A device for preparing integral sand core and a method for using the same
By designing the overall device for the sand core, high-precision core merging is achieved using the flip and positioning units of the upper and lower core boxes, the problems of low core merging accuracy and core-sealing surface sealing are solved, and the quality and efficiency of the casting are ensured.
Patent Information
- Application Number
- CN202410005071.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-01-02
AI Technical Summary
In the prior art, there are problems such as low core-combination accuracy, easy damage to the sand core, and easy drop of resin sand on the core surface sealing surface, resulting in defects in sand sand clamping and inner cavity jointing during the preparation of the standing whole sand core.
A whole sand core preparation device is designed, including the upper half core box and the lower half core box. The 180° flip and fusion combination of the upper and lower half core box is realized through the positioning unit and fixing member to ensure high core-combination accuracy and the core-separation gap is closed. .
The upper and lower core joint can be completed in just one turn, which improves the mold release efficiency of the sand core, avoids sand core damage and casting wall thickness deviation, ensures the uniformity of the casting wall thickness and the sealing of the core surface. Avoid sand clamping and inner cavity seam defects.
Smart Images

Figure CN117773006B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of casting, and in particular to a device for preparing an integral sand core and a method for using the device. Background Art
[0002] As a major casting process, the casting process of horizontally placing castings, the sand core is placed horizontally in the cavity or mold during pouring and closing the box or mold. However, some shell casting sand cores are relatively long. Due to the position limitation of the sand mixer head, it is impossible to prepare a standing integral sand core, or a sand core that requires a chiller is required. In the process of preparing a standing integral sand core, there are often some positions where it is difficult to manually place the chiller or the chiller is easy to fall off. Therefore, half-core making is often adopted. The half-core box is placed horizontally to prepare the upper and lower cores, and then the core box is turned over to take out the upper and lower cores, and then the lower core is turned over and combined with the upper core to form a horizontal integral sand core.
[0003] The invention with application number 201410076603.X discloses a method for assembling a sand core, comprising: placing a first half sand core flat on the floor, providing an adhesive overflow groove on the inner edge of the separation surface of the first half sand core, placing an appropriate amount of adhesive on the separation surface close to the adhesive overflow groove; applying graphite paste on the separation surface close to the adhesive; docking the second half sand core with the first half sand core, combining the first half sand core and the second half sand core together to form an integral sand core; locking the integral sand core with a locking core screw and high-strength self-hardening sand; and scraping off the graphite paste overflowing from the gap between the separation surface of the first half sand core and the separation surface of the second half sand core.
[0004] The sand core in this method has a sand reducing groove and an overflow groove. When making the core, the sand filling area of the separation and combination surface becomes smaller, and it is relatively difficult to compact the sand filling in the core; the two half cores need to be taken out of the core box, and the separation and combination surface of the first sand core needs to be turned over to ensure that the separation and combination surface of the second half core is facing up, so that the upper and lower half cores can be combined; although graphite paste is applied to the outside of the separation and combination surface glue, it is difficult to close the core in one go, and glue may be stuck to the edge of the upper core separation and combination surface, and air hole defects may occur in subsequent pouring; the sand core is locked by a locking screw and high-strength self-hardening sand. When the sand is dropped, the screw is likely to fall into the vibrating sand dropping pit, and the screw may be bent or the screw thread may be chipped due to collision, resulting in the problem that it cannot be used again.
[0005] For preparing the upper and lower core halves in half and then closing the core, it is necessary to flip the upper and lower core boxes to take out the upper and lower core halves, and to flip the lower core again. The two ends of the core head of the lower core are usually lifted by a crane balance wire rope, and two people pull the crane wire rope to complete the sand core flipping. This process is unsafe and the wire rope will cause obvious damage to the sand core during the operation, which needs to be repaired; and the upper core is lifted and manually closed, but the core closing accuracy is low, and there is a possibility of causing wall thickness deviation of the casting. During the core closing process, the sand core needs to be pried for alignment, resulting in local damage to the core head and increasing the sand core repair work; the core dividing surface is sealed with resin sand, etc., and the sealed resin sand is easy to fall off, resulting in sand inclusion in the casting and defects in the inner cavity of the casting. There is no good solution to these problems. Summary of the invention
[0006] In view of the problems that the core assembling process of the prior art requires multiple flipping operations, the core assembling precision is low, the sand core is prone to local damage, and the resin sand etc. blocked by the core splitting surface are prone to fall off, resulting in sand inclusion in the casting and defects in the inner cavity of the casting. The present invention provides a device for preparing an integral sand core. When preparing an integral sand core, the core box only needs to be flipped once, the upper and lower cores are assembled with high precision, the sand core is hardly damaged, and at the same time, the core splitting surface gap sealing effect is good.
