A production process for prefabricated lightweight high-strength concrete segments for wind power
By fixing the claw limiting steel bar frame and shaking vibrator uniform concrete treatment, combined with the movable cutting barrel and spiral blade, the problems of uneven distribution of steel bars and concrete uniformity are solved, and the formation of prefabricated lightweight high-strength concrete pipes of wind power is improved. Strength and efficiency.
Patent Information
- Application Number
- CN202410179698.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-02-18
AI Technical Summary
During the production process of prefabricated reinforced concrete pipe sheets, the uneven distribution of the steel bar frame is not fixed and the molding strength is affected; the uniform distribution time is long when concrete is vibrating, and bubbles are difficult to discharge, which affects the molding efficiency and quality.
The steel bar frame is limited by fixed claws, and the concrete is evenly twitched by a shaking vibrator, combining a movable cutting barrel and spiral blade to improve the uniform distribution of concrete and bubble discharge efficiency.
Ensure the uniform distribution of the steel bar frame in the pipe sheet and improve the forming strength; accelerate the uniform distribution of concrete and bubble discharge, and improve the forming efficiency and quality.
Smart Images

Figure CN118144094B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of concrete segment production, and in particular to a production process for prefabricated lightweight and high-strength concrete segments for wind power. Background Art
[0002] Prefabricated lightweight high-strength concrete segments are arc-shaped components made of a mixture of materials such as cement, gravel, sand and water. They are usually made through the following steps: mold cleaning and oiling, mold assembly, steel skeleton and embedded parts installation, concrete pouring and vibration, concrete forming and plastering, steam curing, and inspection and repair. Prefabricated lightweight high-strength concrete segments are often used in urban drainage, electricity, petroleum, chemical and other fields due to their simple structure, strong durability, simple construction and wide range of applications.
[0003] The base used to support the wind turbine blades is made of prefabricated lightweight high-strength concrete segments spliced and bonded with adhesives. For example, the invention patent with publication number CN106584654A provides a production process for prefabricated reinforced concrete segments, the steps of which include: a. cleaning and oiling the mold; b. mold assembly; c. mold accuracy detection; d. installation of steel skeletons and embedded parts; e. concrete pouring and vibration, with the vibration time controlled at 4 to 10 minutes; f. concrete forming and finishing; g. steam curing of the segments, after the vibration is completed, the segment is left to stand for 3 to 4 hours before heating and steam curing begins. The steam curing of the segments is divided into four stages: static stop T, heating S, constant temperature H, and cooling J; h. demoulding of the segments; i. marking the segment numbers and inspecting the appearance of the segments for repair; j. water curing of the segments; k. storage of the segments. This patent application can save plant construction time, effectively shorten the time used for the entire construction period, and save plant construction costs; the fixed top mold is located in a specified position, which is conducive to the precise management of specified problem segments and can quickly determine the cause of the problem; it can produce high-quality tunnel shield reinforced concrete segments; and the construction operations are standardized, proceduralized and standardized.
[0004] However, the above patent application still has the following defects in the production process of prefabricated reinforced concrete segments: 1. The above patent application does not fix and limit the steel skeleton after it is placed, so that during the subsequent concrete pouring and vibration, the steel skeleton may shake relatively, affecting the position of the steel skeleton, resulting in uneven distribution of the steel skeleton inside the segment, thereby affecting the subsequent forming strength of the segment.
[0005] 2. When vibrating concrete, the concrete is vibrated only by vibration and other means, so that the concrete takes a long time to be evenly distributed inside the mold, and the bubbles inside the concrete are difficult to expel, resulting in a long time for the bubbles inside the concrete to be expelled, affecting the molding efficiency and molding quality of the pipe segment. Summary of the invention
[0006] In order to solve the above-mentioned technical problems, the present application provides a production process for prefabricated lightweight and high-strength concrete segments for wind power, adopting the following technical solution: a production process for prefabricated lightweight and high-strength concrete segments for wind power, S1: Pretreatment: clean and oil the mold set on the base, and place the steel skeleton and embedded parts inside the mold.
