A value-driven architecture design and system delivery assistance system

Through value-driven architectural design and system delivery auxiliary system, the data isolation and cumbersome operation of auxiliary tools in digital platform construction projects are solved, and the full process management from project establishment to delivery is realized, ensuring effective implementation of the project and data consistency .

CN118095763BActive Publication Date: 2024-12-03SHANGHAI ATOZ INFORMATION TECH LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410302633.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-12-03
Estimated Expiration
2044-03-18

AI Technical Summary

Technical Problem

The existing technology lacks full-process and full-scene auxiliary tool support in digital platform construction projects, resulting in data isolation and cumbersome operations, and the APA project management method cannot be effectively implemented.

Method used

A value-driven architectural design and system delivery auxiliary system was designed, including value review module, project schedule module, research management module, solution management module and demand monitoring module, through graphical display, value analysis and review, project schedule calculation Submodules such as research report review and function matching support the full process management from project establishment to delivery.

Benefits of technology

It realizes the full process support of project management, avoids data island effect and cumbersome operation problems, ensures the matching of system business with the actual situation of the project, and provides a traceability basis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118095763B_ABST
    Figure CN118095763B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of project management, and specifically discloses a value-driven architecture design and system delivery auxiliary system. The system includes: a value review module, a project scheduling module, a survey management module, a solution management module and a demand monitoring module. The value review module graphically displays the enterprise organizational structure data and production subject data, conducts value analysis and review of the demand data, and obtains the implementation scope data and implementation difficulty label. The project scheduling module budgets the project schedule. The survey management module establishes a project survey plan, and performs survey punch-in management, survey result recording, survey report review and iterative modeling. The solution management module performs function matching and scheduling iterative review on the standard function list. The demand monitoring module pre-generates the system framework, and establishes and allocates the development demand pool. Supports the full process usage scenario from project establishment to delivery, controls the review of key links, avoids conflicts and facilitates traceability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of project management, and in particular to a value-driven architecture design and system delivery auxiliary system. Background Art

[0002] The APA project management method is a project management method that is business value-oriented and based on business processes. The realization of business value comes from good architecture design. In the APA project management method, architecture design follows the concept to logic, and then to operation, from top to bottom, layer by layer. Therefore, it can ensure the high efficiency and high quality of the project, and is widely used in digital platform construction projects in multiple business fields such as aviation, aerospace, shipbuilding, automobiles, nuclear energy, and mining.

[0003] Digital platform construction projects are often time-consuming, involve many people, have a complex implementation process, and have a lot of delivery content. In a digital platform construction project, it usually goes through processes such as value analysis, research, blueprint generation, business solution design, data architecture and application architecture transformation, and online delivery. In the above process, existing technologies will provide corresponding external auxiliary tools at different project nodes to assist project personnel in project implementation. However, these auxiliary external tools usually have the disadvantages of being non-open source, non-integrated, incomplete in functions, and isolated data. They cannot support the full-process and full-scenario application requirements of implementing digital platform construction projects in accordance with the APA project management method. In addition, the use of multiple auxiliary tools at the same time is not only cumbersome to operate, but also more detrimental to project personnel in content integration and tracing. Summary of the invention

[0004] In order to solve the above problems existing in the prior art, the present invention provides a value-driven architecture design and system delivery auxiliary system, including a value review module, a project scheduling module, a survey management module, a solution management module and a demand monitoring module;

[0005] The value review module obtains the organizational structure data and production subject data of the enterprise, graphically displays the organizational structure data and the production subject data, obtains demand data, performs value analysis and review on the demand data, and obtains implementation scope data and implementation difficulty labels according to the value analysis and review results;

[0006] The project scheduling module inputs the implementation scope data and implementation difficulty label obtained by the value review module into the project scheduling calculation model to perform project scheduling calculation to obtain pre-selected project manager data, pre-selected business consultant data and project cycle data;

[0007] The research management module establishes a project research plan according to the project cycle data, performs research check-in management, research result recording and research report review on the project research plan, and iteratively models the organizational structure data and the production subject data according to the research report that has passed the research report review;

[0008] The solution management module performs function matching on the standard function list according to the research report that has passed the research report review, and performs scheduled iterative review according to the function matching results;

[0009] The demand monitoring module pre-generates a system framework according to the function matching result of the function matching, obtains development requirements according to the system framework to obtain a development requirement pool, and allocates the development requirement pool using a task planning algorithm.