[0007] In order to achieve the above object, the present invention provides the following technical solutions.
[0008] A device for preparing an integral sand core comprises an upper core box and a lower core box; the upper core box comprises an upper core box body and a fixing member; the fixing member comprises a first pin and a second pin; a first core head hole is provided at one end of an inner cavity of the upper core box body, and a second core head hole is provided at the other end of the inner cavity of the upper core box body; the first pin is inserted into the first core head hole, and the second pin is inserted into the second core head hole; the lower core box comprises a lower core box body; the upper core box body is turned 180 degrees and is molded together with the lower core box body through a positioning unit.
[0009] As a further improvement of the present invention, the positioning unit includes a first positioning hole and a second positioning hole; the first positioning hole and the second positioning hole are arranged at diagonal positions of the parting surface of the upper half core box body.
[0010] As a further improvement of the present invention, the lower core box also includes a third positioning hole and a fourth positioning hole; the third positioning hole and the fourth positioning hole are arranged at diagonal positions of the parting surface of the lower core box body; the third positioning hole is arranged opposite to the first positioning hole; the fourth positioning hole is arranged opposite to the second positioning hole.
[0011] As a further improvement of the present invention, a first positioning pin is disposed in the first positioning hole and the third positioning hole; and a second positioning pin is disposed in the second positioning hole and the fourth positioning hole.
[0012] As a further improvement of the present invention, the first pin is located in the inner cavity of the upper core box body and is sheathed with a first pipe; the second pin is located in the inner cavity of the upper core box body and is sheathed with a second pipe.
[0013] As a further improvement of the present invention, a first protrusion is provided on a core head portion at one end of the inner cavity of the main body of the upper core box; and a second protrusion is provided on a core head portion at the other end of the inner cavity of the upper core box.
[0014] As a further improvement of the present invention, a first U-shaped groove is provided at a core head portion at one end of the inner cavity of the lower half core box body; a second U-shaped groove is provided at a core head portion at the other end of the inner cavity of the lower half core box body.
[0015] As a further improvement of the present invention, a first square groove extends from one end of the first U-shaped groove, and a second square groove extends from the other end of the first U-shaped groove; a third square groove extends from one end of the second U-shaped groove, and a fourth square groove extends from the other end of the second U-shaped groove.
[0016] As a further improvement of the present invention, angle irons are provided on the top corners of the parting surface of the lower half core box body.
[0017] A method for preparing an integral sand core device, comprising:
[0018] S1: inserting the first pin in the fixing member into the first core head hole, inserting the second pin into the second core head hole, and then filling the upper half core box with sand and waiting for solidification;
[0019] S2: Fill the lower core box with sand and wait for solidification;
[0020] S3: Flip the upper core box body 180° and close it with the lower core box body through the positioning unit;
[0021] S4: After the mold closing operation is completed, the first pin and the second pin are removed, and the upper half core box body is adjusted to complete the demoulding of the upper half sand core, so that the upper half sand core and the lower half sand core form an integral sand core;
[0022] S5: insert a first pin into one end of the upper sand core and a second pin into the other end of the upper sand core, so that the whole sand core is taken out from the lower core box body.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] Before core making, the upper core box and the lower core box are convenient for placing the chiller, runner, etc. required by the process. During the core making process, the sand mixer head can be moved to the corresponding sand filling position of the upper core box and the lower core box in the device, and the sand filling and tamping are respectively performed, making the core making operation simple and easy to operate. The flipping operation of the device only needs to flip the upper core box once to demould the upper sand core, which is convenient and fast, and improves the working efficiency of sand core demoulding. At the same time, the core box is flipped during the flipping process of the device, avoiding obvious damage during the flipping process of the sand core. The lower core box does not need to be flipped. The lower core box and the upper core box are positioned by the positioning unit, and the positioning accuracy is high. After the mold is closed, it is not necessary to perform core correction, and the sand core damage is avoided, and the workers do not need to perform secondary repairs on the sand core. After the slurry coating is brushed on the edge of the core splitting surface, the mold is closed, and the core splitting surface is well sealed. Therefore, the wall thickness of the casting can be guaranteed to be uniform, and the casting sand inclusion caused by the resin sand falling during the pouring of the core splitting surface and the appearance of the seam defects in the casting cavity can be eliminated. At the same time, the device is simple and easy to manufacture and maintain.
