A concrete composite slab with detachable steel tube ribs

By pre-embedding vertical pipes in the precast base slab and bolting them to the steel pipe ribs to form a detachable truss, the problems of complex structure and material waste in existing concrete composite slabs are solved. This enables the steel pipe ribs to be detachable and reused, improving the structural strength and construction efficiency of the composite layer.

CN118048996BActive Publication Date: 2024-11-22HANGZHOU YOUCHAO STRUCTURAL DESIGN OFFICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410352300.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-22
Estimated Expiration
2044-03-26

AI Technical Summary

Technical Problem

Existing detachable concrete composite slabs have complex structures and poor performance. The integral steel pipes are heavy and difficult to disassemble, which affects the construction of cast-in-place layers. Furthermore, the steel trusses cannot be disassembled after construction, resulting in material waste.

Method used

The prefabricated base plate is used to embed vertical pipes and detachable steel pipe ribs, which are connected by bolts to form a detachable truss. The vertical pipes and steel pipe ribs are detachably connected by bolts and connectors. The height of the steel pipe ribs is adjustable. The split structure is convenient for storage and transportation. The connectors are equipped with springs and steel balls to ensure structural stability.

Benefits of technology

It enables the disassembly and reuse of steel pipe ribs, reduces material waste, improves the structural strength and construction efficiency of the composite layer, reduces construction costs, and the steel pipe ribs can be used as support frames to reduce the use of lower scaffolding. The truss structure has high stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118048996B_ABST
    Figure CN118048996B_ABST
Patent Text Reader

Abstract

The present invention provides a concrete composite slab with detachable steel tube ribs, comprising a prefabricated base plate, a cast-in-place layer and a detachable steel tube rib connected to the top of the prefabricated base plate, wherein a plurality of risers are embedded in the prefabricated base plate, and the periphery of the risers is provided with a concrete pier connected to the prefabricated base plate; the risers are connected to the steel tube ribs by bolts, and the surface of the bolts is provided with an external thread matching the internal thread of the risers, and the bolts are threadedly connected to the risers after passing through the steel tube ribs. The present invention forms a detachable truss through the risers, bolts and steel tube ribs in the prefabricated base plate, and the length of the steel tube ribs can be spliced ​​and the height can be adjusted, so that the steel tube ribs can serve as a support frame; the risers are distributed in point positions on the prefabricated base plate, so that transverse steel bars and longitudinal steel bars can be embedded in the prefabricated base plate and the cast-in-place layer at the same time, effectively improving the bidirectional force performance of the composite layer; in addition, the split steel tube ribs can be stored, transported and assembled separately, which is convenient for construction and turnover.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete composite slabs, in particular to a concrete composite slab with detachable steel tube ribs. Background Art

[0002] Concrete composite slabs are assembled integral floor slabs composed of prefabricated slabs and cast-in-place reinforced concrete layers, and are widely used in existing prefabricated buildings. Existing concrete composite slabs mainly use steel truss concrete composite slabs, which use steel trusses to improve the overall rigidity of the composite slabs and prevent the composite slabs from cracking; however, the steel trusses only play a bending and shearing role during construction. After the composite slabs are formed, their resistance is no longer considered. The steel trusses are permanently left in the composite slabs, which will cause material waste. Therefore, the market urgently needs a composite slab structure with detachable steel trusses.

[0003] Chinese patent CN219343702U discloses a detachable concrete composite slab, wherein the detachable truss steel bar is composed of an anti-slip bottom plate and a truss body, wherein the anti-slip bottom plate is inserted into an anti-slip groove provided on the concrete slab, and the truss body passes through a through groove provided on the concrete slab. This patent technology has fatal defects: (1) The detachable truss steel bar is installed through the anti-slip groove provided on the concrete slab, but after the concrete is cast in place, the detachable truss steel bar is covered under the cast-in-place concrete layer and cannot be removed, thus failing to achieve the detachable effect. (2) The detachable truss steel bar needs to be inserted into the anti-slip groove as a whole, thus requiring a sufficiently large operating space at the construction site, but such a large space cannot be reserved for the composite layer at the corners.

