An intelligent electric material vehicle exchange station site selection and scheduling method and system
Through the intelligent electric material vehicle battery swapping station site selection and dispatching system, a variety of optimization algorithms and data processing methods are used to solve the problems of model complexity, lack of real-time performance and limited factor consideration in the existing technology, and achieve more efficient swapping. Power station site selection and vehicle-battery pack scheduling improve the operating efficiency and adaptability of the system.
Patent Information
- Application Number
- CN202311363564.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing electric vehicle charging station location selection and scheduling methods have problems such as model complexity, insufficient real-time performance, limited factor consideration, reliance on historical data and poor accuracy of prediction models. In particular, they cannot meet the needs of material vehicle battery swapping stations and battery health conditions.
An intelligent electric material vehicle battery swap station location selection and dispatching system is used to determine the optimal battery swap station location and The vehicle-battery pack scheduling strategy takes into account factors such as vehicle driving routes, battery usage, cargo demand, etc., and adjusts system operation through real-time monitoring and optimization.
It improves the accuracy and efficiency of battery swap station location selection and vehicle-battery pack scheduling, enables more refined control of vehicle distances and vehicle groupings, optimizes power consumption, reduces energy consumption, improves transportation efficiency, and achieves self-learning and control through closed-loop optimization. Self-optimization.
Smart Images

Figure CN117408463B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of site selection and scheduling, and in particular relates to a site selection and scheduling method for an intelligent electric material vehicle battery replacement station. Background Art
[0002] With the continuous promotion of the new energy vehicle market, the battery swap model has returned to the public eye with its core advantages such as fast, efficient, safe and stable, as well as its development potential in the fields of unified battery management, cascade utilization, and renewable utilization. In June 2019, the National Development and Reform Commission issued the "Implementation Plan for Promoting the Upgrading and Smooth Resource Recycling of Key Consumer Goods (2019-2020)", which explicitly mentioned concepts such as "battery swap" and "vehicle-battery separation". In April 2020, four ministries and commissions issued the "Notice on Improving the Financial Subsidy Policy for the Promotion and Application of New Energy Vehicles", which specifically emphasized that "battery swap vehicles" are not subject to the pre-subsidy price limit of 300,000 yuan. During this period, the Ministry of Industry and Information Technology held several seminars to further promote the unification of battery swap standards and the innovation of battery swap business models. The battery swap model has officially ushered in a turning point.
[0003] The closest existing technology is the electric vehicle charging station site selection and scheduling method based on optimization theory and computer simulation. This method usually considers the following factors: the investment and operating costs of the charging station, the charging demand of electric vehicles, the distribution capacity of the power grid, and traffic flow. Then, the optimization algorithm is used to solve the optimal charging station location and scheduling strategy.
[0004] However, the existing technology has some technical problems, mainly including:
[0005] Model complexity: This method usually requires the establishment of a complex mathematical model, including many variables and constraints, which makes the solution process very complicated and time-consuming.
[0006] Lack of real-time performance: Since the solution process is time-consuming, this method cannot respond to changes in electric vehicle charging demand and grid status in real time.
[0007] Limited considerations: Existing methods do not fully consider all relevant factors, such as the time cost of charging and replacing batteries, or the power station site selection and vehicle-battery group scheduling problems under different background conditions.
[0008] Model accuracy: Existing methods rely on predictions of electric vehicle charging demand, grid status, etc. If the predictions are inaccurate, it will affect the solution and quality of the model.
[0009] The closest one in the existing technology is the site selection problem of electric vehicle (EV) charging stations.
[0010] In the location selection problem of electric vehicle charging stations, the data collection module collects data such as the GPS location, power status, driving status, etc. of electric vehicles, and also collects traffic data such as road conditions and traffic flow. Then, these data are preprocessed to build an optimization model to determine the best location for the charging station. In addition, the system also involves the use of rechargeable batteries, such as the remaining battery power and usage history, to optimize the scheduling of electric vehicles and charging stations.
[0011] However, the prior art has the following technical problems:
[0012] 1. Ignoring the cargo status and cargo demand data of material vehicles: Unlike material vehicles, electric vehicles do not need to process cargo demand and cargo status. Therefore, this existing technology cannot fully meet the needs of site selection and scheduling of material vehicle swap stations.
[0013] 2. Battery health status is not paid attention to: Existing technologies focus on the remaining power and usage history of the battery, while the battery health status is ignored, which affects the performance and life of the battery.
[0014] 3. Over-reliance on historical data: The models of existing technologies are trained based on historical data, and future changes and trends, such as sudden changes in traffic flow or a sudden increase in demand for goods, are difficult to accurately predict.
[0015] 4. Limitations of the model: Existing optimization models fail to fully consider all variables and constraints, such as the vehicle’s driving route, battery usage, and other factors, resulting in poor prediction results.
[0016] The described system improves on these issues, including collecting more comprehensive data, focusing on the health of the battery, and applying more complex optimization models, which is expected to solve the problems of these existing technologies. Summary of the invention
[0017] In view of the problems existing in the prior art, the present invention provides a method for site selection and scheduling of an intelligent electric material vehicle battery replacement station.
[0018] The present invention is implemented as follows: an intelligent electric material vehicle battery replacement station site selection and dispatching system, the system includes a data collection module, the module has the ability to collect the GPS location, power status, cargo status and operating status of the electric material vehicle, and can collect the battery power status, health status and usage history, and can also collect traffic data, such as road conditions, traffic flow, traffic rules, etc., and cargo demand data, such as cargo demand, demand time, demand location, etc.;
[0019] Data preprocessing module, which can effectively detect and process missing values, outliers, duplicate values, etc., and can sort, group, merge, etc. data according to time, location, type, etc., and convert raw data into the form required by the model, such as converting GPS coordinates into driving distance, battery power into driving mileage, cargo demand into cargo volume, etc.;
[0020] The model building module establishes an optimization model for the location of battery swap stations based on the preprocessed data. The model takes into account factors such as the vehicle's driving route, battery usage, and cargo demand distribution. It also establishes an optimization model for vehicle-battery scheduling. The model takes into account factors such as the vehicle's driving route, battery usage, and the location of the battery swap station.
