includes the following steps:

[0007] Step 1: Establish a coupling mechanism between the secondary market SM and the wholesale electricity market, and decouple the secondary market and the wholesale electricity market by running the reserve demand curve ORDC to promote the coordinated optimization of the secondary market and the wholesale electricity market;

[0008] Step 2: Under the premise of ensuring IES information privacy and decision independence, a decentralized optimization model for IES response capacity assessment is proposed based on the coupling mechanism constructed in step 1;

[0009] Step 3: Solve the IES response capacity assessment decentralized optimization model established in step 2 based on the ADMM algorithm.

[0010] In step 1, the wholesale power market determines the power generation plan of conventional units and the clearing results of the operating reserve capacity based on the economic dispatch of security constraints, as follows:

[0011] The operating reserve capacity of the generator set clearing is expressed as The clearing price is denoted by ρ t (R t The clearing result can be mapped to the operating reserve demand curve ORDC, represented by a point (Q0, p0) on ORDC, where: Q0 and p0 represent

[0012] In step 1, the secondary market SM is operated to determine the maximum response capacity of the integrated energy system IES, as follows: In the secondary market SM, the IES is encouraged to provide operating reserve resources, fully tap the IES response potential, and then the maximum response capacity of the IES is evaluated, which is recorded as R t IES Therefore, the total operating reserve capacity of the system increases to The marginal price is The new equilibrium point in ORDC moves downward to (Q1, p1), where Q1 represents p1 represents Based on the proposed new secondary market SM, the maximum response capacity of IES can be obtained by solving the decentralized optimization model for decentralized IES response capacity evaluation by decoupling ORDC from the wholesale power market. In step 1, the wholesale electricity market operation model is established as follows:

[0013] First, wholesale power market operators run a security-constrained economic dispatch model to jointly optimize the generation schedule of conventional units and the operating reserve capacity:

[0014]

[0015] In formula (1), They represent the power and reserve supply price of conventional unit g in the large power grid at time t respectively; R gt They represent the power and reserve capacity provided by the conventional unit g in the large power grid at time t respectively; Minimum reserve capacity to be provided for all conventional units; represents the operating reserve capacity of the generator set clearing in the wholesale market; ρ represents the operating reserve price demand curve of the wholesale power market; R t Represents the operating reserve capacity in the demand curve.

[0016]

[0017] In formula (2), For any time.

[0018]

[0019] In formula (3), represents the load demand of node n at time t;

[0020] PTDF*(A*PG-B*PD)≤FL max (4);

[0021] In formula (4), PG and PD represent the vectors of generator output and demand respectively; A and B are parameter matrices, FL max is the transmission line capacity vector; PTDF represents the power flow transfer distribution factor.

[0022]

[0023] In formula (5), Indicates the maximum power of conventional unit g in the large power grid; For any generator.

[0024]

[0025] In formula (6), γ min Indicates the reserve factor.

[0026] In step 1, the mathematical model of secondary market SM clearing is as follows:

[0027] ①、Objective function:

[0028] When exploring the IES response potential, the power system hopes to maximize benefits, while the IES hopes to minimize total costs. Therefore, the objective function of SM clearing is expressed as shown in formula (7):

[0029]

[0030] In formula (7), c gi 、c gj,t 、c gl,t 、c gu,t 、c y,t , They represent the unit costs of CHP, electric boiler, gas boiler, gas unit, gas source and electricity purchased from the upper-level power grid; are the thermal power and electrical power of the CHP unit at time t respectively; Respectively represent the heating power of electric boiler and gas boiler; Indicates the electrical power of the gas unit; GS y is the supply volume of gas source y; Indicates the power of the power-to-gas device; represents the operational reserve capacity provided by the secondary market; The product of the two parameters represents the cost of purchasing electricity from the upper-level power grid.

[0031] ② Constraints:

[0032] (1) Power supply system:

[0033]

[0034] In formula (8), represents the load demand in the i-th IES at time t; represents the expected value of the load demand in the i-th IES at time t; It represents the power of the geth CSP power station unit in the i-th IES.

[0035]

[0036] In formula (9), ξ i,t It represents the ratio of the critical load to the total load power at time t in the i-th IES;

[0037]

[0038] In formula (10), represents the change in the power of the CHP unit at time t in the i-th IES; It represents the change in the power exchanged between the IES and the large power grid at time t in the i-th IES, that is, the operating reserve or maximum response capacity provided by the IES; It represents the power change value of CHP unit, gas unit and CSP unit g at time t in the i-th IES.

[0039]

[0040]

[0041] In formula (12), Represents the power change value of all gas units in the i-th IES.

[0042]

[0043] In formula (13), Represents the power change value of the ge-th CSP power station unit in the ith IES.

[0044]

[0045]

[0046] In formula (15), R gi represents the safe operating area of ​​CHP unit g in the i-th IES, represents the rate of change of electric power of the gth CHP unit in the i-th IES; It represents the thermal power change rate of the gth CHP unit in the i-th IES.

[0047]

[0048]

[0049] In formula (17), R i,t , They represent the operating reserve capacity and the maximum reserve capacity provided by the i-th IES at time t respectively.

[0050]

[0051] In formula (18), η G2P is the energy conversion efficiency of each gas-fired unit; GCu represents the gas consumption of the gas-fired unit.

