A flue gas treatment system and process for an organic waste gas incineration catalytic furnace
By combining cooling components, atomizing adsorption components, and cyclone dust collectors, the problem of unstable equipment power caused by the intermittent discharge of flue gas from the organic waste gas incineration catalytic furnace was solved. This system achieved stable cooling and effective purification of the flue gas, removing particles and harmful compounds, and improving the operational stability and processing efficiency of the equipment.
Patent Information
- Application Number
- CN202311088588.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2043-08-25
AI Technical Summary
The flue gas emitted from the organic waste gas incineration catalytic furnace is intermittent, resulting in unstable equipment processing power. High-temperature flue gas treatment equipment cannot maintain a constant working state, and existing equipment is difficult to effectively treat particulate matter and harmful compounds in the flue gas.
The system employs a combination of cooling components, atomizing adsorption components, and cyclone dust collectors, including surrounding ducts, atomizing chambers, rubber and plastic gas storage bags, spraying mechanisms, cyclone dust collectors, and activated carbon adsorption boxes. It treats flue gas through multiple steps of cooling, atomization, condensation, separation, and adsorption.
It achieves stable treatment of intermittent flue gas, reduces flue gas temperature, effectively removes particles and harmful compounds from flue gas, improves the working stability and processing efficiency of the equipment, saves water resources, and reduces secondary pollution.
Smart Images

Figure CN117123012B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of incinerator flue gas treatment, and in particular to a flue gas treatment system and process for an organic waste gas incineration catalytic furnace. Background Art
[0002] The organic waste gas incineration catalytic furnace is a commonly used waste gas treatment equipment, which uses high-temperature combustion to treat waste gas. By controlling parameters such as combustion temperature, oxygen supply and waste gas feed, the organic pollutants are fully oxidized into carbon dioxide and water during the combustion process, thereby achieving the purpose of purifying the waste gas. In order to reduce energy consumption, the regenerative organic waste gas incineration catalytic furnace is often used in the market. In the regenerative organic waste gas incineration catalytic furnace, the combustion chamber and the regenerative chamber are separated. The organic waste gas first enters the combustion chamber for combustion to produce high-temperature flue gas. Then, these flue gases will enter the regenerative chamber through the flue or pipeline, so that the regenerative material absorbs heat and stores heat energy. Therefore, the exhaust gas emission of the regenerative organic waste gas incineration catalytic furnace is intermittent, which is determined by the alternating operation of the combustion chamber and the regenerative chamber. Since the flue gas discharged also contains dust particles and some other compounds, the flue gas discharged from the organic waste gas incineration catalytic furnace also needs to be treated secondary.
[0003] For example, Chinese patent application publication number CN108434966A discloses an incinerator flue gas treatment component, which is arranged at the top of the incinerator chimney. The flue gas treatment component includes a micro-nano atomizer, a medicine box, a cyclone cyclone and an outer expansion barrel. One end of the micro-nano atomizer is connected to the medicine box, and the other end of the micro-nano atomizer is connected to the cyclone cyclone at the outlet of the incinerator chimney. An outer expansion barrel is provided on the outside of the cyclone cyclone.
[0004] However, since the flue gas discharged from the catalytic furnace for incineration of organic waste gas is of high temperature, if the flue gas is directly treated, the high temperature will cause the flue gas treatment equipment to be unable to reach the appropriate operating temperature range. In addition, since the flue gas discharged from the catalytic furnace for incineration of organic waste gas is intermittent, the equipment also needs to work intermittently, resulting in the equipment being unable to maintain a stable working state and unstable processing power. Summary of the invention
[0005] In order to solve the technical problem that the flue gas discharged from the organic waste gas incineration catalytic furnace is intermittent and it is difficult for ordinary equipment to maintain constant power in treating the flue gas, the present invention provides a flue gas treatment system and process for an organic waste gas incineration catalytic furnace to solve the above problem.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A flue gas treatment system for an organic waste gas incineration catalytic furnace, comprising a frame, a cooling assembly, an atomizing adsorption assembly and a cyclone dust collector are arranged at the frame; the cooling assembly comprises a surrounding pipe with a curved stroke; the atomizing adsorption assembly comprises an atomizing chamber, a rubber-plastic air storage bag and an atomizing mechanism, the atomizing chamber is a space with a top opening, the top of the atomizing chamber is provided with the rubber-plastic air storage bag which is mutually conductive with the atomizing chamber, the atomizing chamber and the rubber-plastic air storage bag are tightly connected together and together form a closed space, the atomizing chamber is provided with an atomizing chamber air inlet and an atomizing chamber air outlet; the atomizing mechanism comprises an atomizing agent storage barrel, a second water pump and an atomizing nozzle, the atomizing nozzle has a plurality of them and is evenly arranged above the interior of the atomizing chamber, the atomizing nozzle is connected to the atomizing agent storage barrel through the second water pump and a water pipe; one end of the surrounding pipe is connected to the atomizing chamber air inlet pipe, and the atomizing chamber air outlet is connected to the cyclone dust collector pipe.
