A curtain wall steel streamer and installation construction method thereof

By adopting a curtain wall steel streamer structure with embedded steel beams with segmented lifting and embedded parts, the problems of low efficiency and safety risks of aluminum plates installed at high altitude are solved, construction efficiency and quality are improved, and efficient and safe installation of curtain wall steel streamers are ensured.

CN117758907BActive Publication Date: 2024-11-26CCCC FOURTH HARBOR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311514122.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2024-11-26
Estimated Expiration
2043-11-14

AI Technical Summary

Technical Problem

During the construction of curtain wall steel streamers, the efficiency of installing aluminum plates at high altitudes is low, the quality is difficult to guarantee, and there are safety risks. Especially in super high-rise buildings, how to optimize the construction sequence and improve the installation efficiency and safety is a difficult point.

Method used

The structure of the lower jointed steel streamer, the upper jointed steel streamer, the top steel frame streamer and the building facade outer streamer structure is adopted. Through section lifting and embedded parts, the construction sequence is optimized, the high-altitude installation work is reduced, and the aluminum plate is improved. Installation efficiency and quality control.

Benefits of technology

It significantly improves the construction efficiency and quality of curtain wall steel streamers, reduces the safety risks of high-altitude construction, and ensures installation quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117758907B_ABST
    Figure CN117758907B_ABST
Patent Text Reader

Abstract

The invention discloses a curtain wall steel streamer and an installation construction method thereof. Before the steel streamer is installed, a decorative aluminum plate is installed on a steel column, and then the steel column installed with the decorative aluminum plate is hoisted in sections to a preset position for installation, which can improve the installation efficiency and installation quality of the curtain wall steel streamer and improve the safety of high-altitude installation of the curtain wall steel streamer. The method comprises the following steps: segmenting the vertical streamers of the tower and the streamers outside the building facade along the height direction of the tower, wherein the length of each section of the vertical streamer corresponds to the height of the corresponding section of the tower; separately manufacturing a lower connected steel streamer, an upper connected steel streamer, a top steel frame streamer and a streamer outside the building facade, and after the manufacturing is completed, transporting them to the construction site in batches; segmentally installing the vertical streamers from bottom to top along the height direction of the tower; installing horizontal streamers, a lower connected steel streamer and an upper connected steel streamer, and installing the top steel frame streamer on the top of the tower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, and in particular to a curtain wall steel streamer and an installation construction method thereof. Background Art

[0002] Curtain wall refers to a building enclosure or decorative structure composed of panels and supporting structure systems, with specified bearing capacity, deformation capacity and ability to adapt to the displacement of the main structure, and does not share the effects on the main structure. In the process of house construction, curtain walls are usually set up outside the main structure of the building to make the building appearance more beautiful and the use function more complete. Curtain wall construction usually has two forms. The first is to use reinforced concrete cantilever panels and the main structure of the tower together. The second is to use steel beams as cantilever load-bearing components outside the tower, and then install steel channels on the steel beams to construct curtain walls. Since the curtain wall steel streamers are far away from the main structure of the tower (the distance between the cantilever steel beam and the outer side of the tower is 2~5m), what form of steel streamer structure to use and how to install the steel streamer structure are issues that need to be considered during the construction of the streamers.

[0003] The installation method of curtain wall steel streamers is usually: after the tower construction is completed, the steel columns are hoisted to the installation location in sections for installation. After the steel columns are installed, auxiliary means such as hanging baskets are used to install aluminum keels and aluminum plates on the steel columns at high altitudes. This installation method has the following problems:

[0004] When installing aluminum plates at high altitudes, workers install the keel and aluminum plates in a hanging basket. Due to the poor accessibility of the hanging basket, the installation efficiency of the aluminum plates is low and the installation quality cannot be guaranteed. When inspecting the installation quality of the aluminum plates, the inspection is also carried out at high altitudes, and the rigor of the inspection cannot be guaranteed. The installation of aluminum plates at high altitudes also involves the gluing process, which is prone to safety risks such as falling objects.

[0005] In order to increase the aesthetics of the tower structure, streamers are usually set on the top of the tower. The side beams on the top of the tower are outside the roof structure line. When installing the streamers and aluminum plates on the top of the tower, how to set up a construction platform 15 on the tower to ensure the safety of the streamer installation operation on the top of the tower is a difficult point in the streamer construction.

[0006] During the tower construction of super high-rise buildings (buildings with a ground height of more than 100m are super high-rise buildings), the overall height of the tower is high, and corridor structures are set between adjacent towers. When installing steel streamers on the periphery of the tower, how to optimize the construction sequence and improve the installation efficiency of the steel streamers on the periphery of the tower and the corridor position is the construction difficulty of the steel streamers. How to set up an operating platform for constructing aluminum plates on the periphery of steel columns under high-altitude construction conditions and complete the aluminum plate construction is also a construction difficulty of the steel streamers. Summary of the invention

[0007] At least one of the purposes of the present invention is to provide a curtain wall steel streamer and an installation construction method thereof in order to overcome the problems existing in the above-mentioned prior art. The curtain wall steel streamer includes a lower connected steel streamer, an upper connected steel streamer, a top steel frame streamer and an outer streamer of the building facade. By hoisting the steel columns equipped with decorative aluminum plates in sections to preset installation positions for installation, the construction sequence can be optimized, mutual interference between different steel streamers can be avoided, the construction efficiency and construction quality of the curtain wall steel streamers can be improved, and the safety of high-altitude construction of the curtain wall steel streamers can be improved.

[0008] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention includes the following aspects.

[0009] A curtain wall steel streamer structure comprises: a lower connected steel streamer, an upper connected steel streamer, a top steel frame streamer and an outer streamer of a building facade; wherein the lower connected steel streamer comprises a lower connected streamer beam, the lower connected streamer beam is arranged between two adjacent lower connected steel beams, and the two ends of the lower connected streamer beam are respectively connected to the lower connected steel beams; the lower connected streamer beam is also respectively arranged at the left and right ends of the lower connected body, at the left and right ends of the lower connected body, the first end of the lower connected streamer beam is connected to the lower connected steel beam, and the second end of the lower connected streamer beam is connected to the vertical streamer.