[0052] (2) Heating system:

[0053] The heat network model adopts the mass regulation operation mode, that is, the mass flow rate is constant, and the node heat power is determined by the node temperature. The specific constraints are as follows:

[0054]

[0055]

[0056]

[0057]

[0058]

[0059]

[0060]

[0061]

[0062]

[0063]

[0064]

[0065]

[0066]

[0067] in: Respectively represent the power consumption and heating power of the electric boiler;

[0068] η BOI Indicates the electricity-to-heat efficiency of the electric boiler, η GB The energy conversion efficiency of the gas boiler;

[0069] They represent the gas boiler set and CHP unit set connected to node a respectively; HD is the set of load nodes, d represents the load node;

[0070] and is the set of water supply pipes with node a as the starting point and end point; and are the sets of return pipes with node a as the starting point and the end point respectively;

[0071] and Represents the temperature of the water supply pipe and the return pipe; and represents the supply water temperature and return water temperature of node a; and is the mass flow rate in the heating pipe and the heat recovery pipe; and is the mass flow rate of the heat source node; is the mass flow rate of the heat load node; c is the specific heat capacity of water.

[0072] gi represents the index number of the cogeneration unit; gj represents the index number of the electric boiler; gl represents the index number of the gas boiler; Gn Indicates the index number belonging to the same IES; c w represents the specific heat capacity of water; Represents the heat storage / release power at time t.

[0073] The thermal power of the gas boiler; GB1 represents the gas consumption of the gas boiler.

[0074] p represents the water pipe index; l represents the gas boiler index; c represents the CHP unit index.

[0075] Indicates the minimum temperature of the water supply circuit; Indicates the maximum temperature of the water supply circuit; Indicates the minimum return water circuit temperature; Indicates the maximum return water circuit temperature.

[0076] (3) Gas network constraints:

[0077] The steady-state model is used to model the gas network, as shown in the following formula:

[0078]

[0079]

[0080]

[0081]

[0082]

[0083]

[0084] In the formula, and They represent the gas source set, P2G unit set, gas unit set and gas boiler set connected to node m respectively; GS y , GT x Output for P2G unit; mn is the natural gas flow rate flowing through the gas pipeline mn; GD m is the gas load of node m; C mn is the Weymouth constant of the pipeline mn; π m , π n are the pressure values ​​of nodes m and n respectively; CGD m is the normal gas load demand of node m; GC u With GB l are the gas consumption of the gas unit u and gas boiler gb connected to the node m respectively; η P2Gis the energy conversion efficiency of the power-to-gas device.

[0085] GB l Indicates the gas consumption of gas boiler; Indicates the minimum value of gas source y; Indicates the maximum value of gas source y; Indicates the minimum pressure value of node m; Indicates the maximum pressure of node m; Indicates the electrical power of the P2G unit.

[0086] (4) Constraints related to CSP plants:

[0087] a: Constraints related to the solar thermal power station collector subsystem:

[0088]

[0089]

[0090]

[0091] Where P t JR is the solar radiation heat energy that can be used at time t; P t SH is the heat energy output by the mirror field at time t; is the amount of light abandoned in the mirror field at time t. JR Represents the photothermal conversion efficiency; A JR Represents the mirror field area; P t SC Indicates the electric energy received by the power generation module at time t; Represents the heat storage / release power at time t.

[0092] b: Constraints related to heat exchange and power generation subsystems of CSP power plants:

[0093]

[0094]

[0095]

[0096]

[0097] Where P t CR P is the heat storage at time t; t FR P is the heat released at time t; t JS The power generation module receives thermal energy at time t; is the power generation capacity of the CSP plant at time t; is the heating power of the CSP power station at time t; The upper limit of the power generation capacity of the CSP station; It is the upper limit of the heating power of the CSP plant. SU Indicates the thermal energy required to start the power generation module; η PB represents the thermoelectric conversion efficiency; Indicates the start and stop status of the unit.

[0098] c: Thermal storage constraints of CSP power plants:

[0099]

[0100]

[0101]

[0102]

[0103] E min ≤E t ≤E max (53);

[0104] E T =E t0 (54);

[0105] In the formula, is the heat storage capacity of the heat storage tank at time t; is the heat released from the heat storage tank at time t; E is the upper limit of heat storage / release of the heat storage tank; T is the heat of the heat storage tank at the end of the simulation cycle; E t0 is the heat of the heat storage tank at the beginning of the simulation cycle; η c represents the heat storage efficiency; η f Indicates heat release efficiency; E t represents the heat of the heat storage tank at time t; E t-1 represents the heat of the heat storage tank at time (t-1); η XRG Indicates the heat dissipation coefficient; E min Indicates the minimum capacity of the heat storage tank; E max Indicates the maximum capacity of the heat storage tank.

[0106] In the step 2, the IES response capacity assessment decentralized optimization model includes a power system optimization model and an IES optimization model; 1) Power system optimization model:

[0107] When exploring the IES response potential, the power system hopes to maximize the benefits. Its objective function is expressed as minimizing the sum of the negative value of the operating reserve benefit and the augmented Lagrangian penalty function related to the shared variable, as shown in Equation (55). In order to ensure the consistency of the shared variable value, the augmented Lagrangian penalty function is introduced;

[0108]

[0109] In formula (55), the symbol o represents the Hadamard product; represents the exchange power between the large power grid and IES at time t; α it and β it represents the coefficient of the Lagrange penalty function; It represents the exchange power between IES and the large power grid determined in the last iteration. In the optimization model, the exchange power is considered to be fixed, that is, it is obtained by the optimization of the last IES operation model.