[0008] As a preferred solution of the present invention, the cooling assembly also includes a spray mechanism and a water storage barrel, the spray mechanism includes a spray head and a first water pump, the spray head is arranged toward the surrounding pipe, and the spray head is connected to the water storage barrel through the first water pump and a water pipe.
[0009] As a preferred solution of the present invention, the cooling assembly also includes a surrounding barrel, the spray mechanism also includes a sediment filter, the first water pump is connected to the water storage barrel through a water pipe and the sediment filter; the water storage barrel is a water pool with an opening at the top, the surrounding barrel is cylindrical, the surrounding barrel is fixedly mounted on a frame, the axis of the surrounding barrel is perpendicular to the horizontal plane, the surrounding barrel is arranged above the water storage barrel, a gap is left between the surrounding barrel and the water storage barrel, the horizontal plane of the surrounding barrel is projected into the top opening of the water storage barrel, the surrounding pipe is a curved pipe with a spiral stroke, the axis of the surrounding pipe is colinear with the axis of the surrounding barrel, and the surrounding pipe is arranged inside the surrounding barrel and close to the inner wall of the surrounding barrel.
[0010] As a preferred solution of the present invention, the atomization adsorption assembly also includes a support frame, which is fixedly mounted on the top opening of the atomization chamber, and the support frame includes an arc-shaped support rod and a linear fixed rod, the arc-shaped support rod is arc-shaped, there are several arc-shaped support rods and they are arranged parallel to each other, the arc center of the arc-shaped support rod is below the arc-shaped support rod, the linear fixed rod is a straight long rod, and the linear fixed rod is fixedly mounted together with several of the arc-shaped support rods at the same time.
[0011] As a preferred solution of the present invention, an inclined bottom plate is provided at the bottom of the atomization chamber, the atomization adsorption assembly also includes a bottom plate cleaning assembly and a second valve, the bottom plate cleaning assembly includes a bottom plate cleaning pipe, a bottom plate cleaning pipe opening and a first valve, the bottom plate cleaning pipe is a water pipe extending in a straight direction, the bottom plate cleaning pipe is fixedly arranged on the top of the inclined surface of the bottom plate, the extension direction of the bottom plate cleaning assembly and the inclined direction of the bottom plate are perpendicular to each other, the bottom plate cleaning pipe is provided with a bottom plate cleaning pipe opening facing the bottom plate, the bottom plate cleaning pipe is connected to a water source through the first valve, the bottom of the inclined surface of the bottom plate is connected to a water sink, and the water sink is connected to the outside of the atomization chamber through the second valve.
[0012] As a preferred solution of the present invention, a sealed door is provided on the atomizing chamber, an observation window is provided on the sealed door, and a sealing plastic strip is installed at the portion where the sealed door is in contact with the outer wall of the atomizing chamber.
[0013] As a preferred solution of the present invention, the atomization adsorption assembly further includes a fan, which is installed on the air inlet of the atomization chamber, and the surrounding pipe is connected to the air inlet pipe of the atomization chamber through the fan.
[0014] As a preferred solution of the present invention, a ash hopper is installed on the lower side of the cyclone dust collector.
[0015] As a preferred solution of the present invention, it also includes an activated carbon adsorption box, the cyclone dust collector is connected to the activated carbon adsorption box, the activated carbon adsorption box includes an activated carbon adsorption box body and an activated carbon placement drawer, and the activated carbon placement drawer is installed on the activated carbon adsorption box body so as to be pullable and removable.
