A planning method, control device and medium for a wind farm considering cable layout
Through a comprehensive planning method, combining MILP and non-dominant genetic algorithms to optimize the power generation power and cable cost of wind farms, the problem of suboptimal optimization results in traditional planning is solved, and the cable cost and performance improvement of wind farms is reduced.
Patent Information
- Application Number
- CN202410084820.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-01-19
AI Technical Summary
In traditional wind farm planning, the location and cable layout of the wind turbine are designed as independent steps, resulting in suboptimal optimization results, unable to effectively balance power generation and cable costs, and lack of a comprehensive joint planning method.
A comprehensive planning method is proposed to calculate the power generation power and cable cost of the wind farm, establish a planning model, and use the non-dominant genetic algorithm II to optimize the power generation power and minimize cable cost of the wind farm, and calculate the cable in combination with the MILP model. Installation and energy loss cost, optimize wind turbine position and cable layout.
The reduction of the investment cost of wind farm cables has been achieved, the economy and performance of wind farms have been enhanced, and the reasonable planning of wind turbine units and the optimization of cable costs have been taken into account, so as to find the balance point between wind turbine units and cable layout.
Smart Images

Figure CN117933464B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of electricity service, and specifically provides a planning method, a control device and a medium for a wind farm taking cable layout into consideration. Background Art
[0002] The site selection and cable layout of wind farm planning are usually considered as independent and sequential planning steps, first the planning of wind turbine location, and then the design of cable layout. However, due to the competition between the power generation of wind farm units and the cost of cables, the traditional step-by-step sequential design may lead to suboptimal solutions in the optimization results.
[0003] In this case, a comprehensive joint planning approach needs to be considered, aiming to find a balance between wind turbine location and cable layout, which is of great significance for the research and practical application of wind farm planning. Summary of the invention
[0004] In order to overcome the above-mentioned defects, the present invention proposes a planning method, a control device and a medium for a wind farm taking into account the cable layout. The cable cost is taken into account when rationally planning the location of the wind turbines, which can reduce the investment cost of the wind farm cables and enable the wind farm to perform better.
[0005] In a first aspect, the present invention provides a planning method for a wind farm considering cable layout, comprising:
[0006] Calculate the power generation of the wind farm according to the acquired wind turbine site selection parameters of the wind farm;
[0007] Calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm;
[0008] Establishing a planning model based on the power generation and cable cost;
[0009] A planning method for the wind farm is obtained according to the planning model.
[0010] Further, the calculating the power generation of the wind farm according to the acquired wind turbine siting parameters of the wind farm includes:
[0011] According to the wake model, based on the wind speed and wind direction information of the wind farm, the normalized power generation power AEP of the wind farm is calculated. Normalized .
[0012] Furthermore, the normalized generated power AEP of the wind farm is calculated based on the wake model and the acquired wind speed and wind direction information of the wind farm. Normalized include:
[0013]
[0014] Among them, P i (u l ,θ m ) is the i-th unit at wind speed u l , wind direction is θ m The power at the time, f(u l ,θ m ) is the probability distribution of wind speed and direction, M and m are the total number of wind directions and wind direction serial numbers, L and l are the total number of wind speeds and wind speed serial numbers, N is the number of wind farm units, P Greedy The wind farm can achieve maximum power generation when the wake effect is ignored.
[0015] Further, the calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm includes:
[0016] Building a MILP model based on the acquired cable layout parameters of the wind farm;
[0017] According to the MILP model, the cable cost of the wind farm is calculated.
[0018] Furthermore, constructing the MILP model based on the acquired cable layout parameters of the wind farm includes:
[0019] Calculating the cable installation cost based on the Euclidean distance between nodes in the wind farm, the cable unit price, the safety factor and the number of wind farm units, wherein the nodes in the wind farm include all wind turbine units and booster stations;
[0020] Calculate the energy loss cost based on the failure probability of each node;
[0021] Building a MILP model based on the cable installation cost and energy loss cost;
[0022] According to the MILP model, calculating the cable cost of the wind farm includes:
[0023] According to the constructed MILP model, the sum of the cable installation cost and the energy loss cost is calculated to obtain the cable cost of the wind farm.