[0007] S2: Placement and installation: The steel frame is fixed and limited by two fixing claws set on the top of the base.
[0008] S3: Pouring and Vibration: Pour concrete into the mold through the discharge barrel provided above the base, and stir the concrete in the mold through the shaking vibrating rod provided above the base.
[0009] S4: Surface curing: The finished product obtained in S3 is subjected to surface curing and steam curing.
[0010] S5: demoulding inspection: demoulding the finished product obtained in S4 to obtain pipe segments, and inspecting and repairing the pipe segments, and finally storing the pipe segments in a unified manner.
[0011] Preferably, locking plates are slidably provided on both sides of the left and right ends of the upper end surface of the mold, fixed claws of L-shaped structure are provided on the upper end surface of the locking plate, the long half of the fixed claws are installed on the locking plate through a hinge, connecting protrusions are provided on the lower end surface of the locking plate, a return spring rod is installed between the connecting protrusion and the mold, front and rear symmetrical supporting protrusions are installed in the middle of the lower end surface of the base, a rotating shaft is installed between the supporting protrusions through bearings, fixed pulleys are installed in the middle of the left and right sides of the base, and traction ropes are installed on the locking plates, and the traction ropes are bypassed around the corresponding fixed pulleys at one end away from the locking plate on the same side and are wrapped around the rotating shaft.
[0012] Preferably, a lifting plate that moves up and down is provided above the mold, a shaking plate that moves left and right is provided at the lower end of the lifting plate, a plurality of arc rods evenly distributed from front to back are installed on the lower end surface of the shaking plate, a vibrating rod is fixed on the lower end surface of the arc rod, and a plurality of vibrating rods are evenly arranged along the circumference of the lower side wall of the arc rod.
[0013] Preferably, horizontal protrusions are installed in the middle of the front and rear sides of the mold, a lifting cylinder is installed on the upper end surface of the horizontal protrusion, a lifting block is installed on the upper end surface of the telescopic end of the lifting cylinder, and the front and rear sides of the lifting plate are respectively fixed on the lifting blocks on the same side, wherein the lower end surface of the lifting plate is an arc structure, the shaking plate is slidably arranged on the lower end surface of the lifting plate through a rectangular protrusion, and a triangular plate is installed on the upper end surface of the lifting plate.
[0014] Preferably, the upper end surface of the base is slidingly provided with a front-to-back symmetrical moving frame, and a unloading frame is commonly provided on the two moving frames. A plurality of unloading barrels evenly distributed from front to back are installed through the unloading frame, and a feeding barrel connected with the unloading barrel and opening upward is commonly installed on the upper end surface of the unloading barrel, and a rotating shaft extending forward and backward is installed inside the feeding barrel through a bearing, and a spiral blade is installed on the circumferential surface of the rotating shaft.
[0015] Preferably, the front and rear ends of the unloading rack pass through the corresponding moving rack and move up and down, vertical protrusions are installed at the front and rear ends of the lower end face of the unloading rack, left and right symmetrical support rods are installed on the front and rear sides of the upper end face of the base, and the upper end faces of the left and right support rods are jointly installed with a guide frame that matches the vertical protrusions on the same side, a fixed protrusion is installed on the opposite side of the moving rack, and a reset spring rod is jointly installed between the fixed protrusion and the unloading rack.
[0016] Preferably, a linkage frame is installed below the unloading rack, and an extension tube is fixedly arranged on the linkage frame and passes through it, and the extension tube is slidably matched with the unloading tube. A front-to-back symmetrical electric push rod is installed on the upper end surface of the unloading rack, and the telescopic end of the electric push rod passes through the unloading rack and is fixedly connected to the linkage frame.
[0017] Preferably, the mold is slidably arranged on the upper end surface of the base, and a limiting protrusion extending forward and backward and used for sliding cooperation with the mold is installed in the middle of the upper end surface of the base. Locking protrusions are installed on the front and rear sides of the mold and above the limiting protrusions. The locking protrusions and the limiting protrusions are jointly screwed with fastening bolts. A connecting vertical plate is installed on the front side of the upper end surface of the base, and a connecting spring rod is installed between the connecting vertical plate and the mold.
