A multi-dimensional stereoscopic monitoring system for unplanned operation of power transmission lines

Through a multi-dimensional three-dimensional monitoring system, combined with high-resolution satellite and drone technology, a full scene model is constructed to solve the problem of judging violations in unplanned operations, achieve accurate assessment and real-time supervision of operation risks, and improve operation safety. and efficiency.

CN118117487BActive Publication Date: 2024-10-11STATE GRID JIANGXI ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410290289.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-10-11
Estimated Expiration
2044-03-14

AI Technical Summary

Technical Problem

Existing satellite remote sensing technology can only identify environmental risks with obvious characteristics during unplanned operations, and cannot judge violations and safety risks of operators. This is especially true under weather conditions such as clouds and heavy fog, which results in the safety of workers' lives. threatened.

Method used

A multi-dimensional three-dimensional monitoring system is adopted, including a remote sensing inspection module, a multi-dimensional supervision module, a full-scene modeling module and a supervision and management module. Data is collected through high-resolution satellites, drones and cameras to build a multi-dimensional full-scene model to determine the type of operations and Fit and analyze whether there are violations, monitor and alarm in real time.

Benefits of technology

It achieves accurate judgment and supervision of unplanned operation points, generates standard operation strategies, monitors the behavior of maintenance workers, and provides real-time alarms, which improves operation safety and efficiency and solves the problem of unclear identification under weather conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118117487B_ABST
    Figure CN118117487B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of power transmission, and specifically provides a multi-dimensional stereoscopic monitoring system for unplanned operations of power transmission lines, comprising a remote sensing inspection module: used for inspecting power transmission lines through satellite remote sensing technology, and obtaining unplanned operation points on the power transmission lines; a multi-dimensional supervision module: used for locating unplanned operation points, and calling high-resolution equipment to obtain supervision data of unplanned operation points; a full-scene modeling module: used for performing full-scene modeling of unplanned operation points through supervision data, determining unplanned operation data, and outputting operation strategies of standard operations; a supervision management module: used for judging the operation type of unplanned operation data, and performing fitting analysis with standard operations, and judging whether there are any violations in the unplanned operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transmission line violation determination, and in particular to a multi-dimensional stereoscopic monitoring system for unplanned operation of a transmission line. Background Art

[0002] At present, in the field of power transmission line operations, the power grid intelligent management system will monitor power grid faults and power dispatching, and dispatch workers to perform work tasks. However, when temporary faults occur in some power transmission lines, the corresponding areas cannot detect and determine the type of fault, so unplanned operations will be carried out.

[0003] Unplanned operation of transmission lines refers to emergency or temporary operation of transmission lines without adequate planning and preparation. Such unplanned operation may be caused by emergencies, equipment failures, natural disasters, etc.

[0004] In patent document CN202310475400.7, a method and system for risk assessment of unplanned operations of transmission line satellite remote sensing is proposed:

[0005] Satellite remote sensing technology is used to obtain high-resolution satellite remote sensing images of transmission lines; edge detection method and Fourier transform method are used to identify the high-resolution satellite remote sensing images to obtain on-site operation identification results of transmission lines; based on the on-site operation identification results and the transmission line standardized operation plan database, the risk assessment results of unplanned operations of transmission lines are obtained.

[0006] The above technical solution is only based on high-resolution satellite remote sensing image recognition for unplanned operation identification. However, this identification method is affected by weather conditions such as clouds and fog. Secondly, the highest accuracy of existing satellite remote sensing images can only identify object features, that is, it can determine that a car is a car and a person is a person, but more accurate details require further development of satellite remote sensing technology. Therefore, it can only identify environmental risks with obvious characteristics. It cannot judge the risks or supervise the illegal operations that occur during the operation of the operators, and the operators need to work without pre-established operation plans and safety measures, which puts the lives of the operators in danger. Summary of the invention

[0007] The present invention provides a multi-dimensional stereoscopic monitoring system for unplanned operations of power transmission lines, which is used to solve the technical problem that in risk assessment during unplanned operations through satellite remote sensing, it can only identify environmental risks with obvious characteristics, and cannot judge illegal operations that occur during the operation of operators, and situations in which operators need to operate without pre-established operation plans and safety measures, resulting in life-threatening situations for operators.

[0008] In a first aspect, the present application provides a multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line, the system comprising:

[0009] Remote sensing inspection module: pre-configure the line inspection mechanism in the remote sensing satellite to inspect the transmission line and obtain unplanned operation points on the transmission line;

[0010] Multi-dimensional supervision module: used to locate unplanned operation points and call high-resolution equipment to obtain supervision data of unplanned operation points;

[0011] Full-scenario modeling module: used to conduct full-scenario modeling of unplanned operation points through supervision data, determine unplanned operation data, and output the operation strategy of standard operation;

[0012] Supervision and management module: used to determine the job type of unplanned job data, and perform fitting analysis with standard jobs to determine whether there are any violations in the unplanned jobs.

