A stacking equipment for the production of aluminum-magnesium-carbon bricks
By using a clamping cylinder and spring-driven baffle design in aluminum-magnesium carbon brick palletization equipment, the wedge-shaped pallet cutting of the conveyor belt is avoided, the problem of conveyor belt damage in the prior art is solved, and the conveyor belt is extended Service life.
Patent Information
- Application Number
- CN202410468085.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-04-18
AI Technical Summary
The wedge-shaped pallets of existing aluminum-magnesium carbon brick palletization equipment are prone to cut damage to the conveyor belt during clamping, resulting in a shortening of the service life of the conveyor belt.
A palletizing equipment for the production of aluminum-magnesium carbon bricks was designed, and the clamping cylinder drive clamp is used for clamping, and the baffle is moved under the aluminum-magnesium carbon bricks during lifting to avoid direct contact with the conveyor belt. Contact to prevent cutting.
It effectively prevents the baffle from cutting damage to the conveyor belt and extends the service life of the conveyor belt.
Smart Images

Figure CN118164267B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of refractory material production, in particular to a stacking device for producing aluminum-magnesia-carbon bricks. Background Art
[0002] The production process of aluminum-magnesium-carbon bricks is roughly as follows: the granular raw materials and the binder are mixed evenly and put into a mold, and then pressed into shape by a pressure equipment. The formed aluminum-magnesium-carbon bricks are taken out of the mold and placed on a conveyor belt. The conveyor belt transports the aluminum-magnesium-carbon bricks to the storage workshop, where they are removed and stacked by the stacking equipment.
[0003] In the prior art, the stacking equipment used in the aluminum-magnesium-carbon brick storage workshop is usually composed of a hanger and a clamp, wherein the hanger controls the lifting and displacement of the clamp, and the clamp is used to take and place the aluminum-magnesium-carbon bricks. Figure 1 As shown, a common clamp for aluminum-magnesium-carbon brick stacking equipment includes a cylinder 101, two clamping plates 102, and two wedge-shaped support plates 103 for preventing falling off. When the clamp is clamping the aluminum-magnesium-carbon brick on the conveyor belt, the clamping plates 102 and the wedge-shaped support plates 103 are located on both sides of the aluminum-magnesium-carbon brick, and the bottom surface of the wedge-shaped support plate 103 is against the surface of the conveyor belt. The two clamping plates 102 are driven to approach each other by the cylinder 101, and the clamping plates 102 drive the wedge-shaped support plates 103 to be inserted between the aluminum-magnesium-carbon brick and the conveyor belt, thereby completing the clamping work. However, in the actual working process, since the acute angle end of the wedge-shaped support plate 103 is relatively sharp, when it is inserted between the aluminum-magnesium-carbon brick and the conveyor belt, the wedge-shaped support plate 103 may have a cutting effect on the conveyor belt. In the long-term production process, the cutting effect of the wedge-shaped support plate 103 on the conveyor belt is very likely to cause damage to the conveyor belt, thereby greatly reducing the service life of the conveyor belt. Summary of the invention
[0004] The purpose of the present invention is to solve the defect in the prior art that the clamps used in the stacking equipment may damage the conveyor belt, and to propose a stacking equipment for the production of aluminum-magnesium-carbon bricks.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A stacking device for the production of aluminum-magnesium-carbon bricks is designed, comprising a clamping cylinder, a connecting piece is fixedly connected to the output end of the clamping cylinder, a mounting plate is fixedly connected to the connecting piece, a guide groove is provided on the mounting plate, a guide block is slidably matched in the guide groove, a first spring is provided in the guide groove to apply elastic force to the guide block, a slide groove is fixedly connected to the bottom of the guide block, a sliding seat is slidably matched in the slide groove, a baffle is fixedly connected to the sliding seat, a sliding block is slidably matched on the mounting plate, a clamping plate is fixedly connected to the sliding block, and a second spring is provided on the mounting plate to apply elastic force to the clamping plate.