[0021] The system further includes a model solving module, which uses optimization algorithms such as greedy algorithm, dynamic programming, genetic algorithm, ant colony algorithm, etc. to solve the optimization model of battery swap station site selection and vehicle-battery pack scheduling to determine the optimal battery swap station location and vehicle-battery pack scheduling strategy.
[0022] The system further includes a model verification module, which has the ability to check whether the solution meets all constraints, such as the battery charging time, the vehicle's transportation capacity, the service capacity of the battery swap station, etc., and can verify the feasibility of the solution in actual operation through simulation or actual experiments.
[0023] The system further includes a system feedback module and a system adjustment and optimization module. The system feedback module displays the solution results to users in an intuitive and easy-to-understand manner through charts, reports, etc., and transmits the solution results to other related systems such as logistics management systems and vehicle scheduling systems through networks, databases, etc.; the system adjustment and optimization module monitors the operating status of the system in real time, promptly discovers and handles various problems, adjusts the location of the battery swap station, the scheduling strategy of the vehicle-battery pack, the parameters of the model, etc. according to the actual operating conditions, and finds out the optimization direction and measures by analyzing the effect and efficiency of the system operation, such as improving the model algorithm, upgrading the system hardware, and improving the system user experience.
[0024] Another object of the present invention is to provide an intelligent electric material vehicle exchange station site selection and scheduling method, the method comprising the following steps:
[0025] Data collection steps: This step involves collecting the GPS positioning data of the electric material truck, including the real-time location of the vehicle, expected driving path, driving speed, etc.; collecting the battery status of the vehicle, including the current power, expected power consumption, charging speed, etc.; collecting the cargo status of the vehicle, including the current cargo capacity, expected unloading capacity, cargo capacity, etc.; collecting the operating status of the vehicle, including driving status, parking status, fault status, etc.; collecting the battery power status, health status and usage history, including the number of battery charges, charging efficiency, life prediction, etc.; collecting traffic data, including road types, conditions, traffic rules, etc., as well as real-time data and predicted data on traffic flow; and collecting cargo demand data, including the type of cargo, demand quantity, demand time, demand location, etc.
[0026] The method further includes a data preprocessing step, which involves using various data cleaning methods, such as missing value filling, outlier processing, duplicate value deletion, etc., to ensure the integrity and accuracy of the data; using time, location, type, etc. as keywords to sort, group, merge, and other operations on the data for easy analysis and modeling; converting the original data into the form required by the model, such as converting GPS coordinates into driving distance, converting battery power into drivable mileage, converting cargo demand into cargo capacity, etc., to facilitate model calculation and analysis.
[0027] The method further comprises:
[0028] Model building step: This step involves building an optimization model for battery swap station site selection based on the preprocessed data using specific mathematical methods and algorithms. The model takes into account factors such as the vehicle's driving route, battery usage, and cargo demand distribution to determine the optimal battery swap station location. At the same time, based on the preprocessed data, using specific mathematical methods and algorithms, an optimization model for vehicle-battery pack scheduling is built. The model takes into account factors such as the vehicle's driving route, battery usage, and the location of the battery swap station to determine the optimal vehicle-battery pack scheduling strategy.
[0029] Model solving step: This step involves using optimization algorithms such as greedy algorithm, dynamic programming, genetic algorithm, ant colony algorithm, etc. to solve the above optimization model and obtain the optimal location and optimal scheduling strategy of the battery swap station. Multiple rounds of calculation and optimization are required to achieve the best effect.
[0030] The method further comprises:
[0031] Model verification step: This step involves checking whether the results of the model solution meet all the constraints, such as the battery charging time, the vehicle's transportation capacity, the service capacity of the battery swap station, etc., and using simulation or actual test methods to verify the feasibility and effectiveness of the solution results in actual operation. For example, through simulation operation, check whether the location of the battery swap station is reasonable, whether the vehicle-battery group scheduling strategy is effective, etc.
[0032] Feedback and system optimization step: This step involves presenting the results of model solving and verification to users in the form of charts, reports, etc., so that users can understand and evaluate the operating effect of the system; passing the solution results to other related systems, such as logistics management systems, vehicle scheduling systems, etc., so that these systems can perform corresponding operations and decisions; real-time monitoring of the system's operating status, timely discovery and handling of problems, such as battery failure, traffic congestion, changes in cargo demand, etc.; according to actual operating conditions, adjust the location of the battery swap station, the scheduling strategy of the vehicle-battery pack, the parameters of the model, etc., to optimize the operating effect of the system; and by collecting and analyzing the data of system operation, find out the optimization direction and measures, such as improving the model's algorithm, upgrading the system's hardware, and improving the system's user experience.
[0033] Another object of the present invention is to provide a computer device, which includes a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the intelligent electric material vehicle battery replacement station site selection and scheduling method.
[0034] Another object of the present invention is to provide a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the processor executes the steps of the intelligent electric material vehicle battery replacement station site selection and scheduling method.
[0035] Another object of the present invention is to provide an information data processing terminal, which is used to implement the intelligent electric material vehicle battery replacement station site selection and scheduling system.
[0036] In combination with the above technical solutions and the technical problems solved, the advantages and positive effects of the technical solutions to be protected by the present invention are as follows:
[0037] First, the present invention is practical and has practical application value. It saves time for battery replacement and provides a feasible idea for increasing the amount of material transported. The setting of the distance between each group of vehicles and the control of the distance between groups affect the efficiency of transporting materials. How to control the distance between vehicles more finely is an improvement and promotion of the existing model. In addition, more diversified vehicle grouping may form some creative changes, thereby bringing positive effects to the transportation of materials, which is another promotion of the improvement of the model.