[0013] In combination with the first aspect, the satellite remote sensing technology includes line positioning technology and remote sensing cutting technology; wherein,

[0014] The line positioning technology includes a passive positioning mechanism and an active determination mechanism. The active determination mechanism performs initial positioning of the transmission line through a pre-loaded transmission line map to generate an initial distribution map of the transmission line. The passive positioning mechanism is used to identify branch circuits based on the initial distribution map of the transmission line, determine passive transmission lines, and add them to the initial distribution map of the transmission line to generate a transmission line inspection map.

[0015] Remote sensing cutting technology is used to perform remote sensing image cutting of the nodes of the transmission line after the initial distribution map of the transmission line is determined, and to conduct aimless line inspection through the remote sensing image map of the transmission node after cutting, and to identify branch circuits based on the inspection results.

[0016] In combination with the first aspect, the transmission line inspection comprises the following steps:

[0017] According to the transmission line inspection map, a node response mechanism is constructed;

[0018] The response nodes in the node response mechanism correspond to the circuit nodes in the transmission line;

[0019] According to the node response mechanism, the main inspection response task mechanism and auxiliary inspection identification mechanism are constructed;

[0020] The main inspection response task mechanism is used to inspect the transmission line and generate corresponding response signals when the inspection passes through each circuit node;

[0021] The auxiliary inspection identification mechanism is used to upload the remote sensing images between adjacent inspection points to the cloud database according to the response signal, and to perform rough identification of the operation points through the operation identification mechanism of the cloud database to determine whether there are unplanned operation points in the transmission line.

[0022] In combination with the first aspect, the identification step of the job identification mechanism includes:

[0023] Preset job identification items; wherein,

[0024] The job identification items include a person identification item and a device identification item;

[0025] According to the job identification items, the remote sensing images are split into portraits and equipment;

[0026] Based on the separated equipment and portraits, it is determined in the cloud database whether there is a circuit fault at the corresponding location. If there is a circuit fault, it is marked as an unplanned operation point.

[0027] In combination with the first aspect, the high-resolution equipment includes: a high-resolution satellite, a high-resolution inspection drone, a high-resolution camera and a high-resolution scanner; wherein,

[0028] High-resolution satellites are positioning devices that operate without a plan;

[0029] High-resolution inspection drones are multi-dimensional monitoring equipment;

[0030] High-resolution cameras and high-resolution scanners are auxiliary data acquisition devices.

[0031] In combination with the first aspect, the supervision data includes operation supervision data, line operation data and line environment data; wherein,

[0032] Operation monitoring data refers to the manual operation data and machine operation data during the operation process;

[0033] Line operation data include transmission line power voltage data;

[0034] The line environment data includes line foreign matter data, line insulator defect data, and line component defect data.

[0035] In combination with the first aspect, the obtaining of the supervision data of the unplanned operation point includes:

[0036] Pre-set multi-dimensional full-scenario modeling operation standards, data standards and multi-dimensional supervision angles;

[0037] Call high-resolution equipment to obtain the first operation data of unplanned operation points from a multi-dimensional supervision perspective;

[0038] Screening the first operation data according to the data standard, and determining the screened second operation data;

[0039] The second operation data is behavior-classified, and after the classification, a plurality of different types of supervision data are generated.

[0040] In combination with the first aspect, the full scene modeling includes:

[0041] Obtain scene data of unplanned operation points, and construct a multi-dimensional scene model in the cloud server through scene elements;

[0042] According to the scene data, set the scene reference objects, and build a multi-dimensional operation point model based on the scene reference objects;

[0043] Convert scene data into scene point cloud data and determine the point cloud coordinates of each scene element;

[0044] According to the point cloud coordinates, scene elements are implanted in the multi-dimensional operation point model to generate a multi-dimensional full-scene modeling model of the unplanned operation point, and the unplanned operation data is converted.

[0045] In combination with the first aspect, the unplanned operation data conversion includes:

[0046] Determine the real-time job type based on the multi-dimensional full-scenario modeling model;

[0047] According to the real-time job type, the current job behavior is divided in the preset job database to generate multiple behavior identification items;

[0048] According to the behavior identification items, a data conversion mechanism for the multi-dimensional full-scenario modeling model is constructed, and the full-scenario modeling data with corresponding behavior key features is generated into a corresponding behavior feature determination mechanism according to the behavior type;

[0049] Based on the behavior feature judgment mechanism, unplanned operation data conversion is carried out.

[0050] In combination with the first aspect, the supervision management module includes:

[0051] Type determination unit: used to obtain unplanned operation data, extract behavior features, and sequentially combine multiple behavior features to determine the operation type;

[0052] Rule setting unit: determines the corresponding standard operation behavior according to the sequential combination of behavior characteristics, and sets the behavior rules under the current operation type;

[0053] Violation judgment unit: It is used to build a fitting response mechanism for unplanned operation data according to the operation behavior according to the behavioral criteria. When there is an operation behavior without a fitting response, the corresponding operation behavior is judged as a violation.

[0054] The beneficial effects of the present invention are:

[0055] (1) The present invention can inspect and supervise the power transmission lines, identify unplanned operation points where operators exist, and identify obvious visual faults of the power transmission lines where operators do not exist but need to be repaired by operators.

[0056] That is, the present invention can determine whether a transmission line needs to be repaired due to an unexpected event. In the process of repairing a transmission line failure, if the fault type cannot be identified and the work task and work plan cannot be formulated, the technical solution of the present application can be used to automatically generate an operation strategy, configure a standard operating process with this operation strategy, monitor the work behavior of maintenance workers, and determine whether any violations occur.