[0007] Preferably, a limit block is provided in the guide groove to limit the maximum sliding distance of the guide block in the guide groove.
[0008] Preferably, an anti-slip belt is provided on the guide block, and brake blocks are fixedly connected to both sides of the sliding block, and the brake blocks can be against the anti-slip belt.
[0009] Preferably, a driving structure is provided on the slide groove to drive the sliding seat to slide in the slide groove, and the driving structure includes a guide rod, which is fixedly connected to the slide groove, and a connecting plate is slidably matched on the guide rod, and a first rack is fixedly connected to the connecting plate, and a mounting ear is fixedly connected to the slide groove, and a large gear and a small gear are rotatably installed on the mounting ear, and the large gear matches the small gear, and the large gear is meshed with the first rack, and a second rack is fixedly connected to the sliding seat, and the small gear is meshed with the second rack.
[0010] Preferably, a push rod is fixedly connected to the connecting plate, and a slot is provided on the baffle plate, and the push rod can be slidably fitted in the slot.
[0011] The present invention proposes a stacking device for the production of aluminum-magnesium-carbon bricks, which has the beneficial effect that when the clamp used in the stacking device provided by the present invention clamps the aluminum-magnesium-carbon bricks on the conveyor belt, it drives two clamping plates to clamp and fix the aluminum-magnesium-carbon bricks through a clamping cylinder. When the clamp is lifted by a hoist, gravity and the elastic force of the spring are used as power to move the baffle to the bottom of the aluminum-magnesium-carbon brick. During the lifting process, the bottom surface of the aluminum-magnesium-carbon brick will be separated from the conveyor belt, so that the baffle will not cut the conveyor belt when inserted between the conveyor belt and the aluminum-magnesium-carbon brick, so as to prevent the baffle from damaging the conveyor belt, thereby extending the service life of the conveyor belt. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A clamp used in aluminum-magnesium-carbon brick stacking equipment in the prior art.
[0013] Figure 2 This is a schematic structural diagram of a stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention.
[0014] Figure 3 This is a schematic structural diagram of a mounting plate of a stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention.
[0015] Figure 4 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Figure 3 main view.
[0016] Figure 5 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Figure 4 AA section view.
[0017] Figure 6 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Figure 4 Middle BB section.
[0018] Figure 7 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Figure 4 Mid-CC section view.
[0019] Figure 8 This is a structural schematic diagram of the working state of a stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention.
[0020] Fig. 9 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Figure 8 Main view.
[0021] Fig.10 A stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention Fig. 9 Right view of .
[0022] Fig.11 This is a schematic structural diagram of a baffle of a stacking device for producing aluminum-magnesium-carbon bricks proposed by the present invention.
[0023] In the figure:
[0024] 101, cylinder; 102, clamping plate; 103, wedge-shaped support plate;
[0025] 1. Clamping cylinder; 2. Connecting piece; 3. Mounting plate; 4. Guide groove; 5. Guide block; 6. Slide groove; 7. First spring; 8. Sliding seat; 9. Baffle; 901. Notch; 10. Clamping plate; 11. Second spring; 12. Sliding block; 13. Brake block; 14. Anti-slip belt; 15. Limiting block; 16. Guide rod; 17. Connecting plate; 18. Push rod; 19. First rack; 20. Mounting ear; 21. Large gear; 22. Small gear; 23. Second rack. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0027] Reference Figure 1-5A stacking device for the production of aluminum-magnesium-carbon bricks comprises a clamping cylinder 1, a connecting piece 2 is fixedly connected to the output end of the clamping cylinder 1, a mounting plate 3 is fixedly connected to the connecting piece 2, a guide groove 4 is provided on the mounting plate 3, a guide block 5 is slidably matched in the guide groove 4, a first spring 7 is provided in the guide groove 4 to apply elastic force to the guide block 5, a slide groove 6 is fixedly connected to the bottom of the guide block 5, a sliding seat 8 is slidably matched in the slide groove 6, a baffle 9 is fixedly connected to the sliding seat 8, a sliding block 12 is slidably matched on the mounting plate 3, a clamping plate 10 is fixedly connected to the sliding block 12, and a second spring 11 is provided on the mounting plate 3 to apply elastic force to the clamping plate 10.