[0024] Furthermore, the calculation of the cable installation cost based on the Euclidean distance between nodes in the wind farm, the cable unit price, the safety factor and the number of wind farm units includes:
[0025]
[0026] Among them, CIC is the cable installation cost, C unitis the cable unit price, C and c represent the total number of cable types and the cable type serial number, i and j represent any two nodes in all wind turbines and booster stations in the wind farm, d(i,j) is the Euclidean distance between nodes i and j, sf is the preset safety factor, and N is the number of wind farm units.
[0027] Furthermore, the x c (i,j) represents a binary variable for cable connection:
[0028]
[0029] Further, the calculation of the energy loss cost based on the failure rate of each node includes:
[0030]
[0031]
[0032] Where LEC is the energy loss cost, T and t are the life and life sequence of the wind farm, dr is the discount rate, ep(i) is the electricity price of the i-th node, P(i) is the output power of the wind turbine at the i-th node, λ N (i), λ N (j) are the failure probabilities of the i-th and j-th nodes, r(i) is the maintenance time of the i-th node, λ cable is the cable failure probability.
[0033] Furthermore, constructing the MILP model based on the cable installation cost and the energy loss cost also includes:
[0034] Add constraints for linearization, wherein the constraints include:
[0035]
[0036] Where z(i,j)=λ N (i) x c (i,j), A is a continuous variable, λ WT is the initial failure rate, M
[0037] It is a constant and its value is 1000.
[0038] Furthermore, constructing the MILP model based on the cable installation cost and the energy loss cost also includes:
[0039] Satisfy constraints, where the constraints include:
[0040]
[0041]
[0042]
[0043]
[0044] x c (i,j)+x c (j,i)≤1,i≠j (16);
[0045]
[0046]
[0047]
[0048] Among them, i, j, l, k all represent nodes in the wind farm, POC is the booster station node in the wind farm, I rated is the rated current of the cable, and the set χ is used to store the crossover cable pairs {(i,j),(l,k)}.
[0049] Further, said establishing a planning model based on said power generation and cable cost;
[0050] Based on the non-dominated genetic algorithm II, the combination of power generation and cable cost in the wind farm is optimized and a planning model is established, wherein the optimization goal of the non-dominated genetic algorithm II is set to maximize the power generation of the wind farm and minimize the cable cost.
[0051] Furthermore, the non-dominated genetic algorithm II is used to optimize the combination of wind farm power generation and cable cost, and the planning model is established, including:
[0052] An initial population is randomly generated to initialize the population, wherein each individual in the population includes the coordinates of all wind turbines in the wind farm and the real number codes of the coordinates of the booster station;
[0053] New offspring are generated through crossover and mutation operations;
[0054] Merge the generated new offspring with the original population to obtain an updated population;
[0055] Calculating an objective function value for each individual, wherein the objective function value includes the power generation of the wind farm and the cable cost of the wind farm;
[0056] By comparing the objective function values between individuals, the individuals in the population are divided into different non-dominated levels and the crowding distance is calculated;
[0057] According to the ranking of the non-dominant level and the crowding distance, preferentially selecting individuals with high non-dominant levels;
[0058] Repeat the iteration until convergence is achieved.
[0059] In a second aspect, the present invention provides a control device, comprising a processor and a storage device, wherein the storage device is suitable for storing a plurality of program codes, and the program codes are suitable for being loaded and run by the processor to execute the planning method described in any one of the first aspects.
[0060] In a third aspect, the present invention provides a computer-readable storage medium storing a plurality of program codes, wherein the program codes are suitable for being loaded and run by a processor to execute the planning method described in any one of the first aspects.
[0061] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:
[0062] In implementing the technical solution of the present invention, the site selection of wind turbines in a wind farm and the optimization of cable paths are considered simultaneously, which can reduce the investment cost of wind farm cables, enhance the economy of the wind farm during its entire life cycle, and enable the wind farm to perform better.