[0025] Furthermore, the iron wire is fixed to the arc groove and the square groove arranged at both ends of the core box, so that the lower core is bound with the upper core, and the upper core can be used to allow the lower core to escape from the lower core box, and the positions of the upper and lower cores are fixed.
[0026] Furthermore, the upper and lower core boxes are positioned by positioning pins, the core closing is more accurate, and the core closing does not need to be adjusted, so that the core closing can be in place at one time. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings described herein are for explanation purposes only and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the components in the drawings are only for illustration purposes to help understand the present invention, and are not intended to specifically limit the shapes and proportional dimensions of the components of the present invention. In the drawings:
[0028] Figure 1 It is a structural schematic diagram of an upper core box of a device for preparing a horizontal integral sand core according to the present invention;
[0029] Figure 2 It is a partial schematic diagram of the position of the left core head of the upper core box of a device for preparing a horizontal integral sand core of the present invention;
[0030] Figure 3 It is a partial schematic diagram of the position of the right core head of the upper core box of a device for preparing a horizontal integral sand core of the present invention;
[0031] Figure 4 It is a structural schematic diagram of a lower core box of a device for preparing a horizontal integral sand core according to the present invention;
[0032] Figure 5 It is a partial schematic diagram of the position of the left core head of the lower core box of a device for preparing a horizontal integral sand core of the present invention;
[0033] Figure 6 It is a partial schematic diagram of the position of the right core head of the lower core box of a device for preparing a horizontal integral sand core of the present invention;
[0034] Figure 7 It is a schematic diagram of the process of combining the upper and lower half cores of a device for preparing a horizontal integral sand core according to the present invention;
[0035] Figure 8 It is a schematic diagram of an integral sand core prepared by a device for preparing a horizontal integral sand core of the present invention.
[0036] Among them: 1 is the upper core box; 11 is the upper core box body; 121 is the first positioning hole; 122 is the second positioning hole; 131 is the first core head hole; 132 is the second core head hole; 14 is the first protrusion; 141 is the first groove; 15 is the second protrusion; 151 is the second groove; 2 is the lower core box; 21 is the lower core box body; 221 is the third positioning hole; 222 is the fourth positioning hole; 231 is the first angle iron; 232 is the second angle iron; 233 is the first Triangle iron; 234 is the fourth angle iron; 24 is the first U-shaped groove; 241 is the third groove; 25 is the second U-shaped groove; 251 is the fourth groove; 261 is the first square groove; 262 is the second square groove; 271 is the third triangular groove; 272 is the fourth square groove; 31 is the first pin; 32 is the second pin; 41 is the first pipe; 42 is the second pipe; 51 is the first iron wire; 52 is the second iron wire; 61 is the first positioning pin; 62 is the second positioning pin. DETAILED DESCRIPTION
[0037] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0038] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only embodiment.
[0039] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0040] The present invention discloses a device for preparing an integral sand core, comprising an upper core box 1, a lower core box 2, a positioning unit and a fixing member.
[0041] The positioning unit includes a first positioning hole 121 , a second positioning hole 122 , a third positioning hole 221 , a fourth positioning hole 222 , a first positioning pin 61 , and a second positioning pin 62 .
[0042] The fixing member includes a first pin 31 , a second pin 32 , a first pipe 41 and a second pipe 42 .