[0028] The clamping cylinder 1 controls the spacing between the connecting parts 2 on both sides of the cylinder, thereby driving the mounting plate 3 to move through the connecting parts 2. During the displacement process, the mounting plate 3 drives the clamping plate 10 to move, thereby changing the spacing between the two clamping plates 10 to clamp the aluminum-magnesium-carbon bricks.
[0029] When the clamping plate 10 clamps the aluminum-magnesium-carbon brick, the clamping plate 10 will be subjected to a reverse force given by the aluminum-magnesium-carbon brick. Under the action of the reverse force, the clamping plate 10 will compress the second spring 11 and drive the slider 12 to slide on the mounting plate 3.
[0030] like Figure 5-7 As shown, an anti-skid belt 14 is provided on the guide block 5 , and brake blocks 13 are fixedly connected to both sides of the slider 12 , and the brake blocks 13 can be abutted against the anti-skid belt 14 .
[0031] When the splint 10 is not subjected to the reverse force given by the aluminum-magnesium-carbon brick, the splint 10 is only subjected to the elastic force given by the second spring 11 in the horizontal direction. The splint 10 will generate a pulling force on the slider 12. Under the action of the pulling force, the slider 12 makes the brake block 13 rest against the anti-slip belt 14, thereby preventing the guide block 5 from sliding in the guide groove 4.
[0032] like Fig. 9 As shown, a limit block 15 is provided in the guide groove 4 to limit the maximum sliding distance of the guide block 5 in the guide groove 4 .
[0033] When the clamping plate 10 is subjected to the reverse force given by the aluminum-magnesium-carbon brick, the clamping plate 10 will compress the second spring 11 under the action of the reverse force and drive the slider 12 to slide on the mounting plate 3. During the sliding process of the slider 12, the brake block 13 is driven away from the anti-slip belt 14. At this time, the guide block 5 can slide freely in the guide groove 4. The limiting effect of the limiting block 15 on the guide block 5 can control the maximum distance of the guide block 5 when sliding.
[0034] like Figure 6-Figure 9As shown, a driving structure is provided on the slide groove 6 to drive the sliding seat 8 to slide in the slide groove 6, and the driving structure includes a guide rod 16, which is fixedly connected to the slide groove 6, and a connecting plate 17 is slidably matched on the guide rod 16, and a first rack 19 is fixedly connected to the connecting plate 17, and a mounting ear 20 is fixedly connected to the slide groove 6, and a large gear 21 and a small gear 22 are rotatably installed on the mounting ear 20, and the large gear 21 matches the small gear 22, and the large gear 21 is meshed with the first rack 19, and a second rack 23 is fixedly connected to the sliding seat 8, and the small gear 22 is meshed with the second rack 23.
[0035] like Figure 6-9 As shown, when the connecting plate 17 slides on the guide rod 16, the connecting plate 17 will drive the first rack 19 to move, the movement of the first rack 19 will drive the large gear 21 to rotate, the rotation of the large gear 21 will drive the small gear 22 to rotate, the rotation of the small gear 22 will drive the second rack 23 to move, the displacement of the second rack 23 will drive the sliding seat 8 to slide in the sliding groove 6, and the sliding seat 8 will drive the baffle 9 to move horizontally during the sliding process.
[0036] like Figure 8-11 As shown, a push rod 18 is fixedly connected to the connecting plate 17 , and a notch 901 is provided on the baffle plate 9 , in which the push rod 18 can be slidably fitted.
[0037] The top rod 18 is fixedly connected to the connecting plate 17, and when one of them moves, the other one will also move accordingly.
