A scientific research project docking management system based on financial accounting

By designing data acquisition, primary accounting and secondary accounting modules in the scientific research project docking management system, the problems of low financial accounting efficiency and difficulty in holding accountability are solved, and efficient financial management and fund risk monitoring of scientific research projects are achieved.

CN118071527BActive Publication Date: 2024-11-12NANJING JINGLUN MEDICAL RESEARCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410501306.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-11-12
Estimated Expiration
2044-04-25

Smart Images

  • Figure CN118071527B_ABST
    Figure CN118071527B_ABST
Patent Text Reader

Abstract

The present invention provides a scientific research project docking management system based on financial accounting, which belongs to the field of management systems; it solves the problem of low efficiency of financial accounting of scientific research projects; it is specifically as follows: a data acquisition module: it acquires accounting financial information; a primary accounting module: it conducts a preliminary review of historical applications and financial accounting, and determines whether there are abnormal transfers, abnormal application funds and abnormal sources of funds in the historical applications; a secondary accounting module: it determines whether the submitted application is compliant according to the financial consumption, estimation model and accounting financial information of the submitted application; a docking module: it is used to summarize the data of the accounting financial information processed by the primary accounting module and the secondary accounting module, and feed it back to the user; the present invention obtains, organizes and analyzes the relevant financial information of the scientific research projects, screens out the projects with abnormal funds, and facilitates the relevant personnel to hold them accountable and conduct financial summary.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a scientific research project docking management system based on financial accounting, which relates to the field of management systems. Background Art

[0002] The existing scientific research project docking management system related to financial accounting has the following deficiencies:

[0003] 1. Complicated data entry: The effective operation of the existing system depends on the accurate entry of a large amount of data, and the data entry process may be cumbersome and time-consuming, requiring a lot of manpower and time; at the same time, loading too much non-essential data will occupy computer computing resources; once the system has data loading problems, it will affect the summary and management of the entire scientific research project.

[0004] 2. Difficulty in accountability: The existing system can only query the overall process of scientific research funding use when conducting financial docking. It is unable to count excess funding applications, abnormal funding use and abnormal funding sources, and is unable to hold accountable those who waste and embezzle scientific research funds.

[0005] 3. High operational threshold: The functional design of the management system requires logical considerations. At the same time, the existing systems are usually designed based on fixed processes and rules. For some special or complex scientific research projects, it is difficult to meet the financial docking requirements, resulting in unsatisfactory management results and insufficient flexibility. Summary of the invention

[0006] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a scientific research project docking management system based on financial accounting, aiming to solve the problem of low efficiency of financial accounting of scientific research projects.

[0007] In order to achieve the above object, the present invention is implemented through the following technical solutions: A scientific research project docking management system based on financial accounting includes:

[0008] Data acquisition module: used to obtain the project names, scientific research personnel information and financial reimbursement information of all vertical and horizontal projects, and obtain accounting financial information;

[0009] One-time accounting module: used to extract completed scientific research project applications from financial reimbursement information to obtain historical applications; conduct a preliminary review of historical applications and financial accounting to determine whether the application information of historical applications is complete;

[0010] If the application information is incomplete, the person in charge or the responsible team of the corresponding historical application will be held accountable, and the subsequent process will be skipped to directly execute the secondary accounting module;

[0011] If the application information is complete, the historical application and financial accounting will be reviewed again to determine whether there are any abnormal transfers, abnormal application funds, and abnormal sources of funds in the historical application;

[0012] If so, the person in charge or the responsible team of the corresponding historical application shall be held accountable;

[0013] If it does not exist, execute the secondary accounting module;

[0014] Secondary accounting module: used to extract the submitted and ongoing scientific research project applications from the financial reimbursement information to obtain the submitted applications;

[0015] Real-time monitoring of the research progress, financial consumption, consumption changes and newly added application content of each project in the submitted application;

[0016] Obtain the market price of relevant scientific research materials in real time, and build an estimated model for submitting applications based on the market price of scientific research materials, newly added application content, and changes in consumption;

[0017] Determine whether the application is compliant based on the financial consumption, estimated model and accounting financial information of the application;

[0018] If the application is not in compliance with regulations, the scientific researchers who submitted the application will be held accountable;

[0019] If the submitted application is compliant, the docking module will be executed;

[0020] Docking module: used to summarize the data of financial information processed by the primary accounting module and the secondary accounting module, generate project financial reports, and feedback to users.

[0021] Furthermore, the workflow of the data acquisition module is as follows:

[0022] Obtain the project names and scientific researcher information of all vertical and horizontal projects;

[0023] Researcher information includes: researcher's name, researcher's title, identity certification materials, project start date and project completion date;

[0024] Obtain electronic forms and financial processing for vertical and horizontal projects, and obtain financial reimbursement information for scientific research projects;

[0025] Financial reimbursement information includes: the corresponding project's income and expenditure accounts, project funds, income and expenditure details, bank account opening bank, review department, review time, and review certification materials;

[0026] Financial reimbursement information also includes: the funds of all projects and the time of fund disbursement, the expenditure funds of scientific research institutions and the time of disbursement of expenditure funds, as well as the funds issued and the scientific research materials of the corresponding projects;

[0027] The project names, scientific research personnel information and financial reimbursement information of vertical and horizontal projects are sent to the primary accounting module as accounting financial information.

[0028] Furthermore, the workflow of the primary accounting module is as follows:

[0029] Process A1: Extract the completed scientific research project applications from the financial reimbursement information to obtain historical applications;

[0030] Process A2: Obtain the identity information of all internal staff through the database and compare it with the audit department and audit certification materials in the historical application;

[0031] If the match is successful, the title of the auditing department is determined and process A3 is entered;

[0032] If the comparison fails, it means that the review process of the historical application is unreasonable. The person in charge or the responsible team of the corresponding historical application will be sent to the user's mobile terminal or client for accountability. The subsequent processes A3 to A7 are skipped and the secondary accounting module is directly executed.

[0033] Database: used to store the identity information of internal researchers and staff;

[0034] Process A3: In ascending order of audit time, determine whether the job titles of the auditing departments meet the requirements from low to high;

[0035] If the conditions are met, it means that the personnel review in the review process of the historical application is reasonable, and the funding review is carried out, and the process A4 is entered;

[0036] If not, it means that the review process of the historical application is unreasonable, and the review department information of the corresponding historical application will be sent to the user's mobile terminal or client for accountability; skip the subsequent processes A4 to A7 and directly execute the secondary accounting module;

[0037] Process A4: Accounting for vertical project finances in historical applications;

[0038] Process A5: Count the historical longitudinal project income and expenditure details by monthly accounting to obtain reasonable historical expenditure funds, recorded as hgb;

[0039] Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal fund use are obtained to obtain unreasonable historical fund use, recorded as hnnb;

[0040] Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal funding applications are obtained to obtain unreasonable historical application funds, recorded as hnqb;

[0041] Monthly statistics of expenditures are recorded as ab; funds are issued as ib;

[0042] Process A6: Record the historical longitudinal items marked as abnormal fund use as Category 1 abnormal historical items; record the historical longitudinal items marked as abnormal fund application as Category 2 abnormal historical items; and revise Category 1 abnormal historical items and Category 2 abnormal historical items;

[0043] Process A7: Record the horizontal project finance in the historical application as the historical horizontal project; repeat the process of calculating the vertical project finance in the historical application, calculate the historical horizontal project finance, and determine the mark, abnormal funds and abnormal months of the historical horizontal project;

[0044] Process A8: Read the information of researchers in historical projects marked as irregular transfers, abnormal use of funds, abnormal funding applications, and abnormal funding sources as the information of the person to be held accountable; send the information of the person to be held accountable, the abnormal funds, and the abnormal months to the user's mobile terminal or client for accountability.