[0043] like Figure 1 As shown, the upper core box 1 comprises an upper core box body 11 and a core head hole.
[0044] The first core head hole 131 and the second core head hole 132 are respectively provided at both ends of the length direction of the cavity of the upper core box body 11. The first positioning hole 121 and the second positioning hole 122 are provided at the diagonal position of the parting surface of the upper core box body 11 at a certain distance from the sand core cavity. The first pin 31 is inserted into the first core head hole 131, and the first pin 31 is located in the inner cavity of the upper core box body 11 and the first pipe 41 is sleeved; the second pin 32 is inserted into the second core head hole 132, and the second pin 32 is located in the inner cavity of the upper core box body 11 and the second pipe 42 is sleeved.
[0045] After the resin sand in the inner cavity of the upper core box body 11 is solidified, the first pipe 41 and the second pipe 42 will be located in the resin sand in the inner cavity of the upper core box body 11, and the first pin 31 will be inserted into the first pipe 41 through the first core head hole 131, and the second pin 32 will be inserted into the second pipe 42 through the second core head hole 132. The first pin 31 and the second pin 32 can fix the solidified resin sand in the inner cavity of the upper core box body 11, and when the upper core box 1 is flipped, the solidified resin sand in the inner cavity of the upper core box body 11 is prevented from falling during the flipping process.
[0046] The fixings are replaced with other fixing forms according to the operation requirements.
[0047] like Figure 2 As shown, when the upper core box body 11 is placed horizontally, the left end core head is provided with a first protrusion 14, and the first protrusion 14 leaves a first groove 141 in the left core head area of the upper sand core.
[0048] like Figure 3 As shown, when the cavity in the upper core box body 11 is placed horizontally, the right core head is provided with a second protrusion 15, and the second protrusion 15 leaves a second groove 151 in the right core head area of the upper sand core.
[0049] After the resin sand in the inner cavity of the upper core box body 11 is solidified, the first protrusion 14 and the second protrusion 15 can leave the first groove 141 and the second groove 151 in the core head area at both ends of the solidified resin sand, and the first groove 141 and the second groove 151 facilitate the bundling operation with the lower sand core.
[0050] like Figure 4 As shown, the lower core box 2 includes a lower core box body 21. A third positioning hole 221 and a fourth positioning hole 222 are respectively provided at both ends of the parting surface of the lower core box body 21 in the length direction. The third positioning hole 221 is arranged relative to the first positioning hole 121, and the fourth positioning hole 222 is arranged relative to the second positioning hole 122. A first angle iron 231, a second angle iron 232, a third angle iron 232 and a fourth angle iron 234 are arranged at the four corners of the lower core box body 21.
[0051] like Figure 5 As shown, when the lower core box body 21 is placed horizontally, a first U-shaped groove 24 is provided at the left end core head, one end of the first U-shaped groove 24 is connected to the first square groove 261, and the other end of the first U-shaped groove 24 is connected to the second square groove 262. The first iron wire 51 is placed in the first square groove 261, the first U-shaped groove 24 and the second square groove 262 in sequence, and the bottom of the first U-shaped groove 24 is the inner surface of the lower core box body 21. When the first iron wire 51 is placed in the first U-shaped groove 24, a shape similar to the first protrusion 14 will be formed, and a third groove 241 can be left in the left core head area of the lower half sand core.
[0052] like Figure 6 As shown, when the lower core box body 11 is placed horizontally, a second U-shaped groove 25 is provided on the right core head, one end of the second U-shaped groove 25 is connected to the third square groove 271, and the other end of the second U-shaped groove 25 is connected to the second U-shaped groove 272. The second iron wire 52 is placed in the third square groove 271, the second U-shaped groove 25 and the fourth square groove 272 in sequence, and the bottom of the second U-shaped groove 25 is the inner surface of the lower core box body 21. When the second iron wire 52 is placed in the second U-shaped groove 25, a shape similar to the second protrusion 15 is formed, and a fourth groove 251 can be left in the right core head area of the lower sand core.