[0038] In the case where the battery swap stations in the two directions are not at the same address, we improve the solution to problem 1, taking into account the premise that batteries cannot flow freely in both directions, and design a more refined truck arrangement. In terms of results, the new solution is also better than the old solution.
[0039] The control of vehicle distance and diversified vehicle grouping in the present invention is also a major aspect of improving and promoting the model. In addition, trying new planning of vehicle driving routes and changing the location of the battery swap station under linear constraints is also an aspect of future research on the model. Taking into account the impact of peak, normal and valley electricity prices, this model depicts the time series of both electricity price changes and charging, and uses the Monte Carlo method to find the optimal start time, and finally obtains the daily minimum electricity price and start time, which has good practical application value. Trying diversified transportation solutions can improve and promote the model, refine the average power consumption rate, find the exact function of the power consumption rate and time series, and plan the time series more finely. This is another important improvement and promotion of the model.
[0040] The present invention takes into account that a reasonable route planning can save electricity and transport more materials in the same time. It takes the two battery swap stations in problem 1 and problem 2 to three battery swap stations, making the overall cycle of automobile driving smoother and more reasonable, and making the idea unified.
[0041] Similar transportation solutions can be extended to situations with a single material point, multiple unloading points and multiple material points, multiple unloading points, and can be promoted in general, but at the same time, it is also necessary to consider the more complex situation of increasing number of vehicle battery scheduling and battery swap stations.
[0042] Second, based on the planning of time series, Monte Carlo simulation and ant colony algorithm, the present invention comprehensively plans the site selection and scheduling of electric material vehicle swap stations, which has good practical reference value. The present invention has made certain innovations in the scheduling and grouping of material vehicles, and the method of entering the cycle after several transportations is creative.
[0043] Third, the present invention realizes the integration and processing of a large amount of heterogeneous data, including the GPS positioning, power status, cargo status and operation status of the electric material vehicle, the battery status, as well as traffic data and cargo demand data. This comprehensive data collection can provide more comprehensive and accurate reference information for the site selection of battery swap stations and vehicle-battery group scheduling, improving the efficiency and accuracy of the system.
[0044] The present invention uses various data cleaning and processing methods to ensure the integrity and accuracy of the data, thereby improving the accuracy of the model. At the same time, by converting the original data into the form required by the model, the calculation efficiency and accuracy of the model are further improved.
[0045] By constructing an optimization model and solving it using an optimization algorithm, the present invention can determine the optimal location of a battery swap station and a vehicle-battery group scheduling strategy, thereby effectively improving the operating efficiency of the electric material vehicle system, reducing energy consumption, and improving transportation efficiency.
[0046] The present invention ensures the correctness and feasibility of the model solution results, and through feedback and optimization, the system can be continuously improved and optimized according to the actual operation conditions, thereby improving the adaptability and continuous improvement capability of the system. This closed-loop optimization method enables the system to achieve self-learning and self-optimization, further improving the performance and efficiency of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is a flow chart of the intelligent electric material vehicle exchange station site selection and scheduling method provided by an embodiment of the present invention;
[0048] Figure 2 It is a structural diagram of the intelligent electric material vehicle exchange station site selection and dispatching system provided by an embodiment of the present invention;
[0049] Figure 3 is a simplified diagram of point P, point D and a battery swap station provided by an embodiment of the present invention;
[0050] Figure 4 is a planning path timeline provided by an embodiment of the present invention;
[0051] Figure 5 It is a timing diagram of time series and electricity consumption provided by an embodiment of the present invention;
[0052] Figure 6 The embodiment of the present invention provides
[0053] Figure 7 is a flow chart of an ant colony algorithm provided by an embodiment of the present invention;
[0054] Figure 8 is a comparison chart of the shortest distance and average distance of each generation provided by an embodiment of the present invention;
[0055] Fig. 9 The ant algorithm optimization path provided by the embodiment of the present invention is Figure 1 ;
[0056] Fig.10 The ant algorithm optimization path provided by the embodiment of the present invention is Figure 2 . DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0058] like Figure 1 As shown, an embodiment of the present invention provides an intelligent electric material vehicle exchange station site selection and scheduling method, the method comprising:
[0059] S1: Use the problem-posing module to propose a problem that fully considers the time cost of charging and replacing batteries, and considers the site selection of power stations and vehicle-battery group scheduling solutions under different background conditions;
[0060] S2: Use the problem analysis module to analyze the problems raised by the problem raising module;
[0061] S3: Use the model assumption module to make assumptions about the model;
[0062] S4: Use the model building module to build and solve the model;
[0063] S5: Analyze and verify the model using the model analysis and verification module;
[0064] S6: Use the model evaluation module to evaluate, improve and promote the model.