[0057] (2) The present invention can conduct risk assessment of unplanned operations through satellite remote sensing technology, and can also solve the problem of collecting high-resolution operation scene data in cloudy and foggy weather when satellite remote sensing images are unclear.

[0058] (3) The present invention can conduct near-field real-time monitoring of illegal persons or behaviors and issue real-time alarms.

[0059] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.

[0060] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0062] Figure 1 A system composition diagram of a multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line according to an embodiment of the present invention;

[0063] Figure 2 It is a mechanism execution diagram of the job identification mechanism in an embodiment of the present invention;

[0064] Figure 3 It is a composition diagram of the inspection mode of the transmission line inspection in an embodiment of the present invention;

[0065] Figure 4This is a diagram of the equipment architecture of a multi-dimensional monitoring system for unplanned operation of a power transmission line in an embodiment of the present invention. DETAILED DESCRIPTION

[0066] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0067] Combine the following Figure 1 The present invention proposes a multi-dimensional stereoscopic monitoring system for unplanned operation of power transmission lines, comprising:

[0068] Remote sensing inspection module: pre-configure the line inspection mechanism in the remote sensing satellite to inspect the transmission lines and obtain unplanned operation points on the transmission lines;

[0069] Multi-dimensional supervision module: used to locate unplanned operation points and call high-resolution equipment to obtain supervision data of unplanned operation points;

[0070] Full-scenario modeling module: used to conduct full-scenario modeling of unplanned operation points through supervision data, determine unplanned operation data, and output the operation strategy of standard operation;

[0071] Supervision and management module: used to determine the job type of unplanned job data, and perform fitting analysis with standard jobs to determine whether there are any violations in the unplanned jobs.

[0072] The principle of the above technical solution is:

[0073] like Figure 1 and Figure 4As shown, the present application pre-inputs planned operation points, transmission line operation points and transmission lines into the monitoring system, and then, the remote sensing satellite 100 is used to perform repeated inspections on the entire transmission line under a preset inspection cycle. During the repeated inspection process, it is determined whether there are manual operation locations on the transmission line that do not belong to the planned operation points. If so, it is identified as an unplanned operation point and then transmitted to the first server 101. The first server 101 locates the unplanned operation point on the map and determines whether there is a high-resolution device 102 near the unplanned operation point. The high-resolution device includes but is not limited to a drone, a linear camera and a high refresh rate scanner. The supervision data of the unplanned operation point is then collected by the high-resolution device 102, and the supervision data is mainly the operation scene image of the unplanned operation point. The high-resolution device 102 transmits the work scene image to the second server 103. The second server 103 uses its built-in full-scene modeling software (full-scene modeling is a three-dimensional multi-dimensional modeling method that leaves no blind spots on the construction site) to perform full-scene modeling on the work data of the unplanned work point. After the full-scene modeling, the work type is identified, and the work strategy of the standard work corresponding to the current work type is called from the third server 104. The work strategy is compared with the scene corresponding to the supervision data to compare the overall work data of the unplanned work point without blind spots. The work scene after full-scene modeling is compared in multiple dimensions to compare the work behavior of each operator, the placement of the work equipment in the work scene, and the process sequence of the work process to determine whether there are behaviors that are different from or unrelated to the work strategy, the work process sequence, and the placement of the work equipment, thereby realizing the judgment of illegal behaviors, and then displaying it through the display device 105, generating an alarm signal, and sending the alarm signal to the operator or the superior department.

[0074] The process of comparing operating strategies includes directly comparing illegal behaviors to directly determine whether illegal behaviors exist, and comparing operating strategies to determine whether there are operating behaviors that are not within the operating strategies and determining the corresponding behaviors as illegal behaviors.

[0075] The main application scenario of this application is in the process of monitoring and judging unplanned operations, in order to solve the problem that the line failure at the unplanned operation point occurs suddenly, or after it occurs, someone repairs it, but does not enter the power system to generate a work order, so it is impossible to monitor the transmission line through the supervision mechanism;

[0076] In this application:

[0077] An unplanned operation point means that an operation business already exists, and the operating personnel are performing circuit maintenance operations, or there is no operation business. During the inspection process, an abnormality is found in the transmission line, thereby generating operation information, and performing unplanned operations without knowing the cause of the fault.

[0078] The supervision data includes the real-time environmental conditions of the unplanned work point, the reasons for maintenance and the work data of the operators. When there is fixed and long-term high-resolution equipment near the unplanned work point, it also includes the supervision data before maintenance and the scene data during the maintenance process.

[0079] High-resolution equipment uses the location information of unplanned work points to schedule equipment (drone scheduling, scanners for on-site scanning, and linear cameras for scene data collection. Drone scheduling is preferred, which can perform unmanned operations. When using scanners and linear cameras, they need to be placed manually).

[0080] Full-scene modeling is mainly based on full-scene modeling software, which performs full-scene modeling of unplanned work points, generates three-dimensional scene models of unplanned work points, and displays full-scene modeling images of maintenance workers performing transmission line maintenance operations.