[0053] like Figure 7As shown, the upper core box 1 is turned over 180° and is molded together with the lower core box 2 through the positioning unit. First, the first positioning pin 61 needs to be placed in the third positioning hole 221 in the lower core box body 21, and the second positioning pin 62 needs to be placed in the fourth positioning hole 222. Then, the upper core box 1 is turned over 180° so that the first positioning hole 121 in the upper core box body 22 is aligned with the first positioning pin 61, and the second positioning hole 122 is aligned with the second positioning pin 62. At this time, the upper core box body 1 is molded together with the lower core box body 2.
[0054] like Figure 8 As shown, the first groove 141 is connected to the third groove 241, and the second groove 151 is connected to the fourth groove 251, and the third groove 241 and the fourth groove 251 facilitate the binding operation with the upper half sand core, so that the upper half sand core and the lower half sand core form an integral sand core.
[0055] The upper core box 1 is turned over by a turning device on the outer side of the upper core box 1. A moving device is arranged on the outer side of the lower core box 2 for moving the lower core box 2. According to the operation requirements, the positioning unit can also use an electronic positioner.
[0056] The pins are made of iron, and the pipes are made of iron. They can be replaced with other materials according to the needs of the operation. The iron wire can also be replaced with other materials according to the needs of the operation.
[0057] The device of the present invention is further explained below in conjunction with specific embodiments.
[0058] Example:
[0059] like Figure 1 As shown, an upper core box 1 of a device for preparing an integral sand core of the present invention mainly comprises an upper core box body 11, a positioning hole, a core head hole and an arc groove.
[0060] The upper core box body 11 is a rectangular parallelepiped structure, with the upper surface being the parting surface. The larger cavity below the parting surface is the surface shape of half the sand core, and the two ends of the cavity in the length direction are the positions of the two main core heads of the core box. At the diagonal position of the parting surface of the upper core box body 11, which is 50-100mm away from the sand core cavity, there are a first positioning hole 121 and a second positioning hole 122 that are pulled downward from the parting surface. On the end faces of the two main core head cavities, the first core head hole 131 and the second core head hole 132 with a diameter of 20mm-50mm are respectively provided within the range of the center position being greater than or equal to 20mm vertically downward and less than or equal to the core head radius -20mm. Figure 2 and Figure 3 As shown, on the cylindrical surface at the middle position of the core head length of the two main core head cavities, there are respectively a first protrusion 14 and a second protrusion 15, which are used to form a semicircular groove of the upper half core head when making the core.
[0061] like Figure 4 As shown, a lower core box 2 of a device for preparing an integral sand core of the present invention mainly comprises a lower core box body 21, positioning holes, angle irons, arc grooves and square grooves.
[0062] The main body 21 of the lower core box is a rectangular parallelepiped structure, the upper surface is the parting surface, and the larger cavity below the parting surface is the surface shape of half of the sand core. At the diagonal position of the parting surface of the lower core box 1 50-100mm away from the sand core cavity, there are a third positioning hole 221 and a fourth positioning hole 222 that are pulled downward from the parting surface. The third positioning hole 221 and the fourth positioning hole 222 on the lower core box 2 correspond to the first positioning hole 121 and the second positioning hole 122 of the upper core box 1. The first positioning hole 121 and the third positioning hole 221 are provided with a first positioning pin 61, and the second positioning hole 122 and the fourth positioning hole 222 are provided with a second positioning pin 62. The positioning pins can realize the positioning and matching of the upper and lower core boxes. The four corners of the parting surface of the lower core box 2 are angle iron structures, namely the first angle iron 231, the second angle iron 232, the third angle iron 233 and the fourth angle iron 234, and the thickness of each angle iron is 2-3mm. The first U-shaped groove 24 and the second U-shaped groove 25 are respectively arranged on the cylindrical surface at the middle position of the core head length of the two main core head cavities of the lower core box 1. One end of the first U-shaped groove 24 is connected to the first square groove 261, and the other end of the first U-shaped groove 24 is connected to the second square groove 262. The first iron wire 51 is placed in the first square groove 261, the first U-shaped groove 24 and the second square groove 262 in sequence; one end of the second U-shaped groove 25 is connected to the third square groove 271, and the other end of the second U-shaped groove 25 is connected to the second U-shaped groove 272. The second iron wire 52 is placed in the third square groove 271, the second U-shaped groove 25 and the fourth square groove 272 in sequence. The first U-shaped groove 24 and the second U-shaped groove 25 are 5-15mm lower than the parting surface, and the first U-shaped groove 24 and the second U-shaped groove 25 correspond to the first protrusion 14 and the second protrusion 15 in the upper core box 1. In addition, the angle iron on the lower core box can also be placed in the upper core box.