[0018] In summary, the present application includes at least one of the following beneficial technical effects:
[0019] 1. The two fixed claws designed in the present invention can limit the steel skeleton, so that in the subsequent process of pouring concrete, the steel skeleton will not move relatively due to the contact and collision of concrete, thereby ensuring the stability of the steel skeleton, and then making the steel skeleton evenly distributed in the pipe segment, thereby improving the forming strength of the pipe segment; the shaking vibrator can homogenize the concrete in the mold, avoid the existence of gaps in the concrete in the mold, improve the uniformity of the distribution of the concrete in the mold, and at the same time, the vibrator can speed up the discharge of bubbles in the concrete and improve the forming efficiency of the pipe segment.
[0020] 2. The vibrating rod designed in the present invention can also provide external force to the bubbles that are difficult to expel from the concrete during the shaking process, so that the bubbles inside the concrete can be completely expelled, thereby ensuring the molding quality of the pipe segment.
[0021] 3. The discharge barrel designed in the present invention that can move along the mold can ensure the uniformity of concrete during the discharge process, avoid the problem of concentrated feeding at a certain point of the mold resulting in a long concrete homogenization time, save concrete vibration time, and improve the forming efficiency of the pipe segment. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a process flow chart of the present invention for producing prefabricated lightweight high-strength concrete segments for wind power.
[0023] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention.
[0024] Figure 3 It is a bottom view of the three-dimensional installation structure among the base, the rotating shaft and the traction rope etc. of the present invention.
[0025] Figure 4 The present invention Figure 3 A partial enlarged view of point A.
[0026] Figure 5 It is a schematic diagram of the three-dimensional installation structure between the mold, the arc rod and the lifting plate of the present invention.
[0027] Figure 6 It is a schematic diagram of the three-dimensional installation structure between the base, the movable frame and the feeding barrel of the present invention.
[0028] Figure 7 It is a schematic diagram of the three-dimensional installation structure between the spiral blades, the rotating shaft and the feeding barrel of the present invention.
[0029] Figure 8 The present invention Figure 7 A partial enlarged view of point B.
[0030] Fig. 9 It is a schematic diagram of the three-dimensional installation structure between the connecting vertical plates, the connecting spring rods and the molds of the present invention.
[0031] Fig.10 The present invention Fig. 9 A partial enlarged view of point C.
[0032] Description of the reference numerals: 1. mold; 11. locking plate; 12. connecting protrusion; 13. return spring rod; 14. supporting protrusion; 15. rotating shaft; 16. fixed pulley; 17. traction rope; 18. lifting plate; 19. shaking plate; 10. arc rod; 110. horizontal protrusion; 111. lifting cylinder; 112. lifting block; 113. rectangular protrusion; 114. triangular plate; 2. fixed claw; 3. unloading barrel; 4. vibrating rod; 5 , base; 51, mobile frame; 52, unloading frame; 521, vertical protrusion; 522, support rod; 523, guide frame; 524, fixed protrusion; 525, reset spring rod; 526, linkage frame; 527, extension tube; 528, electric push rod; 53, feeding tube; 54, rotating shaft; 55, spiral blade; 56, limiting protrusion; 57, locking protrusion; 58, fastening bolt; 59, connecting spring rod; 50, connecting vertical plate. DETAILED DESCRIPTION
[0033] The following is combined with Figures 1 to 10 This application is described in further detail.
[0034] The embodiment of the present application discloses a production process for prefabricated lightweight and high-strength concrete segments for wind power. The process can limit the steel skeleton so that the steel skeleton will not move relative to the concrete due to contact and collision during the subsequent pouring of concrete, thereby ensuring the stability of the steel skeleton. At the same time, the concrete can be homogenized to avoid gaps in the concrete, improve the uniformity of concrete distribution, and accelerate the discharge of bubbles in the concrete, thereby improving the forming efficiency of the segments.