[0110] The constraints of the power system include:

[0111]

[0112]

[0113]

[0114] In the formula, P0 represents the change in power exchanged between the large power grid and IES at time t; exp for The initial value of .

[0115] 2) IES optimization model:

[0116] The operation goal of the i-th IES is to minimize the total cost, which can be expressed as:

[0117]

[0118] In the step 3, the method for solving the response capacity evaluation model based on the ADMM algorithm includes the following steps:

[0119] Step 3.1: Set the iteration index sO = 1 and select the initial value

[0120] Step 3.2: Using variables and the value obtained in the previous iteration in the large power grid Solve the optimization model for each IES;

[0121] Step 3.3: Using variables and the value obtained in the previous iteration in IES Solve optimization models of power systems;

[0122] Step 3.4: If and |f sO -f sO-1 | / f sO ≤ε4, jump to step 3.6; otherwise, go to step 3.5;

[0123] Step 3.5: Set sO=sO+1, update the multiplier, and return to step 3.2;

[0124] The multiplier update equation is:

[0125]

[0126] represents the coefficient of the Lagrangian penalty function of the SOth iteration;

[0127] and represents the coefficient of the (SO-1)th iteration Lagrange penalty function;

[0128] represents the exchange power between the large power grid and IES at the (SO-1)th iteration and the tth time;

[0129] It represents the exchange power between IES and the large power grid at the (SO-1)th iteration and the tth moment.

[0130]

[0131] represents the coefficient of the Lagrangian penalty function of the SOth iteration; λ represents the update multiplier of the Lagrangian penalty function coefficient. Step 3.6: End, stop the iteration and output the IES maximum response capacity.

[0132] The present invention provides a market mechanism design method for a comprehensive energy system to participate in power system regulation, and the technical effects are as follows:

[0133] 1) Considering the characteristics of IES, such as large scale, scattered distribution and high control difficulty, the present invention studies the method of IES providing supply and demand balance regulation resources. First, the concept of secondary market is proposed, and the secondary market mechanism of secondary market and traditional wholesale market is constructed. Then, based on the constructed market environment, an IES response capacity evaluation model based on decentralized optimization regulation mechanism and a model solving method based on ADMM algorithm are proposed to evaluate the maximum response capacity of IES participating in power system regulation. 2) The market mechanism proposed in the present invention can fully tap the response potential of IES. On the one hand, IES can maintain a certain response capacity at a certain price every hour, and there is a positive correlation between the response price of IES and the power load level; on the other hand, compared with the traditional method, only conventional units are allowed to provide the supply and demand regulation resources required by the power system.

[0134] 3) Using the method of the present invention to use IES as a provider of regulation resources can reduce the total cost of the power system by 8.1%. 4) The market mechanism proposed by the present invention can fully tap the response potential of IES, and as a provider of DR resources, it can reduce the operating cost of the power system to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0135] Figure 1 This is the electric-thermal safe operation area diagram of the CHP unit.

[0136] Figure 2 This is a schematic diagram of the basic topological structure of the heating network.

[0137] Figure 3 This is the topological structure diagram of the example system.

[0138] Figure 4 This is the daily load curve.

[0139] Figure 5 Plot of the response capacity and clearing price curves provided for IES.

[0140] Figure 6 Schematic diagram of the calculation for running the alternative demand curve. DETAILED DESCRIPTION

[0141] This paper takes IES as the core and studies the market mechanism of IES participating in the regulation of the power system. First, the concept of the secondary market (SM) is proposed to fully tap the response potential of IES in the form of operating reserves. Then, a coupling mechanism between the secondary market and the wholesale electricity market is established, and the decoupling of the two is achieved by operating the reserve demand curve to promote the coordinated optimization of the two markets. Finally, under the premise of ensuring the information privacy and decision-making independence of IES, a decentralized optimization model for IES response capacity evaluation is proposed based on the constructed market mechanism, and the model solving method based on the ADMM algorithm is studied. Through the case analysis of a certain IES, the results show that the market mechanism proposed in this invention can fully tap the response potential of IES, and as a provider of DR resources, it can reduce the operation cost of the power system to a certain extent.

[0142] The present invention first introduces the basic concept of operating the backup demand curve, and then introduces its calculation method.

[0143] The operating reserve demand curve was introduced by the Electric Reliability Council of Texas with the aim of increasing energy prices when operating reserves are in short supply. As the name implies, the operating reserve demand curve is a curve that represents the change in operating reserve demand with market prices, and its price elasticity links operating reserves with marginal value. In addition, the operating reserve demand curve quantifies the marginal benefits of operating reserves, and the benefits of operating reserves are associated with the cost of maintaining system security. Therefore, if the relationship between system security-related costs and the level of operating reserves can be found, the operating reserve demand curve can be calculated. Based on this idea, the calculation of ORDC mainly includes the following three steps:

[0144] Step 1: Calculate the system security related costs under different operating reserve levels, such as Figure 6 As shown in the left sub-figure

[0145] First, for a given operating reserve level, the security cost C in system state s is Q,s It can be calculated as:

[0146]

[0147] In the formula, the system state is determined by the state of the components. They represent the frequency deviation cost, load curtailment cost and cost associated with planned power exchange deviation under state s respectively.