[0010] The upper-body steel streamer includes an upper-body streamer beam, which is arranged between two adjacent upper-body steel beams, and both ends of the upper-body streamer beam are respectively connected to the upper-body steel beams; the upper-body streamer beam is also respectively arranged at the left and right ends of the upper body, and at the left and right ends of the upper body, the first end of the upper-body streamer beam is connected to the upper-body steel beam, and the second end of the upper-body streamer beam is connected to the vertical streamer.

[0011] The top steel frame streamer is a roof steel frame, which includes columns, cross beams and side beams. The cross beams are arranged on the tops of the columns, the side beams are connected to the cross beams or the columns, and the side beams are cantilevered out of the roof edge line.

[0012] The external streamers of the building facade are distributed on the outside of the tower and arranged around the tower. The external streamers of the building facade include vertical streamers and horizontal streamers. The vertical streamers are connected to the tower through embedded parts or embedded steel beams. The vertical streamers are arranged along the height direction of the tower, and the tops thereof extend out of the top of the tower and are connected to the side beams of the roof steel frame; the two ends of the horizontal streamers are respectively connected to the vertical streamers or cantilever beams.

[0013] Preferably, the lower connected ribbon beam, the upper connected ribbon beam, the vertical ribbon, the horizontal ribbon, the column, the cross beam and the side beam are all covered with aluminum plates in the length direction.

[0014] The present invention also provides a method for installing and constructing a curtain wall steel streamer, comprising the following steps:

[0015] Step 1: segment the vertical streamers of the tower and the outer streamers of the building facade along the height direction of the tower, and the length of each vertical streamer segment corresponds to the height of the corresponding segment of the tower;

[0016] Step 2: manufacture the lower connected steel streamers, the upper connected steel streamers, the top steel frame streamers and the building facade outer streamers respectively. After the manufacturing is completed, transport them to the construction site in batches;

[0017] Step 3: Install vertical streamers in sections from bottom to top along the height direction of the tower;

[0018] Step 4: Install horizontal streamers, lower connected steel streamers and upper connected steel streamers;

[0019] Step 5: Install the top steel frame streamers on the top of the tower.

[0020] Preferably, the step two includes: manufacturing a tire frame; controlling the distance between two adjacent tire frames according to the designed length of each section of the steel column or steel beam, fixing the tire frame on the hardened ground with post-embedded parts, ensuring that the heights of the two tire frames are consistent, and ensuring that the top surface of each tire frame is horizontal; transferring the steel column or steel beam to the tire frame with a forklift, adjusting the level and elevation of the steel column or steel beam, and measuring the deflection of the steel column or steel beam; popping up the aluminum plate dividing line on the steel column or steel beam according to the ribbon construction drawing; making a transverse keel mold, and after uniformly processing the transverse keel, welding the transverse keel to the steel column along the length direction of the steel column or steel beam, and welding the vertical keel to the transverse keel; checking the horizontality and verticality of the transverse keel and the vertical keel, and correcting and adjusting; fixing the aluminum plate to the keel in the middle of the steel column or steel beam with self-tapping screws to ensure that the aluminum plate is straight and the width of the glue seam is consistent; applying glue and cleaning.

[0021] Preferably, in the step three, before installing the vertical streamers, the embedded parts and / or embedded steel beams are embedded in the tower, and the embedding process of the embedded steel beams includes: setting up the formwork of the floor structure on the tower, according to the designed installation position of the embedded steel beams; checking the axis position of the embedded steel beams on the formwork, drawing lines on the formwork, and marking the specific position of the embedded steel beams; laying concrete beam bottom reinforcement on the formwork; hoisting the embedded steel beams to the formwork of the corresponding floor; installing limit plates on the bottom and side surfaces of the first end of the embedded steel beams; passing the embedded steel beams through the concrete column reinforcement, and positioning the embedded steel beams at the preset installation position; connecting the limit plates to the formwork; laying concrete beam surface reinforcement and stirrups on the concrete bottom reinforcement, and installing concrete side formwork; checking the position of the embedded steel beams to ensure that the position of the embedded steel beams is consistent with the design requirements; and pouring tower concrete.

[0022] Preferably, in the process of installing the vertical streamers in step three, a single-machine rotation method or a double tower crane is used to hoist the vertical streamers.

[0023] Preferably, in step three, the installation process between two adjacent sections of vertical streamers includes: when the vertical streamer is hoisted to 100~200mm above the preset installation position, the hoisting is stopped to keep the vertical streamer stable; after aligning the bolt holes and the cross lines, the vertical streamer is slowly dropped to align the center lines of the four sides of the vertical streamer with the cross axis of the foundation; after the vertical streamer is in place, it is temporarily fixed to the concrete structure column with a steel wire rope; the deviation is corrected, and after the deviation is corrected, the two adjacent sections of the vertical streamer are fixed.

[0024] Preferably, when making the vertical streamers, step 2 further includes the steps of installing a cantilever beam on the vertical streamers and installing a second operating platform on the top of the vertical streamers.

[0025] Preferably, step five includes: according to design requirements, connecting the columns and beams of the top-level steel frame streamers vertically and horizontally on the roof, connecting the side beams with the columns or beams, and connecting the side beams with the top of the vertical streamers; after the top-level steel frame streamers are installed, closing the side beam aluminum plates and the cross beam aluminum plates.

[0026] Preferably, before closing the aluminum plates of the side beams, tracks are laid on the roof, a cantilevered mobile platform is set on the tracks, and the aluminum plates of the side beams are closed using the cantilevered mobile platform; large decorative strips on the crossbeams of the top-level steel frame streamers are installed using aluminum alloy door frames or lifting vehicles; for the installation of aluminum plates at the connection positions of adjacent horizontal streamers, a hanging basket is set up on the tower floor, and aluminum plates are installed on the sides of the horizontal streamers close to the tower surface in the hanging basket; a hanging basket is set up on the roof, and the aluminum plates of the horizontal streamers away from the tower surface are installed using the hanging basket on the roof.