[0063] In summary, the present invention can solve the problems of multiple flipping of core boxes and sand cores in the existing process of core making and assembling half cores, low precision of manually assembling half cores into a whole core, and easy falling off during pouring of the split core surface sealed with resin sand after assembling the core.
[0064] The second object of the present invention is to provide a method for preparing a horizontal integral sand core device, comprising:
[0065] S1: insert the first pin 31 in the fixing member into the first core head hole 131, insert the second pin 32 into the second core head hole 132, and then fill the upper half core box 1 with sand and wait for solidification;
[0066] S2: Fill the lower core box 2 with sand and wait for solidification;
[0067] S3: The upper core box body 11 is turned over 180° and is closed with the lower core box body 21 through the positioning unit;
[0068] S4: After the mold closing operation is completed, the first pin 31 and the second pin 32 are removed, and the upper half core box body 11 is adjusted to complete the demoulding of the upper half sand core, so that the upper half sand core and the lower half sand core form an integral sand core;
[0069] S5: insert the first pin 31 into one end of the upper half sand core, and insert the second pin 32 into the other end of the upper half sand core, so that the whole sand core is taken out from the lower half core box body 21.
[0070] The specific method is as follows:
[0071] S1: insert the first pin 31 into the first core head hole 131 in the upper core box 1, insert the second pin 32 into the second core head hole 132, the first pin 31 and the second pin 32 extend into the core box by no less than 10 cm, and the length exposed outside the core box is no less than 10 cm;
[0072] S2: A first pipe 41 is put on the first pin 31 in the inner cavity of the upper core box 1, and a second pipe 42 is put on the second pin 32; the inner diameter of the pipe is about 1-10 mm larger than the pin, and the length of the pipe is larger than the insertion length of the pin;
[0073] S3: Filling the upper core box 1 with resin sand, tamping it, scraping it flat, and then placing it for curing;
[0074] S4: The first iron wire 51 is sequentially placed in the first square groove 261, the first U-shaped groove 24 and the second square groove 262; the second iron wire 52 is sequentially placed in the third U-shaped groove 271, the second U-shaped groove 25 and the fourth square groove 272;
[0075] S5: Fill the lower core box 2 with resin sand, tamp it, scrape it flat, and place it for curing;
[0076] S6: After the upper and lower core halves are cured, a first positioning pin 61 is placed in the third positioning hole 221 of the lower core box 2, and a second positioning pin 62 is placed in the fourth positioning hole 222. At the same time, an alcohol-based paste coating with a Baume degree of 50-90 is applied within a range of 50-100 mm inward from the edge of the core splitting surface sand core, and the coating thickness is not less than 1 mm;
[0077] S7: Using the turning device arranged on the upper core box 1, the upper core box 1 is turned over 180° by means of a box turning machine or a crane, etc., and the upper core box 1 is lifted up to be closed with the lower core box 2, and the first positioning hole 121 passes through the first positioning pin 61, and the second positioning hole 122 passes through the second positioning pin 62; after the upper core box 1 and the lower core box 2 are closed together, the first pin 31 and the second pin 32 are pulled out, and the upper core box 1 is knocked, and the upper core is removed from the upper core box 1, and is well attached to the lower core on the core separation surface and the excess coating is squeezed out; then, the upper core box 1 is lifted up; the entire turning and closing operation should be completed within 10 minutes;
[0078] S8: The first iron wire 51 in the first square groove 261 and the second square groove 262 is inserted into the first groove 141 in the upper half of the core head area, and the second iron wire 52 in the third square groove 271 and the fourth square groove 272 is inserted into the second groove 151 in the upper half of the core head area, and the two wires are bundled to form an integral sand core, and the excess coating is further squeezed out from the core splitting surface;
[0079] The first groove 141 and the second groove 151 at the two core heads of the upper half core are formed by the first protrusion 14 and the second protrusion 15;
[0080] S9: Using the turning device outside the upper core box 1, the upper core box 1 is moved away, and then the first pin 31 is inserted into the first pipe 41, and the second pin 32 is inserted into the second pipe 42, and the first pin 31 and the second pin 32 are lifted and knocked against the lower core box 2, so that the whole sand core is taken out from the lower core box 2;
[0081] S10: For the 20mm range above and below the core surface of the sand cores, first apply a 50-65 Baume alcohol-based slurry paint, brush off the excess paint and seal the gaps better, then use a 10-30 Baume alcohol-based slurry paint to apply it again until it is smooth and ignite it immediately to complete the sealing of the gaps on the core surface.