[0045] Furthermore, the specific working process of process A4 is as follows:

[0046] Process A41: Record the longitudinal projects in the historical applications as historical longitudinal projects; compare the names, titles and identity certification materials of the researchers in the historical longitudinal projects with the identity information of all internal researchers in the database; determine whether they are completely matched;

[0047] If they are completely matched, it means that there is no foreign investment in the historical vertical project, and the process goes to process A42;

[0048] If the comparison is not complete, it means that foreign investment has been introduced into the historical vertical project, and the process will be entered into A43;

[0049] Process A42: Separate accounting for historical vertical projects without foreign investment;

[0050] Process A421: record the historical vertical projects without foreign investment as historical vertical projects without capital; count the number of historical vertical projects without capital, record as hon;

[0051] Accounting for the No. 1 unfunded historical vertical project;

[0052] Process A422: With the start time of the project No. 1 without a history of capital as the start point and the end time as the end point, query the income and expenditure accounts and the opening bank of the project No. 1 without a history of capital, and determine whether the income and expenditure accounts and the opening bank are consistent; if they are consistent, do not process; if they are inconsistent, mark the project No. 1 without a history of capital as: irregular transfer;

[0053] Process A423: record the project funds of the No. 1 Unfunded History Longitudinal Project as hm; calculate the difference in months from the start time to the end time, record it as hyn; count the income and expenditure details of the No. 1 Unfunded History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Unfunded History Longitudinal Project, record it as he1, he2, ... he hyn ; hm and he1, he2, ... he hyn , satisfying he1+he2+……+he hyn ≥hm;

[0054] Process A424: Determine (he1 + he2 + ... + he hyn ) / hm is less than or equal to 1;

[0055] If it is satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is reasonable and the No. 1 No-Fund History Vertical Project has passed the accounting;

[0056] If it is not satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is unreasonable, and the No. 1 No-Fund History Vertical Project is marked as: abnormal use of funds;

[0057] Process A425: Repeat the process of calculating the No. 1 unfunded historical vertical project to complete the separate accounting of the No. 2 to No. hon unfunded historical vertical projects;

[0058] Process A43: Separate accounting for historical vertical projects with foreign investment.

[0059] Furthermore, the specific working process of the process A43 is as follows:

[0060] Process A431: record the historical vertical projects with foreign investment as historical vertical projects with investment; count the number of historical vertical projects with investment, record as hrn;

[0061] Accounting for the No. 1 qualified historical vertical project;

[0062] Process A432: Call the process of judging whether the income and expenditure account and the opening bank of the vertical project with no capital history No. 1 are consistent, and judge whether the income and expenditure account and the opening bank of the vertical project with capital history No. 1 are consistent; if they are consistent, no processing will be done; if they are inconsistent, the vertical project with capital history No. 1 will be marked as: irregular transfer;

[0063] Process A433: record the project funds of the No. 1 Qualified History Longitudinal Project as hn; calculate the difference in months from the start time to the end time, record it as hym; count the income and expenditure details of the No. 1 Qualified History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Qualified History Longitudinal Project, record it as hx1, hx2, ... hx hym ; hm and hx1, hx2, ... hx hym, satisfying hx1+hx2+……+hx hym ≥hn;

[0064] Process A434: Determine (hx1 + hx2 + ... + hx hym ) / hn is greater than or equal to 1;

[0065] If it is satisfied, it means that the project funding approval of the No. 1 funded historical vertical project is reasonable and the No. 1 funded historical vertical project has passed the accounting;

[0066] If it is not satisfied, it means that the project funding approval of the No. 1 funded history vertical project is unreasonable, and the No. 1 funded history vertical project is marked as: abnormal funding application;

[0067] Process A435: Repeat the process of calculating the historical vertical project No. 1 to complete the separate accounting of the historical vertical projects No. 2 to hrn.

[0068] Furthermore, the specific working process of process A6 is as follows:

[0069] Process A61: Determine whether ab-hgb is greater than or equal to 0;

[0070] If the conditions are met, it means that the scientific research institution has no remaining funds, and the Category 1 abnormal historical project has over-applied. The corresponding mark of the Category 1 abnormal historical project will be changed to: abnormal funding application;

[0071] If not, it means that the scientific research institution has surplus funds, and the allowable allocation coefficient aa of the funds is determined, and the process A62 is entered; the calculation of aa is as follows:

[0072] ;

[0073] Process A62: Determine whether aa is greater than or equal to 1;

[0074] If aa is greater than or equal to 1, it means that the category 1 abnormal historical project and the category 2 abnormal historical project are reasonable applications, and the corresponding marks of the category 1 abnormal historical project and the category 2 abnormal historical project are deleted, and the category 1 abnormal historical project and the category 2 abnormal historical project pass the accounting;

[0075] If aa is less than 1, determine whether aa is greater than or equal to 0, and enter process A63;

[0076] Process A63: If aa is greater than or equal to 0, it means that the funds of the 2nd type of abnormal historical project are over-expended, and the corresponding mark of the 2nd type of abnormal historical project is changed to: abnormal use of funds;

[0077] If aa is less than 0, it means that the funding sources of the Category 1 abnormal historical project and the Category 2 abnormal historical project are unknown, and the corresponding marks of the Category 1 abnormal historical project and the Category 2 abnormal historical project are changed to: abnormal funding sources, and enter process A64;

[0078] Process A64: Record the historical longitudinal items marked as abnormal funding sources as Category 3 abnormal historical items;

[0079] The project funds for the three types of abnormal historical projects are recorded as unb;

[0080] The income and expenditure details of the three types of abnormal historical projects are counted on a monthly basis to obtain the months of the three types of abnormal historical projects, recorded as unm; the monthly expenditures of the three types of abnormal historical projects are recorded as uns1, nus2, and uns unm ;

[0081] Process A65: Determine whether SS = (uns1) is greater than or equal to unb; if so, uns1 will be marked as abnormal funds, and the month corresponding to uns1 will be marked as an abnormal month; if not, determine whether SS = (uns1 + nus2) is greater than or equal to; if so, nus2 will be marked as abnormal funds, and the month corresponding to nus2 will be marked as an abnormal month; and so on, repeat the execution, and each time it is repeated, SS will increase the fund expenditure of the subsequent month on the original basis until the abnormal funds and abnormal months of the three types of abnormal historical projects are determined.