[0148] Second, a set of possible system states is generated using Monte Carlo simulation, where the random parameters for Monte Carlo sampling are: 1) the availability of transmission lines and generators, 2) the load deviation from the initial plan, and 3) the moment when the initial system state changes per unit time. For each generated system state, a dynamic simulation is performed to calculate the system cost. Thus, the expected system security cost C associated with the operating reserve level is Q It is expressed as:

[0149]

[0150] Where SN is the number of states without line and generator failures; SC is the number of states with line or generator failures; u g is the failure rate of generator g, u l is the failure rate of transmission line l. Ng and Nl are the number of generators and transmission lines respectively.

[0151] Using the above calculation formula, the expected system safety-related costs for different levels of operating reserve can be determined.

[0152] Step 2: Fit an analytical function to express the relationship between system safety-related costs and operating reserve levels. Figure 6 As shown in the middle sub-figure of

[0153] Step 3: The marginal benefit of running the backup can be obtained by calculating the negative value of the derivative of the system security-related cost function.

[0154] For ease of understanding, a schematic diagram of the three steps described in the first, second and third steps is drawn as follows: Figure 6 shown. Figure 6 In the right sub-figure, the marginal cost of different reserve levels is calculated as follows:

[0155]

[0156] Where: ρ represents the marginal price of operating reserve. It is worth noting that the coefficient of the operating reserve demand curve ORDC changes every hour, so the system operator needs to calculate 24 sets of ORDC every day.

[0157] This paper designs a market mechanism for the participation of integrated energy systems in power system regulation and studies the integration of power systems, thermal systems and gas systems to tap the DR potential of IES. Details are as follows:

[0158] 1. Market mechanism for integrated energy system to participate in power system regulation:

[0159] The capacity of IES units is limited, and it is often difficult to meet the threshold for participating in the wholesale electricity market. Therefore, the present invention constructs a two-level market mechanism that is compatible with IES participating in power system regulation, and proposes an evaluation method for IES response capacity based on this mechanism. In addition, the seamless connection between SM and the wholesale market is achieved through the Operating Reserve Demand Curve (ORDC). The connection mechanism between the wholesale market and SM is introduced as follows:

[0160] Upper wholesale power market: The operation wholesale market is based on economic dispatch with safety constraints to determine the generation plan of conventional units and the clearing results of the operating reserve capacity. The clearing of the operating reserve capacity of the generating units is expressed as The clearing price is denoted by ρ t (R t The clearing result can be mapped to ORDC and represented as a point (Q0, p0) on ORDC, where Q0 and p0 represent

[0161] SM market: Run SM to determine the maximum response capacity of IES: In SM, IES is encouraged to provide operating backup resources to fully tap the IES response potential, and then the maximum response capacity of IES is evaluated, which is recorded as Therefore, the total system operating reserve capacity increases to The marginal price is The new equilibrium point in ORDC moves downward to (Q1, p1), where Q1 represents p1 represents Based on the proposed new SM, the maximum response capacity of IES can be obtained by solving the decentralized optimization model by decoupling ORDC from the wholesale market.

[0162] 1) Wholesale electricity market operation model:

[0163] First, wholesale power market operators run a security-constrained economic dispatch model to jointly optimize the generation schedule of conventional units and the operating reserve capacity:

[0164]

[0165]

[0166]

[0167] PTDF*(A*PG-B*PD)≤FL max (4);

[0168]

[0169]

[0170] In the formula, They represent the power and reserve supply price of conventional unit g in the large power grid at time t respectively; R gt They represent the power and reserve capacity provided by the conventional unit g in the large power grid at time t respectively; Minimum reserve capacity to be provided for all conventional units; represents the load demand of node n at time t; PG and PD represent the vectors of generator output and demand respectively, A and B are parameter matrices, FL max is the transmission line capacity vector; represents the maximum power of conventional unit g in the large power grid; γ min Indicates the reserve factor.

[0171] 2)SM operation model:

[0172] The following is a simple example to illustrate how IES in the present invention participates in the operation of the power system in the form of DR:

[0173] Assume that the exchange power between the i-th IES and the power system at time t is And the operating reserve (i.e., the maximum response capacity) maintained under the excitation of the power system is R i,t MW. Therefore, when the power system requires IES to provide regulation resources, the i-th IES reduces its demand by R i,t MW. In return, IES will be paid to cover the cost of holding the response capacity. The mathematical model of SM clearing is introduced as follows:

[0174] ①、Objective function:

[0175] When exploring the IES response potential, the power system hopes to maximize the benefits, while the IES hopes to minimize the total cost. Therefore, the objective function of SM clearing can be expressed as follows. In particular, the integral term in the formula is first fitted into an exponential function form, and then processed using the piecewise linearization method.

[0176]

[0177] In the formula, c gi 、c gj,t 、c gl,t 、c gu,t 、c y,t , They represent the unit costs of CHP, electric boiler, gas boiler, gas unit, gas source and electricity purchased from the upper-level power grid; are the thermal power and electrical power of the CHP unit at time t respectively; Respectively represent the heating power of electric boiler and gas boiler; Indicates the electrical power of the gas unit. GS y is the supply amount of gas source y.

[0178] ② Constraints:

[0179] (1) Power supply system:

[0180]

[0181]

[0182]

[0183]

[0184]

[0185]

[0186]

[0187]

[0188]

[0189]

[0190]

[0191] In the formula, represents the load demand in the i-th IES at time t; represents the maximum power of the CHP unit in the i-th IES at time t; ξ i,t It represents the ratio of the critical load to the total load power at time t in the i-th IES;

[0192] represents the change in the power of the CHP unit at time t in the i-th IES; It represents the change in the power exchanged between the IES and the large power grid at time t in the i-th IES, that is, the operating reserve or maximum response capacity provided by the IES; It represents the power change value of CHP unit, gas unit and CSP unit g at time t in the i-th IES.