[0010] Furthermore, the value review module includes the following sub-modules: organizational structure modeling, production subject modeling, modeling graphics, demand data import, value analysis review and review result viewing, the organizational structure modeling and the production subject modeling obtain the organizational structure data and the production subject data, the modeling graphics graph the organizational structure data and the production subject data, the demand data import obtains the demand data, the value analysis review extracts keywords from the demand data to obtain demand characteristics, a demand review process is established based on the demand characteristics to perform demand review to obtain the implementation scope data and the implementation difficulty label, the review result viewing graphically displays the node information and node results of the demand review process, and displays the implementation scope data and the implementation difficulty label in a list.

[0011] Furthermore, the project scheduling module includes the following sub-modules: project manager management, business consultant management, project scheduling budget, project scheduling graphics, milestone setting and project plan review. The project manager management and the business consultant management are connected to the employee management system through an interface to obtain the basic employee information, employment status and qualification rating information of the project manager and the business consultant, record the project data, project status and project time of the project manager and the business consultant, calculate the pre-selected project manager data, the pre-selected business consultant data and the project cycle data through the project scheduling calculation model, and the project scheduling graphics graphically display the pre-selected project manager data, the pre-selected business consultant data and the project cycle data. The milestone setting records the project milestone data, obtains the preset project milestone delivery calibration according to the project milestone data, and verifies the project milestone document according to the project milestone delivery calibration. The project plan review establishes a project plan review process to obtain the final project manager data, the final business consultant data and the project cycle data.

[0012] Furthermore, the method for calculating the project schedule by the project schedule budget meter specifically includes the following steps:

[0013] Step 1: Construct an implementation system set and an implementation workshop set according to the implementation scope data, wherein the implementation system set is S={ t 1,..., t n}, n Indicates the number of implemented systems, n ≤ N , t n ∈A, A represents the system implementation capability set, N is the number of systems with implementation capabilities in A, and the implementation workshop set is W={( a 0 , b 1 ),...,( a x , b y )}, x Indicates the number of workshops in the production subject data, y Indicates the number of production lines in the production subject data;

[0014] Step 2: Associate the implementation system set with the implementation workshop set to obtain the implementation range feature vector M=( t n , a x , b y ), actively weighting the implementation scope feature vector according to the implementation difficulty label to obtain a weighted feature vector;

[0015] Step 3: Convert the weighted feature vector into a feature matrix and input it into the project scheduling calculation model to obtain the pre-selected project manager data, the pre-selected business consultant data and the project cycle data.

[0016] Furthermore, the survey management module includes the following sub-modules: survey plan management, survey punch-in management, survey result recording, survey report review and iterative modeling. The survey plan management establishes a project survey plan. The survey punch-in management records the survey location, survey time, participants and punch-in pictures. The survey result recording obtains survey audio data, performs audio recognition on the survey audio data to obtain a survey recognition result. The survey report review establishes a survey report review process. The iterative modeling iterates the organizational structure data and production subject data according to the survey report that has passed the survey report review process, and obtains process modeling data, material modeling data, bill of materials modeling data and asset modeling data.

[0017] Furthermore, the solution management module includes the following sub-modules: a standard function list, a standard interface list, a standard API list and a scheduled iterative review. The standard function list, the standard interface list and the standard API list mark the status of the standard function data, standard interface data and standard API data in the standard product library. The status marking includes: direct migration and migration modification. The scheduled iterative review establishes a scheduled iterative review process for the project cycle data according to the number of marks of the direct migration and the migration modification to obtain the final project cycle results and final milestone data.