[0082] Furthermore, the workflow of the secondary accounting module is as follows:

[0083] Process B1: Access the scientific research management system; read the "paper list" and "patent list" through the scientific research management system; extract the accounting financial information whose project name does not match the paper list and patent list as submitted application;

[0084] Obtain the submitted applications in progress through the financial system and obtain the submitted applications;

[0085] Process B2: Count the number of submitted applications, recorded as sn; read the current system time, recorded as t;

[0086] Real-time monitoring of application submission by No. 1;

[0087] Process B3: Real-time monitoring of the research progress, financial expenditure, consumption increase and decrease changes, and newly added application content of the application submitted by No. 1;

[0088] Process B4: Real-time monitoring of the newly added content of the application submitted by No. 1;

[0089] In the income and expenditure details of application No. 1, the names and prices of the materials that are not included in the scientific research materials submitted in application No. 1 shall be counted as the newly added application materials;

[0090] Construct the estimation model for application No. 1: mm model and mmc calculation formula;

[0091] Process B5: Determine whether the application submitted by No. 1 is compliant;

[0092] Process B51: Read the current system time, recorded as Δt; use the financial system to count the income and expenditure details corresponding to the application submitted by No. 1 in the current month, and count the expenses, recorded as tam; extract the scientific research funds in tam, recorded as tam1; add the application funds, recorded as tam2; add the funds, recorded as tam3; tam1, tam2 and tam3 satisfy tam1+tam2+tam3=tam;

[0093] Process B52: Obtain the amount of funds applied for by No. 1 through the financial system, recorded as Δm; substitute Δm into the mm model to obtain mm1;

[0094] Determine whether uup1 is greater than or equal to Δm;

[0095] If so, it means that the funding application submitted by No. 1 is compliant;

[0096] If not, it means that the application submitted by No. 1 has exceeded the quota and the process will proceed to B53;

[0097] Process B53: Substitute Δt into the mmc calculation formula in turn to obtain mmc1; determine whether tam2+tam3 is less than or equal to mm1+mmc1;

[0098] If it is met, it means that the amount of funds applied for by No. 1 is in compliance;

[0099] If not, it means that the funding amount of application No. 1 is not in compliance with regulations, and the application No. 1 is marked as abnormal. The information of the researcher corresponding to the application No. 1 is sent to the user's mobile terminal or client for accountability.

[0100] Process B6: Repeat the real-time monitoring process of application submission by No. 1 to determine whether the applications submitted by No. 2 to No. SN are in compliance; collect the information of scientific researchers corresponding to the funding application abnormalities in the submitted applications as the secondary accountability object information; send the secondary accountability object information to the user's mobile terminal or client for accountability.

[0101] Furthermore, the specific working process of process B3 is as follows:

[0102] Process B31: Real-time research progress of application submitted by No. 1;

[0103] Process B311: Read the start time and end time of the application, recorded as at and bt respectively; calculate the time progress pts of the application submitted by No. 1, pts = (t-at) / (bt-at);

[0104] Process B312: According to the project name submitted by No. 1, the total number of scientific research materials of the corresponding project is counted, recorded as srm; according to the scientific research materials and income and expenditure details submitted by No. 1, the total number of purchased scientific research materials is counted, recorded as brm; calculate the material progress prs submitted by No. 1, prs = brm / srm;

[0105] Process B313: Comprehensive progress of application submitted by No. 1, pl = (pts*prs) 1 / 2 ;

[0106] Process B32: Real-time monitoring of the financial consumption and consumption increase / decrease changes of No. 1’s application;

[0107] Process B321: Obtain the project funds submitted by No. 1 through the financial system, recorded as srf;

[0108] The month corresponding to the start date of the application is used as the starting month for statistics, and the previous month corresponding to the current system time is used as the ending month for statistics. The income and expenditure details of the application submitted on the 1st are counted monthly, recorded as: m1, m2...m t-1 ; Set m1~m t-1 , as the financial expenditure for the application submitted by No. 1;

[0109] Process B322: With the month as the horizontal axis and the financial consumption as the vertical axis, construct the time-consumption curve of No. 1's application submission, recorded as the estimated curve; call the differential function to calculate the slope corresponding to each month, recorded as so1, so2...so t-1 ; Calculate the consumption predictability coefficient fco for application No. 1. The calculation of fco is as follows:

[0110] ; The parameter subscripts on the right side of the fco calculation formula all represent the months corresponding to financial consumption and slope;

[0111] Determine whether fco is greater than or less than the first threshold; if so, it means that fco is available, and the consumption increase or decrease change submitted by No. 1 is determined to be fco; if so, it means that fco is not available, and the consumption increase or decrease change submitted by No. 1 is determined to be 0.

[0112] Furthermore, the specific working process of the process B4 is as follows:

[0113] Process B41: record the material name in the newly added application materials as the given material; and record the material price as the given price;

[0114] Process B42: Create a shopping website query link to query the price of a given material, record it as the query price; determine whether the given price is less than or equal to the query price;

[0115] If not, it means that the application submitted by No. 1 has over-declared, and the application submitted by No. 1 will be marked as abnormal. The information of the researcher corresponding to the application submitted by No. 1 will be sent to the user's mobile terminal or client for accountability. The subsequent processes B43 to B53 will be skipped.

[0116] If the requirements are met, it means that the additional materials submitted for application No. 1 are reasonable and the application will proceed to process B43;

[0117] Process B43: Count the other application funds that are not new application materials in the income and expenditure details submitted by No. 1 as new funds, recorded as am;

[0118] Process B44: Constructing the estimated cost model for application No. 1:

[0119] No. 1 submits an application to predict the maximum single application funding mm model;

[0120] ;

[0121] The maximum amount of excess application funds that can be predicted for application No. 1, mmc;

[0122] ;pts=(t-at) / (bt-at); pl=(pts*prs) 1 / 2 ;

[0123] The subscripts of the parameters on the right side of the uup and mm calculation formulas represent the months of the corresponding financial consumption and time; the t in the pts and pl calculation formulas represents the month of the current system time.

[0124] Compared with the prior art, the present invention has the following beneficial effects:

[0125] 1. Data simplification: The present invention obtains data by associating the internal scientific research management system and financial system of the scientific research institution, thereby reducing the loading process of the original data; at the same time, in the process of data acquisition, key data is extracted through data retrieval, thereby reducing the computing power consumption of the computer.

[0126] 2. Strong reference value: When supervising ongoing scientific research projects, the present invention tracks the use of funds of corresponding projects in real time; according to the use of funds of the project and the newly added application content, it predicts the normal use and abnormal use of the subsequent funds of the project, and can timely discover the financial risks of the corresponding projects to ensure the smooth progress of scientific research projects.

[0127] 3. Strong risk prevention and control capabilities: The present invention focuses on checking the funding usage of scientific research projects and the funding distribution of scientific research institutions; screens out related projects and persons in charge with unreasonable review processes, unreasonable funding usage, unreasonable funding sources, etc., to facilitate subsequent funding tracing and personnel accountability by scientific research institutions. BRIEF DESCRIPTION OF THE DRAWINGS

[0128] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0129] Figure 1 It is a functional schematic diagram of the system of the present invention;

[0130] Figure 2 This is a schematic diagram of the historical application data processing of the present invention;

[0131] Figure 3 Schematic diagram of data processing for submitting application for the present invention. DETAILED DESCRIPTION

[0132] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0133] See also Figure 1 A scientific research project docking management system based on financial accounting includes: a data acquisition module, a primary accounting module, a secondary accounting module, a docking module, a database and a server; wherein the data acquisition module, the primary accounting module, the secondary accounting module and the docking module are connected to the database and the server respectively.