[0193] R i,t , They represent the operating reserve capacity and the maximum reserve capacity provided by the i-th IES at time t. G2P is the energy conversion efficiency of each gas unit.gi represents the safe operating area of ​​CHP unit g in the i-th IES,

[0194] The specific expression is as follows:

[0195] The CHP unit of the present invention adopts an exhaust type, and its electrical and thermal loads can be adjusted simultaneously, and is widely used in power systems. Figure 1 is the thermal power safe operation area of ​​the air-extraction CHP unit, and A, B, C, and D are four points in the safe operation area. Therefore, the electrical and thermal output power of the air-extraction CHP unit can be modeled as:

[0196]

[0197]

[0198]

[0199]

[0200] In the formula, R CHP Indicates the number of vertices in the safe operating area of ​​the air extraction CHP unit; They represent the electric power and thermal power of the extraction CHP unit at the vertex k, respectively. Figure 1 As shown, where P max and P min Respectively represent the maximum and minimum power output of the CHP unit under pure condensing conditions; H max Indicates the maximum thermal output of the unit; H med is the heating power corresponding to the minimum generating power of the unit; c v In order to keep the total amount of steam inlet unchanged, the reduction in power generation after producing more heating heat per unit is calculated. v1 、c v2 They are c corresponding to the maximum and minimum air intake of the unit respectively. v Value; c m is the back pressure operation elastic coefficient of the unit; represents the weight coefficient. The dotted line MN represents the heat output of the unit when H m When the power output is adjusted within the range of P m,min and P m,max Among them, P m,min and P m,max They respectively represent the minimum and maximum output of the unit under pure condensing conditions.

[0201] (2) Heating system:

[0202] The heat network model adopts the mass regulation operation mode, that is, the mass flow rate is constant and the node heat power is determined by the node temperature. The specific constraints are as follows:

[0203]

[0204]

[0205]

[0206]

[0207]

[0208]

[0209]

[0210]

[0211]

[0212]

[0213]

[0214]

[0215]

[0216] In the formula, Respectively represent the power consumption and heating power of the electric boiler; η BOI Indicates the electricity-to-heat efficiency of the electric boiler, η GB It is the energy conversion efficiency of gas boiler. They represent the gas boiler set and CHP unit set connected to node a respectively; HD is the set of load nodes, d represents the load node; and is the set of water supply pipes with node a as the starting point and end point; and are the sets of return pipes with node a as the starting point and the end point respectively; and Represents the temperature of the water supply pipe and the return pipe; and Represents the supply water temperature and return water temperature of node a. and is the mass flow rate in the heating pipe and the heat recovery pipe; and is the mass flow rate of the heat source node; is the mass flow rate of the heat load node; c is the specific heat capacity of water. Figure 2 shown.

[0217] (3) Gas network constraints:

[0218] The gas network model constructed in the present invention does not consider time coupling, and adopts a steady-state model to model the gas network, which can take into account both calculation accuracy and calculation efficiency, as shown in the following formula:

[0219]

[0220]

[0221]

[0222]

[0223]

[0224]

[0225] In the formula, and They represent the gas source set, P2G unit set, gas unit set and gas boiler set connected to node m respectively. y v, GT x Output for P2G unit; mn is the natural gas flow rate flowing through the gas pipeline mn, GD m is the gas load of node m; C mn is the Weymouth constant for the pipe mn, π m , π n are the pressure values ​​of nodes m and n respectively; CGD m is the normal gas load demand of node m, GC u With GB l They are the gas consumption of the gas unit u and gas boiler gb connected to node m. P2G is the energy conversion efficiency of the power-to-gas device.

[0226] (4) Constraints related to CSP plants:

[0227] A. Constraints related to the solar thermal power station collector subsystem:

[0228]

[0229]

[0230]

[0231] Where P t JRis the solar radiation heat energy that can be used at time t; P t SH is the heat energy output by the mirror field at time t; is the amount of light abandoned in the mirror field at time t.

[0232] B. Constraints on heat exchange and power generation subsystems in CSP plants:

[0233]

[0234]

[0235]

[0236]

[0237] Where P t CR P is the heat storage at time t; t FR P is the heat released at time t; t JS The power generation module receives thermal energy at time t; is the power generation capacity of the CSP plant at time t; is the heating power of the CSP power station at time t; The upper limit of the power generation capacity of the CSP station; It is the upper limit of heating power of CSP power station.

[0238] C. Thermal storage constraints of CSP plants:

[0239]

[0240]

[0241]

[0242]

[0243] E min ≤E t ≤E max (53);

[0244] E T =E t0 (54);

[0245] In the formula, is the heat storage capacity of the heat storage tank at time t; is the heat released from the heat storage tank at time t; E is the upper limit of heat storage / release of the heat storage tank; T is the heat of the heat storage tank at the end of the simulation cycle; E t0is the heat of the thermal storage tank at the beginning of the simulation cycle.