[0027] In summary, due to the adoption of the above technical solution, the present invention has at least the following beneficial effects:

[0028] By hoisting the steel column with the aluminum plate installed to the preset position for installation, the construction efficiency and quality of the curtain wall steel streamer can be improved, and the safety of the high-altitude construction of the curtain wall steel streamer can be improved; compared with the existing construction method of first installing the steel column and then installing the keel and aluminum plate on the steel column, the aluminum plate of the present invention has been installed on the steel column before the steel column is installed, and a large number of aluminum plates have been installed at the same time as the steel column is installed, thereby reducing the high-altitude installation work of a large number of aluminum plates, and the installation efficiency and installation quality are significantly improved. In the present invention, the keel and aluminum plate are installed on the steel column on the tire frame on the ground, and the installation quality of the aluminum plate structure surface can be better controlled from the aspects of construction and acceptance, and it is not easy to have the situation of poor installation appearance quality, loose glue, etc., and the installation quality can be guaranteed. Compared with the high-altitude installation method, the installation method of the present invention reduces the installation difficulty and improves the construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1It is a schematic diagram of the lower connected steel streamer structure of an exemplary embodiment of the present invention.

[0030] Figure 2 yes Figure 1 An enlarged schematic diagram of the lower connected steel ribbon structure A.

[0031] Figure 3 It is a schematic diagram of the arrangement of the curtain wall steel streamer structure according to an exemplary embodiment of the present invention.

[0032] Figure 4 It is a schematic diagram of a first type of vertical ribbon connection node of an exemplary embodiment of the present invention.

[0033] Figure 5 It is a schematic diagram of a second type of vertical ribbon connection node of an exemplary embodiment of the present invention.

[0034] Figure 6 It is a flow chart of curtain wall steel streamer installation construction according to an exemplary embodiment of the present invention.

[0035] Figure 7 Schematic diagram of a tire frame structure according to an exemplary embodiment of the present invention.

[0036] Figure 8 It is a schematic diagram of installing a transverse keel on a steel column according to an exemplary embodiment of the present invention.

[0037] Fig. 9 It is a schematic diagram of installing a vertical keel on a transverse keel of a steel column according to an exemplary embodiment of the present invention.

[0038] Fig.10 It is a schematic diagram of installing aluminum plates on the horizontal keel and vertical keel of a steel column according to an exemplary embodiment of the present invention.

[0039] Fig.11 is a schematic cross-sectional view of a vertical streamer according to an exemplary embodiment of the present invention.

[0040] Fig.12 It is a schematic diagram of the first state of vertical streamer lifting according to an exemplary embodiment of the present invention.

[0041] Fig.13 Schematic diagram of the second state of vertical streamer hoisting of an exemplary embodiment of the present invention.

[0042] Fig.14 It is a schematic diagram of the second vertical streamer hoisting of an exemplary embodiment of the present invention.

[0043] Fig.15 It is a schematic diagram of the vertical ribbon torsional deviation correction structure of an exemplary embodiment of the present invention.

[0044] Fig.16It is a schematic diagram of the working states of the first operating platform and the second operating platform of an exemplary embodiment of the present invention.

[0045] Fig.17 Schematic diagram of a cantilevered mobile platform according to an exemplary embodiment of the present invention.

[0046] Fig.18 It is a schematic diagram of closing the aluminum plate of the crossbeam according to an exemplary embodiment of the present invention.

[0047] Fig.19 It is a schematic diagram of closing the aluminum plate on the outer side of the horizontal streamer according to an exemplary embodiment of the present invention.

[0048] Fig. 20 Schematic diagram of a suspension machine arrangement according to an exemplary embodiment of the present invention.

[0049] Markings in the figure: 1-vertical streamer, 2-cantilever beam, 3-embedded steel beam, 4-lower connected streamer beam, 5-lower connected steel beam, 6-connecting plate, 7-horizontal streamer, 8-embedded parts, 9-first support column, 10-first cross bar, 11-second support column, 12-second cross bar, 13-third cross bar, 14-diagonal brace, 15-construction platform, 16-counterweight. DETAILED DESCRIPTION

[0050] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0051] The curtain wall steel streamer structure of the exemplary embodiment of the present invention includes a lower connected steel streamer, an upper connected steel streamer, a top steel frame streamer and a streamer outside the building facade; wherein the lower connected steel streamer includes a lower connected streamer beam 4, the lower connected streamer beam 4 is arranged between two adjacent lower connected steel beams 5, and the two ends of the lower connected streamer beam 4 are respectively connected to the lower connected steel beam 5; the lower connected streamer beam 4 is also respectively arranged at the left and right ends of the lower connected body, at the left and right ends of the lower connected body, the first end of the lower connected streamer beam 4 is connected to the lower connected steel beam 5, and the second end of the lower connected streamer beam 4 is connected to the vertical streamer 1 (reference Figure 1 ).

[0052] The upper-body steel streamer includes an upper-body streamer beam, which is arranged between two adjacent upper-body steel beams, and the two ends of the upper-body streamer beam are respectively connected to the upper-body steel beams; the upper-body streamer beam is also respectively arranged at the left and right ends of the upper body, at which the first end of the upper-body streamer beam is connected to the upper-body steel beam, and the second end of the upper-body streamer beam is connected to the vertical streamer.

[0053] The top-level steel frame ribbon is the roof steel structure, including columns, beams and side beams. The columns, beams and side beams are all made of steel sections. The beams are set on the top of the columns. The distance between the top of the beams and the tower roof is 6~10m. The side beams are connected to the beams or columns, and the side beams are cantilevered out of the roof edge.

[0054] The streamers on the building facade are distributed on the outside of the tower and are arranged around the tower. The streamers on the building facade are box-shaped structures made of Q355B. The distance between the streamers on the building facade and the tower is 1.3~3.3m. The streamers on the building facade include vertical streamers 1 and horizontal streamers 7. The vertical streamers 1 are distributed at the four feet of the two towers, the north-south direction on the left side of the upper body ( Figure 3 The vertical ribbon 1 is connected to the tower through embedded parts 8 or embedded steel beams 7 (refer to Figure 4 , Figure 5 ), the vertical streamer 1 is arranged along the height direction of the tower, and its top extends out of the top of the tower and is connected to the side beam of the roof steel frame; the horizontal streamers 7 are respectively arranged near the bottom and top of the tower, and the two ends of the horizontal streamers 7 are respectively connected to the vertical streamers 1 or the cantilever beam 2.

[0055] The lower connected ribbon beam 4, the upper connected ribbon beam, the vertical ribbon 1, the horizontal ribbon 7, the cantilever beam, the column, the cross beam and the side beam are all covered with aluminum plates in the length direction.