[0082] Many embodiments and many applications beyond the examples provided will be apparent to those skilled in the art upon reading the above description. Therefore, the scope of the present teachings should not be determined with reference to the above description, but rather with reference to the preceding claims and the full scope of equivalents to which such claims are entitled. For the purpose of comprehensiveness, all articles and references, including disclosures of patent applications and publications, are incorporated herein by reference. The omission of any aspect of the subject matter disclosed herein in the preceding claims is not intended to be a disclaimer of such subject matter, nor should it be considered that the applicants did not consider such subject matter to be part of the disclosed inventive subject matter.
[0083] The above content is a further detailed description of the present invention. It cannot be determined that the specific implementation methods of the present invention are limited to these. For ordinary technicians in the technical field to which the present invention belongs, without departing from the concept of the present invention, they can also make several simple deductions or substitutions, which should be regarded as belonging to the protection scope of the present invention determined by the submitted claims.
Claims
1. A method for preparing an integral sand core device, characterized in that: A device for preparing an integral sand core comprises an upper core box (1) and a lower core box (2); The upper core box (1) comprises an upper core box body (11) and a fixing member; The fixing member comprises a first pin (31) and a second pin (32); A first core head hole (131) is formed at one end of the inner cavity of the upper core box body (11), and a second core head hole (132) is formed at the other end of the inner cavity of the upper core box body (11); the first pin (31) is inserted into the first core head hole (131), and the second pin (32) is inserted into the second core head hole (132); The lower core box (2) comprises a lower core box body (21); The upper core box body (11) is turned 180 degrees and is closed with the lower core box body (21) through a positioning unit; The positioning unit comprises a first positioning hole (121) and a second positioning hole (122); The first positioning hole (121) and the second positioning hole (122) are arranged at diagonal positions of the parting surface of the upper half core box body (11); The lower core box (2) further comprises a third positioning hole (221) and a fourth positioning hole (222); The third positioning hole (221) and the fourth positioning hole (222) are arranged at diagonal positions of the parting surface of the lower half core box body (21); The third positioning hole (221) is arranged opposite to the first positioning hole (121); The fourth positioning hole (222) is arranged opposite to the second positioning hole (122); A first positioning pin (61) is provided in the first positioning hole (121) and the third positioning hole (221); A second positioning pin (62) is provided in the second positioning hole (122) and the fourth positioning hole (222); The method for preparing an integral sand core device comprises the following steps: S1: inserting a first pin (31) into a first core head hole (131) in the upper core box (1), and inserting a second pin (32) into a second core head hole (132); S2: The first pipe (41) is mounted on the first pin (31) in the inner cavity of the upper core box (1), and the second pipe (42) is mounted on the second pin (32); S3: filling the upper core box (1) with resin sand, tamping it, scraping it flat, and leaving it for curing; filling the lower core box (2) with resin sand, tamping it, scraping it flat, and leaving it for curing; S4: after the upper core box (1) and the lower core box (2) are solidified, a first positioning pin (61) is placed in the third positioning hole (221) of the lower core box (2), and a second positioning pin (62) is placed in the fourth positioning hole (222); S5: the upper core box (1) is turned over 180 degrees and joined with the lower core box (2); the first positioning pin (61) is passed through the first positioning hole (121), and the second positioning pin (62) is passed through the second positioning hole; after the upper core box (1) and the lower core box (2) are joined together, the first pin (31) and the second pin (32) are removed, and the upper core box (1) is knocked, so that the upper core is removed from the upper core box (1); S6: The upper core box (1) is moved away, and then the first pin (31) is inserted into the first pipe (41), and the second pin (32) is inserted into the second pipe (42), and the first pin (31) and the second pin (32) are lifted and knocked against the lower core box (2), so that the whole sand core is taken out from the lower core box (2).