[0246] (II) Comprehensive energy system response capacity assessment model and solution:

[0247] Based on the concept of system in system, the present invention will establish an IES response capacity evaluation model based on decentralized optimization regulation mechanism, including power system optimization model and IES optimization model:

[0248] ① Power system optimization model:

[0249] When exploring the IES response potential, the power system hopes to maximize the benefits. The objective function of the present invention is expressed as minimizing the sum of the negative value of the operating reserve benefit and the augmented Lagrangian penalty function related to the shared variables, as shown in the following formula.

[0250] In order to ensure the consistency of shared variable values, the augmented Lagrangian penalty function is introduced.

[0251]

[0252] In the formula, the symbol o represents the Hadamard product; Indicates the exchange power determined in the last iteration. In the optimization model, the exchange power is considered to be fixed, that is, it is obtained by the last IES running model optimization.

[0253] The constraints of the power system include:

[0254]

[0255]

[0256]

[0257] In the formula, It represents the change of power exchanged between the large power grid and IES at time t; for The initial value of .

[0258] ②IES optimization model:

[0259] The operation goal of the i-th IES is to minimize the total cost, which can be expressed as:

[0260]

[0261] The constraints of IES include the electricity constraints, thermal constraints, natural gas constraints and CSP power plant constraints in Section (I).

[0262] Therefore, the solution method of the response capacity assessment model based on the ADMM algorithm includes the following steps:

[0263] Step 3.1: Set the iteration index sO = 1 and select the initial value

[0264] Step 3.2: Using variables and the value obtained in the previous iteration in the large power grid Solve the optimization model for each IES;

[0265] Step 3.3: Using variables and the value obtained in the previous iteration in IES Solve optimization models of power systems;

[0266] Step 3.4: If and |f sO -f sO-1 | / f sO ≤ε4, jump to step 3.6; otherwise, go to step 3.5; Step 3.4 is the algorithm stopping criterion.

[0267] Step 3.5: Set sO=sO+1, update the multiplier, and return to step 3.2;

[0268] The multiplier update equation is:

[0269]

[0270] represents the coefficient of the Lagrangian penalty function of the SOth iteration; and represents the coefficient of the (SO-1)th iteration Lagrange penalty function; represents the exchange power between the large power grid and IES at the (SO-1)th iteration and the tth time; It represents the exchange power between IES and the large power grid at the (SO-1)th iteration and the tth moment.

[0271]

[0272] represents the coefficient of the Lagrangian penalty function of the SOth iteration; λ represents the update multiplier of the Lagrangian penalty function coefficient. Step 3.6: End, stop the iteration and output the IES maximum response capacity.

[0273] (III) Use the model for verification:

[0274] In order to verify the effectiveness of the proposed model and method, the present invention conducts a case analysis on the market mechanism of IES participating in power system regulation and the response capacity evaluation method to prove that the power system can incentivize IES to hold a certain response capacity at a certain price. Figure 3The electricity-heat-gas integrated energy system shown.

[0275] 1) The topological connection structure of the power system, natural gas system and thermal system is as follows Figure 3 As shown, they are connected via gas units, power-to-gas equipment and CHP units.

[0276] 2) Connect two CHP devices to node 2 of the power system, and connect one gas unit to nodes 7 and 13 respectively; 3) Install one P2G device on node 3 of the natural gas system. The parameters of the CHP unit, gas unit and P2G device in the example system are shown in Table 1.

[0277] Table 1 Equipment configuration in the system

[0278]

[0279] The calorific value of natural gas is taken as 10 (kWh / m 3 ), the daily load curve is as follows Figure 4 As shown in the figure, the load level of the original power, heat and gas systems is taken as the maximum load demand in the daily load curve, and the load prediction error X~N(0,0.015 2 ), using a five-segment normal distribution model to discretize the prediction error. The CHP unit of IES 1 operates at a constant heat-to-power ratio, with an electrical efficiency of 0.35 and a thermal efficiency of 0.45. The CHP unit of IES 2 uses a variable heat-to-power ratio, which is more flexible. The efficiency of the gas boiler of IES is 0.8. In SM, IES can obtain a considerable profit to compensate for the cost of providing demand response resources. Figure 5 The maximum response capacity of IES1 and IES 2 within 24 hours and the response price of IES are shown.

[0280] Depend on Figure 5 It can be found that IES can hold a part of the response capacity at a certain incentive price. Figure 4 It can be seen that there is a positive correlation between the electricity load level and the response price of IES, that is, a larger load level leads to a higher response price; on the contrary, the response price of a lower load level is also relatively low, thereby increasing the opportunity cost of IES response. In this regard, the supply and demand regulation resources provided by IES are similar to those provided by conventional generators, proving the correctness and effectiveness of the proposed model to explore the response potential of IES and then evaluate the maximum response capacity of IES. Figure 5 From the bar chart, we can see that at any time, the maximum response capacity of IES 2 is greater than that of IES 1. This is because IES2 uses a variable heat-to-power ratio CHP unit, which has higher flexibility.