[0038] Working principle and workflow:
[0039] The device is installed on a sling, and the lifting and displacement of the device are controlled by the sling.
[0040] like Figure 5 As shown, in the initial state, the device is suspended in the air by a sling. At this time, when the splint 10 is not subjected to the reverse force given by the aluminum-magnesium-carbon brick, the splint 10 is only subjected to the elastic force given by the second spring 11 in the horizontal direction. The splint 10 will generate a pulling force on the slider 12. Under the action of the pulling force, the slider 12 makes the brake block 13 rest against the anti-slip belt 14, thereby preventing the guide block 5 from sliding in the guide groove 4, and at this time the guide block 5 is located at the highest point in the guide groove 4.
[0041] like Figure 5 As shown, in the initial state, the bottom height of the baffle 9 is higher than the bottom height of the clamping plate 10;
[0042] like Figure 5 As shown, in the initial state, the bottom surface of the push rod 18 is flush with the bottom surface of the baffle 9.
[0043] When clamping the aluminum-magnesium-carbon bricks on the conveyor belt, the steps are as follows:
[0044] S1: The sling controls the movement of the device so that the two clamping plates 10 are located on both sides of the aluminum-magnesium-carbon bricks;
[0045] S2: The clamping cylinder 1 is started, and the clamping cylinder 1 controls the distance between the connecting parts 2 to decrease. The connecting parts 2 drive the mounting plate 3 to move, and the distance between the mounting plates 3 will also decrease accordingly. The mounting plate 3 drives the clamping plate 10 to move, so that the distance between the two clamping plates 10 decreases. The distance between the two clamping plates 10 decreases and the aluminum-magnesium-carbon bricks are clamped;
[0046] S2: Lift the device together with the aluminum-magnesium-carbon bricks into the air by lifting the hoist;
[0047] S21: During the lifting process of the hoist, the clamping plate 10 is subjected to the reverse force given by the aluminum-magnesium-carbon brick. Driven by the reverse force, the clamping plate 10 compresses the second spring 11 and drives the slider 12 to slide on the mounting plate 3. During the sliding process of the slider 12, the brake block 13 is driven away from the anti-slip belt 14. At this time, the guide block 5 can slide freely in the guide groove 4;
[0048] S22: Since the guide block 5 can slide freely in the guide groove 4 at this time, as the sling drives the device to rise, under the action of gravity and the elastic force of the first spring 7, the guide block 5 slides down in the guide groove 4, and due to the limiting action of the limiting block 15, the guide block 5 slides down to the lowest point in the guide groove 4;
[0049] S23: When the guide block 5 slides down in the guide groove 4, the guide block 5 drives the slide groove 6 to move downward, the slide groove 6 drives the sliding seat 8 to move downward, and the sliding seat 8 drives the baffle plate 9 to move downward. When the guide block 5 is located at the lowest point in the guide groove 4, the height of the upper surface of the baffle plate 9 is lower than the height of the bottom of the clamping plate 10. At this time, the baffle plate 9 is located below the clamping plate 10;
[0050] S24: Fig.10 As shown, when the baffle 9 is located below the clamping plate 10, under the action of gravity, the connecting plate 17 and the push rod 18 move downward, the connecting plate 17 moves downward to drive the first rack 19 to move downward, the first rack 19 moves downward to drive the large gear 21 to rotate clockwise, the large gear 21 drives the small gear 22 to rotate counterclockwise, the small gear 22 rotates counterclockwise to drive the second rack 23 to move rightward, the second rack 23 moves rightward to drive the sliding seat 8 to move rightward in the sliding groove 6, and the sliding seat 8 drives the baffle 9 to move rightward;
[0051] S25: When the connecting plate 17 moves up and down on the guide rod 16 to the lowest point, the baffle 9 moves right to the maximum distance. At this time, the baffle 9 is located below the aluminum-magnesium-carbon bricks to protect the aluminum-magnesium-carbon bricks and prevent them from falling.