[0004] Chinese patent CN215858494U discloses a detachable concrete composite slab, which is detachable by a rectangular steel tube made of an I-shaped steel plate and a screw rod. However, the patent technology has the following defects: (1) The lower flange of the I-shaped steel plate is anchored into the concrete base plate and will remain permanently in the composite slab, which consumes a large amount of steel; (2) Because the I-shaped steel plate protrudes from the surface of the base plate, the steel bars in the cast-in-place layer can only be laid along the length direction of the I-shaped steel plate, and vertical steel bars cannot be set, so a two-way slab cannot be formed, and the structural force of the composite slab is unreasonable; (3) The upper detachable rectangular steel tube is an integral steel beam with a heavy weight. Both installation and disassembly require crane operation, which is inconvenient for construction and cannot form a vertical flow construction operation.

[0005] Chinese patent CN114000631B discloses a rotating and detachable steel frame and composite plate connection structure, including a plurality of square steel pipes detachably fixed on a prefabricated base plate for supporting. However, the patent technology has the following defects: (1) the plurality of square steel pipes for supporting are located below the prefabricated base plate. When the steel pipes are removed, temporary support and protection measures need to be set up under the plate, and vertical layered flow operation is not possible, which is inefficient; (2) the square steel pipes are tightly attached to the bottom of the prefabricated base plate, and a separate support frame needs to be placed above the prefabricated base plate for construction workers to operate, which is complex and inconvenient. Summary of the invention

[0006] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a concrete composite slab with detachable steel tube ribs, which is used to solve the problems in the prior art that the detachable truss structure is complex, the effect is poor, it affects the cast-in-place layer, and the integral steel tube is heavy and inconvenient to disassemble.

[0007] In order to achieve the above-mentioned object and other related objects, the present invention provides the following technical solutions:

[0008] A first aspect of the present invention provides a detachable steel tube rib concrete composite slab, comprising a prefabricated bottom plate, a cast-in-place layer cast on the prefabricated bottom plate, and a detachable steel tube rib connected to the top of the prefabricated bottom plate, wherein a plurality of risers are pre-buried in the prefabricated bottom plate, the risers are vertically arranged and have internal threads, and the periphery of the risers is provided with a concrete pier connected to the prefabricated bottom plate;

[0009] The riser is connected to the steel pipe rib by bolts. The surface of the bolt is provided with an external thread matching the internal thread of the riser. The bolt passes through the steel pipe rib and is connected with the riser thread.

[0010] In one embodiment of the present invention, a vertically penetrating hole is provided on the steel pipe rib, a threaded tube is provided in the hole, and the threaded tube is connected with the bolt.

[0011] In one embodiment of the present invention, a vertically penetrating hole is formed on the steel tube rib, and the bolt passes through the hole and is connected with the nut.

[0012] In one embodiment of the present invention, the risers are spaced apart from each other, and a plurality of the risers are arranged in a rectangular array on the prefabricated bottom plate.

[0013] In one embodiment of the present invention, a plurality of transverse steel bars and longitudinal steel bars are embedded inside the cast-in-place layer.

[0014] In one embodiment of the present invention, a movable sleeve is sleeved on the middle of the bolt, the lower surface of the sleeve contacts the upper surface of the riser, and the upper surface of the sleeve is highly consistent with the upper surface of the cast-in-place layer.

[0015] In one embodiment of the present invention, the steel tube rib is a split structure, and two adjacent steel tube ribs are detachably connected via a connecting piece.

[0016] In one embodiment of the present invention, the connecting member is a tubular structure matched with the steel pipe rib, and a first installation groove is formed on the inner wall of the connecting member, and a spring piece is disposed in the first installation groove.

[0017] In one embodiment of the present invention, a plurality of second installation grooves are formed on the inner wall of the middle portion of the connecting member, steel balls are disposed in the second installation grooves, and a compressed elastic member is disposed between the steel balls and the second installation grooves.

[0018] A second aspect of the present invention provides a method for installing a concrete composite slab, comprising the following steps:

[0019] S1. Use connectors to connect the steel tube ribs to the required length, and fix the steel tube ribs on the top of the prefabricated bottom plate with bolts;

[0020] S2. Hoist the prefabricated bottom plate to the corresponding position of the wall, and adjust the position of the prefabricated bottom plate so that the two become a whole;

[0021] S3. Laying transverse and longitudinal steel bars on the prefabricated base plate;

[0022] S4, pouring concrete on the prefabricated base plate, and after the concrete pouring is completed, curing it and superimposing it to form a complete load-bearing component;

[0023] S5. After the concrete strength meets the requirements, remove the bolts and steel pipe ribs and recycle them.