[0018] Furthermore, the demand monitoring module includes the following sub-modules: system framework pre-generation, development demand management, test demand management, demand pool management and demand delivery. The system framework pre-generation generates the system framework according to the direct migration mark. The development demand management obtains demand data, demand category data, demand delivery time data and man-day estimated data. The test demand management generates test demand data according to the demand data. The demand pool management allocates demand pool according to the demand data, the demand category data, the demand delivery time data and the man-day estimated data through the task planning algorithm. The demand delivery monitors the demand delivery time data and obtains demand delivery feedback results.

[0019] The beneficial effects of the present invention are:

[0020] (1) By setting up the value review module, project scheduling module, research management module, solution management module and demand monitoring module, the project support system can support the full process usage scenarios from the project establishment stage to the delivery stage, avoiding the data island effect and cumbersome usage caused by the simultaneous use of multiple external project management tools;

[0021] (2) By setting up sub-modules such as value analysis review, project plan review, research report review, and scheduling iteration review, the review of key links in project management is controlled, avoiding conflicts between system business and actual project conditions, and leaving content basis for traceability. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0023] Figure 1 The following is a system arrangement framework diagram of the present invention. DETAILED DESCRIPTION

[0024] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0025] See also Figure 1 , a value-driven architecture design and system delivery support system, including value review module, project scheduling module, research management module, solution management module and demand monitoring module;

[0026] The value review module obtains the organizational structure data and production subject data of the enterprise, graphically displays the organizational structure data and the production subject data, obtains demand data, performs value analysis and review on the demand data, and obtains implementation scope data and implementation difficulty labels according to the value analysis and review results;

[0027] The project scheduling module inputs the implementation scope data and implementation difficulty label obtained by the value review module into the project scheduling calculation model to perform project scheduling calculation to obtain pre-selected project manager data, pre-selected business consultant data and project cycle data;

[0028] The research management module establishes a project research plan according to the project cycle data, performs research check-in management, research result recording and research report review on the project research plan, and iteratively models the organizational structure data and the production subject data according to the research report that has passed the research report review;

[0029] The solution management module performs function matching on the standard function list according to the research report that has passed the research report review, and performs scheduled iterative review according to the function matching results;

[0030] The demand monitoring module pre-generates a system framework according to the function matching result of the function matching, obtains development requirements according to the system framework to obtain a development requirement pool, and allocates the development requirement pool using a task planning algorithm.

[0031] Furthermore, the value review module includes the following sub-modules: organizational structure modeling, production subject modeling, modeling graphics, demand data import, value analysis review and review result viewing, the organizational structure modeling and the production subject modeling obtain the organizational structure data and the production subject data, the modeling graphics graph the organizational structure data and the production subject data, the demand data import obtains the demand data, the value analysis review extracts keywords from the demand data to obtain demand characteristics, a demand review process is established based on the demand characteristics to perform demand review to obtain the implementation scope data and the implementation difficulty label, the review result viewing graphically displays the node information and node results of the demand review process, and displays the implementation scope data and the implementation difficulty label in a list.

[0032] Furthermore, the project scheduling module includes the following sub-modules: project manager management, business consultant management, project scheduling budget, project scheduling graphics, milestone setting and project plan review. The project manager management and the business consultant management are connected to the employee management system through an interface to obtain the basic employee information, employment status and qualification rating information of the project manager and the business consultant, record the project data, project status and project time of the project manager and the business consultant, calculate the pre-selected project manager data, the pre-selected business consultant data and the project cycle data through the project scheduling calculation model, and the project scheduling graphics graphically display the pre-selected project manager data, the pre-selected business consultant data and the project cycle data. The milestone setting records the project milestone data, obtains the preset project milestone delivery calibration according to the project milestone data, and verifies the project milestone document according to the project milestone delivery calibration. The project plan review establishes a project plan review process to obtain the final project manager data, the final business consultant data and the project cycle data.