[0052] S26: When the connecting plate 17 moves up and down on the guide rod 16 to the lowest point, the bottom end of the top rod 18 passes through the notch 901 and is located below the baffle 9;
[0053] S3: The hoist transfers the device together with the aluminum-magnesium-carbon bricks to the top of the stack, and then the hoist controls the device together with the aluminum-magnesium-carbon bricks to move downward for stacking.
[0054] S31: Fig.10 As shown, at this time, the bottom end of the push rod 18 is the lowest point of the device. When the device moves downward together with the aluminum-magnesium-carbon bricks, the push rod 18 first contacts the ground and is subjected to a reverse force in the direction of the push rod 18 from the ground, so that the push rod 18 moves upward.
[0055] S32: Fig.10 As shown, the push rod 18 moves upward to drive the connecting plate 17 to move upward to reset, the connecting plate 17 moves upward to drive the first rack 19 to move upward to reset, the first rack 19 moves upward to drive the large gear 21 to rotate counterclockwise to reset, the large gear 21 drives the small gear 22 to rotate clockwise to reset, the small gear 22 rotates clockwise to drive the sliding seat 8 to move left to reset, the sliding seat 8 drives the baffle 9 to move left to reset, so that the baffle 9 is pulled out from under the aluminum-magnesium-carbon brick;
[0056] S33: When the top rod 18 moves upward and resets until the bottom surface of the top rod 18 is flush with the bottom surface of the baffle 9, at this time, the bottom surface of the baffle 9 will also contact the ground. As the sling continues to drive the device downward, the baffle 9 will also move upward under the reverse force given by the ground. The upward movement of the baffle 9 drives the sliding seat 8 to move upward, the upward movement of the sliding seat 8 drives the sliding groove 6 to move upward, and the upward movement of the sliding groove 6 drives the guide block 5 to move upward, so that the guide block 5 moves upward in the guide groove 4 and resets;
[0057] S34: After the guide block 5 is reset in the guide groove 4, the clamping cylinder 1 is started again to increase the distance between the two mounting plates 3. During the process of increasing the distance between the two mounting plates 3, the distance between the clamping plate 10 and the mounting plate 3 increases due to the elastic force of the second spring 11. During the process of increasing the distance between the clamping plate 10 and the mounting plate 3, the slider 12 moves relative to the mounting plate 3 until it is reset. When the slider 12 is reset, the slider 12 drives the brake block 13 to rest against the anti-slip belt 14 on the guide block 5 again. The brake block 13 brakes the guide block 5 again to prevent the guide block 5 from sliding in the guide groove 4.
[0058] S35: After the brake block 13 brakes the guide block 5 again, as the distance between the two mounting plates 3 continues to increase, the distance between the two clamping plates 10 also begins to increase, so that the clamping plates 10 are separated from the aluminum-magnesium-carbon bricks, and the aluminum-magnesium-carbon bricks fall onto the stacked ground.
[0059] S4: Start the hoist again, and the hoist drives the device to rise into the air again, and the resetting work of the device is completed at this time.
[0060] S5: Repeat the steps in S1-S4 above until all the aluminum-magnesium-carbon bricks are stacked.
[0061] Compared with the prior art, the clamp used in the stacking equipment provided by the present invention clamps the aluminum-magnesium-carbon bricks on the conveyor belt by driving two clamping plates 10 through the clamping cylinder 1 to clamp and fix the aluminum-magnesium-carbon bricks. When the clamp is lifted by the hoist, gravity and the elastic force of the spring are used as power to move the baffle 9 to the bottom of the aluminum-magnesium-carbon bricks. During the lifting process, the bottom surface of the aluminum-magnesium-carbon bricks will be separated from the conveyor belt, so that the baffle 9 will not cut the conveyor belt when inserted between the conveyor belt and the aluminum-magnesium-carbon bricks, so as to prevent the baffle 9 from damaging the conveyor belt, thereby extending the service life of the conveyor belt.