[0134] Database: used to store the identity information of internal researchers and staff;

[0135] It should be noted that the "internal researchers and staff" in the present invention refers to the researchers and staff of the same research institution as the user; the "identity information of internal researchers and staff" refers to the name, title, electronic signature and other identity information of the internal researchers and staff;

[0136] Data acquisition module: used to obtain the project names, scientific research personnel information and financial reimbursement information of all vertical and horizontal projects, and obtain accounting financial information;

[0137] The workflow of the data acquisition module is as follows:

[0138] Access the scientific research management system; obtain the project names and scientific researcher information of all vertical and horizontal projects through the scientific research management system;

[0139] Researcher information includes: researcher's name, researcher's title, identity certification materials, project start date and project completion date;

[0140] Access the financial system; extract the electronic forms and financial processing of vertical and horizontal projects through the financial system to obtain the financial reimbursement information of scientific research projects;

[0141] Financial reimbursement information includes: the corresponding project's income and expenditure accounts, project funds, income and expenditure details, bank account opening bank, review department, review time, and review certification materials;

[0142] Financial reimbursement information also includes: the funds for all projects and the time of fund disbursement, the expenditure funds of scientific research institutions and the time of expenditure fund disbursement, as well as the funds issued and scientific research materials for corresponding projects.

[0143] It should be noted that the "scientific research institution" in the present invention means institutions or departments such as universities, research institutes, and company technical departments that participate in or engage in scientific research; "scientific research management system" and "financial system" refer to complete management systems that are subordinate to internal personnel of scientific research institutions; if a scientific research institution does not have a scientific research management system, scientific researchers are required to manually upload "project names of vertical projects and horizontal projects, scientific researcher information, and financial reimbursement information" to the data acquisition module; the financial system defaults to the financial system of the user's affiliated institution;

[0144] "Expenditures" refers to the monthly statistics of expenditures of scientific research institutions; "Issued funds" refers to the funds that scientific research institutions apply to their superiors every month;

[0145] The scientific research institutions in the present invention default to issuing and applying for funds on a monthly basis; if the scientific research institutions issue funds on a daily, weekly or annual basis, the expenditure funds are: the total corresponding fund expenditure used by the scientific research institutions for scientific research projects each month; the issued funds are: the total corresponding fund income used by the scientific research institutions for scientific research projects each month.

[0146] The project names, scientific research personnel information and financial reimbursement information of vertical and horizontal projects are sent to the primary accounting module as accounting financial information.

[0147] It should be noted that the "project name" in the present invention only includes projects in the scientific research management system whose project applications have been approved; "identity proof materials" refer to documents such as electronic signatures, official seals, archives, etc. that prove the identity of scientific researchers; "review department" refers to the department or person responsible for approving and issuing scientific research funds; "review proof materials" refer to identity proof materials that prove the "review department".

[0148] One-time accounting module: extract the completed scientific research project applications from the financial reimbursement information to obtain historical applications; conduct a preliminary review of the historical applications and financial accounting to determine whether the application information of the historical applications is complete;

[0149] If the application information is incomplete, the person in charge or the responsible team of the corresponding historical application will be held accountable, and the subsequent process will be skipped to directly execute the secondary accounting module;

[0150] If the application information is complete, the historical application and financial accounting will be reviewed again to determine whether there are any abnormal transfers, abnormal application funds, and abnormal sources of funds in the historical application;

[0151] If so, the person in charge or the responsible team of the corresponding historical application shall be held accountable;

[0152] If it does not exist, execute the secondary accounting module;

[0153] Process A: Please refer to Figure 2 , the workflow of the primary accounting module is as follows:

[0154] Process A1: Access the scientific research management system; read the "paper list" and "patent list" through the scientific research management system; extract the accounting financial information whose project name matches the paper list and patent list as the completed scientific research project application, and obtain the historical application;

[0155] It should be noted that "matching" in process A1 means: in the "paper list and patent list", the "project name" appears in the title or summary of the paper or patent; for example: Project A name: ABC, Paper B: Based on ABC..., Project A and Paper B "match".

[0156] Process A2: Obtain the identity information of all internal staff through the database and compare it with the audit department and audit certification materials in the historical application;

[0157] If the match is successful, the title of the auditing department is determined and process A3 is entered;

[0158] If the comparison fails, it means that the review process of the historical application is unreasonable. The person in charge or the responsible team of the corresponding historical application will be sent to the user's mobile terminal or client for accountability. The subsequent processes A3 to A7 are skipped and the secondary accounting module is directly executed.

[0159] Process A3: In ascending order of audit time, determine whether the job titles of the auditing departments meet the requirements from low to high;

[0160] If the conditions are met, it means that the personnel review in the review process of the historical application is reasonable, and the funding review is carried out, and the process A4 is entered;

[0161] If not, it means that the review process of the historical application is unreasonable, and the review department information of the corresponding historical application will be sent to the user's mobile terminal or client for accountability; skip the subsequent processes A4 to A7 and directly execute the secondary accounting module;

[0162] Process A4: Accounting for vertical project finances in historical applications;

[0163] Process A41: Record the longitudinal projects in the historical applications as historical longitudinal projects; compare the names, titles and identity certification materials of the researchers in the historical longitudinal projects with the identity information of all internal researchers in the database; determine whether they are completely matched;

[0164] If they are completely matched, it means that there is no foreign investment in the historical vertical project, and the process goes to process A42;

[0165] If the comparison is not complete, it means that foreign investment has been introduced into the historical vertical project, and the process will be entered into A43;

[0166] Process A42: Separate accounting for historical vertical projects without foreign investment;

[0167] Process A421: record the historical vertical projects without foreign investment as historical vertical projects without capital; count the number of historical vertical projects without capital, record as hon;

[0168] Accounting for the No. 1 unfunded historical vertical project;

[0169] Process A422: With the start time of the project No. 1 without a history of capital as the start point and the end time as the end point, query the income and expenditure accounts and the opening bank of the project No. 1 without a history of capital, and determine whether the income and expenditure accounts and the opening bank are consistent; if they are consistent, do not process; if they are inconsistent, mark the project No. 1 without a history of capital as: irregular transfer;

[0170] Process A423: record the project funds of the No. 1 Unfunded History Longitudinal Project as hm; calculate the difference in months from the start time to the end time, record it as hyn; count the income and expenditure details of the No. 1 Unfunded History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Unfunded History Longitudinal Project, record it as he1, he2, ... he hyn ; hm and he1, he2, ... he hyn , satisfying he1+he2+……+he hyn ≥hm;

[0171] Process A424: Determine (he1 + he2 + ... + he hyn ) / hm is less than or equal to 1;

[0172] If it is satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is reasonable and the No. 1 No-Fund History Vertical Project has passed the accounting;

[0173] If it is not satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is unreasonable, and the No. 1 No-Fund History Vertical Project is marked as: abnormal use of funds;

[0174] Process A425: Repeat the process of calculating the No. 1 unfunded historical vertical project to complete the separate accounting of the No. 2 to No. hon unfunded historical vertical projects;

[0175] Process A43: Separate accounting for historical vertical projects with foreign investment;

[0176] Process A431: record the historical vertical projects with foreign investment as historical vertical projects with investment; count the number of historical vertical projects with investment, record as hrn;

[0177] Accounting for the No. 1 qualified historical vertical project;

[0178] Process A432: Call the process of judging whether the income and expenditure account and the opening bank of the vertical project with no capital history No. 1 are consistent, and judge whether the income and expenditure account and the opening bank of the vertical project with capital history No. 1 are consistent; if they are consistent, no processing will be done; if they are inconsistent, the vertical project with capital history No. 1 will be marked as: irregular transfer;