[0024] As described above, the concrete composite slab with detachable steel tube ribs of the present invention has the following beneficial effects:

[0025] 1. The present invention forms a detachable truss through the risers, bolts and steel tube ribs in the prefabricated bottom plate. The tension on the bottom of the truss is borne by the prefabricated bottom plate, and the compression on the top of the truss is borne by the steel tube ribs, giving full play to the advantages of both. Moreover, by adjusting the position of the bolts relative to the risers or the steel tube ribs, or replacing bolts of different lengths, the height of the steel tube ribs can be adjusted, so that the truss composed of the steel tube ribs and the prefabricated bottom plate can act as a supporting frame, and the lower scaffolding support can be used less or even not used during construction, which speeds up the construction period and saves costs.

[0026] 2. The risers of the present invention are distributed at points on the prefabricated base plate, so they do not affect the laying of steel bars on the upper surface of the prefabricated base plate. Therefore, transverse and longitudinal steel bars can be laid on the upper surface of the prefabricated base plate at the same time, and then cast-in-place concrete can be added, so that a number of transverse and longitudinal steel bars are buried inside the cast-in-place layer at the same time, effectively improving the structural strength of the composite layer.

[0027] 3. The present invention arranges the steel pipe ribs into a split structure, so that each steel pipe can be stored, transported and assembled separately, which is convenient for construction and turnover.

[0028] 4. The present invention realizes the connection between two steel tube ribs through a connecting piece, and a spring sheet is arranged on the inner wall of the connecting piece. The elastic force of the spring sheet is used to press the end of the steel tube rib tightly into the connecting piece to prevent the steel tube rib from shaking and ensure the structural stability of the truss; and an elastic piece and a steel ball are arranged in the middle of the connecting piece, and the steel ball is used to provide axial force for the steel tube ribs on both sides to ensure the axial stability of the steel tube ribs, thereby ensuring the firmness of the entire truss. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic structural diagram of a concrete composite slab with detachable steel tube ribs disclosed in Example 1 of the present invention.

[0030] Figure 2 A cross-sectional view of a concrete composite slab with detachable steel tube ribs disclosed in Example 1 of the present invention Figure 1 .

[0031] Figure 3 A cross-sectional view of a concrete composite slab with detachable steel tube ribs disclosed in Example 1 of the present invention Figure 2 .

[0032] Figure 4 It is a cross-sectional schematic diagram of the connecting piece disclosed in Example 3 of the present invention.

[0033] Component number description

[0034] 1. Prefabricated base plate; 11. Vertical pipe; 12. Concrete pier; 13. Prestressed steel bars; 2. Cast-in-place layer; 21. Transverse steel bars; 22. Longitudinal steel bars; 3. Steel pipe ribs; 4. Bolts; 5. Connectors; 51. First mounting groove; 52. Shrapnel; 53. Second mounting groove; 54. Steel balls; 55. Elastic parts. DETAILED DESCRIPTION

[0035] The following specific embodiments illustrate the implementation of the present invention, and those familiar with the technology can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0036] Example 1

[0037] See also Figures 1 to 3The present invention provides a concrete composite slab with detachable steel tube ribs, comprising a precast base plate 1, a cast-in-place layer 2 cast on the precast base plate 1, and a detachable steel tube rib 3 connected to the top of the precast base plate 1, wherein a plurality of risers 11 are embedded in the precast base plate 1, wherein the risers 11 are vertically arranged and have internal threads, and a concrete pier 12 connected to the precast base plate 1 is arranged on the periphery of the risers 11; the risers 11 are connected to the steel tube ribs 3 by bolts 4, and the surface of the bolts 4 is provided with external threads matching the internal threads of the risers 11, and the bolts 4 are threadedly connected to the risers 11 after passing through the steel tube ribs 3.

[0038] The present invention connects the steel tube rib 3 with the riser 11 in the prefabricated base plate 1 to form a truss. The prefabricated base plate 1 bears the tension at the bottom of the truss, and the steel tube rib 3 bears the compression at the top of the truss, giving full play to the advantages of both. High-pressure grouting can also be performed in the steel tube rib 3 to further improve its rigidity. In addition, the present invention provides a detachable truss, and after the composite plate is formed, the truss can be disassembled and reused to avoid material waste. In addition, by adjusting the position of the bolt 4 and the riser 11 or the steel tube rib 3, or by replacing the bolts 4 of different lengths, the height adjustment of the steel tube rib 3 can be achieved, so that the steel tube rib 3 can act as a support frame, and the lower scaffolding support can be used less or even not at all during construction, saving costs.