[0056] refer to Figure 6 The installation construction method of the curtain wall steel streamer of the exemplary embodiment of the present invention comprises the following steps:

[0057] Step 1: Segment the vertical streamers 1 of the tower and the building facade along the height direction of the tower, and the length of each vertical streamer section corresponds to the height of the corresponding section of the tower; during the segmentation process, the vertical streamer 1 is divided into sections every 3 to 5 floors along the height direction of the tower. For example, when the tower has a section every four floors, it is divided into eight sections in total, the first section is 2 to 5 floors, the second section is 6 to 9 floors, the third section is 10 to 13 floors, the fourth section is 14 to 17 floors, the fifth section is 18 to 21 floors, the sixth section is 22 to 25 floors, the seventh section is 26 to 29 floors, and the eighth section is 30 floors to the roof; among them, the lower connecting body (steel corridor set near the bottom of the tower) is set in the first section of the two towers, and the upper connecting body (steel corridor set near the top of the tower) is set in the sixth section of the tower to the roof.

[0058] Step 2: manufacture the lower connected steel streamers, upper connected steel streamers, top steel frame streamers and building facade outer streamers respectively, and transport them to the construction site in batches after manufacturing. Among them, the height of each section of vertical streamers 1 is adapted to the length of the corresponding section of the tower, the length of each section of the lower connected streamer beam 4 is adapted to the distance between two adjacent lower connected steel beams 5, and the length of each section of the upper connected streamer beam is adapted to the distance between two adjacent upper connected steel beams.

[0059] The production process of each section of vertical streamer 1 includes: making a tire frame; using 80×80 steel square tubes to make a tire frame with a height of 1300~1500mm, a width of 460~500mm, and a length of 900~1200mm to support the vertical streamer; fixing the tire frame on the ground; according to the length of each section of vertical streamer 1, control the distance between two adjacent tire frames, and fix the tire frame on the hardened ground with post-embedded parts to ensure that the heights of the two tire frames are consistent and the top surface of each tire frame is horizontal. Use a forklift to transfer the steel column (box steel or H-shaped steel) of the vertical streamer 1 to the tire frame, adjust the level and elevation of the steel column, and measure the deflection of the steel column. Measure and lay out; according to the streamer construction drawing, pop up the aluminum plate dividing line on the steel column. Weld the keel; make a horizontal keel mold, and after uniformly processing the horizontal keel, weld the horizontal keel to the steel column along the length direction of the steel column (reference Figure 8 ), after grinding the welding parts, carry out anti-rust treatment; after anti-rust treatment, weld the vertical keel to the horizontal keel (refer to Fig. 9 ); Check the horizontality and verticality of the horizontal and vertical keels, and make corrections. Fix the aluminum plate to the keel in the middle of the steel column with self-tapping screws. The aluminum plates at both ends of the steel column are not installed yet (refer to Fig.10 ), ensure that the aluminum plate is straight and the glue seam width is consistent, and finally apply glue and clean up. Reference for the cross section of the steel column after installing the aluminum plate Fig.11 . refer to Fig. 9 , Fig.11 When the vertical streamer adopts a box-shaped column, the process of installing the transverse keel includes: welding angle steels at the four feet of the box-shaped column, respectively welding two or more first vertical rods on the first side and the second side opposite to each other of the box-shaped column, and the first vertical rods on the first side and the second side of the box-shaped column have the same length; respectively welding two or more second vertical rods on the third side and the fourth side opposite to each other of the box-shaped column, and the length of the second vertical rod on the third side of the box-shaped column is not less than the length of the second vertical rod on the fourth side; and then using four connecting rods to connect the first vertical rod and the second vertical rod, and the four connecting rods form a rectangular structure.

[0060] The manufacturing process of the lower connected streamer beam 4, the upper connected streamer beam, the horizontal streamer 7, the column, the cross beam and the side beam is the same as the manufacturing process of the vertical streamer.

[0061] Step 3: Install the vertical streamers 1 in sections from bottom to top along the height direction of the tower.

[0062] When installing each section of vertical streamers, install the vertical streamers of the west tower first, and then install the vertical streamers of the east tower; for the vertical streamers of the west tower, proceed from left to right ( Figure 3Left and right direction), along the length of the West Tower, install the vertical streamers on both sides of the tower width direction at the first axis, and then install the vertical streamers on both sides of the tower width direction at the second axis, until the vertical streamers at all installation positions are installed; the installation method of the vertical streamers of the East Tower is the same as that of the West Tower.

[0063] The vertical streamers are box-shaped columns. Along the height direction of the tower, the vertical streamers 1 are connected to the tower through the cantilever beams 2. The connection position between the cantilever beams 2 and the tower is provided with embedded parts 8 or embedded steel beams 3. The embedded parts 8 are arranged near the bottom of the tower, and the embedded steel beams 3 are arranged in the middle and above of the tower. The embedded parts 8 are embedded in the tower during the concrete construction of the tower. Figure 4 The embedded parts include an embedded base plate, on which a plurality of embedded holes are arranged in an array, and each embedded hole is provided with an embedded bolt, which is embedded in the tower; a corbel is coaxially arranged on the embedded base plate, and the corbel is made of box steel or H-shaped steel, and the first end of the corbel is welded to the embedded base plate, and the second end of the corbel is used to connect with the cantilever beam. During the connection process, when the corbel is an H-shaped steel, a plurality of through holes can be arranged in an array at the second end of the corbel; when the corbel is a box steel, connecting plates can be respectively arranged at the top and bottom of the second end of the corbel, and a plurality of through holes can be arranged on the connecting plates. After the corbel is connected to the cantilever beam by bolts, it is welded at the connection position.

[0064] The first end of the embedded steel beam is embedded in the concrete of the tower, and the second end is cantilevered out of the tower and connected to the vertical streamer; the embedded steel beam can increase the length of the cantilevered tower, and can also increase the length embedded in the concrete of the tower, making the connection between the vertical streamer and the tower more stable and reliable.