[0033] Furthermore, the method for calculating the project schedule by the project schedule budget meter specifically includes the following steps:

[0034] Step 1: Construct an implementation system set and an implementation workshop set according to the implementation scope data, wherein the implementation system set is S={ t 1,..., t n}, n Indicates the number of implemented systems, n ≤ N , t n ∈A, A represents the system implementation capability set, N is the number of systems with implementation capabilities in A, and the implementation workshop set is W={( a 0 ,b 1 ),...,( a x , b y )}, x Indicates the number of workshops in the production subject data, y Indicates the number of production lines in the production subject data;

[0035] Step 2: Associate the implementation system set with the implementation workshop set to obtain the implementation range feature vector M=( t n , a x , b y ), actively weighting the implementation scope feature vector according to the implementation difficulty label to obtain a weighted feature vector;

[0036] Step 3: Convert the weighted feature vector into a feature matrix and input it into the project scheduling calculation model to obtain the pre-selected project manager data, the pre-selected business consultant data and the project cycle data.

[0037] Furthermore, the survey management module includes the following sub-modules: survey plan management, survey punch-in management, survey result recording, survey report review and iterative modeling. The survey plan management establishes a project survey plan. The survey punch-in management records the survey location, survey time, participants and punch-in pictures. The survey result recording obtains survey audio data, performs audio recognition on the survey audio data to obtain a survey recognition result. The survey report review establishes a survey report review process. The iterative modeling iterates the organizational structure data and production subject data according to the survey report that has passed the survey report review process, and obtains process modeling data, material modeling data, bill of materials modeling data and asset modeling data.

[0038] Furthermore, the solution management module includes the following sub-modules: a standard function list, a standard interface list, a standard API list and a scheduled iterative review. The standard function list, the standard interface list and the standard API list mark the status of the standard function data, standard interface data and standard API data in the standard product library. The status marking includes: direct migration and migration modification. The scheduled iterative review establishes a scheduled iterative review process for the project cycle data according to the number of marks of the direct migration and the migration modification to obtain the final project cycle results and final milestone data.

[0039] Furthermore, the demand monitoring module includes the following sub-modules: system framework pre-generation, development demand management, test demand management, demand pool management and demand delivery. The system framework pre-generation generates the system framework according to the direct migration mark. The development demand management obtains demand data, demand category data, demand delivery time data and man-day estimated data. The test demand management generates test demand data according to the demand data. The demand pool management allocates demand pool according to the demand data, the demand category data, the demand delivery time data and the man-day estimated data through the task planning algorithm. The demand delivery monitors the demand delivery time data and obtains demand delivery feedback results.

[0040] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A value-driven architecture design and system delivery support system, It is characterized in that It includes value review module, project scheduling module, research management module, solution management module and demand monitoring module; The value review module obtains the organizational structure data and production subject data of the enterprise, graphically displays the organizational structure data and the production subject data, obtains demand data, performs value analysis and review on the demand data, and obtains implementation scope data and implementation difficulty labels according to the value analysis and review results; The project scheduling module inputs the implementation scope data and implementation difficulty label obtained by the value review module into the project scheduling calculation model to perform project scheduling calculation to obtain pre-selected project manager data, pre-selected business consultant data and project cycle data; The project schedule calculation includes: Step 1: Construct an implementation system set and an implementation workshop set according to the implementation scope data, wherein the implementation system set is S={ t 1 ,..., t n }, n represents the number of implemented systems, n ≤ N , t n ∈A, A represents the system implementation capability set, N is the number of systems with implementation capabilities in A, and the implementation workshop set is W={( a 0 , b 1 ),...,( a x , b y )}, x Indicates the number of workshops in the production subject data, y Indicates the number of production lines in the production subject data; Step 2: Associate the implementation system set with the implementation workshop set to obtain the implementation range feature vector M=( t n , a x , b y ), actively weighting the implementation scope feature vector according to the implementation difficulty label to obtain a weighted feature vector; Step 3: Convert the weighted feature vector into a feature matrix and input it into the project scheduling calculation model to obtain the pre-selected project manager data, the pre-selected business consultant data and the project cycle data; The research management module establishes a project research plan according to the project cycle data, performs research check-in management, research result recording and research report review on the project research plan, and iteratively models the organizational structure data and the production subject data according to the research report that has passed the research report review; The solution management module performs function matching on the standard function list according to the research report that has passed the research report review, and performs scheduled iterative review according to the function matching results; The demand monitoring module pre-generates a system framework according to the function matching result of the function matching to obtain a system framework, obtains development requirements according to the system framework to obtain a development requirement pool, and uses a task planning algorithm to allocate the development requirement pool to the development requirement pool.