[0062] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A stacking equipment for the production of aluminum-magnesium-carbon bricks, It is characterized in that The invention comprises a clamping cylinder (1), wherein a connecting member (2) is fixedly connected to the output end of the clamping cylinder (1), a mounting plate (3) is fixedly connected to the connecting member (2), a guide groove (4) is provided on the mounting plate (3), a guide block (5) is slidably matched in the guide groove (4), a first spring (7) is provided in the guide groove (4) to apply elastic force to the guide block (5), a slide groove (6) is fixedly connected to the bottom of the guide block (5), a sliding seat (8) is slidably matched in the slide groove (6), a baffle (9) is fixedly connected to the sliding seat (8), a sliding block (12) is slidably matched on the mounting plate (3), a clamping plate (10) is fixedly connected to the sliding block (12), and a second spring (11) is provided on the mounting plate (3) to apply elastic force to the clamping plate (10); The slide groove (6) is provided with a driving structure to drive the sliding seat (8) to slide in the slide groove (6), and the driving structure includes a guide rod (16), the guide rod (16) is fixedly connected to the slide groove (6), and a connecting plate (17) is slidably matched on the guide rod (16), and a first rack (19) is fixedly connected to the connecting plate (17), and a mounting ear piece (20) is fixedly connected to the slide groove (6), and a large gear (21) and a small gear (22) are rotatably mounted on the mounting ear piece (20), and the large gear (21) matches the small gear (22), and the large gear (21) is meshed with the first rack (19), and a second rack (23) is fixedly connected to the sliding seat (8), and the small gear (22) is meshed with the second rack (23); The guide block (5) is provided with an anti-skid belt (14), and a brake block (13) is fixedly connected to one side of the slider (12), and the brake block (13) can be pressed against the anti-skid belt (14); A push rod (18) is fixedly connected to the connecting plate (17), a notch (901) is provided on the baffle plate (9), and the push rod (18) can be slidably fitted in the notch (901); The specific clamping steps are as follows: S1: the sling controls the movement of the device so that the two clamping plates (10) are located on both sides of the aluminum-magnesium-carbon brick; S11: The clamping cylinder (1) is started, and the clamping cylinder (1) controls the distance between the connecting parts (2) to decrease, and the connecting parts (2) drive the mounting plate (3) to move, and the distance between the mounting plates (3) also decreases accordingly, and the mounting plate (3) drives the clamping plate (10) to move, so that the distance between the two clamping plates (10) decreases, and the distance between the two clamping plates (10) decreases and the aluminum-magnesium-carbon bricks are clamped; S2: Lift the equipment together with the aluminum-magnesium-carbon bricks into the air with the lifting device; S21: During the lifting process of the lifting device, the clamping plate (10) is subjected to the reverse force given by the aluminum-magnesium-carbon brick. Driven by the reverse force, the clamping plate (10) will compress the second spring (11) and drive the slider (12) to slide on the mounting plate (3). During the sliding process of the slider (12), the brake block (13) is driven away from the anti-slip belt (14). At this time, the guide block (5) can slide freely in the guide groove (4); S22: Since the guide block (5) can slide freely in the guide groove (4) at this time, as the sling drives the device to rise, under the action of gravity and the elastic force of the first spring (7), the guide block (5) slides down in the guide groove (4); S23: When the guide block (5) slides down in the guide groove (4), the guide block (5) drives the slide groove (6) to move downward, and the downward movement of the slide groove (6) drives the sliding seat (8) to move downward, and the downward movement of the sliding seat (8) drives the baffle plate (9) to move downward. When the guide block (5) is located at the lowest point in the guide groove (4), the height of the upper surface of the baffle plate (9) is lower than the height of the bottom of the clamping plate (10), and the baffle plate (9) is located below the clamping plate (10); S24: When the baffle (9) is located below the clamping plate (10), under the action of gravity, the connecting plate (17) and the push rod (18) move