[0179] Process A433: record the project funds of the No. 1 Qualified History Longitudinal Project as hn; calculate the difference in months from the start time to the end time, record it as hym; count the income and expenditure details of the No. 1 Qualified History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Qualified History Longitudinal Project, record it as hx1, hx2, ... hx hym ; hm and hx1, hx2, ... hx hym , satisfying hx1+hx2+……+hx hym ≥hn;

[0180] Process A434: Determine (hx1 + hx2 + ... + hx hym ) / hn is greater than or equal to 1;

[0181] If it is satisfied, it means that the project funding approval of the No. 1 funded historical vertical project is reasonable and the No. 1 funded historical vertical project has passed the accounting;

[0182] If it is not satisfied, it means that the project funding approval of the No. 1 funded history vertical project is unreasonable, and the No. 1 funded history vertical project is marked as: abnormal funding application;

[0183] Process A435: Repeat the process of calculating the historical vertical project No. 1 to complete the sub-accounting of the historical vertical projects No. 2 to hrn;

[0184] Process A5: Count the historical longitudinal project income and expenditure details by monthly accounting to obtain reasonable historical expenditure funds, recorded as hgb;

[0185] Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal fund use are obtained to obtain unreasonable historical fund use, recorded as hnnb;

[0186] Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal funding applications are obtained to obtain unreasonable historical application funds, recorded as hnqb;

[0187] Monthly statistics of expenditures are recorded as ab; funds are issued as ib;

[0188] Process A6: Record the historical longitudinal items marked as abnormal fund use as Category 1 abnormal historical items; record the historical longitudinal items marked as abnormal fund application as Category 2 abnormal historical items; and revise Category 1 abnormal historical items and Category 2 abnormal historical items;

[0189] Process A61: Determine whether ab-hgb is greater than or equal to 0;

[0190] If the conditions are met, it means that the scientific research institution has no remaining funds, and the Category 1 abnormal historical project has over-applied. The corresponding mark of the Category 1 abnormal historical project will be changed to: abnormal funding application;

[0191] If not, it means that the scientific research institution has surplus funds, and the allowable allocation coefficient aa of the funds is determined, and the process A62 is entered; the calculation of aa is as follows:

[0192] ;

[0193] Process A62: Determine whether aa is greater than or equal to 1;

[0194] If aa is greater than or equal to 1, it means that the category 1 abnormal historical project and the category 2 abnormal historical project are reasonable applications, and the corresponding marks of the category 1 abnormal historical project and the category 2 abnormal historical project are deleted, and the category 1 abnormal historical project and the category 2 abnormal historical project pass the accounting;

[0195] If aa is less than 1, determine whether aa is greater than or equal to 0, and enter process A63;

[0196] Process A63: If aa is greater than or equal to 0, it means that the funds of the 2nd type of abnormal historical project are over-expended, and the corresponding mark of the 2nd type of abnormal historical project is changed to: abnormal use of funds;

[0197] If aa is less than 0, it means that the funding sources of the Category 1 abnormal historical project and the Category 2 abnormal historical project are unknown, and the corresponding marks of the Category 1 abnormal historical project and the Category 2 abnormal historical project are changed to: abnormal funding sources, and enter process A64;

[0198] Process A64: Record the historical longitudinal items marked as abnormal funding sources as Category 3 abnormal historical items;

[0199] The project funds for the three types of abnormal historical projects are recorded as unb;

[0200] The income and expenditure details of the three types of abnormal historical projects are counted on a monthly basis to obtain the months of the three types of abnormal historical projects, recorded as unm; the monthly expenditures of the three types of abnormal historical projects are recorded as uns1, nus2, and uns unm ;

[0201] Process A65: Determine whether the monthly cumulative expenditure SS = (uns1) is greater than or equal to unb; if so, uns1 is marked as abnormal expenditure, and the month corresponding to uns1 is marked as abnormal month; if not, determine whether SS = (uns1 + nus2) is greater than or equal to; if so, nus2 is marked as abnormal expenditure, and the month corresponding to nus2 is marked as abnormal month; and so on, repeat the execution, and each time the execution is repeated, SS will increase the expenditure of the subsequent month on the original basis until the abnormal expenditure and abnormal month of the three types of abnormal historical items are determined;

[0202] Process A7: Record the horizontal project finance in the historical application as the historical horizontal project; repeat the process of calculating the vertical project finance in the historical application, calculate the historical horizontal project finance, and determine the mark, abnormal funds and abnormal months of the historical horizontal project;

[0203] Among them, in the accounting history horizontal project financial engineering, the judgment condition of process A424 is changed to "greater than or equal to 1"; the judgment condition of process A434 is changed to "less than or equal to 1";

[0204] Process A8: Read the information of researchers in historical projects marked as irregular transfers, abnormal use of funds, abnormal funding applications, and abnormal funding sources as the information of the person to be held accountable; send the information of the person to be held accountable, the abnormal funds, and the abnormal months to the user's mobile terminal or client for accountability.

[0205] It should be noted that the user mobile terminal refers to the user's mobile phone, and the user client refers to the user's computer.

[0206] Secondary accounting module: used to extract the submitted and ongoing scientific research project applications from the financial reimbursement information to obtain the submitted applications;

[0207] Real-time monitoring of the research progress, financial consumption, consumption changes and newly added application content of each project in the submitted application;

[0208] Obtain the market price of relevant scientific research materials in real time, and build an estimated model for submitting applications based on the market price of scientific research materials, newly added application content, and changes in consumption;

[0209] Determine whether the application is compliant based on the financial consumption, estimated model and accounting financial information of the application;

[0210] If the application is not in compliance with regulations, the scientific researchers who submitted the application will be held accountable;

[0211] If the submitted application is compliant, the docking module will be executed;

[0212] Process B: Please refer to Figure 3 ,The workflow of the secondary accounting module is as follows:

[0213] Process B1: Access the scientific research management system; read the "paper list" and "patent list" through the scientific research management system; extract the accounting financial information whose project name does not match the paper list and patent list as submitted application;

[0214] Obtain the submitted applications in progress through the financial system and obtain the submitted applications;

[0215] Process B2: Count the number of submitted applications, recorded as sn; read the current system time, recorded as t;

[0216] Real-time monitoring of application submission by No. 1;

[0217] Process B3: Real-time monitoring of the research progress, financial expenditure, consumption increase and decrease changes, and newly added application content of the application submitted by No. 1;

[0218] Process B31: Real-time research progress of application submitted by No. 1;

[0219] Process B311: Read the start time and end time of the application, recorded as at and bt respectively; calculate the time progress pts of the application submitted by No. 1, pts = (t-at) / (bt-at);

[0220] Process B312: According to the project name submitted by No. 1, the total number of scientific research materials of the corresponding project is counted, recorded as srm; according to the scientific research materials and income and expenditure details submitted by No. 1, the total number of purchased scientific research materials is counted, recorded as brm; calculate the material progress prs submitted by No. 1, prs = brm / srm;

[0221] Process B313: Comprehensive progress of application submitted by No. 1, pl = (pts*prs) 1 / 2 ;

[0222] Process B32: Real-time monitoring of the financial consumption and consumption increase / decrease changes of No. 1’s application;