[0016] A flue gas treatment process for an organic waste gas incineration catalytic furnace is implemented using the flue gas treatment system for an organic waste gas incineration catalytic furnace, and comprises the following steps:
[0017] Step 1: The flue gas discharged from the organic waste gas incineration catalytic furnace enters the surrounding pipe, the first water pump works to pump the water in the water storage bucket into the spray head, and the spray head sprays the water onto the surrounding pipe to cool the flue gas entering the spray head;
[0018] Step 2: The flue gas cooled by the surrounding pipe is sent into the atomizing chamber by the fan, and the second water pump works to pump the atomizing agent in the atomizing agent storage barrel into the atomizing nozzle, and the atomizing nozzle atomizes the atomizing agent and sprays it evenly in the atomizing chamber, and the particles in the flue gas are adsorbed, captured and condensed into condensed particles by the atomized atomizing agent;
[0019] Step 3: The cyclone dust collector works to suck in the flue gas with condensed particles in the atomization chamber, and separates and discharges the condensed particles into the ash hopper;
[0020] Step 4: The flue gas treated by the cyclone dust collector enters the activated carbon adsorption box, and the flue gas is adsorbed by the activated carbon in the activated carbon adsorption box and then discharged.
[0021] in:
[0022] The function of step one is to cool down the flue gas discharged from the organic waste gas incineration catalytic furnace.
[0023] The function of step 2 is to atomize and condense the particles in the cooled flue gas into larger condensed particles.
[0024] The function of step three is to separate and discharge the condensed particles in the flue gas.
[0025] The function of step four is to separate pollutants such as nitrogen oxides and sulfur oxides and particles from the flue gas.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] 1. In the present invention, by installing a rubber-plastic air storage bag on the atomizing chamber, the space between the atomizing chamber and the rubber-plastic air storage bag is variable, which can be suitable for intermittently discharged smoke and atomize and condense particles in the smoke. In addition, by designing a surrounding pipe, the contact area between the smoke and the air is increased. At the same time, the spray mechanism sprays water onto the surrounding pipe, which can have a good cooling effect on the smoke.
[0028] 2. In the present invention, through the design of the surrounding barrel and the water storage barrel, the spray mechanism can spray excess water on the surrounding pipe for recycling and saving water resources. The design of the support frame can support the rubber and plastic air storage bag to prevent the rubber and plastic air storage bag from collapsing into the atomization chamber and affecting the work of the atomization mechanism. At the same time, through the design of the bottom plate cleaning component, the condensed particles settled on the bottom plate can be cleaned to prevent circulation pollution.
[0029] 3. In the present invention, through the design of the observation window on the closed door, the atomization effect inside the atomization chamber can be observed without destroying the airtightness of the atomization chamber, and through the design of the fan, the smoke in the surrounding pipe can be drawn into the atomization chamber, which can effectively solve the technical problem that the elasticity of the rubber and plastic air storage bag causes a high air pressure in the atomization chamber, making it difficult for the smoke in the surrounding pipe to enter the atomization chamber.
[0030] 4. In the present invention, the condensed particles separated by the cyclone dust collector can be collected through the ash hopper of the cyclone dust collector, and then centrally processed to prevent secondary pollution. The activated carbon adsorption box is designed to finally process the flue gas treated by the cyclone dust collector, thereby achieving the purpose of removing various compounds and untreated particles in the flue gas. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A three-dimensional schematic diagram of the present invention Figure 1 ;
[0032] Figure 2 A three-dimensional schematic diagram of the present invention Figure 2 ;
[0033] Figure 3 A three-dimensional schematic diagram of the present invention Figure 3 ;
[0034] Figure 4 A three-dimensional cross-sectional view of the cooling assembly of the present invention Figure 1 ;
[0035] Figure 5 A three-dimensional cross-sectional view of the cooling assembly of the present invention Figure 2 ;
[0036] Figure 6 It is a three-dimensional schematic diagram of the atomized adsorption particle assembly of the present invention;
[0037] Figure 7 It is a three-dimensional cross-sectional schematic diagram of the atomized adsorption particle assembly of the present invention;
[0038] Figure 8 for Figure 7 A local enlarged view of point A;
[0039] Fig. 9 A three-dimensional schematic diagram of the atomization mechanism of the present invention Figure 1 ;
[0040] Fig.10 It is a three-dimensional schematic diagram of the cyclone dust collector and the activated carbon adsorption box of the present invention.