[0065] The pre-embedded steel beam embedding process is as follows: set up the template of the floor structure on the tower (the template outside the tower is not installed), check the axis position of the pre-embedded steel beam on the template according to the designed installation position of the pre-embedded steel beam, draw lines on the template to mark the specific position of the pre-embedded steel beam, and the pre-embedded steel beam protrudes 300~500mm from the axis; lay concrete beam bottom reinforcement on the template; use a 10t forklift to transfer the pre-embedded steel beam from the stacking site to the tower crane operation range, and use the tower crane to lift the pre-embedded steel beam to the template of the corresponding floor; install the limit on the bottom and side of the first end of the pre-embedded steel beam Positioning plate; pass the embedded steel beam through the concrete column reinforcement and position the embedded steel beam at the preset installation position; connect the limiting plate to the formwork to prevent the embedded steel beam from shifting widely during the subsequent laying of the tower concrete beam bottom reinforcement on the formwork; lay the concrete beam surface reinforcement and stirrups on the concrete bottom reinforcement and install the concrete side formwork; check the position of the embedded steel beam, and when the displacement range of the embedded steel beam position does not meet the design requirements, adjust the position of the embedded steel beam to make it in a suitable position (in line with the design requirements); pour the tower concrete to embed the embedded steel beam into the tower concrete.

[0066] During the installation of the vertical streamer 1, the cantilever beam 2 can be installed on the embedded part 8 before the vertical streamer 1 is installed; the cantilever beam 2 can also be vertically welded to the vertical streamer 1 according to the design requirements, and the vertical streamer 1 and the cantilever beam 2 can be hoisted and lifted together to reduce the hoisting and connection operations of the steel components and improve the construction efficiency.

[0067] The installation process of the vertical streamer is as follows: the vertical streamer is transported to the location to be hoisted by a forklift or a translation trolley; the length of each vertical streamer is 17~23m, and the weight is not more than 6t. To ensure the safety of the lifting of each vertical streamer, two tower cranes are used for lifting; Fig.12 , Fig.13 The lifting process of the vertical streamer includes: connecting the hooks of the two tower cranes to the two ends of the vertical streamer respectively, controlling the hook of the first tower crane to move upward to lift the first end of the vertical streamer upward, keeping the hook of the second tower crane stationary or moving downward to lower the second end of the vertical streamer, and during the lowering process, adjusting the direction of the trolley of the first tower crane and the direction of the trolley of the second tower crane respectively until the vertical streamer is in a vertical state; after releasing the hook of the second tower crane from the second end of the vertical streamer, the first tower crane vertically transports the vertical streamer to the installation position; after the vertical streamer is transported to the installation position, the construction personnel connect the top and / or bottom nodes of the vertical streamer at the second operating platform, and connect and fix the cantilever beam on the vertical streamer to the embedded parts or embedded steel beams at the first operating platform. The first and second tower cranes are both Zoomlion T600-32U tower cranes. Both tower cranes have a jib length of 70m, a maximum lifting radius of 60m, and a rated lifting capacity of 7.2t.

[0068] After the embedded steel beam is embedded in the tower, the installation process of the vertical streamer includes: connecting the cantilever beam with the embedded steel beam, and then connecting the cantilever beam with the vertical streamer, or installing the cantilever beam on the vertical streamer first, hoisting it to the preset position together with the vertical streamer, and then connecting the cantilever beam with the embedded steel beam. The process of connecting the cantilever beam with the embedded steel beam includes: after using the tower crane to hoist the cantilever beam to the preset installation position, adjusting the elevation of the cantilever beam, using a level ruler to level the cantilever beam, and after leveling, using a yard plate to fix and spot weld the welding area of ​​the cantilever beam (the connection position between the cantilever beam and the second end of the embedded steel beam) around; during the spot welding process, a 3t hoist is hung on the lifting lug at the cantilever end of the cantilever beam, and the hoist is tightened to ensure that the tower crane can safely release the hook to ensure the safety of hoisting.

[0069] Vertical streamers can also be hoisted using a single machine rotation method (refer to Fig.14 ), before lifting, set sleepers at the bottom of the vertical streamers to avoid contact between the bottom of the column and the ground during lifting, and avoid dragging the column end on the ground during lifting; during the lifting of the vertical streamers from the horizontal direction, observe whether the aluminum plate is bent or deformed, and when the vertical streamers are lifted to a vertical state, check the flatness of the aluminum plate.

[0070] Before hoisting the vertical streamers, mark the installation direction of the vertical streamers on the vertical streamer column to facilitate subsequent installation; the lifting points are set at the top and bottom ear plates of the vertical streamers (for the first section of the vertical streamers, the lifting points are set at the top ear plates), and the tower crane hook and the vertical streamers are connected with a clamping ring (such as a D-shaped buckle) to prevent the ear plates from deforming during the hoisting process; before installing the next section of vertical streamers on top of the installed vertical streamers, clean the loose rust on the top of the section of vertical streamers and the bottom of the vertical streamers to be installed.

[0071] The installation process between two adjacent sections of vertical streamers includes: when the vertical streamer to be installed is hoisted to 100~200mm above the preset installation position (the installed vertical streamer), stop hoisting to keep the vertical streamer stable, align the bolt holes and the cross lines, and then slowly drop the vertical streamer to align the center lines of the four sides of the vertical streamer with the cross axis of the foundation. After the vertical streamers are in place, they are temporarily fixed on the concrete structure columns with steel wire ropes to prevent the steel columns from shaking during the installation process. During the alignment and installation of the vertical streamers, if there is any alignment deviation, use the jack and adjustment nut method to correct it (correction accuracy is ±1mm). If the column body is twisted, adjust the twist deviation of the column body. When the twist deviation is small, set pads (pad thickness is 0.5-1.0mm) on different sides of the ear plates of the two adjacent vertical streamers, and adjust them by tightening the large hexagonal bolts. Each adjustment should be within 3mm of the twist deviation. If the deviation is too large, adjust it in 2-3 times. When the twist deviation is large, temporarily install a jack on the side of the column body (refer to Fig.15 ), and correct the torsional deviation of the steel column joint. After the vertical streamer is in place, the verticality and elevation of the vertical streamer are also corrected. The verticality correction process is: drive a steel wedge or set a lifting jack on the deflected side of the steel column, and use a total station for observation and control; under the premise of ensuring that the verticality of a single section of the steel column does not exceed the standard, pay attention to the influence of the shrinkage of the reserved weld on the verticality, and control the offset of the top axis of the steel column to the specified range; tighten the large hexagonal head high-strength bolts of the temporary connection ear plate to the rated torque, and fix the steel wedge to the ear plate. The elevation correction process is: set a connecting plate on both sides of the ear plate, use bolts to temporarily fix the ear plate and the connecting plate (the connecting plate is not clamped), and adjust the gap between the columns by the lifting hook and the pry bar; compare the distance between the elevation control lines of the column with the design elevation value, consider the shrinkage and compression deformation of the weld, and adjust the elevation deviation to within 5mm; after meeting the requirements, drive in the steel wedge and spot weld to limit the fall of the steel column. The connecting plate between two adjacent steel columns will be cut off after welding is completed (reserving 3~5mm). After cutting, it will be polished smooth and painted with anti-rust paint.