[0035] Embodiment 1:
[0036] See also Figure 1 as well as Figure 2 A production process for prefabricated lightweight high-strength concrete segments for wind power, the steps of which are: S1: pretreatment: cleaning and oiling the mold 1 set on the base 5, and placing the steel skeleton and embedded parts inside the mold 1.
[0037] S2: Placement and installation: The steel bar skeleton is fixed and limited by two fixing claws 2 arranged above the base 5.
[0038] S3: pouring and vibrating: concrete is poured into the mold 1 through the discharge barrel 3 arranged above the base 5, and the concrete in the mold 1 is stirred by the shaking vibrating rod 4 arranged above the base 5.
[0039] S4: Surface curing: The finished product obtained in S3 is subjected to surface curing and steam curing.
[0040] S5: demoulding inspection: demoulding the finished product obtained in S4 to obtain pipe segments, and inspecting and repairing the pipe segments, and finally storing the pipe segments in a unified manner.
[0041] In the initial state, the vibrating rod 4 is located outside the mold 1, and the discharge barrel 3 is located on the right side above the base 5. The two fixed claws 2 cooperate with each other to limit the steel skeleton, so that in the subsequent pouring of concrete, the steel skeleton will not move relative to each other due to contact and collision with the concrete, thereby ensuring the stability of the steel skeleton, and then making the steel skeleton evenly distributed in the pipe segment, thereby improving the forming strength of the pipe segment; the shaking vibrating rod 4 can homogenize the concrete in the mold 1, avoid gaps in the concrete in the mold 1, and improve the uniformity of the distribution of the concrete in the mold 1. At the same time, the vibrating rod 4 can accelerate the discharge of bubbles in the concrete and improve the forming efficiency of the pipe segment.
[0042] See also Figure 3 as well as Figure 4 , locking plates 11 are slidably provided on both sides of the upper end surface of the mold 1, and a fixing claw 2 of an L-shaped structure is provided on the upper end surface of the locking plate 11. The long half of the fixing claw 2 is installed on the locking plate 11 through a hinge, and a connecting protrusion 12 is provided on the lower end surface of the locking plate 11. A return spring rod 13 is installed between the connecting protrusion 12 and the mold 1 for resetting the locking plate 11. A front-to-back symmetrical supporting protrusion 14 is installed in the middle of the lower end surface of the base 5, and a rotating shaft 15 is installed between the supporting protrusions 14 through a bearing. Fixed pulleys 16 are installed in the middle of the left and right sides of the base 5, and the traction rope 17 is reversed. The locking plate 11 is installed with a traction rope 17, and the traction rope 17 is away from the locking plate 11 on the same side. The end of the traction rope 17 passes around the corresponding fixed pulley 16 and is wound around the rotating shaft 15.
[0043] Before placing the steel frame, the fixing claws 2 are rotated to the left and right sides of the mold 1 to avoid collision between the steel frame and the fixing claws 2 when placing the steel frame. During specific work, the steel frame is placed in the mold 1 and the fixing claws 2 are inserted into the frame. At this time, the rotating shaft 15 is driven to rotate by an external driving force (motor, etc.). During the rotation of the rotating shaft 15, the traction ropes 17 on the left and right sides are reeled in. During the reeling process of the traction rope 17, the locking plate 11 is driven to move through the fixed pulley 16. At this time, the return spring rod 13 is stretched, and the locking plate 11 drives the fixing claws 2 to lock the steel frame during the movement, thereby avoiding the shaking of the steel frame and ensuring the stability of the steel frame during concrete pouring.
[0044] When the concrete is poured and vibrated, the rotating shaft 15 is driven to reverse by an external driving force (motor, etc.), at which time the return spring rod 13 is reset, the fixing claw 2 and the steel frame are released from the limit, and then the fixing claw 2 is taken out of the concrete.