[0063] The present invention can take into account the reasonable planning of the location of the wind turbines while also considering the optimization and reduction of cable costs, thereby achieving a balance between maximizing the power generation of the wind farm and minimizing the cable costs, and finding a balance between the location of the wind turbines and the cable layout, which is of great significance to the research and practical application of wind farm planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] The disclosure of the present invention will become more easily understood with reference to the accompanying drawings. It is easy for those skilled in the art to understand that these drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In addition, similar numbers in the figures are used to represent similar components, among which:
[0065] Figure 1 is a flowchart of main steps of a planning method according to an embodiment of the present invention;
[0066] Figure 2 A graph showing thrust coefficient and power coefficient of a wind turbine according to an embodiment of the present invention;
[0067] Figure 3 A wind rose diagram of a wind farm according to an embodiment of the present invention;
[0068] Figure 4 A schematic diagram of a process of establishing a planning model according to an embodiment of the present invention;
[0069] Figure 5 A layout result diagram of the output wind turbine position, booster station position and cable path of an application example of the present invention;
[0070] Figure 6 A multi-objective optimization algorithm solution result diagram of an application example of the present invention;
[0071] Figure 7 This is an investment profit comparison chart of an application example of the present invention. DETAILED DESCRIPTION
[0072] Some embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0073] Reference Figure 1 The present invention provides a planning method for a wind farm considering cable layout, comprising:
[0074] S1, calculating the power generation of the wind farm according to the acquired wind turbine site selection parameters of the wind farm;
[0075] S2, calculating the cable cost of the wind farm according to the obtained cable layout parameters of the wind farm;
[0076] S3, establishing a planning model based on the power generation and cable cost;
[0077] S4, obtaining a planning method for the wind farm according to the planning model.
[0078] In one embodiment, the calculation process of step S1 is described as follows:
[0079] According to the wake model, the normalized wake velocity loss of the i-th wind turbine in the wind farm at (x, y, z) is The expression is:
[0080]
[0081] Where D is the diameter of the wind wheel, C T is the thrust coefficient of the wind turbine, σ(x) is the standard deviation of the Gaussian wake profile, z i is the height of the hub center of the i-th wind turbine, y i is the spanwise coordinate of the hub center of the i-th wind turbine, and x, y, and z are the position coordinates in the wind farm.
[0082] The wake velocity loss at the downstream location of the wind farm is caused by the wake loss of multiple wind turbines upstream. To calculate the total wake loss, solve the final velocity u at each location in the wind farm w (x,y,z), using the local linear superposition method, is calculated as follows:
[0083]
[0084] Where U ∞ is the ambient flow velocity, is the inflow wind speed of the i-th wind turbine.
[0085] When the wind turbine inflow speed is u (i.e. U obtained by formula (2) w ), the unit output power calculation formula is as follows:
[0086]
[0087] Among them, u in and u out Respectively represent the cut-in wind speed and cut-out wind speed of the wind turbine; P(u w ) is obtained by interpolating the unit power curve. In one embodiment, the unit power curve refers to Figure 2 , Figure 2 This is a graph of thrust coefficient and power coefficient in an application scenario.
[0088] Reference Figure 3 The wind direction and wind speed distribution diagram, considering the probability distribution of wind direction θ and wind speed u, the total power generation power P of the wind farm WF It can be calculated as follows:
[0089]
[0090] Among them, P i (u l ,θ m ) is the i-th unit at wind speed u l , wind direction is θ m The power at the time, f(u l ,θ m ) is the probability distribution of wind speed and direction, M and m are the total number of wind directions and wind direction serial numbers respectively, L and l are the total number of wind speeds and wind speed serial numbers respectively, and N is the number of wind farm units. It should be noted that N is actually the total number of wind farm nodes, but when calculating power, the booster station node has no power output by default, so when calculating power, N becomes the number of wind farm units.
[0091] In order to better evaluate the power generation efficiency, a normalized parameter is introduced:
[0092]
[0093] Where P Greedy The wind farm can achieve maximum power generation when the wake effect is ignored.
[0094] In summary, according to the wake model, based on the wind speed and wind direction information of the wind farm, the normalized power generation power AEP of the wind farm is calculated. Normalized include:
[0095]
[0096] By calculating the normalized power generation AEP Normalized The generated power of the wind farm S1 can be obtained.