[0039] Furthermore, the risers 11 are arranged at intervals, and a plurality of the risers 11 are arranged in a rectangular array on the precast base plate 1. The concrete piers 12 outside the risers 11 can well support the risers 11, ensuring the vertical arrangement of the risers 11. Since the risers 11 of the present invention are distributed at points on the precast base plate 1, they do not affect the laying of steel bars on the upper surface of the precast base plate 1, so that transverse and longitudinal steel bars can be laid on the upper surface of the precast base plate 1 at the same time, and then cast-in-place concrete is added, so that a plurality of transverse steel bars 21 and longitudinal steel bars 22 are buried in the cast-in-place layer 2 at the same time, effectively improving the bidirectional force performance of the laminated layer.

[0040] In order to achieve the matching connection between the steel tube rib 3 and the bolt 4, in a preferred connection method: a vertical through hole is opened on the steel tube rib 3, a threaded pipe is fixed in the hole, and the threaded pipe is matched with the bolt 4. All methods that can make the steel tube rib 3 and the bolt 4 match and connect can be used. In another preferred connection method: a vertical through hole is opened on the steel tube rib 3, and the bolt 4 is matched with the nut after passing through the hole, and the height of the steel tube rib 3 can be controlled by the position of the nut on the bolt 4.

[0041] Since the prefabricated base plate 1 has been manufactured in the factory, and the cast-in-place layer 2 is cast at the construction site according to demand, in order to achieve controllable thickness of the cast-in-place layer 2, a movable pipe sleeve (not shown in the figure) is also sleeved in the middle of the bolt 4, and the pipe sleeve can move up and down along the rod of the bolt 4, and the lower surface of the pipe sleeve contacts the upper surface of the riser 11, and the upper surface of the pipe sleeve is highly consistent with the upper surface of the cast-in-place layer 2. By providing the pipe sleeve, the present invention can prevent the bolt 4 from being covered by the cast-in-place layer 2 and unable to be removed, and the pipe sleeve can be replaced according to the required thickness of the cast-in-place layer 2, so that cast-in-place layers 2 of different thicknesses can be cast according to demand.

[0042] Furthermore, in order to enhance the strength of the prefabricated base plate 1, a plurality of transversely and longitudinally arranged prestressed steel bars 13 are embedded inside the prefabricated base plate 1, and the prestressed steel bars 13 include one or a combination of stress-relieving steel wires, medium-strength prestressed steel wires, prestressed threaded steel bars, and steel strands.

[0043] Furthermore, the prefabricated base plate 1 is cast by concrete of C40 or above.

[0044] Example 2

[0045] The GPK composite plate in Example 1 is equivalent to the steel tube web truss prestressed composite plate and the PK composite plate to calculate the moment of inertia of the steel tube rib to the bottom of the plate.

[0046] (1) In Example 1: Steel tube rib cross-sectional area Ag = 975 mm 2 , elastic modulus ratio of steel tube rib to precast base plate concrete α Eg =6.34;

[0047] The converted cross-sectional area of ​​the steel tube rib is A0=6181.5, and the moment of inertia of the converted cross-sectional area of ​​the steel tube rib to the bottom of the plate is I 01 =3.41*10 8 mm 4 (The neutral axis moment of inertia of the steel tube rib itself is ignored).

[0048] (2) In the prestressed composite slab of steel tube web truss: rib cross-sectional area Ag = 3000mm 2 , the elastic modulus ratio of rib to precast base plate concrete α Eg =1.17; rib inner steel bar cross-sectional area As = 59mm 2 , the elastic modulus ratio of steel bar to precast base plate concrete α Eg =6.31;

[0049] Concrete rib converted cross-sectional area A0 = 3882.3 mm 2 ;

[0050] The moment of inertia I of the converted section of the steel tube rib to the bottom of the plate 02 =2.51*107 mm 4 .

[0051] (3) In PK composite slab: the concrete cross-sectional area in the rib is Ac = 531 mm 2 , the elastic modulus ratio of the concrete in the rib to the precast bottom plate concrete is α Ec =1.11; steel tube rib cross-sectional area As=85mm 2 , elastic modulus ratio of steel tube rib to precast base plate concrete α Eg =6.34;

[0052] Conversion cross-sectional area of ​​steel tube concrete rib A0=1128.3mm 2 ;

[0053] Moment of inertia I of rib conversion section to plate bottom 03 =7.22*10 6 mm 4 .

[0054] From the calculation results, it can be seen that the moment of inertia of the steel tube ribs to the bottom of the plate in Example 1 is much greater than that of other composite plates. It can be seen that the GPK plate has the strongest support-free resistance during the construction stage.