[0072] The vertical streamers are hoisted in accordance with the installation sequence of each partition, and a stable structural system is formed in time. During the correction, the axis, verticality, elevation, weld gap and other factors are comprehensively considered to ensure that the deviation value meets the design and specification requirements. The positioning axis of each section of the vertical streamer is drawn up with the ground control line as the reference line, and the floor elevation is carried out according to the relative elevation. When installing the first section of the vertical streamer, the control elevation is drawn from the reference point on the concrete foundation or steel column, and this elevation is used each time thereafter to ensure that the structural elevation meets the design and specification requirements.

[0073] Before the vertical streamers are hoisted, a second operating platform is set at the designed position on the top of each section of the vertical streamers. When the second operating platform is set, the second operating platform is supported by the supporting members and / or cantilever beams on the top of the vertical streamers, and the second operating platform is hoisted together with the vertical streamers to facilitate the subsequent docking of two adjacent sections of the vertical streamers.

[0074] Before installing each section of vertical streamer, a first operating platform is set at the installation position of the cantilever beam and the embedded parts or embedded steel beams. After the first operating platform is assembled on the ground, it is hoisted to the preset installation position by a tower crane and then hung on the concrete floor. The first operating platform is fixed to the concrete floor by embedded parts or other means, and is also fixed to the concrete floor by a 8~12mm safety rope (iron wire) to ensure safety (reference Fig.16 ); When the cantilever beam of the vertical streamer is connected with the embedded parts or embedded steel beams, the construction personnel enter the first operating platform and connect the cantilever beam with the embedded parts or embedded steel beams (a fire-connecting rod is set at the connection position to prevent welding slag from falling from high altitude to the ground). When the adjacent vertical streamers are docked, the operator enters the second operating platform (hanging a fall arrester when walking) along the safety rope and safety column on the cantilever beam from the first operating platform (the operator's safety belt is hung on the safety rope), and docks the adjacent vertical streamers in the second operating platform. After docking, the safety rope and safety column are removed in the first operating platform, and then the second operating platform and the first operating platform are dismantled by a tower crane.

[0075] Step 4, install the horizontal streamers, the lower connected steel streamers and the upper connected steel streamers; Step 4 and Step 3 are performed alternately, along the height direction of the tower, when the vertical streamers are installed to the preset installation position of the horizontal streamers, install the first layer of horizontal streamers, after the first layer of horizontal streamers is installed, continue to install the vertical streamers; when the vertical streamers are installed to the preset installation position of the lower connected steel streamers, install the lower connected steel streamers, after the lower connected steel streamers are installed, continue to install the vertical streamers; when the vertical streamers are installed to the preset installation position of the upper connected steel streamers, install the upper connected steel streamers, after the upper connected steel streamers are installed, continue to install the vertical streamers (the installation of the upper connected steel streamers can be carried out simultaneously with the installation of the vertical streamers); when the vertical streamers are installed to the preset installation position of the second layer of horizontal streamers, install the second layer of horizontal streamers, after the second layer of horizontal streamers is installed, continue to install the vertical streamers until the installation of the vertical streamers is completed.

[0076] The horizontal streamer is installed between adjacent cantilever beams or between adjacent vertical streamers. The installation process of the horizontal streamer includes: transporting the horizontal streamer to the position to be hoisted by a forklift and a translation trolley for a second time; connecting the hooks of the two tower cranes to the two ends of the horizontal streamer respectively, controlling the two tower cranes to lift the horizontal streamer at the same time, so that the horizontal streamer is lifted to between two adjacent cantilever beams, adjusting the position of the horizontal streamer so that the connection position of the horizontal streamer is aligned with the connection position of the cantilever beam or the vertical streamer, and after alignment, bolting the horizontal streamer to the cantilever beam or the vertical streamer; after bolting, measuring the installation position of the horizontal streamer again, and when the installation position of the horizontal streamer meets the design requirements, welding the flange plate of the horizontal streamer to the flange plate of the cantilever beam.

[0077] When installing the lower connected steel ribbon, weld the connecting plate 6 (reference Figure 2), set screw holes at corresponding positions on the connecting plate, and then use two tower cranes to hoist the lower connected ribbon beam 4 to the corresponding installation position of the adjacent lower connected steel beam 5, and temporarily fix the lower connected ribbon beam 4 and the lower connected steel beam 5 with bolts. After fixation, adjust the elevation and horizontal position of the lower connected ribbon beam 4. After adjustment, use a yard plate to yard and spot weld the welding area at the connection between the lower connected ribbon beam 4 and the lower connected steel beam 5, and then release the tower crane. After the lower body streamer beam 4 in the middle of the lower body is installed, the lower body streamer beam 4 at the end of the lower body is installed. The installation process is the same as the installation process of the lower body streamer beam 4 in the middle of the lower body, and the process includes: welding connecting plates 6 at corresponding positions on the steel beams at both ends of the lower body, setting screw holes at corresponding positions on the connecting plates 6, using a tower crane to hoist the lower body streamer beam 4 to the corresponding installation positions of the steel beams at both ends of the lower body, and temporarily fixing one end of the lower body streamer beam 4 to the connecting plate with bolts, adjusting the elevation and horizontal position of the lower body streamer beam 4, and after adjustment, using a yard plate to yard and spot weld the welding area around, and then loosen the tower crane hook to ensure the safety of hoisting; after loosening the tower crane hook, the other end of the lower body streamer beam 4 is connected to the vertical streamer 1. The installation method of the upper body steel streamer is the same as that of the lower body steel streamer.