Claims

1. The market mechanism design method for the participation of integrated energy systems in power system regulation is characterized by The following steps are involved: Step 1: Establish a coupling mechanism between the secondary market SM and the wholesale electricity market, and decouple the secondary market and the wholesale electricity market by running the reserve demand curve to promote the coordinated optimization of the secondary market and the wholesale electricity market; Step 2: Based on the coupling mechanism constructed in step 1, a decentralized optimization model for IES response capacity assessment is proposed; Step 3: Solve the IES response capacity assessment decentralized optimization model established in step 2 based on the ADMM algorithm; In the step 2, the IES response capacity assessment decentralized optimization model includes a power system optimization model and an IES optimization model; 1) Power system optimization model: When exploring the IES response potential, the power system hopes to maximize benefits; its objective function is expressed as minimizing the sum of the negative value of the operating reserve benefit and the augmented Lagrangian penalty function related to the shared variable, as shown in the following equation (55); in order to ensure the consistency of the shared variable value, the augmented Lagrangian penalty function is introduced; In formula (55), the symbol o represents the Hadamard product; represents the exchange power between the large power grid and IES at time t; α it and β it represents the coefficient of the Lagrange penalty function; It represents the exchange power between IES and the large power grid determined in the last iteration. In the optimization model, the exchange power is considered to be fixed, that is, it is obtained by the optimization of the last IES operation model; The constraints of the power system include: In the formula, It represents the change of power exchanged between the large power grid and IES at time t; for The initial value of 2) IES optimization model: The operation goal of the i-th IES is to minimize the total cost, which can be expressed as: In the step 3, the method for solving the response capacity evaluation model based on the ADMM algorithm includes the following steps: Step 3.1: Set the iteration index sO = 1 and select the initial value Step 3.2: Using variables and the value obtained in the previous iteration in the large power grid Solve the optimization model for each IES; Step 3.3: Using variables and the value obtained in the previous iteration in IES Solve optimization models of power systems; Step 3.4: If and |f sO -f sO-1 |f sO ≤ε4, jump to step 3.6; otherwise, go to step 3.5; Step 3.5: Set sO=sO+1, update the multiplier, and return to step 3.2; The multiplier update equation is: represents the coefficient of the Lagrangian penalty function of the SOth iteration; and represents the coefficient of the (SO-1)th iteration Lagrange penalty function; represents the exchange power between the large power grid and IES at the (SO-1)th iteration and the tth time; represents the exchange power between IES and the large power grid at the (SO-1)th iteration and the tth time; represents the coefficient of the Lagrangian penalty function at the SOth iteration; λ represents the update multiplier of the Lagrangian penalty function coefficient; Step 3.6: End, stop iteration and output IES maximum response capacity.

2. The market mechanism design method for the integrated energy system to participate in the power system regulation according to claim 1 is characterized by: In step 1, the wholesale power market determines the power generation plan of conventional units and the clearing results of the operating reserve capacity based on the economic dispatch of security constraints, as follows: The operating reserve capacity of the generator set clearing is expressed as The clearing price is denoted by ρ t (R t ); the clearing result can be mapped to the operating reserve demand curve ORDC, represented by a point (Q0, p0) on ORDC, where: Q0 and p0 represent 3. The market mechanism design method for the integrated energy system to participate in the power system regulation according to claim 1 is characterized by: In step 1, the secondary market SM is operated to determine the maximum response capacity of the integrated energy system IES, as follows: In the secondary market SM, the IES is encouraged to provide operating reserve resources, fully tap the IES response potential, and then the maximum response capacity of the IES is evaluated, which is recorded as Therefore, the total system operating reserve capacity increases to The marginal price is The new equilibrium point in ORDC moves downward to (Q1, p1), where Q1 represents p1 represents Based on the proposed secondary market SM, the maximum response capacity of IES can be obtained by solving the decentralized optimization model for decentralized IES response capacity evaluation by decoupling ORDC from the wholesale power market.

4. The market mechanism design method for the integrated energy system to participate in the power system regulation according to claim 1 is characterized by: In step 1, the wholesale electricity market operation model is established as follows: First, wholesale power market operators run a security-constrained economic dispatch model to jointly optimize the generation schedule of conventional units and the operating reserve capacity: In formula (1), They represent the power and reserve supply price of the conventional unit g in the large power grid at time t respectively; R gt They represent the power and reserve capacity provided by the conventional unit g in the large power grid at time t respectively; Minimum reserve capacity to be provided for all conventional units; represents the operating reserve capacity of the generator set clearing in the wholesale market; ρ represents the operating reserve price demand curve of the wholesale power market; R t represents the operating reserve capacity in the demand curve; In formula (2), For any time; In formula (3), represents the load demand of node n at time t; PTDF*(A*PG-B*PD)≤FL max (4); In formula (4), PG and PD represent the vectors of generator output and demand respectively; A and B are parameter matrices, FL max is the transmission line capacity vector; PTDF represents the power flow transfer distribution factor; In formula (5), Indicates the maximum power of conventional unit g in the large power grid; It means that for any generator; In formula (6), γ min Indicates the reserve factor.

5. The market mechanism design method for the integrated energy system to participate in the power system regulation according to claim 4 is characterized by: The mathematical model of SM clearing in the secondary market is as follows: Objective function: When exploring the IES response potential, the power system hopes to maximize benefits, while the IES hopes to minimize total costs. Therefore, the objective function of SM clearing is expressed as shown in formula (7): In formula (7), c gi 、c gj,t 、c gl,t 、c gu,t 、c y,t , They represent the unit costs of CHP, electric boiler, gas boiler, gas unit, gas source and electricity purchased from the upper-level power grid; are the thermal power and electrical power of the CHP unit at time t respectively; Respectively represent the heating power of electric boiler and gas boiler; Indicates the electrical power of the gas unit; GS y is the supply volume of gas source y; Indicates the power of the power-to-gas device; represents the operational reserve capacity provided by the secondary market; The product of the two parameters represents the cost of purchasing electricity from the upper-level power grid.