[0097] In one embodiment, the calculation process of step S2 is described as follows:
[0098] First, define a binary variable x c (i,j), where c is the cable type number, i,j represent any two nodes among all nodes where wind turbines and booster stations are located:
[0099]
[0100] In formula (6), x c When the value of (i,j) is 0, there are two cases: 1. A cable different from the type c is installed between nodes i and j; 2. There is no cable connection between nodes i and j.
[0101] Although there are C types of cables to choose from, each type of cable is mutually exclusive. Only one type of cable can be selected for the same path, and the constraints are as follows:
[0102]
[0103] Where C and c represent the total number of cable types and the cable type serial number.
[0104] In the present application, step S2, the step of calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm comprises:
[0105] Building a MILP model based on the acquired cable layout parameters of the wind farm;
[0106] According to the MILP model, the cable cost of the wind farm is calculated.
[0107] In one embodiment, calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm includes:
[0108] Building a MILP model based on the acquired cable layout parameters of the wind farm;
[0109] According to the MILP model, the cable cost of the wind farm is calculated.
[0110] In one embodiment, constructing the MILP model based on the acquired cable layout parameters of the wind farm includes:
[0111] Calculating the cable installation cost based on the Euclidean distance between nodes in the wind farm, the cable unit price, the safety factor and the number of wind farm units, wherein the nodes in the wind farm include all wind turbine units and booster stations;
[0112] Calculate the energy loss cost based on the failure probability of each node;
[0113] A MILP model is constructed based on the cable installation cost and energy loss cost.
[0114] According to the MILP model, calculating the cable cost of the wind farm includes:
[0115] According to the constructed MILP model, the sum of the cable installation cost and the energy loss cost is calculated to obtain the cable cost of the wind farm.
[0116] The above process is described in detail below.
[0117] The cable cost of the wind farm is the total cost, including the cable installation cost (CIC) and the energy loss cost (LEC):
[0118] Cable Cost=CIC+LEC (8)
[0119] The calculation formula for cable installation cost is:
[0120]
[0121] Among them, CIC is the cable installation cost, C unit is the cable unit price, C and c represent the total number of cable types and the cable type serial number, i and j represent any two nodes in all wind turbines and booster stations in the wind farm, d(i,j) is the Euclidean distance between nodes i and j, sf is the preset safety factor, N is the number of wind farm units, and N is the total number of wind farm nodes. In one embodiment, sf can be set to 1.7.
[0122] The energy loss cost is calculated as
[0123]
[0124] LEC is the energy loss cost, T and t are the life and life sequence of the wind farm respectively, dr is the discount rate, ep(i) is the electricity price of the i-th node, P(i) is the output power of the wind turbine at the i-th node, λ N (i) is the failure probability of the ith node, r(i) is the maintenance time of the ith node, and N is the total number of nodes in the wind farm.
[0125] LEC represents the economic loss caused by cable failure and is used to evaluate the reliability of the power collection system. In one embodiment, T can be set to 20 years.
[0126]
[0127] where λ cable is the cable failure probability. When node i represents a wind turbine, the initial failure rate λ init (i) Set to λ WT ; When node j represents a power conversion station (POC), this value is set to 0. λ N (i), λ N (j) are the failure probabilities of the i-th and j-th nodes respectively.
[0128] It should be noted that in formula (11), λ N (j)·x c (j,i) introduces nonlinear terms. In order to maintain the construction of the mixed linear integer model, the Big M method is used and the following constraints are added for linearization:
[0129]
[0130] Introduce a new variable z(i,j), where A is a continuous variable with a lower bound of the initial failure rate λ WT , the upper limit is a constant M. In one embodiment, M can be set to 1000.
[0131] In order to meet the design requirements of the radial wind farm collection system, the cable path layout should meet the following constraints:
[0132]
[0133]
[0134]
[0135] x c (i,j)+x c (j,i)≤1,i≠j (16);
[0136]
[0137]
[0138]
[0139] i, j, l, k all represent nodes in the wind farm, POC is the booster station node, I ratedis the rated current of the cable, and the set χ is used to store the crossover cable pairs {(i,j),(l,k)}.