[0078] Step 5: Install the top steel frame streamer on the top of the tower; according to the design requirements, connect the columns and beams of the top steel frame streamer vertically and horizontally on the roof, connect the side beams with the columns or beams, connect the cantilevered ends of the side beams with the top of the vertical streamer, the roof steel frame is 7.2m away from the roof, and the side beams of the roof steel frame cantilever out of the roof edge. After the top steel frame streamer is installed, close the aluminum plates of the side beams and the aluminum plates of the beams.

[0079] Before closing the aluminum plate of the side beam of the top steel frame streamer, lay a track on the roof and set a cantilevered mobile platform on the track. The height of the cantilevered mobile platform is 7.2m (its height can be changed according to the height of the roof steel frame). Fig.17The cantilevered mobile platform includes a box-type bracket at the bottom, which is a quadrangular prism structure, including a first support column 9 arranged at the four vertices of a rectangle, and a first cross bar 10 is respectively arranged at the top and bottom of the first support column 9, and the first cross bar 10 is welded to the first support column 9; both ends of the first cross bar 10 at the top of the box-type bracket extend out of the box-type bracket by 0.5~1m, and one end or both ends of the first cross bar 10 at the bottom extend out of the box-type bracket by 0.5~1m; a trapezoidal bracket is arranged at the top of the box-type bracket, and the top length of the trapezoidal bracket is greater than the bottom length (the top length is 1~3m greater than the bottom length), and the trapezoidal bracket includes a second support column 11, and the second support column 11 is coaxially arranged with the first support column 9, and a second cross bar 12 and a third cross bar 13 are arranged at the top of the second support column 11, and the second cross bar 12 is connected to the second support column 11, and the third cross bar 13 and the second cross bar 12 are coaxially arranged, and the third cross bar 13 is integrally connected or rotatably connected with the second cross bar 12; diagonal braces 14 are arranged on both sides of the trapezoidal bracket, and the trapezoidal bracket is provided with a plurality of support columns 14 at the top of the trapezoidal bracket. On the left side of the bracket, the second cross bar 12 at the top of the trapezoidal bracket extends out of the trapezoidal bracket, the first end of the diagonal brace 4 is detachably connected to the second support column 11, and the second end is detachably connected to the second cross bar 12; on the right side of the trapezoidal bracket, the first end of the diagonal brace 4 is detachably connected to the second support column 11, and the second end of the diagonal brace 4 is detachably connected to the third cross bar 13; both ends of the second cross bar 12 at the bottom of the trapezoidal bracket extend out of the trapezoidal bracket, and the second cross bar 12 at the bottom of the trapezoidal bracket is connected to the first cross bar 10 at the top of the box-shaped bracket; a construction platform 15 is provided at the top of the trapezoidal bracket, and the construction platform 15 is erected on the second cross bar 12 and the third cross bar 13, and guardrails are provided around the construction platform 15; the first cross bars 10 on the left side of the box-type bracket are also supported by support rods, and a counterweight block 16 (1~2t concrete block) is provided at the bottom of the box-type bracket, and the counterweight block 16 is arranged close to the left side of the box-type bracket to increase the stability of the cantilevered mobile platform; the box-type bracket is installed on the track of the roof, and the construction platform 15 at its top cantilevers out of the roof.

[0080] When installing the aluminum plate of the side beam streamer, the construction workers stand on the top of the cantilevered mobile platform and close the aluminum plate of the side beam (refer to Fig.17 ). When the third cross bar 13 is rotatably connected to the second cross bar 12, after removing the diagonal brace 14, the third cross bar 13 can be rotated at a certain angle relative to the second cross bar 12, so that the cantilevered part on the right side of the top of the cantilevered moving platform is flipped at a certain angle relative to the vertical part, thereby preventing the vertical streamers on the outside of the roof from interfering with the movement of the cantilevered moving platform.

[0081] For the large decorative strips on the crossbeams of the top steel frame streamers, use aluminum alloy door frames or lift trucks for installation (refer to Fig.18For the installation of aluminum plates at the connection positions of adjacent vertical streamers, a U-shaped hanging basket is used. Three hanging machines are set on the roof. The hanging machines are respectively set at both ends and in the middle of the roof. The vertical poles of the hanging machines are connected with the base, and the base is welded to the steel structure of the roof. The size of the cantilevered part of the hanging machine bracket is 1100~1700mm, and the base is a 100*100*5mm reinforced sleeve. The brackets of the three hanging machines are arranged in a cross-height staggered manner (reference Fig. 20 ); The suspension machine can make the hanging basket rise or fall along the height direction of the vertical streamers. The installation of aluminum plates at the connection positions of adjacent vertical streamers in the hanging basket can reduce the high-altitude work of installing aluminum plates on the outside of the steel column.

[0082] For the installation of aluminum plates at the connection position of adjacent horizontal ribbons, a hanging basket is set up on the tower floor, and the aluminum plates are installed on the side of the horizontal ribbon close to the tower surface in the hanging basket. For the aluminum plates of the horizontal ribbon away from the tower surface, a hanging basket is set up on the roof and installed using the hanging basket on the roof (refer to Fig.19 ).

[0083] The above is only a detailed description of the specific implementation of the present invention, rather than a limitation of the present invention. Various substitutions, modifications and improvements made by those skilled in the relevant art without departing from the principle and scope of the present invention should be included in the protection scope of the present invention.