[0081] The judgment of illegal behavior is to determine the operation behavior during the unplanned operation through the operation behavior of the maintenance personnel, and then determine the specific operation type based on the operation behavior; after the operation type is determined, the standard operation strategy and real-time operation information are fitted and analyzed to determine whether there are illegal behaviors in the entire operation process, make a violation judgment, and upload an alarm. The fitting analysis includes the supervision fitting of the standard operation data corresponding to the operation strategy of the standard operation with the real-time operation data in the supervision data to achieve the violation judgment.

[0082] The beneficial effects of the above technical solution are:

[0083] (1) The present invention can inspect and supervise the power transmission lines, identify unplanned operation points where operators exist, and identify obvious visual faults of the power transmission lines where operators do not exist but need to be repaired by operators.

[0084] That is, the present invention can determine whether a transmission line needs to be repaired due to an unexpected event. In the process of repairing a transmission line failure, if the fault type cannot be identified and the work task and work plan cannot be formulated, the technical solution of the present application can be used to automatically generate an operation strategy, configure a standard operating process with this operation strategy, monitor the work behavior of maintenance workers, and determine whether any violations occur.

[0085] (2) The present invention can conduct risk assessment of unplanned operations through satellite remote sensing technology, and can also solve the problem of collecting high-resolution operation scene data in cloudy and foggy weather when satellite remote sensing images are unclear.

[0086] (3) The present invention can conduct near-field real-time monitoring of illegal persons or behaviors and issue real-time alarms.

[0087] As an optional embodiment of the present invention, during the inspection of unplanned operation points, some transmission lines are connected to the power grid and can be monitored by abnormal voltage on the power grid, but there are some transmission lines that are branch circuits of the power grid. There are line faults in the branch circuits. However, because they are not connected to the power grid, it is difficult to find the line faults in the branch circuits. In the transmission line inspection stage of wireless remote sensing technology, the present application adopts line positioning technology and remote sensing cutting technology; wherein,

[0088] Line location technology includes passive location mechanism and active determination mechanism;

[0089] The active determination mechanism performs initial positioning of the transmission line through a pre-loaded transmission line map and generates an initial distribution map of the transmission line; that is, it determines the location information of the main transmission lines that the power grid can monitor, as well as the locations of planned operation points.

[0090] The passive positioning mechanism is used to identify branch circuits and determine passive transmission lines based on the initial distribution map of transmission lines, and add them to the initial distribution map of transmission lines to generate a transmission line inspection map. Through remote sensing technology, it is determined whether the main transmission line is still connected to other branch transmission lines, and they are automatically added to the initial distribution map of transmission lines.

[0091] In actual transmission lines, transmission lines are generally connected to load equipment or transmitted to distribution rooms and other places. However, there are some transmission lines that are not connected to distribution rooms. Only a part of the transmission line is shown in the remote sensing image, and it is suddenly blocked by other mountains or trees, making it impossible to determine the power supply destination of the transmission line. At this time, through remote sensing cutting technology, after the initial distribution map of the transmission line is determined, the nodes of the transmission line are cut by remote sensing images. The nodes are transmission nodes, and the remote sensing images of the transmission nodes after cutting are used to check for aimless lines, and branch circuits are identified based on the inspection results.

[0092] The principle of the above technical solution is:

[0093] The satellite remote sensing technology of the present application includes line positioning technology and remote sensing cutting technology, and the line positioning technology includes a passive positioning mechanism and an active determination mechanism. The passive positioning mechanism is used to identify branch circuits based on the initial distribution map of the transmission line, determine the passive transmission lines, and add them to the initial distribution map of the transmission line to generate a transmission line inspection map. The active determination mechanism performs initial positioning of the transmission line through a pre-loaded transmission line map to generate an initial distribution map of the transmission line. The remote sensing cutting technology is used to perform remote sensing image cutting of the nodes of the transmission line after the initial distribution map of the transmission line is determined, and to perform purposeless line inspection through the remote sensing image map of the transmission node after cutting, and to identify branch circuits based on the inspection results.

[0094] The beneficial effects of the above technical solution are:

[0095] This application uses satellite remote sensing technology to achieve comprehensive, high-precision, long-term monitoring and management of power transmission lines, improving the safety and reliability of power transmission;

[0096] Through the passive positioning mechanism and active determination mechanism, the branch circuits in the transmission line can be quickly and accurately identified and incorporated into the inspection map of the transmission line, which is convenient for regular inspection and troubleshooting;

[0097] Through remote sensing cutting technology and purposeless line inspection, real-time monitoring of transmission line nodes and timely detection of faults can be achieved, improving the safety and reliability of power transmission.

[0098] As an optional embodiment of the present invention, during the inspection process, each high-voltage tower of the transmission line is a circuit node. If the whole process inspection is directly carried out, it is impossible to determine whether the transmission line inspection is comprehensive. Therefore, during the transmission line inspection process, the following steps are adopted:

[0099] According to the transmission line inspection map, a node response mechanism is constructed;

[0100] The response nodes in the node response mechanism correspond to the circuit nodes in the transmission line; the node response mechanism corresponds to the high-voltage towers or distribution stations, etc., in each transmission line, and the power transmission nodes.