[0045] See also Figure 5A lifting plate 18 that moves up and down is arranged above the mold 1, which can drive the vibrating rod 4 to move up and down. A shaking plate 19 that moves left and right is arranged at the lower end of the lifting plate 18. A plurality of arc rods 10 evenly distributed from front to back are installed on the lower end surface of the shaking plate 19, and the arc rods 10 extend left and right. The vibrating rod 4 is fixed on the lower end surface of the arc rod 10, and a plurality of vibrating rods 4 are evenly arranged along the circumference of the lower side wall of the arc rod 10.
[0046] Continue reading Figure 5 , horizontal protrusions 110 are installed in the middle of the front and rear sides of the mold 1, and a lifting cylinder 111 is installed on the upper end surface of the horizontal protrusion 110 to drive the lifting plate 18 to move up and down. A lifting block 112 is installed on the upper end surface of the telescopic end of the lifting cylinder 111, and the front and rear sides of the lifting plate 18 are respectively fixed on the lifting block 112 on the same side, wherein the lower end surface of the lifting plate 18 is an arc structure, and the shaking plate 19 is slidably arranged on the lower end surface of the lifting plate 18 through a rectangular protrusion 113, and a triangular plate 114 is installed on the upper end surface of the lifting plate 18.
[0047] After the fixing claws 2 fix the steel frame, the lifting cylinder 111 is started to drive the lifting plate 18 to move downward through the lifting block 112. During the downward movement of the lifting plate 18, the vibrating rod 4 is driven to be inserted into the steel frame. The fixing claws 2 can align the gap of the steel frame with the vibrating rod 4 during the process of limiting and fixing the steel frame, so as to avoid the collision of the vibrating rod 4 with the steel frame during the downward movement.
[0048] See also Figure 6 as well as Figure 7 A front-to-rear symmetrical moving frame 51 is slidably provided on the upper end surface of the base 5, and a material discharge frame 52 is commonly provided on the two moving frames 51. A plurality of material discharge barrels 3 evenly distributed from front to rear are installed through the material discharge frame 52, and a feeding barrel 53 which is connected with the material discharge barrel 3 and opened upward is commonly installed on the upper end surface thereof. A rotating shaft 54 extending forward and backward is installed inside the feeding barrel 53 through a bearing, and a spiral blade 55 is installed on the circumferential surface of the rotating shaft 54, so as to transport and process the concrete inside the feeding barrel 53.
[0049] During specific operation, concrete is poured into the feeding barrel 53, and the movable frame 51 is driven to move from right to left by an external driving force (cylinder, etc.), and then the rotating shaft 54 is driven to rotate by an external drive (motor, etc.). During the rotation of the rotating shaft 54, the spiral blade 55 is driven to feed the concrete into the lower barrel 3. When the lower barrel 3 moves to the area surrounded by the steel skeleton, the concrete falls into the mold 1 through the lower barrel 3. The movable frame 51 moving left and right can drive the lower barrel 3 to move along the mold 1, avoiding the problem of concentrated feeding at a certain point of the mold 1 resulting in a long concrete homogenization time, saving concrete vibration time, and improving the forming efficiency of the pipe segment.
[0050] When the concrete falls into the mold 1, the external driving force (cylinder, etc.) cooperates with the rectangular protrusion 113 to drive the shaking plate 19 to shake slightly back and forth along the lower end surface of the lifting plate 18 (without colliding with the steel frame). During the reciprocating slight shaking of the shaking plate 19, the arc rod 10 drives the vibrating rod 4 to shake the concrete inside the steel frame, thereby homogenizing the concrete inside the mold 1 to avoid gaps in the concrete in the mold 1 and improve the uniformity of the distribution of the concrete in the mold 1. At the same time, the vibrating rod 4 can accelerate the discharge of bubbles in the concrete and improve the forming efficiency of the pipe segment.
[0051] When the lower barrel 3 passes over the lifting plate 18 and during the unloading process, the triangular plate 114 can guide the falling concrete to avoid the accumulation of concrete on the lifting plate 18, which would cause the lifting plate 18 to be subjected to excessive force and be prone to breakage, thereby increasing the service life of the lifting plate 18.