Claims

1. A curtain wall steel ribbon structure, characterized in that: include: A lower connected steel streamer, an upper connected steel streamer, a top steel frame streamer and an outer streamer of the building facade; wherein the lower connected steel streamer comprises a lower connected streamer beam, the lower connected streamer beam is arranged between two adjacent lower connected steel beams, and the two ends of the lower connected streamer beam are respectively connected to the lower connected steel beam; the lower connected streamer beam is also respectively arranged at the left and right ends of the lower connected body, at the left and right ends of the lower connected body, the first end of the lower connected streamer beam is connected to the lower connected steel beam, and the second end of the lower connected streamer beam is connected to the vertical streamer; The upper connected steel streamer includes an upper connected streamer beam, the upper connected streamer beam is arranged between two adjacent upper connected steel beams, and the two ends of the upper connected streamer beam are respectively connected to the upper connected steel beams; the upper connected streamer beam is also respectively arranged at the left and right ends of the upper connected body, at the left and right ends of the upper connected body, the first end of the upper connected streamer beam is connected to the upper connected steel beam, and the second end of the upper connected streamer beam is connected to the vertical streamer; The top steel frame streamer is a roof steel frame, and the roof steel frame includes columns, cross beams and side beams. The cross beams are arranged on the tops of the columns, and the side beams are connected to the cross beams or columns, and the side beams are cantilevered out of the roof edge line; The external streamers of the building facade are distributed on the outside of the tower and arranged around the tower. The external streamers of the building facade include vertical streamers and horizontal streamers. The vertical streamers are connected to the tower through embedded parts or embedded steel beams. The vertical streamers are arranged along the height direction of the tower, and the tops thereof extend out of the top of the tower and are connected to the side beams of the roof steel frame; the two ends of the horizontal streamers are respectively connected to the vertical streamers or cantilever beams.

2. The curtain wall steel ribbon structure according to claim 1, characterized in that: The lower connected ribbon beam, the upper connected ribbon beam, the vertical ribbon, the horizontal ribbon, the column, the cross beam and the side beam are all covered with aluminum plates in the length direction.

3. A method for installing and constructing a curtain wall steel streamer, characterized in that: The installation and construction method of the curtain wall steel streamer is used for the construction of the curtain wall steel streamer structure according to claim 1 or 2, and the installation and construction method of the curtain wall steel streamer comprises the following steps: Step 1: segment the vertical streamers of the tower and the outer streamers of the building facade along the height direction of the tower, and the length of each vertical streamer segment corresponds to the height of the corresponding segment of the tower; Step 2: manufacture the lower connected steel streamers, the upper connected steel streamers, the top steel frame streamers and the building facade outer streamers respectively. After the manufacturing is completed, transport them to the construction site in batches; Step 3: Install vertical streamers in sections from bottom to top along the height direction of the tower; Step 4: Install horizontal streamers, lower connected steel streamers and upper connected steel streamers; Step 5: Install the top steel frame streamers on the top of the tower.

4. The installation construction method of curtain wall steel streamers according to claim 3 is characterized in that: The second step comprises: Manufacturing tire frames; According to the designed length of each section of steel column or steel beam, control the distance between two adjacent tire frames, fix the tire frames on the hardened ground with post-embedded parts, ensure that the heights of the two tire frames are consistent, and ensure that the top surface of each tire frame is level; Use a forklift to transfer the steel column or steel beam to the tire frame, adjust the level and elevation of the steel column or steel beam, and measure the deflection of the steel column or steel beam; According to the ribbon construction drawing, pop up the aluminum plate dividing line on the steel column or steel beam; Make a transverse keel mold, uniformly process the transverse keels, weld the transverse keels to the steel columns along the length direction of the steel columns or steel beams, and weld the vertical keels to the transverse keels; Check the horizontality and verticality of the horizontal keel and vertical keel, and make corrections; Fix the aluminum plate to the keel in the middle of the steel column or beam with self-tapping screws to ensure that the aluminum plate is straight and the glue seams are of uniform width; apply glue and clean.

5. The installation construction method of curtain wall steel streamers according to claim 3 is characterized in that: In the step three, before installing the vertical streamers, the embedded parts and / or embedded steel beams are embedded in the tower, and the embedding process of the embedded steel beams includes: setting up the template of the floor structure on the tower, according to the designed installation position of the embedded steel beams; checking the axis position of the embedded steel beams on the template, drawing lines on the template, marking the specific position of the embedded steel beams; laying concrete beam bottom reinforcement on the template; lifting the embedded steel beams to the template of the corresponding floor; installing limit plates on the bottom and side surfaces of the first end of the embedded steel beams; passing the embedded steel beams through the concrete column reinforcement, and positioning the embedded steel beams at the preset installation position; connecting the limit plates to the template; laying concrete beam surface reinforcement and stirrups on the concrete bottom reinforcement, and installing concrete side templates; checking the position of the embedded steel beams to ensure that the position of the embedded steel beams is consistent with the design requirements; pouring tower concrete.

6. The installation construction method of curtain wall steel streamers according to claim 3 is characterized in that: In the process of installing the vertical streamers in step three, the vertical streamers are hoisted by a single-machine rotation method or a double tower crane.

7. The installation construction method of curtain wall steel streamers according to claim 3 is characterized in that: In the step three, the installation process between two adjacent vertical streamers includes: when the vertical streamer is hoisted to 100~200mm above the preset installation position, the hoisting is stopped to keep the vertical streamer stable; after aligning the bolt holes and the cross lines, the vertical streamer is slowly dropped to align the center lines of the four sides of the vertical streamer with the cross axis of the foundation; after the vertical streamer is in place, it is temporarily fixed to the concrete structure column with a steel wire rope; the deviation is corrected, and after the deviation is corrected, the two adjacent vertical streamers are fixed.

8. The installation construction method of curtain wall steel streamers according to claim 3 is characterized in that: When making the vertical streamers, the second step also includes the steps of installing a cantilever beam on the vertical streamers and installing a second operating platform on the top of the vertical streamers.

9. The installation construction method of the curtain wall steel streamer according to any one of claims 3 to 8, characterized in that: The step five comprises: according to the design requirements, connecting the columns and beams of the top-level steel frame streamers on the roof vertically and horizontally, connecting the side beams with the columns or beams, and connecting the side beams with the top of the vertical streamers; after the top-level steel frame streamers are installed, closing the side beam aluminum plates and the cross beam aluminum plates.

10. The installation construction method of curtain wall steel streamers according to claim 9, characterized in that: Before closing the aluminum plates of the side beams, lay tracks on the roof, set up a cantilevered mobile platform on the tracks, and use the cantilevered mobile platform to close the aluminum plates of the side beams; use aluminum alloy door frames or lifts to install large decorative strips on the crossbeams of the top-level steel frame streamers; for the installation of aluminum plates at the connection positions of adjacent horizontal streamers, set up a hanging basket on the tower floor, and install aluminum plates on the sides of the horizontal streamers close to the tower surface in the hanging basket; set up a hanging basket on the roof, and use the hanging basket on the roof to install the aluminum plates of the horizontal streamers away from the tower surface.