[0065] Further, the S2 includes:
[0066] (1) Analysis of Question 1
[0067] Considering that the distance between the loading point P and the unloading point D is 10km, and the distance between the two vehicles is 0.2km, then the PD road can accommodate a maximum of 98 vehicles for simultaneous transportation, with a total of 125 electric trucks, each with a speed of 60km / h, and each vehicle is equipped with 6 batteries as a battery pack. Considering that a total of 900 batteries, that is, 150 battery packs, are prepared, in order to transport as much material as possible in 1000 hours, it is necessary to minimize the time consumed by loading and unloading and switching batteries, and at the same time, charge when the remaining power is as little as possible; according to some simple Monte Carlo simulations, the location of the battery swap station has little effect on the material transportation volume within a reasonable range. It is better to set the battery swap station at the midpoint of PD, that is, 5km away from point P; the battery swap stations in both directions are at the same location, and it is assumed that the batteries can flow between the battery swap stations, that is, the fully charged batteries can be transported to all vehicles entering the battery swap station; in order to minimize the remaining power, it is assumed that each vehicle transports 10 round trips each time, and based on this premise, the plan is planned;
[0068] (2) Analysis of Question 2
[0069] When a battery swap station is set up in each direction between point P and point D, the battery swap stations in the P→D direction and the D→P direction cannot communicate with each other, that is, the battery cannot be freely transported between the two stations; therefore, the scheduling of batteries becomes an important factor affecting material transportation; similarly, in order to maximize the amount of material transportation, the time for loading and unloading and switching batteries should be minimized; the plan is planned based on this principle;
[0070] (3) Analysis of Question 3
[0071] First, we searched for data to determine the unit price of electric trucks, the floor space and average land price of the battery swap station, labor costs, the cost of the battery swap station, the local peak and off-peak electricity prices, the unit price of batteries, the total battery voltage and battery capacity; we determined the minimum daily transportation volume based on daily working hours and transportation methods, and planned the transportation time based on the minimum transportation volume and the location of the battery swap station; based on the division of time periods and Monte Carlo simulation, we could come up with the best time to start transporting goods;
[0072] (4) Analysis of Question 4
[0073] Problem 4 studies multiple material collection points and a single unloading point, and arranges the location of the battery swap station and the scheduling of the vehicle-battery pack. This is an advancement of Problem 1 and Problem 2. The number of material collection points changes from one to multiple, and the total number of vehicles and battery packs remains unchanged. On this basis, four material collection points are considered, and the coordinates of the four material collection points and the unloading point are randomly generated using random numbers. Taking this as an example, the model is solved. Considering the principle of maximizing the benefits of saving electricity and time, the shortest path of the entire route is calculated through the ant colony algorithm. On this route, the location of the battery swap station and the scheduling of the vehicle-battery pack are changed. If the final plan is reasonable, it is accepted, and finally an arrangement that meets the needs is obtained.
[0074] Further, the S3 includes:
[0075] Assume that charging will not cause power loss and will not affect the battery capacity;
[0076] Assume that the two-way co-located battery swap stations can communicate with each other, and the rest of the battery swap stations exist independently;
[0077] Assume that battery swapping and loading and unloading operations can be performed simultaneously at the battery swapping station;
[0078] Assume that all material trucks are dispatched from the battery swap station;
[0079] Assume that the equipment will not age or break down;
[0080] Assuming that there will be no events such as extreme weather, natural disasters, etc. that affect delivery;
[0081] Assume that local electricity price levels remain stable and the power supply system is operating normally.
[0082] The symbols are explained as follows:
[0083]
[0084] Further, the S4 includes:
[0085] (1) Model establishment and solution of problem 1
[0086] In order to maximize the material carrying capacity, consider planning a material transportation plan so that the time for replacing batteries and charging batteries will not affect the transportation of trucks as much as possible; considering that there are 125 vehicles and 25 sets of spare batteries, it can be roughly regarded as 150 sets of batteries; all vehicles and batteries are divided into two parts, each containing 75 sets of batteries, that is, part one contains three sets of trucks, and part two contains two sets of trucks and 25 sets of spare batteries; in addition, in this question, the battery swap stations in both directions are built at the same location, and it is assumed that the batteries can flow between the two stations; the interval between vehicles in each group is 200m, and the interval between groups is 2km; based on these three premises, the following plan is planned:
[0087] Step 1:
[0088] a departs from B2 and transports 10 round trips;
[0089] b. Start from B2 and transport 10 round trips;
[0090] c. Start from B2 and transport 10 round trips;
[0091] Step 2:
[0092] a enters B2 to replace the battery, while d starts from B2 and makes 10 round trips.
[0093] b enters B2 to charge, while e starts from B2 and transports 10 round trips.
[0094] c enters B2 to charge, while a starts from B2 and transports 10 round trips.
[0095] Then, by looping steps 1 and 2, it can be ensured that there are always at most 3 groups of cars driving on the road within 1000 hours. Through code calculation, the result of such planning can be obtained:
[0096] Number of materials transported: 184050;
[0097] Number of times passed through battery swap stations: 18,000;
[0098] (2) Model establishment and solution of problem 2
[0099] According to the symbol assumption, a simplified diagram of point P, point D and the battery swap station is given, as follows: Figure 2 shown.
[0100] Similarly, the interval between two vehicles in each group is set to 200m, and the interval between groups is 2km. In addition, each round is defined as the round of battery charging. According to the symbol definition, the transportation process is replanned:
[0101]
[0102]
[0103] After entering the fourth round, at the beginning of each round, the three trucks (or two trucks and a spare battery) are all at B1, B1 and B2, which can be regarded as entering a cycle, and each subsequent round repeats the process of the fourth round;
[0104] In order to express the planning path more intuitively, draw a timeline, such as Figure 3 shown.