[0041] In the figure: 100, rack; 200, cooling assembly; 210, surrounding pipe; 220, spray mechanism; 221, spray head; 222, first water pump; 223, sediment filter; 230, surrounding barrel; 240, water storage barrel; 300, atomization adsorption particle assembly; 310, atomization chamber; 311, bottom plate; 312, water tank; 313, atomization chamber air inlet; 314, atomization chamber air outlet; 320, closed door; 321, observation window; 330, rubber and plastic air storage bag; 340, support frame ; 341. Arc support rod; 342. Straight fixing rod; 350. Atomizing mechanism; 351. Atomizer storage barrel; 352. Second water pump; 353. Atomizing nozzle; 360. Bottom plate cleaning assembly; 361. Bottom plate cleaning pipe; 362. Bottom plate cleaning pipe water outlet; 363. First valve; 370. Fan; 380. Second valve; 400. Cyclone dust collector; 410. Ash hopper; 500. Activated carbon adsorption box; 510. Activated carbon adsorption box body; 520. Activated carbon placement drawer. Implementation
[0042] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0043] Example 1: Please refer to Figure 1-10 The smoke treatment system for an organic waste gas incineration catalytic furnace shown in the figure includes a frame 100, on which a cooling assembly 200, an atomizing adsorption assembly 300 and a cyclone dust collector 400 are arranged; the cooling assembly 200 includes a surrounding pipe 210 with a curved stroke; the atomizing adsorption assembly 300 includes an atomizing chamber 310, a rubber-plastic air storage bag 330 and an atomizing mechanism 350, the atomizing chamber 310 is a space with a top opening, the top of the atomizing chamber 310 is equipped with the rubber-plastic air storage bag 330 which is mutually conductive with the atomizing chamber 310, and the atomizing chamber 310 and the rubber-plastic air storage bag 330 are tightly fitted. They are connected together and together form a closed space, and the atomization chamber 310 is provided with an atomization chamber air inlet 313 and an atomization chamber air outlet 314; the atomization mechanism 350 includes an atomization agent storage barrel 351, a second water pump 352 and an atomization nozzle 353, and there are several atomization nozzles 353 that are evenly arranged above the inside of the atomization chamber 310, and the atomization nozzle 353 is connected to the atomization agent storage barrel 351 through the second water pump 352 and a water pipe; one end of the surrounding pipe 210 is connected to the atomization chamber air inlet 313 pipe, and the atomization chamber air outlet 314 is connected to the cyclone dust collector 400 pipe.
[0044] Specifically, the flue gas discharged from the organic waste gas incineration catalytic furnace is first cooled by the cooling component 200, then enters the atomization chamber 310 to be adsorbed and settled by the atomized particles, and then enters the cyclone dust collector 400 for secondary particle removal, which can effectively remove the smoke particles in the flue gas discharged from the organic waste gas incineration catalytic furnace.
[0045] More specifically, the atomizer stored in the atomizer storage barrel 351 is selected according to the organic waste gas treated by the organic waste gas incineration catalytic furnace. For example, when the organic waste gas treated by the organic waste gas incineration catalytic furnace contains a large amount of sulfur compounds, an alkaline solution can be selected as the atomizer, which also plays a role in neutralizing and removing sulfur oxides in the process of adsorption and sedimentation of flue gas particles.
[0046] The flue gas discharged from the heat storage type organic waste gas incineration catalytic furnace is intermittent, and the intermittently discharged flue gas intermittently passes through the surrounding pipe 210. Since the surrounding pipe 210 has a tortuous course, the contact area between the surrounding pipe 210 and the air will be increased, which can have a good heat dissipation effect on the flue gas. The flue gas after heat dissipation by the surrounding pipe 210 intermittently enters the closed space composed of the atomizing chamber 310 and the rubber-plastic air storage bag 330 through the atomizing chamber air inlet 313. The surface of the rubber-plastic air storage bag 330 is soft. Due to the function of the rubber-plastic air storage bag 330, the size of the closed space composed of the atomizing chamber 310 and the rubber-plastic air storage bag 330 can be dynamically changed, which can meet the temporary storage of the flue gas intermittently entering the closed space composed of the atomizing chamber 310 and the rubber-plastic air storage bag 330.
[0047] The second water pump 352 works to pump the atomizer in the atomizer storage barrel 351 into the atomizing nozzle 353, and the atomizing nozzle 353 atomizes the atomizer and evenly sprays it in the atomizing chamber 310. The particles in the flue gas are adsorbed and captured by the atomized atomizer and condensed into condensed particles. Then, the gas with condensed particles is sucked away from the atomizing chamber outlet 314 by the cyclone dust collector 400 and the condensed particles are separated. Then, the gas discharged from the cyclone dust collector 400 is a relatively clean gas.