downward, the connecting plate (17) moves downward and drives the first rack (19) to move downward, the first rack (19) moves downward and drives the large gear (21) to rotate clockwise, the large gear (21) drives the small gear (22) to rotate counterclockwise, the small gear (22) rotates counterclockwise and drives the second rack (23) to move rightward, the second rack (23) moves rightward and drives the sliding seat (8) to move rightward in the sliding groove (6), and the sliding seat (8) drives the baffle (9) to move rightward; S25: When the connecting plate (17) moves up and down on the guide rod (16) to the lowest point, the baffle (9) moves rightward to the maximum distance. At this time, the baffle (9) is located below the aluminum-magnesium-carbon bricks to protect the aluminum-magnesium-carbon bricks; S26: When the connecting plate (17) moves up and down on the guide rod (16) to the lowest point, the bottom end of the top rod (18) passes through the notch (901) and is located below the baffle (9); S3: The hoist transfers the equipment together with the aluminum-magnesium-carbon bricks to the top of the stack, and then the hoist controls the equipment together with the aluminum-magnesium-carbon bricks to move downward for stacking; S31: At this time, the bottom end of the push rod (18) is the lowest point of the device. When the device and the aluminum-magnesium-carbon bricks move downward, the push rod (18) first contacts the ground and is subjected to a reverse force in the direction of the push rod (18) from the ground, so that the push rod (18) moves upward. S32: the top rod (18) moves upward and drives the connecting plate (17) to move upward to reset, the connecting plate (17) moves upward and drives the first rack (19) to move upward to reset, the first rack (19) moves upward and drives the large gear (21) to rotate counterclockwise to reset, the large gear (21) drives the small gear (22) to rotate clockwise to reset, the small gear (22) rotates clockwise to drive the sliding seat (8) to move left to reset, the sliding seat (8) drives the baffle (9) to move left to reset, so that the baffle (9) is pulled out from under the aluminum-magnesium-carbon brick; S33: When the top rod (18) moves upward and resets until the bottom surface of the top rod (18) is flush with the bottom surface of the baffle (9), the bottom surface of the baffle (9) will also contact the ground. As the sling continues to drive the device downward, the baffle (9) will also move upward under the reverse force given by the ground. The baffle (9) moves upward to drive the sliding seat (8) to move upward, and the sliding seat (8) moves upward to drive the slide groove (6) to move upward. The slide groove (6) moves upward to drive the guide block (5) to move upward, so that the guide block (5) moves upward in the guide groove (4) and resets. S34: After the guide block (5) is reset in the guide groove (4), the clamping cylinder (1) is started again to increase the distance between the two mounting plates (3). During the process of increasing the distance between the two mounting plates (3), the distance between the clamping plate (10) and the mounting plate (3) increases due to the elastic force of the second spring (11). During the process of increasing the distance between the clamping plate (10) and the mounting plate (3), the slider (12) moves relative to the mounting plate (3) until it is reset. When the slider (12) is reset, the slider (12) drives the brake block (13) to rest against the anti-skid belt (14) on the guide block (5) again, and the brake block (13) brakes the guide block (5) again to prevent the guide block (5) from sliding in the guide groove (4); S35: After the brake block (13) brakes the guide block (5) again, as the distance between the two mounting plates (3) continues to increase, the distance between the two clamping plates (10) also begins to increase, so that the clamping plates (10) are separated from the aluminum-magnesium-carbon bricks, and the aluminum-magnesium-carbon bricks fall onto the stacked ground; S4: Start the spreader again, and the spreader drives the equipment to rise into the air again, and the resetting work of the equipment is completed at this time; S5: Repeat the steps in S1-S4 above until all the aluminum-magnesium-carbon bricks are stacked.
2. The stacking equipment for producing aluminum-magnesium-carbon bricks according to claim 1, It is characterized in that A limit block (15) is provided in the guide groove (4) to limit the maximum sliding distance of the guide block (5) in the guide groove (4).