[0105] At the same time, in order to meet this timeline, the site selection of the battery swap station should meet the following conditions
[0106]
[0107]
[0108] m+n≥10
[0109] m+n≤20
[0110] m+n≤10
[0111] According to these constraints, the following relationship between m and n is obtained:
[0112] m+n=10
[0113] Based on the symmetry and comparison of various situations, a better method for setting up battery swap stations is obtained:
[0114] m=3 n=7
[0115] Each switch between the backup battery and the onboard battery, the loading and unloading of goods on different trucks, and the 3-hour charging time of each battery pack can be appropriately offset by the main timeline; in other words, in this case, after the fourth round of charging, there are always 3 groups of trucks repeating the fourth transportation activity; after the following analysis, the following results are calculated through code operation:
[0116] Number of materials transported: 197250
[0117] Number of times passed through battery swap stations: 18726;
[0118] (3) Establishment and solution of the model for problem 3
[0119] After consulting the data and considering the average price in the market, the cost is given as follows:
[0120] quantity unit price Total Price truck 125 170000 21250000 Battery 150 groups 30000 4500000 Land 14 acres 500000 70o0000 Battery replacement workshop 4 4000000 16000000 Artificial 8 people 5000 / month 1440000
[0121] The following are electricity price data and electricity consumption periods in Shenzhen:
[0122]
[0123] x1=0.3078,x2=1.0000
[0124] Peak Hour 10:00-12:00,14:00-19:00 usually 8:00-10:00,12:00-14:00,19:00-24:00 Valley Time 0:00-8:00
[0125] Assuming that each worker works 8 hours a day, the two batches of trucks work a total of 16 hours, that is, 16 hours a day are spent transporting materials; the problem is transformed into how to plan time to maximize the amount of material transported;
[0126] According to the transportation plan in the first question, the duration of a full charge and the interval between two charges are calculated as follows:
[0127] t1=208, t2=14
[0128] When the working time of each truck is 8 hours, that is, 480 minutes, it is assumed that each truck runs 20 round trips per day, that is, 440 minutes of work. Based on this premise, the minimum number of material transportation times per day is calculated as follows:
[0129] m s =20*75*2=3000 times
[0130] Based on the battery capacity of 64.64kw·h and the total working time, the average power consumption per minute is calculated as:
[0131] v=23kw·h / min
[0132] After preliminary judgment, it is believed that transportation between 19:00 and 10:00 the next day can maximize the advantages of electricity prices during normal and off-peak hours. This period lasts 900 minutes. At the same time, from the time the first truck starts charging after the start of transportation to the time all batteries are fully charged after the end of transportation, the process lasts a total of 874 minutes. Based on the above premises, the constraints for one-day electricity price consumption can be given:
[0133]
[0134] w=4x t t1+3*0t2
[0135] 4t1+3t2=874
[0136] Considering the departure time between 19:00-19:26, the charging time can be limited to between 19:00 and 10:00 the next day;
[0137] Through Monte Carlo simulation, a time series diagram of time series and electricity consumption is drawn, such as Figure 4 As shown, the minimum electricity cost is given:
[0138] The minimum daily electricity cost is y min =11925.73 yuan
[0139] After calculation, the lowest comprehensive cost for three years is:
[0140] w=59498674.35 yuan
[0141] About 59.5 million yuan;
[0142] (4) Model establishment and solution for problem 4
[0143] According to the problem analysis, this question still maintains 125 material trucks and 900 sets of batteries; first, we need to establish a random distribution map of multiple material collection points and a single unloading point. Taking 4 material collection points as an example, we use the random number function of matlab to randomly generate the coordinates of the material collection points and unloading points and make a distribution map of the unloading points and material collection points, such as Figure 5 shown.
[0144] The coordinates are [41,48][7,48][26,5][9,21][38,20];
[0145] The ant colony algorithm is used to implement Figure 6 As shown;
[0146] The following results are obtained by running the MATLAB program: Figure 7 , 8 , as shown in 9:
[0147] The unloading point is 1, and the rest is the material collection point;
[0148] According to the results of the ant colony algorithm, the shortest path length in the example is 131.7888 km, and the transportation distances of empty and loaded material trucks are:
[0149] 225km≤x1≤270km
[0150] 150km≤x2≤180km
[0151] Because the distance from pick-up point 2 to unloading point 1 is greater than the distance from pick-up point 5 to unloading point 1, combined with the results of the ant colony algorithm, the vehicle's route is:
[0152] 2→4→3→5→1→2
[0153] The distance of section 1→2 is 34km in an unloaded state, and the length of the remaining sections is 97.7888km. The power consumption between each section is calculated:
[0154] 1→2 11.33%
[0155] 2→4 13.54%
[0156] 4 → 3 11.67%
[0157] 3→5 9.60%
[0158] 5 → 1 14.08%
[0159] The total power consumption of the unloaded section is 11.33%, and the total power consumption of the loaded section is 48.89%, totaling 60.22%;
[0160] Continuing the ideas of Questions 1 and 2, the vehicles are still divided into 5 groups. Due to the long road section, it is decided to build three swap stations B1, B2, and B3 in this question. According to the route map, the first material collection point is 2, and the construction of B1 near 2 is the most reasonable construction plan. Because the total power consumption of one circle is 60.22%, the vehicle can run about 1.33 complete routes when it needs to be charged; the following driving arrangements are made:
[0161] The extra batteries are placed at B2.
[0162] a and b first drive in a circle to reach B3, and c and d drive to B2 to rest before starting the whole process.
[0163] a starts from B3 and arrives at B1 after 1 round of transportation
[0164] c. Start from B2 and arrive at B3 after one round of transportation;
[0165] e starts from B1 and arrives at B2 after one round of transportation;
[0166] aReplace the battery in B2.
[0167] bStart from B3 and drive 1 circle to reach B1.
[0168] dStart from B2 and drive 1 circle to reach B3.
[0169] aStart from B1 and drive 1 circle to reach B2.
[0170] bReplace the battery
[0171] cStart from B3 and drive 1 circle to reach B1.
[0172] eStart from B2 and drive 1 circle to reach B3.
[0173] bStart from B1 and drive one circle to reach B2.
[0174] cReplace the battery.
[0175] Repeat the above operations in sequence to complete the scheduling of vehicles and batteries;
[0176] Based on the above analysis, the amount of electricity consumed by the vehicle traveling between the two battery swap stations is about 20% of the total electricity. Since B1 is set up at 2 locations, after calculation, it is found that the locations of the two battery swap stations B2 and B3 are within a certain range. Let:
[0177] B2: 4→3, 14 km from position 4;
[0178] B3: 5→1 is 10km away from position 5.