[0048] Furthermore, in order to accelerate the cooling effect of the surrounding pipe 210 on the flue gas, the following preferred technical solutions are provided:
[0049] The cooling assembly 200 also includes a spray mechanism 220 and a water storage barrel 240. The spray mechanism 220 includes a spray head 221 and a first water pump 222. The spray head 221 is arranged toward the surrounding pipe 210, and the spray head 221 is connected to the water storage barrel 240 through the first water pump 222 and a water pipe.
[0050] Specifically, clean water is placed in the water storage barrel 240, and the first water pump 222 pumps the clean water in the water storage barrel 240 into the spray head 221. The spray head 221 sprays water onto the surrounding pipe 210 to cool down the surrounding pipe 210, thereby accelerating the cooling effect of the surrounding pipe 210 on the flue gas.
[0051] Further, in order to solve the technical problem of reducing the waste of water resources by the spray mechanism 220, the following preferred technical solutions are provided:
[0052] The cooling assembly 200 also includes a surrounding barrel 230, and the spray mechanism 220 also includes a sediment filter 223. The first water pump 222 is connected to the water storage barrel 240 through a water pipe and the sediment filter 223. The water storage barrel 240 is a water pool with an opening on the top, and the surrounding barrel 230 is cylindrical. The surrounding barrel 230 is fixedly installed on the frame 100, and the axis of the surrounding barrel 230 is perpendicular to the horizontal plane. The surrounding barrel 230 is arranged above the water storage barrel 240, and a gap is left between the surrounding barrel 230 and the water storage barrel 240. The horizontal plane of the surrounding barrel 230 is projected into the top opening of the water storage barrel 240. The surrounding pipe 210 is a curved pipe with a spiral stroke. The axis of the surrounding pipe 210 is colinear with the axis of the surrounding barrel 230, and the surrounding pipe 210 is arranged inside the surrounding barrel 230 and close to the inner wall of the surrounding barrel 230.
[0053] Specifically, there are multiple spray heads 221. Due to the effect of the surrounding barrel 230, the water sprayed by the spray head 221 on the surrounding pipe 210, the part splashing outward will be blocked by the surrounding barrel 230 and finally flow back into the water storage barrel 240, so as to achieve the purpose of water circulation and reduce the waste of water resources. Since the top opening of the water storage barrel 240 is in an open-air state, mud and sand will fall into the water storage barrel 240, and the mud and sand filter 223 can filter the mud and sand, preventing the mud and sand from being pumped into the first water pump 222, causing damage to the first water pump 222 and clogging the spray head 221.
[0054] Furthermore, since the surface of the rubber-plastic air storage bag 330 is soft, when the cyclone dust collector 400 extracts too much gas from the atomizing chamber 310, the rubber-plastic air storage bag 330 will collapse and fall into the atomizing chamber 310, affecting the atomizing mechanism 350. To solve this technical problem, the following preferred technical solutions are provided:
[0055] The atomization adsorption assembly 300 also includes a support frame 340, which is fixedly installed on the top opening of the atomization chamber 310. The support frame 340 includes an arc-shaped support rod 341 and a linear fixed rod 342. The arc-shaped support rod 341 is arc-shaped. There are several arc-shaped support rods 341 and they are arranged parallel to each other. The arc center of the arc-shaped support rod 341 is below the arc-shaped support rod 341. The linear fixed rod 342 is a straight long rod. The linear fixed rod 342 is fixedly installed together with several arc-shaped support rods 341 at the same time.
[0056] Specifically, when the rubber-plastic air storage bag 330 collapses, it will be supported by the support frame 340 to prevent further falling. The arc-shaped support rod 341 is arc-shaped and has good compression resistance. The straight fixing rod 342 can connect and fix the arc-shaped support rods 341 together to play a reinforcing role.