[0101] According to the node response mechanism, the main inspection response task mechanism and auxiliary inspection identification mechanism are constructed;

[0102] The main inspection response task mechanism is used to inspect the transmission line and generate a corresponding response signal when the inspection passes through each circuit node; the response signal indicates that the inspection of the transmission line between a response point and a real-time response point on the transmission line is completed.

[0103] Because the operation points on the transmission line have been input into the first server 101, in order to accurately determine whether the transmission line is a planned operation point or an unplanned operation point, the auxiliary inspection identification mechanism uploads the remote sensing images between adjacent inspection points to the cloud database based on the response signal, and performs a rough identification of the operation points through the operation identification mechanism of the cloud database to determine whether there are unplanned operation points in the transmission line.

[0104] The principle of the above technical solution is:

[0105] As attached Figure 3 As shown, the present application analyzes each circuit node in the transmission line, and determines the scope of responsibility and response mode corresponding to each node according to the characteristics and location information of these nodes. On the basis of the node response mechanism, the main inspection response task mechanism and the auxiliary inspection identification mechanism are constructed. The main inspection response task mechanism is mainly used for real-time inspection of the transmission line. Its specific operation is to generate a corresponding response signal at each circuit node inspected during the inspection process. The auxiliary inspection identification mechanism is mainly responsible for identifying the remote sensing images between adjacent inspection points by analyzing the response signals collected from the main inspection, and uploading them to the cloud database. For the remote sensing images uploaded to the cloud database, the operation point is roughly identified through the operation identification mechanism of the cloud database. Through the operation identification mechanism of the cloud database, it is accurately determined whether there is an unplanned operation point in the transmission line. If it exists, it is necessary to take timely measures to avoid affecting the normal operation of the transmission line. By combining with the main inspection response task mechanism, effective management and control of the entire transmission line inspection process can be achieved. At the same time, the combination of the auxiliary inspection identification mechanism and the operation identification mechanism of the cloud database also provides strong support for subsequent fault diagnosis.

[0106] The beneficial effects of the above technical solution are:

[0107] The node response mechanism is to establish a complete set of node response mechanisms so that the subsequent main inspection response task mechanism and auxiliary inspection identification mechanism can work normally. This transmission line inspection system based on the node response mechanism can not only improve the accuracy and efficiency of inspections, but also effectively prevent accidents caused by human factors.

[0108] As an optional embodiment of the present invention, in the process of determining the operation type of the unplanned operation point, because the unplanned operation point has no operation arrangement plan, in the process of identifying the operation type through the operation identification mechanism:

[0109] Preset job identification items; wherein,

[0110] The operation identification items include portrait identification items and equipment identification items; the portrait identification items represent the work type identification items of the operating personnel, and the equipment identification items represent the type identification items of the operating equipment. Through these two types of data, the specific type of circuit fault can be determined, and it can also be determined whether the fault repair is to be carried out. Therefore, when it is determined that it is a fault, it is also marked as an unplanned operation point during the operation process to prevent irrelevant personnel or irrelevant equipment on the transmission line from being identified as operation data during the transmission line identification, resulting in mobilization errors.

[0111] According to the job identification items, the remote sensing images are split into portraits and equipment;

[0112] Based on the separated equipment and portraits, it is determined in the cloud database whether there is a circuit fault at the corresponding location. If there is a circuit fault, it is marked as an unplanned operation point.

[0113] The principle of the above technical solution is:

[0114] As attached Figure 2 As shown, the present application sets a job identification item, which is used to determine the type of object to be identified so as to correctly associate it with the corresponding processing method. In the portrait recognition item, specific facial features or identity information can be specified to facilitate subsequent image matching and recognition. In the device identification item, a specific device type, model or number can be specified to facilitate subsequent device positioning and recognition.

[0115] According to the job identification items, the remote sensing image is split into portrait and device. Portrait splitting refers to separating the person in the original image from the background for further processing and analysis. Device splitting refers to separating the device in the original image from the background for further processing and analysis. Various image processing techniques can be used to achieve portrait and device splitting, such as convolutional neural network (CNN) based on deep learning.

[0116] Based on the split portraits and devices, determine whether there is a circuit fault at the corresponding location in the cloud database. Use machine learning algorithms to detect and classify objects in the image, and find the corresponding circuit fault information based on the object's category and location information. This information can be obtained from previously collected data sets or through real-time monitoring systems. If circuit fault information is found, it will be marked as an unplanned operation point.

[0117] The beneficial effects of the above technical solution are:

[0118] The operation recognition mechanism can effectively identify the operation points in the remote sensing image, classify and mark them, which helps to timely discover and solve potential safety hazards, and also helps to improve work efficiency and reduce labor costs.

[0119] As an optional embodiment of the present invention, the high-resolution equipment includes: a high-resolution satellite, a high-resolution inspection drone, a high-resolution camera and a high-resolution scanner; wherein,

[0120] High-resolution satellites are positioning devices that operate without a plan;

[0121] High-resolution inspection drones are multi-dimensional monitoring equipment;

[0122] High-resolution cameras and high-resolution scanners are auxiliary data acquisition devices.