[0223] Process B321: Obtain the project funds submitted by No. 1 through the financial system, recorded as srf;

[0224] The month corresponding to the start date of the application is used as the starting month for statistics, and the previous month corresponding to the current system time is used as the ending month for statistics. The income and expenditure details of the application submitted on the 1st are counted monthly, recorded as: m1, m2...m t-1 ; Set m1~m t-1 , as the financial expenditure for the application submitted by No. 1;

[0225] Process B322: With the month as the horizontal axis and the financial consumption as the vertical axis, construct the time-consumption curve of No. 1's application submission, recorded as the estimated curve; call the differential function to calculate the slope corresponding to each month, recorded as so1, so2...so t-1 ; Calculate the consumption predictability coefficient fco for application No. 1. The calculation of fco is as follows:

[0226] ; The parameter subscripts on the right side of the fco calculation formula all represent the months corresponding to financial consumption and slope;

[0227] Determine whether fco is greater than or less than the first threshold; if so, it means that fco is available, and the consumption increase / decrease change applied for by No. 1 is determined as fco; if so, it means that fco is not available, and the consumption increase / decrease change applied for by No. 1 is determined as 0;

[0228] It should be noted that the first threshold represents the degree of fit between multiple consumption changes submitted for application and the overall consumption changes; the first threshold is generally taken as 0.7; the specific value of the first threshold is adjusted by the user or system developer according to specific needs.

[0229] Process B4: Real-time monitoring of the newly added content of the application submitted by No. 1;

[0230] In the income and expenditure details of application No. 1, the names and prices of the materials that are not included in the scientific research materials submitted in application No. 1 shall be counted as the newly added application materials;

[0231] Construct an estimation model for application No. 1;

[0232] Process B41: record the material name in the newly added application materials as the given material; and record the material price as the given price;

[0233] Process B42: Create a shopping website query link to query the price of a given material, record it as the query price; determine whether the given price is less than or equal to the query price;

[0234] If not, it means that the application submitted by No. 1 has over-declared, and the application submitted by No. 1 will be marked as abnormal. The information of the researcher corresponding to the application submitted by No. 1 will be sent to the user's mobile terminal or client for accountability. The subsequent processes B43 to B53 will be skipped.

[0235] If the requirements are met, it means that the additional materials submitted for application No. 1 are reasonable and the application will proceed to process B43;

[0236] It should be noted that the shopping website in the present invention refers to Taobao, JD.com, China Instrument Network, etc., which are websites where scientific research materials can be purchased; the inquiry price refers to the most expensive price of a given material on the shopping website.

[0237] Process B43: Count the other application funds that are not new application materials in the income and expenditure details submitted by No. 1 as new funds, recorded as am;

[0238] Process B44: Constructing the estimated cost model for application No. 1:

[0239] No. 1 submits an application to predict the maximum single application funding mm model;

[0240] ;

[0241] The maximum amount of excess application funds that can be predicted for application No. 1, mmc;

[0242] ;pts=(t-at) / (bt-at); pl=(pts*prs) 1 / 2 ;

[0243] The subscripts of the parameters on the right side of the uup and mm calculation formulas represent the months of the corresponding financial consumption and time; the t in the pts and pl calculation formulas represents the month of the current system time;

[0244] Process B5: Determine whether the application submitted by No. 1 is compliant;

[0245] Process B51: Read the current system time, recorded as Δt; use the financial system to count the income and expenditure details corresponding to the application submitted by No. 1 in the current month, and count the expenses, recorded as tam; extract the scientific research funds in tam, recorded as tam1; add the application funds, recorded as tam2; add the funds, recorded as tam3; tam1, tam2 and tam3 satisfy tam1+tam2+tam3=tam;

[0246] Process B52: Obtain the amount of funds applied for by No. 1 through the financial system, recorded as Δm; substitute Δm into the mm model, replacing m t , get mm1;

[0247] Determine whether uup1 is greater than or equal to Δm;

[0248] If so, it means that the funding application submitted by No. 1 is compliant;

[0249] If not, it means that the application submitted by No. 1 has exceeded the quota and the process will proceed to B53;

[0250] Process B53: Substitute Δt into the calculation formulas of pts, pl and mmc in turn, replace t therein, and obtain mmc1; determine whether tam2+tam3 is less than or equal to mm1+mmc1;

[0251] If it is met, it means that the amount of funds applied for by No. 1 is in compliance;

[0252] If not, it means that the funding amount of application No. 1 is not in compliance with regulations, and the application No. 1 is marked as abnormal. The information of the researcher corresponding to the application No. 1 is sent to the user's mobile terminal or client for accountability.

[0253] Process B6: Repeat the real-time monitoring process of application submission by No. 1 to determine whether the applications submitted by No. 2 to No. SN are in compliance; collect the information of scientific researchers corresponding to the funding application abnormalities in the submitted applications as the secondary accountability object information; send the secondary accountability object information to the user's mobile terminal or client for accountability.

[0254] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technical personnel in this field according to actual conditions. For example, if there are weight coefficients and proportional coefficients, their set sizes are to quantify each parameter to obtain a specific value, which is convenient for subsequent comparison. Regarding the size of the weight coefficient and the proportional coefficient, it is sufficient as long as it does not affect the proportional relationship between the parameter and the quantized value.