[0057] Further, in order to clean up the condensed particles that fall into the atomization chamber 310 due to gravity, the following preferred technical solutions are provided:
[0058] An inclined bottom plate 311 is provided at the bottom of the atomizing chamber 310. The atomizing adsorption assembly 300 also includes a bottom plate cleaning assembly 360 and a second valve 380. The bottom plate cleaning assembly 360 includes a bottom plate cleaning pipe 361, a bottom plate cleaning pipe opening 362 and a first valve 363. The bottom plate cleaning pipe 361 is a water pipe extending in a straight direction. The bottom plate cleaning pipe 361 is fixedly arranged on the top of the inclined surface of the bottom plate 311. The extension direction of the bottom plate cleaning assembly 360 and the inclined direction of the bottom plate 311 are perpendicular to each other. The bottom plate cleaning pipe 361 is provided with a bottom plate cleaning pipe opening 362 facing the bottom plate 311. The bottom plate cleaning pipe 361 is connected to a water source through the first valve 363. A water tank 312 is connected to the bottom of the inclined surface of the bottom plate 311. The water tank 312 is connected to the outside of the atomizing chamber 310 through the second valve 380.
[0059] Specifically, the first valve 363 is an electrically controlled valve, and the second valve 380 is a manual valve. The first valve 363 is opened at a fixed time, and then the water flows into the bottom plate cleaning pipe 361 and is discharged from the bottom plate cleaning pipe opening 362 to the bottom plate 311. Since the bottom plate 311 is inclined, the water flow will wash away the condensed particles on the bottom plate 311 and flow into the water tank 312. After that, the second valve 380 is opened regularly to discharge the sewage in the water tank 312 for collection and cleaning.
[0060] Further, in order to solve the technical problem of observing the atomization situation inside the atomization chamber 310 and conveniently entering the atomization chamber 310 for cleaning, the following preferred technical solutions are provided:
[0061] The atomizing chamber 310 is provided with a sealed door 320 , and an observation window 321 is provided on the sealed door 320 . A sealing plastic strip is installed at the portion where the sealed door 320 is in contact with the outer wall of the atomizing chamber 310 .
[0062] Further, in order to solve the technical problem that the internal air pressure of the atomizing chamber 310 is too high due to the elastic contraction of the rubber-plastic air storage bag 330, and the smoke in the surrounding pipe 210 is difficult to actively enter the atomizing chamber 310 under the action of the air pressure, the following preferred technical solutions are provided:
[0063] The atomizing adsorption assembly 300 further includes a fan 370 , which is installed on the air inlet 313 of the atomizing chamber. The surrounding pipe 210 is connected to the air inlet 313 of the atomizing chamber through the fan 370 .
[0064] Specifically, through the operation of the fan 370, the smoke in the surrounding pipe 210 can be drawn into the atomization chamber 310. Further:
[0065] An ash hopper 410 is installed at the lower side of the cyclone dust collector 400 .
[0066] Specifically, the ash hopper 410 is used to collect the condensed particles separated by the cyclone dust collector 400.
[0067] Furthermore, since the flue gas treated by the cyclone dust collector 400 still contains extremely fine dust particles, and pollutant gases such as nitrogen oxides, sulfur oxides and dioxins, in order to absorb and treat these pollutants, the following preferred technical solutions are provided:
[0068] It also includes an activated carbon adsorption box 500, the cyclone dust collector 400 is connected to the activated carbon adsorption box 500, and the activated carbon adsorption box 500 includes an activated carbon adsorption box body 510 and an activated carbon placement drawer 520, and the activated carbon placement drawer 520 is installed on the activated carbon adsorption box body 510 so as to be pullable and removable.
[0069] Specifically, the activated carbon adsorption box 500 can perform final treatment on the flue gas treated by the cyclone dust collector 400, so as to remove various compounds and untreated particles in the flue gas. The activated carbon is placed on the activated carbon placement drawer 520. When the activated carbon needs to be replaced, it only needs to be replaced by pulling out the activated carbon placement drawer 520. Embodiment 2
[0070] A flue gas treatment process for an organic waste gas incineration catalytic furnace is implemented using the flue gas treatment system for an organic waste gas incineration catalytic furnace, and comprises the following steps:
[0071] Step 1: The flue gas discharged from the catalytic furnace for incinerating organic waste gas enters the surrounding pipe 210, and the first water pump 222 works to pump the water in the water storage barrel 240 into the spray head 221. The spray head 221 sprays water onto the surrounding pipe 210 to cool the flue gas entering the spray head 221;
[0072] Step 2: The flue gas cooled by the surrounding pipe 210 is sent into the atomizing chamber 310 by the fan 370. The second water pump 352 works to pump the atomizing agent in the atomizing agent storage barrel 351 into the atomizing nozzle 353. The atomizing nozzle 353 atomizes the atomizing agent and sprays it evenly in the atomizing chamber 310. The particles in the flue gas are adsorbed and captured by the atomized atomizing agent and condensed into condensed particles.