[0123] The principle of the above technical solution is:

[0124] The high-resolution satellite of the present application uses satellite remote sensing technology to take high-precision photos of power transmission lines at a long distance. It can obtain image information of power transmission lines. By analyzing these image information, the status and potential problems of power transmission lines can be determined. High-resolution satellites can be set in fixed positions or mobile orbits and can be flexibly dispatched according to actual needs.

[0125] High-resolution equipment, such as drones, can be equipped with a variety of sensors and visual equipment, such as radars and infrared detectors, to detect power lines from multiple angles and scales in the air and obtain detailed information about the power lines. By cooperating with other equipment (for example, circuit transmission monitoring equipment), real-time monitoring of power lines can be achieved and abnormal conditions can be detected in a timely manner. High-resolution equipment can select different modes according to mission requirements, such as remote control, autonomous navigation, etc.

[0126] In actual implementation, high-resolution cameras and high-resolution scanners can be used together to obtain detailed information on the surface of transmission lines, such as line materials, equipment layout, etc. By combining with data from high-resolution satellites and drones, the status and risks of transmission lines can be assessed more accurately. High-resolution cameras and scanners can obtain different data types, such as digital elevation models (DEMs), laser scanning point clouds, etc., through different sensors and acquisition methods.

[0127] The beneficial effects of the above technical solution are:

[0128] Through the collaborative operation of multiple devices, the accuracy and efficiency of data collection can be improved, and adaptive working modes can be achieved in different environments.

[0129] As an optional embodiment of the present invention, in order to ensure more accurate identification of the operation data of the unplanned operation point, the supervision data of the present invention includes operation supervision data, line operation data and line environment data; wherein,

[0130] Operation monitoring data refers to the manual operation data and machine operation data during the operation process;

[0131] Line operation data include transmission line power voltage data;

[0132] The line environment data includes line foreign matter data, line insulator defect data, and line component defect data.

[0133] The principle of the above technical solution is:

[0134] In the process of operation supervision, the operation supervision data collected by this application includes manual operation data and machine operation data during the operation process, which can be obtained by real-time monitoring and recording of various operation behaviors on the transmission line. Manual operation data can include manual inspection, maintenance, cleaning and other operations; machine operation data can include drone inspection, robot inspection, automation system monitoring and other operations. These data can be collected through sensors, cameras and other equipment installed on site, and then uploaded to the cloud server for storage and analysis through the data transmission and processing system.

[0135] Line operation data includes transmission line power voltage data, which can be obtained through online monitoring systems. Online monitoring systems can use various sensors and technologies to detect the status and performance of transmission lines, such as current sensors, voltage sensors, power meters, frequency meters, thermometers, etc. These sensors can be installed at different locations of the transmission line and monitor and record in real time in local or remote data centers.

[0136] Line environment data includes line foreign matter data, line insulator defect data, and line component defect data, which can be obtained through regular inspection and monitoring of the environment around the transmission line. These data can be collected by environmental monitoring equipment installed on site, such as cameras, sensors, drones, etc.

[0137] The beneficial effects of the above technical solution are:

[0138] The present invention can monitor and record in real time, continuously and accurately, can effectively discover and solve the potential safety hazards of the power transmission line, and ensure the normal and reliable operation of the power transmission line.

[0139] As an optional embodiment of the present invention, in order to ensure the comprehensiveness of the operation data, the process of obtaining the supervision data of the unplanned operation point in the present application includes:

[0140] Pre-set multi-dimensional full-scenario modeling operation standards, data standards and multi-dimensional supervision angles;

[0141] Call high-resolution equipment to obtain the first operation data of unplanned operation points from a multi-dimensional supervision perspective;

[0142] Screening the first operation data according to the data standard, and determining the screened second operation data;

[0143] The second operation data is behavior-classified, and after the classification, a plurality of different types of supervision data are generated.

[0144] The principle of the above technical solution is:

[0145] This application sets data standards and multi-dimensional supervision angles by pre-setting the full-scene modeling operation standards. This step is to ensure that in the subsequent operation data acquisition and processing process, unified standards can be followed to ensure the accuracy and consistency of the data. In the device call, the high-resolution device is called to obtain the first operation data of the unplanned operation point from the multi-dimensional supervision angle. This step is to obtain the first-hand data of the unplanned operation point under the specified multi-dimensional supervision angle by using high-resolution equipment, which is the basis for obtaining all subsequent data. The first operation data is screened according to the data standard, and the second operation data after screening is determined. This step is to remove erroneous, incomplete or non-standard data in the original data and obtain the second operation data that meets the requirements. The second operation data is behaviorally classified, and after classification, multiple different types of supervision data are generated. This step is to analyze the screened second operation data, classify it according to its behavioral characteristics, so as to obtain more refined supervision data to provide support for subsequent management decisions.

[0146] The beneficial effects of the above technical solution are:

[0147] Obtain effective supervision data of unplanned work points so that managers can promptly discover and solve possible problems and improve work efficiency and management level.