[0140] Formula (13) ensures that each node has only one cable for energy output. Formula (14) ensures that at least one cable is connected to the booster station. Formula 15 prevents the same section of cable from being connected to the same node. Formula (16) prevents energy loops from occurring between any two nodes. Formula (17) avoids any two sections of cable from crossing, and the set χ stores the crossed cable pairs {(i,j),(l,k)}. Formula (18) represents the power balance of each node, where f is a continuous non-negative variable. Formula (19) ensures that the power flow on each cable is lower than the cable capacity.
[0141] So far, formulas (6)-(19) constitute the complete MILP model of the wind farm cable topology path.
[0142] In one embodiment, the calculation process of step S3 is described as follows:
[0143] Based on the non-dominated genetic algorithm II, the combination of power generation and cable cost in the wind farm is optimized and a planning model is established, wherein the optimization goal of the non-dominated genetic algorithm II is set to maximize the power generation of the wind farm and minimize the cable cost.
[0144] In one embodiment, the non-dominated genetic algorithm II uses the NSGA-II algorithm to optimize the target setting as follows:
[0145] max(AEP Normalized )&min(Cable Costx otal ),
[0146] Among them, AEP Normalized is the power generation of the wind farm, which is the total power generation of the wind turbines. total is the cable cost of the wind farm, which is the sum of the costs of all cables.
[0147] In the present invention, reference is made to Figure 4 The non-dominated genetic algorithm II is used to optimize the combination of wind farm power generation and cable cost, and the planning model is established including:
[0148] S31, population initialization
[0149] An initial population is randomly generated, in which each individual contains the location coordinates of all wind turbines and the real number encoding Φ = (h1, ..., hi, v1, ..., vi) of the location coordinates of the booster station, where h represents the horizontal coordinate and v represents the vertical coordinate.
[0150] Each individual represents a planning method for a wind farm, planning how to reasonably layout the locations of wind turbines and booster stations. Therefore, each individual includes the location coordinates of the wind turbines and the location coordinates of the booster stations.
[0151] In one application scenario, there are 40 individuals in the population, namely 39 wind turbines and 1 substation.
[0152] S32, crossover and mutation operations
[0153] New offspring are generated through crossover and mutation operations. The mutation adopts polynomial mutation; in one application scenario, the crossover adopts simulated binary crossover.
[0154] S33, population update
[0155] The newly generated offspring are merged with the original population to obtain an updated population.
[0156] S34, fitness function evaluation
[0157] The objective function value of each individual is calculated, and the objective function value of the present invention includes the power generation of the wind farm and the cable cost of the wind farm.
[0158] Each individual includes two objective function values, one of which is the value of the power generated by the wind farm, and the other is the value of the cable cost of the wind farm.
[0159] The planning scheme of the present invention not only considers the reasonable layout of the wind turbines to maximize the value of the generated power, but also considers minimizing the cable cost under this layout.
[0160] The power generated by the wind farm is obtained through calculation, and the cable cost is obtained through optimization.
[0161] The value of the wind farm's power generation is obtained according to step S1. Step S1 can construct a corresponding power generation model according to formulas (1)-(5) to calculate the value of the wind farm's power generation. If there is a situation where the spacing d(i, j) of wind turbines in an individual is less than the safety distance, a penalty mechanism is introduced to set the power generation of the individual to 0, and the power generation under the layout is obtained.
[0162] The value of the cable cost of the wind farm is obtained according to step S2. Step S2 can construct a corresponding cable cost MILP model according to formulas (6)-(19). The model includes cable-related costs and cable layout. In one embodiment, the cable cost model is a MILP model, which is constructed according to formulas (6)-(19) to obtain the value of the cable cost of the wind farm.
[0163] The cable-related costs and cable layout are obtained by solving the MILP model. For a wind farm with N nodes, directly introducing the cable no-crossing constraint (i.e., formula (17)) will increase N 4 The number of variables in the equation greatly increases the difficulty of solving the problem. In order to solve the problem quickly, the relaxed model without cross constraints is solved first (i.e., the relaxed model contains formulas (6)-(16) and formulas (18)-(19)). After obtaining the initial solution, determine whether the cable crossover occurs and identify the crossover position. Add no-crossover constraints to the crossover position to form a new relaxed model (i.e., the new relaxed model contains formulas (6)-(16), formulas (18)-(19) and no-crossover constraints at some positions). Repeat the iteration until a cable layout without crossover is generated.