[0052] See also Fig. 9 as well as Fig.10 The mold 1 is slidably arranged on the upper end surface of the base 5. A limiting protrusion 56 extending forward and backward and used for slidingly cooperating with the mold 1 is installed in the middle of the upper end surface of the base 5 to prevent the mold 1 from moving left and right. Locking protrusions 57 are installed on the front and rear sides of the mold 1 and above the limiting protrusion 56. The locking protrusion 57 and the limiting protrusion 56 are screwed together with a fastening bolt 58 to fix the mold 1. A connecting vertical plate 50 is installed on the front side of the upper end surface of the base 5. A connecting spring rod 59 is installed between the connecting vertical plate 50 and the mold 1 for resetting the mold 1.
[0053] At the starting position, the fastening bolt 58 fixes the mold 1 on the limiting protrusion 56 through the locking protrusion 57 to ensure the stability of the mold 1 during the concrete pouring process. During specific operation, when the concrete fills the mold 1, the fastening bolt 58 is removed, and the mold 1 is pushed backward by external force (human push, etc.). At this time, the connecting spring rod 59 is stretched. When the mold 1 moves backward for a certain distance, the external force leaves the mold 1. At this time, the connecting spring rod 59 is reset and contracted to drive the mold 1 to move forward. Repeating the above actions can drive the mold 1 to move back and forth. During the reciprocating movement of the mold 1, the cooperation with the reciprocating vibrating rod 4 can ensure the concrete vibration effect, avoid the existence of gaps in the concrete in the mold 1, and improve the uniformity of the distribution of the concrete in the mold 1. At the same time, the vibrating rod 4 can accelerate the discharge of bubbles in the concrete and improve the forming efficiency of the pipe segment.
[0054] At this time, the lifting cylinder 111 is started to drive the vibrating rod 4 to leave the mold 1, and the concrete in the mold 1 is subjected to surface curing and demoulding detection.
[0055] Example 2: See Figures 6 to 8On the basis of the first embodiment, in order to ensure the uniform distribution of concrete in the mold 1 and avoid the possibility of splashing when concrete falls into the mold 1, the front and rear ends of the unloading rack 52 of the present invention pass through the corresponding moving rack 51 and move up and down, and vertical protrusions 521 are installed at both ends of the front and rear ends of the lower end face of the unloading rack 52, and left and right symmetrical support rods 522 are installed on the front and rear sides of the upper end face of the base 5. The upper end surfaces of the left and right support rods 522 are jointly installed with a guide frame 523 that cooperates with the vertical protrusion 521 on the same side, so that the vertical protrusion 521 drives the unloading rack 52 to move along the guide frame 523, and a fixed protrusion 524 is installed on the opposite side of the moving rack 51, and a return spring rod 525 is jointly installed between the fixed protrusion 524 and the unloading rack 52.
[0056] The guide frame 523 is an arc-shaped structure that opens downward and cooperates with the upper end surface of the mold 1. The middle part of the guide frame 523 is provided with a structure that makes way for the lifting plate 18 and protrudes upward. The right end of the guide frame 523 is provided with a horizontal section for placing the vertical protrusion 521. During specific operation, the vertical protrusion 521 is located on the horizontal section of the guide frame 523 in the initial state. When concrete needs to be poured, the mobile frame 51 moves from right to left. During the movement of the mobile frame 51, the vertical protrusion 521 moves along the guide frame 523. During the movement of the vertical protrusion 521, the unloading frame 52 and the unloading barrel 3 are always driven to move along the upper end surface of the mold 1, and the lower end of the unloading barrel 3 moves to the upper side of the steel frame, so as to avoid the possibility of splashing when the concrete falls into the mold 1 during the horizontal movement of the unloading barrel 3 from right to left, thereby improving the concrete dropping effect. The reset spring rod 525 resets the unloading frame 52 during the movement of the unloading frame 52.