6. The method for designing a market mechanism for the participation of an integrated energy system in power system regulation according to claim 5 is characterized by: The constraints of the objective function are: (1) Power supply system: In formula (8), represents the load demand in the i-th IES at time t; represents the expected value of the load demand in the i-th IES at time t; represents the power of the geth CSP power plant unit in the i-th IES; In formula (9), ξ i,t It represents the ratio of the critical load to the total load power at time t in the i-th IES; In formula (10), represents the change in the power of the CHP unit at time t in the i-th IES; It represents the change in the power exchanged between the IES and the large power grid at time t in the i-th IES, that is, the operating reserve or maximum response capacity provided by the IES; It represents the power change value of CHP unit, gas unit and CSP unit g at time t in the i-th IES; In formula (12), represents the power change value of all gas units in the i-th IES; In formula (13), represents the power change value of the ge-th CSP power station unit in the i-th IES; In formula (15), R gi represents the safe operating area of ​​CHP unit g in the i-th IES, represents the rate of change of electric power of the gth CHP unit in the i-th IES; represents the thermal power change rate of the g-th CHP unit in the i-th IES; In formula (17), R i,t , They represent the operating reserve capacity and the maximum reserve capacity provided by the i-th IES at time t respectively; In formula (18), η G2P is the energy conversion efficiency of each gas unit; GCu represents the gas consumption of the gas unit; (2) Heating system: The heat network model adopts the mass regulation operation mode, that is, the mass flow rate is constant, and the node thermal power is determined by the node temperature. The specific constraints are as follows: in: Respectively represent the power consumption and heating power of the electric boiler; η BOI Indicates the electricity-to-heat efficiency of the electric boiler, η GB The energy conversion efficiency of the gas boiler; They represent the gas boiler set and CHP unit set connected to node a respectively; HD is the set of load nodes, d represents the load node; and is the set of water supply pipes with node a as the starting point and end point; and are the sets of return pipes with node a as the starting point and the end point respectively; and Represents the temperature of the water supply pipe and the return pipe; and represents the supply water temperature and return water temperature of node a; and is the mass flow rate in the heating pipe and the heat recovery pipe; and is the mass flow rate of the heat source node; is the mass flow rate of the heat load node; c represents the specific heat capacity of water; gi represents the index number of the cogeneration unit; gj represents the index number of the electric boiler; gl represents the index number of the gas boiler; Gn represents the index number belonging to the same IES; c w represents the specific heat capacity of water; Indicates the heat storage / release power at time t; The thermal power of the gas boiler; GB1 represents the gas consumption of the gas boiler; p represents the water pipe index; l represents the gas boiler index; c represents the CHP unit index; Indicates the minimum temperature of the water supply circuit; Indicates the maximum temperature of the water supply circuit; Indicates the minimum return water circuit temperature; Indicates the maximum temperature of the return water circuit; (3) Gas network constraints: The steady-state model is used to model the gas network, as shown in the following formula: In the formula, and They represent the gas source set, P2G unit set, gas unit set and gas boiler set connected to node m respectively; GS y , GT x Output for P2G unit; mn is the natural gas flow rate flowing through the gas pipeline mn; GD m is the gas load of node m; C mn is the Weymouth constant of the pipeline mn; π m , π n are the pressure values ​​of nodes m and n respectively; CGD m is the normal gas load demand of node m; GC u With GB l are the gas consumption of the gas unit u and gas boiler gb connected to the node m respectively; η P2G is the energy conversion efficiency of the power-to-gas device; GB l Indicates the gas consumption of gas boiler; Indicates the minimum value of gas source y; Indicates the maximum value of gas source y; Indicates the minimum pressure value of node m; Indicates the maximum pressure of node m; Indicates the electrical power of the P2G unit; (4) Constraints related to CSP plants: a: Constraints related to the solar thermal power station collector subsystem: Where P t JR is the solar radiation heat energy that can be used at time t; P t SH is the thermal energy output by the mirror field at time t; is the amount of light abandoned in the mirror field at time t; η JR Represents the photothermal conversion efficiency; A JR Represents the mirror field area; P t SC Indicates the electric energy received by the power generation module at time t; Indicates the heat storage / release power at time t; b: Constraints related to heat exchange and power generation subsystems of CSP power plants: Where P t CR P is the heat storage at time t; t FR P is the heat released at time t; t JS The power generation module receives thermal energy at time t; is the power generation capacity of the CSP plant at time t; is the heating power of the CSP power station at time t; The upper limit of the power generation capacity of the CSP station; P is the upper limit of the heating power of the CSP plant; SU Indicates the thermal energy required to start the power generation module; η PB represents the thermoelectric conversion efficiency; Indicates the start and stop status of the unit; c: Thermal storage constraints of CSP power plants: AND min ≤E t ≤E max (53); AND T =And t0 (54); In the formula, is the heat storage capacity of the heat storage tank at time t; is the heat released from the heat storage tank at time t; E is the upper limit of heat storage / release of the heat storage tank; T is the heat of the heat storage tank at the end of the simulation cycle; E t0 is the heat of the heat storage tank at the beginning of the simulation cycle; η c represents the heat storage efficiency; η f Indicates heat release efficiency; E t represents the heat of the heat storage tank at time t; E t-1 represents the heat of the heat storage tank at time (t-1); η XRG Indicates the heat dissipation coefficient; E min Indicates the minimum capacity of the heat storage tank; E max Indicates the maximum capacity of the heat storage tank.