2. The system according to claim 1, It is characterized in that The value review module includes the following sub-modules: organizational structure modeling, production subject modeling, modeling graphics, demand data import, value analysis review and review result viewing. The organizational structure modeling and the production subject modeling obtain the organizational structure data and the production subject data. The modeling graphics graph the organizational structure data and the production subject data. The demand data import obtains the demand data. The value analysis review extracts keywords from the demand data to obtain demand characteristics. A demand review process is established based on the demand characteristics to perform demand review and obtain the implementation scope data and the implementation difficulty label. The review result viewing graphically displays the node information and node results of the demand review process, and displays the implementation scope data and the implementation difficulty label in a list.

3. The system according to claim 1, It is characterized in that The project scheduling module includes the following submodules: project manager management, business consultant management, project scheduling budget, project scheduling graphics, milestone setting and project plan review. The project manager management and the business consultant management are connected to the employee management system through an interface to obtain the basic employee information, employment status and qualification rating information of the project manager and the business consultant, record the project data, project status and project time of the project manager and the business consultant, calculate the pre-selected project manager data, the pre-selected business consultant data and the project cycle data through the project scheduling calculation model, and the project scheduling graphics graphically display the pre-selected project manager data, the pre-selected business consultant data and the project cycle data. The milestone setting records the project milestone data, obtains the preset project milestone delivery calibration according to the project milestone data, and verifies the project milestone document according to the project milestone delivery calibration. The project plan review establishes a project plan review process to obtain the final project manager data, the final business consultant data and the project cycle data.

4. The system according to claim 1, It is characterized in that The survey management module includes the following submodules: Survey plan management, survey punch-in management, survey result recording, survey report review and iterative modeling. The survey plan management establishes a project survey plan. The survey punch-in management records the survey location, survey time, participants and punch-in pictures. The survey result recording obtains survey audio data, performs audio recognition on the survey audio data to obtain survey recognition results. The survey report review establishes a survey report review process. The iterative modeling iterates the organizational structure data and production subject data according to the survey report that has passed the survey report review process, and obtains process modeling data, material modeling data, bill of materials modeling data and asset modeling data.

5. The system according to claim 1, It is characterized in that The solution management module includes the following sub-modules: a standard function list, a standard interface list, a standard API list and a scheduled iterative review. The standard function list, the standard interface list and the standard API list mark the status of the standard function data, standard interface data and standard API data in the standard product library. The status marking includes: direct migration and migration modification. The scheduled iterative review establishes a scheduled iterative review process for the project cycle data according to the number of marks of the direct migration and the migration modification to obtain the final project cycle results and final milestone data.

6. The system according to claim 5, It is characterized in that The demand monitoring module includes the following sub-modules: system framework pre-generation, development demand management, test demand management, demand pool management and demand delivery. The system framework pre-generation generates the system framework according to the direct migration mark. The development demand management obtains demand data, demand category data, demand delivery time data and man-day estimated data. The test demand management generates test demand data according to the demand data. The demand pool management allocates demand pool according to the demand data, the demand category data, the demand delivery time data and the man-day estimated data through the task planning algorithm. The demand delivery monitors the demand delivery time data and obtains demand delivery feedback results.