[0055] Example 3

[0056] This embodiment provides a concrete composite slab with detachable steel tube ribs, and the technical features provided by the concrete composite slab include all the technical features disclosed in Embodiment 1, except that:

[0057] The steel tube ribs 3 are of a split structure, and two adjacent steel tube ribs 3 are detachably connected via a connecting piece 5 .

[0058] The present invention sets the steel tube rib 3 as a split structure, so that each steel tube can be stored, transported and assembled separately before storage, transportation and assembly, and can better protect the steel tube rib 3 and the prefabricated bottom plate 1, thereby reducing the probability of bending and deformation of the prefabricated bottom plate 1 and the steel tube rib 3, and finally reducing the probability of the integrity of the floor slab being deteriorated. In addition, the present invention sets the connecting piece 5 to connect the split steel tube rib 3, so that any steel tube rib 3 can be disassembled and assembled, which is convenient for workers to operate.

[0059] refer to Figure 4 In this embodiment, the connecting member 5 is a tubular structure matched with the steel tube rib 3 , and a first mounting groove 51 is formed on the inner wall of the connecting member 5 , and a spring piece 52 is disposed in the first mounting groove 51 .

[0060] Since the steel tube rib 3 needs to extend into the hole of the connector 5, the inner diameter of the connector 5 will be slightly larger than the outer diameter of the steel tube rib 3. In addition, since the steel tube rib 3 is repeatedly used, the tube wall of the steel tube rib 3 is compressed and shrinks inward, making the gap between the steel tube rib 3 and the connector 5 larger, causing the steel tube rib 3 to shake in the connector 5, affecting the stability and firmness of the truss. The present invention, by arranging a spring sheet 52 on the inner wall of the connector 5, can use the elastic force of the spring sheet 52 to press the end of the steel tube rib 3 tightly into the connector 5, preventing the steel tube rib 3 from shaking and ensuring the structural stability of the truss.

[0061] In this embodiment, the connection between the connecting member 5 and the steel tube rib 3 is achieved by bolts and nuts. The locking of the bolts and nuts can effectively prevent the steel tube rib 3 from shaking in the horizontal direction, but cannot prevent the steel tube rib 3 from shaking in the vertical direction. Therefore, spring plates 52 can be installed on the upper and lower sides of the inner wall of the connecting member 5 along the direction of bolt penetration to prevent the steel tube rib 3 from shaking in the longitudinal direction.

[0062] Furthermore, a plurality of second mounting grooves 53 are formed on the inner wall of the middle portion of the connecting member 5 . Steel balls 54 are disposed in the second mounting grooves 53 . A compressed elastic member 55 is disposed between the steel balls 54 and the second mounting grooves 53 .

[0063] When the two steel tube ribs 3 are just connected in the connecting piece 5, the ends of the two steel tube ribs 3 press against each other to provide axial force, but as the steel tube ribs 3 are compressed and bent, the two steel tube ribs 3 are no longer in contact with each other, a gap is formed, and the axial support force can no longer be provided for the steel tube ribs 3. The present invention uses steel balls 54 to press against the ends of the steel tube ribs 3 on both sides, providing axial force for the steel tube ribs 3 on both sides, ensuring the axial stability of the steel tube ribs 3, thereby ensuring the firmness of the entire truss. In addition, under the action of the elastic member 55, the steel balls 54 can expand and contract according to the size of the gap, thereby always maintaining close contact between the steel balls 54 and the steel tube ribs 3.

[0064] Example 4

[0065] A method for installing a concrete composite slab comprises the following steps:

[0066] S1. Use connectors to connect the steel tube ribs to the required length, and fix the steel tube ribs on the top of the prefabricated bottom plate with bolts;

[0067] S2. Hoist the prefabricated bottom plate to the corresponding position of the wall, and adjust the position of the prefabricated bottom plate so that the two become a whole;

[0068] S3. Laying transverse and longitudinal steel bars on the prefabricated base plate;

[0069] S4, pouring concrete on the prefabricated base plate, and after the concrete pouring is completed, curing it and superimposing it to form a complete load-bearing component;

[0070] S5. After the concrete strength meets the requirements, remove the bolts and steel pipe ribs and recycle them.