[0057] A linkage frame 526 is installed below the unloading rack 52, and an extension tube 527 is fixedly set on the linkage frame 526 so that the unloading barrel 3 can be lengthened, and the extension tube 527 is slidably matched with the unloading barrel 3. A front-to-back symmetrical electric push rod 528 is installed on the upper end surface of the unloading rack 52, and the telescopic end of the electric push rod 528 passes through the unloading rack 52 and is fixedly connected to the linkage frame 526.
[0058] During specific operation, when the discharge barrel 3 moves to the area enclosed inside the steel frame, the electric push rod 528 is started to drive the extension barrel 527 to move downward and extend into the steel frame. At this time, the bottom of the discharge barrel 3 is close to the inner bottom surface of the mold 1. The discharge barrel 3 pours concrete into the mold 1 to further reduce the possibility of concrete splashing.
[0059] As concrete is poured, the electric push rod 528 is started to drive the extension tube 527 to move slowly upward through the linkage frame 526, so that the lower end of the extension tube 527 moves upward while unloading concrete, avoiding the lower end of the extension tube 527 being blocked during the continuous pouring of concrete, thereby improving the concrete dropping effect.
[0060] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0061] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A process for producing prefabricated lightweight high-strength concrete segments for wind power generation, comprising the following steps: S1: Pretreatment: cleaning and oiling the mold (1) disposed on the base (5), and placing the steel bar skeleton and embedded parts inside the mold (1); S2: Placement and installation: The steel bar skeleton is fixed and limited by two fixing claws (2) arranged above the base (5); S3: pouring and vibrating: pouring concrete into the mold (1) through a feed tube (3) disposed above the base (5), and stirring the concrete in the mold (1) through a vibrating vibrator (4) disposed above the base (5); S4: Surface curing: plastering and steam curing the finished product obtained in S3; S5: demoulding inspection: demoulding the finished product obtained in S4 to obtain pipe segments, inspecting and repairing the pipe segments, and finally storing the pipe segments in a unified manner; A lifting plate (18) that moves up and down is arranged above the mold (1), and a shaking plate (19) that moves left and right is arranged at the lower end of the lifting plate (18). A plurality of arc-shaped rods (10) that are evenly distributed from front to back are installed on the lower end surface of the shaking plate (19). A vibrating rod (4) is fixed on the lower end surface of the arc-shaped rod (10). During the reciprocating shaking process of the shaking plate (19), the arc-shaped rod (10) drives the vibrating rod (4) to shake the concrete inside the steel skeleton, and a plurality of vibrating rods (4) are evenly arranged along the circumference of the lower side wall of the arc-shaped rod (10); The mold (1) is slidably arranged on the upper end surface of the base (5), and a limiting protrusion (56) extending forward and backward and used for slidingly cooperating with the mold (1) is installed in the middle of the upper end surface of the base (5). Locking protrusions (57) are installed on both the front and rear sides of the mold (1) and above the limiting protrusions (56). The locking protrusions (57) and the limiting protrusions (56) are screwed together with fastening bolts (58). A connecting vertical plate (50) is installed on the front side of the upper end surface of the base (5), and a connecting spring rod (59) is installed between the connecting vertical plate (50) and the mold (1). During the reciprocating movement of the mold (1) forward and backward, the mold (1) cooperates with the reciprocating vibrating rod (4) to ensure the concrete vibration effect. The upper end surface of the base (5) is slidably provided with a front-to-back symmetrical moving frame (51), and a material discharge frame (52) is commonly provided on the two moving frames (51), and a plurality of material discharge barrels (3) evenly distributed from front to back are installed through the material discharge frame (52), and a feeding barrel (53) which is connected with the material discharge barrel (3) and opens upward is commonly installed on the upper end surface of the material discharge barrel (3), and a rotating shaft (54) extending forward and backward is installed inside the feeding barrel (53) through a bearing, and a spiral blade (55) is installed on the circumferential surface of the rotating shaft (54); The front and rear ends of the unloading rack (52) pass through the corresponding moving rack (51) and move up and down. The front and rear ends of the lower end face of the unloading rack (52) are both