[0164] S35, Non-dominated sorting and crowding distance calculation
[0165] By comparing the objective function values between individuals, the individuals in the population are divided into different non-dominated levels and the crowding distance is calculated.
[0166] S36, the choice of a new generation of individuals
[0167] According to the non-dominated order and crowding distance, individuals with high non-dominated levels are selected. If adding all individuals of a certain non-dominated level will make the population size exceed the limit, individuals with higher crowding degree are selected until the required number of individuals is obtained.
[0168] S37, repeat the iteration until convergence is satisfied
[0169] Iterate steps S32 to S36 until the convergence condition is met.
[0170] The optimization stopping condition is defined as the growth rate of HV value is less than 0.0001 in 1000 consecutive generations. Where HV is defined as follows
[0171]
[0172] where δ represents the Lebesgue determination, and [f1(X),r1]×[f2(X),r2] represents the hypervolume composed of each point of the frontier solution and the reference point.
[0173] After convergence is met, the planning model is established.
[0174] In one embodiment, the method for obtaining the planning of the wind farm according to the planning model is described in S4.
[0175] According to the planning model, the planning method for the wind farm is obtained, including: inputting the arrangement of wind turbines and cable layout of the wind farm to obtain the planning method for the wind farm, and the output planning method can be one or more preferred solutions.
[0176] Since the maximum power generation of a wind farm and the minimum cable cost are often not reflected in one planning scheme, multiple recommended schemes with maximum power generation of the wind farm and minimum cable cost are often obtained based on the planning model.
[0177] It should be pointed out that although the various steps in the above embodiments are described in a specific order, those skilled in the art can understand that in order to achieve the effects of the present invention, different steps do not have to be performed in such an order. They can be performed simultaneously (in parallel) or in other orders. These changes are within the scope of protection of the present invention.
[0178] The invention provides an optimization design method that takes into account the micro-site selection of wind turbines in a wind farm and the cable path, which can reduce the investment cost of wind farm cables, enhance the economy of the wind farm over its entire life cycle, and enable the wind farm to perform better.
[0179] Application Example 1
[0180] S1, calculating the power generation of the wind farm according to the acquired siting parameters of the wind turbines in the wind farm.
[0181] In this application example, the planned size of the wind farm is 3000m*3000m, that is, the location of the wind turbines and booster stations should meet the following requirements:
[0182] Φ=(h1,…,hi,v1,…,vi),hi∈(0,3000),vi∈(0,3000)
[0183] Using real wind resource data, the wind rose diagram is as follows: Figure 2 The thrust coefficient and power coefficient curve of wind turbine are as follows: Figure 3 The safety distance between units in a wind farm is set to 3 times the diameter of the wind rotor;
[0184] According to the above parameters, calculate
[0185] S2, calculating the cable cost of the wind farm according to the obtained cable layout parameters of the wind farm. Table 1 shows the optional cable parameters.
[0186] Table 1 Optional cable parameters
[0187]
[0188] Table 2 Reliability parameters
[0189]
[0190] Based on the values in Table 1 and Table 2, a MILP model is constructed; according to the MILP model, the cable cost of the wind farm is calculated, including the cable installation cost (CIC) and the energy loss cost (LEC).
[0191] S3, based on the power generation and cable cost, a multi-objective optimization model for the joint planning of wind turbine micro-site selection and cable path planning in the wind farm is established, i.e., the planning model of the present invention.
[0192] The optimization objectives of the NSGA-II algorithm are set as follows:
[0193] max(AEP Normalized )&min(Cable Cost total ),
[0194] Among them, AEP Normalized is the normalized power generation of the wind farm. Cable Cost total is the total cable cost.
[0195] Solve the planning model
[0196] An initial population is randomly generated, in which each individual contains the coordinates of all wind turbines and the real number codes (hi, vi) of the coordinates of the booster stations, and each individual is a wind farm unit arrangement scheme.
[0197] New offspring are generated through crossover and mutation operations.
[0198] The mutation adopts polynomial mutation and the crossover adopts simulated binary crossover. The newly generated offspring is merged with the original population to obtain the updated population. The objective function value of each individual is calculated. In the joint optimization, the objective functions are a. power generation and b. cable cost.