[0179] Further, the implementation steps of the ant colony algorithm are:
[0180] All parameters in the algorithm are initialized, that is, time t = 0, number of iterations N = 0, and the maximum number of iterations N is set max , place m ants on n cities, ant k = 1, let the initial time πij(0) = C, Δπ ij (0) = 0, assigning ρ and Q;
[0181] Iteration number N→N+1;
[0182] The number of ants k→k+1;
[0183] Each ant moves with probability P according to the state k ij (t) Select city j and move forward;
[0184] After the ant has made its choice, it moves the ant to the new city and moves the city to the ant's taboo list;
[0185] If you have not visited all n cities, go to (3), otherwise go to (7);
[0186] Update the amount of information on each route;
[0187] If the number of iterations N ≥ N max , then the iteration process ends, otherwise go to (2);
[0188] When using MATLAB to solve the route using the ant colony algorithm, the algorithm parameters are set as:
[0189] The number of ants is 50, the number of iterations is 200, Q=1, ρ=0.1.
[0190] Further, the S5 includes:
[0191] (1) In question 1, consider model 1. Since the location of the battery swap station has no significant impact on the material transportation volume, according to the principle of symmetry, it is of practical significance to set the battery swap station at the midpoint of the PD section. In order to maximize the material transportation volume, it is also necessary to reduce the battery remaining power and the battery swap time. The remaining power can be minimized to overlap the battery swap time with the vehicle swap time, so that the battery swap does not affect the departure time. The 125 electric trucks and 25 sets of spare batteries are divided into two groups. As long as the battery swap time can be saved, they can be regarded as 150 vehicles. Since the interval between two vehicles is at least 200 meters, the PD two-way road can accommodate a maximum of 98 vehicles. The 150 vehicles are divided into two parts, each with 75 vehicles, that is, the delivery problem can be planned at the overall level. After inspection, the order of magnitude of the transported materials is consistent with the intuitive estimate.
[0192] (2) In question 2, the battery swap stations in the two directions can be set at different locations. In this case, the batteries cannot flow freely between the two battery swap stations. The condition that the battery swap stations in the two directions can be set at different locations also provides great convenience for planning the transportation mode. According to the proposed planning method, the cycle can be entered after the fifth transportation. If the trucks and batteries are equivalent to 150 vehicles, then for each subsequent transportation, two groups of vehicles will start transportation at B1 and one group of vehicles will start transportation at B2. In addition, the time for battery replacement and cargo replacement will not affect the continuity of the departure. At the same time, in order to meet the transportation sequence and ensure that the remaining power of the battery pack is greater than 10%, a linear restriction is also imposed on the number of transportations of each group of trucks. Finally, it is obtained that B1 is 7 km away from point P and B2 is 3 km away from point P. From the results, the number of planned transportations saves a certain amount of time compared with the initial method. According to the timeline drawn, the feasibility of this method can also be seen more intuitively.
[0193] (3) In question 3, first, after a comprehensive market comparison and comprehensive analysis, the construction costs of vehicles, battery packs, land, labor, and battery swap stations were confirmed; according to the statutory working hours, the appropriate minimum daily transportation times were also determined, which has practical significance; considering model three, according to the electricity price levels during peak and off-peak hours, the power station location and vehicle travel arrangements in the first question were followed, and the charging time series was considered on this basis; the average power consumption rate was calculated based on the charging time of each vehicle, the charging interval of each part of the vehicle under the scheduling plan, and the capacity of each battery pack, and the starting charging time was planned based on the above conditions; through Monte Carlo simulation in a given set domain, 10 time points were found; when the vehicle departed at this time point, the daily electricity price level could reach the lowest; finally, it was concluded that the comprehensive cost of establishing this transportation route in 3 years was approximately RMB 59.5 million;
[0194] (4) In question 4, the coordinates of the material collection point and the unloading point were first generated by a random generation method, so that the overall analysis was carried out under a completely new route; due to the uncertainty of the randomly generated route, the ant colony algorithm was used to find the shortest route among all routes. After completing the route planning, the power consumption of the vehicle traveling between two adjacent points on the route and the total power consumption of completing a complete route were specifically calculated, and a general understanding of the vehicle's travel planning was obtained; combined with the scheduling of vehicles and batteries in questions 1 and 2, the plan of 75 vehicles in a group of 25 vehicles was still adopted; before the four groups of vehicles a, b, c, and d were driven to the designated locations before the overall plan was launched, and the locations of the exchange stations B1, B2, and B3 were reasonably planned, making the method feasible and reasonable.
[0195] like Fig.10 As shown, an embodiment of the present invention provides an intelligent electric material vehicle swap station site selection and scheduling system for implementing the intelligent electric material vehicle swap station site selection and scheduling method, the system comprising:
[0196] The problem-posing module is used to propose problems that fully consider the time cost of charging and replacing batteries, and the site selection of power stations and vehicle-battery group scheduling solutions under different background conditions;
[0197] A problem analysis module, connected to the problem raising module, is used to analyze the problem raised by the problem raising module;
[0198] A model assumption module, connected to the problem analysis module, is used to make assumptions about the model based on the analysis results;
[0199] A model building module, connected to the model assumption module, is used to build and solve the model according to the assumed model;
[0200] The model analysis and verification module is connected with the model establishment module and is used to analyze and verify the model according to the solution results;
[0201] The model evaluation module is connected to the model analysis and verification module and is used to evaluate, improve and promote the model.
[0202] An embodiment of the present invention provides a computer device, which includes a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the intelligent electric material vehicle battery replacement station site selection and scheduling method.
[0203] An embodiment of the present invention provides a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the processor executes the steps of the intelligent electric material vehicle battery replacement station site selection and scheduling method.
[0204] An embodiment of the present invention provides an information data processing terminal, which is used to implement the intelligent electric material vehicle battery replacement station site selection and scheduling system.
[0205] As an optimization solution of the present invention, the intelligent electric material vehicle exchange station site selection and dispatching system for implementing the intelligent electric material vehicle exchange station site selection and dispatching method provided in the embodiment of the present invention includes:
[0206] 1. Data Collection Module
[0207] This module is mainly responsible for collecting all data related to logistics and transportation. Data types include but are not limited to:
[0208] Vehicle data: vehicle location (via GPS positioning), power status (via battery management system), cargo status (via cargo sensor), operating status (via on-board computer), etc.