installed with vertical protrusions (521). The front and rear sides of the upper end face of the base (5) are installed with left-right symmetrical support rods (522). The upper end faces of the left and right support rods (522) are jointly installed with a guide frame (523) that matches the vertical protrusion (521) on the same side. A fixed protrusion (524) is installed on the opposite side of the moving rack (51). A return spring rod (525) is jointly installed between the fixed protrusion (524) and the unloading rack (52); The guide frame (523) is an arc-shaped structure with an opening downward and matched with the upper end surface of the mold (1). A structure for giving way to the lifting plate (18) and protruding upward is provided in the middle of the guide frame (523). A horizontal section for placing the vertical protrusion (521) is provided at the right end of the guide frame (523). In the initial state, the vertical protrusion (521) is located on the horizontal section of the guide frame (523). When concrete needs to be poured, the mobile frame (51) moves from right to left. During the movement of the mobile frame (51), the vertical protrusion (521) moves along the guide frame (523). During the movement of the vertical protrusion (521), the material discharge frame (52) and the material discharge barrel (3) are driven to always move along the upper end surface of the mold (1), and the lower end of the material discharge barrel (3) moves to the upper side of the steel frame, so as to prevent concrete from splashing when it falls into the mold (1) during the horizontal movement of the material discharge barrel (3) from right to left.
2. The process for producing prefabricated lightweight high-strength concrete segments for wind power according to claim 1, characterized in that: The upper end surface of the mold (1) is slidably provided with locking plates (11) on both sides, an L-shaped fixed claw (2) is arranged on the upper end surface of the locking plate (11), and the long half of the fixed claw (2) is installed on the locking plate (11) through a hinge. The lower end surface of the locking plate (11) is provided with a connecting protrusion (12), and a return spring rod (13) is installed between the connecting protrusion (12) and the mold (1). The middle part of the lower end surface of the base (5) is provided with a front-to-back symmetrical supporting protrusion (14), and a rotating shaft (15) is installed between the supporting protrusions (14) through a bearing. Fixed pulleys (16) are installed in the middle part of the left and right sides of the base (5), and a traction rope (17) is installed on the locking plate (11). The traction rope (17) is away from the locking plate (11) on the same side. The end of the traction rope (17) passes around the corresponding fixed pulley (16) and is wound around the rotating shaft (15).
3. The process for producing prefabricated lightweight high-strength concrete segments for wind power according to claim 1, characterized in that: The mold (1) is provided with a horizontal protrusion (110) in the middle of both the front and rear sides, a lifting cylinder (111) is provided on the upper end surface of the horizontal protrusion (110), a lifting block (112) is provided on the upper end surface of the telescopic end of the lifting cylinder (111), and the front and rear sides of the lifting plate (18) are respectively fixed on the lifting block (112) on the same side, wherein the lower end surface of the lifting plate (18) is an arc-shaped structure, the shaking plate (19) is slidably arranged on the lower end surface of the lifting plate (18) through a rectangular protrusion (113), and a triangular plate (114) is provided on the upper end surface of the lifting plate (18).
4. The process for producing prefabricated lightweight high-strength concrete segments for wind power according to claim 1, characterized in that: A linkage frame (526) is installed below the unloading frame (52), and an extension tube (527) is fixedly provided on the linkage frame (526) so as to pass through the linkage frame (526) and the extension tube (527) is slidably matched with the unloading tube (3). A front-to-back symmetrical electric push rod (528) is installed on the upper end surface of the unloading frame (52), and the telescopic end of the electric push rod (528) passes through the unloading frame (52) and is fixedly connected to the linkage frame (526).
Citation Information
Patent Citations
Production process for prefabricated reinforced concrete duct pieces
CN106584654A
Formula and production process for subway segment concrete
CN112025955A
Graded insertion type high-frequency vibrating cover plate for shield segment forming die
CN113997377A
A anti hook assembly that floats that is used for cast -in -place hollow superstructure board
CN205907878U
Board -like prefab individual layer reinforcing bar net piece positioner
CN207942552U