[0199] By comparing the objective function values between individuals, the individuals in the population are divided into different non-dominated levels and the crowding distance is calculated.
[0200] According to the non-dominated order and crowding distance, individuals with high non-dominated levels are selected. If adding all individuals of a certain non-dominated level will make the population size exceed the limit, individuals with higher crowding degree are selected until the required number of individuals is obtained.
[0201] The iterations were repeated until the convergence criterion was met. The optimization stopping criterion was defined as the increase rate of HV value was less than 0.0001 in 1000 consecutive generations.
[0202] S4, obtaining a planning method for the wind farm according to the planning model
[0203] Through the above steps, the multi-objective optimization results are obtained as follows Figure 5The wind farm layout plan is obtained as Figure 6 ,In the figure, WT is the abbreviation of wind turbine, which means wind turbine set; POC means booster station.
[0204] Comparative Example 1
[0205] According to the existing independent and sequential planning steps, the wind turbine location is planned first, and then the cable layout is designed, so as to obtain the wind turbine location and circuit layout of the power plant.
[0206] The application example 1 and the comparative example 1 using the planning method of the present invention are compared. Figure 7 (Point A is comparative example 1, and point T is application example 1.) It can be seen that the ordinate of point T is higher than that of point A, indicating that the optimization design of the wind farm wind turbine site selection and the cable path by the present invention is superior to the ordinary single sequential optimization of comparative example 1. Therefore, the impact of cable cost on the economic efficiency of the entire life cycle should be considered in planning, and a better topological structure of the power collection system should be found.
[0207] It is understood by those skilled in the art that the present invention implements all or part of the processes in the method of the above embodiment, and can also be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable storage medium may include: any entity or device, medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electric carrier signal, telecommunication signal and software distribution medium that can carry the computer program code. It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electric carrier signals and telecommunication signals.
[0208] Furthermore, the present invention also provides a control device. In an embodiment of a control device according to the present invention, the control device includes a processor and a storage device, the storage device can be configured to store a program for executing the wind farm planning method of the above method embodiment, and the processor can be configured to execute the program in the storage device, which includes but is not limited to the program for executing the wind farm planning method of the above method embodiment. For ease of explanation, only the parts related to the embodiment of the present invention are shown. For specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The control device can be a control device device formed by various electronic devices.
[0209] Furthermore, the present invention also provides a computer-readable storage medium. In a computer-readable storage medium embodiment according to the present invention, the computer-readable storage medium can be configured to store a program for executing the wind farm planning method of the above method embodiment, and the program can be loaded and run by a processor to implement the above wind farm planning method. For ease of explanation, only the parts related to the embodiment of the present invention are shown. For specific technical details not disclosed, please refer to the method part of the embodiment of the present invention. The computer-readable storage medium can be a storage device formed by various electronic devices. Optionally, the computer-readable storage medium in the embodiment of the present invention is a non-temporary computer-readable storage medium.
[0210] In the description of the present invention, "processor" may include hardware, software or a combination of the two. The processor has data and / or signal processing functions. The processor can be implemented in software, hardware or a combination of the two. Non-transitory computer-readable storage media include any suitable medium that can store program code, such as a disk, hard disk, optical disk, flash memory, read-only memory, random access memory, etc.