2. A method for using a device for preparing an integral sand core according to claim 1, characterized in that: A first protrusion (14) is provided at a core head portion at one end of the inner cavity of the upper core box body (11); A second protrusion (15) is provided at the core head portion at the other end of the inner cavity of the upper core box body (11).
3. The method for using the device for preparing an integral sand core according to claim 1, characterized in that: A first U-shaped groove (24) is provided at a core head portion at one end of the inner cavity of the lower core box body (21); A second U-shaped groove (25) is provided at the core head portion at the other end of the inner cavity of the lower half core box body (21).
4. The method for using the device for preparing an integral sand core according to claim 3, characterized in that: A first square groove (261) extends from one end of the first U-shaped groove (24), and a second square groove (262) extends from the other end of the first U-shaped groove (24); A third square groove (271) extends from one end of the second U-shaped groove (25), and a fourth square groove (272) extends from the other end of the second U-shaped groove (25).
5. The method for using the device for preparing an integral sand core according to claim 1, characterized in that: Angle iron is provided on the top corner of the parting surface of the lower half core box body (21).
6. The method for using the device for preparing an integral sand core according to claim 1, characterized in that: The first pin (31) and the second pin (32) extend into the upper core box (1) by a length of not less than 10 cm, and the length exposed outside the upper core box (1) by a length of not less than 10 cm.
7. The method for using the device for preparing an integral sand core according to claim 1, characterized in that: After the upper core box (1) and the lower core box (2) are cured, an alcohol-based paste coating having a Baume degree of 50-90 is applied within a range of 50-100 mm inward from the edge of the core-dividing surface sand core, and the coating thickness is not less than 1 mm.
8. The method for using the device for preparing an integral sand core according to claim 1, characterized in that: The upper core box (1) is moved away, and then the first pin (31) is inserted into the first pipe (41), and the second pin (32) is inserted into the second pipe (42), and the first pin (31) and the second pin (32) are lifted and knocked against the lower core box (2), so that the whole sand core is taken out from the lower core box (2), and then: For the 20mm range above and below the core surface of the sand cores that are put together, first apply a 50-65 Baume alcohol-based slurry coating, brush off the excess coating and seal the gaps, then use a 10-30 Baume alcohol-based slurry coating to apply it again until it is smooth and ignite it immediately to complete the sealing of the core surface gaps.
9. The method for using the device for preparing an integral sand core according to claim 4, characterized in that: The lower core box (2) is filled with resin sand, compacted, scraped flat, and placed for curing, before which: The first iron wire (51) is sequentially placed in the first square groove (261), the first U-shaped groove (24) and the second square groove (262) of the lower core box (2); the second iron wire (52) is sequentially placed in the third square groove (271), the second U-shaped groove (25) and the fourth square groove (272) of the lower core box (2); then, the lower core box (2) is filled with resin sand, compacted, scraped flat, and placed for curing.
10. The method for using the device for preparing an integral sand core according to claim 9, characterized in that: The upper core is removed from the upper core box (1), after which: The first iron wire (51) located in the first square groove (261) and the second square groove (262) is tied into the first groove (141) in the upper half of the sand core head area, and the second iron wire (52) located in the third square groove (271) and the fourth square groove (272) is tied into the second groove (151) in the upper half of the sand core head area, and the two wires are tied together to form an integral sand core; The first groove (141) and the second groove (151) at the two core heads of the upper core half are formed by the first protrusion (14) and the second protrusion (15) in the upper core half box (1).