[0148] As an optional embodiment of the present invention, in order to ensure that the multi-dimensional monitoring data is Accuracy, full-scenario modeling includes:

[0149] Obtain scene data of unplanned operation points, and construct a multi-dimensional scene model in the cloud server through scene elements;

[0150] According to the scene data, set the scene reference objects, and build a multi-dimensional operation point model based on the scene reference objects;

[0151] Convert scene data into scene point cloud data and determine the point cloud coordinates of each scene element;

[0152] According to the point cloud coordinates, scene elements are implanted in the multi-dimensional operation point model to generate a multi-dimensional full-scene modeling model of the unplanned operation point, and the unplanned operation data is converted.

[0153] The principle of the above technical solution is:

[0154] During the implementation of this application, in order to effectively monitor and control unplanned work points, we need to first obtain relevant scene data. To determine the different elements in the scene, full-scene modeling technology and full-scene modeling software are used. By analyzing and processing the scene data, a multi-dimensional three-dimensional scene model is constructed in the cloud server. This model includes various elements in the scene, such as workers and work equipment; in order to accurately describe the position and posture of the work point, we need to set a scene reference. This reference can be a fixed point or surface, or an object or other feature. By analyzing the scene data and combining the actual situation, determine the appropriate reference. Based on the scene reference and scene data, a multi-dimensional work point model is further constructed. This model includes various elements around the work point, such as lines, towers, etc., and each element is assigned specific three-dimensional coordinates and attribute information. At the same time, scene elements are implanted in the multi-dimensional work point model according to the point cloud coordinates to achieve refined management of the entire scene.

[0155] As an optional embodiment of the present invention, in order to accurately identify the operation behavior in the unplanned operation process, the present invention performs the following steps during the unplanned operation data conversion process:

[0156] Determine the real-time job type based on the multi-dimensional full-scenario modeling model;

[0157] According to the real-time job type, the current job behavior is divided in the preset job database to generate multiple behavior identification items;

[0158] According to the behavior identification items, a data conversion mechanism for the multi-dimensional full-scenario modeling model is constructed, and the full-scenario modeling data with corresponding behavior key features is generated into a corresponding behavior feature determination mechanism according to the behavior type;

[0159] Based on the behavior feature judgment mechanism, unplanned operation data conversion is carried out.

[0160] The principle of the above technical solution is:

[0161] In this application, the type of real-time operation is automatically identified through in-depth analysis and processing of input data. For example, wire laying, maintenance and other work can be identified by processing image, sound, motion and other data. The current operation behavior is classified using a pre-set operation database to generate corresponding behavior identification items. These behavior identification items can serve as the basis for subsequent data conversion and are used for subsequent in-depth analysis and processing. Through the data conversion mechanism of different operation types, different operation types can obtain corresponding feature extraction and analysis methods. This will provide possibilities for subsequent data processing and also provide a basis for the intelligence of the system. By determining the behavior characteristics, specific operation behaviors can be obtained, thereby realizing real-time monitoring and management of unplanned operations.

[0162] As an optional embodiment of the present invention, the supervision management module includes:

[0163] Type determination unit: used to obtain unplanned operation data, extract behavior features, and sequentially combine multiple behavior features to determine the operation type;

[0164] Rule setting unit: determines the corresponding standard operation behavior according to the sequential combination of behavior characteristics, and sets the behavior rules under the current operation type;

[0165] Violation judgment unit: It is used to build a fitting response mechanism for unplanned operation data according to the operation behavior according to the behavioral criteria. When there is an operation behavior without a fitting response, the corresponding operation behavior is judged as a violation.

[0166] The principle of the above technical solution is:

[0167] In this application, the role of the type determination unit is to obtain the unplanned operation data provided by the input part and extract the behavior features. Specifically, the type determination unit extracts the characteristic information of the operation from the input part, such as the operation time, location, personnel, etc.; and extracts the behavior features related to the operation based on this information. These behavior features can be known, predefined, or adaptive. After extracting all the behavior features, the type determination unit will combine them in sequence to form a complete sequence of operation behavior features. This sequence contains all the behavior features related to the operation and can be used to determine the type of the operation. The rule setting unit determines the corresponding operation behavior according to the behavior feature sequence and sets the behavior rules under the current operation type. Specifically, the rule setting unit uses the behavior feature sequence to find the existing rule library and match it. If a matching rule is found, it is applied to the behavior rule of the current operation type. If no matching rule is found, it is necessary to set the rule according to the actual situation. Finally, the rule setting unit outputs the behavior rules to the output part for use by the subsequent violation determination unit. The violation determination unit constructs a fitting response mechanism according to the operation behavior for the unplanned operation data based on the behavior criteria. Specifically, the violation judgment unit will use the behavior feature sequence to match the behavior rules in the rule base and determine whether the unplanned operation data provided by the input part conforms to these rules. If not, the corresponding behavior will be regarded as a violation and the corresponding warning information will be output or corresponding measures will be taken. At the same time, the violation judgment unit will also record abnormal behavior information so that the administrator can discover and solve the problem in time.

[0168] The beneficial effects of the above technical solution are:

[0169] It can effectively identify, monitor and control the risks of unplanned operations to ensure the safe and stable operation of transmission lines.