[0071] The present invention provides a concrete composite slab with detachable steel tube ribs, comprising a prefabricated base plate, a cast-in-place layer and a detachable steel tube rib connected to the top of the prefabricated base plate, wherein a plurality of risers are embedded in the prefabricated base plate, and the periphery of the risers is provided with a concrete pier connected to the prefabricated base plate; the risers are connected to the steel tube ribs by bolts, and the surface of the bolts is provided with an external thread matching the internal thread of the risers, and the bolts are threadedly connected to the risers after passing through the steel tube ribs. The present invention forms a detachable truss through the risers, bolts and steel tube ribs in the prefabricated base plate, and the length of the steel tube ribs can be spliced ​​and the height can be adjusted, so that the steel tube ribs can serve as a support frame; the risers are distributed in point positions on the prefabricated base plate, so that transverse steel bars and longitudinal steel bars can be embedded in the prefabricated base plate and the cast-in-place layer at the same time, effectively improving the bidirectional force performance of the composite layer; in addition, the split steel tube ribs can be stored, transported and assembled separately, which can better protect the steel tube ribs and the prefabricated base plate, and the construction is convenient and can be circulated. The present invention realizes the connection between two steel tube ribs through a connector, and a spring sheet is arranged on the inner wall of the connector, and the elastic force of the spring sheet is used to press the end of the steel tube rib tightly into the connector to prevent the steel tube rib from shaking and ensure the structural stability of the truss; and an elastic member and a steel ball are arranged in the middle of the connector, and the steel ball is used to provide axial force for the steel tube ribs on both sides to ensure the axial stability of the steel tube ribs, thereby ensuring the firmness of the entire truss. Therefore, the present invention effectively overcomes various shortcomings in the prior art and has a high industrial utilization value.

[0072] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. All equivalent modifications or changes made by those skilled in the art without departing from the spirit and technical ideas disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A concrete composite slab with detachable steel tube ribs, characterized in that: It includes a prefabricated bottom plate, a cast-in-place layer cast on the prefabricated bottom plate, and a detachable steel pipe rib connected to the top of the prefabricated bottom plate. A plurality of vertical pipes are embedded in the prefabricated bottom plate. The vertical pipes are vertically arranged and have internal threads. The periphery of the vertical pipes is provided with a concrete pier connected to the prefabricated bottom plate. The riser is connected to the steel pipe rib by bolts, the surface of the bolt is provided with an external thread matching the internal thread of the riser, the steel pipe rib is provided with a vertical through hole, and the bolt passes through the steel pipe rib and is connected with the riser thread; The steel tube rib is a split structure, and two adjacent steel tube ribs are detachably connected by a connecting piece. The connecting piece is a tubular structure that cooperates with the steel tube rib. The steel tube rib extends into the hole of the connecting piece. The inner diameter of the connecting piece is larger than the outer diameter of the steel tube rib. The connecting piece and the steel tube rib are connected by bolts and nuts. A first mounting groove is provided on the inner wall of the connecting piece, and a spring sheet is provided in the first mounting groove. A plurality of second mounting grooves are provided on the middle inner wall of the connecting piece, and a steel ball is provided in the second mounting groove. A compressed elastic piece is provided between the steel ball and the second mounting groove.

2. The concrete composite slab with detachable steel tube ribs according to claim 1, characterized in that: A threaded tube is arranged in the hole, and the threaded tube is connected with the bolt in cooperation.

3. The concrete composite slab with detachable steel tube ribs according to claim 1, characterized in that: The bolt passes through the hole and is connected with the nut.

4. The concrete composite slab with detachable steel tube ribs according to claim 1, characterized in that: The risers are spaced apart from each other, and a plurality of the risers are arranged in a rectangular array on the prefabricated bottom plate.

5. The concrete composite slab with detachable steel tube ribs according to claim 4, characterized in that: A plurality of transverse steel bars and longitudinal steel bars are embedded in the cast-in-place layer.

6. The concrete composite slab with detachable steel tube ribs according to claim 1, characterized in that: A movable sleeve is also sleeved on the middle part of the bolt, the lower surface of the sleeve contacts the upper surface of the riser, and the upper surface of the sleeve is highly consistent with the upper surface of the cast-in-place layer.

7. A method for installing a concrete composite slab according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. Use connectors to connect the steel tube ribs to the required length, and fix the steel tube ribs on the top of the prefabricated bottom plate with bolts; S2. Hoist the prefabricated bottom plate to the corresponding position of the wall, and adjust the position of the prefabricated bottom plate so that the two become a whole; S3. Laying transverse and longitudinal steel bars on the prefabricated base plate; S4, pouring concrete on the prefabricated base plate, and after the concrete pouring is completed, curing it and superimposing it to form a complete load-bearing component; S5. After the concrete strength meets the requirements, remove the bolts and steel pipe ribs and recycle them.