[0209] Battery data: battery charge status, health status, usage history, etc.
[0210] Traffic data: road conditions, traffic flow, traffic rules, etc.
[0211] Cargo demand data: cargo demand quantity, demand time, demand location, etc.
[0212] 2. Data preprocessing module
[0213] This module is mainly responsible for cleaning, organizing and transforming the collected raw data to make it suitable for the needs of the model. The main tasks include:
[0214] Data cleaning: Detect and process missing values, outliers, duplicate values, etc.
[0215] Data organization: Sort, group, merge, etc. data by time, location, type, etc.
[0216] Data conversion: Convert raw data into the form required by the model, such as converting GPS coordinates into driving distance, battery power into mileage, cargo demand into cargo volume, etc.
[0217] 3. Model building module
[0218] This module is mainly responsible for establishing an optimization model for battery swap station site selection and vehicle-battery group scheduling based on preprocessed data. The main tasks include:
[0219] Battery swap station site selection model: Based on factors such as vehicle driving routes, battery usage, and cargo demand distribution, an optimization model for battery swap station site selection is established.
[0220] Vehicle-battery scheduling model: Based on factors such as the vehicle’s driving route, battery usage, and the location of battery swap stations, an optimization model for vehicle-battery scheduling is established.
[0221] 4. Model solving module
[0222] This module is mainly responsible for solving the optimization model to obtain the optimal location of the battery swap station and the vehicle-battery group scheduling strategy. The solution algorithms used include greedy algorithm, dynamic programming, genetic algorithm, ant colony algorithm, etc.
[0223] 5. Model Validation Module
[0224] This module is mainly responsible for verifying the validity and feasibility of the model solution. The main tasks include:
[0225] Validity verification: Check whether the solution meets all constraints, such as battery charging time, vehicle transportation capacity, and battery swap station service capacity.
[0226] Feasibility verification: Through simulation or actual experiments, check whether the solution is feasible in actual operation.
[0227] 6. System feedback module
[0228] This module is mainly responsible for feeding back the model solution results to system users or other related systems. The main tasks include:
[0229] Result presentation: The solution results are presented to users in an intuitive and easy-to-understand manner through charts, reports, etc.
[0230] Result transfer: The solution results are transferred to other related systems such as logistics management system, vehicle dispatching system, etc. through the network, database, etc.
[0231] 7. System adjustment and optimization module
[0232] This module is mainly responsible for adjusting and optimizing the system based on system feedback and actual operation conditions. The main tasks include:
[0233] System monitoring: Through real-time monitoring of the system's operating status, various problems can be discovered and handled in a timely manner.
[0234] System adjustment: According to the actual operation situation, adjust the location of the battery swap station, the scheduling strategy of the vehicle-battery pack, the parameters of the model, etc.
[0235] System optimization: By analyzing the effectiveness and efficiency of system operation, find out the optimization direction and measures, such as improving the model algorithm, upgrading the system hardware, and improving the system user experience.
[0236] The above is the detailed content of each module of the intelligent electric material vehicle exchange station site selection and dispatching system. The design and implementation of this system requires multidisciplinary knowledge and technology, including logistics management, operation research, data processing, optimization algorithms, computer science, etc.
[0237] Example 1: Application in large warehouses
[0238] In large warehouses, electric material vehicles are used to move goods from the entry point to various storage locations, or from the storage location to the exit point. Assume that the length of this warehouse is 10km and the width is 1km. The entry point and the exit point are both located at one end of the warehouse, and the storage area is distributed throughout the length of the warehouse.
[0239] In this case, a battery swap station can be set up at the midpoint of the warehouse. Assume that there are 100 electric material trucks and 150 battery packs. Each vehicle can be loaded with 6 batteries. After each transportation, the vehicle replaces the battery at the battery swap station. Through simulation or optimization algorithms, the optimal vehicle-battery pack scheduling strategy can be determined to maximize the total amount of materials transported within a certain period of time while minimizing the time for loading, unloading and battery swapping.
[0240] Using IoT technology and computer control systems, the location, power level, cargo volume, and battery supply of each vehicle are monitored in real time. When the vehicle's power level falls below a certain threshold, the control system automatically dispatches the vehicle to the battery swap station for battery replacement. At the same time, based on the demand and storage location of the cargo, the control system automatically dispatches vehicles for loading and unloading.
[0241] Example 2: Application in large ports
[0242] In large ports, electric material trucks are used to move containers from the dock to the yard, or from the yard to the dock. Assume that the length of this port is 10km and the width is 1km. The dock is located at one end of the port, and the yard is distributed over the entire length of the port.
[0243] In this case, a battery swap station can be set up at the midpoint of the port. Assuming there are 200 electric material vehicles and 300 battery packs, each vehicle can be loaded with 6 batteries, and the vehicles will be replaced at the battery swap station after each transport. Through simulation or optimization algorithms, the optimal vehicle-battery pack scheduling strategy can be determined to maximize the total amount of containers transported within a certain period of time while minimizing the time for loading, unloading and battery swapping.
[0244] Using IoT technology and computer control systems, the location, power, cargo volume of each vehicle, and battery supply at the battery swap station are monitored in real time. When the vehicle's power level falls below a certain threshold, the control system automatically dispatches the vehicle to the battery swap station for battery replacement. At the same time, based on container demand and yard location, the control system automatically dispatches vehicles for loading and unloading.