[0170] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A multi-dimensional monitoring system for unplanned operation of power transmission lines, characterized in that: include: Remote sensing inspection module: pre-configure the line inspection mechanism in the remote sensing satellite to inspect the transmission lines and obtain unplanned operation points on the transmission lines; Multi-dimensional supervision module: used to locate unplanned operation points and call high-resolution equipment to obtain supervision data of unplanned operation points; Full-scenario modeling module: used to conduct full-scenario modeling of unplanned operation points through supervision data, determine unplanned operation data, and output the operation strategy of standard operation; Supervision and management module: used to determine the operation type of unplanned operation data, and to perform fitting analysis with standard operations to determine whether there are any violations in the unplanned operations; The line inspection mechanism includes line positioning technology and remote sensing cutting technology; wherein, The line positioning technology includes a passive positioning mechanism and an active determination mechanism. The active determination mechanism performs initial positioning of the transmission line through a pre-loaded transmission line map to generate an initial distribution map of the transmission line. The passive positioning mechanism is used to identify branch circuits based on the initial distribution map of the transmission line, determine passive transmission lines, and add them to the initial distribution map of the transmission line to generate a transmission line inspection map. Remote sensing cutting technology is used to perform remote sensing image cutting of the transmission nodes of the transmission lines after the initial distribution map of the transmission lines is determined. The remote sensing image of the transmission nodes after cutting is used to check for random lines, and branch circuits are identified based on the results of the inspection.

2. A multi-dimensional monitoring system for unplanned operation of a power transmission line as claimed in claim 1, characterized in that: The transmission line inspection comprises the following steps: According to the transmission line inspection map, a node response mechanism is constructed; The response nodes in the node response mechanism correspond to the circuit nodes in the transmission line; According to the node response mechanism, the main inspection response task mechanism and auxiliary inspection identification mechanism are constructed; The main inspection response task mechanism is used to inspect the transmission line and generate corresponding response signals when the inspection passes through each circuit node; The auxiliary inspection identification mechanism is used to upload the remote sensing images between adjacent inspection points to the cloud database according to the response signal, and to perform rough identification of the operation points through the operation identification mechanism of the cloud database to determine whether there are unplanned operation points in the transmission line.

3. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 2, characterized in that: The identification step of the job identification mechanism includes: Preset job identification items; wherein, The job identification items include a person identification item and a device identification item; According to the job identification items, the remote sensing images are split into portraits and equipment; Based on the separated equipment and portraits, it is determined in the cloud database whether there is a circuit fault at the corresponding location. If there is a circuit fault, it is marked as an unplanned operation point.

4. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 1, characterized in that: The high-resolution equipment includes: high-resolution satellites, high-resolution inspection drones, high-resolution cameras and high-resolution scanners; High-resolution satellites are positioning devices that operate without a plan; High-resolution inspection drones are multi-dimensional monitoring equipment; High-resolution cameras and high-resolution scanners are auxiliary data acquisition devices.

5. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 1, characterized in that: The supervision data includes operation supervision data, line operation data and line environment data; wherein, Operation monitoring data refers to the manual operation data and machine operation data during the operation process; Line operation data include transmission line power voltage data; The line environment data includes line foreign matter data, line insulator defect data, and line component defect data.

6. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 5, characterized in that: The obtaining of the supervision data of the unplanned operation point includes: Pre-set multi-dimensional full-scenario modeling operation standards, data standards and multi-dimensional supervision angles; Call high-resolution equipment to obtain the first operation data of unplanned operation points from a multi-dimensional supervision perspective; Screening the first operation data according to the data standard, and determining the screened second operation data; The second operation data is behavior-classified, and after the classification, a plurality of different types of supervision data are generated.

7. A multi-dimensional monitoring system for unplanned operation of a power transmission line as claimed in claim 1, characterized in that: The full scene modeling includes: Obtain scene data of unplanned operation points, and construct a multi-dimensional scene model in the cloud server through scene elements; According to the scene data, set the scene reference objects, and build a multi-dimensional operation point model based on the scene reference objects; Convert scene data into scene point cloud data and determine the point cloud coordinates of each scene element; According to the point cloud coordinates, scene elements are implanted in the multi-dimensional operation point model to generate a multi-dimensional full-scene modeling model of the unplanned operation point, and the unplanned operation data is converted.

8. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 7, characterized in that: The unplanned operation data conversion includes: Determine the real-time job type based on the multi-dimensional full-scenario modeling model; According to the real-time job type, the current job behavior is divided in the preset job database to generate multiple behavior identification items; According to the behavior identification items, a data conversion mechanism for the multi-dimensional full-scenario modeling model is constructed, and the full-scenario modeling data with corresponding behavior key features is generated into a corresponding behavior feature determination mechanism according to the behavior type; Based on the behavior feature judgment mechanism, unplanned operation data conversion is carried out.

9. A multi-dimensional stereoscopic monitoring system for unplanned operation of a power transmission line as claimed in claim 1, characterized in that: The supervision and management module includes: Type determination unit: used to obtain unplanned operation data, extract behavior features, and sequentially combine multiple behavior features to determine the operation type; Rule setting unit: determines the corresponding standard operation behavior according to the sequential combination of behavior characteristics, and sets the behavior rules under the current operation type; Violation judgment unit: It is used to build a fitting response mechanism for unplanned operation data according to the operation behavior according to the behavioral criteria. When there is an operation behavior without a fitting response, the corresponding operation behavior is judged as a violation.