[0255] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A scientific research project docking management system based on financial accounting, It is characterized in that The management system includes: Data acquisition module: used to obtain the project names, scientific research personnel information and financial reimbursement information of all vertical and horizontal projects, and obtain accounting financial information; One-time accounting module: used to extract completed scientific research project applications from financial reimbursement information to obtain historical applications; conduct a preliminary review of historical applications and financial accounting to determine whether the application information of historical applications is complete; If the application information is incomplete, the person in charge or the responsible team of the corresponding historical application will be held accountable and the secondary accounting module will be directly executed; If the application information is complete, the historical application and financial accounting will be reviewed again to determine whether there are any abnormal transfers, abnormal application funds, and abnormal sources of funds in the historical application; If so, the person in charge or the responsible team of the corresponding historical application shall be held accountable; If it does not exist, the secondary accounting module is executed; Secondary accounting module: used to extract the submitted and ongoing scientific research project applications from the financial reimbursement information to obtain the submitted applications; Real-time monitoring of the research progress, financial consumption, consumption changes and newly added application content of each project in the submitted application; Obtain the market price of relevant scientific research materials in real time, and build an estimated model for submitting applications based on the market price of scientific research materials, newly added application content, and changes in consumption; Determine whether the application is compliant based on the financial consumption, estimated model and accounting financial information of the application; If the application is not in compliance with regulations, the scientific researchers who submitted the application will be held accountable; If the submitted application is compliant, the docking module will be executed; Docking module: used to summarize the data of financial information processed by the primary accounting module and the secondary accounting module, generate project financial reports, and feedback to users; The workflow of the secondary accounting module is as follows: Process B1: Access the scientific research management system; read the "paper list" and "patent list" through the scientific research management system; extract the accounting financial information whose project name does not match the paper list and patent list as the submitted application; Obtain the submitted applications in progress through the financial system and obtain the submitted applications; Process B2: Count the number of submitted applications, recorded as sn; read the current system time, recorded as t; Real-time monitoring of application submission No. 1; Process B3: Real-time monitoring of the research progress, financial expenditure, consumption increase and decrease changes, and newly added application content of the application submitted by No. 1; Process B4: Real-time monitoring of the newly added content of the application submitted by No. 1; In the income and expenditure details of application No. 1, the names and prices of the materials that are not included in the scientific research materials submitted in application No. 1 shall be counted as the newly added application materials; Construct the estimation model for application No. 1: mm model and mmc calculation formula; Process B5: Determine whether the application submitted by No. 1 is compliant; Process B51: read the current system time, recorded as Δt; through the financial system, count the income and expenditure details corresponding to the application submitted by No. 1 in the current month, and count the expenses, recorded as tam; extract the scientific research funds in tam, recorded as tam1; add the application funds, recorded as tam2; add the funds, recorded as tam3; tam1, tam2 and tam3 satisfy tam1+tam2+tam3=tam; Process B52: Obtain the amount of funds applied for by No. 1 through the financial system, recorded as Δm; substitute Δm into the mm model to obtain mm1; Determine whether uup1 is greater than or equal to Δm; If so, it means that the funding application submitted by No. 1 is compliant; If not, it means that the application submitted by No. 1 has exceeded the quota and the process will proceed to B53; Process B53: Substitute Δt into the mmc calculation formula in turn to obtain mmc1; determine whether tam2+tam3 is less than or equal to mm1+mmc1; If it is met, it means that the amount of funds applied for by No. 1 is in compliance; If not, it means that the funding amount of application No. 1 is not in compliance with regulations, and the application No. 1 is marked as abnormal. The information of the researcher corresponding to the application No. 1 is sent to the user's mobile terminal or client for accountability. Process B6: Repeat the process of real-time monitoring the application submitted by No. 1 to determine whether the applications submitted by No. 2 to No. SN are in compliance; collect the information of the researchers corresponding to the abnormal funding applications in the submitted applications as the secondary accountability object information; send the secondary accountability object information to the user's mobile terminal or client for accountability; The specific workflow of process B3 is as follows: Process B31: Real-time research progress of application submitted by No. 1; Process B311: read the start time and end time of the application, record them as at and bt respectively; calculate the time progress pts of the application submitted by No. 1, pts = (t-at) / (bt-at); Process B312: According to the project name submitted by No. 1, the total number of scientific research materials of the corresponding project is counted, recorded as srm; according to the scientific research materials and income and expenditure details submitted by No. 1, the total number of purchased scientific research materials is counted, recorded as brm; calculate the material progress prs submitted by No. 1, prs = brm / srm; Process B313: Comprehensive progress of application submitted by No. 1, pl = (pts*prs) 1 / 2 ; Process B32: Real-time monitoring of the financial consumption and consumption increase / decrease changes of No. 1’s application; Process B321: Obtain the project funds submitted by No. 1 through the financial system, recorded as srf; The month corresponding to the start time of the application submission is the starting month, and the previous month corresponding to the current system time is the ending month. The income and expenditure details of the application submitted on the 1st are counted monthly, recorded as: m 1 、m 2 ……m t-1 ; m 1 ~m t-1 , as the financial expenditure for the application submitted by No. 1; Process B322: With the month as the horizontal axis and the financial consumption as the vertical axis, construct the time-consumption curve of No. 1's application submission, recorded as the estimated curve; call the differential function to calculate the slope corresponding to each month, recorded as so 1 、so 2 ……so t-1 ; Calculate the consumption predictability coefficient fco for application No.

1. The calculation of fco is as follows: Among them, the parameter subscripts on the right side of the fco calculation formula all represent the months corresponding to financial consumption and slope; Determine whether fco is greater than or less than the first threshold; if so, it means that fco is available, and the consumption increase / decrease change applied for by No. 1 is determined as fco; if so, it means that fco is not available, and the consumption increase / decrease change applied for by No. 1 is determined as 0; The specific working process of the process B4 is as follows: Process B41: record the material name in the newly added application materials as the given material; and record the material price as the given price; Process B42: Create a shopping website query link to query the price of a given material, record it as the query price; determine whether the given price is less than or equal to the query price; If not, it means that the application submitted by No. 1 has over-declared, and the application submitted by No. 1 will be marked as abnormal. The information of the researcher corresponding to the application submitted by No. 1 will be sent to the user's mobile terminal or client for accountability. The subsequent processes B43 to B53 will be skipped. If the requirements are met, it means that the additional materials submitted for application No. 1 are reasonable and the application will proceed to process B43; Process B43: Count the other application funds that are not new application materials in the income and expenditure details submitted by No. 1 as new funds, recorded as am; Process B44: Constructing the estimated cost model for application No. 1: No. 1 submits an application to predict the maximum single application funding mm model; The maximum amount of excess application funds that can be predicted for application No. 1, mmc; pts=(t-at) / (bt-at);pl=(pts*prs) 1 / 2 ; The subscripts of the parameters on the right side of the uup and mm calculation formulas represent the months of the corresponding financial consumption and time; the t in the pts and pl calculation formulas represents the month of the current system time.

2. According to the scientific research project docking management system based on financial accounting as described in claim 1, It is characterized in that The workflow of the data acquisition module is as follows: Obtain the project names and scientific researcher information of all vertical and horizontal projects; Researcher information includes: researcher's name, researcher's title, identity certification materials, project start date and project completion date; Obtain electronic forms and financial processing for vertical and horizontal projects, and obtain financial reimbursement information for scientific research projects; Financial reimbursement information includes: the corresponding project's income and expenditure accounts, project funds, income and expenditure details, bank account opening bank, review department, review time, and review certification materials; Financial reimbursement information also includes: the funds of all projects and the time of fund disbursement, the expenditure funds of scientific research institutions and the time of disbursement of expenditure funds, as well as the funds issued and the scientific research materials of the corresponding projects; The project names, scientific research personnel information and financial reimbursement information of vertical and horizontal projects are sent to the primary accounting module as accounting financial information.

3. According to the scientific research project docking management system based on financial accounting as described in claim 2, It is characterized in that The workflow of the primary accounting module is as follows: Process A1: Extract the completed scientific research project applications from the financial reimbursement information to obtain historical applications; Process A2: Obtain the identity information of all internal staff through the database and compare it with the audit department and audit certification materials in the historical application; If the match is successful, the title of the auditing department is determined and process A3 is entered; If the comparison fails, it means that the review process of the historical application is unreasonable. The person in charge or the responsible team of the corresponding historical application will be sent to the user's mobile terminal or client for accountability. Skip process A3 to process A7 and directly execute the secondary accounting module. Database: used to store the identity information of internal researchers and staff; Process A3: In ascending order of audit time, determine whether the job titles of the auditing departments meet the requirements from low to high; If the conditions are met, it means that the personnel review in the review process of the historical application is reasonable, and the funding review is carried out, and the process A4 is entered; If not, it means that the review process of the historical application is unreasonable, and the review department information of the corresponding historical application will be sent to the user's mobile terminal or client for accountability; skip process A4 to process A7 and directly execute the secondary accounting module; Process A4: Accounting for vertical project finances in historical applications; Process A5: Count the historical longitudinal project income and expenditure details by monthly accounting to obtain reasonable historical expenditure funds, recorded as hgb; Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal fund use are obtained to obtain unreasonable historical fund use, recorded as hnnb; Monthly statistics of historical longitudinal project revenue and expenditure details marked as abnormal funding applications are obtained to obtain unreasonable historical application funds, recorded as hnqb; Monthly statistics of expenditures are recorded as ab; funds are issued as ib; Process A6: Record the historical longitudinal items marked as abnormal fund use as Category 1 abnormal historical items; record the historical longitudinal items marked as abnormal fund application as Category 2 abnormal historical items; and revise Category 1 abnormal historical items and Category 2 abnormal historical items; Process A7: Record the horizontal project finance in the historical application as the historical horizontal project; repeat the process of calculating the vertical project finance in the historical application, calculate the historical horizontal project finance, and determine the mark, abnormal funds and abnormal months of the historical horizontal project; Process A8: Read the information of researchers in historical projects marked as irregular transfers, abnormal use of funds, abnormal funding applications, and abnormal funding sources as the information of the person to be held accountable; send the information of the person to be held accountable, the abnormal funds, and the abnormal months to the user's mobile terminal or client for accountability.