[0245] It should be noted that the embodiments of the present invention can be implemented by hardware, software, or a combination of software and hardware. The hardware part can be implemented using dedicated logic; the software part can be stored in a memory and executed by an appropriate instruction execution system, such as a microprocessor or dedicated design hardware. It can be understood by a person of ordinary skill in the art that the above-mentioned devices and methods can be implemented using computer executable instructions and / or contained in a processor control code, such as a carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. Such code is provided on the carrier medium. The device and its modules of the present invention can be implemented by hardware circuits such as very large-scale integrated circuits or gate arrays, semiconductors such as logic chips, transistors, etc., or programmable hardware devices such as field programmable gate arrays, programmable logic devices, etc., can also be implemented by software executed by various types of processors, and can also be implemented by a combination of the above-mentioned hardware circuits and software, such as firmware.
[0246] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.
Claims
1. An intelligent electric material vehicle exchange station site selection and dispatching system, It is characterized in that The system includes a data collection module, which has the ability to collect the GPS location, power status, cargo status and operating status of the electric material vehicle, and can collect the battery power status, health status and usage history, and can also collect traffic data, including road conditions, traffic flow, traffic rules, and cargo demand data, including the demand quantity, demand time and demand location of the cargo; Data preprocessing module, which can effectively detect and process missing values, abnormal values, and duplicate values, and can sort, group, and merge data according to time, location, and type, and convert raw data into the form required by the model, including converting GPS coordinates into driving distance, converting battery power into driving mileage, and converting cargo demand into cargo volume; Model building module, which builds an optimization model for battery swap station location based on preprocessed data. The model takes into account factors such as vehicle routes, battery usage, and cargo demand distribution. It also builds an optimization model for vehicle-battery scheduling. The model takes into account factors such as vehicle routes, battery usage, and battery swap station location. It includes a model solving module, which uses an optimization algorithm to solve the optimization model of battery swap station site selection and vehicle-battery group scheduling to determine the optimal battery swap station location and vehicle-battery group scheduling strategy; The system further includes a model verification module, which has the ability to check whether the solution meets all constraints, including the battery charging time, the vehicle's transportation capacity, and the service capacity of the battery swap station, and can verify the feasibility of the solution in actual operation through simulation or actual testing; The system further includes a system feedback module and a system adjustment and optimization module. The system feedback module displays the solution results to users in an intuitive and easy-to-understand manner through charts and reports, and transmits the solution results to other related systems, including logistics management systems and vehicle scheduling systems, through the network and database. The system adjustment and optimization module monitors the operating status of the system in real time, promptly discovers and handles various problems, adjusts the location of the battery swap station, the vehicle-battery pack scheduling strategy, and the parameters of the model according to the actual operating conditions, and finds out the optimization direction and measures by analyzing the effect and efficiency of the system operation, including improving the model algorithm, upgrading the system hardware, and improving the system user experience.
2. A method for site selection and dispatching of intelligent electric material vehicle exchange stations, It is characterized in that The method comprises the following steps: Data collection step: This step involves collecting GPS positioning data of the electric material truck, including the real-time location of the vehicle, the expected driving path, and the driving speed; collecting the power status of the vehicle, including the current power, expected power consumption, and charging speed; collecting the cargo status of the vehicle, including the current cargo load, expected unloading capacity, and cargo capacity; collecting the operating status of the vehicle, including driving status, parking status, and fault status; collecting the power status, health status, and usage history of the battery, including the number of times the battery has been charged, charging efficiency, and life prediction; collecting traffic data, including the type, condition, and traffic rules of the road, as well as real-time and predicted data on traffic flow; and collecting cargo demand data, including the type, quantity, time, and location of cargo; It includes a data preprocessing step, which involves using various data cleaning methods to ensure the integrity and accuracy of the data; using time, location, and type as keywords to sort, group, and merge data for easy analysis and modeling; converting raw data into the form required by the model, converting GPS coordinates into driving distance, converting battery power into mileage, and converting cargo demand into cargo volume for easy calculation and analysis of the model; include: Model building step: This step involves building an optimization model for battery swap station location selection based on the preprocessed data using specific mathematical methods and algorithms. The model takes into account the vehicle's driving route, battery usage, and cargo demand distribution factors to determine the optimal battery swap station location. At the same time, based on the preprocessed data, using specific mathematical methods and algorithms, building an optimization model for vehicle-battery group scheduling. The model takes into account the vehicle's driving route, battery usage, and battery swap station location factors to determine the optimal vehicle-battery group scheduling strategy. Model solving step: This step involves using greedy algorithm, dynamic programming, genetic algorithm, and ant colony optimization algorithm to solve the above optimization model and obtain the optimal location and optimal scheduling strategy of the battery swap station. Multiple rounds of calculation and optimization are required to achieve the best effect; include: Model verification step: This step involves checking whether the model solution meets all constraints, including battery charging time, vehicle transportation capacity, and battery swap station service capacity. It also uses simulation or actual test methods to verify the feasibility and effectiveness of the solution in actual operation. Through simulation operation, it is checked whether the location of the battery swap station is reasonable and whether the vehicle-battery group scheduling strategy is effective. Feedback and system optimization step: This step involves presenting the results of model solving and verification to users in the form of charts and reports so that users can understand and evaluate the operating effects of the system; passing the solution results to other related systems so that these systems can perform corresponding operations and decisions; real-time monitoring of the system's operating status, timely discovery and handling of problems; adjusting the location of the battery swap station, the vehicle-battery pack scheduling strategy, and the parameters of the model according to the actual operating conditions to optimize the system's operating effects; and finding optimization directions and measures by collecting and analyzing system operation data, including improving the model's algorithm, upgrading the system's hardware, and improving the system's user experience.
3. A computer-readable storage medium storing a computer program, which, when executed by a processor, enables the processor to execute the steps of the intelligent electric material vehicle battery replacement station site selection and scheduling method as described in claim 2.
4. An information data processing terminal, It is characterized in that The information data processing terminal is used to implement the intelligent electric material vehicle battery replacement station site selection and dispatching system as described in claim 1.
Citation Information
Patent Citations
Electric vehicle quick charging demand scheduling method based on load space transfer
CN110458332A
Planning method and planning device for centralized charging station and battery swap station, and chip
CN114118536A