[0073] Step 3: The cyclone dust collector 400 works to suck in the flue gas with condensed particles in the atomization chamber 310, and separates and discharges the condensed particles into the ash hopper 410;
[0074] Step 4: The flue gas treated by the cyclone dust collector 400 enters the activated carbon adsorption box 500, and the flue gas is adsorbed by the activated carbon in the activated carbon adsorption box 500 and then discharged.
[0075] in:
[0076] The function of step one is to cool down the flue gas discharged from the organic waste gas incineration catalytic furnace.
[0077] The function of step 2 is to atomize and condense the particles in the cooled flue gas into larger condensed particles.
[0078] The function of step three is to separate and discharge the condensed particles in the flue gas.
[0079] The function of step four is to separate pollutants such as nitrogen oxides and sulfur oxides and particles from the flue gas.
[0080] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A flue gas treatment system for an organic waste gas incineration catalytic furnace, Features: It comprises a frame (100), wherein a cooling assembly (200), an atomizing adsorption assembly (300) and a cyclone dust collector (400) are arranged on the frame (100); the cooling assembly (200) comprises a surrounding pipe (210) having a curved stroke; The cooling assembly (200) further comprises a spray mechanism (220) and a water storage barrel (240); the spray mechanism (220) comprises a spray head (221) and a first water pump (222); the spray head (221) is arranged toward the surrounding pipe (210); the spray head (221) is connected to the water storage barrel (240) via the first water pump (222) and a water pipe; The cooling assembly (200) further comprises a surrounding barrel (230), the spray mechanism (220) further comprises a sediment filter (223), the first water pump (222) and the water storage barrel (240) are connected via a water pipe and the sediment filter (223); the water storage barrel (240) is a water pool with an opening at the top, the surrounding barrel (230) is cylindrical, the surrounding barrel (230) is fixedly mounted on the frame (100), the axis of the surrounding barrel (230) is perpendicular to the horizontal plane, and the surrounding barrel (230) ) is arranged above the water storage barrel (240), a gap is left between the surrounding barrel (230) and the water storage barrel (240), the horizontal plane of the surrounding barrel (230) is projected into the top opening of the water storage barrel (240), the surrounding pipe (210) is a curved pipe with a spiral stroke, the axis of the surrounding pipe (210) is colinear with the axis of the surrounding barrel (230), and the surrounding pipe (210) is arranged inside the surrounding barrel (230) and close to the inner wall of the surrounding barrel (230); The atomizing adsorption assembly (300) comprises an atomizing chamber (310), a rubber-plastic air storage bag (330) and an atomizing mechanism (350); the atomizing chamber (310) has a space with an open top; the rubber-plastic air storage bag (330) which is in communication with the atomizing chamber (310) is installed on the top of the atomizing chamber (310); the atomizing chamber (310) and the rubber-plastic air storage bag (330) are tightly connected together and together form a closed space; the atomizing chamber (310) is provided with an atomizing chamber air inlet (313) and an atomizing chamber air outlet (314); The atomizing mechanism (350) comprises an atomizing agent storage barrel (351), a second water pump (352) and an atomizing nozzle (353); the atomizing nozzle (353) is in multiple numbers and is evenly arranged above the inside of the atomizing chamber (310); the atomizing nozzle (353) is connected to the atomizing agent storage barrel (351) via the second water pump (352) and a water pipe; one end of the surrounding pipe (210) is connected to the atomizing chamber air inlet (313) pipe, and the atomizing chamber air outlet (314) is connected to the cyclone dust collector (400) pipe; The atomization adsorption assembly (300) further comprises a support frame (340), wherein the support frame (340) is fixedly mounted on the top opening of the atomization chamber (310), wherein the support frame (340) comprises an arc-shaped support rod (341) and a linear fixed rod (342), wherein the arc-shaped support rod (341) is in the shape of an arc, wherein there are a plurality of the arc-shaped support rods (341) which are arranged parallel to each other, wherein the arc center of the arc-shaped support rod (341) is below the arc-shaped support rod (341), wherein the linear fixed rod (342) is in the shape of a straight long rod, and wherein the linear fixed rod (342) is fixedly mounted together with a plurality of the arc-shaped support rods (341) at the same time.