4. According to the scientific research project docking management system based on financial accounting as claimed in claim 3, It is characterized in that The specific workflow of process A4 is as follows: Process A41: Record the longitudinal projects in the historical applications as historical longitudinal projects; compare the names, titles and identity certification materials of the researchers in the historical longitudinal projects with the identity information of all internal researchers in the database; determine whether they are completely matched; If they are completely matched, it means that there is no foreign investment in the historical vertical project, and the process goes to process A42; If the comparison is not complete, it means that foreign investment has been introduced into the historical vertical project, and the process will be entered into A43; Process A42: Separate accounting for historical vertical projects without foreign investment; Process A421: record the historical vertical projects without foreign investment as historical vertical projects without capital; count the number of historical vertical projects without capital, record as hon; Accounting for the No. 1 unfunded historical vertical project; Process A422: With the start time of the project No. 1 without a history of capital as the start point and the end time as the end point, query the income and expenditure accounts and the opening bank of the project No. 1 without a history of capital, and determine whether the income and expenditure accounts and the opening bank are consistent; if they are consistent, do not process; if they are inconsistent, mark the project No. 1 without a history of capital as: irregular transfer; Process A423: record the project funds of the No. 1 Unfunded History Longitudinal Project as hm; calculate the difference in months from the start time to the end time, record it as hyn; count the income and expenditure details of the No. 1 Unfunded History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Unfunded History Longitudinal Project, record it as he 1 、he 2 、……he hyn ;hm and he 1 、he 2 、……he hyn , satisfy him 1 +he 2 +……+he hyn ≥hm; Process A424: Determine 1 +he 2 +……+he hyn ) / hm is less than or equal to 1; If it is satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is reasonable and the No. 1 No-Fund History Vertical Project has passed the accounting; If it is not satisfied, it means that the project funding approval of the No. 1 No-Fund History Vertical Project is unreasonable, and the No. 1 No-Fund History Vertical Project is marked as: abnormal use of funds; Process A425: Repeat the process of calculating the No. 1 unfunded historical vertical project to complete the separate accounting of the No. 2 to No. hon unfunded historical vertical projects; Process A43: Separate accounting for historical vertical projects with foreign investment.

5. According to the scientific research project docking management system based on financial accounting as claimed in claim 4, It is characterized in that The specific workflow of process A43 is as follows: Process A431: record the historical vertical projects with foreign investment as historical vertical projects with investment; count the number of historical vertical projects with investment, record as hrn; Accounting for the No. 1 qualified historical vertical project; Process A432: Call the process of judging whether the income and expenditure account and the opening bank of the vertical project with no capital history No. 1 are consistent, and judge whether the income and expenditure account and the opening bank of the vertical project with capital history No. 1 are consistent; If they are consistent, no processing will be done; if they are inconsistent, the No. 1 qualified historical vertical item will be marked as: irregular transfer; Process A433: record the project funds of the No. 1 Qualified History Longitudinal Project as hn; calculate the difference in months from the start time to the end time, record it as hym; count the income and expenditure details of the No. 1 Qualified History Longitudinal Project on a monthly basis, and obtain the monthly expenditure of the No. 1 Qualified History Longitudinal Project, record it as hx 1 、hx 2 、……hx hym ;hn and hx 1 、hx 2 、……hx hym , satisfying hx 1 +hx 2 +……+hx hym ≥hn; Process A434: Determine (hx 1 +hx 2 +……+hx hym ) / hn is greater than or equal to 1; If it is satisfied, it means that the project funding approval of the No. 1 funded historical vertical project is reasonable and the No. 1 funded historical vertical project has passed the accounting; If it is not satisfied, it means that the project funding approval of the No. 1 funded history vertical project is unreasonable, and the No. 1 funded history vertical project is marked as: abnormal funding application; Process A435: Repeat the process of calculating the historical vertical project No. 1 to complete the separate accounting of the historical vertical projects No. 2 to hrn.

6. According to claim 3, a scientific research project docking management system based on financial accounting, It is characterized in that The specific workflow of process A6 is as follows: Process A61: Determine whether ab-hgb is greater than or equal to 0; If the conditions are met, it means that the scientific research institution has no remaining funds, and the Category 1 abnormal historical project has over-applied. The corresponding mark of the Category 1 abnormal historical project will be changed to: abnormal funding application; If not, it means that the scientific research institution has surplus funds, and the allowable allocation coefficient aa of the funds is determined, and the process A62 is entered; the calculation of aa is as follows: Process A62: Determine whether aa is greater than or equal to 1; If aa is greater than or equal to 1, it means that the category 1 abnormal historical project and the category 2 abnormal historical project are reasonable applications, and the corresponding marks of the category 1 abnormal historical project and the category 2 abnormal historical project are deleted, and the category 1 abnormal historical project and the category 2 abnormal historical project pass the accounting; If aa is less than 1, determine whether aa is greater than or equal to 0 and enter process A63; Process A63: If aa is greater than or equal to 0, it means that the funds of the 2nd type of abnormal historical project are over-expended, and the corresponding mark of the 2nd type of abnormal historical project is changed to: abnormal use of funds; If aa is less than 0, it means that the funding sources of the Category 1 abnormal historical project and the Category 2 abnormal historical project are unknown, and the corresponding marks of the Category 1 abnormal historical project and the Category 2 abnormal historical project are changed to: abnormal funding sources, and enter process A64; Process A64: Record the historical longitudinal items marked as abnormal funding sources as Category 3 abnormal historical items; The project funds for the three types of abnormal historical projects are recorded as unb; The monthly income and expenditure details of the three types of abnormal historical projects are counted, and the months of the three types of abnormal historical projects are recorded as unm; the monthly expenditures of the three types of abnormal historical projects are recorded as uns 1 、nus 2 、uns unm ; Process A65: Determine the monthly cumulative SS of expenditure = (uns 1 ) is greater than or equal to unb; if so, uns 1 Mark abnormal funds, uns 1 The corresponding month is marked as an abnormal month; if it does not meet the requirement, then SS=(uns 1 +nus 2 ) is greater than or equal to whether it is satisfied; if it is satisfied, then nus 2 Abnormal funds will be marked, nus 2 The corresponding month is marked as an abnormal month; and this process is repeated in this way. Each time the process is repeated, the monthly cumulative expenditure will be increased by the expenditure of the subsequent months on the original basis until the abnormal funds and abnormal months of the three types of abnormal historical projects are determined.