[0211] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A planning method for wind farms considering cable layout, It is characterized in that include: Calculate the power generation of the wind farm according to the acquired wind turbine site selection parameters of the wind farm; Calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm; Establishing a planning model based on the power generation and cable cost; According to the planning model, a planning method for the wind farm is obtained; The step of calculating the power generation of the wind farm according to the acquired wind turbine site selection parameters of the wind farm comprises: According to the wake model, based on the wind speed and wind direction information of the wind farm, the normalized power generation power AEP of the wind farm is calculated. Normalized ; The normalized power generation AEP of the wind farm is calculated based on the wake model and the wind speed and wind direction information of the wind farm. Normalized include: Among them, P i (u l ,θ m ) is the i-th unit at wind speed u l , wind direction is θ m The power at the time, f(u l ,θ m ) is the probability distribution of wind speed and direction, M and m are the total number of wind directions and wind direction serial numbers, L and l are the total number of wind speeds and wind speed serial numbers, N is the number of wind farm units, P Greedy The wind farm can achieve the maximum power generation when the wake effect is ignored; Calculating the cable cost of the wind farm according to the acquired cable layout parameters of the wind farm includes: Building a MILP model based on the obtained cable layout parameters of the wind farm; According to the MILP model, calculating the cable cost of the wind farm; The constructing of the MILP model based on the acquired cable layout parameters of the wind farm includes: Calculating the cable installation cost based on the Euclidean distance between nodes in the wind farm, the cable unit price, the safety factor and the number of wind farm units, wherein the nodes in the wind farm include all wind turbine units and booster stations; Calculate the energy loss cost based on the failure probability of each node; Building a MILP model based on the cable installation cost and energy loss cost; According to the MILP model, calculating the cable cost of the wind farm includes: According to the constructed MILP model, the sum of the cable installation cost and the energy loss cost is calculated to obtain the cable cost of the wind farm; The calculation of the cable installation cost based on the Euclidean distance between nodes in the wind farm, the cable unit price, the safety factor and the number of wind farm units includes: Among them, CIC is the cable installation cost, C unit is the cable unit price, C and c represent the total number of cable types and the cable type serial number, i and j represent any two nodes in all wind turbines and booster stations in the wind farm, d(i,j) is the Euclidean distance between nodes i and j, sf is the preset safety factor, and N is the number of wind farm units; The x c (i,j) represents a binary variable for cable connection: The energy loss cost calculation based on the failure rate of each node includes: Where LEC is the energy loss cost, T and t are the life and life sequence of the wind farm, dr is the discount rate, ep(i) is the electricity price of the i-th node, P(i) is the output power of the wind turbine at the i-th node, λ N (i), λ N (j) are the failure probabilities of the i-th and j-th nodes, r(i) is the maintenance time of the i-th node, λ cable is the cable failure probability; The constructing of the MILP model based on the cable installation cost and the energy loss cost further comprises: Add constraints for linearization, wherein the constraints include: Where z(i,j)=λ N (i) x c (i,j), A is a continuous variable, λ WT is the initial failure rate, M is a constant, and its value is 1000; The constructing of the MILP model based on the cable installation cost and the energy loss cost further comprises: Satisfy constraints, where the constraints include: x c (i,j)+x c (j,i)≤1,i≠j; Among them, i, j, l, k all represent nodes in the wind farm, POC is the booster station node in the wind farm, I rated is the rated current of the cable, and the set χ is used to store the crossover cable pairs {(i,j),(l,k)}.
2. The method according to claim 1, It is characterized in that said establishing a planning model based on said power generation and cable cost; Based on the non-dominated genetic algorithm II, the combination of power generation and cable cost in the wind farm is optimized and a planning model is established, wherein the optimization goal of the non-dominated genetic algorithm II is set to maximize the power generation of the wind farm and minimize the cable cost.
3. The method according to claim 2, It is characterized in that The non-dominated genetic algorithm II is used to optimize the combination of wind farm power generation and cable cost, and the planning model is established, including: An initial population is randomly generated to initialize the population, wherein each individual in the population includes the coordinates of all wind turbines in the wind farm and the real number codes of the coordinates of the booster station; New offspring are generated through crossover and mutation operations; Merge the generated new offspring with the original population to obtain an updated population; Calculating an objective function value for each individual, wherein the objective function value includes the power generation of the wind farm and the cable cost of the wind farm; By comparing the objective function values between individuals, the individuals in the population are divided into different non-dominated levels and the crowding distance is calculated; According to the ranking of the non-dominant level and the crowding distance, preferentially selecting individuals with high non-dominant levels; Repeat the iteration until convergence is achieved.
4. A control device comprising a processor and a storage device, wherein the storage device is suitable for storing a plurality of program codes, It is characterized in that The program code is suitable for being loaded and run by the processor to execute the planning method according to any one of claims 1 to 3.
5. A computer-readable storage medium having a plurality of program codes stored therein, It is characterized in that The program code is suitable for being loaded and run by a processor to execute the planning method according to any one of claims 1 to 3.