2. The flue gas treatment system for the organic waste gas incineration catalytic furnace according to claim 1, Features: The bottom of the atomizing chamber (310) is provided with an inclined bottom plate (311). The atomizing adsorption assembly (300) further comprises a bottom plate cleaning assembly (360) and a second valve (380). The bottom plate cleaning assembly (360) comprises a bottom plate cleaning pipe (361), a bottom plate cleaning pipe opening (362) and a first valve (363). The bottom plate cleaning pipe (361) is a water pipe extending in a straight direction. The bottom plate cleaning pipe (361) is fixedly arranged on the top of the inclined surface of the bottom plate (311). The extension direction of the bottom plate cleaning assembly (360) and the inclination direction of the bottom plate (311) are perpendicular to each other; the bottom plate cleaning tube (361) is provided with a bottom plate cleaning tube opening (362) facing the bottom plate (311); the bottom plate cleaning tube (361) is connected to a water source via the first valve (363); the bottom of the inclined surface of the bottom plate (311) is connected to a water tank (312); and the water tank (312) is connected to the outside of the atomization chamber (310) via a second valve (380).
3. The flue gas treatment system for the organic waste gas incineration catalytic furnace according to claim 1, Features: The atomizing chamber (310) is provided with a sealed door (320), the sealed door (320) is provided with an observation window (321), and a sealing plastic strip is installed at the portion where the sealed door (320) is in contact with the outer wall of the atomizing chamber (310).
4. The flue gas treatment system for an organic waste gas incineration catalytic furnace according to claim 1, It is characterized in that The atomizing adsorption assembly (300) further comprises a fan (370), wherein the fan (370) is mounted on the air inlet (313) of the atomizing chamber, and the surrounding pipe (210) is connected to the pipe of the air inlet (313) of the atomizing chamber via the fan (370).
5. The flue gas treatment system for an organic waste gas incineration catalytic furnace according to claim 1, Features: An ash hopper (410) is installed at the lower side of the cyclone dust collector (400).
6. The flue gas treatment system for an organic waste gas incineration catalytic furnace according to claim 1, Features: It also includes an activated carbon adsorption box (500), the cyclone dust collector (400) is connected to the activated carbon adsorption box (500), and the activated carbon adsorption box (500) includes an activated carbon adsorption box body (510) and an activated carbon placement drawer (520), and the activated carbon placement drawer (520) is installed on the activated carbon adsorption box body (510) in a pullable manner.
7. A flue gas treatment process for an organic waste gas incineration catalytic furnace, Features: The method is implemented by using the flue gas treatment system for an organic waste gas incineration catalytic furnace as described in any one of claims 1 to 6, comprising the following steps: Step 1: the flue gas discharged from the organic waste gas incineration catalytic furnace enters the surrounding pipe (210), the first water pump (222) works to pump the water in the water storage barrel (240) into the spray head (221), and the spray head (221) sprays the water onto the surrounding pipe (210) to cool the flue gas entering the spray head (221); Step 2: The flue gas cooled by the surrounding pipe (210) is sent into the atomizing chamber (310) by the fan (370), the second water pump (352) works to pump the atomizing agent in the atomizing agent storage barrel (351) into the atomizing nozzle (353), the atomizing nozzle (353) atomizes the atomizing agent and sprays it evenly in the atomizing chamber (310), and the particles in the flue gas are adsorbed, captured and condensed into condensed particles by the atomized atomizing agent; Step 3: the cyclone dust collector (400) operates to suck in the flue gas with condensed particles in the atomization chamber (310), and separates and discharges the condensed particles into the ash hopper (410); Step 4: The flue gas treated by the cyclone dust collector (400) enters the activated carbon adsorption box (500), and the flue gas is adsorbed by the activated carbon in the activated carbon adsorption box (500) and then discharged.
Citation Information
Patent Citations
Incinerator flue gas treatment device and method thereof
CN108434966A
Turbofan stable-pressure desulfurizing, denitrifying and smoke uniformizing device and desulfurizing and denitrifying mehtod
CN107583438A
Rubber regenerative exhaust gas treatment device
CN108295587A
Plastic regeneration waste gas purification treatment device and working method thereof
CN113413740A
Fire balloon type fixed-point accurate dust removal device
CN114932129A